1 Cost of Poor Quality: Analysis for IT Service Management Software Software Concurrent Session: ISE 09 Wed. May 23, 8:00 AM 9:00 AM Presenter: Daniel Zrymiak

2 Key Points: Use the Cost of Poor Quality: Failure Dimensions to address and resolve problems originating from an inadequate IT Service Management application. Define Factors and Dimensions of Failure by Type Define Factors and Dimensions by Correction Type Define Failures by Phase Track specified outcomes for Continual Improvement Show the Cost-Benefit advantages of improvements

3 Presentation Benefits (1 of 2): Learning Objectives: Demonstrate how a detailed classification of Failure Costs and Resolution Methods can be applied to support the development and maintenance of IT Service Management software. Can you think of one example of a Failure Cost or Cost of Poor Quality related to the development, deployment, and maintenance of a software system? How would this example be categorized?

4 Presentation Benefits (2 of 2): Career Benefits: Align quality initiatives to financial realities and priorities Expand analysis to include financial tracking of failures and corrections for future reference Technical Content: Software Quality Engineering/Management, Lean Six Sigma Professional Development: Cost of Poor Quality is pertinent for Managers of Quality and Organizational Excellence, also Lean Six Sigma Black Belts. Automation software is relevant for Testing, IT Governance.

5 Scenario: Deficient IT application Canadian-based Energy company used an IT Service Management application from an external vendor. Development, training, and deployment did not occur as scheduled causing schedule delays and cost overruns. Eventual implementation and go-live was characterized by frequent outages, user dissatisfaction, and interruption of regular business processes. Transition budget was depleted before the application was stabilized.

6 Factors and Dimensions Factors: Broad categories or segments to address the failures at a more granular level Dimensions: Elements of analysis within a factor to determine appropriate resolution and corrective action

7 Factors of Failure Costs Failure Type: People, Product, Process, Transaction, General Correction Type: Failure Phase: Resolution, Restoration Expectations, Commitment, Realization, Delivery, Support

8 People (Capability vs. Engagement) For failures related to people performing the work, two dimensions should be considered. Capability refers to the qualifications and general competency. Engagement considers the overall motivation and willingness to perform the work to the required standard. Due to inadequate training and communication, the individuals using the tool were not adequately capable nor engaged to use the tool correctly.

9 Product (Meeting Specs vs. Fitness For Use) For failures related to products, two dimensions should be considered. Meeting Specifications can be demonstrated by objective verifications. Fitness For Use can be observed through subjective validations (i.e. look and feel) The tool was ITIL compliant and demonstrated correct functionality in controlled tests, but was not robust to handle normal volumes, nor could it be adapted to fit the client s normal business processes or expected workflows.

10 Transaction (Accuracy vs. Timeliness) For failures related to transactions, two dimensions should be considered. Transactions can fail at the point of interaction or discovery can occur later through reporting. Accuracy can relate to the correctness of quantity, suitability, and thoroughness. Timeliness refers to tracking delays and lateness of the deliverable. The tool was difficult to configure, and configuration problems affected accuracy. Timeliness was impaired by performance problems, causing delays to handle requests.

11 Process (Effectiveness vs. Adherence) For failures related to processes, two dimensions should be considered. Process failures can lead to subsequent failures in other areas. Effectiveness determines whether the process was suitable and applicable. Adherence analysis reveals points where a valid process is being disregarded in favor of ad-hoc or tailored solutions. The tool had a distinct workflow which was different from the client s prior patterns, requiring adjustment. To bypass restrictions, tailoring and shortcuts were required.

12 General (Explicit vs. Implicit) For failures that do not align with a single category, a general analysis should occur. Explicit failures reveal shortcomings relative to an approved standard or benchmark. Implicit failures diverge from expected outcomes and contribute more significantly to overall dissatisfaction. There was a subjective sense of frustration and disappointment with the tool, which diminished the overall effectiveness of the transition.

13 Cost of Poor Quality Measurements People: Losses are measured in hours and days delayed per person, and Escalation/Specialist resource time and materials to resolve. Product: Losses are measured in the variable costs of system impairments and downtime arising from the deficiencies. Process: Losses are measured in the frequency of redundant or abandoned processes needed to complete transactions. General: There were indirect outcomes assignable to the low quality tools including team member attrition and project deferral due to lack of confidence with the tool.

14 Factors of Failure Costs Failure Type: People, Product, Process, Transaction, General Correction Type: Failure Phase: Resolution, Restoration Expectations, Commitment, Realization, Delivery, Support

15 Resolution (Contingency vs. Correction) All failures must be resolved to move from a failed error state to a stabilized recovery. Contingency programs involve different initiatives to compensate for the error condition. Corrective actions require the root causes to be identified and resolved. As a contingency, departments revert to tracking information on their MS Office applications and updating by . To correct the problems, technical teams investigated based on priorities reported by the post-go Live Command Center.

16 Restoration (Mitigation vs. Accommodation) Following the interruption and loss arising from failures, efforts are needed to restore the trust and confidence in the relationship. Mitigation includes collaboration through awareness and vigilance, and applied controls and standards to entities. Accommodation refers to the concessions and compensations to address losses and penalties. Mitigation for future releases could be established through a more rigorous approval and release process (on next slide). Accommodation was made through financial concessions.

