1 DPS Verizon Waterbury Communications Tower Project Waterbury, Vermont Aesthetic Analysis Report December 30, 2015 Prepared for: Public Service Department State of Vermont Prepared by:

2 ii

3 PSD Verizon Waterbury Center Table of Contents I. Introduction... 1 II. Project Description... 2 III. Methodology... 4 IV. Evaluation of Impacts... 8 V. Project Mitigation VI. Community Standards VII. Shocking and Offensive VIII. Findings and Conclusions IX. References Appendices Appendix A... Project Maps 1-3 Appendix B... Photographic Inventory of Existing Conditions Appendix C. Photographic Simulations Prepared by All-Points Technology Corporation Appendix D... Community Standards Excerpts iii

4

5 Aesthetic Analysis Report I. Introduction T. J. Boyle Associates, LLC ( TJBA ), a landscape architecture and planning firm located in Burlington, Vermont, was retained by the State of Vermont s Public Service Department ( PSD ) to conduct a visual analysis to evaluate potential impacts resulting from the construction of a new communications tower on property owned by Christopher Curtis and Tari Swenson at 657 Ruby Raymond Road, Waterbury, Vermont. T. J. Boyle Associates has reviewed the Applicant s application, conducted field investigations, analyzed Geographic Information System ( GIS ) data, and used the latest computer technologies to understand the Project and how planned improvements will alter the visual character of the landscape for which the Project is proposed. This aesthetic analysis utilizes the Quechee Test to determine whether changes to the landscape s visual character attributable to the proposed Project are adverse, and if so, whether these changes are also undue. During this review, it was determined that there are several areas within a 3-mile study area where the Project would have an adverse aesthetic impact. However, the effect on the area as a whole is considered NOT UNDULY ADVERSE. The following report details this analysis. 1

6 PSD Verizon Waterbury Center II. Project Description The project site, is located on the military crest south of North Hill s peak in the town of Waterbury, approximately 50 feet from the border with Stowe, Vermont. The site is forested with mature trees ranging from 53 to 89 feet tall. The site is in the center of the peak, near the ridgeline, as shown in Figure 1. The following project description is taken from the project application (Vermont RSA Limited Partnership and Cellco Partnership 2015) and prefile testimony of Lanpher (2015) and Hodgetts (2015). Figure 1: View from Route 100, the Green Mountain Byway, the Project site is 1.2 miles distant, at the location marked by the arrow. The tower is designed to resemble a leafless tree, 90 feet in height with the topmost antennas and branches extending to approximately 93 feet above ground level, as shown in Figure 2. A total of twelve (12) panel antennas and nine (9) Remote Radio Heads (RRHs)) will be centered just below the top of the tower on a triangular mounting frame, with four (4) antennas and three (3) RRHs per side or sector. Each sector will consist of: One (1) 850 MHz cellular antenna (76.1 long by 11.9 wide) One (1) 1900 MHz PCS antenna (57.9 long by 10.8 wide) One (1) 700 MHz LTE or 4G antenna (76.1 long by 11.9 wide) One (1) 2100 MHz AWS/LTE antenna (76.1 long by 6.1 wide) The RRHs, measuring either 36.6 long and 10.6 wide or 24.4 long and 10.6 wide will be mounted directly behind the panel antennas. Two (2) cable distribution boxes will be mounted on the tower at the same centerline as the antennas. The tower and antennas will be painted brown to better blend with the surrounding and will be located within a 20-by-20-foot fenced compound. A 12-by-30-foot shelter will be constructed on the ground inside the fenced compound to the northwest of the tower. A proposed access and utility easement will extend approximately 3,800 feet (0.72 miles) from the end of Ruby Raymond Road to the compound. The proposed access and utility easement will extend southward from Ruby Raymond Road, following an existing dirt farm road through wooded portions of the property and continuing to follow the farm road as it turns sharply northward. The access will then turn northeastward, diverging from the existing farm road, and rising steeply upward until it reaches the compound near the height of land in the eastern corner of the property. Underground utilities will follow the proposed access from an existing modular transformer cabinet to the compound and will run alongside or under the access road. At the completion of construction, the proposed access road and all utility trenching will be mulched and seeded, allowing them to return to 2

7 Aesthetic Analysis Report their natural state. Culverts, check dams, water bars and silt fencing will be placed along the access road as required and at the compound to control erosion both during and after construction. Although some clearing will be necessary for the Project, the contractor will limit clearing to the minimum required to construct the access drive and compound area. All disturbed areas will be seeded and mulched as soon as feasible to re-establish a vegetative cover. Due to grade changes that will be made at the intersection between the existing and proposed access, the amount of permanent earth disturbance postconstruction will be approximately 19,395 square feet (0.45 acres). The proposed new impervious area will be approximately 1,750 square feet (0.04 acres). Figure 3 shows a plan of the Project compound area, including the location of mature trees within 100 feet of the tower. Table 1 documents each tree s base elevation, tree top elevation, distance of the tree, below the 90-foot tower top, and a description of the tree. Trees 23, 24 and 25 will be removed during construction; this tree line is an average of 34.1 feet below the top of the tower. These data come from the pre-filed Testimony of Louis Hodgetts, Exhibit LH-1 Permit Drawings, Sheet C-10, and consider the top of the tower to be 90 feet rather than 93 feet tall, which it will be when the antennae are installed. Table 1. Summary Height Information of Mature Tree within 100 Feet of the Tower Tree Base Top Height Below Tower Description Tower MAPLE 9 159S MAPLE MAPLE ASH MAPLE ASH MAPLE MAPLE MAPLE MAPLE MAPLE MAPLE MAPLE MAPLE MAPLE Tree to be removed 28 MAPLE Tree to be removed 24 MAPLE Tree to be removed 18 ASH Source: Pre-Filed Testimony of Louis Hodgetts, Exhibit LH-1 Permit Drawings, Sheet C-10. 3

8 PSD Verizon Waterbury Center Figure 2. Elevation of the proposed stealth leafless tree tower design and the utility structure.. (Source: Pre-Filed Testimony of Louis Hodgetts, Exhibit LH-1 Permit Drawings, Sheet C-11.) 4

9 Aesthetic Analysis Report Figure 3. Site plan of Project compound indicating location of mature trees within 100 feet of the tower. (Source: Pre-Filed Testimony of Louis Hodgetts, Exhibit LH-1 Permit Drawings, Sheet C-10.) 5

10 PSD Verizon Waterbury Center III. Methodology Section 6086 (a) in Title 10, Vermont Statutes requires that Before granting a permit, the district commission shall find that the subdivision or development: (8) Will not have an undue adverse effect on the scenic or natural beauty of the area, aesthetics. In Re: Quechee Lakes Corporation, No. 3W0411-EB and No. 3W0439-EB (November 4, 1985), the Vermont Environmental Board elaborated the process to evaluate the aesthetic impact of projects, which has come to be known as the Quechee Analysis: In judging the impact of a proposed project on the values described in Criterion 8, the cornerstone is the question: Will the proposed project be in harmony with its surroundings will it fit the context within which it will be located? Several specific features must be evaluated in answering this question: 1) What is the nature of the project's surroundings? Is the project to be located in an urban, suburban, village, rural or recreational resort area? What land uses, presently exist? What is the topography like? What structures exist in the area? What vegetation is prevalent? Does the area have particular scenic values? 2) Is the project's design compatible with its surroundings? Is the architectural style of the buildings compatible with other buildings in the area? Is the scale of the project appropriate to its surroundings? Is the mass of structures proposed for the site consistent with land use and density patterns in the vicinity? 3) Are the colors and materials selected for the project suitable for the context within which the project will be located? 4) Where can the project be seen from? Will the project be in the viewer's foreground, middleground or background? Is the viewer likely to be stationary so that the view is of long duration, or will the viewer be moving quickly by the site so that the length of view is short? 5) What is the project's impact on open space in the area? Will it maintain existing open areas, or will it contribute to a loss of open space? All of these factors must be weighed collectively in deciding whether the proposed project is in harmony with i.e., fits its surroundings. The land uses which surround a project are crucial to the analysis. The same building which may add to the aesthetic qualities of an urban area may detract from those qualities in a rural setting, because the context is different. The visual impact of a single large building may be lessened if its mass is broken up into several smaller structures. A building which may project itself toward the viewer because it is painted white or red, may tend to recede into the background if it were painted in darker tones. Loss of open space areas tends to be "adverse" from a strictly aesthetic standpoint, because open space is an important feature in the scenic beauty of Vermont. 6

