Contents. Executive Summary...ES-1

Size: px
Start display at page:

Download "Contents. Executive Summary...ES-1"

Transcription

1

2 Contents Section Page Executive Summary...ES-1 1 Introduction Purpose of a Strategic 20-Year Master Plan Background Service Area and Customer Base Report Organization Population and Water Demand Forecast Summary Introduction Projected Population Permanent Population Seasonal Population Functional Population Historic Water Production Swimming Pool Construction Permits Current Homeowner Versus Former Homeowner Water Use Projected Finished Water Demand Peak Hour Demands Demand by Service Type Demand by Service Type Unmetered Water Conclusions Water Supply System Water Supply Wells Raw Water Quality Biscayne Aquifer Floridan Aquifer Additional Raw Water Facilities Water Supply Permitting Saline Water Intrusion Wastewater Reuse Feasibility of Implementing Wastewater Reuse Water Supply Recommendations Aquifer Storage and Recovery GNV DOC/ WB DFB II

3 CONTENTS, CONTINUED Section Page Low-Pressure Reverse Osmosis Desalination Wastewater Reuse Water Supply Summary Construction Cost Estimates for the Water Supply System Water Treatment System J. Robert Dean Water Treatment Plant General Description Treatment Facilities Summary Kermit H. Lewin Seawater Desalination Facility at Stock Island Marathon RO Emergency Facility, Marathon, Florida Drinking Water Standards and Water Quality General Recent Drinking Water Regulatory Changes Water Quality Data Conclusion Evaluation of Water Treatment Facilities Water Demand and Treatment Capacity J. Robert Dean Water Treatment Plant Kermit H. Lewin RO Seawater Desalination Facility, Stock Island, Florida Marathon Island RO Seawater Desalination Facility, Marathon Island, Florida Water Treatment System Recommendations J. Robert Dean Water Treatment Plant, Florida City, Florida New LPRO Facility at the J. Robert Dean Water Treatment Plant, Florida City, Florida Kermit H. Lewin RO Emergency Facility, Stock Island, Florida Marathon RO Desalination Facility, Marathon, Florida Proposed Ocean Reef RO Facility, Ocean Reef, Florida Construction Cost Estimates for the Water Treatment System New LPRO Facility at the J. Robert Dean Water Treatment Plant, Florida City, Florida Kermit H. Lewin RO Desalination Facility, Stock Island, Florida Marathon RO Desalination Facility, Marathon, Florida Ocean Reef LPRO Treatment Plant, Ocean Reef, Florida Water Transmission System Existing Transmission System Evaluation of Existing Transmission System Transmission System Mains Transmission System Booster Pump Stations and Storage Facilities GNV DOC/ WB DFB III

4 CONTENTS, CONTINUED Section Page 5.3 Transmission System Recommendations Transmission System Mains Transmission System Pump Stations and Storage Facilities Construction Cost Estimates for the Transmission System Water Distribution System Existing Distribution Systems Evaluation of Distribution Systems Distribution Piping Distribution Pump Stations and Storage Facilities Recommended Improvements and Upgrades to Distribution Systems Distribution Piping Existing Distribution Pump Stations and Storage Facilities Proposed Distribution Pump Stations and Storage Facilities Construction Cost Estimates for the Distribution System Capital Improvement Program Year Water System Infrastructure Program Year Water System Capital Improvement Program Mission Year Water System Capital Improvement Program Goals and Objectives Water Infrastructure System Major System Upgrades Basis of Project Cost Estimates Strategic Financial Plan Capital Improvement Funding Strategy Existing Debt and Bond Covenants Five-Year Capital Improvement Funding Twenty-Year Capital Improvement Funding Works Cited Appendix A B C D E F Justification for Projected Per Capita Water Demand in the FKAA Service Area Drinking Water Regulations Update Proposed Water Facilities Improvements Transmission System Capital Cost Estimates Distribution System Capital Cost Estimates Wastewater Reuse Background Information GNV DOC/ WB DFB IV