17 Establish Mandatory Release Criteria Given the error conditions realized from a poor IT Service Management application, releases to client production systems should be restricted until objectively proven adequate in the following categories of system assurance: PRODUCT SYSTEM COMPLIANCE Functionality Availability Security Reliability Configurability Environmental Controls (i.e. SOX) Usability Performance Verification and Validation Assurance Maintainability Efficiency Data Privacy

18 Cost of Correction Measurements Contingency: These costs are measured in hours and days of just in case plans to continue in the event of system failure or data corruption. Corrective Actions: These costs reflected the rework, redesign, and incremental variable costs associated with maintenance and support releases and retraining of personnel. Mitigation: These costs reflected the additional design and process steps needed in response to identified risks and hazards of software failure. Accommodations: These costs include the various penalties and concessions which were needed to comply with contractual service level expectations and preserve the business relationship.

19 Factors of Failure Costs Failure Type: People, Product, Process, Transaction, General Correction Type: Failure Phase: Resolution, Restoration Expectations, Commitment, Realization, Delivery, Maintenance and Support

20 Need to Distinguish Failures by Phase CoPQ programs experience a disproportionate clustering of failures within the client-facing areas of the organization. The true source and timing of failures actually occurred earlier in the business cycle. Distinguishing failures by phase increases transparency and accountability across the entire enterprise. Early-stage failures can affect acceptance at later stages.

21 Phase 1: Expectations Prior to engagement, the organization establishes expectations as the basis for comparisons and standards (i.e. boutique shop vs. factory outlet merchandise). Failure points are established by the overall impression of quality as communicated by marketing and positioning strategies. The vendor promoted itself as a reliable provider of IT Service Management applications, and sold itself being capable of delivering a quality product.

22 Phase 2: Commitment and Planning In this phase, specific promises and delivery terms are established. Based on these agreements, the details for fulfillment are created. Fine print needs to be carefully reviewed to avoid potential problems. Risks and contingency scenarios should be considered in anticipation of probable potential failures. When committing and planning for the development and deployment of the IT Service Management tool, there were inadequate resources applied to testing, training, and deployment, creating opportunities for failures.

23 Phase 3: Realization and Fulfillment In this phase, actual work is performed to bring the solution from concept to readiness. Depending on the complexity, this is the phase where most failures are injected. Without the necessary controls, failures from this phase can propagate and taint the overall solution. With respect to the IT Service Management tool, inadequate configurations were pushed to the client system by the vendor, without having had the key assurance attributes (i.e. reliability, usability, system performance, etc.) properly verified and validated. False Green indicators were given.

24 Phase 4: Delivery In this phase, the product, service, or solution is provided to the customer or stakeholder. This is where evident failures could be rejected, causing delays and dissatisfaction. This is the go-live portion where failures combine technical internal failure characteristics and supplemental external failure business losses. With the vendor, there was inadequate preparation for the go-live, and the resulting change to the business was met with surprise and frustration. Damage control was needed with the involvement of senior technical expertise.

25 Phase 5: Maintenance and Support In this final phase, constant interaction is performed to address the correction, adaptation, or prevention of identified or potential shortcomings. Support can be scheduled or immediate, depending on the scope and importance of the failure. After applying the corrections, organizations should communicate causes and actions through a Failure Tracking System to reduce overall failures. Maintenance and Support are provided by the vendor through a responsive Command Center to expedite fixes.

26 Continual Improvement through Tracking Failure Analysis includes the categorization and discovery of the modes and effects of different failure types. Failure Tracking links this information to specific actions and an ongoing information system. SLACK model: Summary, Lessons Learned, Action, Commitment, Knowledge Base

27 Summary Failures can be summarized and categorized by factor and dimension (i.e. People-based, Capability). From a simple description, quick analysis and rapid responses can be consistently supported across the organization. Common failure identifications can support trend analysis and statistical process controls. The IT Service Management tool failures reflected failures across all categories (i.e. people, product, process) and in almost every dimension (i.e. capability, engagement).

28 Lessons Learned This instructive portion captures the discovery of the information while it is current and available. Insights on the impacts and downstream effects of particular failures will prompt the establishment and application of appropriate controls and standards. Real-life examples will reinforce training and awareness, and leverage common experiences across the enterprise. The lessons learned from the deficient IT Service Management tools are shown on the next slide.

29 Lessons Learned People: Ensure intended users are proficient and engaged with the product prior to release, and are positive advocates. Product: Restrict releases until they have met the mandatory assurance criteria for Product, System and Compliance. Process: Align the IT Service Management tools with the established processes agreed by client, business, and stakeholders; preventing workarounds and ad hoc solutions. General: Forcing a deficient application upon a client and delivery team will deplete time and resources, causing losses. It is better to stabilize the system prior to release.

