VENDOR QUALIFICATION APPROVAL FORM

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "VENDOR QUALIFICATION APPROVAL FORM"

Transcription

1 COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit: ODA Authority: VENDOR QUALIFICATION APPROVAL FORM Sub of: Yes No PMA /TSO Authority: Yes Telephone: No Date of Survey: OEM If yes, for what prime Mfg: Yes No KEY MANAGEMENT CONTACTS AT YOUR LOCATION: Q.A.: Admin: Address: Engineering: Other: TYPE OF BUSINESS: Repair / Overhaul Manufacturer Distributor / Supplier Other Principal Products & Services PRINCIPAL CUSTOMERS: FACILITIES: Own Lease Employees (Give Number Of) Total Area (Sq. Ft) Type: Inspection Admin Production Mfg.- Ovhl/Rpr Engr / Tech Other PROGRAMS: (CHECK IF CERTIFICATED MUST INCLUDE COPY) ISO 9000 SERIES C.A.S.E. STANDARDS F.A.R. 145 (Repair Station) DOT/FAA Drug/Alcohol Program Other: (List all applicable) (Required by repair stations, non-certificated manufacturers producing safety-sensitive parts, non-certificated processors performing safety sensitive functions) Form #: QAO-001 (11/22/13, Rev 6) Page 1 of 6

2 PROCESSING FACILITIES AND CONTROLLING SPEC: Heat Treating Welding Plating Chemical Films Peening Stripping / Cleaning Finish Other NON-DESTRUCTIVE TESTING AND CONTROLLING SPEC: Magnetic Particle Radiographic Eddy Current Pressure Test Penetrant Ultrasonic Hardness Other INSPECTIONS: Jet Aviation, our Customers, FAA and Regulatory Offices must have the right of access to your facility and documentation for on-site audit purposes. Agree - Yes Disagree -No (You must be in agreement with this statement) Date of last Government Inspection: Name of Government Representative: Name of FAA PMI: Has the FAA ever investigated your facility (other than an audit)? Please list customer including Government agencies, major contracts, and names of their representatives who have inspected your operation and accepted your Quality Program in the last year. (Add attachment, if necessary) A. QUALITY SYSTEMS: 1. Is there a Quality Program in place? 2. Is there a Quality Procedures Manual? 3. Is a copy issued to inspector and supervisors? 4. Are QA/QC and production functions separated? 5. Is there a roster of supervisory and inspection personnel maintained with samples of signatures, initials, and stamps? 6. Is all work including inspection and tests performed in accordance with FAA approved technical data? 7. Are work instructions (travelers) used for documenting production, inspection, and testing operations (with provisions for part ID, who performed operation and when)? Form #: QAO-001 (11/22/13, Rev 6) Page 2 of 6

3 A. QUALITY SYSTEMS: (Continued) 8. Are all incoming materials and parts subjected to a documented receiving inspection (including hidden damage as applicable)? 9. Are all inspections and tests documented? 10. Is there a system for the segregation and disposition of non-conforming items? 11. Does the vendor have a documented procedure describing how they report defects and un-airworthy conditions to the customer and the FAA (if applicable)? 12. Are procedures in place for maintenance, preventive maintenance, alterations and inspections? 13. Are procedures in place to assure the work documents returned from a subcontractor (at any tier) are adequate to support a major/minor determination? B. TECHNICAL DATA 1. Is there a procedure for preparation, maintenance and control of drawings, specifications, work instructions and other technical data? 2. Do procedures assure that obsolete, illegible, or marked up technical data is not used? 3. Are changes in technical data effectively identified and followed up for incorporation in your procedures? 4. When Blueprints are provided to build and or assembly product, are your technicians trained in Blueprint reading and interpretation to build? C. TRAINING 1. Is there an established training program for inspection, production, and other personnel including: a. Indoctrination training? b. Proficiency training and testing? c. Recurrent training? 2. Are individual employee s training records maintained? 3. Are NDT/NDI personnel certificated as I/A/W by NAS 410? D. TOOLS AND TEST EQUIPMENT 1. Is there a system to assure tools and test equipment was maintained in a serviceable and calibrated condition? 2. Are tools and test equipment calibration traceable to the N.I.S.T. (formerly N.B.S.) Form #: QAO-001 (11/22/13, Rev 6) Page 3 of 6

