1 Contracts for Difference - the new support regime for low carbon generation James Taylor Raj Bavishi 11 November 2014

2 UK Incentive Regimes Small scale Feed in Tariffs and the Renewables Obligations have made the UK an attractive destination for renewable energy developers. The Renewable Heat Incentive is doing the same for heat The supported technologies are varied and include wind, solar, geothermal, energy from waste, biomass and hydro. Target is 30% renewables generation by But Legislation and traditional banding can t keep up with market forces Falling costs of deployment meant excess profit at the expense of unsustainable energy bills Highly politicised Discipline now imposed in the form of the Levy Control Framework (LCF ) Contracts for Differences CfDs will replace the Renewables Obligation as the main way of supporting renewables projects ROC RUSH 2 / L_LIVE_EMEA1: v1

3 The solution - Electricity Market Reform After three years of debate the Energy Bill, legislating for the Government s Electricity market reform (EMR), finally became the Energy Act in December 2013 EMR will deliver savings to consumers of around 5bn to 2030, relative to the current RO regime Feed-in tariffs with Contracts for Difference (FiT CfDs), are a core part of EMR. CfDs will become the main incentive regime for renewable projects not supported by the existing small scale feed-in tariff regime ( 5MW). The first CfDs are due to be awarded by the end of this year and with the RO being closed to new projects from 1 April / L_LIVE_EMEA1: v1

4 The Levy Control Framework, a reminder Levy-funded expenditure is considered to be Government spending even though it is funded through electricity bills In 2011, DECC and the Treasury established the LCF cap The LCF requires early action to keep costs within the caps The LCF includes small scale FiT, the RO, FiT CfD and the Warm Homes Discount. (Not the RHI) As CfD is included in the LCF this means that there is a defined pot of money out of which the CfDs may be funded. The LCF rises to 7.6B by 2020/21 (please note this is expressed in prices) 4 / L_LIVE_EMEA1: v1

5 What is a CfD? A financial instrument that guarantees a fixed price for generators supplying energy, called a reference price or a strike price (based on wholesale rates). The generators will then sell energy to suppliers, and the cost at which they sell this energy may be the same as the strike price; below it; or slightly above it. If the sales of energy by the generators are the same as the strike price, then there is no further action. If the price is below the strike price, it will trigger top up payments by the counterparty. If the sales by the generators are at a higher price, it will result in generators paying back the difference. 5 / L_LIVE_EMEA1: v1

6 What is a CfD? 15 year contract between an eligible generator and the Low Carbon Contracts Company Funded through a charge on suppliers Not a Power Purchase Agreement Issues in development: Generator credit support Necessary and minor changes Cure period for breach Milestone delivery dates Capacity adjustment Status of CfD counterparty Private wire arrangements 6 / L_LIVE_EMEA1: v1

7 RO vs CfD Advantages of CfD Removes wholesale price exposure No ROC price volatility No ROC Rush to hit banding or grace periods Faster settlement (daily billing with 28 day payment) Standard contract Disadvantages of CfD No certainty as to availability Uncertainty until after planning ACT qualification Auction strategies Frequency of allocation rounds 15 years and not 20 Robust counterparty CPI linked prices Virtual floor price 7 / L_LIVE_EMEA1: v1 Use of market reference as opposed to PPA creates a gap Unfamiliar Slightly lower price than RO to account for lower risk

8 Qualification criteria The project must use a qualifying form of low carbon generation plus tidal range, nuclear and carbon capture and storage (CCS). Waste projects can be ACT or AD (with or without CHP) or EfW with CHP. Planning permission or development consent (as applicable) has been secured, normally evidenced by a Decision Notice. A grid connection offer has been accepted. The applicant is validly incorporated under the laws of the relevant jurisdiction in which it is incorporated (for example, for a UK-based limited liability company, this could be evidenced through the provision of a valid VAT number and company number);. For projects above 300 MW, evidence (in the form of a certificate from the Government) that a company has a valid supply chain plan. Supporting evidence that enables the CfD to be drafted, such as the geographic location of the project, its estimated installed capacity and its target commissioning date. 8 / L_LIVE_EMEA1: v1

9 Strike Prices Some technologies will no longer receive benefit support under FiT CfD in comparison to the RO. These are: dedicated biomass plants without CHP; biomass co-firing; standard bioliquids; and geopressure (which generates electricity by using the pressure in the gas network). Very large capital intensive projects such as nuclear, tidal range and large hydro >50MW will have individually negotiated project specific strike prices and this has used up much of the LCF budget. Further down the line, Hinkley Point C will be 92.50/MWh 9 / L_LIVE_EMEA1: v1

