TEST PROJECT REFRIGERATION AND AIR CONDITIONING

Size: px
Start display at page:

Download "TEST PROJECT REFRIGERATION AND AIR CONDITIONING"

Transcription

1 TEST PROJECT REFRIGERATION AND AIR CONDITIONING WorldSkills International Secretariat Keizersgracht 62-64, 1015 CS Amsterdam, The Netherlands Tel: , Fax: WSC2015

2 TEST PROJECT MODULES There are Three (3) Modules to complete in the 20 hour competition. A) Component Fabrication 13.5 Marks Time Allowed 3.0 Hrs B) Refrigeration System Installation and Commissioning 49 Marks Time Allowed 13.0 Hrs C) Air Conditioning System Fault Find, Repair and Commissioning 37.5 Marks Time Allowed 4.0 Hrs TEST PROJECT DOCUMENTATION Section 1: Competitor Instructions Competition Details This contains all of the competition details, except for the specific information on the refrigeration and air conditioning systems to be used in the competition. This will be provided to all participating countries approximately six (6) months prior to the competition to enable it to be translated into the Competitor s language and passed onto the Competitor. This document will be superseded by Section 4 prior to the competition. Section 2: Competitor Instructions Manufacturers, Equipment and Materials Manuals This contains the full operating manuals, wiring diagrams and specifications of the major equipment to be used in the competition. This will be provided to all participating countries approximately three (3) months prior to the prior to the competition to enable it to be translated into the Competitor s language and passed onto Competitors, all information will be available online via the WorldSkills Infrastructure List for competition Section 3: Test Project Drawings The drawings will be distributed with Section 1. The drawings may be altered as part of the 30% change to the project which will take place at the competition. The drawings are issued as a guide only and are finalized at the competition. Section 4: Competition Instructions This document supersedes Section 1 and will be provided to all Competitors at the Information Session prior to start of the competition and will include a 30% change to the test project described in Section 1, it will include or provide reference to: The Competitor s competition timetable Health, safety and environment requirements Category competition rules and procedures Refrigeration Competition Standards Additional information Section 5: Marking Scale The marking summary will be distributed with Section 2 approximately three months prior to the competition. The marking scale detail will be finalized by the Experts prior to the competition dependent on the availability of materials and equipment supplied by the host nation and the 30% change to the Test Project. 2 of 19

3 TIME ALLOWED FOR EACH MODULE To enable all Competitors complete the Modules they will carry out the work at the same time. The Competition Time Table in the Competitors Instructions Section 4 must be followed. Where system pipe work is installed, the Competitor is free to work autonomously in a safe manner with all relevant assessment being completed outside of competition time, pressure transducers may be used to ensure minimum pressure test and evacuation requirements are met by the Competitors. Competitors MUST perform all electrical testing in the presence of an Expert prior to energizing the installation. CHECK POINTS An important part of this competition are the procedures used to carry out various tasks. Therefore, at various points in this competition you must ask an Expert to observe and check your work. Once checked the Expert must place their initial in a progress box as per the example below. Electrical Installation Testing Expert 1 Initials and Country CM AUS Expert 2 Initials and Country MF UK Expert 3 Initials and Country DO IE INFORMATION CONCERNING SAFETY REQUIREMENTS During the competition, all Competitors MUST follow the safety rules listed below along with the local Health, Safety and Environment requirements of the host country. SHOES Fully enclosed work shoes or boots must be worn at all times. CLOTHING Legs must be covered at all times, by either long work trousers or overalls. Upper body must be covered at all times. Arms must be covered with long sleeves, when brazing and using refrigerant. CLEAR SAFETY GLASSES Must be worn when necessary to protect your eyes. Must be worn when brazing, soldering, filing, reaming, hack-sawing, drilling, grinding and using refrigerant, dry nitrogen and compressed air. GLOVES Must be worn when brazing and using refrigerants 3 of 19

4 ELECTRICAL Competitors must NOT switch on (apply power) to any electrical equipment until they receive permission from an Expert, except for hand power tools. Any Competitor that is identified as not wearing the correct safety attire or is engaging in any unsafe practice will be stopped and advised on the correct safety practice by an Expert. If the unsafe working practice is repeated the Expert may STOP the Competitor and report the issue to the chief or Deputy Chief Expert. The Competitor may not be allowed to continue until the safety issue is resolved. The Competitor will lose associated safety marks. If the Competitor continues to ignore the safe working practice they may be removed from the competition area for a safety briefing for ten minute by the host country health, safety and environment representative, the time taken to complete the safety briefing will be considered to be a part of the Competitor s competition time. 4 of 19

5 COMPETITION DETAILS - MODULE A COMPONENT FABRICATION MAXIMUM TIME ALLOWED - 3 HOURS 13.5 MARKS SCOPE The Competitors are required to fabricate a copper tubing circuit for the secondary refrigerant circuit that will form the ice rink surface, this coil will be incorporated into the design of the system at a later stage. The coil is constructed using 13 lengths of 1/2 copper tubing, fed by a 7/8 copper header as per supplied drawing. This entire unit will sit in the bottom of a tank and form the secondary refrigerant coil for the ice rink being installed in Module B. TIMING Competitors are to all complete the ice rink piping at the same time in the morning of C1, this will allow for marking to take place in the afternoon, any Competitors that do not finish Module A in the allocated time will be required to submit the unfinished project for assessment. Competitors will receive additional points for completing this module in less than the allocated time (as defined in the marking summary) providing that the fabricated component does not leak when pressure tested. ASSESSMENT Competitors will be assessed as per technical description, the marking scale will reflect dimensions and tolerances for assessment in addition to the quality of brazed joints. Fabricated component will be tested for leaks by pressure testing with dry nitrogen to ensure no leaks are present. Any Competitor who does not complete Module A in the required time (3 hours) will be allowed to complete it after it is assessed and handed back to them during Module B no additional time will be allowed for either Module A or Module B for those who do not complete the fabrication in the allotted time. DRAWINGS R.001 Coil of Ice Rink COMPONENTS Components to be installed will include the following; Pre manufactured 7/8 header copper pipework 5 of 19

6 COMPETITION DETAILS - MODULE B REFRIGERATION SYSTEM INSTALLATION AND COMMISSIONING MAXIMUM TIME ALLOWED - 13 HOURS 49.0 MARKS SCOPE Competitors are to install a refrigeration system to refrigerate a small scale ice rink, the system uses a secondary refrigerant to remove heat from the ice rink and mimics a small industrial plant commonly used to carry out a much larger duty. The Competitors are required to use the supplied components along with the coil fabricated in Module A to form a low pressure flooded system that utilizes a brazed plate heat exchanger to refrigerate propylene glycol to remove heat from water to form the ice rink. A small condensing unit is used to draw vapour off the top of the vessel and compress and condense the refrigerant, an electric expansion valve is used to meter the refrigerant into the vessel. Two level switches are used to control the liquid level inside the vessel, a capacity control valve is used to ensure suction pressure does not drop below design. Refrigerant is R134a. Secondary refrigerant circuit for ice rink is to be constructed using copper pipe, copper pipe will be used to form the secondary refrigerant pipe circuit joining heat exchanger, ice rink coil and glycol tank with a flexible hose connection used to connect the copper pipe to the circulating pump. Competitors are required to connect all components to a prewired electrical panel TIMING Competitors are to all complete the installation over C1, C2 and C3. The secondary refrigerant circuit (glycol) pipework must be completed by the end of C2 for assessment overnight, the entire installation will be completed by the end of C3 for assessment. The completed project with ice rink frozen may be left running and displayed on C4. ASSESSMENT Competitors will be assessed as per technical description with particular weighting on the commissioning and operation of the project. DRAWINGS R.002 Primary refrigerant flow circuit R.003 Secondary refrigerant flow circuit R.004 General Installation View R.005 Glycol Tank and Ice Rink R.006 Low Pressure Vessel R.007 Electrical Control Panel R.008 Electrical Control Diagram R.009 Electrical Power Diagram R.010 Electrical Terminal Connections 6 of 19