11 Aesthetic Analysis Report The expert witnesses agreed that certain types of land forms are especially sensitive to change, because these land forms tend to be visible from a wide area or they are seen by large numbers of people. These sensitive areas include ridgelines, steep slopes, shorelines and floodplains. Other features are sensitive because they are aesthetically unique; examples may include historic structures, wetlands and natural areas. In evaluating a project proposed in a sensitive area, the Board and District Commissions should give special attention in assessing whether the scenic qualities of these sites will be maintained. If after a collective analysis of these factors, we conclude that the proposed project would have an adverse impact on the aesthetics or scenic or natural beauty of the area, the next step is to determine whether the adverse impact is "undue." We conclude that an adverse impact is undue, and therefore violates Criterion 8, if we reach a positive conclusion with regard to any one of the following: 1) Does the project violate a clear, written community standard intended to preserve the aesthetics or scenic, natural beauty of the area? Such standards may, for example, be set forth in the local or regional plan, or be adopted in the creation of an historic design district, or be incorporated into a municipal or State scenic road designation. If the Board or Commissions find that such standards do exist, and that the project as designed would violate those standards, the adverse impact would be undue. 2) Does the project offend the sensibilities of the average person? The Legislature has directed the Commissions and this Board, composed of lay people from many different communities within Vermont, to determine what is acceptable in terms of new developments' impact on aesthetics and scenic and natural beauty. If our sensibilities are, collectively, offended by a project, its impact under Criterion 8 is undue. It is not enough that we might prefer to see a different design or style of building, or that we might prefer a different type of land use, but that the project, when viewed as a whole, is offensive or shocking, because it is out of character with its surroundings, or significantly diminishes the scenic qualities of the area. 3) Has the Applicant failed to take generally available mitigating steps which a reasonable person would take to improve the harmony of the proposed project with its surroundings? Such steps may include selection of less obtrusive colors and building materials, implementation of a landscaping plan, selection of a less obtrusive building site within the project area, or reduction of the mass or density of a project. If there are reasonable alternatives available to the Applicant that would mitigate the adverse impact of the project, failure to take advantage of those alternatives may, in some circumstances, render undue an otherwise acceptable aesthetic impact. In summary, we approach the Criterion 8 evaluation of the Quechee projects by first deciding whether or not those projects are in harmony with their surroundings. In 7

12 PSD Verizon Waterbury Center performing this analysis, special scrutiny must be given to sensitive natural features. If we determine that a project's impact on its surroundings would be adverse in some manner, we then must determine whether the impact is "undue" because the project would violate an express community standard pertaining to aesthetics, would be offensive or shocking to the sensibilities of the average person, or has failed to incorporate reasonable mitigating steps which would improve its harmony with its surroundings. For this Project, four distinct methods are used in conducting the Quechee analysis, and in preparing this report: (1) Background data collection, (2) GIS viewshed analysis mapping, (3) Field investigation, and (4) Project visualization. The background data and field investigation are used to characterize the study area. The GIS viewshed mapping and field investigation are used to identify areas with potential visibility of the Project. The visualization is used to determine how the Project will be visually perceived from various locations. All four methods are used to evaluate whether there are in fact adverse impacts and if so, whether those impacts could be considered undue. 1. Background Data Collection. Standard data that can help describe the landscape within three miles of the project are assembled in a GIS database. The GIS is used to calculate the viewshed analysis, display GPS waypoints documenting the areas visited during the field investigation, locate the viewpoint locations from which photographs and field notes were recorded, and prepare the maps used in this report. The sources of the data are listed in the Reference section of the report. The standard data in the GIS database include project elements (e.g., tower location and height), topography, water, forest cover, transportation roads, railroads, and trails, buildings, outdoor recreation sites, and aerial photography. In addition, regional and municipal plans for the project location are reviewed for locally designated areas of scenic significance. This information is then used in the Quechee Analysis to evaluate whether an adverse impact is undue. 2. GIS Viewshed Analysis. The GIS data are used to identify areas that may have potential views of the Project. The study area is limited to three miles surrounding the project tower. An area of three miles is chosen because it is near the limits of visual recognition of a standard communications tower. The analysis results, portrayed as two viewshed maps, are the basis for organizing the field investigation. Figure 4 illustrates how line-of-sight is determined in the viewshed analysis. 8

13 Aesthetic Analysis Report a. First, a Terrain Viewshed map is created to evaluate how the existing land form may block views of the tower. The elevation data used for this analysis come from the National Elevation Dataset (NED). The visibility map distinguishes between potential visibility from open areas (without forest cover) and areas within forests. For the purposes of this map, a viewshed was run using the structural height of the proposed tower and antennae (93 ). b. A second map is created Figure 4. Topographic Viewshed versus a Vegetated Viewshed that represents a Vegetated Viewshed. This map shows how buildings and forest canopy, in addition to landform, may block views of the Project. The forest canopy is identified from the 2011 National Land Cover Data (NLCD 2011), and areas of evergreen, deciduous and mixed forest are all assigned a nominal canopy height of 12 meters (40 feet). The screening effect is supplemented by digitizing the area of buildings, hedgerows, and other obvious obstructions that appear from aerial photography to be 40 feet or taller. For the purposes of this map, a viewshed was run using the structural height of the proposed tower and antennae (93 ). These viewshed maps are a useful tool in preparing for field investigation. When properly reviewed, they indicate areas most likely to have views, emphasizing areas likely to have the greatest impacts, and identifying areas that are unlikely to have views. However, the assumptions used to calculate these maps are not perfect, and due since the forest canopy is typically higher than 40 feet and development is only partially accounted for, the maps tend to over-estimate Project visibility. Thus, these maps are primarily used in preparation of the field investigation, which more fully evaluates the landscape context, Project visibility, and potential impacts. It is inappropriate to use these maps as the only basis to evaluate visual impacts. 3. Field Investigation. The viewshed maps focus the field investigation to areas most likely to have views of the Project. The purpose of the field investigation is to verify potential visibility as indicated on the viewshed maps, photographically document landscape visual character within the study area, photograph views toward the project, record notes concerning each viewpoint where photographs are taken and the landscape character throughout the study area. All field photography used a Nikon D7000 camera and a zoom lens set to either 18 mm (wide angle) or 35 mm (normal) focal length, which respectively have a 66.5 and 37.3-degree horizontal angle of view. 9