10 Allocation Contracts will be allocated through allocation rounds. The Allocation Framework for the first allocation round divides the CfD budget into Groups including: Group 1 - a group of established technologies (Onshore Wind (>5 MW), Solar Photovoltaic (PV) (>5 MW), Energy from Waste with CHP, Hydro (>5 MW and <50 MW), Landfill Gas and Sewage Gas). Group 2 - a group of less established technologies (Offshore Wind, Wave, Tidal Stream, Advanced Conversion Technologies, Anaerobic Digestion, Dedicated Biomass with Combined Heat and Power and Geothermal). The size of the budget in the CfD allocation rounds for Group 1 technologies is deliberately short Group 2 technologies will not automatically move to competition and will not compete on price directly with Group 1 technologies. If all the projects seeking support within Group 2 can be accommodated within the allocated budget, they will receive support at the administrative strike price. 10 / L_LIVE_EMEA1: v1 m (2011/12 prices) Delivery Year (as defined in legislation) CFD Budget (2014 release) Pot 1 (established technologies) Pot 2 (less established technologies) 15/16 16/17 17/1 18/1 19/2 20/

11 Auction process Pot 1 is short and will go to sealed bids. Pot 2 is said to only support 1 offshore wind farm so also likely to go to sealed bids. Can ACT come in lower than offshore wind? A potential complication to the process is maxima and minima caps for specific technologies The allocation process will work as follows: all projects will be ranked by their sealed bid, representing the strike price they would be willing to accept working from the bottom of the ranked list upwards, projects that can offer the lowest bids would be allocated CfDs first once the entire allocated budget is used up, no further projects will be awarded CfDs all projects get the last accepted bid for the technology in that year 11 / L_LIVE_EMEA1: v1

12 Auction tactics Projects that are unlikely to accredit within the RO (March 2017 and March 2015 for solar) are likely to seek CfDs. (Note importance of Grace Periods) DECC advice is to calculate your costs, add your minimum acceptable margin, and bid the lowest possible strike price But much will depend upon data and tactics How quickly will the Pot 2 be used up and over what time period How will off-shore wind bid? What is everyone else doing? DECC is not binding future governments as to the size of future pots and whether actual CfD payments (as opposed to valuation estimates) could result in greater pots in the future All depends upon the LCF, 80% already allocated: in May 2014 DECC awarded eight renewable energy projects early CfDs (five offshore wind, two dedicated biomass and one biomass conversion) under the Final Investment Decision enabling for Renewables (FIDeR) scheme, worth a total of 16.6 billion 12 / L_LIVE_EMEA1: v1

13 The need for a PPA A renewable power station needs a CfD and a PPA. (Under the NETA and BETA electricity market reforms, CfDs were the PPAs under which power was sold - that is not true now) Reasons why a PPA is needed The purpose of the CfD is only to provide the generator with an extra payment if the electricity market price is below the level stated in the CfD. The generator still has to sell the actual electricity produced by the power station. In practice this means selling under a PPA, rather than selling on a spot basis through the balancing and settlement system. This is because: a PPA will be needed in order to provide a bankable long term purchase commitment. a PPA is also necessary in order to avoid the risk of very volatile system prices, and the risk of having to make imbalance payments that would arise when intermittent forms of renewable generation are not available as predicted. 13 / L_LIVE_EMEA1: v1

14 PPA issues Problems getting PPAs Government consultation suggests that it may continue to be hard for independent renewable projects to obtain PPAs This is because there is a limited number of creditworthy energy companies with large market portfolios that can absorb the volatility in the output of renewable power stations and they have relatively little incentive to buy the power Government is developing a voluntary code of practice and model PPAs to help develop a liquid market for PPAs Government is also planning to introduce an offtaker of last resort proposal that would offer PPAs to renewable projects if they cannot get one elsewhere. How would backstop last resort PPAs work: The backstop PPA would be at a discount to market prices. ( 25/MWh) The level of the discount is set to encourage direct PPAs Backstop PPAs would be available to holders of CfDs Some suppliers would be obliged to offer backstop PPAs. Others would offer them voluntarily They would also be available after a commercial PPA expires or is terminated They would last at least 6 months but could be renewed annually Fees charged by the offtakers would be determined by a competitive process and spread across all suppliers 14 / L_LIVE_EMEA1: v1

15 CfD Timetable Recently varied Application window now 16 October to 30 October 2014 Round closure now 15 April 2015 and not end of March 15 / L_LIVE_EMEA1: v1

16 simmons-simmons.com elexica.com This document is for general guidance only. It does not contain definitive advice. SIMMONS & SIMMONS and S&S are registered trade marks of Simmons & Simmons LLP. Simmons & Simmons is an international legal practice carried on by Simmons & Simmons LLP and its affiliated practices. Accordingly, references to Simmons & Simmons mean Simmons & Simmons LLP and the other partnerships and other entities or practices authorised to use the name Simmons & Simmons or one or more of those practices as the context requires. The word partner refers to a member of Simmons & Simmons LLP or an employee or consultant with equivalent standing and qualifications or to an individual with equivalent status in one of Simmons & Simmons LLP s affiliated practices. For further information on the international entities and practices, refer to simmonssimmons.com/legalresp. Simmons & Simmons LLP is a limited liability partnership registered in England & Wales with number OC and with its registered office at CityPoint, One Ropemaker Street, London EC2Y 9SS. It is authorised and regulated by the Solicitors Regulation Authority. A list of members and other partners together with their professional qualifications is available for inspection at the above address. 16 / L_LIVE_EMEA1: v1

Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer:

Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer: Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer: Electricity market reform: an update on contracts for difference Electricity market reform:

More information

Electricity Market Reform

Electricity Market Reform 2016 Electricity Market Reform Background The Electricity Market Reform (EMR) was issued by the UK government as a potential solution to the nation s core energy problems which include; keeping energy

More information

Contract for Difference: The Basics. Levy Control Framework

Contract for Difference: The Basics. Levy Control Framework Contract for Difference: The Basics Electricity Market Reform has long been a key priority for the renewable energy industry. Scottish Renewables has been closely involved in this fast changing policy

More information

CFDS: POTENTIAL OPPORTUNITIES FOR HYDRO PROJECTS. John Puddephatt October 29th 2014

CFDS: POTENTIAL OPPORTUNITIES FOR HYDRO PROJECTS. John Puddephatt October 29th 2014 CFDS: POTENTIAL OPPORTUNITIES FOR HYDRO PROJECTS John Puddephatt October 29th 2014 Statkraft at a glance Installed capacity * 17 607 MW Power production (2013) * 55.9 TWh 97% renewable energy 3 600 employees

More information

The levy control framework (LCF) & contracts for difference (CfD) allocation what it means for the low-carbon generation mix

The levy control framework (LCF) & contracts for difference (CfD) allocation what it means for the low-carbon generation mix The levy control framework (LCF) & contracts for difference (CfD) allocation what it means for the low-carbon generation mix Gareth Redmond 24 th September, 2014 Paid for through energy bills costs passed

More information

What next for UK auctions of renewable Contracts for Difference?

What next for UK auctions of renewable Contracts for Difference? What next for UK auctions of renewable Contracts for Difference? In February we saw the results of the first competitive auction for Contracts for Difference (CfDs), the primary support mechanism for incentivising

More information

Annex B: Strike price methodology July 2013

Annex B: Strike price methodology July 2013 July 2013 URN 13D/189 Contents Introduction... 3 Overview of methodology for deriving a CfD strike price... 3 Strike Prices during the cross-over period with the RO (2014/15 2016/17)... 4 Comparison of

More information

Offshore Wind Economics under EMR: Quantifying the risks

Offshore Wind Economics under EMR: Quantifying the risks Offshore Wind Economics under EMR: Quantifying the risks Daniel Radov - Associate Director, Environment Practice (presenting) Dr. Mauricio Bermudez-Neubauer - Associate Director, Environment Practice Aberdeen

More information

Investing in renewable technologies CfD contract terms and strike prices

Investing in renewable technologies CfD contract terms and strike prices Investing in renewable technologies CfD contract terms and strike prices December 2013 Crown copyright 2013 You may re-use this information (not including logos) free of charge in any format or medium,

More information

Regulatory Briefing. Capital Markets Day. 17 October 2013

Regulatory Briefing. Capital Markets Day. 17 October 2013 Regulatory Briefing Capital Markets Day 17 October 2013 Agenda Andrew Koss Director of Strategy Damien Speight Head Trader Renewables Obligation Contracts for Difference Levy Control Framework Capacity

More information

Contracts for Difference Round Guidance

Contracts for Difference Round Guidance 30th June 2014 Contracts for Difference Round Guidance Contracts for Difference Allocation Round 1 2014 CFD Round Guidance 3 rd October 2014 National Grid Delivery Body Page 1 CFD Allocation Round Guidance

More information

UK renewable energy an update

UK renewable energy an update UK renewable energy an update 30 October 2014 Robert Hull, Managing Director Renewable energy key challenges 1 2 3 Costs to Climate change: Risks to security consumers: decarbonising of supply: short affordability

More information

ELECTRICITY MARKET REFORM - WHITE KNIGHT OR HORSEMAN OF THE APOCALYPSE?

ELECTRICITY MARKET REFORM - WHITE KNIGHT OR HORSEMAN OF THE APOCALYPSE? ELECTRICITY MARKET REFORM - WHITE KNIGHT OR HORSEMAN OF THE APOCALYPSE? Tim Foster Head of Renewable Generation May 2014 Statkraft Statkraft is Europe s largest generator of renewable energy Hydropower,

More information

OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014

OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014 OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014 Statkraft providing Pure Energy Statkraft is Europe s largest generator of renewable energy

More information

UK legislative framework for renewable energy

UK legislative framework for renewable energy UK legislative framework for renewable energy 2015 Update Dominic FitzPatrick Partner, Head of Energy (UK) Last year s article for Clean Energy UK Finance Guide 2014 set out a comprehensive review of the

More information

This seeks to define Contracts for Difference (CfDs) and their relevance to energy related development in Copeland.