7 COMPONENTS Components to be installed will include the following; Basic air cooled condensing unit with liquid receiver ad oil separator Low pressure vessel Capacity control valve (Danfoss KVC) Electric expansion valve (Danfoss AKV) 2 x liquid level switches (Reed Switch) Brazed plate heat exchanger (Danfoss) Circulating pump (submersible type) Electrical switchboard Temperature controller (Danfoss) Data logging pressure transducer (Siemens) 7 of 19

8 SYSTEM DESIGN SPECIFICATIONS The following system design specifications for the installation should be used for commissioning and control setting and are as follows: SYSTEM SPECIFICATIONS Primary refrigerant = R134a Secondary refrigerant = Propylene Glycol (40% by volume) Maximum ambient temperature = 35 C Db, 28 C Wb Design saturated suction temperature = -15 C Suction line pressure drop = 1 K Design Glycol temperature = -10 C supply to ice rink CONTROL AND SAFETY SETTING Low Pressure Controller cut off 5K lower than design saturated suction temperature (SST). Low Pressure Controller cut in at -10 C saturated suction temperature Capacity control valve to maintain -15 C saturated suction temperature High Pressure cut out the system when the Condensing temperature reaches 55 C Temperature controller cut out at -15 C Temperature controller cut in at -10 C Temperature sensor to be submerged in glycol tank SYSTEM OPERATION Low level liquid level sensor to cycle on electric expansion valve High level liquid level sensor to cycle off electric expansion valve Temperature controller to cycle off expansion valve if glycol tank temperature falls below -15 C Temperature controller to cycle on expansion valve if glycol tank temperature rises above -10 C Capacity control valve set to maintain -15 C saturated suction temperature and limit temperature cycling to safety only (unit should run continually and not cycle on and off) 8 of 19

9 INSTALL AND COMMISSION REFRIGERATION SYSTEM All Competitors will be required to perform the following tasks to complete this module, task 6 has an Expert sign off sheet which needs to be filled in and signed prior to moving ahead on this task 1. INSTALL REFRIGERATION SYSTEM All Competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and WorldSkills International Standard for Refrigeration and Air Conditioning. Refer to the following project drawings to assist to complete this task R.002 Primary refrigerant flow circuit R.003 Secondary refrigerant flow circuit R.004 General Installation View R.005 Glycol Tank and Ice Rink R.006 Low Pressure Vessel 2. INSTALL ELECTRICAL SYSTEM All Competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and WorldSkills International Standard for Refrigeration and Air Conditioning. All cabling to be installed in double insulated, flexible cable or single insulated cable protected by conduit, no single insulated cable is to be left without additional protection. All temperature probe cables to be protected by conduit. Refer to the following project drawings to assist to complete this task R.007 Electrical Control Panel R.008 Electrical Control Diagram R.009 Electrical Power Diagram R.010 Electrical Terminal Connections 3. PRESSURE TEST SYSTEM Carry out a staged pressure test of the primary refrigeration system (R134a) to a value of 9.5 bar gauge (950kpa). The pressure test point should not drop from the starting point in the fifteen (15) minutes after the pressure test is isolated from the Nitrogen cylinder. If the pressure test has not been achieved, the Competitor can continue to fix the leak and achieve the pressure test, however the full mark for Pressure Test will be lost. The pressure test will be monitored remotely via a data logging process to ensure all Competitors achieve the required pressure and standing time. 9 of 19

10 To be filled in by COMPETITORS PRESSURE TEST ATTEMPT #1 Starting test pressure: Starting Time: kpa psi Test pressure after standing time: kpa Finishing Time: psi PRESSURE TEST ATTEMPT #2 Starting test pressure: Starting Time: kpa psi Test pressure after standing time: kpa Finishing Time: psi 4. EVACUATION Evacuate the primary refrigeration system (R134a) in accordance with manufacturer s instructions and WorldSkills standards using the Deep Vacuum Method to hold a vacuum of at least 1000 microns (130Pa absolute) of mercury. The evacuation point should not rise to a value greater than 1000 microns in the Ten (10) minutes after the vacuum pump is isolated from the system under test. 10 of 19

11 To be filled in by EXPERTS ONLY EVACUATION TEST ATTEMPT #1 Starting evacuation level: Starting Time: microns Evacuation level after standing time: Finishing Time: microns EVACUATION TEST ATTEMPT #2 Starting evacuation level: Starting Time: microns Evacuation level after standing time: Finishing Time: Comments: microns Refrigeration Evacuation Test Expert 1 Initials & Country: Expert 2 Initials & Country: Expert 3 Initials & Country: 5. CHARGING WITH REFRIGERANT PRIMARY CIRCUIT Charge the primary refrigeration system (R134a) with the required weight of refrigerant to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices. To be filled in by EXPERTS ONLY Bottle weight prior to charging: kg lb Bottle weight at completion of charging: kg Comments: lb 6. CHARGING WITH REFRIGERANT SECONDARY CIRCUIT Charge the secondary refrigeration system (propylene glycol) with the required quantity of glycol and water to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices. 11 of 19

12 To be filled in by EXPERTS ONLY Bottle volume prior to charging: L fl oz Bottle volume at completion of charging: L Comments: fl oz 7. ELECTRICAL TESTING Under the supervision of an Expert, perform all necessary safety checks to ensure the Test Project is safe to energize. PLEASE FILL IN THE EXPERT CHECK POINT SHEET BELOW BEFORE PROCEEDING ANY FURTHER To be filled in by EXPERTS ONLY Competitor Name: Competitor Country: All wiring inspected by Expert prior to energizing: Yes Electrical safety checks performed prior to energizing: Yes Comments: Refrigeration System Electrical Test Expert 1 Initials & Country: Expert 2 Initials & Country: Expert 3 Initials & Country: 12 of 19

13 8. COMMISSION THE SYSTEM Competitors are to commission the system for operation in accordance with the design specifications supplied. Please fill out the following commissioning document with the system fully operational and as close to operating temperatures as possible. Please indicate units by checking appropriate boxes. Ambient Temperature: Celsius Fahrenheit Refrigerant Type: Mass of Refrigerant Charge: grams pounds Suction Pressure: kpa psi Discharge Pressure: kpa psi Condenser Subcooling: Total System Superheat: Kelvin Fahrenheit Degrees Kelvin Fahrenheit Degrees LP Control Cut In: kpa psi LP Control Cut Out: kpa psi HP Control Cut Out: kpa psi HP Control Cut In: kpa psi Capacity regulator setting: Celsius Fahrenheit Glycol supply to ice rink temp: Celcius Fahrenheit Glycol return from ice rink temp: Celsius Fahrenheit Condensing Unit Operating Current: Glycol Pump Operating Current: Amps Amps 13 of 19

