Network diagrams in context

Size: px
Start display at page:

Download "Network diagrams in context"

Transcription

1 PM Network diagrams in context SOW CHARTER SCOPE DEFINITION WBS circulation, negotiation, translation WBS WP à activities estimation Time Cost GANTT PERT AOA AON planning, resource alloca7on, cost alloca7on, control Mainly PMBOK chapter 6

2

3 Network diagrams WBS

4 PERT, what does it state for? They are like WBS?

5 PERT Program Evalua/on & Review Technique

6 WBS GANTT PERT

7 Network Analysis (PERT Program Evalua/on & Review Technique; CPM Cri/cal Path Method) Network modula7on approach used in planning, scheduling and controlling projects. Beyond the analysis they facilitate, they represent a common ground to discuss op7ons so they are excellent communica7on tools. They facilitate thema7c brain- storming analysis Network diagrams are en7ty/rela7onship models (interrela7ons among instances of resources) usually used in project planning, namely on scheduling and 7me management Using these models we need to take into account: interrela7on of ac7vi7es (sequencing rela7ons) and rela7ons among ac7vi7es and resources (alloca7on) There are more complex models, using sta7s7cs but we will eventually address them later

8 Cri7cal Path Method (CPM) (determinis7c) A schedule network analysis technique used to determine the amount of scheduling flexibility (the amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project dura7on. Early dates are calculated by means of a forward pass, using a specified start date. Late dates are calculated by means of a backward pass, star7ng from a specified comple7on date, which some7mes is the project early finish date calculated during the forward pass calcula7on. Program Evalua7on and Review Technique (PERT) (probabilis7c) A technique used to improve the accuracy of the cost or dura7on es7mates of project components when there is uncertainty. PERT uses weighted averages of op7mis7c, pessimis7c, and most likely es7mates (the well- known three- point es7mates) of the components' cost or dura7on. Different weigh7ng schemes represent different probability distribu7ons of the possible cost or dura7on of a component. For instance, the typical formula is [(op/mis/c + 4 /mes the most likely + pessimis/c) divided by 6], approximates a beta distribu7on.

9 CPM/PERT Cri7cal Path Method (CPM) DuPont & Remington- Rand (1956) Determinis7c task 7mes Ac7vity- on- node network construc7on Project Evalua7on and Review Technique (PERT) US Navy, Booz, Allen & Hamilton Mul7ple task 7me es7mates (probabilis7c) Ac7vity- on- arrow network construc7on

10 PERT elements Events (states), ac7vi7es (nature and 7me), preceding, alloca7on, context (context must always be defined and clarified) Some examples of PERT representa7on - AOA ac/vity on arrow, or ADM - arrow diagramming method; and AON ac7vity on node A,3 B,5 C,7 D,2 E,6 F,3 G,10

11 PERT elements Events (states), ac7vi7es (nature and 7me), preceding, alloca7on, context (context must always be defined and clarified) Some examples of PERT representa7on - AOA ac7vity on arrow, or ADM - arrow diagramming method; and AON ac7vity on node A,3 E,6 B,5 C,7 F,3 G,10 D,

12 Examples of different nota/ons

13 AOA - Parallel ac/vi/es signaled as we exemplify are not allowed A B A A,B B dummy

14 Task B can only be started acer ac7vity A is completed. The same with D and C A,3 B,7 C,4 D,

15 Network Analysis example AOA A,3 B,7 C,4 D,6 There is a dummy ac/vity dura7on 0 (only a logical dependency)

16 Network Analysis example AOA A,3 B,7 C,4 D, Are all paths iden7fied?

17 Network Analysis example AOA A,3 B,7 C,4 D, No, there are three paths, not two! And that makes quite a difference!!

18 Network Analysis example AOA A,3 B,7 C,4 D, Activity Duration Early St Early Fi Latest St Lat. Fi. Float A B C D Dummy

19 Network Analysis example AOA A,3 B,7 C,4 D, Activity Duration Early St Early Fi Latest St Lat. Fi. Float A B C D Dummy