30 Action The correction is outlined by factor and dimension (i.e.: Resolution, Contingency). By recording the actions, this provides a ready reference to support recurrence and rapid turnaround of corrections. There are many actions required to correct and mitigate the risks arising from the deployment of a deficient IT Service Management System. These should be noted in order to be consistently leveraged and replicated across different engagements.

31 Commitment Every action requires a commitment which includes the resource owning the solution and the completion date. Tracking will increase transparency and accurate computation of costs for failure response. CoPQ can be approximated and used as a baseline for cost reduction initiatives including Variance Analysis, Activity Based Costing, and Lean Six Sigma programs. Compressing transition costs comes from increasing preparations and preventive measures, increasing levels of assurance, and controlling the deployment of applications.

32 Knowledge Base All failure information should be aggregated into a common knowledge base. Objective information can be used as inputs for verification, validation and future planning activities. Build a continual learning organization which updates knowledge for continual improvement. Knowledge of IT Service Management applications currently in use can be captured and made available for future reference.

33 Benefits to CoPQ Programs Increased accuracy of failure tracking and diagnosis. Improved application of corrective methods to target nature and timing of failure type. Diligent tracking of failures and response activities will generate more accurate cost information. Combination of approaches will objectively reduce Cost of Poor Quality and reduce turnaround time for solutions.

34 Cost-Benefit Rationale for Improvements False savings to reduce costs by streamlining development and deployment of IT Service Management applications. Actual Experience from Canadian Energy company demonstrates that a deficient solution will create delays and disruptions, requiring rework from technical resources, and deplete transition budgets without client satisfaction. Incremental improvements to enhance assurance, user preparations, and release controls will result in a more correct and usable solution, reducing the need for expensive restoration and stabilization, saving time and money.

35 Learning Confirmation: Demonstrate Demonstrate how a detailed classification of Failure Costs and Resolution Methods can be applied to support the development and maintenance of IT Service Management software. Can you now apply Cost of Poor Quality analysis methods, using factors and dimensions, to demonstrate the expected benefits and mitigations resulting from adopting increased quality approaches?

36 Presentation Business Context What is the business context and how does it improve upon the existing knowledge base? This presentation extends the analysis of Failure Costs by defining categories of failure and resolution, and specifying phases for appropriate correction.

37 Presentation Practical Applications What are the practical applications towards the participants jobs, functions, projects, or departments? This presentation defined the cost descriptions to support diagnosis and the establishment of an ongoing knowledge base to support more rapid resolutions.

38 Presentation Integration or Connection How can this knowledge be integrated or connected to other areas? This presentation is tied to overall software quality management and continual improvement. Lean and Six Sigma practitioners will benefit from obtaining the cost measures and deriving the value streams for software.

39 Presentation Business Context What are the expected gains, and the risks and implications of omission? This presentation provides awareness of potential software quality problems and a structured approach to correction, with the risks being expanded losses and Cost of Poor Quality from undesirable outcomes.

40 Comments/ Questions: Daniel Zrymiak Accenture: Mobilization/ Outsourcing Excellence (604) or (604) A Ave., Surrey, B.C., Canada

Outsourcing Life Cycle: Integrating DMAIC Controls. WCQI Concurrent Session: M09 Monday May 21, 1:30 2:30 PM Presenter: Daniel Zrymiak

Outsourcing Life Cycle: Integrating DMAIC Controls. WCQI Concurrent Session: M09 Monday May 21, 1:30 2:30 PM Presenter: Daniel Zrymiak Outsourcing Life Cycle: Integrating DMAIC Controls WCQI Concurrent Session: M09 Monday May 21, 1:30 2:30 PM Presenter: Daniel Zrymiak Introduction This presentation combines knowledge of an Outsourcing

More information

Camber Quality Assurance (QA) Approach

Camber Quality Assurance (QA) Approach Camber Quality Assurance (QA) Approach Camber s QA approach brings a tested, systematic methodology, ensuring that our customers receive the highest quality products and services, delivered via efficient

More information

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK MAXIMIZE PERFORMANCE AND REDUCE RISK 1 BROCHURE COMPLEXITIES IN MISSION CRITICAL SYSTEMS CONTINUE TO INCREASE Mission critical communications systems have become increasingly complex as more features and

More information

Part A OVERVIEW...1. 1. Introduction...1. 2. Applicability...2. 3. Legal Provision...2. Part B SOUND DATA MANAGEMENT AND MIS PRACTICES...

Part A OVERVIEW...1. 1. Introduction...1. 2. Applicability...2. 3. Legal Provision...2. Part B SOUND DATA MANAGEMENT AND MIS PRACTICES... Part A OVERVIEW...1 1. Introduction...1 2. Applicability...2 3. Legal Provision...2 Part B SOUND DATA MANAGEMENT AND MIS PRACTICES...3 4. Guiding Principles...3 Part C IMPLEMENTATION...13 5. Implementation

More information

Digital Asset Manager, Digital Curator. Cultural Informatics, Cultural/ Art ICT Manager

Digital Asset Manager, Digital Curator. Cultural Informatics, Cultural/ Art ICT Manager Role title Digital Cultural Asset Manager Also known as Relevant professions Summary statement Mission Digital Asset Manager, Digital Curator Cultural Informatics, Cultural/ Art ICT Manager Deals with