14 COMPETITION DETAILS - MODULE C AIR CONDITIONING SYSTEM FAULT FIND, REPAIR & COMMISSIONING MAXIMUM TIME ALLOWED - 4 HOURS 37.5 MARKS SCOPE Competitors will be provided with an air conditioning system that has been leak tested and verified to have no leaks, pressure testing of the system is not required at any point in time. Competitors will be required to identify 1x electrical fault and 1x refrigeration system fault on the supplied air conditioning systems, once faults have been identified the Competitors will be required to repair the faults including full refrigerant recovery and recharging of refrigerant charge to manufacturer s specifications. Competitors will then be required to commission the system and plot operating conditions on a psychometric chart. TIMING Competitors are all to complete this module on C4 at the same time ASSESSMENT Competitors will be assessed as per technical description with particular weighting on the fault finding and commissioning of the project. DRAWINGS R.011 Cradle for AC Unit R.012 Psychrometric chart (SI units) R.013 Psychrometric chart (IP units) 1. FAULT FINDING All Competitors are required to identify 1 x electrical fault and 1 x refrigeration system fault with the operation of the unit, the root cause must be found and repaired. Once the fault is identified Competitors are to fill in this sheet of paper identifying what they believe to be the fault with the equipment. An Expert then needs to sign this sheet of paper. All fault finding MUST be done with all relevant safety rules adhered to. Once faults are found and recorded the Competitor is free to continue by running the unit and progressing to the next stage of the Module. 14 of 19

15 ELECTRICAL SYSTEM FAULT Please write down what the fault with the equipment is and any supporting information that indicates what the fault was. Please indicate what repairs need to be done to the system to return it to normal operation REFRIGERATION SYSTEM FAULT Please write down what the fault with the equipment is and any supporting information that indicates what the fault was. Please indicate what repairs need to be done to the system to return it to normal operation 2. REPAIR SYSTEM All Competitors are required to repair the faults they have identified on the unit, refrigerant must be removed from the system to repair the refrigeration fault. All necessary materials will be provided to repair the equipment and return it to an operating state All repairs MUST be done with all relevant safety rules adhered to. 15 of 19

16 3. RECLAIM SYSTEM All Competitors are required to repair the fault they have identified on the unit, the refrigerant will need to be removed from the system to complete the repair then the system pressure tested, evacuated and recharged with refrigerant. All necessary materials will be provided to repair the equipment and return it to an operating state. All repairs MUST be done with all relevant safety rules adhered to. To be filled in by EXPERTS ONLY Reclaim System Reclaim bottle weight prior to reclaim: kg lb Reclaim bottle weight at completion of reclaim: kg lb Comments: 4. EVACUATION Evacuate the refrigeration system in accordance with manufacturer s instructions and WorldSkills standards using the Deep Vacuum Method to hold a vacuum of at least 1000 microns (130Pa absolute) of mercury. The evacuation point should not rise to a value greater than 1000 microns in the Ten (10) minutes after the vacuum pump is isolated from the system under test. To be filled in by EXPERTS ONLY Evacuation Test Starting evacuation level: microns Starting Time: Evacuation level after standing time: microns Finishing Time: Comments: 16 of 19

17 Air Conditioning System Evacuation Expert 1 Initials & Country: Expert 2 Initials & Country: Expert 3 Initials & Country: 5. CHARGING WITH REFRIGERANT Charge the refrigeration system with the required weight of refrigerant to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices. To be filled in by EXPERTS ONLY Refrigerant Charging Bottle weight prior to charging: kg lb Bottle weight at completion of charging: kg lb Comments: 17 of 19

18 6. COMMISSION THE SYSTEM Competitors are to commission the system for operation in accordance with the manufacturers specifications supplied. Please fill out the following commissioning document with the system fully operational, on Cooling mode, indoor fan on highest speed and as close to operating temperatures as possible. Please indicate units by checking appropriate boxes. Ambient Temperature: Celsius Fahrenheit Return Air Dry Bulb Temperature: Celsius Fahrenheit Return Air Wet Bulb Temperature: Celsius Fahrenheit Supply Air Dry Bulb Temperature: Celsius Fahrenheit Supply Air Wet Bulb Temperature: Celsius Fahrenheit Air Velocity of indoor unit: m/sec ft/sec Air Volume of indoor unit: m3/sec cfm Indoor Fan Speed: High Medium Low Mode of Operation: Cooling Heating Refrigerant Type: Mass of Refrigerant Charge: grams pounds Suction Pressure: kpa psi Total System Superheat: Compressor Operating Current: Indoor Fan Operating Current: Kelvin Fahrenheit Degrees Amps Amps 18 of 19

19 7. COOLING PROCESS Plot the supply and return air conditions as specified in your commissioning report on the psychrometric chart supplied. Join the supply and return conditions with a line as per below example. 19 of 19

20 COIL OF THE ICE RINK Ø1/2" 300 Ø 1/2" Ø 1/2" Ø 1/2" Detail 1 Ø 7/8" Ø 7/8" R001 - Coil of the Ice Rink.dwg

21 PRIMARY REFRIGERANT FLOW CIRCUIT Pressure Transducer TEE 3/8"x3/8"x3/8" Condenser 3/8" 3/8" 3/8" Liquid Tank Ball Valve Access TEE 3/8"x3/8"x1/4" HP Filter Dryer 3/8" 3/8" 3/8" 3/8" 1/2" 1/4" Sleeve 3/8" x 1/2" Hot Gas Bypass Regulator Sight glass 3/8" Electric Expansion Valve TEE 1/2"x1/2x1/4" 1/2" 1/2" Low Pressure Vessel 7/8" Q4 Q1 Sleeve 7/8"x1/2" Plate Heat Exchanger Oil Separator Dual Pressure Switch 1/4" LP 1/4" 1/2" 1/2" 1/2" 1/2" Q3 Q2 Hermetic Compressor 3/8" Suction Accumulator TEE 1/2"x1/2x1/4" TEE 1/2"x1/2x1/2" Service Valve R002 - Primary Refrigerant Flow Circuit.dwg

22 SECONDARY REFRIGERANT FLOW CIRCUIT Plate Heat Exchanger Q4 Q1 5/8" 5/8" 1/2" 1/2" Q3 Q2 5/8" 1/2" 5/8" 1/2" Water Pump Glycol Tank 1/2" Coil of Ice Rink Ice Rink Tank R003 - Secondary Refrigerant Flow Circuit.dwg