14 PSD Verizon Waterbury Center The location of photograph viewpoints was recorded using a global positioning system ( GPS ) and are shown on Map 1 in Appendix A. The documentation of the field investigation includes (1) the route traveled and location of photograph viewpoints, (2) catalog of photographs, and (3) table of field notes. All three components are coordinated by being indexed to the viewpoint number. A selection of photos focusing on views oriented toward the proposed tower is used to illustrate this report. 4. Project Visualizations. It is normally helpful to create visualizations as an aid to evaluate visual impacts. A photographic simulation is particularly helpful in describing how the project will appear to the affected public. The specific selection of the simulation viewpoint is typically based on the extent of the project s visibility, the probable frequency and sensitivity of viewers, and the availability of a suitable photograph from the field investigation. Each simulation attempts to illustrate the most visible condition for the area it represents. Visual simulations prepared by All-Points Technology Corporation were included as part of the 248a petition in Steele s (2015) pre-riled testimony. These simulations are included as Appendix C of this review. The pre-filed testimony describes the simulation process in this way: Q.9 How did you determine how the Project will look in its proposed surroundings? A.9 I reviewed the results of a "balloon test" conducted on May 8, 2014 in order to predict and better understand the impact of the proposed tower on the Town's scenic resources. The deciduous trees were without leaves thereby maximizing the opportunity for views of the project site. With balloons in the air to mark the location and height of the Tree, and with monitoring to ensure that any drifting of the balloons was taken into account, Verizon Wireless' consultant All Points Technology Corporation traveled public roads in the vicinity of the project to find prominent public vantage points from which the balloons could be seen. As a result, 17 viewpoints were selected for further analysis, and photographic simulations were created to demonstrate what the proposed Tree would look like in the surrounding landscape when seen from these viewpoints. This same text is found in Steele s Visual Impact Analysis (VIA), which is an Exhibit JS-1 to his testimony. The VIA also includes this additional information. Please note that the balloon was floated to a height of 95 feet above ground level (AGL), and the simulated tower assumed to be that high. In fact, the tower portion of this installation will be 90 feet AGL, with the highest appurtenances extending to 93 feet AGL. The report by All-Points Technology Corporation (2015) only includes photographs of 17 viewpoints, simulations from those viewpoints, and a map locating each viewpoint. The report does not include any text; specifically there is no description of the methods used to assure that the balloon was at the appropriate height or how the simulations were created. Typically the balloon would be tethered with a line that that is the length of the tower height 10

15 Aesthetic Analysis Report The closest weather station to the Project site is located on Guild Hill (latitude , longitude , and elevation 840 feet), close to viewpoint 10 in Appendix B and 2.1 miles south of the Project. The archived wind speed and direction data for May 8, 2015 obtained from the Weather Underground are shown in Table 2. Most of the photos were taken when the wind was 6 mph, which is a light breeze on the Beaufort Wind Scale weather vanes are active, wind is felt on the face and leaves rustle. There are gusts up to 10 or more mph, which is a gentle breeze sufficient to move leaves and small twigs or extend light flags. It is our experience that such winds are sufficient to cause considerable movement and elevation change of the balloon. The simulations are apparently created using a digital paint program, such as Adobe PhotoShop. An image of the leafless tree, perhaps from the elevation in Figure 2, is copied to second image layer, where it is positioned and scaled between the ground level of the ridgeline and the bottom of the balloon. The tower is 93-feet tall and the balloon was tethered to a nominal 95 feet. However, given the breeze it was almost certainly below that height; perhaps even below 93 feet. The simulations all show the tower being located well below the balloon s level. This can be checked in Adobe Acrobat by going to the View menu, scrolling to Page Display and selecting Single Page View. Next, in the View menu select Full Screen Mode. Each viewpoint s existing photograph and proposed simulation should be registered so that one can easily go back and forth between the two views using the Page Up and Page Down keys on the keyboard. Using a pencil or pen, point to the balloon in the existing photograph and then Page Down to the proposed simulation. It is clear that the tower is always located well below the balloon. Table 2. Wind Speed and Direction at the Time the Simulation Photos Were Taken Photo taken Time Wind Direction WindSpeed (mph) WindSpeedGust (mph) 10:01 West :06 WSW :11 SW :16 SW :21 West :26 NW :31 WSW :36 West :41 West :48 10:46 WSW :51 WSW :55 10:59 11:06 11:11 11:24 11:28 11:34 11:34 10:56 WSW :44 West

16 PSD Verizon Waterbury Center 11:50 11:49 West :54 SW :58 11:59 West :04 12:04 SW :09 12:09 SSW :12 12:16 12:14 WNW :19 WSW :24 SW :29 SW :34 SW :38 12:39 West :44 NW :49 NW :54 West :59 12:59 East :04 East :09 East :34 East :39 NE :44 NE :49 NE :54 East :59 SE 2 11 Source: Weather Underground for Guild Hill, Waterbury Center, VT [KVTWATER7] on May 8, Note: The weather station is approximately 2.1 miles to the south and 772 feet below the Project site. The original photographs were submitted for review. They were taken using a Nikon D3000 camera with 50 mm lens. The photos capture a 27.6-degree horizontal angle of view, which is the equivalent of a 73 mm lens on a 35 mm film or FX-format digital camera. The Nikon D3000 has 10.2 million effective pixel; the size of each photographs is 3,872-by-2,592 pixels. While the camera s resolution is lower than the current standard for professional simulations, the use of a slight telephoto lens provides 2.4 pixels per arc-minute, which is sufficient to capture the level of visual detail to which we are normally sensitive. However, the resolution of the Photosimulation PDF document is only 150 dots per inch, which is substantially below the resolution of recognition visual acuity. As a result, the leafless tree looks like a blocky smudge, when viewers throughout the study area may be able to identify the dense symmetrical branching, as represented in Figure 2. The simulations are inches wide when printed on the default letter sized paper. To be in proper perspective, these simulations should be viewed at approximately 20.6 inches, or arm s length. 12

17 Aesthetic Analysis Report The visual analysis is reported in two parts. The first part characterizes the landscape within three miles of the proposed tower (the study area). This section uses the topographic and vegetated viewshed maps to identify publicly accessible areas. Special attention is paid to areas of statewide or locally designated significance that have potential views of the Project as applicable. The visual character and potential visibility from these areas are verified during the field inventory. The second part of the visual analysis applies the two-part Quechee Analysis to evaluate the impact of potential views as seen from publicly accessible places within the study area. If the view is deemed out of character with the surroundings to the degree it causes an adverse impact, the three Quechee criteria are used to determine if the adverse impact is undue. 13

18 PSD Verizon Waterbury Center IV. Evaluation of Impacts The first step in evaluating scenic impacts using the Quechee Analysis is to consider will the project be in harmony with its surroundings will it fit the context within which it will be located? The answer to this question is based on the collective evaluation five considerations described at the beginning of the methodology section. In order to do this, it is necessary to understand the existing conditions in areas where the Project may be visible. To this end, a characterization of the surrounding area is provided, such as residential density, park or recreational uses, agricultural fields, and commercial. Additionally, the typical class of roadways in the surrounding area is provided, such as Class 2 collector road or Class 30 state highway. Together, these descriptions are utilized to portray the land-use and intensity of development and travel in the areas with potential visibility. Views of the proposed Project are described using three distance zones. These are areas within a 1-mile radius, areas between a 1- to 2-mile radius, and areas between a 2 to 3-mile radius. Due to the significant reduction of Project visibility and visual magnitude, areas outside of a 3-mile radius were not considered to be adversely affected by the proposed Project. The following outline is a descriptive inventory of these areas, and is meant to be reviewed in conjunction with Appendices A through C. A. Areas Within a 1-Mile Radius The landscape character of Waterbury and Stowe within one mile of the Project the land is primarily forest cover that appears to be managed and much of it is on high ridges with steep slopes. The proposed tower is located on one of these high ridges, which creates a sky-line that is not seen against other landforms in the background. There are several open fields appear to have been planted in corn or hay that have the effect of increasing visual access to the Project ridgeline. There is also a scattering of large-lot or low density residential accessed primarily from unpaved town roads The residential areas in Waterbury include a few houses on Burt Farm Lane, Gregg Hill Road, Maggies Way, Russell Road, and Tayer Lane. In addition, there is potential visibility from perhaps a dozen houses along Ruby Raymond Road and twice that many on Spruce Haven. In Stowe, there are over 20 large lot residences off North Hill Road. In addition, there are a several large lot houses on South Hollow Road/Hollow s End, Raven Hill Road, Ayers Farm Road, and Points North. Vermont Route 100 is the Green Mountain Byway, a designated Vermont Scenic Byway that skirts the western side of this area for approximately a mile and a half. It is the only primary state highway within 3 miles of the Project. By and large there is no visibility from Rt. 100 within a mile of the Project. However, there is considerable visibility from varying distances along the unpaved town roads that serve the residential areas. The closest residence is on Hollow s End, about a quarter of a mile from the project. A representative example is shown in Figure 5, where after turning onto Ruby Raymond Road, residents will be looking directly at the tower as they drive a quarter of a mile; there will be potential visibility from most other areas of this neighborhood. The field photographs in Appendix B within a mile of the Project are from viewpoints 1, 2 and 9. Figure 6 shows a simulation of how the structure will appear from a nearby location. Portions along Burt Farm Lane, Gregg Hill Road, South Hollow Road/Hollow s End, Russell Road, Spruce Haven, Tayer Lane, will be similarly affected. 14