More information

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY The Define/Align/Approve Reference Series NEEDS BASED PLANNING FOR IT DISASTER RECOVERY Disaster recovery planning is essential it s also expensive. That s why every step taken and dollar spent must be

More information

Internal Audit Report ITS CHANGE MANAGEMENT PROCESS. Report No. SC-11-11

Internal Audit Report ITS CHANGE MANAGEMENT PROCESS. Report No. SC-11-11 Internal Audit Report ITS CHANGE MANAGEMENT PROCESS Report No. SC-11-11 March 2011 SANTA CRUZ: INTERNAL AUDIT March 31, 2011 MARY DOYLE Vice Chancellor Information Technology Re: Internal Audit Report

More information

Ohio Supercomputer Center

Ohio Supercomputer Center Ohio Supercomputer Center IT Business Continuity Planning No: Effective: OSC-13 06/02/2009 Issued By: Kevin Wohlever Director of Supercomputer Operations Published By: Ohio Supercomputer Center Original

More information

Qlik UKI Consulting Services Catalogue

Qlik UKI Consulting Services Catalogue Qlik UKI Consulting Services Catalogue The key to a successful Qlik project lies in the right people, the right skills, and the right activities in the right order www.qlik.co.uk Table of Contents Introduction

More information

Advisory Guidelines of the Financial Supervisory Authority. Requirements regarding the arrangement of operational risk management

Advisory Guidelines of the Financial Supervisory Authority. Requirements regarding the arrangement of operational risk management Advisory Guidelines of the Financial Supervisory Authority Requirements regarding the arrangement of operational risk management These Advisory Guidelines have established by resolution no. 63 of the Management

More information

Business Continuity Position Description

Business Continuity Position Description Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary

More information

MKS Integrity & CMMI. July, 2007

MKS Integrity & CMMI. July, 2007 & CMMI July, 2007 Why the drive for CMMI? Missed commitments Spiralling costs Late delivery to the market Last minute crunches Inadequate management visibility Too many surprises Quality problems Customer

More information

IAOP: Creating Sustainable value in Outsourcing Klaus Koefoed

IAOP: Creating Sustainable value in Outsourcing Klaus Koefoed IAOP: Creating Sustainable value in Outsourcing Klaus Koefoed April 28 th 2010 Copyright 2009 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture.

More information

White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard

White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard Abstract: This white paper outlines the ITIL industry best practices methodology and discusses the methods in

More information

The fact is that 90% of business strategies are not implemented through operations as intended. Overview

The fact is that 90% of business strategies are not implemented through operations as intended. Overview Overview It is important to recognize that a company s network determines its supply chain efficiency and customer satisfaction. Designing an optimal supply chain network means the network must be able

More information

Configuration control ensures that any changes to CIs are authorized and implemented in a controlled manner.

Configuration control ensures that any changes to CIs are authorized and implemented in a controlled manner. ITIL Intermediate Capability Stream: RELEASE CONTROL AND VALIDATION (RCV) CERTIFICATE SCENARIO BOOKLET Scenario One A global company develops its own applications to support the business. The service transition

More information

Data Quality Assessment. Approach

Data Quality Assessment. Approach Approach Prepared By: Sanjay Seth Data Quality Assessment Approach-Review.doc Page 1 of 15 Introduction Data quality is crucial to the success of Business Intelligence initiatives. Unless data in source

More information

Building a Data Quality Scorecard for Operational Data Governance

Building a Data Quality Scorecard for Operational Data Governance Building a Data Quality Scorecard for Operational Data Governance A White Paper by David Loshin WHITE PAPER Table of Contents Introduction.... 1 Establishing Business Objectives.... 1 Business Drivers...

More information

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing

More information

Address IT costs and streamline operations with IBM service desk and asset management.

Address IT costs and streamline operations with IBM service desk and asset management. Asset management and service desk solutions To support your IT objectives Address IT costs and streamline operations with IBM service desk and asset management. Highlights Help improve the value of IT

More information

Consequences of Poorly Performing Software Systems

Consequences of Poorly Performing Software Systems Consequences of Poorly Performing Software Systems COLLABORATIVE WHITEPAPER SERIES Poorly performing software systems can have significant consequences to an organization, well beyond the costs of fixing

More information

Products/Services. Contact and Servicing Center Outsource Business Processes to Reduce Costs and Increase Business Agility

Products/Services. Contact and Servicing Center Outsource Business Processes to Reduce Costs and Increase Business Agility Products/Services Contact and Servicing Center Outsource Business Processes to Reduce Costs and Increase Business Agility Products/Services Does the world seem to be spinning faster these days? Change

More information

Tapping the benefits of business analytics and optimization

Tapping the benefits of business analytics and optimization IBM Sales and Distribution Chemicals and Petroleum White Paper Tapping the benefits of business analytics and optimization A rich source of intelligence for the chemicals and petroleum industries 2 Tapping

More information

Best practices in project and portfolio management

Best practices in project and portfolio management Business white paper Best practices in project and portfolio management Practical advice for achieving greater value and business benefits Table of contents 3 Introduction 3 The importance of best practices