This seeks to define Contracts for Difference (CfDs) and their relevance to energy related development in Copeland. Contracts for Difference and Electricity Market Reform LEAD OFFICER: REPORT AUTHOR: John Groves Denice Gallen Summary and Recommendation: This seeks to define Contracts for Difference (CfDs) and their

More information

Viewpoint. Insights and opinions from Baringa Partners. UK Contracts for Difference: Risks and opportunities

Viewpoint. Insights and opinions from Baringa Partners. UK Contracts for Difference: Risks and opportunities Viewpoint Insights and opinions from Baringa Partners UK Contracts for Difference: Risks and opportunities UK Contracts for Difference: Risks and opportunities The UK Government is set to introduce a

More information

Power Generation. Lilian Macleod Power Supply Manager National Grid

Power Generation. Lilian Macleod Power Supply Manager National Grid Power Generation Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. This text box and image can

More information

ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW

ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW February 2014 ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL The Energy Bill is the government s flagship energy policy. There have

More information

Contracts for Difference: an EMR CfD Primer

Contracts for Difference: an EMR CfD Primer Contracts for Difference: an EMR CfD Primer 1 Briefing note October 2015 Contracts for Difference: an EMR CfD Primer This primer briefing is the first in a series of briefings describing the principal

More information

Electricity Generation Costs

Electricity Generation Costs October 2012 Introduction Electricity generation costs are a fundamental part of energy market analysis, and a good understanding of these costs is important when analysing and designing policy. DECC regularly

More information

Renewable Energy in the UK. Dr John Roberts CBE FREng

Renewable Energy in the UK. Dr John Roberts CBE FREng Renewable Energy in the UK Dr John Roberts CBE FREng Renewable Energy in the UK Legislation and Targets: Technology: International Frameworks EU Context National Context Overview and outlook for key renewable

More information

Annex A Feed-in Tariff with Contracts for Difference: Operational Framework

Annex A Feed-in Tariff with Contracts for Difference: Operational Framework Annex A Feed-in Tariff with Contracts for Difference: Operational Framework November 2012 Contents Executive Summary... 5 Document Overview... 9 1. Introduction... 10 The Energy Bill: The Legal Framework

More information

EMR Update Hedging Your Bets

EMR Update Hedging Your Bets New Balls Please The UK Government s overarching energy policy intent centres on the need to decarbonise the economy in an affordable manner while maintaining a sufficient degree of energy security. The

More information

Foratom event 29 April 2015

Foratom event 29 April 2015 Foratom event 29 April 2015 New nuclear in the UK and Electricity Market Reform Colin Parker Head of European Liaison - EDF Energy 1 April 2015 EDF Energy plc. All rights reserved. EDF Energy A UK energy

More information

Government response to the consultation on proposals for the levels of banded support under the Renewables Obligation for the period 2013-17 and the

Government response to the consultation on proposals for the levels of banded support under the Renewables Obligation for the period 2013-17 and the Government response to the consultation on proposals for the levels of banded support under the Renewables Obligation for the period 2013-17 and the Renewables Obligation Order 2012 July 2012 Government

More information

Subsidising Biomass Electricity - Contracts for Difference and what they mean for dedicated and converted biomass power stations

Subsidising Biomass Electricity - Contracts for Difference and what they mean for dedicated and converted biomass power stations January 2014 Subsidising Biomass Electricity - Contracts for Difference and what they mean for dedicated and converted biomass power stations New Government support for renewable electricity, and hence

More information

How Electricity Market Reform may affect independent renewable generators. Robert Buckley Cornwall Energy

How Electricity Market Reform may affect independent renewable generators. Robert Buckley Cornwall Energy How Electricity Market Reform may affect independent renewable generators Robert Buckley Cornwall Energy What we will talk about Current baseline RO & CfD FiTs Commercial implications some thoughts 2 Current

More information

Consultation on changes to Feed-in Tariff accreditation

Consultation on changes to Feed-in Tariff accreditation Consultation on changes to Feed-in Tariff accreditation Removing preliminary accreditation from the Feedin Tariff 21 July 2015 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW

More information

Electricity Market Reform: Catering for smaller players and onsite generation under EMR. REA 27 March 2013 Chris Hemsley, DECC

Electricity Market Reform: Catering for smaller players and onsite generation under EMR. REA 27 March 2013 Chris Hemsley, DECC Electricity Market Reform: Catering for smaller players and onsite generation under EMR REA 27 March 2013 Chris Hemsley, DECC Overall objectives and the role of independent renewables The Government s

More information

POLICY FEEDING RENEWABLE. How the Energy Bill might affect green electricity suppliers and also renewable generators

POLICY FEEDING RENEWABLE. How the Energy Bill might affect green electricity suppliers and also renewable generators FEEDING RENEWABLE POLICY How the Energy Bill might affect green electricity suppliers and also renewable generators Holly Tomlinson Regulation and Compliance Analyst for Ecotricity 18 th January 2013 Contents

More information

Electricity Market Reform: Contract for Difference - Allocation Methodology for Renewable Generation

Electricity Market Reform: Contract for Difference - Allocation Methodology for Renewable Generation Electricity Market Reform: Contract for Difference - Allocation Methodology for Renewable Generation 5 August 2013 Contents Contents... 2 Overview... 4 PART 1... 6 Section 1 - Application... 6 Application

More information

Electricity Market Reform: Consultation on proposals for implementation Government Response

Electricity Market Reform: Consultation on proposals for implementation Government Response Electricity Market Reform: Consultation on proposals for implementation Government Response June 2014 Crown copyright 2014 URN 14D/222 You may re-use this information (not including logos) free of charge

More information

Response to direct consultation questions

Response to direct consultation questions Consultation on proposals for the levels of banded support under the Renewables Obligation for the period 2013-17 and the Renewables Obligation (Scotland) Order 2011 Response by RenewableUK RenewableUK