19 Aesthetic Analysis Report Figure 5. View as one drives up Ruby Raymond Road 0.7 miles from Project site. There are approximately a dozen homes on this road between 0.3 and 0.8 miles from the Project. A normal lens with a 37-degree horizontal angle of view was used (Appendix B, Viewpoint 2). Figure 6. A photosimulation from Ruby Raymond Road, near the location shown in Figure 5. The dark bottle-brush shape is more noticeable because it breaks the sky-line and presents a high color contrast with the sky. The simulation is prepared by All-Points Technology Corporation for Verizon using a telephoto lens with a 28-degree horizontal angle of view Appendix C, Viewpoint 2). 15

20 PSD Verizon Waterbury Center Figure 5Figure 6 are representative the views to the project from a distance of up to 1 mile. The proposed Photosimulations 1 through 10, and 17 in Appendix C are all within 1 mile of the project. These views are primarily from town roads and numerous residences on large lots; the Ruby Raymond Road, Spruce Haven, and Hollow Road neighborhoods will be particularly affected. There is relatively little visibility from Rt. 100 in this area. The site is located on a ridgeline over 1,600 feet in elevation that is forested with mixed hardwoods. The setting is typical of scenic rural Vermont; in the fall it will be ablaze with bright colors. The site stands against the sky in the background, and the proposed leafless-tree will appear like a dark bottlebrush rising above the horizon. The Project will catch the eye because of its regular shape and uniform color; it will appear like a column rising above the horizon line. It is very unlikely that a typical Vermont resident would mistake the Project as represented in the photosimulations for a natural tree. For these reasons the Project will have an ADVERSE scenic impact. B. Areas Between a 1- to 2-Mile Radius The land cover in the area 1 to 2 miles from the Project is still dominated by forest, but a large proportion is also in open fields, particularly hay fields, which opens up more views toward the Project site. On the Waterbury side, several roads run south to north through this ring: Gregg Hill Road, Maggie s Way, Barnes Hill Road, and Sweet Road. These are town roads, largely unpaved with scattered farms and residences along them. There will be clear or filtered visibility of the Project from many stretches of these road, as is apparent from the field photography at viewpoints 3 through 6, 8, and 10 through 14 in Appendix B. On the Stowe side of the boarder there is a greater amount of large-lot and low intensity residential development. The through roads continue north from Waterbury: Barnes Hill Road becomes Stowe Hollow Road, Sweet Road becomes Waterworks Road. There are also several east-west connecting roads: Moscow Road, Gold Brook Road, and Dewey Hill Road. There is an extensive number of small residential roads branching from these primary toads. These are also town roads that are mostly unpaved. The only potential visibility is near the border with Waterbury along Waterworks Road and Barnes Hill Road (different road than Barnes Hill Road in Waterbury). However, field investigation found that it is quite unlikely that there will be visibility from Stowe, even in this area. There is approximately 1.4 miles of Rt. 100 the Green Mountain Byway in this 1 to 2-mile ring that is in the town of Waterbury and approximately 1.3 miles in Stowe. There are a few businesses as well as residences along these stretches of Rt. 100, the annual average daily traffic (AADT) as measured in 2014 is 9,500. There will be clear or filtered visibility of the Project from many stretches of Rt. 100 in Waterbury, as represented by Figure 7Figure 8. It is unlikely that the Project will be visible from Rt. 100 in Stowe. There is considerable visibility from Waterbury of the Project within the 1 to 2-mile ring, as represented by the simulations in Appendix C from viewpoints 11 through 15. In particular there is a significant amount of visibility from Rt. 100, the Green Mountain Byway, which is a designated Vermont Scenic Byway. This byway is a primary destination for leaf-peepers in the fall and is heavily traveled all year long. The visual affect from the 1 to 2-mile ring is similar to that from within 1 mile of the Project as can be seen from comparing the simulations in Figure 6Figure 9. The Project presents an apparently solid cylinder that extends will above the horizon, creating an eye-catching anomaly on the horizon. Distance begins to ameliorate the visual magnitude, however the visual affect remains ADVERSE. 16

21 Aesthetic Analysis Report Figure 7. View toward the Project site from the Green Mountain Club picnic area at a distance of 1.7 miles. A normal lens with a 37-degree horizontal angle of view was used (Appendix B, Viewpoint 6). Figure 8. View from Rt the Green Mountain Byway to the Project site 1.1 miles away. A normal lens with a 37-degree horizontal angle of view was used (Appendix B, Viewpoint 5). 17

22 PSD Verizon Waterbury Center Figure 9. A photosimulation from Rt. 100, the Green Mountain Byway, near the location shown in Figure 8. The simulation is prepared by All-Points Technology Corporation for Verizon using a telephoto lens with a 28-degree horizontal angle of view (Appendix C, Viewpoint 11). C. Areas Between a 2- to 3-Mile Radius The land uses within a 2- to 3-mile radius of the Project are more diverse than in the other two areas. Forest cover still is dominant, but Waterbury Reservoir is a large area of open water, and more developed portions of Waterbury Center and Lower Stowe Village fall within this area. There are a large number of residential roads at the northern side of the area surrounding Stowe and the southern end surrounding Waterbury Center. The Project site is situated on a high ridge and continues to be visible from area roads, particularly those oriented north-south or when the view is over an open field. There will be visibility from Rt. 100 the Green Mountain Byway that is similar to the visibility from within the 1 to 2-mile ring, as shown in Figure 10. No simulations were prepared from this distance. However, there is relatively little visibility from Waterbury Reservoir due to screening from the steep terrain on the eastern shore. While the viewshed maps in Appendix A indicate the potential for visibility in and around Waterbury Center, in fact the field investigation found that buildings and trees effectively screen views toward the Project. There is also no apparent visibility from the developed areas of Stowe Village. The visual affect from the 2 to 3-mile ring is similar to that from within 1 to 2-miles of the Project. The Project presents an apparently solid cylinder that extends will above the horizon, creating an eye-catching anomaly on the horizon. However, the visual affect is largely ameliorate by distance, and the visual magnitude of the Project is now minimal. Nonetheless, the visual effect of a structure breaking through the horizon line is eye-catching and the result remains ADVERSE. 18

23 Aesthetic Analysis Report Figure 10. The view traveling north on Rt. 100 the Green Mountain Byway, 2.3 miles from the Project site. A normal lens with a 37-degree horizontal angle of view was used (Appendix B, Viewpoint 7). 19