5 CONTENTS, CONTINUED Exhibit Page 1-1 FKAA Existing Water Facilities Sources of Population Projection Data Monroe County Historic and Projected Population Projections Year Historic and Projected Percent Changes in Functional Population Historic Raw Water Production Historic Finished Water Production Year Historic Percent Changes in Functional Population, Raw Water Demand, and Per Capita Water Demand Annual Swimming Pool Construction Permits Issued by Monroe County FKAA Service Area Projected Population and Finished Water Demands Graphic Representation of FKAA Service Area Projected Population and Finished Water Demands Projected Peak Hour Demands Average Monthly Water Use by Category, million gallons, October 2003 September Graphic Summary of Average Monthly Water Use by Category, million gallons, October 2003 September U.S. Navy Water Usage from 1996 to Raw Water Wells and Pipelines, J. Robert Dean Water Treatment Plant FKAA Water Supply Wells Average Biscayne Aquifer Water Quality, Average Monthly Biscayne Aquifer Raw Water Quality Floridan Aquifer Raw Water Quality and Pumpage Water Use Permitting Water Supply Construction Cost Opinion WTP Flows (Average Monthly) Maximum Daily Month Treated Flows for the Period from January 2000 to June Existing Process Flow Schematic, J. Robert Dean WTP Existing Facilities at J. Robert Dean WTP Lime Dose (Monthly Average) IDSE and Stage 2 Compliance Dates Typical Treatment Facility Water Quality Data and Associated Water FDEP Standards Yearly Average Values: J. Robert Dean Water Treatment Plant Water Treatment Capacities To Meet Maximum Day Demands Preliminary Design Water Quality at J. Robert Dean WTP Process Flow Diagram Preliminary Mass Balance (Phase 1) Preliminary Mass Balance (Phase 2) Preliminary Major Equipment List and Design Criteria Summary J. Robert Dean WTP Phase I and Phase II RO Facility Construction Cost Opinion GNV DOC/ WB DFB V

6 CONTENTS, CONTINUED Exhibit Page 4-16 Kermit H. Lewin RO Desalination WTP Membrane Replacement and Plant Upgrades, Stock Island Construction Cost Opinion Marathon RO Desalination WTP Membrane Replacement and Plant Upgrades, Marathon, Construction Cost Opinion Characteristics of Transmission System Booster Pump Stations and Storage Facilities Construction and Total Project Cost Estimates for Proposed Transmission Main Improvement Projects Approximate Maximum Flow Through Various Size Taps Characteristics of Distribution Pump Stations and Storage Facilities Distribution Pump Station System Sizing Criteria Fire Protection Parameters for Selected Distribution Systems throughout the Keys Distribution System Pumping Capacity and Storage Requirements for Selected Distribution Systems throughout the Keys Approximate Site Size Required for Distribution Pump Stations with Various Size Ground Storage Tanks Construction and Total Project Cost Estimates for Proposed Distribution Pipeline Improvements Construction and Total Project Cost Estimates of Proposed Distribution Pump Station System Improvements and for Proposed New Distribution Pump Station Systems Year Water Infrastructure Capital Improvement - Order of Magnitude Cost Summary Year Water Infrastructure Capital Improvement - Detailed Cost Summary Existing Water Revenue Bonds Five-Year Capital Improvement Funding Plan Five-Year Capital Funding Sources Issuance of Additional Revenue Bonds Estimated Future Aggregate Debt Service Projected Water Rate Adjustments Projected Debt Service Coverage GNV DOC/ WB DFB VI

7 Executive Summary The Florida Keys Aqueduct Authority (FKAA) faces ever-increasing water demands from population growth in the Florida Keys, more stringent environmental protection requirements, and higher customer service expectations. To help address these issues for a 20-year period (from 2006 through 2025), FKAA has prepared this comprehensive strategic Master Plan. The purpose of the Master Plan is to provide FKAA with guidance and recommendations on water system capital improvements and expansion programs through This Master Plan includes recommendations for new facilities or upgrades to existing facilities in water treatment, water supply, transmission, water storage, pumping stations, and distribution. In addition, the Master Plan includes a capital improvement program and a financial analysis to help prioritize and sequence the improvements to have as minimal impact on water rates as possible. The goals and objectives of this strategic plan are focused around the following: Improve water supply and treatment reliability Optimize existing and future treatment to meet current and future regulatory limits Evaluate and implement alternative water supplies: Floridan aquifer, seawater, aquifer storage and recovery (ASR), and reuse Improve transmission and distribution infrastructure Additional storage capacity for distribution systems Replace small-diameter galvanized mains Provide more interconnects between distribution system and transmission main Loop distribution piping where possible Reduce system water losses Provide a long-range financial plan Identify long-term financing options Phase and develop cash flow and investment program Incorporate impact of increased operations and maintenance (O&M) and debt service Quantify impact on rates GNV DOC/ WB DFB ES-1