More information

2014 No. 0000 ELECTRICITY. The Contracts for Difference (Allocation) Regulations 2014

2014 No. 0000 ELECTRICITY. The Contracts for Difference (Allocation) Regulations 2014 Draft Regulations laid before Parliament under section 6(8) of the Energy Act 2013, for approval by resolution of each House of Parliament. D R A F T S T A T U T O R Y I N S T R U M E N T S 2014 No. 0000

More information

CFD Auction Guidance 25 September 2014

CFD Auction Guidance 25 September 2014 CFD Auction Guidance 25 September 2014 This Guidance is intended for information only, it remains subject to change and is not legally binding. This Guidance does not constitute legal or investment advice

More information

Implementing Electricity Market Reform (EMR)

Implementing Electricity Market Reform (EMR) Implementing Electricity Market Reform (EMR) Finalised policy positions for implementation of EMR June 2014 Crown copyright 2014 URN 14D/221 You may re-use this information (not including logos) free of

More information

Early contracts for renewable electricity

Early contracts for renewable electricity Report by the Comptroller and Auditor General Department of Energy & Climate Change Early contracts for renewable electricity HC 172 SESSION 2014-15 27 JUNE 2014 Our vision is to help the nation spend

More information

Making CfDs work for renewable generators

Making CfDs work for renewable generators Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical

More information

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015 Disclaimer: All costs contained within this report are indicative and based on latest market information 16 th March 2015 FD SUMMARY The make up of the electricity bill is changing, with non-commodity

More information

Consultation on the draft Electricity Market Reform Delivery Plan

Consultation on the draft Electricity Market Reform Delivery Plan Consultation on the draft Electricity Market Reform Delivery Plan July 2013 URN:13D/139 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website: www.decc.gov.uk

More information

Electricity Generation Costs 2013

Electricity Generation Costs 2013 Electricity Generation Costs 2013 July 2013 Contents Introduction... 4 How Levelised Costs are calculated... 5 2 Definition of Levelised Costs of Electricity Generation... 5 Data Sources and Assumptions...

More information

npower EMR Explained Session The Energy Event 10 th & 11 th September 2013

npower EMR Explained Session The Energy Event 10 th & 11 th September 2013 npower EMR Explained Session The Energy Event 10 th & 11 th September 2013 Welcome Chris Billing, Head of Indirect Sales, npower Agenda > 13.30 Welcome & introduction Chris Billing EMR Pulse Survey Results

More information

Independent Renewable Energy Generators

Independent Renewable Energy Generators Route to Market Q&A 1. Why won t the CfD-FITs provide a route to market for independent generators? 2. Why won't the problem be resolved with the introduction of CfDs? 3. Why won't the proposed voluntary/market-led

More information

4. Comparison with DECC (2014) Estimated impacts of energy and climate change policies on energy prices and bills

4. Comparison with DECC (2014) Estimated impacts of energy and climate change policies on energy prices and bills Energy prices and bills - supplementary tables Contents: 1. Energy prices and bills 2. Assumptions 3. Scenarios to 2030 4. Comparison with DECC (2014) Estimated impacts of energy and climate change policies

More information

RE: CONSULTATION ON THE DRAFT ELECTRICITY MARKET REFORM DELIVERY PLAN Dear Sir / Madam,

RE: CONSULTATION ON THE DRAFT ELECTRICITY MARKET REFORM DELIVERY PLAN Dear Sir / Madam, 25 September 2013 EMR Delivery Plan Team Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW By email to: emrdeliveryplan@decc.gsi.gov.uk RE: CONSULTATION ON THE DRAFT ELECTRICITY

More information

Electricity Market Reform Contract for Difference: Contract and Allocation Overview

Electricity Market Reform Contract for Difference: Contract and Allocation Overview Electricity Market Reform Contract for Difference: Contract and Allocation Overview August 2013 EMR: Contract for Difference: Contract and Allocation Overview Version 1.0 Contents Energy Market Reform

More information

Electricity Generation Costs (December 2013)

Electricity Generation Costs (December 2013) Electricity Generation Costs (December 2013) [19 th December 2013] Crown copyright [2013] You may re-use this information (not including logos) free of charge in any format or medium, under the terms of

More information

Supporting Carbon Capture and Storage through Policy and Regulation: UK approach 22 April 2015

Supporting Carbon Capture and Storage through Policy and Regulation: UK approach 22 April 2015 Supporting Carbon Capture and Storage through Policy and Regulation: UK approach 22 April 2015 UK Position Most active country in EU on CCS One of the best policy environments for CCS in the world (GCCSI)

More information

Wind and solar reducing consumer bills An investigation into the Merit Order Effect

Wind and solar reducing consumer bills An investigation into the Merit Order Effect Switch for Good Wind and solar reducing consumer bills An investigation into the Merit Order Effect Executive summary Concerns over the cost of renewable subsidy schemes have led to significant policy

More information

ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK

ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK 1 CONTENTS Introduction...3 Section A Price Setting...8 Section B CfD Allocation... 18 Section C CfD Terms Pre Commissioning...