More information

Feet On The Ground: A Practical Approach To The Cloud Nine Things To Consider When Assessing Cloud Storage

Feet On The Ground: A Practical Approach To The Cloud Nine Things To Consider When Assessing Cloud Storage Feet On The Ground: A Practical Approach To The Cloud Nine Things To Consider When Assessing Cloud Storage by seth anderson consultant audiovisual preservation solutions 2014 AVPreserve Media Archiving

More information

Sound Practices for the Management of Operational Risk

Sound Practices for the Management of Operational Risk 1 Sound Practices for the Management of Operational Risk Authority 1.1 Section 316 (4) of the International Business Corporations Act (IBC Act) requires the Commission to take any necessary action required

More information

WHITE PAPER APRIL 2012. Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives

WHITE PAPER APRIL 2012. Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives WHITE PAPER APRIL 2012 Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives New healthcare reforms have created an unprecedented impact on hospital systems operations.

More information

Introduction. What is ITIL? Automation Centre. Tracker Suite and ITIL

Introduction. What is ITIL? Automation Centre. Tracker Suite and ITIL 1 Introduction The Information Technology Infrastructure Library (ITIL) aims to improve the management of IT services within the organization, for lowered costs, improved efficiency and productivity. But

More information

FINANCIAL MANAGEMENT MATURITY MODEL

FINANCIAL MANAGEMENT MATURITY MODEL Definition: Financial management is the system by which the resources of an organisation s business are planned, directed, monitored and controlled to enable the organisation s goals to be achieved. Guidance

More information

Problem Management Fermilab Process and Procedure

Problem Management Fermilab Process and Procedure Management Fermilab Process and Procedure Prepared for: Fermi National Laboratory June 12, 2009 Page 1 of 42 GENERAL Description Purpose Applicable to Supersedes This document establishes a Management

More information

Reaching CMM Levels 2 and 3 with the Rational Unified Process

Reaching CMM Levels 2 and 3 with the Rational Unified Process Reaching CMM Levels 2 and 3 with the Rational Unified Process Rational Software White Paper TP174 Table of Contents INTRODUCTION... 1 LEVEL-2, REPEATABLE... 3 Requirements Management... 3 Software Project

More information

Best Practices in ICS Security for System Operators. A Wurldtech White Paper

Best Practices in ICS Security for System Operators. A Wurldtech White Paper Best Practices in ICS Security for System Operators A Wurldtech White Paper No part of this document may be distributed, reproduced or posted without the express written permission of Wurldtech Security

More information

MyOfficePlace Business Critical Services Handbook

MyOfficePlace Business Critical Services Handbook MyOfficePlace Business Critical Services Handbook 1. Support overview Mission statement MyOfficePlace LTD. is committed to responding quickly to your inquiries. We will help you ensure that your IT environments

More information

Project Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator

Project Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator Project Management for Process Improvement Efforts Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator 2 Project and Process Due to the nature of continuous improvement, improvement

More information

Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today s presentation)

Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today s presentation) Data Center Migration Primer Mark Smith Wednesday, June 27, 2012 General Information Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today

More information

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus Information Technology Engineers Examination Information Technology Service Manager Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination

More information

ITIL Introducing service transition

ITIL Introducing service transition ITIL Introducing service transition The goals of service transition Aligning the new or changed service with the organisational requirements and organisational operations Plan and manage the capacity and

More information

Vendor Management Best Practices

Vendor Management Best Practices 23 rd Annual and One Day Seminar Vendor Management Best Practices Catherine Bruder CPA, CITP, CISA, CISM, CTGA Michigan Texas Florida Insight. Oversight. Foresight. SM Doeren Mayhew Bruder 1 $100 billion

More information

Credit Union Liability with Third-Party Processors

Credit Union Liability with Third-Party Processors World Council of Credit Unions Annual Conference Credit Union Liability with Third-Party Processors Andrew (Andy) Poprawa CEO, Deposit Insurance Corporation of Ontario Canada 1 Credit Union Liability with

More information

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University.

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University. Data Sheet Cisco Optimization s Optimize Your Solution using Cisco Expertise and Leading Practices Optimizing Your Business Architecture Today, enabling business innovation and agility is about being able

More information

ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists

ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists Incident ITSM Maturity Model 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident process exists Incident policies governing incident Incident urgency, impact and priority

More information

Information Technology Infrastructure Library (ITIL )

Information Technology Infrastructure Library (ITIL ) Information Technology Infrastructure Library (ITIL ) A Case Study on Incident Management February 8, 2006 Tim Shepich Principal, IT Management Consulting, Nouri Associates Inc. itsmf USA San Diego Local

More information

ICG Team. ICG Solutions: Your challenges and seeing them through. software solutions for oil & Gas companies

ICG Team. ICG Solutions: Your challenges and seeing them through. software solutions for oil & Gas companies WHAT'S INSIDE Product Catalog, Software Solutions for Oil & Gas companies ICG Team INNOVATION CENTRIC GROUP ICG Solutions: Your challenges and seeing them through. Designing custom software solutions for