8 EXECUTIVE SUMMARY Service Area and Customer Base The service area of FKAA includes all of Monroe County plus that area in Miami-Dade County within 1 mile of the transmission pipeline. The service area includes a mix of commercial, industrial, and residential zonings that typify the land uses of a suburban area. Minimal service exists in Miami-Dade County, consisting of service to only a ranger station just outside of the treatment plant. FKAA does not expect that the distribution facilities of the System will be significantly expanded in Miami-Dade County. The Florida Keys are comprised of a chain of more than 800 individual islands located at the southern tip of Florida. FKAA is the only potable water purveyor within the Florida Keys. There are no other competing utilities. However, FKAA is presently precluded by its rules from serving anyone in certain environmentally sensitive areas. Excluded areas are limited to National Wildlife Refuges and certain hardwood hammock lands. Additionally, FKAA is under contract with the U.S. Department of Defense (DoD) to provide up to 2.4 million gallons per day (mgd) of potable water to DoD facilities located at Key West, Boca Chica, and throughout the Keys. Population and Water Demand Forecast FKAA serves three distinct populations: permanent residents, seasonal residents (those residing in the Keys for 6 months or less), and day visitors. The term functional population is a concept that incorporates these three elements of population. Because of the unique nature of the Keys, which has an economy based on seasonal tourism, it is appropriate to use one population number that incorporates these three separate population components. For this Plan, the functional population value is used in all per capita calculations and estimates. There are approximately 3.6 people per customer account within FKAA s service area using functional population as the basis. Population projections developed by the Monroe County Planning Department (MCPD) indicate that the permanent population for the GNV DOC/ WB DFB ES-2

9 EXECUTIVE SUMMARY Florida Keys in 2005 was 81,701, and the seasonal population was 73,737. The term functional population is a concept that incorporates permanent residents, seasonal residents, and day visitors. The functional population for Monroe County in the year 2005 was 155,438. By 2025, Monroe County is expected to have a permanent population of 84,603, a seasonal population of 75,071, and a functional population of 159,674. Projected Water Demand The maximum day projected finished water demands in the FKAA service area are expected to increase from mgd in 2005 to mgd in 2010, mgd in 2015, mgd in 2020, and mgd in Projected maximum-day and peak hour demand were also calculated using peaking factors of 1.25 and 1.35, respectively. Water Supply Recommendations Because of recent regulatory trends, it is unlikely that FKAA will be able to rely on the Biscayne Aquifer, its historical source of potable water, to meet its future needs for additional water. The South Florida Water Management District s (SFWMD s) Lower East Coast (LEC) Regional Water Supply Plan (RWSP) (SFWMD, 2005) advocates the use of the Floridan aquifer as an alternative water supply, either for ASR or for direct withdrawals for blending or reverse osmosis (RO). GNV DOC/ WB DFB ES-3

10 EXECUTIVE SUMMARY Water Supply Summary FKAA s projected 2025 average-day finished water demand is mgd, and the projected 2025 maximum-day finished water demand is mgd. Assuming that Biscayne Aquifer withdrawals are limited to 17.0 mgd during the dry season, 6 mgd can be provided by a new Low Pressure Reverse Osmosis (LPRO) water treatment plant (WTP) at Florida City, and 1 mgd of Floridan aquifer water can be blended at Florida City, which totals approximately 24 mgd. The additional treatment capacity to meet the mgd projected demand would need to come from additional LPRO at Florida City, seawater desalination facilities in the lower Keys and Ocean Reef, or potentially subsidized wastewater reuse. Construction cost estimates for Floridan aquifer supply wells and deep injection well (DIW) for FKAA s cost share of the Ocean Reef 4.5-mgd RO WTP facility are included in the construction cost estimate for water treatment provided in Section 4. FKAA should continue its plans to construct its ASR system as a shortterm solution to comply with a consent order with SFWMD. ASR can provide a short-term bridge to provide FKAA with additional water until an LPRO WTP utilizing the Floridan aquifer as a supply well for the LPRO treatment system is constructed. The ASR well will be constructed with a stainless-steel casing so as to minimize the likelihood of GNV DOC/ WB DFB ES-4