23 CRADLE Condensing Unit Ice Rink Tank Glycol Tank R004 - General Installation View.dwg

24 ICE RINK AND GLYCOL TANK Ice Rink Tank Glycol Tank R005 - Glycol_Ice Rink Tank.dwg

25 12, ,75 30,75 A ( 1 : 1 ) 91,7 01 A 19,25 12,75 12,75 A 13/16-20 UENF- B B 3/8"- 16G UNC A SENSORES ,63 3/8"- 16G UNC C C 12,75 -TODAS AS SOLDAS DEVERÃO SER DO TIPO PRATA 45% D ISOMÉTRICO PROJETO: NOME: WorldSkills 2015 Evaporador Inundado MATHEUS DIOMAR SOUZA LIMA AUTORIZADO POR: FOLHA: PAULO VINÍCIUS 1 /1 UNIDADE: ESCALA: DATA: mm 1:2 02/2015 D A3

26 ELECTRICAL CONTROL PANEL ELETRONIC TEMPERATURE CONTROLLER DRILLING FOR THE ELETRONIC TEMPERATURE CONTROLLER RIVET FIXING RAIL FOR THE COMPONENTS DIN 35mm FRONT VIEW DRILLING OF THE COVER MOUNTING PLATE R007 - Electrical Control Panel.dwg

27 ELECTRICAL CONTROL DIAGRAM L1(R) RED 1mm² ELETRONIC REFRIGERATION CONTROLLER DANFOSS ERC 102C TEMPERATURE CONTROL DEFROSTING PROBE COMPRESSOR DEFROST FAN D(S1) C(S2) B(S3) A(DI) SS S1 - TEMPERATURE CONTROL 13 S2 - DEFROSTING PROBE SS3 HLS LLS K SS K OR LP DPS HP C A B D SENSORS L2(S) PRETO 1mm² K3 A1 A2 K2 A1 A2 H1 K1 A1 A2 H2 H3 H4 H5 R008 - Electrical Control Diagram.dwg

28 ELECTRICAL CONTROL POWER DIAGRAM 2 ~ 220V 60Hz L1(R) L2(S) PE BLACK 2,5mm² RED 2,5mm² GREEN 2,5mm² Q1 Q RED 1mm² L1(R) K1 A1 A K2 A1 A K3 A1 A OR BLACK 1mm² L2(S) 2 ~ 220V 60Hz M 2 ~ CONDENSING UNIT GLYCOL PUMP AKV R009 - Electrical Control Power Diagram.dwg

29 ELECTRICAL TERMINAL CONNECTION LEGEND L1(R) - PHASE L2(S) - PHASE PE - EARTH CONDENSING UNIT (R) CONDENSING UNIT (S) CONDENSING UNIT (PE) GLYCOL PUMP (R) GLYCOL PUMP (S) DUAL PRESSURE SWITCH - A DUAL PRESSURE SWITCH - B DUAL PRESSURE SWITCH - C DUAL PRESSURE SWITCH - D S1 - TEMPERATURE CONTROL S1 - TEMPERATURE CONTROL S2 - DEFROSTING PROBE S2 - DEFROSTING PROBE AKV (R) AKV (S) AKV (PE) HIGHER LIQUID LEVEL SWITCH HIGHER LIQUID LEVEL SWITCH LOW LIQUID LEVEL SWITCH LOW LIQUID LEVEL SWITCH BLACK - BLACK FLEXIBLE CABLE RED - RED FLEXIBLE CABLE GREEN - GRREN FLEXIBLE CABLE Q1 - BIPOLAR BREAKER FOR POWER CIRCUIT Q2 - BIPOLAR BRAKER FOR COMMAND CIRCUIT K1 - POWER CONTACTOR OF CONDENSING UNIT K2 - CONTACTOR OF GLYCOL PUMP K2 - CONTACTOR OF AKV EXPANSION VALVE OR - OVERLOAD RELAY OF CONDENSING UNIT AKV - COIL OF ELETRONIC EXPANSION VALVE HLS - HIGHER LIQUID LEVEL SWITCH OF LOW PRESSURE VESSEL LLS - LOWER LIQUID LEVEL SWITCH OF LOW PRESSURE VESSEL SS1 - SELECTOR SWITCH OF CONDENSING UNIT SS2 - SELECTOR SWITCH OF GLYCOL PUMP SS3 - SELECTOR SWITCH OF AKV H1 - DASH LAMP FOR "TURNED OFF CONDENSING UNIT" H2 - DASH LAMP FOR "TURNED ON CONDENSING UNIT" H3 - DASH LAMP FOR "HIGH PRESSURE" H4 - DASH LAMP FOR "LOW PRESSURE" H5 - DASH LAMP FOR "OVERLOAD CONDENSING UNIT" DPS - DUAL PRESSURE SWITCH R010 - Electrical Terminal Connection.dwg

30 CRADLE FOR AC UNIT 7/8" 1/8" 7/8" R011 - Cradle for AC Unit.dwg

31 DRY BULB TEMPERATURE - C HUMIDITY RATIO - GRAMS OF MOISTURE PER KILOGRAM OF DRY AIR ENTHALPY - KJ PER KG OF DRY AIR PSYCHROMETRIC CHART Sea Level BAROMETRIC PRESSURE 760 mm of Mercury WET BULB TEMPERATURE - C ENTHALPY - KJ PER KG OF DRY AIR SATURATION TEMPERATURE - C %.90 SPECIFIC VOLUME m³/kg OF DRY AIR.88 80% 20 70% 60% % 40% % % % RELATIVE HUMIDITY.78 Linric Company Psychrometric Chart, VAPOR PRESSURE - MM OF MERCURY DEW POINT - C

32 DRY BULB TEMPERATURE - F HUMIDITY RATIO - GRAINS OF MOISTURE PER POUND OF DRY AIR PSYCHROMETRIC CHART Sea Level BAROMETRIC PRESSURE inches of Mercury WET BULB TEMPERATURE - F ENTHALPY - BTU PER POUND OF DRY AIR SATURATION TEMPERATURE - F SPECIFIC VOLUME ft³/lb OF DRY AIR 65 90% % 70% 60% % 40% 30% % 30 10% RELATIVE HUMIDITY 12.5 Linric Company Psychrometric Chart, VAPOR PRESSURE - INCHES OF MERCURY DEW POINT - F

Skills Canada National Competition Instructions and Competition Details 38 Refrigeration and Air Conditioning / Post - Secondary May 27-30, 2015 -

Skills Canada National Competition Instructions and Competition Details 38 Refrigeration and Air Conditioning / Post - Secondary May 27-30, 2015 - Skills Canada National Competition Instructions and Competition Details / Post - Secondary May 27-30, 2015 - Saskatoon 1. Test Project Details This project is designed to test the range of skills used

More information

Rusty Walker, Corporate Trainer Hill PHOENIX

Rusty Walker, Corporate Trainer Hill PHOENIX Refrigeration 101 Rusty Walker, Corporate Trainer Hill PHOENIX Compressor Basic Refrigeration Cycle Evaporator Condenser / Receiver Expansion Device Vapor Compression Cycle Cooling by the removal of heat

More information

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

MAC-120HE-01 Air-Cooled Chiller

MAC-120HE-01 Air-Cooled Chiller MAC-120HE-01 Air-Cooled Chiller 10 Ton / 120,000 BTUH Air-Cooled Chiller 208/230-1-50/60 1 HVAC Guide Specifications Air-Cooled Liquid Chiller Nominal Size: 10 Tons Multiaqua Model Number: MAC-120HE-01

More information

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm. Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water