20 PERTS, and projects 1. Define the project and all its ac7vi7es. The project is made of tasks and all tasks should have a single start and a single finish 2. Develop the rela7onships among the ac7vi7es. Decide which ac7vi7es must precede, which must follow others, and the ones that can be executed in parallel. If you are short in 7me try to put in parallel as much ac7vi7es as you can 3. Draw the network diagram connec7ng all the ac7vi7es. Each ac7vity is unique. Dummy ac7vi7es are immaterial in 7me but relevant in sequence, they impose logical dependences 4. You can assign 7me and cost to each ac7vity Preceded by a planning effort by the project management team. This planning effort is part of the Develop Project Management Plan process 5. Compute the longest 7me path through the network. This path is called the Cri/cal Path 6. Use the network to help plan, schedule, monitor and control the project and also as a communica7on tool documented in the schedule management plan

21 PERTS, and projects

22 PERTS, and projects

23

24 Late start and backward path backward pass Early dates are calculated forwards, using the forward path. Late dates are calculated in reverse direc7on, star7ng at the date of the finishing of the project this is the backward path In this example one backward path leads us to event 3 through ac7vity B. So we have: Total project 7me (cri7cal path) = = 4. This means that the late start for ac7vity B is 4 Rela7ng to event 2 we have to evaluate two paths, Dummy and D. Through Dummy we have 4-0 = 4, this means that Dummy late start is 4 and through D we have 11-6 = 5, so ac7vity D late start is 5 Activ ity Dura tion Early St Early Fi Lates t St Lat. Fi. Float A,3 3 B,7 A B C D Dum my DUMMY,0 C,4 D,6 2 4

25 So you already have the rule to compute early starts and late starts. Early starts are computed in the forward path from the beginning to the end, adding dura7on and late starts are computed in the backwards path, subtrac7ng dura7on from the end Project management tools compute this for you, you just have to manage according to situated condi7ons (environment, resources, risk, )

26 Your project is to design and develop an electric motor. Ac7vity dura7ons and predecessors are iden7fied at the following table. A) construct a PERT; B) Which is the dura7on of every path? Which path is the cri7cal one? C) What happens if ac7vity E dura7on becomes 8? Ac7vity dura7on predecessor A 10 - B 20 - C 4 - D 2 A E 10 B,C F 8 B,C G 4 B,C H 2 C I 6 G,H J 2 D,E

27 Network Analysis example AOA Ac7vity dura7on predecessor A 10 - B 20 - C 4 - D 2 A E 10 B,C F 8 B,C G 4 B,C H 2 C I 6 G,H J 2 D,E

28 Network Analysis example AOA Ac7vity dura7on predecessor A 10 - B 20 - C 4 - D 2 A E 10 B,C F 8 B,C G 4 B,C H 2 C I 6 G,H J 2 D,E 8 paths CP

29 Network Analysis example AOA à AON AOA A,3 B,7 C,4 D,6 AON B A,3 B,7 END C,4 D,6 With AON you don t have dummies

30 Network Analysis example AON A,10 D,2 Ac7vity dura7on predecessor A 10 - B 20 - C 4 - D 2 A E 10 B,C F 8 B,C G 4 B,C H 2 C I 6 G,H J 2 D,E B B,20 C,4 E,10 F,8 G,4 H,2 J,2 I,6 END ADJ 14 BEJ 32 BF 28 BGI 30 CEJ 16 CF 12 CGI 14 CHI 12

31 Question exam type You have an activity with an early start in week 6, an early finish in week 10, a latest start in week 14 and a latest finish in week 18. The slack of this activity is? A) Four weeks; B) Six weeks; C) Eight weeks; D) Twelve weeks

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps Project Planning What are you going to do in the project? Lecture Objectives To discuss the tasks in planning a project To describe the tools that can be used for developing a project plan To illustrate

More information

Project Planning and Scheduling

Project Planning and Scheduling Project Planning and Scheduling MFS606 Project Planning Preliminary Coordination Detailed Task Description Objectives Budgeting Scheduling Project Status Monitoring When, What, Who Project Termination

More information

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072 Chapter 6: Project Time Management King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072 Learning Objectives Understand the importance of project schedules Define