11 EXECUTIVE SUMMARY deterioration should it be used to withdraw brackish water on a longterm basis. The total estimated cost for the water supply improvement is $11,575,000. This includes $10,575,000 to design and construct five Floridan aquifer supply wells for the new 6-mgd LPRO WTP (Phase I and Phase II) at the J. Robert Dean WTP. In addition, $1 million is already allocated to the ongoing ASR well (cost per FKAA for FY 2007 only). The detailed cost breakdown and discussion can be found in Section 3. Water Treatment System Recommendations New Water Treatment Facilities LPRO Facility at the J. Robert Dean Water Treatment Plant, Florida City To meet increased demand, FKAA is proposing to expand capacity by installing new LPRO capacity at the J. Robert Dean WTP site. A Preliminary Design Report for a brackish water RO expansion at the J. Robert Dean Water Treatment Plant has been completed by CH2M HILL on January 19, Revision 1 of the Preliminary Design Report was completed on August 28, The design includes a building to accommodate four RO trains, which when installed would produce a maximum total of mgd finished water. This includes an RO permeate flow of 6 mgd combined with a maximum Floridan bypass blend flow of mgd. Phase I will include three trains totaling 4.5 mgd of capacity of the LPRO WTP, which will meet the projected demands for 2009 through With the installation of the fourth train as Phase II of the project, bringing the new plant to a total of mgd (maximum), projected demands for 2013 through 2018 will be met. Meeting the projected maximum day water demand of 2018 and beyond will require either utilizing finished water storage or an expansion of the facilities at Florida City or elsewhere. One DIW for the proposed RO desalting plant s concentrate disposal will be required. The DIW is currently under design with a disposal capacity adequate for 6 mgd of RO capacity. The estimated cost for Phase I (4.5 mgd) is $25,223,399, with Phase II adding another 1.5 mgd of capacity at a cost of $1,836,400. The total project cost (both phases) for a new 6 mgd capacity WTP is $27,059,799. Detailed costs and discussions can be found in Section 4. Proposed Ocean Reef RO Facility, Ocean Reef, Florida FKAA is also considering construction of an LPRO brackish water plant at Ocean Reef to offset the costs to replace or expand the 65,000 feet of GNV DOC/ WB DFB ES-5

12 EXECUTIVE SUMMARY transmission main from Key Largo to Ocean Reef. The capacity of the facility is expected to be approximately 4.5 mgd, which will provide irrigation and potable water supply to the Ocean Reef community. Approximately 1.5 mgd of the capacity will be utilized to offset current FKAA demands and will reduce the capacity needs at the Florida City Dean WTP by 1.5 mgd. The benefits of a facility would be the elimination of the high capital costs to replace the 65,000-foot transmission pipeline, elimination of booster pumping costs at the new Key Largo Pump Station, high quality water for one of FKAA s better customers, and a joint public/private project that benefits both Ocean Reef and FKAA. The cost share for FKAA is estimated to be $8,350,000 (per FKAA). Existing Water Treatment Facilities Upgrades J. Robert Dean Water Treatment Plant, Florida City, Florida Overall, the lime-softening WTP is in good condition, and no major repairs are anticipated in the future. Minor improvement items include: Add extra filter anthracite media to compensate for media loss and maintain filter performance. Investigate visible surface cracks on the recently installed 5 million gallon (MG) storage tank onsite. The cracks are probably superficial in nature. An investigation is pending by Crom, the tank manufacturer. Evaluate seepage problems and discoloration on the outside of the sludge thickener tank. Repairs may be needed. Add two new chlorinators to the existing chlorinator facility for use under the following circumstances: One chlorinator will be dedicated to feed chlorine to the new clearwell and paced to maintain a desirable chlorine concentration based on total RO permeate flow. The second chlorinator will be dedicated to feed chlorine to the scrubber system recirculation line to maintain the desired ORP set point. The second chlorinator will be dedicated to feed chlorine to the scrubber system recirculation line to maintain the desired ORP set point. Kermit H. Lewin RO Emergency Facility, Stock Island, Florida The following improvement items are proposed at the Kermit H. Lewin RO facility to increase production capacity to 2.5 mgd: Retrofit two trains with existing DuPont permeators with Toyobo modules GNV DOC/ WB DFB ES-6