More information

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX Fan Coil Replacement Coil Kit EBX & EBXX These instructions must be read and understood completely before attempting installation. These instructions covers the installation of replacement coil kit into

More information

Test Code: 8297 / Version 1

Test Code: 8297 / Version 1 Blueprint HVAC Maintenance Technology PA Test Code: 8297 / Version 1 Copyright 2014. All Rights Reserved. General Assessment Information HVAC Maintenance Technology PA Blueprint Contents General Assessment

More information

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS 2009 Tecumseh Products Company. All rights reserved. Page 1 of 8 Refrigerant R22 is widely used for residential and commercial air conditioning, as

More information

COMPRESSOR REPLACEMENT PROCEDURE

COMPRESSOR REPLACEMENT PROCEDURE COMPRESSOR REPLACEMENT PROCEDURE Bard Manufacturing Company Bryan, Ohio 43506 Since 1914...Moving ahead just as planned Manual No.: 2100-003E Supersedes 2100-003D File: Volume I, Tab 1 Date: 06-25-02 Copyright

More information

It will be available soon as an 8.5 X 11 paperback. For easier navigation through the e book, use the table of contents.

It will be available soon as an 8.5 X 11 paperback. For easier navigation through the e book, use the table of contents. The System Evaluation Manual and Chiller Evaluation Manual have been revised and combined into this new book; the Air Conditioning and Refrigeration System Evaluation Guide. It will be available soon as

More information

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions Refrigerant Changeover Guidelines R-22 to R-407C Leading the Industry with Environmentally Responsible Refrigerant Solutions Emerson Climate CFC Technologies, Inc. does not advocate the HCFC wholesale

More information

Characteristics of Evaporators

Characteristics of Evaporators Characteristics of Evaporators Roger D. Holder, CM, MSME 10-28-2003 Heat or Energy In this paper, we will discuss the characteristics of an evaporator coil. The variance of the operational condenses of

More information

TEST REPORT #44. System Drop-in Tests of Refrigerant R-32 in Single Packaged Vertical Heat Pump (SPVH)

TEST REPORT #44. System Drop-in Tests of Refrigerant R-32 in Single Packaged Vertical Heat Pump (SPVH) Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Low-GWP Alternative Refrigerants Evaluation Program (Low-GWP AREP) TEST REPORT #44 System Drop-in Tests of Refrigerant R-32 in Single Packaged

More information

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING INDEX 1. Introduction 3 2. Objectives 3 3. Employment Opportunity 4 4. Course Structure 4 5. Entry Qualification 4 6. List

More information

CLOSE CONTROL SYSTEM. PFD series provide you with highly reliable computer room cooling system. High Reliability

CLOSE CONTROL SYSTEM. PFD series provide you with highly reliable computer room cooling system. High Reliability PFD-P250VM-E PUHY-P250YJM-A(-BS) PUHY-P500YSJM-A(-BS) PQHY-P250YHM-A CLOSE CONTROL SYSTEM MITSUBISHI ELECTRIC s Close Control System (PFD series) is specifically designed for computer rooms, laboratories

More information

MAKING MODERN LIVING POSSIBLE. Wiring Diagram DHP-R. www.heating.danfoss.com

MAKING MODERN LIVING POSSIBLE. Wiring Diagram DHP-R. www.heating.danfoss.com MAKING MODERN LIVING POSSIBLE Wiring Diagram www.heating.danfoss.com Danfoss A/S is not liable or bound by warranty if these instructions are not adhered to during installation or service. The English

More information

Refrigeration Basics 101. By: Eric Nelson

Refrigeration Basics 101. By: Eric Nelson Refrigeration Basics 101 By: Eric Nelson Basics Refrigeration is the removal of heat from a material or space, so that it s temperature is lower than that of it s surroundings. When refrigerant absorbs

More information

SERVICE MANUAL OUTDOOR UNIT. No. OBH590 REVISED EDITION-B. Models HFC

SERVICE MANUAL OUTDOOR UNIT. No. OBH590 REVISED EDITION-B. Models HFC SPLIT-TYPE AIR CONDITIONERS Revision B: MUZ-EF25/35/42/50VE - E2 and MUZ-EF25/35VEH - E2 have been added. Please void OBH590 REVISED EDITION-A. OUTDOOR UNIT SERVICE MANUAL HFC utilized R410A. OBH590 REVISED

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

Troubleshooting an Air Conditioning system. R D Holder Eng. Roger D Holder MSME

Troubleshooting an Air Conditioning system. R D Holder Eng. Roger D Holder MSME Troubleshooting an Air Conditioning system R D Holder Eng. Roger D Holder MSME Troubleshooting of an air conditioning system is a step by step procedure. I have found that a 4 step procedure is the best

More information

A/C refrigerant system, overview

A/C refrigerant system, overview Page 1 of 19 87-18 A/C refrigerant system, overview A/C refrigerant system, identification Typical A/C refrigerant system with expansion valve and receiver drier 1 - Evaporator 2 - Expansion valve 3 -

More information

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions Refrigerant Changeover Guidelines R-22 to R-407C Leading the Industry with Environmentally Responsible Refrigerant Solutions Copeland does not CFC advocate the wholesale changeover of HCFC HCFC refrigerants

More information

Any Service Technician Can Fix It A Good Service Technician Can Figure Out What s Wrong With It.

Any Service Technician Can Fix It A Good Service Technician Can Figure Out What s Wrong With It. I Dave s Statement If the thermostat calls for cooling, and the furnace fan is running properly, and the coil airflow is adequate, and the condenser fan is running properly, and the condenser airflow is

More information

HVAC-02, Air Conditioning Troubleshooting and Repair

HVAC-02, Air Conditioning Troubleshooting and Repair HVAC-02, Air Conditioning Troubleshooting and Introduction Since I'm constantly receiving questions on 944 air conditioning systems, I figured it's time to come up with come helpful troubleshooting tips.

More information

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTM3-SF-1. Split System Cooling 4TTM3018-4TTM3060

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTM3-SF-1. Split System Cooling 4TTM3018-4TTM3060 4TTM3-SF-1 Service Facts Split System Cooling 4TTM3018-4TTM3060! CAUTION UNIT CONTAINS R-410A REFRIGERANT! R-410A OPERATING PRESSURE EXCEEDS THE LIMIT OF R-22. PROPER SERVICE EQUIPMENT IS REQUIRED. FAILURE

More information

Engineering Specifications

Engineering Specifications Engineering Specifications NORDIC W-85-H-B-*S-PD Water to Water Heat Pump Single-Stage R134a Nominal 7.5 Ton With Double Wall Condenser for Domestic Hot Water Production Maritime Geothermal Ltd. P.O. Box

More information

How To Understand Evaporator

How To Understand Evaporator SECTION 5 COMMERCIAL REFRIGERATION UNIT 21 EVAPORATORS AND THE REFRIGERATION SYSTEM UNIT OBJECTIVES After studying this unit, the reader should be able to Define high-, medium-, and low-temperature refrigeration.