24 PSD Verizon Waterbury Center V. Community Standards When a project is found to have an Adverse scenic impact, as was found above, the three criteria of the Quechee test are employed to determine if this impact is Undue. The first test criterion is whether the project violates a clear, written community standard intended to preserve the aesthetics or scenic beauty of the area. What constitutes a clear, written community standard is frequently contested among various parties to a project. In its Order for Docket Number 7508 on the Petition of Georgia Mountain Community Wind. LLC for a Certificate of Public Good, the Public Service Board has clarified what they understand a clear, written community standard to be. In order for a provision to be considered a clear, written community standard, it must be intended to preserve the aesthetics or scenic beauty of the area where the proposed project is located and must apply to specific resources in the proposed project area (page 52). Zoning regulations have been interpreted to constitute a clear, written community standard for purposes of the Quechee test. Given our statutory charge, we conclude that zoning regulations are not the most appropriate source for a clear, written community standard under the Quechee test, as applied by the Board in Section 248 proceedings. Because towns often grant exceptions and variances to these ordinances on a case-by-case basis, it is difficult to rely on a zoning ordinance as a clear and consistent statement of a community's policies or standards. The ability of a town to grant zoning variances will, in many cases, result in different zoning standards being applied depending upon the individual circumstances of the permit application. Therefore, it is more appropriate to rely on the town plan as the primary source of clear written community standards (page 53). Pursuant to Board precedent, we consider the societal benefits associated with a project when evaluating the project's aesthetic impacts (page 54). For this Project, the primary planning documents are the Central Vermont Regional Planning Commission s Central Vermont Regional Plan 2008, adopted September 9, 2008, amended September 8, 2015, and amended October 13, 2015 (the Regional Plan ), and the Town and Village of Waterbury s Municipal Plan , adopted December 9, 2013 (the Town Plan ), set forth the community standards that affect the Project location. Pages from these two plans that are relevant to the aesthetic impacts of the Project are included in Appendix D. These two planning documents make explicit reference to Waterbury s Zoning Regulations. They also reference the Green Mountain Byway, and the Green Mountain Byway Vermont Byway Corridor Management Plan, which was prepared by LandWorks. The regional planning commissions submitted this plan on behalf of the town governments to the State, which subsequently accepted it and designated the Green Mountain Byway as a Vermont Scenic Byway. Relevant pages from these documents are also included in Appendix D for information purposes. 20

25 Aesthetic Analysis Report Following is a discussion of the scenic standards from the Regional and Municipal Plans that are relevant to the Project. In particular, they concern three issue: (1) scenic resources, (2) protection of high ridgelines, and (3) siting telecommunications facilities. REGIONAL PLAN A. Scenic Resources The Regional Plan states that the Central Vermont Regional Planning Commission (CVRPC): Views the Plan primarily as a means to enhance the lives of the Region s residents. Accordingly, the preservation and enhancement of the "quality of life" for all Central Vermont residents is the guiding principle of this Plan any analysis of quality of life must address both our basic needs and our desires and aspirations. Among these are Natural Beauty - We place a high value on the scenery and resources the landscape provides. Scenery and scenic resources are described in the Resource Protection section of Chapter 2: Land Use Element. However, it is less than 100 words and so general as to apply to almost anywhere in Vermont. The fifth land use goal is To preserve the aesthetic quality of the Region. There are policies to inventory and map the Region s scenic resources and track indicators that show impacts on aesthetic quality and natural beauty. However, the Regional Plan does not include specific scenic resources or report indicators aesthetic impacts. The CVRPC did participate in the creation of the Green Mountain Byway Vermont Byway Corridor Management Plan, which it submitted to the State on behalf of Waterbury. This subsequently resulted in its designation as a Vermont Scenic Byway. B. Protection of High Ridgelines One of the policies in the Resource Protection section of Chapter 2: Land Use Element is: 2. Unless effectively screened, or clearly in the best interest of the general public, ridge line development or conspicuous development on locally prominent landscape features is discouraged. C. Siting Telecommunications Facilities The Regional Plan also recognizes that wireless communication has become a part of everyday. While Central Vermonters want and expect good cellular service, they also expect the placement and design of new facilities to be guided by a respect for the integrity of the Region s landscape As such, it is important to balance aesthetics, signal quality, health, business and personal needs when deciding whether and where to build new towers and other facilities. One of the policies in the Resource Protection section of Chapter 2: Land Use Element is: 3. The scale and siting of new structures should be in keeping with the surrounding landscape and architecture; however, towers should utilize stealth technology. 21

26 PSD Verizon Waterbury Center The Regional Plan s Wireless Telecommunication Faculties Goal is for Effective and efficient communication systems. Among the related policies are: 2. Telecommunication facilities should be sited, designed, maintained and operated so as to minimize negative impacts on natural, cultural and scenic resources. Use of stealth design and/or use of existing structures are encouraged where appropriate. New towers should be no taller than necessary to provide coverage. The policies of this Plan addressing ridgeline and hilltop development (see Land Use Element, Goal 5) are intended to apply to telecommunication facilities. 9. Access roads should be designed to minimize their impact on scenic, agricultural, forestry, and natural resources. D. Conclusion In conclusion, the Regional Plan states that scenic values are important to its residents quality-of-life, but it has not inventoried or otherwise located these resources. There are references to the scenic sensitivity of high ridgelines. The Regional Plan also recognizes the importance of modern wireless communications, while identifying the need to minimize the scenic impacts from tower siting and access roads. The Regional Plan appears to lack the specificity of a clear, written community standard for aesthetics. Relevant selections from the Regional Plan are included in Appendix D. MUNICIPAL PLAN A. Scenic Resources The Municipal Plan states that according to the community survey, nearly 85% of residents rate their ability to enjoy scenic views in Waterbury as good to excellent. When asked about the most important resources to protect in Waterbury, scenic views ranked second behind historic buildings. However, the Town Plan identifies few specific scenic resources, and usually, they are mentioned as examples rather than clearly designated scenic resources. A major exception is Route 100 through the Towns of Waterbury and Stowe. It was nominated by the regional planning commission on behalf of the two towns in 2008 and was enthusiastically accepted into the program and is officially designated as the Green Mountain Byway. It should be noted that the Byway Corridor encompasses both towns in their entirety and is not limited to Route 100 or its right-of-way. In the section on Open Lands and Scenic Resources, the Municipal Plan states: Waterbury has numerous scenic vistas of surrounding mountains and valleys, which contribute to its visual character. Both the Green and Worcester Mountain Ranges are prominent features when traveling east or west on the highways adjacent to the Winooski River in the southwest part of town. From hills to the west and east of Route 100, the mountains, the Winooski River Valley, and the Waterbury Reservoir create a magnificent view. Travelers along Route 100 can see broad expanses of mountains and rolling hills and the snowy peak of Mount Mansfield in Stowe. 22

27 Aesthetic Analysis Report It is for these reasons and others that Waterbury and Stowe joined together to nominate Route 100 to the Vermont Byways Program in The nomination was enthusiastically accepted into the program and is officially designated as the Green Mountain Byway. It should be noted that the Byway Corridor encompasses both towns in their entirety and is not limited to Route 100 or its right-of-way. The nomination cited the following intrinsic resources: historic and archaeological qualities, cultural qualities, natural qualities, recreational qualities, and scenic qualities. The Green Mountain Byway Vermont Byway Corridor Management Plan dated October 30, 2008 fully details each intrinsic quality. The Natural Qualities and Scenic Qualities sections speak directly to the open lands and scenic resources this plan strives to protect. The management plan summarizes that sustaining activities such as agriculture, forestry and recreation depend on and have thrived on the rich abundance of natural resources of the land. Protecting and increasing public awareness of these resources within the corridor will be an essential part of sustaining harmony between humans and the environment. The plan goes on to rank the corridor s scenic quality high (+3 on a scale of +3 to -3) for its long distance views of high ridges, alternating patterns of undeveloped meadows and historic farmsteads and their associated cultivated lands, historic buildings and settlement patterns, and the variety and extent of classic Vermont scenes and landscape patterns which contribute to this area s unique sense of place. Waterbury adopted regulations in 2006 to ensure residential development in high elevations and steep slopes would not have a detrimental impact on scenic and natural resources. As Waterbury continues to accommodate and direct new growth, and the pressure to develop its open land increases, difficult decisions will need to be made regarding the value of such open lands to the community and perhaps the region. Some resources may be more critical to Waterbury s environmental, economic, and cultural wellbeing than others. Such lands should be identified and adequate measures developed to ensure their protection for future generations. In the Municipal Plan s section on Existing Settlement Patterns Town there is additional description of the importance of Route 100. Route 100. The Route 100 corridor is a 5.6-mile stretch along the state highway from Route 2 (Main Street) in Waterbury Village to the Stowe town line. Route 100 is a major feature of Waterbury as it is the primary access to the Stowe resort area and for many visitors it is their only experience of Waterbury. Many historically significant and architecturally distinctive structures are located along Route 100, particularly in Colbyville and Waterbury Center village. Several scenic views, including distant mountain peaks and broad expanses of open space, can be experienced while traveling along Route 100. The Shutesville Hill area in northern Waterbury has been identified as a significant wildlife crossing between habitat blocks to the east and west. The Route 100 corridor in both Waterbury and Stowe has state and federal designation as the Green Mountain Byway. This designation recognizes the area s intrinsic values of scenic quality, and resources in the areas of culture, history, recreation, and wildlife. Yet, Route 100 is being transformed from a rural, residential transportation route to a growing commercial strip. In 1996 Waterbury revised the zoning regulations for the Route 100 area to 23