More information

Use project management tools

Use project management tools Use project management tools Overview Using project management tools play a large role in all phases of a project - in planning, implementation, and evaluation. This resource will give you a basic understanding

More information

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture - 9 Basic Scheduling with A-O-A Networks Today we are going to be talking

More information

Operational Research. Project Menagement Method by CPM/ PERT

Operational Research. Project Menagement Method by CPM/ PERT Operational Research Project Menagement Method by CPM/ PERT Project definition A project is a series of activities directed to accomplishment of a desired objective. Plan your work first..then work your

More information

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort Basic s Project Scheduling and Tracking The process of building a schedule for any case study helps really understand how it s done. The basic idea is to get across to break the software project into well-defined

More information

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects Project Time Management Chapter 6 Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes

More information

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration Prof. M. Rammohan Rao Former Dean Professor Emeritus Executive Director, Centre for Analytical

More information

Project Management Glossary

Project Management Glossary Project Management Glossary THE VOCABULARY OF ACHIEVEMENT RON BLACK THE MENTOR GROUP WWW.RONBLACK.COM 800-381-8686 This glossary is an excerpt from Ron Black s book, The Complete Idiot s Guide to Project

More information

Project Time Management

Project Time Management Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please

More information

CPM-200: Principles of Schedule Management

CPM-200: Principles of Schedule Management CPM-: Principles of Schedule Management Lesson B: Critical Path Scheduling Techniques Instructor Jim Wrisley IPM Fall Conference PMI-College of Performance Management Professional Education Program Copyright

More information

Time Management. Part 5 Schedule Development. Richard Boser

Time Management. Part 5 Schedule Development. Richard Boser Time Management Part 5 Schedule Development Richard Boser 6.5 Schedule Development Inputs Organizational Process Assets Scope Statement Activity List Activity Attributes Network Diagrams Resource Req ms

More information

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management Project Scheduling Goals of the Unit Making the WBS into a schedule Understanding dependencies between activities Learning the Critical Path technique Learning how to level resources!2 Initiate Plan Execute

More information

Lecture 26 CPM / PERT Network Diagram

Lecture 26 CPM / PERT Network Diagram Lecture 26 CPM / PERT Network Diagram 26.1 Introduction to CPM / PERT Techniques CPM (Critical Path Method) was developed by Walker to solve project scheduling problems. PERT (Project Evaluation and Review

More information

Scheduling Glossary Activity. A component of work performed during the course of a project.

Scheduling Glossary Activity. A component of work performed during the course of a project. Scheduling Glossary Activity. A component of work performed during the course of a project. Activity Attributes. Multiple attributes associated with each schedule activity that can be included within the

More information

Project Time Management

Project Time Management Project Time Management By Augsburg College 1 Learning Objectives Understand the importance of project schedules and good project time management Define activities as the basis for developing project schedules

More information

Chapter 6: Project Time Management

Chapter 6: Project Time Management CIS 486 Managing Information Systems Projects Fall 2003 (Chapter 6), PhD jwoo5@calstatela.edu California State University, LA Computer and Information System Department Chapter 6: Project Time Management

More information

PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited

PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT WHAT DOES THE TIME MANAGEMENT AREA ATTAIN? Manages the project schedule to ensure timely completion of

More information

8. Project Time Management

8. Project Time Management 8. Project Time Management Project Time Management closely coordinated Two basic approaches -bottom-up (analytical) -top-down (expert judgement) Processes required to ensure timely completion of the project

More information

B. 2-4-6 D. 3-4-5 E. 3-5-7 F. 5-7-9

B. 2-4-6 D. 3-4-5 E. 3-5-7 F. 5-7-9 Lesson 01 Project Management Solutions #1: The network diagram for a project is shown below, with three time estimates (optimistic, most likely, and pessimistic) for each activity. Activity times are in

More information

Chapter 2: Project Time Management

Chapter 2: Project Time Management Chapter 2: Project Time Management Learning Objectives o o o o Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules.

More information

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management MECH 896 Professional Development for MEng Students Mohamed Hefny and Brian Surgenor (hefny@cs.queensu.ca and surgenor@me.queensu.ca) Winter : Lecture # Project Time Management Homework Discussion Homework

More information

Project Time Management

Project Time Management Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.