More information

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student

More information

Indoor coil is too warm in cooling mode or too cold in heating mode. Reversing valve or coil thermistor is faulty

Indoor coil is too warm in cooling mode or too cold in heating mode. Reversing valve or coil thermistor is faulty Codes Room Air Conditioner range: Indoor unit alarm s If timer lamp flashes for 1 second on, 1 second off, this indicates pre heating on the coil during heating mode and is not an error. If timer lamp

More information

Vacuum. How It Relates to Refrigeration And Air Conditioning Service

Vacuum. How It Relates to Refrigeration And Air Conditioning Service Vacuum How It Relates to Refrigeration And Air Conditioning Service Moisture In A Refrigeration System Visible Moisture Water Droplets Uncommon, but it can occur Invisible Moisture Water Vapor Found in

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

Condensing unit type EPSILON-ECHOS LE Technical information manual

Condensing unit type EPSILON-ECHOS LE Technical information manual Condensing unit type EPSILON-ECHOS LE Technical information manual 2 > EPSILON ECHOS Water chiller > EPSILON ECHOS /HP Reversible heat pump > EPSILON ECHOS /ST Water chiller with storage tank and pumps

More information

Recharge Procedure for Telemark TVP-2000 and TVP-3500

Recharge Procedure for Telemark TVP-2000 and TVP-3500 Recharge Procedure for Telemark TVP-2000 and TVP-3500 Required items: 1.) Refrigeration service manifold. 2.) Charge recovery system. 3.) Dry nitrogen gas. If a high pressure cylinder is used, a pressure

More information

High School Graduation years 2013, 2014, 2015. Unit/Standard Number

High School Graduation years 2013, 2014, 2015. Unit/Standard Number 1 Secondary Task List 100 INTRODUCTION TO HVAC 101 Identify HVAC systems. 102 Describe career opportunities in the HVAC profession. 103 Demonstrate awareness of the occupational requirements. 104 Explain

More information

Technical data. Danfoss DHP-A

Technical data. Danfoss DHP-A Technical data Danfoss DHP-A An air heat pump which produces both heat and hot water Can operate efficiently down to -0 C Danfoss TWS tank gives plenty of hot water quickly and with low operating costs

More information

SERVICE MANUAL MUZ-GE25VA - E1 MUZ-GE25VAH - E1 MUZ-GE35VA - E1 MUZ-GE35VAH - E1 MUZ-GE42VA - E1 MUZ-GE42VAH - E1 MUZ-GE50VA - E1 MUZ-GE50VAH - E1

SERVICE MANUAL MUZ-GE25VA - E1 MUZ-GE25VAH - E1 MUZ-GE35VA - E1 MUZ-GE35VAH - E1 MUZ-GE42VA - E1 MUZ-GE42VAH - E1 MUZ-GE50VA - E1 MUZ-GE50VAH - E1 SPLIT-TYPE AIR CONDITIONERS Revision A: MUZ-GE42/50VA(H) - E1 has been added. Please void OBH516. OUTDOOR UNIT SERVICE MANUAL HFC utilized R410A. OBH516 REVISED EDITION-A Models MUZ-GE25VA - E1 MUZ-GE25VAH

More information

REFRIGERATED TYPE COMPRESSED AIR DRYERS INSTRUCTION MANUAL. For Sales & Service please contact:

REFRIGERATED TYPE COMPRESSED AIR DRYERS INSTRUCTION MANUAL. For Sales & Service please contact: 7610.478.16 8/99 INSTRUCTION MANUAL Models 8005, 8010, 8015 For Sales & Service please contact: CENTRAIR Air Systems & Supplies Phone: 705-722-5747 Fax: 705-722-5458 Email: sales@centrair.ca Website: www.centrair.ca

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

Geothermal Alliance of Illinois. TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls

Geothermal Alliance of Illinois. TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls Geothermal Alliance of Illinois TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls Thermal Expansion Valve Topics Anatomy Operation Terms &

More information

Refrigeration & Air Conditioning

Refrigeration & Air Conditioning & Air Conditioning The Fundamentals of Commercial Trainers Air Conditioning Systems Semi-Hermetic Air Compressors Controls Automotive Air Conditioning Chilled Water Air Conditioning Plant More and more

More information

technical data air conditioning systems RXS20-25-35E (single phase) FBQ-B8V1-B8V3B Split Heat Pump Condensing Units Split Sky Air

technical data air conditioning systems RXS20-25-35E (single phase) FBQ-B8V1-B8V3B Split Heat Pump Condensing Units Split Sky Air technical data RXS20-25-35E FBQ-B8V-B8V3B (single phase) Split Heat Pump Condensing Units air conditioning systems Split Sky Air Outdoor Units R-40A RXS-E2VB Split Sky Air Outdoor Units Features O u t

More information

Refrigeration and Air Conditioning Mechanic On-the-Job Training Guide

Refrigeration and Air Conditioning Mechanic On-the-Job Training Guide Refrigeration and Air Conditioning Mechanic On-the-Job Training Guide Refrigeration and Air Conditioning Mechanics install, maintain and repair primary and secondary refrigeration and cooling systems,

More information

Contents and Nomenclature

Contents and Nomenclature DX Coils Contents and Nomenclature Nomenclature... 1 Evaporator Coil Types EN... 2 EF... 2 ER... 2 EJ... 3 EK... 3 Evaporator Construction Connections... 4 Tubing... 4 Headers... 5 Tube Supports... 5 Coil

More information

Split units TH with hermetic compressors

Split units TH with hermetic compressors Split units TH with compressors Refrigeration units in split variant. Available with screw or solder terminal. Condensing unit with sound insulated weatherproof housing for outdoor installation. Split

More information

543-0032-00, 943-0032-00. User s Manual

543-0032-00, 943-0032-00. User s Manual 543-0032-00, 943-0032-00 User s Manual 1 Comfort Alert Diagnostics Faster Service And Improved Accuracy The Comfort Alert diagnostics module is a breakthrough innovation for troubleshooting heat pump and

More information

Automotive Air-Conditioning Service Equipment Ariazone 5001 OPERATOR MANUAL Ariazone 5001

Automotive Air-Conditioning Service Equipment Ariazone 5001 OPERATOR MANUAL Ariazone 5001 Automotive Air-Conditioning Service Equipment Ariazone 5001 OPERATOR MANUAL Ariazone 5001 - Automotive A/C Service Station 1 Contents Page 1. Introduction... 3 2. Safety firts... 4 3. Technical Features...

More information

Troubleshooting HVAC/R systems using refrigerant superheat and subcooling

Troubleshooting HVAC/R systems using refrigerant superheat and subcooling Troubleshooting HVAC/R systems using refrigerant superheat and subcooling Application Note Troubleshooting and servicing refrigeration and air conditioning systems can be a challenging process for both

More information

COMPRESSOR REPLACEMENT PROCEDURE

COMPRESSOR REPLACEMENT PROCEDURE R-22 and R-410A COMPRESSOR REPLACEMENT PROCEDURE Bard Manufacturing Company, Inc. Bryan, Ohio 43506 Since 1914...Moving ahead just as planned Manual No.: 2100-003F Supersedes 2100-003E File: Volume I,

More information

POLICY BULLETIN Tecumseh Compressor Company Compressor Group

POLICY BULLETIN Tecumseh Compressor Company Compressor Group to Bulk Milk Coolers and Other System Page 1 of 5 Overall reliability can be enhanced if there exists a complete understanding of the features, system design, installation requirements, processing, charging

More information

Wiring Diagram. Diplomat 400V 3N. www.thermia.com

Wiring Diagram. Diplomat 400V 3N. www.thermia.com www.thermia.com Thermia Värmepumpar is not liable or bound by warranty if these instructions are not adhered to during installation or service. The English language is used for the original instructions.