4 E. GENERAL 1. Is there a sufficient fire protection system, i.e. sprinkler system and/or fire extinguisher of the proper class in adequate numbers and locations? 2. Is your facility and operations in compliance with all applicable OSHA and EPA requirements? 3. Is provision made to segregate and identify parts and material throughout facility? F. STORAGE 1. Are there remote storage areas for finished parts, raw stock, hardware, etc., separate from areas where work is performed? 2. Are customer owned parts and materials identified from other parts and materials including those of the same type? 3. Are procedures in place to assure that damaged or unacceptable parts and materials are not issued for use? 4. Is there a system for control of shelf life materials? G. RECORDS 1. Are records of work and/or material/parts conformity maintained a minimum of two years? 2. Are records traceable by job number, repair or purchase order number, and is referenced on documents provided to customer? 3. Do records include the name of those performing or supervising the work and those inspecting work? H. ANTI-DRUG AND ALCOHOL MISUSE PREVENTION PROGRAM: (If your company does not perform safety-sensitive maintenance functions as defined in 14 CFR, Part 120, Subpart E and F, please circle N/A and skip to next section. 1. Do you confirm that each of your employees (and/or subcontractors) received a Verified Negative preemployment drug test result prior to being hired to perform a safety sensitive function or prior to being transferred from a non safety-sensitive function to a safety-sensitive function? 2. If the answer to question 1 is YES, do you confirm that your company complies with the FAA and DOT regulation covering Anti-drug and Alcohol Misuse Prevention Programs? 3. Upon our request, is your company readily prepared to present a list of the employees (and/or subcontractors) assigned to work on our aircraft, or aircraft parts / components, with the dates the preemployment drug test results were received? 4. Does your company ensure that all your safety-sensitive employees are subject to all testing listed 14 CFR Part 120 Subpart E & F, including random drug and alcohol testing requirements? 5. Has more than 180 days elapsed since any of your employees (and/or subcontractors) received a verified negative drug test result or been hired or transferred into a safety-sensitive function. 6. Has more than 180 days elapsed since any of your employees (and / or subcontractors) been hired or transferred into a safety-sensitive function? 7. If the answer to question 5 or 6 is YES have the subject employees (and / or subcontractors) received a Verified Negative pre-employment drug test result? 8. Have two-year drug and alcohol history checks been performed on all safety-sensitive employees (new hire or transfer to a safety-sensitive position)? Form #: QAO-001 (11/22/13, Rev 6) Page 4 of 6