More information

The Future of Renewables. Stuart Pocock Chief Operating Officer

The Future of Renewables. Stuart Pocock Chief Operating Officer The Future of Renewables Stuart Pocock Chief Operating Officer Who we are The REA was established in 2001 as a not-for-profit trade association, representing British renewable energy producers and promoting

More information

Contracts for Difference User Guide Issue 2

Contracts for Difference User Guide Issue 2 Contracts for Difference User Guide Issue 2 Guidance Document for CFD Applicants Issue 2 Contracts for Difference User Guide 3 rd October 2014 National Grid Delivery Body Page 1 Legal Disclaimer This User

More information

Generating a Return. July 2008 BHA SEMINAR

Generating a Return. July 2008 BHA SEMINAR Generating a Return July 2008 BHA SEMINAR Why invest in renewable generation? Reduces CO 2 emissions and climate change Reduces cost of electricity at the site as not paying for transmission of electricity

More information

Session 7: Introduction to Supply Chain Finance and Receivables Purchasing

Session 7: Introduction to Supply Chain Finance and Receivables Purchasing Session 7: Introduction to Supply Chain Finance and Receivables Purchasing Jolyon Ellwood-Russell Richard McKeown 30 October 2015 Agenda Overview of Receivables Risks and credit quality Specific structures:

More information

Opening the CfD support scheme to non-uk renewables projects

Opening the CfD support scheme to non-uk renewables projects Opening the CfD support scheme to non-uk renewables projects European Commission workshop, Brussels, 5 November 2014 Agenda 1. What is the CfD support scheme? 2. What may be the benefits of opening the

More information

EMR update: Parliamentary Committee report is highly critical of the draft Energy Bill

EMR update: Parliamentary Committee report is highly critical of the draft Energy Bill 23-07-2012 ECCC Report EMR update 24.07.2012 EMR update: Parliamentary Committee report is highly critical of the draft Energy Bill Yesterday the Energy and Climate Change Committee (the ECCC) published

More information

The UK Electricity Market Reform and the Capacity Market

The UK Electricity Market Reform and the Capacity Market The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have

More information

The Levy Control Framework

The Levy Control Framework Report by the Comptroller and Auditor General Department of Energy & Climate Change The Levy Control Framework HC 815 SESSION 2013-14 27 NOVEMBER 2013 4 Key facts The Levy Control Framework Key facts 2bn

More information

DRAFT DELIVERY PLAN KEY FACTS

DRAFT DELIVERY PLAN KEY FACTS DRAFT DELIVERY PLAN KEY FACTS The draft EMR Delivery Plan sets out the detail of how the Government will drive investment in renewables while securing electricity supplies at lower cost to consumers. The

More information

Renewable energy in 2014

Renewable energy in 2014 Renewable energy in 2014 Special feature Renewable energy in 2014 Introduction This article updates the information on renewable energy published in the June 2014 edition of Energy Trends, and in the 2014

More information

The UK Offshore Wind Experience

The UK Offshore Wind Experience The UK Offshore Wind Experience Tom Simchak Policy Advisor, Energy British Embassy, Washington EESI Briefing, 28 September 2015 UNCLASSIFIED The United Kingdom is The global market leader in offshore wind:

More information

Estimating the Price of ROCs

Estimating the Price of ROCs Estimating the Price of ROCs Jeff Bryan Ian Lange Alex MacDonald Stirling Economics Discussion Paper 2013-08 July 2013 Online at http://www.management.stir.ac.uk/research/economics/workingpapers Estimating

More information

The Case for Renewables in UK Business

The Case for Renewables in UK Business The Case for Renewables in UK Business New incentives, energy market trends and building regulations have transformed the returns available to UK businesses from generating their own renewable energy Between

More information

The death of invest and forget

The death of invest and forget PÖYRY POINT OF VIEW - APRIL 2015 The death of invest and forget A brave new world for European renewables investors A brave new world for European renewables investors For many investors, renewables have

More information

NIRIG response to EMR: Consultation on Proposals for Implementation

NIRIG response to EMR: Consultation on Proposals for Implementation 90% NIRIG response to EMR: Consultation on Proposals for Implementation 23 rd December 2013 The Northern Ireland Renewables Industry Group (NIRIG) is a joint collaboration between the Irish Wind Energy

More information

THE MAJOR ENERGY USERS COUNCIL BUSINESS ENERGY ROADSHOW SERIES AUTUMN 2012

THE MAJOR ENERGY USERS COUNCIL BUSINESS ENERGY ROADSHOW SERIES AUTUMN 2012 THE MAJOR ENERGY USERS COUNCIL BUSINESS ENERGY ROADSHOW SERIES AUTUMN 2012 Supported by APX-Endex * British Gas Business * BuyEnergyOnline * Corona Energy * Dong Energy * EDF Energy * ENER-G * E.ON UK

More information

Energy Policy & Regulation Briefing Note

Energy Policy & Regulation Briefing Note Creating a sporting habit for life UK Energy Policy and Regulation and what it means for the sports and leisure sector Introduction We have got used to the fact that energy costs will continue to increase.