More information

HP switch LP switch Discharge thermo Comp. Surface thermo

HP switch LP switch Discharge thermo Comp. Surface thermo 1 Specifications Zubadan Model Name PUHZ-SHW80VHA PUHZ-SHW11VHA PUHZ-SHW11YHA Power supply (phase, cycle, voltage) 1φ, V, Hz 1φ, V, Hz 3φ, 0V, Hz Max. current A 9.5 35.0 13.0 Breaker size A 3 16 Outer

More information

Failure code manual. content

Failure code manual. content Failure code manual content 一 wall split AC series 2 二 floor standing AC series. 4 三 portable AC series.. 5 四 dehumidifer 6 五 DC inverter single split series...7 六 DC inverter multi-split series 10 1 一

More information

Central Air Conditioning Plants

Central Air Conditioning Plants Central Air Conditioning Plants In our department, these plants (Air cooled or water cooled) are commonly available above 10 TR up to 100 TR. These types of plants are more suitable for large installations

More information

2015 HVAC Excellence Educator Conference Variable Refrigerant Flow & Variable Refrigerant Temperature

2015 HVAC Excellence Educator Conference Variable Refrigerant Flow & Variable Refrigerant Temperature 2015 HVAC Excellence Educator Conference Variable Refrigerant Flow & Variable Refrigerant Temperature Slide 1 Residential Market Push for more efficiency Green Building Initiative R-22 & High Efficiency

More information

NSN 4120-01-21 4-3692

NSN 4120-01-21 4-3692 *TM 9-4120-388-14 TECHNICAL MANUAL Operator s, Unit, Direct Support, And General Support Maintenance Manual AIR CONDITIONER, VERTICAL, COMPACT, 18,000 BTU/HR 208 VOLT, 3 PHASE, 50/60 HERTZ NSN 4120-01-21

More information

MP-4000 Alarm List (Software version 2.4.3 or later)

MP-4000 Alarm List (Software version 2.4.3 or later) Service Bulletin SUBJECT: MP4000 Alarm s BULLETIN: C 100 DATE: June 19, 2013 ALARM LIST Where it is possible the alarm number is kept the same as for MP-3000. MP-3000 holds alarm number from 0 to 127.

More information

DIABLO VALLEY COLLEGE CATALOG 2015-2016

DIABLO VALLEY COLLEGE CATALOG 2015-2016 HEATING, VENTILATION, AIR CONDITIONING, REFRIGERATION - HVACR Tish Young, Dean Physical Sciences and Engineering Division Physical Sciences Building, Room 263 Possible career opportunities Upon successful

More information

ThermoSorb Desiccant Dryers

ThermoSorb Desiccant Dryers ThermoSorb Desiccant Dryers Sierra Why dry compressed air? Contamination reduces efficiency The air we breathe contains contamination in the form of water vapour and airborne particles. During the compression

More information

TRAINING, EXAMINATION AND CERTIFICATION

TRAINING, EXAMINATION AND CERTIFICATION TECHNICAL STANDARDS & SAFETY AUTHORITY TRAINING, EXAMINATION AND CERTIFICATION REFRIGERATION OPERATOR CLASS B CERTIFICATION & EXAMINATION GUIDE REVISED EDITION 2 CERTIFICATIONS PERSUANT TO THE OPERATING

More information

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR.8.2.4-09 İ-COLD 12.03.2014 Rev. 00

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR.8.2.4-09 İ-COLD 12.03.2014 Rev. 00 E Refrigerant Charging Unit ICOGD 020AH1000 Operating Manual FR.8.2.4-09 İ-COLD 12.03.2014 Rev. 00 Contents Technical Specifications... 20 Safety... 21 A/C System... 22 Components... 23 Control Panel...

More information

INSTALLATION INSTRUCTIONS HOT GAS BYPASS SYSTEM DESIGN MANUAL

INSTALLATION INSTRUCTIONS HOT GAS BYPASS SYSTEM DESIGN MANUAL INSTALLATION INSTRUCTIONS HOT GAS BYPASS SYSTEM DESIGN MANUAL MODELS: WA/WL44H WA/WLH WA/WL70*H NOTE: Electrical data presented in this manual supersedes any other data f the above listed models. Bard

More information

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Identify, interpret, and

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

Automobile Air Conditioning Primer

Automobile Air Conditioning Primer Automobile Air Conditioning Primer An air conditioner is basically a refrigerator without the insulated box. It uses the evaporation of a refrigerant, like Freon, to provide cooling. The mechanics of the

More information

Solenoid valves Type EVU

Solenoid valves Type EVU Data sheet Solenoid valves EVU EVU solenoid valves are designed to fit into compact refrigeration systems. Available in direct and pilot operated versions, they can be applied in liquid, suction, and hot

More information

Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29

Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29 Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29 A refrigerant retrofit project, involving the conversion of a large Data Room cooling system from R22 to R422D (DuPont

More information

Heat Recovery In Retail Refrigeration

Heat Recovery In Retail Refrigeration This article was published in ASHRAE Journal, February 2010. Copyright 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not

More information

M SERIES REFRIGERANT COIL MODULE REFRIGERANT COILS for R-22, R-407C, R-410A

M SERIES REFRIGERANT COIL MODULE REFRIGERANT COILS for R-22, R-407C, R-410A Bulletin 20-20.2 / July 2012 M SERIES REFRIGERANT COIL MODULE REFRIGERANT COILS for R-22, R-407C, R-410A ➀ ➁ ➂ Model Number Key M 2430 C L 1 - A - ➀ Unit Type M=Modular Nominal Capacity 2430=24000 to 30000

More information

Refrigeration Installation 101

Refrigeration Installation 101 Refrigeration Installation 101 Hundreds of Installations Refrigerated Cases 2 Compressor Racks 3 Condensing Units 4 Walk-in Boxes 5 Some were done very well 6 Some had some issues... 7 8 Some seemingly

More information

Air Conditioning 101. STN Presentation AC101

Air Conditioning 101. STN Presentation AC101 Air Conditioning 101 What is Refrigeration? Refrigeration is Cooling by the Removal of Heat Heat is Measured In BTU s A BTU is a British Thermal Unit It is the Amount of Heat to Raise One Pound of Water,

More information

Legacy Data Centres Upgrading the cooling capabilities What are the options?

Legacy Data Centres Upgrading the cooling capabilities What are the options? Legacy Data Centres Upgrading the cooling capabilities What are the options? Presentation Structure What is a Legacy Data Centre? What is CRAC cooling? ASHRAE Standards Overview Available Cooling Systems

More information

GENERAL INFORMATION FOR REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ).