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval:

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval: CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS Conditional Use Permit Approved by Board of Supervisors Date of approval: Site Plan Approval: Date of approval: Fees: $4,000 Licensed Co-location

More information

TOWN OF VINALHAVEN LAND USE ORDINANCE SECTION 19 WIRELESS TELECOMMUNICATIONS FACILITIES

TOWN OF VINALHAVEN LAND USE ORDINANCE SECTION 19 WIRELESS TELECOMMUNICATIONS FACILITIES TOWN OF VINALHAVEN LAND USE ORDINANCE SECTION 19 WIRELESS TELECOMMUNICATIONS FACILITIES Section 19. Wireless Telecommunications Facilities A. Purposes: The purposes of this section are to provide a process

More information

CHAPTER 23 Wireless Communication Facilities

CHAPTER 23 Wireless Communication Facilities CHAPTER 23 Wireless Communication Facilities Section 23.1 Purpose It is the general purpose and intent of this Section to comply with the requirements of the Federal Telecommunications Act of 1996, as

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

3 September 9, 2015 Public Hearing

3 September 9, 2015 Public Hearing 3 September 9, 2015 Public Hearing APPLICANT: PI TELECOM INFRASTRUCTURE T, LLC PROPERTY OWNER: JSW HOLDINGS, LLC STAFF PLANNER: Carolyn A.K. Smith REQUEST: Conditional Use Permit (communications tower-monopole)

More information

Council Policy for New Telecommunication Facilities

Council Policy for New Telecommunication Facilities Council Policy for New Telecommunication Facilities 1. Purpose To establish policies and procedures for the installation of new telecommunication antennas, towers and related structures which emphasize

More information

Proposed Wireless Telecommunications Facility

Proposed Wireless Telecommunications Facility Attachment 5 Visual Resource Evaluation Report Proposed Wireless Telecommunications Facility AT&T Site ID: SR1038 National Guard Armory 284 New Canaan Avenue (Route 123) Norwalk, Connecticut Prepared for

More information

TOWER ORDINANCE TOWN OF OWLS HEAD

TOWER ORDINANCE TOWN OF OWLS HEAD TOWER ORDINANCE TOWN OF OWLS HEAD Adopted - August 30, 1999 Amended - August 26, 2002 Amended June 1, 2009 TABLE OF CONTENTS PAGE Section 1 Title.. 1 Section 2 Authority.. 1 Section 3 Purpose. 1 Section

More information

Mobile Network Base Station Design Guide User Manual

Mobile Network Base Station Design Guide User Manual Mobile Network Base Station Design Guide User Manual Prepared for the Mobile Carriers Forum and the Design and Innovation Programme Taskforce February 2008 Consultant Contact: Nicole Halsey, Director Urban

More information

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa

More information

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division

More information

4. Priority Areas of Conservation

4. Priority Areas of Conservation 4. Priority Areas of Conservation A. SIGNIFICANT RESOURCE AREAS This Open Space and Farmland Plan identifies the key issues facing open space and agricultural resources in the Town, highlights the location

More information

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER

More information

EXHIBIT A LOCATION MAP AND LAND USE INFORMATION

EXHIBIT A LOCATION MAP AND LAND USE INFORMATION EXHIBIT A LOCATION MAP AND LAND USE INFORMATION In accordance with Arizona Corporation Commission Rules of Practice and Procedure R14-3-219, Applicant provides the following location maps and land use

More information

MPC STAFF REPORT WIRELESS TELECOMMUNCATIONS FACILITY February 19, 2013 MPC FILE NO. 12-002102-PLAN

MPC STAFF REPORT WIRELESS TELECOMMUNCATIONS FACILITY February 19, 2013 MPC FILE NO. 12-002102-PLAN MPC STAFF REPORT WIRELESS TELECOMMUNCATIONS FACILITY MPC FILE NO. 12-002102-PLAN WTF SUMMARY Report Status MPC Project Planner Petitioner, Property Owner, Agent Information Initial Report Jack Butler,

More information

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015 TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015 ARTICLE 8: The Town voted by 2/3 vote to amend its Zoning Bylaws by deleting the current Section 6.14 Wireless Communications Facilities

More information

Draft ARTICLE 20A "AO" ANTIETAM OVERLAY DISTRICT

Draft ARTICLE 20A AO ANTIETAM OVERLAY DISTRICT Draft ARTICLE 20A "AO" ANTIETAM OVERLAY DISTRICT Section 20A.0 Purpose The purpose of the Antietam Overlay District is to provide mechanisms for the protection of significant historic structures and land

More information

Thanks, Rob, Thanks, Rob,

Thanks, Rob, Thanks, Rob, From: Hingtgen, Robert J To: "Asha Bleier"; Patrick BROWN Cc: Gungle, Ashley; Hofreiter, Larry; Ramaiya, Jarrett; Waterman, Ryan R. Subject: RE: 3910 120005, Soitec Solar -- RE: Soitec - Key Viewshed Map

More information

Pima Regional Remote Sensing Program

Pima Regional Remote Sensing Program Pima Regional Remote Sensing Program Activity Orthophoto GIS Mapping and Analysis Implementing Agency Pima Association of Governments (Tucson, Arizona area Metropolitan Planning Organization) Summary Through

More information

Chapter 7 ZONING PLAN

Chapter 7 ZONING PLAN Chapter 7 ZONING PLAN Introduction This Chapter opens with a general description of a zoning plan. It is followed by a brief explanation of the relationship between this Growth Management Plan and the

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition

More information

The Application of Land Use/ Land Cover (Clutter) Data to Wireless Communication System Design

The Application of Land Use/ Land Cover (Clutter) Data to Wireless Communication System Design Technology White Paper The Application of Land Use/ Land Cover (Clutter) Data to Wireless Communication System Design The Power of Planning 1 Harry Anderson, Ted Hicks, Jody Kirtner EDX Wireless, LLC Eugene,

More information

AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF

AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF DC/2015/00494 AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF LAND AT ONEN, ADJACENT TO B4233, NP25 5EN. RECOMMENDATION: APPROVE Case Officer: Elizabeth Bennett Date Registered:

More information

7.0 INTRODUCTION 7.1 BACKGROUND

7.0 INTRODUCTION 7.1 BACKGROUND Section 7: Economic Development 7.0 INTRODUCTION A community s character is a function of its residential neighborhoods, its open spaces, and its commercial districts. Commercial uses also play another

More information

A-2, RURAL ESTATE-AGRICULTURE DISTRICT

A-2, RURAL ESTATE-AGRICULTURE DISTRICT CHAPTER 52 A-2, RURAL ESTATE-AGRICULTURE DISTRICT SECTION: 10-52-1: Purpose 10-52-2: Permitted Uses 10-52-3: Accessory Uses 10-52-4: Conditional Uses 10-52-5: Interim Uses 10-52-6: Lot Area, Density, and

More information

DENSITY AND PUBLIC SPACE AT BISHOP STREET

DENSITY AND PUBLIC SPACE AT BISHOP STREET DENSITY AND PUBLIC SPACE AT BISHOP STREET Niehoff Urban Studio Senior Planning Capstone Spring 2015 Justin M. Lightfield U N I V E R S I T Y O F C I N C I N N A T I Table of Contents Overview... 3 Design