More information

Cambridge International AS and A Level Computer Science

Cambridge International AS and A Level Computer Science Topic support guide Cambridge International AS and A Level Computer Science 9608 For examination from 2017 Topic 4.4.3 Project management PERT and GANTT charts Cambridge International Examinations retains

More information

Module 3: The Project Planning Stage

Module 3: The Project Planning Stage Overview Once you've initiated the project and gathered all relevant information, you'll then begin planning your project. The planning stage depends on the size of your project, how much information you

More information

PROJECT MANAGEMENT. BIPARD, Patna 25 th January 2012. Rajiv Misra

PROJECT MANAGEMENT. BIPARD, Patna 25 th January 2012. Rajiv Misra PROJECT MANAGEMENT BIPARD, Patna 25 th January 2012 CAN A SUCCESSFUL PROJECT MANAGER SUCCEED EVERYWHERE? WHAT WERE THE DIFFERENT TASKS WE DID? WHAT WERE THE DIFFERENT TASKS WE DID? PLANNING STAGE PRODUCT

More information

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM)

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM) PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM) Project Evaluation Review Technique (PERT) and Critical Path Method (CPM) are scheduling techniques used to plan, schedule, budget

More information

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Planning and Managing Software Projects 2011-12 Class 9 Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Credits 2 This slides

More information

Project Management SCM 352. 2011 Pearson Education, Inc. publishing as Prentice Hall

Project Management SCM 352. 2011 Pearson Education, Inc. publishing as Prentice Hall 3 Project Management 3 SCM 35 11 Pearson Education, Inc. publishing as Prentice Hall Boeing 787 Dreamliner Delays are a natural part of the airplane supply business. They promise an unreasonable delivery

More information

Chapter 4: Project Time Management

Chapter 4: Project Time Management Chapter 4: Project Time Management Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes

More information

Network analysis: P.E.R.T,C.P.M & Resource Allocation Some important definition:

Network analysis: P.E.R.T,C.P.M & Resource Allocation Some important definition: Network analysis: P.E.R.T,C.P.M & Resource Allocation Some important definition: 1. Activity : It is a particular work of a project which consumes some resources (in ) & time. It is shown as & represented

More information

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan CISC 322 Software Architecture Project Scheduling (PERT/CPM) Ahmed E. Hassan Project A project is a temporary endeavour undertaken to create a "unique" product or service A project is composed of a number

More information

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Learning Objectives Understand the importance of project schedules and good project time management Define activities

More information

ME 407 Mechanical Engineering Design Spring 2016

ME 407 Mechanical Engineering Design Spring 2016 ME 407 Mechanical Engineering Design Spring 2016 Project Planning & Management Asst. Prof. Dr. Ulaş Yaman Acknowledgements to Dieter, Engineering Design, 4 th edition Ullman, The Mechanical Design Process,

More information

Project Scheduling: PERT/CPM

Project Scheduling: PERT/CPM Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times (as in exercises 1, 2, 3 and 5 in the handout) and considering Time-Cost Trade-Offs (as in exercises 4 and 6 in the handout). This

More information

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition Lecture 6: Project Time Management By: Prof. Lili Saghafi Information Technology Project Management, Fifth Edition Learning Objectives 2 Understand the importance of project schedules and good project

More information

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu Note: See the text itself for full citations. More courses at cie-wc.edu Understand the importance of project schedules and good project time management Define activities as the basis for developing project

More information

CPM -100: Principles of Project Management

CPM -100: Principles of Project Management CPM -100: Principles of Project Management Lesson B: Time and Cost Management Presented by Bruce R. Shaw, P.E., PMP starshaw@starpower.net Ph: 703-922-2772 Presented at the PMI-CPM 2002 Fall Conference

More information

Chapter-6. Developing a Project Plan

Chapter-6. Developing a Project Plan MGMT 4135 Project Management Chapter-6 Where we are now Developing the Project Network Why? Graphical representation of the tasks to be completed Logical sequence of activities Determines dependencies