13 EXECUTIVE SUMMARY Install new carbon dioxide storage and feed system for raw water Replace existing feed piping (downstream of the feed throttling valve), the concentrate piping, and permeate piping Install a limited-size bypass line around the energy recovery units to lessen the concentrate backpressure Refurbish and seal the clearwell under the degasifiers Install an elevated walkway and platform on the north side of the building connecting the second story stairway platform to the diesel fuel storage tank system The estimated cost for these improvements is $3,817,566. A detailed cost breakdown and discussion can be found in Section 4. Marathon RO Desalination Facility, Marathon, Florida The following improvement items are proposed at the Marathon RO emergency facility to provide 1.25 mgd of production capacity: Retrofit two trains with existing DuPont permeators with Toyobo modules Install new carbon dioxide storage and feed system for raw water Replace existing feed piping (downstream of the feed throttling valve), the concentrate piping, and permeate piping Refurbish and seal the clearwell under the degasifiers Upgrade components that are affected by corrosion The estimated cost for these improvements is $2,659,003. A detailed cost breakdown and discussion can be found in Section 4. The locations of all water treatment improvements including new facilities are shown in Appendix C. Transmission System Recommendations FKAA has a unique water system that extends some 130 miles from Florida City to Key West and is only approximately 3 miles wide at its widest point. The water transmission system begins at the high-service pumps at the J. Robert Dean WTP in Florida City. This plant pumps water into the transmission main at an operating pressure of 250 pounds per square inch (psi) to transmit water through the entire Keys service area. The proposed improvements for the different components of the transmission system are briefly described below. GNV DOC/ WB DFB ES-7

14 EXECUTIVE SUMMARY Transmission System Mains Improvements Jewfish Creek Bridge 36-Inch Transmission Main Relocation C-111 Canal Bridge 36-Inch Transmission Main Relocation Other U.S. 1 8-Mile Stretch Highway Improvements that may Impact 36-Inch Transmission Main 12-Inch Ocean Reef Transmission Main (22,000 feet of the main to be replaced) 36-Inch Transmission Main, Key Largo, MM 93 to MM Inch Transmission, MM Phase II Cathodic Protection System Improvements Transmission Main Improvements, North Roosevelt Boulevard Highway Improvements Transmission System Pump Stations and Storage Facilities High-Service Pumping and Storage Facilities at the J. Robert Dean WTP Key Largo Booster Pump Station Plantation Key Booster Pump Station Marathon Booster Pump Station and Storage Facilities The locations of these improvements including new facilities are shown in Appendix C. The total estimated cost for all transmission system mains, booster pump stations, and storage facilities is $58,899,034. Detailed cost estimates and project descriptions can be found in Section 5. Distribution Systems Recommendations The proposed improvements for the distribution system includes distribution main, pumping stations, and storage facilities. When these improvements are initiated, this will be the first time since the early 1980s that any new distribution system tankage has been built. The proposed distribution pump station pump sizes and storage volumes and all distribution system piping sizes were determined without verification through hydraulic modeling. Before final design of any system begins, the system component sizes should be verified through hydraulic modeling. The recommended improvements to both existing and new facilities are briefly described below. GNV DOC/ WB DFB ES-8