5 NERH. AAMPP (Continued) Jet Aviation St. Louis, Inc. 9. Does your company audit or confirm that sub-contract suppliers and / or maintenance technicians that perform safety-sensitive functions are in compliance with 14 CFR Part 120 Subpart E & F, including random drug and alcohol testing requirements? 10. Does your company use any sub-contract suppliers and/or maintenance technicians to perform safetysensitive functions that are not in compliance with 14 CFR Part 120 Subpart E & F, including random drug and alcohol testing requirements? 11. Do you subcontract any safety-sensitive functions (maintenance/preventative maintenance)? Note: if your answer to this question is YES please include an example of the letter distributed to your sub-tier suppliers exhibiting the flow-down requirement for compliance to the FAA Final rule amending the antidrug and alcohol misuse testing program. I. THE DODD-FRANK ACT WALL STREET REFORM AND CONSUMER PROTECTION ACT 1. Has your company adopted a policy on minerals from conflict areas? 2. Does your company procure Conflict Minerals from covered countries? 3. Does supplier further certify that it has not provided, and will not provide, Jet Aviation with any products or materials that contain such Conflict Minerals. 3. Have you conducted an inquiry to determine whether or not your suppliers procure Conflict Minerals from covered countries? Please be sure the following documents (as applicable) are supplied with the return of this survey: 1. Air Agency Certificate and Operation Specifications 2. FAA Anti-Drug Program Approval Letter (If you subcontract safety-sensitive functions, please also include a copy of the letter distributed to your sub-tier suppliers exhibiting the flow-down requirement for compliance to the FAA Final Rule of October 10, 2006) 3. FAA PMA or TSO Approvals, etc. 4. Documentation to support Quality Control Program 5. Roster or list, including sample signatures of those authorized to sign Maintenance Release, Certificates of Conformance, and other records. 6. Organizational Chart. Outsourced Services Documentation: 1. If contracted for DER, DAR, Auditor, please include copy of resume, Letter of Designation from the FAA, Inspection Authorization, etc. 2. Engineers Professional Certificates showing certifications and qualifications 3. Certificate of Insurance if performing a repair on Jet Aviation Property All vendors approved to Jet Aviation s Approved Vendor List will remain approved on the list as long as your performance continues to meet our standards with quality products, ontime deliveries and satisfactory services. This approval shall remain in force until suspended or revoked as long as a quality product continues to be delivered Please provide Jet Aviation notification of any changes to your operations, management, or certificates. Copies should be provided as soon as possible. I hereby certify to the best of my knowledge, the information supplied herein is accurate, complete and current. I am an authorized representative to sign this certification. Signature Title Date Form #: QAO-001 (11/22/13, Rev 6) Page 5 of 6

6 Return Survey to: Jet Aviation St. Louis, Inc. Quality Assurance Department Attention: Janet Parvin 6400 Curtiss-Steinberg Drive, Cahokia, IL Phone: FAX to: (618) THIS PAGE FOR Jet Aviation, INC. USE ONLY Documentation Requirements (As Applicable) 1. Air Agency Certificate and Operation Specifications 2. FAA Anti-Drug Program Approval Letter (If you subcontract safety-sensitive functions, please also include a copy of the letter distributed to your sub-tier suppliers exhibiting the flow-down requirement for compliance to the FAA Final Rule of October 10, 2006) 3. FAA PMA or TSO Approvals, etc. 4. Documentation to support Quality Control Program 5. Roster or list, including sample signatures of those authorized to sign Maintenance Release, Certificates of Conformance, and other records. 6. Organizational Chart. Outsourced Services Documentation: 1. If contracted for DER, DAR, Auditor, please include copy of resume, Letter of Designation from the FAA, certificates, Inspection Authorization, etc. 2. Engineers Professional certificates showing certifications and qualifications 3. Certificate of Insurance if performing a repair on Jet Aviation Property File: Requirements Not Met: Requirements Met: Comments: Quality Evaluation by: Date: Form #: QAO-001 (11/22/13, Rev 6) Page 6 of 6

D3 AVIATION USE ONLY. Conforms to requirements, procedures & control exists to control the product.

D3 AVIATION USE ONLY. Conforms to requirements, procedures & control exists to control the product. (Please Print) Date Supplier Name FAA Certificate No. and Type Address: Phone No. City, State, Zip Code Fax No. Total Facility Area (No. Buildings, Sq. Ft.) Email Years in Operation Total No. Employees

More information

SUPPLIER QUESTIONNAIRE

SUPPLIER QUESTIONNAIRE SUPPLIER QUESTIONNAIRE January 17, 2014 Dear Valued Customer, It is Summit Aerospace Inc., policy to respond in a timely fashion to every regulatory and quality inquiry as presented by our current and

More information

FAA REPAIR STATION # OMXR603L-EASA

FAA REPAIR STATION # OMXR603L-EASA PHS/MWA Aviation Services 42355 Rio Nedo Temecula, CA 92590 USA FAA REPAIR STATION # OMXR603L-EASA.145.5102 Valued Customer, It is the PHS/MWA Aviation Services policy to respond in a timely fashion to