More information

Contract for Difference for non-uk Renewable Electricity Projects

Contract for Difference for non-uk Renewable Electricity Projects Contract for Difference for non-uk Renewable Electricity Projects August 2014 Crown copyright 2014 URN 14D/291 You may re-use this information (not including logos) free of charge in any format or medium,

More information

Readers should be aware of the following documents which support this publication:

Readers should be aware of the following documents which support this publication: 1 Overview This document is for generators that receive or would like to receive support under the Renewables Obligation (RO) scheme in England, Wales, Scotland and Northern Ireland. It gives an overview

More information

REA response to Commons Energy & Climate Change Committee Inquiry into Low Carbon Infrastructure

REA response to Commons Energy & Climate Change Committee Inquiry into Low Carbon Infrastructure REA response to Commons Energy & Climate Change Committee Inquiry into Low Carbon Infrastructure The Renewable Energy Association (REA) is pleased to submit this response to the above consultation. The

More information

Renewables Obligation: Guidance for Generators

Renewables Obligation: Guidance for Generators Renewables Obligation: Guidance for Generators Guidance Team: Renewable Electricity Publication date: 1 June 2014 Tel: 0207 901 7310 Email: Renewable@ofgem.gov.uk Overview: This document is for generators

More information

FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS

FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS BRIEFING FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS SEPTEMBER 2015 ENERGY TRANSITION ACT ADOPTED ON 22 JULY 2015 NEW SUPPORT MECHANISM THE CONTRACT FOR DIFFERENCE CALCULATION

More information

Chapter 6 Renewable sources of energy

Chapter 6 Renewable sources of energy RENEWABLES Key points Chapter 6 Renewable sources of energy Electricity generation in the UK from renewable sources increased by 21 per cent between 2013 and 2014, to reach 64.7 TWh. Capacity grew by 24

More information

IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014

IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014 IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014 PÖYRY MANAGEMENT CONSULTING ENERGY Pöyry offices (c) grafikdienst.com Pöyry Management

More information

Energy Productivity & Pricing

Energy Productivity & Pricing Energy Productivity & Pricing Markets for energy, renewable energy and carbon Dr Jenny Riesz February 2014 2 Average electricity retail prices Electricity price rises CSIRO Future Grid (2013) Change and

More information

Renewable Development Funds Guidelines - 2016

Renewable Development Funds Guidelines - 2016 - 2016 Clean Wind and Green Source Development Funds Thank you for your interest in PGE s Renewable Development Fund program - a program made possible by contributing customers participating in Portland

More information

EMR: Consultation on Balancing and Settlement Code subsidiary documents

EMR: Consultation on Balancing and Settlement Code subsidiary documents EMR: Consultation on Balancing and Settlement Code subsidiary documents URN: 14D/108 April 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website:

More information

Energy, Trade & Commodities Alert

Energy, Trade & Commodities Alert Energy, Trade & Commodities Alert If you have questions or would like additional information on the material covered in this Alert, please contact the author, or the Reed Smith lawyer with whom you regularly

More information

Electricity Market Reform: policy overview

Electricity Market Reform: policy overview Electricity Market Reform: policy overview November 2012 2 ELECTRICITY MARKET REFORM: POLICY OVERVIEW Presented to Parliament by the Secretary of State for Energy and Climate Change by Command of Her Majesty

More information

Opportunities for Biogas Digesters

Opportunities for Biogas Digesters Opportunities for Biogas Digesters Presented to the California Bioresources Alliance September 13, 2011 Jody S. London P.O. Box 3629 Oakland, California 94609 510/459-0667 jody_london_consulting@earthlink.net

More information

Tax Fraud in Financial Services

Tax Fraud in Financial Services Tax Fraud in Financial Services Innocent Until Proven Careless? Nick Skerrett Stephen Gentle 30 September 2014 Contents Where are financial institutions exposed to fraud? Civil enforcement Statutory tax

More information

Electricity Market Reform: Amendment to Contracts for Difference (Definition of Eligible Generator) Regulations

Electricity Market Reform: Amendment to Contracts for Difference (Definition of Eligible Generator) Regulations Electricity Market Reform: Amendment to Contracts for Difference (Definition of Eligible Generator) Regulations Consultation on a proposed amendment to enable retrofit Carbon Capture and Storage projects

More information

Electricity Market Reform

Electricity Market Reform e-factsheet Electricity Market Reform Making sure your business is ready 2/9 Electricity Market Reform is here The UK s energy policy is no longer in debate: it s now reality. On 1 August, the Capacity

More information

Caithness-Moray Needs Case Consultation

Caithness-Moray Needs Case Consultation Caithness-Moray Needs Case Consultation Introduction RenewableUK and Scottish Renewables are the leading trade associations for renewable technologies in the UK and Scotland respectively, and welcome the

More information

ELECTRICITY MARKET REFORM SHAPING THE FUTURE GB POWER MARKET

ELECTRICITY MARKET REFORM SHAPING THE FUTURE GB POWER MARKET ELECTRICITY MARKET REFORM SHAPING THE FUTURE GB POWER MARKET A Pöyry briefing note Electricity Market Reform (EMR) proposals, intended to deliver the transition to a decarbonised electricity sector, have