More information

Risk profile table for deployment of releases to the main web site. High Acceptable Unacceptable Unacceptable

Risk profile table for deployment of releases to the main web site. High Acceptable Unacceptable Unacceptable ITIL V3 Intermediate Capability Stream: RELEASE, CONTROL AND VALIDATION (RC&V) CERTIFICATE SCENARIO BOOKLET Scenario One A global company develops their own applications to support the business. The Service

More information

Managing IT Using the Summit Platform

Managing IT Using the Summit Platform White Paper Managing IT Using the Summit Platform SUMMUS Software 1 Introduction Midsize and enterprise organizations worldwide are faced with increasingly tough challenges. Many are asking their IT organizations

More information

Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models

Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models 2013 Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models 1 Contents 1 Context... 1 2 General... 2 3 Guidelines on Pre-application for Internal Models...

More information

ITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0

ITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0 ITIL by Test-king Number: ITIL-F Passing Score: 800 Time Limit: 120 min File Version: 15.0 Sections 1. Service Management as a practice 2. The Service Lifecycle 3. Generic concepts and definitions 4. Key

More information

Risk management and the transition of projects to business as usual

Risk management and the transition of projects to business as usual Advisory Risk management and the transition of projects to business as usual Financial Services kpmg.com 2 Risk Management and the Transition of Projects to Business as Usual Introduction Today s banks,

More information

Fundamentals of Measurements

Fundamentals of Measurements Objective Software Project Measurements Slide 1 Fundamentals of Measurements Educational Objective: To review the fundamentals of software measurement, to illustrate that measurement plays a central role

More information

WHITE PAPER December, 2008

WHITE PAPER December, 2008 INTRODUCTION Key to most IT organization s ongoing success is the leadership team s ability to anticipate, plan for, and adapt to change. With ever changing business/mission requirements, customer/user

More information

Which statement about Emergency Change Advisory Board (ECAB) is CORRECT?

Which statement about Emergency Change Advisory Board (ECAB) is CORRECT? ITIL Foundation mock exam 4 1. Which of the following is NOT a purpose of Service Transition? A) To ensure that a service can be managed, operated and supported B) To provide training and certification

More information

Project Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit

Project Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit Project Management On-Site Training and Facilitation Services For more information, visit www.performanceweb.org Benefits of On-Site Training The Performance Institute s proven consulting methodology is

More information

WHITE PAPER: ANALYSIS OF SUCCESSFUL SUPPLY CHAIN ORGANIZATION MODELS

WHITE PAPER: ANALYSIS OF SUCCESSFUL SUPPLY CHAIN ORGANIZATION MODELS WHITE PAPER: ANALYSIS OF SUCCESSFUL SUPPLY CHAIN ORGANIZATION MODELS Enporion, Inc. March, 2009 www.enporion.com SUPPLY CHAIN ORGANIZATION MODELS THAT DRIVE SUCCESS To ensure success in your supply chain

More information

Achieving business excellence through quality in a BPO environment

Achieving business excellence through quality in a BPO environment Achieving business excellence through quality in a BPO environment Worldwide BPO Forecast for Horizontal Business Functions, 2004 2009, US$M Worldwide spending on horizontal business process outsourcing

More information

Applying ITIL v3 Best Practices

Applying ITIL v3 Best Practices white paper Applying ITIL v3 Best Practices to improve IT processes Rocket bluezone.rocketsoftware.com Applying ITIL v. 3 Best Practices to Improve IT Processes A White Paper by Rocket Software Version

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES Headquarters, Copenhagen O.D. No. 33 16 April 2010 ORGANIZATIONAL DIRECTIVE No. 33 UNOPS Strategic Risk Management Planning Framework 1. Introduction 1.1.

More information

4.13 System Testing. Section 4 Bidder's Products, Methodology, and Approach to the Project. 4.14 System Training

4.13 System Testing. Section 4 Bidder's Products, Methodology, and Approach to the Project. 4.14 System Training Section 4 Bidder's Products, Methodology, and Approach to the Project 4.1 FACTS II Requirements Summary 4.11 Interfaces 4.2 Functional Requirements 4.12 System Development 4.3 Technical Requirements 4.13

More information

The multisourcing approach to IT consolidation

The multisourcing approach to IT consolidation Experience the commitment WHITE PAPER The multisourcing approach to IT consolidation The proven commercial practice of multisourcing services integration can help state and local governments achieve IT

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

Innovations in Outsourcing: The Microsoft Experience. Case Study

Innovations in Outsourcing: The Microsoft Experience. Case Study Innovations in Outsourcing: The Microsoft Experience Case Study Prepared by Dr. Beena George, Ph.D, Associate Professor at The University of St. Thomas GEO IAOP s Global Excellence in Outsourcing Award

More information

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements. CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision

More information

Achieve Economic Synergies by Managing Your Human Capital In The Cloud

Achieve Economic Synergies by Managing Your Human Capital In The Cloud Achieve Economic Synergies by Managing Your Human Capital In The Cloud By Orblogic, March 12, 2014 KEY POINTS TO CONSIDER C LOUD S OLUTIONS A RE P RACTICAL AND E ASY TO I MPLEMENT Time to market and rapid

More information

System Development Life Cycle Guide

System Development Life Cycle Guide TEXAS DEPARTMENT OF INFORMATION RESOURCES System Development Life Cycle Guide Version 1.1 30 MAY 2008 Version History This and other Framework Extension tools are available on Framework Web site. Release

More information

White Paper from Global Process Innovation. Fourteen Metrics for a BPM Program

White Paper from Global Process Innovation. Fourteen Metrics for a BPM Program White Paper from Global Process Innovation by Jim Boots Fourteen Metrics for a BPM Program This white paper presents 14 metrics which may be useful for monitoring progress on a BPM program or initiative.