More information

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES REPAIR/OVERHAUL VENDOR AUDIT CHECKLIST Audit Date: Vendor Allocation #: C.A.S.E. Member #: Auditor: Vendor Name: U.S./Canadian Certificate #: EASA Certificate #: Address Line 1: Address Line 2: City: Country:

More information

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D

More information

Quality Supplier/Vendor Questionnaire. Supplier Name. 1. Type of Business: Manufacturer's Maintenance Facility. Surplus Parts Dealer / Broker

Quality Supplier/Vendor Questionnaire. Supplier Name. 1. Type of Business: Manufacturer's Maintenance Facility. Surplus Parts Dealer / Broker Bald Eagle Turbine Sales, LLC. 2105 South 48th Street Suite # 109 Tempe AZ 85282 602 454 1110 602 454 1112 sales@baldeagleturbine.com Quality Supplier/Vendor Questionnaire Supplier Name Bill To Address

More information

RELIABLE TOOL AND MACHINE INC. / RELIABLE MACHINE & ANODIZE. Quality Manual

RELIABLE TOOL AND MACHINE INC. / RELIABLE MACHINE & ANODIZE. Quality Manual RELIABLE TOOL AND MACHINE INC. / RELIABLE MACHINE & ANODIZE Quality Manual AS9100 & ISO9001: 2000 NTI/QM/001 CONTENTS Clauses of the standard Pg. # 1. Scope 4 1.1 General 4 1.2 Permissible exclusions 4

More information

GLOBAL AEROSPACE PROCEDURE

GLOBAL AEROSPACE PROCEDURE 1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to

More information

Vendor Qualification Quality Audit Checklist

Vendor Qualification Quality Audit Checklist In order for your firm to be placed on our Approved Vendor List, it is necessary that the person responsible for the Quality system in your firm fill out this audit form and return it to us via mail, fax,

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Product Order Quality Requirements Meggitt (Orange County), Inc.

Product Order Quality Requirements Meggitt (Orange County), Inc. Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record

More information

Purchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document

Purchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document Purchase Order Attachment 1600 Revision 02 June-2006 Raytheon Aircraft Company Supplier Quality Requirements Document Issued by: Raytheon Aircraft Company Supply Chain Management Quality Assurance 101

More information

Document Revision Log

Document Revision Log Document Revision Log TITLE: Binghamton Supplier Quality Requirements Manual DOC. NUMBER: 8.003.583-BNG Rev: Date: Description: Changed By: A 03-23-12 New Document S. Asante and J. Vellenga B 11-26-12

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1 Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

Self-Audit Checklist. Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature:

Self-Audit Checklist. Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

WEATHERFORD AEROSPACE, LLC STANDARD PURCHASE ORDER QUALITY TERMS AND CONDITIONS

WEATHERFORD AEROSPACE, LLC STANDARD PURCHASE ORDER QUALITY TERMS AND CONDITIONS Note to Suppliers: Terms and Conditions have been revised. Please review document upon receipt. Q-1 Quality Management System (Formerly Quality System) The supplier shall have a quality management system

More information

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Turbo Resources International Quality Procedure

Turbo Resources International Quality Procedure TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE

More information

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E 9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

Gulfstream Production Certificate Operations

Gulfstream Production Certificate Operations SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.