15 EXECUTIVE SUMMARY Distribution Piping Replace Old Galvanized Mains Upsize Small-Diameter Mains to 4-Inch Minimum Install Additional Tap on Little Torch Key Cudjoe Key-Additional Distribution Main Header to Interconnect System Taps Improvements to Existing Distribution Pump Stations and Storage Facilities Ocean Reef 1 MG of storage, plus standby power Rock Harbor Replace and upsize pump and increase storage by 1 MG Tavernier Upsize pump station and increase storage by 1 MG Islamorada Install a distribution main header Crawl Key, Marathon 1 MG of additional storage and two new pumps. Vaca Cut, Marathon Install new 0.5 MG storage tank 33rd Street, Marathon Replace existing pump station and 0.5 MG storage Summerland Key Replace pump station and 0.5 MG storage tank Stock Island Distribution Pump Station - Replace Pump station Proposed New Distribution Pump Stations and Storage Facilities Lake Surprise, between Adams Cut and Lake Surprise New pump station and 0.75 MG storage tank Plantation Key New pump station and 1.0 MG storage tank Lower Matecumbe Key New pump station and 0.5 MG storage tank Duck Key/Grassy Key - New pump station and 0.75 MG storage tank Ramrod Key - New pump station and 0.5 MG storage tank Cudjoe Key (under design; two feet and one 1.0 MG storage tank) Lower Sugarloaf Key - New pump station and 0.5 MG storage tank The locations of these improvements including new facilities are shown in Appendix C. The total estimated cost for all distribution main upgrades is $47,500,000. For the pump station and storage facilities upgrades, the GNV DOC/ WB DFB ES-9

16 EXECUTIVE SUMMARY estimated cost is $33,546,000. Detailed cost estimates and project descriptions can be found in Section Year Water Infrastructure Order-of-Magnitude Cost Summary Capital Improvement Program FKAA s Water Infrastructure Capital Improvement Program (CIP) involves upgrades to existing facilities as well as proposed new infrastructure for FKAA s Water System through the investment of approximately $208.6 million (in 2006 dollars) in capital improvements. This cost estimate includes project construction costs for improvements over a 20-year period and also includes additional cost for contingency and consulting/administrative/legal costs. The CIP identifies many short-term and long-term improvements to the water transmission system, raw water supply system, the water storage and distribution system, and the WTPs. Upgrades to the Water System will increase capacity, and improve flows and pressures to meet anticipated water demands. Significant upgrades to the WTPs are planned to improve the reliability and quality of FKAA s drinking water. A specific goal is to provide high quality water that continues to meets regulatory standards to the entire service area. Major improvements to the water system include a new Floridan aquifer wellfield that will serve a new LPRO treatment facility at the J Robert Dean WTP in Florida City, multiple rehabilitation or upgrade projects at both the Kermit H. Lewin Desalination WTP and the Marathon Desalination WTP facility to increase reliability and capacity to meet emergency and peak day flows, and various transmission/ distribution line replacements, distribution pump station upgrades, and additional water storage tank capacity to improve storage and delivery GNV DOC/ WB DFB ES-10

17 EXECUTIVE SUMMARY capacity of the system. Detailed cost estimates and listing of the entire CIP can be found in Section 7. Financial Strategy Funding for the Capital Improvement Program outlined in Section 7 will be accommodated by various sources of revenue available from the Water System together with potential grants from either the SFWMD, the State of Florida, and/or federal grant programs. It is expected that the majority of the funding will arise from leveraging the water revenues from the rate payers as a source of repayment on long term bond issues utilizing sound financial practices and financing tools to protect the financial integrity of the system as well as reduce interest costs thereby having the least impact upon ratepayers. The projects outlined in Section 7 will be detailed in a rolling 5-year capital funding program, which will be presented to the FKAA Governing Board annually as part of the budget process. FKAA will maintain the integrity of the existing System s credit ratings in the bond market by maintaining or improving the ratings that currently exist on the outstanding bonds. Implicit in maintaining the System s bond ratings is strict adherence to the bond covenants under FKAA s Master Bond Resolution. The overall capital improvement funding strategy will strive to minimize and spread out on an intergenerational basis the impact of rate adjustments required to amortize the proposed bond issues with a fair allocation of costs to current and future beneficiaries or users. More than 40 percent of the 20-year capital improvements are scheduled within the next 5 years (that is, by Fiscal Year 2011). Because financial forecasting is less reliable beyond a 5-year period, a detailed funding analysis has not been completed past Fiscal Year As future projects GNV DOC/ WB DFB ES-11