More information

Eagle Machining, Inc. Quality Management System

Eagle Machining, Inc. Quality Management System Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014

More information

What you need to know about cloud backup: your guide to cost, security and flexibility.

What you need to know about cloud backup: your guide to cost, security and flexibility. What you need to know about cloud backup: your guide to cost, security and flexibility. Over the last decade, cloud backup, recovery and restore (BURR) options have emerged as a secure, cost-effective

More information

RESERVE BANK OF VANUATU OPERATIONAL RISK MANAGEMENT

RESERVE BANK OF VANUATU OPERATIONAL RISK MANAGEMENT RESERVE BANK OF VANUATU DOMESTIC BANK PRUDENTIAL GUIDELINE NO 12 OPERATIONAL RISK MANAGEMENT 1. This Guideline outlines a set of principles that provide a framework for the effective management of operational

More information

Cisco Change Management: Best Practices White Paper

Cisco Change Management: Best Practices White Paper Table of Contents Change Management: Best Practices White Paper...1 Introduction...1 Critical Steps for Creating a Change Management Process...1 Planning for Change...1 Managing Change...1 High Level Process

More information

Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development

Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development Project Planning and Management (PPM) V2.0 Project Type Guide Custom Development Version 1.1 January 2014 Last Revision: 1/22/2014 Page 1 Project Type Guide Summary: Custom Development Custom software

More information

OCC 98-3 OCC BULLETIN

OCC 98-3 OCC BULLETIN To: Chief Executive Officers and Chief Information Officers of all National Banks, General Managers of Federal Branches and Agencies, Deputy Comptrollers, Department and Division Heads, and Examining Personnel

More information

GUIDELINES FOR BUSINESS CONTINUITY IN WHOLESALE MARKETS AND SUPPORT SYSTEMS MARKET SUPERVISION OFFICE. October 2004

GUIDELINES FOR BUSINESS CONTINUITY IN WHOLESALE MARKETS AND SUPPORT SYSTEMS MARKET SUPERVISION OFFICE. October 2004 GUIDELINES FOR BUSINESS CONTINUITY IN WHOLESALE MARKETS AND SUPPORT SYSTEMS MARKET SUPERVISION OFFICE October 2004 1 1. Introduction Guaranteeing the efficiency and correct operation of money and financial

More information

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Processes and Best Practices Guide

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Processes and Best Practices Guide HP Service Manager Software Version: 9.34 For the supported Windows and UNIX operating systems Processes and Best Practices Guide Document Release Date: July 2014 Software Release Date: July 2014 Legal

More information

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES 1. ROLE DEFINITIONS ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES The purpose of this section is to distinguish among the roles interacting with the SPM obtained through

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

_experience the commitment TM. Seek service, not just servers

_experience the commitment TM. Seek service, not just servers The complete cloud Creating and preserving cloud savings, security and service quality transition planning and service management ABOUT THIS PAPER Creating and preserving cloud infrastructure savings,

More information

Release Management: Effective practices for IT delivery

Release Management: Effective practices for IT delivery Release Management: Effective practices for IT delivery Introduction Today s health plans face a unique combination of technology challenges due to their complex IT environments. These environments serve

More information

Fieldprint Implementation Plan

Fieldprint Implementation Plan Fieldprint Implementation Plan The implementation of the proposed management and technical plan, outline in Section 3 of this proposal will consist of the following steps: Contract Begins (0 days) In this

More information

The ITIL v.3 Foundation Examination

The ITIL v.3 Foundation Examination The ITIL v.3 Foundation Examination Sample Paper A, version 3.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions. 3. All answers are to be marked on

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

#KPMG Ignite. Join the conversation

#KPMG Ignite. Join the conversation #KPMG Ignite Join the conversation Increasing value in supply chain and procurement Mary Hemmingsen Mark Woods Welcome Mary Hemmingsen Partner, Energy Advisory Leader and Global LNG Leader Mark Woods Partner,

More information

Problem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies

Problem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies Problem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies Problem Management Overview Agenda Overview of the ITIL framework Overview of Problem Management

More information

CIRCULAR 3,647, MARCH 4 2013

CIRCULAR 3,647, MARCH 4 2013 CIRCULAR 3,647, MARCH 4 2013 Establishes the minimum requirements for use of the advanced approach based on internal models for the calculation of the operational risk component (RWA OAMA ) of the Risk-Weighted

More information

Implement a unified approach to service quality management.