GENERAL INFORMATION FOR REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ). GENERAL INFMATION F REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ). Name of sector Refrigeration & Air Conditioning Name of Module REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING

More information

Cool Design for Homes and Offices

Cool Design for Homes and Offices AIR BLUE AIR BLUE air conditioning Homes Easy to install and use, quiet, attractive, and designed to fit any space: there are Cool Design for Homes and Offices a lot of reasons why Air Blue air conditioners

More information

2. AIRCONDITIONING AND REFRIGERATION

2. AIRCONDITIONING AND REFRIGERATION 2. AIRCONDITIONING AND REFRIGERATION 1. INTRODUCTION Air Conditioning and Refrigeration is an important area where in lot of self-employment opportunities are available. Now a day there is hardly a house

More information

evo+ Installation, Service & Troubleshooting DUCTLESS SYSTEM

evo+ Installation, Service & Troubleshooting DUCTLESS SYSTEM evo+ DUCTLESS SYSTEM Installation, Service & Troubleshooting Models: GWH09AB-A3DNA2B GWH12AB-A3DNA2B GWH09AB-D3DNA2D GWH12AB-D3DNA2D GWH18AB-D3DNA2D GWH24AB-D3DNA2D Table of Contents Safety Precautions

More information

Operations and Maintenance Manual

Operations and Maintenance Manual Operations and Maintenance Manual FOR MODELS 1234XL 1090XL 1095XL P/N 99971-SP Rev. 1/98 Table of Contents Set-Up...1 Introduction... 1 Unit Set-Up... 1 White Industries Models...1 1090XL Panel and 1234XL

More information

TWE+TTA TWE+TWA 6.25-20 T.R.

TWE+TTA TWE+TWA 6.25-20 T.R. TWE+TTA TWE+TWA 6.25-20 T.R. Main features : TWE indoor unit : Convertible cabinet, vertical or horizontal. Adjustable speed pulley-belt drive centrifugal fan motor. Aluminium fin coil with copper-tubes.

More information

COIL INPUT SCREENS. ITEM NUMBER: Always use a 1 through? In this field you might also use a dash and place quantity of coils here.

COIL INPUT SCREENS. ITEM NUMBER: Always use a 1 through? In this field you might also use a dash and place quantity of coils here. COIL INPUT SCREENS Example of a Water Coil Input Screen: (*please see the appendix for an example of an Evaporator, Steam or Condenser Coil input screen) PHYSICAL DATA ITEM NUMBER: Always use a 1 through?

More information

Total Heat Versus Sensible Heat Evaporator Selection Methods & Application

Total Heat Versus Sensible Heat Evaporator Selection Methods & Application Total Heat Versus Sensible Heat Evaporator Selection Methods & Application Scope The purpose of this paper is to provide specifying engineers, purchasers and users of evaporators in industrial refrigeration

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

Adsorption air dryers ADS 1 215

Adsorption air dryers ADS 1 215 Adsorption air dryers ADS 25 INDUSTRY CUSTOMER SERVICE COMPRESSED AIR AIR INTAKE 20 C 70% UR 760 mm Hg 2 grh 2 O/m 3 AIR PRESSURE 0 bar COOLING SYSTEM 30 C 00% UR 0 bar 2,8 grh 2 O/m 3 A compressor that

More information

ON-VEHICLE INSPECTION

ON-VEHICLE INSPECTION Sight Glass I11244 ONVEHICLE INSPECTION 1. INSPECT REFRIGERANT VOLUME Observe the sight glass on the liquid tube. AC3 AC22F05 Test conditions: Running engine at 1,500 rpm Blower speed control switch: HI

More information

10ACC WARNING WARNING. Service Literature 10ACC SERIES UNITS

10ACC WARNING WARNING. Service Literature 10ACC SERIES UNITS Service Literature ACC SERIES UNITS ACC Corp. 0201 L1 Revised 08 2004 The ACC is a residential split-system condensing unit available in sizes ranging from 1 1/2 to 5 tons. Condensing coil size, circuiting

More information

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...

More information

Table Z. Troubleshooting Chart for Air Conditioners. Cause

Table Z. Troubleshooting Chart for Air Conditioners. Cause Troubleshooting Chart for Air Conditioners Type of Unit Complaint Cause With open-type compressor Electric motor will not start Power failure Check circuit for power source Compressor stuck Locate cause

More information

AIR CONDITIONING TECHNOLOGY

AIR CONDITIONING TECHNOLOGY AIR CONDITIONING TECHNOLOGY PART 9 Water Cooled Condensers & Cooling Towers IN LAST month s article we looked at how Air Cooled Condensers are used to transfer the total heat of rejection from the air

More information

SECTION 23 81 43 HEAT PUMPS

SECTION 23 81 43 HEAT PUMPS SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:

More information

Heat Pump Water Heater IOM Manual

Heat Pump Water Heater IOM Manual Heat Pump Water Heater IOM Manual Installation Operation & Maintenance This manual is intended as an aid to qualified service personnel for proper installation, operation and maintenance of the heat pump

More information

Commercial Semi-Instantaneous Water Heaters

Commercial Semi-Instantaneous Water Heaters FEATURES HWI Models A. O. Smith s HWI models are available for operation with steam or boiler water as the energy source. They are factory assembled with components sized, piped and checked at the factory

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE. ACHP 104 Refrigeration & Air Conditioning Service II

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE. ACHP 104 Refrigeration & Air Conditioning Service II STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ACHP 104 Refrigeration & Air Conditioning Service II Prepared By: Stan Skowronek CANINO SCHOOL OF ENGINEERING TECHNOLOGY

More information

Glossary of Heating, Ventilation and Air Conditioning Terms

Glossary of Heating, Ventilation and Air Conditioning Terms Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment

More information

AUTOMOTIVE AIR CONDITIONING

AUTOMOTIVE AIR CONDITIONING 3rd Edition 3rd Edition Resources available For the instructor Register online at: www.cengagebrain.com for the study tools that come with your textbook! Companion website: includes weblinks and downloadable

More information

marine/bespoke split applications

marine/bespoke split applications split applications marine/bespoke evaporators, condensers and split air conditioning systems suitable for a multitude of applications such as coastal, extreme high and low ambients, harsh dusty environments

More information

SWIMMING POOL HEAT PUMP Owners Manual

SWIMMING POOL HEAT PUMP Owners Manual SWIMMING POOL HEAT PUMP Owners Manual This manual refers to the 17.0kw and 21.0kw models only. The heat pump unit is sold with a 1 year warranty. In addition there is a 2 year parts warranty on the compressor

More information

Testing methods applicable to refrigeration components and systems

Testing methods applicable to refrigeration components and systems Testing methods applicable to refrigeration components and systems Sylvain Quoilin (1)*, Cristian Cuevas (2), Vladut Teodorese (1), Vincent Lemort (1), Jules Hannay (1) and Jean Lebrun (1) (1) University

More information

PANASONIC TROUBLE SHOOTING GUIDE

PANASONIC TROUBLE SHOOTING GUIDE A General Guide To Room Style Products Pipework Pipe sizes and lengths should be as the relevant Technical Guide Both lines should be insulated No line accessories or oil traps should be fitted In cooling

More information

HVAC and REFRIGERATION

HVAC and REFRIGERATION This is a preview. Some pages have been omitted. PE principles and practice prracticce of engineering mechanical: HVAC and REFRIGERATION sample questions + solutions Copyright 2011 by NCEES. All rights

More information