More information

SE351a: Software Project & Process Management

SE351a: Software Project & Process Management SE351a: Software Project & Process Management W8: Software Project Planning 22 Nov., 2005 SE351a, ECE UWO, (c) Hamada Ghenniwa SE351 Roadmap Introduction to Software Project Management Project Management

More information

Systems Analysis and Design

Systems Analysis and Design Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis

More information

The Project s Network Diagram

The Project s Network Diagram The Project s Network Diagram Ricardo Viana Vargas, MSc, IPMA-B, PMP ricardo.vargas@macrosolutions.com.br Ricardo Viana Vargas, MSc, IPMA-B, PMP Ricardo Viana Vargas is a project, portfolio and risk management

More information

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761 Appendix A Glossary Terms of Project Management Appendix Table of Contents REFERENCES...761 750 Appendix A. Glossary of Project Management Terms Appendix A Glossary Terms of Project Management A Activity

More information

The work breakdown structure can be illustrated in a block diagram:

The work breakdown structure can be illustrated in a block diagram: 1 Project Management Tools for Project Management Work Breakdown Structure A complex project is made manageable by first breaking it down into individual components in a hierarchical structure, known as

More information

Unit 1: Project Planning and Scheduling

Unit 1: Project Planning and Scheduling Unit : Project Planning and Scheduling Objective Ð To provide a brief introduction to project planning and scheduling. The critical area where project management meets system development. ackground Most

More information

Scheduling. Anne Banks Pidduck Adapted from John Musser

Scheduling. Anne Banks Pidduck Adapted from John Musser Scheduling Anne Banks Pidduck Adapted from John Musser 1 Today Network Fundamentals Gantt Charts PERT/CPM Techniques 2 WBS Types: Process, product, hybrid Formats: Outline or graphical organization chart

More information

The Project Planning Process Group

The Project Planning Process Group 3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity

More information

A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN

A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN Introduction A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN The core technique available to Project Managers for planning and controlling their projects is Network Analysis. This short guide will provide

More information

Online Saturday & Sunday 4-Day Live PMP Training

Online Saturday & Sunday 4-Day Live PMP Training Online Saturday & Sunday 4-Day Live PMP Training Course Syllabus: DAY 1: Welcome a. Who is BOBCAT Academy? b. Introduce Yourself c. Follow Us Module 1: Course Introduction a. Course Dates b. Start/Stop

More information

Project Management Chapter 3

Project Management Chapter 3 Project Management Chapter 3 How Project Management fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis

More information

Network Calculations

Network Calculations Network Calculations The concepts and graphical techniques described in this week s readings form the basis of the tools widely used today to manage large projects. There is no way of simplifying the tasks

More information

Information Technology Project Management

Information Technology Project Management Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John Wiley & Sons, Inc. all rights reserved. Reproduction

More information

Project Time Management

Project Time Management Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please

More information

Critical Path Analysis

Critical Path Analysis Chapter 13 Critical Path Analysis Basic Concepts Activity An activity is any portion of a project which consumes time or resources and has a definable beginning and ending. For example, laying of pipe

More information

PROGRAMMING TECHNIQUES. Chapter 5(Part 2)

PROGRAMMING TECHNIQUES. Chapter 5(Part 2) PROGRAMMING TECHNIQUES Chapter 5(Part 2) LEARNING OUTCOME At the end of this lesson, students will be able to: Understand the different types of planning techniques. Understand the network analysis. Formulate

More information

PERT/CPM. Network Representation:

PERT/CPM. Network Representation: - 1 - PERT/CPM PERT Program Evaluation & Review Technique It is generally used for those projects where time required to complete various activities are not known as a priori. It is probabilistic model

More information

The Project In the beginning was The Project, and then arose the Assumptions.! And The Project was without form and the Assumptions were void.

The Project In the beginning was The Project, and then arose the Assumptions.! And The Project was without form and the Assumptions were void. ERP Project management overview The Project In the beginning was The Project, and then arose the Assumptions.! And The Project was without form and the Assumptions were void. And darkness was upon the

More information

CIS Project Management

CIS Project Management Topic # 4 CIS Project Management A Correspondence of Positions and Languages/Communications in CIS Analysis, Design, Development and Implementation (Engineering) Industry Correspondence of Positions and

More information

Introduction to IT Project Management

Introduction to IT Project Management Adapted from Managing Information Technology Projects, Chapter 1, Schwalbe Introduction to IT Project Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Sep 17th, 2015 Outline

More information

Second Edition. Mantel, Meredith, Shafer, and Sutton. John Wiley and Sons, Inc. Prepared by Scott M. Shafer. Copyright 2005 John Wiley & Sons, Inc.