More information

Key HR Legal Issues for Asset Managers. Andrea Finn, Ian Fraser & Julian Taylor

Key HR Legal Issues for Asset Managers. Andrea Finn, Ian Fraser & Julian Taylor Key HR Legal Issues for Asset Managers Andrea Finn, Ian Fraser & Julian Taylor October 2015 Overview FEMR people recommendations Culture focus Remuneration 1 / B_LIVE_EMEA1:2813797v1 Culture and conduct

More information

Renewable Energy Sources (RES) Support Levels, 2009

Renewable Energy Sources (RES) Support Levels, 2009 Austria Hydropower Green electricity act Feed-in tariff (incentive only) 3.25 644,000 5.05 Wind (onshore) Green electricity act Feed-in tariff (incentive only) 59.46 1,915,000 31.05 Biomass Green electricity

More information

Disability discrimination: managing disability in the employment lifecycle. Philip Bartlett and Sarah Wybron

Disability discrimination: managing disability in the employment lifecycle. Philip Bartlett and Sarah Wybron Disability discrimination: managing disability in the employment lifecycle Philip Bartlett and Sarah Wybron 04 March 2015 Introductions Legal position and recent case law Recruitment Performance management

More information

e-factsheet Feed-in Tariffs what we have to offer

e-factsheet Feed-in Tariffs what we have to offer e-factsheet Feed-in Tariffs what we have to offer 2 of 12 Feed-in Tariffs (FITs) make renewable generation more financially rewarding for smaller installations and help reduce the UK s carbon emissions.

More information

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX] EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy

More information

Insurance issues for commercial development

Insurance issues for commercial development Insurance issues for commercial development Mark Waghorn, Partner, Banking (Simmons & Simmons) Steve Cox, Executive Director (Willis) and Jack Rutherford, Associate, Projects (Simmons & Simmons) 1 December

More information

UK: Energy Briefing. February 2013

UK: Energy Briefing. February 2013 UK: Energy Briefing February 2013 Contents Introduction 01 The statutory regime 02 The objectives of wholesale market 02 liquidity The ʺsecure & promoteʺ generation 03 licence condition The ʺmandatory

More information

Electricity market reform: policy overview

Electricity market reform: policy overview Electricity market reform: policy overview May 2012 Contents Introduction... 3 Electricity Market Reform... 6 The Move to EMR... 21 Costs and Benefits of EMR... 24 EMR in the Devolved Administrations...

More information

Contracts for Difference and the Energy from Waste Industry. Gareth Simkins Intelligence Analyst

Contracts for Difference and the Energy from Waste Industry. Gareth Simkins Intelligence Analyst Contracts for Difference and the Energy from Waste Industry Gareth Simkins Intelligence Analyst Agenda The regime The winning projects What happens next What are Contracts for Difference? A new subsidy

More information

2014 No ELECTRICITY. The Contracts for Difference (Definition of Eligible Generator) Regulations 2014

2014 No ELECTRICITY. The Contracts for Difference (Definition of Eligible Generator) Regulations 2014 Draft Regulations laid before Parliament under section 6(8) of the Energy Act 2013, for approval by resolution of each House of Parliament. D R A F T S T A T U T O R Y I N S T R U M E N T S 2014 No. 0000

More information

CONSULTATION ON DRAFT GUIDANCE: OFFTAKER OF LAST RESORT (OLR): ESSENTIAL GUIDE FOR LICENSED SUPPLIERS

CONSULTATION ON DRAFT GUIDANCE: OFFTAKER OF LAST RESORT (OLR): ESSENTIAL GUIDE FOR LICENSED SUPPLIERS Licensed suppliers Other interested parties Email: REDevelopment@ofgem.gov.uk Date: 29 June 2015 Dear Supplier, CONSULTATION ON DRAFT GUIDANCE: OFFTAKER OF LAST RESORT (OLR): ESSENTIAL GUIDE FOR LICENSED

More information

TOWARDS AN AUCTION SYSTEM FOR RENEWABLE ENERGY REMUNERATION: KEY POINTS PAPER PUBLISHED

TOWARDS AN AUCTION SYSTEM FOR RENEWABLE ENERGY REMUNERATION: KEY POINTS PAPER PUBLISHED ENERGY BRIEFING TOWARDS AN AUCTION SYSTEM FOR RENEWABLE ENERGY REMUNERATION: KEY POINTS PAPER PUBLISHED AUGUST 2015 FROM 2017, AN AUCTION SYSTEM WILL APPLY TO RENEWABLE ENERGY REMUNERATION THE KEY POINTS

More information

Cloud Computing Adoption in the Financial Services Industry

Cloud Computing Adoption in the Financial Services Industry Cloud Computing Adoption in the Financial Services Industry James Cotter Lawrence Brown 07 and 08 October 2015 Agenda Recap on what cloud services are Differences between cloud services and more traditional

More information

White Paper Growing Up: Onshore wind s place in a competitive, low carbon power generation system. At a Crossroad the UK Power Market

White Paper Growing Up: Onshore wind s place in a competitive, low carbon power generation system. At a Crossroad the UK Power Market FTI Consulting: Energy sector White Paper Growing Up: Onshore wind s place in a competitive, low carbon power generation system October 2015 At a Crossroad the UK Power Market The UK is at a pivotal moment

More information