More information

Supplier Self Audit Questionnaire Quality Assurance Survey

Supplier Self Audit Questionnaire Quality Assurance Survey Supplier Self Audit Questionnaire Quality Assurance Survey Supplier/Sub-contractor Details Name: Address (city/state/zip): Telephone No.: Fax Number: Email Address: Website: Name: Name: Name: Name: Key

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

ASTRIUM SPACE TRANSPORTATION GENERIC QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS MANAGED BY DIRECT MATERIALS

ASTRIUM SPACE TRANSPORTATION GENERIC QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS MANAGED BY DIRECT MATERIALS ASTRIUM SPACE TRANSPORTATION GENERIC QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS MANAGED BY DIRECT MATERIALS ISSUE: 02 RELEASE DATE: 02.04.2013 Supplier Organisational Unit: Name: ASTRIUM Space Transportation

More information

PROGRAM QUALITY PLAN NUCLEAR SERVICES

PROGRAM QUALITY PLAN NUCLEAR SERVICES PROGRAM QUALITY PLAN DOCUMENT NO. PQP NUCLEAR Revision 1 NUCLEAR SERVICES Prepared by Southwest Research Institute Quality Systems January 2002 Southwest Research Institute P. O. Drawer 28510 6220 Culebra

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

Quality Assurance Manual

Quality Assurance Manual [COMPANY NAME] Quality Assurance Manual 10 CFR 50 Appendix B and ASME NQA-1 Approved By: [Enter date] Table of Contents Section Description Page 1 Introduction 2 2 Purpose and Scope 3 3 Definitions 4 4

More information

QA Procedure Page 1 Appendix A

QA Procedure Page 1 Appendix A *Changes from the previous QASE noted by "yellow" highlight of block Evaluation Summary Company: Prepared By: Section Element Manual Audit OK Objective Evidence 2.1 Objective of Quality Assurance Program

More information

Bogue Machine Company, Inc. Business Instruction

Bogue Machine Company, Inc. Business Instruction Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,

More information

Manual 2621 NORTH IROQUOIS AVENUE TULSA, OK Page 1 of 11

Manual 2621 NORTH IROQUOIS AVENUE TULSA, OK Page 1 of 11 2621 NORTH IROQUOIS AVENUE TULSA, OK 74106 Supplier Quality Requirements Manual Page 1 of 11 Revision Sheet Revision Date Description of Change Rev. N/C 12-01-07 Initial Release Rev. A 4/16/08 Approved

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5 Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS

PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS Approved By Claude Rigsby Sourcing Manager Approved By Doug Nixon Manager,Quality Assurance PPG Industries, Inc. - PPG Aerospace Transparencies 1719

More information

Counterfeit Parts Prevention Program

Counterfeit Parts Prevention Program Counterfeit Parts Prevention Program 1.0 Purpose The purpose of this document is to describe the process and due diligence performed by Northern Wings Repair, Inc (NWR) to prevent the purchase and / or

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

SUPPLIER QUALITY SYSTEM AUDIT

SUPPLIER QUALITY SYSTEM AUDIT Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company

More information

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0 Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015

More information

Standard Procedure Document: SP Supplier Quality Assurance Requirements and Quality Clauses Revision: J

Standard Procedure Document: SP Supplier Quality Assurance Requirements and Quality Clauses Revision: J CEO Approval: QA Director Approval: Date: 09/08/15 Page 1 of 12 PURPOSE SUPPLIER QUALITY ASSURANCE REQUIREMENTS AND QUALITY CLAUSES To establish the Supplier quality requirements applicable to procured

More information

APPENDIX I. QUALITY PURCHASE ORDER NOTES (NOTE NUMBER IDs)

APPENDIX I. QUALITY PURCHASE ORDER NOTES (NOTE NUMBER IDs) APPENDIX I QUALITY PURCHASE ORDER NOTES (NOTE NUMBER IDs) Quality PO Note (Note Number ID) Description 2000 Certificate of Compliance is required. Certificate must include manufacturer or supplier s name;

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Change Notice Revision 2 adds a definition of NANDTB, and acceptance of the National Aerospace NDT Board of Australia.