Implement a unified approach to service quality management. Service quality management solutions To support your business objectives Implement a unified approach to service quality management. Highlights Deliver high-quality software applications that meet functional

More information

Software Engineering Compiled By: Roshani Ghimire Page 1

Software Engineering Compiled By: Roshani Ghimire Page 1 Unit 7: Metric for Process and Product 7.1 Software Measurement Measurement is the process by which numbers or symbols are assigned to the attributes of entities in the real world in such a way as to define

More information

Security & IT Governance: Strategies to Building a Sustainable Model for Your Organization

Security & IT Governance: Strategies to Building a Sustainable Model for Your Organization Security & IT Governance: Strategies to Building a Sustainable Model for Your Organization Outside View of Increased Regulatory Requirements Regulatory compliance is often seen as sand in the gears requirements

More information

BRIDGE. the gaps between IT, cloud service providers, and the business. IT service management for the cloud. Business white paper

BRIDGE. the gaps between IT, cloud service providers, and the business. IT service management for the cloud. Business white paper BRIDGE the gaps between IT, cloud service providers, and the business. IT service management for the cloud Business white paper Executive summary Today, with more and more cloud services materializing,

More information

1. LEADERSHIP 90 INFORMATION & ANALYSIS STRATEGIC QUALITY PLANNING 4. HUMAN RESOURCE DEVELOPMENT & MANAGEMENT 150

1. LEADERSHIP 90 INFORMATION & ANALYSIS STRATEGIC QUALITY PLANNING 4. HUMAN RESOURCE DEVELOPMENT & MANAGEMENT 150 MANAGEMENT EFFECTIVENESS If you are interested in achieving quality management, service excellence and customer satisfaction, this is the audit used by Ritz Carlton to earn the national quality award.

More information

Revenue Integrity Strategies

Revenue Integrity Strategies Agenda Discuss the key activities performed, risks and typical deficiencies that exist, and various process improvement strategies within the following revenue cycle components: Patient Access Utilization

More information

Introduction to ITIL: A Framework for IT Service Management

Introduction to ITIL: A Framework for IT Service Management Introduction to ITIL: A Framework for IT Service Management D O N N A J A C O B S, M B A I T S E N I O R D I R E C T O R C O M P U T E R O P E R A T I O N S I N F O R M A T I O N S Y S T E M S A N D C

More information

IT Outsourcing s 15% Problem:

IT Outsourcing s 15% Problem: IT Outsourcing s 15% Problem: The Need for Outsourcing Governance ABSTRACT: IT outsourcing involves complex IT infrastructures that make it extremely difficult to get an accurate inventory of the IT assets

More information

Serena Dimensions CM. Develop your enterprise applications collaboratively securely and efficiently SOLUTION BRIEF

Serena Dimensions CM. Develop your enterprise applications collaboratively securely and efficiently SOLUTION BRIEF Serena Dimensions CM Develop your enterprise applications collaboratively securely and efficiently SOLUTION BRIEF Move Fast Without Breaking Things With Dimensions CM 14, I am able to integrate continuously

More information

Overview, Goals, & Introductions

Overview, Goals, & Introductions Improving the Retail Experience with Predictive Analytics www.spss.com/perspectives Overview, Goals, & Introductions Goal: To present the Retail Business Maturity Model Equip you with a plan of attack

More information

Payroll Operations and Information Management and Payroll Services Alliance Management Office Annual Report. November 2007

Payroll Operations and Information Management and Payroll Services Alliance Management Office Annual Report. November 2007 Payroll Operations and Information Management and Payroll Services Alliance Management Office Annual Report November 2007 1. Initiative Overview 2. Status Update 3. Appendix A: Contract Objectives 4. Appendix

More information

Critical Success Factors in Selecting an IT Infrastructure Provider

Critical Success Factors in Selecting an IT Infrastructure Provider white paper: IT solutions Critical Success Factors in Selecting an IT Infrastructure Provider Start by Doing Your Homework....................................... 2 One Last Thing to Consider...................................................

More information

Discover the Advantage of Having Dyrand at the Controls

Discover the Advantage of Having Dyrand at the Controls Discover the Advantage of Having Dyrand at the Controls Your Virtual IT Department shift Shift Your Focus From IT Concerns To Your Business For most small to mid-sized companies in Canada, an IT Department

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

Outsourcing BI Maintenance Services Version 3.0 January 2006. With SourceCode Inc.

Outsourcing BI Maintenance Services Version 3.0 January 2006. With SourceCode Inc. Outsourcing BI Maintenance Services With Inc. An Overview Outsourcing BI Maintenance Services Version 3.0 January 2006 With Inc. Version 3.0 May 2006 2006 by, Inc. 1 Table of Contents 1 INTRODUCTION...

More information

Health IT Workforce Roles and Competencies

Health IT Workforce Roles and Competencies Health IT Workforce Roles and Health IT Implementation Support Positions These members of the workforce will support implementation at specific locations for a period of time, and when their work is done,

More information

Development, Acquisition, Implementation, and Maintenance of Application Systems

Development, Acquisition, Implementation, and Maintenance of Application Systems Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of

More information