Second Edition. Mantel, Meredith, Shafer, and Sutton. John Wiley and Sons, Inc. Prepared by Scott M. Shafer. Copyright 2005 John Wiley & Sons, Inc. Project Management in Practice Second Edition Mantel, Meredith, Shafer, and Sutton Prepared by Scott M. Shafer Wake Forest University John Wiley and Sons, 5-1 Chapter 5 Scheduling the Project 5-2 PERT

More information

Precedence Diagram Method. CSTM 462 Planning & Scheduling

Precedence Diagram Method. CSTM 462 Planning & Scheduling Precedence Diagram Method CSTM 462 Planning & Scheduling Precedence Diagramming Method (PDM) PDM is more flexible than AON or AOA networks because PDM allows the overlapping of concurrent activities.

More information

Scope management can be defined as controlling what is and what is not a part of the project.

Scope management can be defined as controlling what is and what is not a part of the project. Scope Management Scope management can be defined as controlling what is and what is not a part of the project. According to the 2004 PMBOK scope management: Includes the processes required to ensure that

More information

Chapter 3 Managing the Information Systems (IS) Project

Chapter 3 Managing the Information Systems (IS) Project Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project

More information

Unit 4: Time Management (PMBOK Guide, Chapter 6)

Unit 4: Time Management (PMBOK Guide, Chapter 6) (PMBOK Guide, Chapter 6) The questions on this topic focus heavily on scheduling techniques, network diagrams, Gantt charts, the critical path, compressing the schedule, PERT, and float. You may or may

More information

Application Survey Paper

Application Survey Paper Application Survey Paper Project Planning with PERT/CPM LINDO Systems 2003 Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are two closely related techniques for monitoring

More information

Introduction to Project Management

Introduction to Project Management Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George 2008 Prentice Hall 6-1 What is Project

More information

Example Gantt Chart. PERT charts...) (Later, but next, Source: http://www.nan.go.th/nanpoc/svg/chartdirector/doc/cdphpd oc/images/gantt.

Example Gantt Chart. PERT charts...) (Later, but next, Source: http://www.nan.go.th/nanpoc/svg/chartdirector/doc/cdphpd oc/images/gantt. PERT and Gantt Example Gantt Chart (Later, but next, PERT charts...) Source: http://www.nan.go.th/nanpoc/svg/chartdirector/doc/cdphpd oc/images/gantt.png PERT Charts Acronym for: Program Evaluation and

More information

Guidance on Critical Path Analysis

Guidance on Critical Path Analysis Guidance on Critical Path Analysis OCR GCE in Applied Business Unit F248 (Unit 9): Strategic Decision Making As part of the assessment for Unit F248 Strategic Decision-Making the examination may contain

More information

PROJECT TIME MANAGEMENT

PROJECT TIME MANAGEMENT 6 PROJECT TIME MANAGEMENT Project Time Management includes the processes required to ensure timely completion of the project. Figure 6 1 provides an overview of the following major processes: 6.1 Activity

More information

Project Scheduling and Gantt Charts

Project Scheduling and Gantt Charts Project Scheduling and Gantt Charts Siddharth Gangadhar Dr. Prasad Kulkarni Department of Electrical Engineering & Computer Science Lab Presentation siddharth@ku.edu prasadk@ku.edu 4 November 2015 2015

More information

Project Management Concepts and Strategies

Project Management Concepts and Strategies Project Management Concepts and Strategies Contact Hours: 24 Course Description This series provides a detailed examination of project management concepts and strategies. It discusses the seven components

More information

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS Chapter 3 of Systems Analysis and Design in a Changing World explains the techniques and steps required to build a project schedule

More information

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time Computer Scheduling Critical path method (CPM) requires numerous computations to determine activity start and finish dates,

More information

Critical Path Analysis & PERT Charts (taken from www.business.com.