18 EXECUTIVE SUMMARY move within the 5-year planning horizon, specific capital strategies will be developed. Such capital funding will likely include additional borrowing as well as cash funding from rates. The underlying objective will be to continue to fund necessary capital improvements, minimize future water rate adjustments, and maintain the creditworthiness of the FKAA Water System. Five-Year Capital Funding Sources Funding Source Five-Year Amount % of Total Operating Reserves $8,774, % System Development Charges $5,062, % Series 2006 Bonds Remaining Funds $23,162, % Series 2007 Bonds $53,368, % Series 2009 Bonds $25,539, % Grants $500, % Total 1 $116,405, % Note: 1 Project amounts obtained from the Water Master Plan as of September 2006, with adjustments obtained from FKAA staff regarding FY2006 project carryovers as of October A detailed discussion and financing plan can be found in Section 8. GNV DOC/ WB DFB ES-12

19 SECTION 1 Introduction 1.1 Purpose of a Strategic 20-Year Master Plan The Florida Keys Aqueduct Authority (FKAA) faces ever-increasing water demands from population growth in the Florida Keys, more stringent environmental protection requirements, and higher customer service expectations. To help address these issues for a 20-year period (from 2006 through 2025), FKAA has prepared this comprehensive strategic Master Plan that includes a list of Capital Improvement Projects (CIP) during this 20-year planning period. Specific strategic goals and objectives for this plan were defined early on in the Master Plan process and included: Developing a long-range strategic facilities plan Improving system reliability Providing financial forecasting tool Developing cash flow and investment program in conjunction with phasing all CIP plans Developing long-term financing plan to match CIP Determining rate impact of increased operations and maintenance (O&M) and debt service Optimizing water treatment (reverse osmosis [RO], lime softening, raw) to meet future compliance issues and water quality goals Meeting future water supply needs by using alternative water supplies: Biscayne, seawater, Floridan aquifer, aquifer storage and recovery (ASR) Improving production reliability of J. Robert Dean WTP Improving reliability of all desalination facilities Improving storage capabilities throughout the Keys Eliminating all galvanized water mains Connecting Distribution Systems along U.S. 1 to interconnect with more taps where possible Reducing as much as possible the dependency of taps as the primary means of maintaining distribution system pressures, particularly for the larger, more concentrated distribution systems WPB DOC/ WD DFB

20 SECTION 1 - INTRODUCTION Looping all distribution where possible Increasing storage to reduce difficulty in maintaining needed water levels Address Regulatory Requirements: Water treatment Disinfectant/Disinfection By-product (D/ DBP) Rule Permitting - Future Biscayne water use allocation from the South Florida Water Management District (SFWMD) Reduce system water losses (as much as 12 percent at present) Clearly develop strategy on transmission vs. distribution operation From these strategic goals and objectives, the Master Plan was created to provide FKAA with guidance and recommendations on strategic water system capital improvements and expansion programs through This Master Plan includes recommendations for new facilities or upgrades to existing facilities in water treatment, water supply, transmission, water storage, pumping stations, and distribution. In addition, the Master Plan includes a capital improvement program and a financial analysis to help prioritize and sequence the improvements to have as minimal impact on water rates as possible. 1.2 Background FKAA was created in 1937 by the State of Florida to be the sole provider of potable water for all of the residents of the Florida Keys. FKAA presently serves more than 44,000 customers within Monroe County. Potable water is transported to the Keys through a 130-mile-long transmission pipeline, with an additional 649 miles of distribution pipelines that deliver water to the customer s property. In 1998 and 2002, FKAA s Enabling Legislation was amended to redefine the primary purpose of FKAA to include collecting, treating, and disposing of wastewater in certain areas of the Florida Keys. FKAA s activities relating to provision of wastewater services are accounted for separately from the water service and are not included in this document. However, this Master Plan document does take into consideration the impact of wastewater reuse and the need to consider reuse to offset increased water demand and its impact on per capita cost. 1.3 Service Area and Customer Base The service area of FKAA includes all of Monroe County plus that area in Miami-Dade County within 1 mile of the transmission pipeline. The FKAA existing Water System overview is presented in Exhibit 1-1, which shows transmission mains, pumping facilities, ground storage tanks, and water treatment facilities. The service area includes a mix of commercial, industrial, and residential zonings that typify the land uses of a suburban area. Minimal service exists in Miami-Dade County, consisting of service to only a ranger station just outside of the treatment plant. FKAA does not expect that the distribution facilities of the System will be significantly expanded in Miami-Dade County per FKAA Statute Provision of Water Service Within Miami-Dade County. WPB DOC/ WD DFB