More information

COUNTY OF ELBERT. 18 September, 2014 For the Planning Commission meeting of 25 September, 2014 ELBERT COUNTY PLANNING COMMISSION

COUNTY OF ELBERT. 18 September, 2014 For the Planning Commission meeting of 25 September, 2014 ELBERT COUNTY PLANNING COMMISSION COMMUNITY & DEVELOPMENT SERVICES OFFICE P.O. BOX 7 215 COMANCHE STREET KIOWA, COLORADO 80117 303-621-3136 FAX: 303-621-3165 COUNTY OF ELBERT 18 September, 2014 For the Planning Commission meeting of 25

More information

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD Introduction Utility meters are a necessary component for any building. When older buildings were originally provided with utility

More information

STATEMENT OF PURPOSE

STATEMENT OF PURPOSE STATEMENT OF PURPOSE Community Properties, Inc. ( CPI ) is applying to Chatham County for approval of a major subdivision, Meadowview PUD (the Project ), with access to NC 87 and Old Graham Road, just

More information

Conducting a Land Use Inventory

Conducting a Land Use Inventory Chapter 3 Conducting a Land Use Inventory Included in this chapter: Determining Current Land Use Conditions Preparing a Base Map Deciding on Land Use Categories Collecting Current Land Use Data Preparing

More information

TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision...

TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision... MCKENZIE COUNTY COMPREHENSIVE PLAN TABLE OF CONTENTS INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal....2 Vision...3 ECONOMIC DEVELOPMENT...4

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Commercial Mobile Radio Service Facilities (CMRS) For Cellular Phone Service Providers

Commercial Mobile Radio Service Facilities (CMRS) For Cellular Phone Service Providers Commercial Mobile Radio Service Facilities (CMRS) For Cellular Phone Service Providers Section 1200, Article 12, Chapter 146, Aurora Municipal Code (Includes up to Ordinance 2004-17, effective 05-03-04)

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

CULTURAL HISTORY The United States Public Land Survey System The Rectangular Grid By Neal McLain

CULTURAL HISTORY The United States Public Land Survey System The Rectangular Grid By Neal McLain CULTURAL HISTORY The United States Public Land Survey System The Rectangular Grid By Neal McLain In last month's column, I discussed the origin of the United States Public Land Survey System (USPLSS, or

More information

Rural Residential Buildable Lands Inventory

Rural Residential Buildable Lands Inventory The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...

More information

CHARLOTTE PLANNING COMMISSION RECONSIDERED AND RESTATED FINDINGS OF FACT AND DECISION IN RE APPLICATION OF

CHARLOTTE PLANNING COMMISSION RECONSIDERED AND RESTATED FINDINGS OF FACT AND DECISION IN RE APPLICATION OF Background CHARLOTTE PLANNING COMMISSION RECONSIDERED AND RESTATED FINDINGS OF FACT AND DECISION IN RE APPLICATION OF RCC Atlantic, Inc. d/b/a Unicel, Applicant John H. Crabbe, Jr., Property Owner Site

More information

VI. UTILITIES & PUBLIC SERVICES

VI. UTILITIES & PUBLIC SERVICES VI. UTILITIES & PUBLIC SERVICES WATER For Grantham s residents outside of the Eastman Community, potable water is provided by individual private wells. Within Eastman the Village Water District, a municipal

More information

DOUGLAS COUNTY ZONING RESOLUTION Section 5 RR - Rural Residential District 3/10/99. -Section Contents-

DOUGLAS COUNTY ZONING RESOLUTION Section 5 RR - Rural Residential District 3/10/99. -Section Contents- SECTION 5 RR - RURAL RESIDENTIAL DISTRICT -Section Contents- 501 Intent...5-2 502 Principal Uses...5-2 503 Accessory Uses...5-3 504 Uses Permitted by Special Review...5-4 505 Land Dedication...5-4 506

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

THE RUSKIN COMMUNITY PLAN

THE RUSKIN COMMUNITY PLAN THE RUSKIN COMMUNITY PLAN Introduction Ruskin is a historic community situated on the shores of Tampa Bay, the Little Manatee River and the Ruskin Inlet, approximately 16 miles southeast of Tampa. The

More information

Presentation to Knox County Commission Monday, February 23, 2015

Presentation to Knox County Commission Monday, February 23, 2015 The Northwest County Sector Plan Update Presentation to Knox County Commission Monday, February 23, 2015 COMMUNITIES OF THE NORTHWEST COUNTY SECTOR Ball Camp Cedar Bluff Last NW Sector Update: 2003 Land

More information

12 February 8, 2012 Public Hearing APPLICANT:

12 February 8, 2012 Public Hearing APPLICANT: 12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

understanding Sustainable Landscaping & Tree Preservation Standards

understanding Sustainable Landscaping & Tree Preservation Standards understanding Sustainable Landscaping & Tree Preservation Standards Purpose To promote landscaping around development that is compatible with the existing environment, and which reduces greenhouse gas

More information

Solar Friendly Best Planning Practices for New Hampshire Communities

Solar Friendly Best Planning Practices for New Hampshire Communities Solar Friendly Best Planning Practices for New Hampshire Communities Photo by: Blue Selenium LLC A Quick Resource Guide for Planning Boards and Municipal Officials in Crafting Solar Friendly Regulations

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection

More information

COST PROXY MODELS IN RURAL TELEPHONE COMPANIES

COST PROXY MODELS IN RURAL TELEPHONE COMPANIES COST PROXY MODELS IN RURAL TELEPHONE COMPANIES Prepared for the United States Telephone Association by Austin Communications Education Services, Inc. 2937 Landmark Way Palm Harbor, FL 34684-5019 USA Tel:

More information

Summary of Pacific Northwest Municipal Tree Regulations Prepared by Seattle DPD in conjunction with Sound Tree Solutions February 8, 2010

Summary of Pacific Northwest Municipal Tree Regulations Prepared by Seattle DPD in conjunction with Sound Tree Solutions February 8, 2010 Summary of Pacific Northwest Municipal Tree Regulations Prepared by Seattle DPD in conjunction with Sound Tree Solutions February 8, 2010 The attached table is the comparison of Seattle to eleven Pacific

More information

WIRELESS TELECOMMUNICATIONS FACILITIES ORDINANCE

WIRELESS TELECOMMUNICATIONS FACILITIES ORDINANCE WIRELESS TELECOMMUNICATIONS FACILITIES ORDINANCE CONTENTS Section 1 Title ---------------------------------------------------------------------------------------- 1 Section 2 Authority -----------------------------------------------------------------------------------

More information

Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6

Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6 Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6 GEORGIA CONSERVATION TAX CREDIT PROGRAM TABLE OF CONTENTS 391-1-6-.01 Purpose and

More information

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS This section provides guidance on a variety of trail issues for planners and developers of the Ice Age NST across the state. It also provides introductory

More information

Using Aerial Photography to Measure Habitat Changes. Method

Using Aerial Photography to Measure Habitat Changes. Method Then and Now Using Aerial Photography to Measure Habitat Changes Method Subject Areas: environmental education, science, social studies Conceptual Framework Topic References: HIIIB, HIIIB1, HIIIB2, HIIIB3,

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT. Final Report. Michael Lackner, B.A. Geography, 2003

2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT. Final Report. Michael Lackner, B.A. Geography, 2003 2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT Final Report by Michael Lackner, B.A. Geography, 2003 February 2004 - page 1 of 17 - TABLE OF CONTENTS Abstract 3 Introduction 4 Study

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

Maine Forest Service Interpretations of the Maine Forest Practices Act Statute and Rules (12 MRSA 8867-A to 8888 & MFS Rules Chapter 20)

Maine Forest Service Interpretations of the Maine Forest Practices Act Statute and Rules (12 MRSA 8867-A to 8888 & MFS Rules Chapter 20) Maine Forest Service Interpretations of the Maine Forest Practices Act Statute and Rules (12 MRSA 8867-A to 8888 & MFS Rules Chapter 20) These interpretations take into account the full context, meaning,

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 6, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Doris Nguyen, Associate

More information

Using Land Use Planning Tools to Support Strategic Conservation

Using Land Use Planning Tools to Support Strategic Conservation Using Land Use Planning Tools to Support Strategic Conservation Resources A Citizen s Guide to Planning & Zoning in Virginia (2003) Provides background information on how basic land use planning tools

More information

MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy.

MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy. MAPPING MINNEAPOLIS URBAN TREE CANOPY Why is Tree Canopy Important? Trees are an important component of urban environments. In addition to their aesthetic value, trees have significant economic and environmental

More information

Benton MacKaye Trail - Section 2. Three Forks (FS 58) to GA. Highway 60. 11.4 miles

Benton MacKaye Trail - Section 2. Three Forks (FS 58) to GA. Highway 60. 11.4 miles General Benton MacKaye Trail - Section 2 Three Forks (FS 58) to GA. Highway 60 11.4 miles This is the longest and most remote section of the Benton MacKaye Trail (BMT) east of GA 5. It follows the Appalachian

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

EAST BETHEL PLANNING COMMISSION MEETING June 24, 2014

EAST BETHEL PLANNING COMMISSION MEETING June 24, 2014 EAST BETHEL PLANNING COMMISSION MEETING June 24, 2014 The East Bethel Planning Commission met for a Regular Planning Commission Meeting on June 24, 2014 at 7:00 P.M for their regular meeting at City Hall.

More information

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES Site Analysis Floyd Zimmerman, FASLA Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 Sensitive owners and designers understand that from the facility user s perspective,

More information

MEMORANDUM. Managers, Administrators, Clerks, Attorneys, and Planners

MEMORANDUM. Managers, Administrators, Clerks, Attorneys, and Planners MEMORANDUM To: From: Managers, Administrators, Clerks, Attorneys, and Planners Kimberly S. Hibbard, General Counsel Date: September 15, 2013 Re: City Authority to Regulate Wireless Telecommunications HB

More information

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES Joint City-County Planning Commission of Barren County, Kentucky 126 East Public Square City Hall Glasgow, KY 42141 A. PURPOSE:

More information

Benzie County Master Plan Survey Results Summary and Report

Benzie County Master Plan Survey Results Summary and Report August 31, 2015 Benzie County Master Plan Survey Results Summary and Report As part of the 2015 Benzie County Master Plan update, the Benzie County Planning Commission and the Master Plan Committee developed

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 The Planning and Development Department hereby forwards

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

Bell Mobility has submitted an application for a Radiocommunication Antenna System at 1360 Bloomington Road East (see location map below).

Bell Mobility has submitted an application for a Radiocommunication Antenna System at 1360 Bloomington Road East (see location map below). Cell Phone Tower Proposal Bell Mobility has submitted an application for a Radiocommunication Antenna System at 1360 Bloomington Road East (see location map below). Bell is proposing a 40 m high self-support

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Catawba County Application for a Wireless Communication New Tower or Combination New Tower/Collocation (Quasi-Judicial Hearing - Board of Adjustment)

Catawba County Application for a Wireless Communication New Tower or Combination New Tower/Collocation (Quasi-Judicial Hearing - Board of Adjustment) Catawba County Application for a Wireless Communication New or Combination New /Collocation (Quasi-Judicial Hearing - Board of Adjustment) Type of Facility (please check one): New Only Combination New

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS This document provides a brief overview of zoning designations only. Inaccuracies may be present. Please consult the Sacramento County Zoning Code for

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT

TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT TO: FROM/PHONE: SUBJECT: Mayor and Councilmembers Mark Kutney, AICP (954) 797-1101 Quasi Judicial Hearing: Variance TITLE OF AGENDA ITEM: V 3-2-01 MDM Services/BP/Amoco,

More information

STATE OF VERMONT PUBLIC SERVICE BOARD ) ) ) ) )

STATE OF VERMONT PUBLIC SERVICE BOARD ) ) ) ) ) STATE OF VERMONT PUBLIC SERVICE BOARD Docket No. 7212 Petition of H.W. Ventures, L.C., for a certificate of public good, pursuant to 30 V.S.A. 248(j, authorizing the installation and operation of a temporary

More information

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed. Adopted 12/5/00; revised as of 1/2/07 Marietta Tree Commission Rules and Regulations I. Tree Planting A. Planting Specifications 1. Trees must be: A) of a minimum 1¼ inches caliper; B) single stem, straight,

More information

HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY

HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY AN ORDINANCE TO AMEND CHAPTER XIII OF THE REVISED GENERAL ORDINANCES BEING THE LAND DEVELOPMENT ORDINANCE OF THE TOWNSHIP OF HARDWICK TOWNSHIP IN ORDER TO ADOPT

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors

More information

Division 51-4.400. Yard, Lot, and Space Regulations.

Division 51-4.400. Yard, Lot, and Space Regulations. Division 51-4.400. Yard, Lot, and Space Regulations. SEC. 51-4.401. MINIMUM FRONT YARD. (a) General provisions. (1) Required front yards must be open and unobstructed except for fences. Except as otherwise

More information

Public Survey for Phase I

Public Survey for Phase I Rockfish Valley Area Plan: Public Survey for Phase I For Nelson County Residents & Property Owners Name: OPTIONAL: Location of residence or property: o Address: o Voting District: North Central West South

More information

Anamorphic Projection Photographic Techniques for setting up 3D Chalk Paintings

Anamorphic Projection Photographic Techniques for setting up 3D Chalk Paintings Anamorphic Projection Photographic Techniques for setting up 3D Chalk Paintings By Wayne and Cheryl Renshaw. Although it is centuries old, the art of street painting has been going through a resurgence.

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

PLANNING AND ZONING 102 E. Airline Highway, LaPlace, Louisiana, 70068 (985) 651-5565 Fax (985) 653-9808

PLANNING AND ZONING 102 E. Airline Highway, LaPlace, Louisiana, 70068 (985) 651-5565 Fax (985) 653-9808 PLANNING AND ZONING 102 E. Airline Highway, LaPlace, Louisiana, 70068 (985) 651-5565 Fax (985) 653-9808 TELECOMMUNICATIONS TOWER/CO-LOCATION PERMIT APPLICATION PERMIT #: DATE REQUESTED: ZONING DISTRICT:

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: April 17, 2014...Agenda Item *3 Company: Docket No. Minnesota Power E015/GP-13-978 In the Matter of the Application of Minnesota

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

Chapter 18.42 PERSONAL WIRELESS SERVICE FACILITIES Sections: 18.42.010 Purpose, policy, goals, and interpretation. 18.42.020 Scope and applicability

Chapter 18.42 PERSONAL WIRELESS SERVICE FACILITIES Sections: 18.42.010 Purpose, policy, goals, and interpretation. 18.42.020 Scope and applicability Chapter 18.42 PERSONAL WIRELESS SERVICE FACILITIES Sections: 18.42.010 Purpose, policy, goals, and interpretation. 18.42.020 Scope and applicability Exemptions. 18.42.030 Definitions. 18.42.040 Application

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

For Discussion Wireless Communications Zoning Amendment

For Discussion Wireless Communications Zoning Amendment For Discussion Wireless Communications Zoning Amendment Motivation Two tentative tower sites are under discussion, with aspirations for high towers that would have serious visual impacts. Under the current

More information

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD

More information

TRAFFIC IMPACT ANALYSIS (TIA)

TRAFFIC IMPACT ANALYSIS (TIA) GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (TIA) FOR REZONING APPLICATIONS AND OTHER DEVELOPMENT APPROVALS REQUIRING TRANSPORTATION IMPACT ANALYSIS IN SUMTER COUNTY, FLORIDA July 17, 2007 PURPOSE AND APPLICABILITY

More information