Critical Path Analysis & PERT Charts (taken from www.business.com. Critical Path Analysis & PERT Charts (taken from www.business.com. - Planning and scheduling more complex projects Critical Path Analysis and PERT are powerful tools that help you to schedule and manage

More information

Project Management Dr. James A. Bednar

Project Management Dr. James A. Bednar Project Management Dr. James A. Bednar jbednar@inf.ed.ac.uk http://homepages.inf.ed.ac.uk/jbednar SAPM Spring 2006: Project Management 1 Project Management A project is a temporary endeavour to produce

More information

Project Scheduling: PERT/CPM

Project Scheduling: PERT/CPM Project Scheduling: PERT/CPM CHAPTER 8 LEARNING OBJECTIVES After completing this chapter, you should be able to: 1. Describe the role and application of PERT/CPM for project scheduling. 2. Define a project

More information

CRITICAL PATH METHOD (CEE 320 VDC SEMINAR)

CRITICAL PATH METHOD (CEE 320 VDC SEMINAR) CRITICAL PATH METHOD (CEE 320 VDC SEMINAR) 4 February 2009 Jesse Santiago & Desirae Magallon Overview Background & History CPM Defined The CPM approach Definitions Class Exercise Background & History Developed

More information

Project Scheduling. Introduction

Project Scheduling. Introduction Project Scheduling Introduction In chapter, the O and ON networks were presented, also the time and cost of individual activities based were calculated. Yet, however, we do not know how long is the total

More information

CSSE 372 Software Project Management: Software Project Scheduling

CSSE 372 Software Project Management: Software Project Scheduling CSSE 372 Software Project Management: Software Project Scheduling Shawn Bohner Office: Moench Room F212 Phone: (812) 877-8685 Email: bohner@rose-hulman.edu Examination #1 Results Average Score 82.70% Median

More information

專 案 管 理 實 務 嘉 義 縣 政 府 學 分 班 : 管 理 實 務 專 題 2006 中 正 大 學 企 管 系 助 理 教 授 周 瑞 生

專 案 管 理 實 務 嘉 義 縣 政 府 學 分 班 : 管 理 實 務 專 題 2006 中 正 大 學 企 管 系 助 理 教 授 周 瑞 生 專 案 管 理 實 務 嘉 義 縣 政 府 學 分 班 : 管 理 實 務 專 題 2006 中 正 大 學 企 管 系 助 理 教 授 周 瑞 生 講 師 介 紹 > 學 歷 台 灣 大 學 學 士 台 灣 大 學 碩 士 美 國 德 州 大 學 奧 斯 汀 校 區 工 程 專 案 管 理 博 士 中 華 民 國 土 木 工 程 大 地 工 程 水 土 保 持 工 程 專 門 技 術 人 員 高

More information

Network Planning and Analysis

Network Planning and Analysis 46 Network Planning and Analysis 1. Objective: What can you tell me about the project? When will the project finish? How long will the project take (project total duration)? 2. Why is this topic Important

More information

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose 1 2 Author s Preface The Medialogist s Guide to Project Time Management is developed in compliance with the 9 th semester Medialogy report The Medialogist s Guide to Project Time Management Introducing

More information

Collaborative Scheduling using the CPM Method

Collaborative Scheduling using the CPM Method MnDOT Project Management Office Presents: Collaborative Scheduling using the CPM Method Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc. Housekeeping Items Lines

More information

CRITICAL-PATH ANALYSIS FOR NETWORK SCHEDULING

CRITICAL-PATH ANALYSIS FOR NETWORK SCHEDULING CRITICAL-PATH ANALYSIS FOR NTWORK SCHULING From studying this section, you will be able to: - Perform CPM and PM analyses for AOA and AON networks; - Calculate the early / late times that an activity can

More information

Chapter 6 (part 1) Project Time Management. (Project Scheduling)

Chapter 6 (part 1) Project Time Management. (Project Scheduling) Chapter 6 (part 1) Project Time Management. (Project Scheduling) 1 Objectives Understand the process of project decomposition into activities Understand the level of details required for activities Understand