Change Notice Revision 2 adds a definition of NANDTB, and acceptance of the National Aerospace NDT Board of Australia. Advisory Circular AC43-8 Revision 2 Non-destructive Testing 27 February 2015 General Civil Aviation Authority advisory circulars contain information about standards, practices, and procedures that the

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

CENTRIS CONSULTING. Quality Control Manual

CENTRIS CONSULTING. Quality Control Manual CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

Qualified Contractor Management System

Qualified Contractor Management System FCIA Education Program Quality Module UL Qualified Contractor Firm Candidates Management System & Audit Preparation Education FCIA July 8, 2007; November 2007; March 2008 FCIA Management System Education

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

QUALITY ASSURANCE PURCHASE ORDER REQUIREMENTS Revision V Release Date: 04/08/2008

QUALITY ASSURANCE PURCHASE ORDER REQUIREMENTS Revision V Release Date: 04/08/2008 1. QUALITY SYSTEM REQUIREMENTS 1a. Supplier shall maintain a Quality Management System [QMS] certified by accredited independent third party registrar to Aerospace Standard SAE AS9100, International Standard

More information

State Meat and Poultry Inspection (MPI) Program Laboratory Quality Management System Checklist

State Meat and Poultry Inspection (MPI) Program Laboratory Quality Management System Checklist This checklist is intended to help laboratories improve the quality of their testing programs with regard to meat and poultry testing samples, in order to ensure those laboratories are at least equal to

More information

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013 UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd

More information

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL 8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents

More information

Business Management System Manual. Context, Scope and Responsibilities

Business Management System Manual. Context, Scope and Responsibilities Business Management System BMS Manual Page 1 of 11 Business Management System Manual Context, Scope and Responsibilities ISO 9001:2015 BMS.0100 R1 MAS Solutions LLC 29810 FM 1093 Suite C Fulshear, TX 77441

More information

Purchase Order Clauses and Conditions

Purchase Order Clauses and Conditions Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:

More information

ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES

ATTACHMENT Q PURCHASE ORDER QUALITY CLAUSES 1 of 8 Q0. Instructions: Review your Purchase Order for any Q clauses listed below. Specific clauses other than Q0 apply only when listed on the PO. All certifications provided to CAI are to be complete,

More information

QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14

QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14 QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21 Revision: 14 SPRINGS FABRICATION, INC. ADVANCED TECHNOLOGY GROUP 2685 Industrial Lane Broomfield, CO 80020 Controlled

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

Error! Bookmark not defined.

Error! Bookmark not defined. Table of Contents Table of Contents... 1 GENERAL INFORMATION... 3 DESCRIPTION OF BUSINESS... 3 ORGANIZATION STRUCTURE... 3 CUSTOMER SUPPORT... 4 REPAIR FACILITIES... 4 QUALITY ASSURANCE... 4 AUDITS / INSPECTIONS...

More information

QUALITY CONTROL MANUAL

QUALITY CONTROL MANUAL QUALITY CONTROL MANUAL PAGE 1 OF 23 Contents TABLE OF CONTENTS Section Title Page Introduction Introduction 3 Chapter 1 Manual Control 4 Chapter 2 Quality Control Department 5 Chapter 3 Quality Control

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

ISO 9001:2008 QUALITY MANUAL. Revision B

ISO 9001:2008 QUALITY MANUAL. Revision B ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,

More information

Supplier Quality Requirements F16 Program

Supplier Quality Requirements F16 Program ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL MILL-MAX MFG.CORP. 190 PINE HOLLOW ROAD P.O.BOX 300 OYSTER BAY, NY 11771-0300 PHONE 516 922-6000 www.mill-max.com Mill-Max Mfg.Corp. QUALITY ASSURANCE MANUAL Revision L, May 28, 2013 TABLE OF CONTENTS

More information

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE 1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior

More information

REPAIR STATION PROCEDURE

REPAIR STATION PROCEDURE REPAIR STATION PROCEDURE Subject Number: Revision: Page: Inspection Procedures Manual RSP002 F 1 of 2 FAA Approved Repair Station No. LD7R612J Original signatures on file with EDC: Approved: Rick Phillips

More information

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010 Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power

More information

SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST

SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST General Information SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST Vendor Code: Phone Fax: Vendor Name: Vendor Address: Completed by: Title: Signature: Date: Management Name: Title: Products/Services Description

More information

ATTACHMENT COMPARISON OF APPENDIX B TO ISO CFR 50 APPENDIX B ISO REGULATORY IMPACT/COMPLIANCE

ATTACHMENT COMPARISON OF APPENDIX B TO ISO CFR 50 APPENDIX B ISO REGULATORY IMPACT/COMPLIANCE ATTACHMENT COMPARISON OF APPENDIX B TO ISO 9001-2000 CRITERION I: ORGANIZATION 10 CFR 50 APPENDIX B ISO 9001-2000 REGULATORY IMPACT/COMPLIANCE I - Responsibility for establishing and executing of a quality

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632 THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632 Metal Finishing Instrumentation, Equipment and Supplies ISO 9001: 2008 QUALITY MANAGEMENT MANUAL ISSUED: 03/01/02(REV. 0) REVISION NO: 4 DATE:

More information

PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS

PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written

More information

Repair Station Training Suspected Unapproved Parts

Repair Station Training Suspected Unapproved Parts Title 14 CFR Part 1 Part 21 Part 43 Part 45 Part 91 Part 121 Part 135 Part 145 Information & References Advisory Circular AC 21-29-B AC 20-62 General FAA Info Suspected Unapproved Parts Program Plan (Report

More information

VERTECHS ENTERPRISES, INC.

VERTECHS ENTERPRISES, INC. Page 1 of 32 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 788 Greenfield Drive El Cajon, CA 92021 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

SUPPLIERS QUALITY ASSURANCE REQUIREMENTS

SUPPLIERS QUALITY ASSURANCE REQUIREMENTS SUPPLIERS QUALITY ASSURANCE REQUIREMENTS BNGSQAR01 Britten-Norman Supplier Quality Assurance Requirements Page 1 of 11 This document defines the Supplier Quality requirements for:- B-N Group Britten-Norman

More information

Substance Abuse Program: Comprehensive Audit and Inspection Protocol Form. Alcohol Misuse Programs. Form No.: 3.1.10 Revision 1

Substance Abuse Program: Comprehensive Audit and Inspection Protocol Form. Alcohol Misuse Programs. Form No.: 3.1.10 Revision 1 Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety Substance Abuse Program: Comprehensive Audit and Inspection Protocol Form Alcohol Misuse Programs Form No.: 3.1.10 Revision

More information

CERTIFICATION & TRACEABILITY REQUIREMENTS

CERTIFICATION & TRACEABILITY REQUIREMENTS 4101 W. Highway 29 Georgetown, TX 78628 Phone: 512.868.1111 / Fax: 512.868.2223 www.redaviation.com CERTIFICATION & TRACEABILITY REQUIREMENTS These requirements establish the minimum certification and

More information

ACCREDITATION OF OWNER/USER SELF-INSPECTION REPAIR PROGRAM

ACCREDITATION OF OWNER/USER SELF-INSPECTION REPAIR PROGRAM ACCREDITATION OF OWNER/USER SELF-INSPECTION REPAIR PROGRAM TSSA GUIDE FOR REVIEW TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th

More information

Thank you for your interest in Phoenix Composite Solutions, LLC.

Thank you for your interest in Phoenix Composite Solutions, LLC. Phoenix Composite Solutions, LLC FAA Repair Station - 4PR734 Dear Quality Manager, Thank you for your interest in Phoenix Composite Solutions, LLC. Due to the extensive number of customer survey requests,

More information

EN 4179/NAS 410 Interpretation

EN 4179/NAS 410 Interpretation EN 4179/NAS 410 Interpretation The NANDTB has adopted NAS 410 / EN 4179 in lieu of AS 3669 as the standard for the qualification and approval of NDT technicians. Employers applying these standards sometimes

More information