More information

Devising new Software Project Risk Management Model: MARUNA

Devising new Software Project Risk Management Model: MARUNA Devising new Software Project Risk Management Model: MARUNA Bekim Fetaji South East European University, Computer Sciences, Ilindenska bb, 00 Tetovo, Macedonia Abstract The focus of this research is the

More information

ANALYSIS OF PROJECT PLANNING USING CPM AND PERT

ANALYSIS OF PROJECT PLANNING USING CPM AND PERT ANALYSIS OF PROJECT PLANNING USING CPM AND PERT Rogelio Acuña Spring 2010 In Partial Fulfillment of Math 4395-Senior Project Department of Computer and Mathematical Sciences Faculty Advisor: Dr. Timothy

More information

PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) ABSTRACT Category: Planning/ Monitoring - Control KEYWORDS Program (Project) Evaluation and Review Technique (PERT) (G) is a project management tool used

More information

Application of Critical Path Method scheduling to research plan and management of graduate students research project in engineering education

Application of Critical Path Method scheduling to research plan and management of graduate students research project in engineering education OPEN ACCESS Engineering Leaders Conference 2014 Application of Critical Path Method scheduling to research plan and management of graduate students research project in engineering education M.O. Daramola

More information

SECTION 01311 - CONSTRUCTION SCHEDULE B. Part 1 - General... 1. 1.01 Work Included... 1. 1.02 Related Requirements... 1. 1.03 Reference Standards...

SECTION 01311 - CONSTRUCTION SCHEDULE B. Part 1 - General... 1. 1.01 Work Included... 1. 1.02 Related Requirements... 1. 1.03 Reference Standards... SECTION 01311 - CONSTRUCTION SCHEDULE B CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement

More information

Scheduling 8.1 BACKGROUND

Scheduling 8.1 BACKGROUND 5426ch08.qxd_jt 9/19/02 10:39 AM Page 379 C H A P T E R 8 Scheduling The previous chapter initiated our discussion of project implementation. In this and the following three chapters, we continue with

More information

MnDOT Project Management Office Presents: Schedule Float. Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc.

MnDOT Project Management Office Presents: Schedule Float. Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc. MnDOT Project Management Office Presents: Schedule Float Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc. Housekeeping Items Lines will be muted during the webinar

More information

Abar Solutions Petroleum Consultancy & Training Qualified From KPC Training & Consulting Services Provider. Code Period Language Start End Location

Abar Solutions Petroleum Consultancy & Training Qualified From KPC Training & Consulting Services Provider. Code Period Language Start End Location Training Course : Project Management Skills & Estimation Development Training Course For One Week In Canada, Montreal, Hyatt Regency Montreal Which Be Held As Under Details : Tel. : 00965 22610021 99600277,

More information

Project Management DISCUSSION QUESTIONS

Project Management DISCUSSION QUESTIONS 3 C H A P T E R Project Management DISCUSSION QUESTIONS. There are many possible answers. Project management is needed in large construction jobs, in implementing new information systems, in new product

More information

10 Project Management with PERT/CPM

10 Project Management with PERT/CPM 10 Project Management with PERT/CPM 468 One of the most challenging jobs that any manager can take on is the management of a large-scale project that requires coordinating numerous activities throughout

More information

Deming s 14 Points for TQM

Deming s 14 Points for TQM 1 Deming s 14 Points for TQM 1. Constancy of purpose Create constancy of purpose for continual improvement of products and service to society, allocating resources to provide for long range needs rather

More information

Leaving Certificate Technology. Project Management. Student Workbook

Leaving Certificate Technology. Project Management. Student Workbook Leaving Certificate Technology Project Management Student Workbook Project Management Student notes Introduction Project management is the name given to a number of techniques used in industry to manage

More information

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Planning and Managing Software Projects 2010-11 Session 5 Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Credits 2 This slides

More information

Chapter 11 Monte Carlo Simulation

Chapter 11 Monte Carlo Simulation Chapter 11 Monte Carlo Simulation 11.1 Introduction The basic idea of simulation is to build an experimental device, or simulator, that will act like (simulate) the system of interest in certain important

More information