21 N SYSTEM MAP "= 8 MILES FLORIDA CITY SYSTEM MAP 8 OCEAN REEF SYSTEM MAP 7 KEY LARGO SYSTEM MAP 6 TAVERNIER SYSTEM MAP 5 UPPER MATECUMBE KEY SYSTEM MAP 2 SYSTEM MAP 3 SYSTEM MAP 4 SYSTEM MAP 1 MARATHON BIG PINE KEY RAMROD KEY KEY WEST ROCKLAND KEY EXHIBIT 1-1 SYSTEM MAP KEY PLAN (EXISTING WATER FACILITIES) FLORIDA KEYS AQUEDUCT AUTHORITY WATER SYSTEM CAPITAL IMPROVEMENT MASTER PLAN 00nc101f_ dgn 22-FEB-2006

22 2.0 MGD R.O. PLANT

23 N "= 1 MILE EXISTING 18" WATER TRANSMISSION MAIN OVERSEAS HWY / U.S. 1 EXISTING 18" WATER TRANSMISSION MAIN MATCHLINE - SEE SYSTEM MAP 1 SUMMERLAND KEY MATCHLINE - SEE SYSTEM MAP 3 DISTRIBUTION PUMP STATION DIST.2 MG RAMROD KEY EXISTING 24" WATER TRANSMISSION MAIN BOOSTER PUMP STATION EXISTING 24" WATER TRANSMISSION MAIN EXHIBIT 1-1 SYSTEM MAP 2 (EXISTING WATER FACILITIES) FLORIDA KEYS AQUEDUCT AUTHORITY WATER SYSTEM CAPITAL IMPROVEMENT MASTER PLAN 00nc102f_ dgn 14-MAR-2006

24 NO NAME KEY 1.0 MGD R.O. PLANT VACA KEY GRASSY KEY

25 N EXISTING 30" WATER TRANSMISSION MAIN EXISTING 30" WATER TRANSMISSION MAIN "= 1 MILE MATCHLINE - SEE SYSTEM MAP 5 MATCHLINE - SEE SYSTEM MAP 4 EXISTING 18" WATER TRANSMISSION MAIN EXISTING 18" WATER TRANSMISSION MAIN EXISTING 30" WATER TRANSMISSION MAIN BOOSTER PUMP STATION LONG KEY EXHIBIT 1-1 SYSTEM MAP 5 EXISTING 18" WATER TRANSMISSION MAIN (EXISTING WATER FACILITIES) FLORIDA KEYS AQUEDUCT AUTHORITY WATER SYSTEM CAPITAL IMPROVEMENT MASTER PLAN N 1"= 1 MILE TAVERNIER MATCHLINE - SEE SYSTEM MAP 7 MATCHLINE - SEE SYSTEM MAP 6 ISLAMORADA DISTRIBUTION PUMP STATION DIST.5 MG DISTRIBUTION DIST DIST EXISTING 18" WATER TRANSMISSION MAIN PUMP STATION 1 MG EXISTING 30" WATER TRANSMISSION MAIN.5 MG EXHIBIT 1-1 SYSTEM MAP 6 FLORIDA KEYS AQUEDUCT AUTHORITY EXISTING 18" WATER TRANSMISSION MAIN (EXISTING WATER FACILITIES) WATER SYSTEM CAPITAL IMPROVEMENT MASTER PLAN 00nc101f_ dgn 14-MAR-2006

26 KEY LARGO BOOSTER PUMP STATION 12 TRANSMISSION MAIN 12 TRANSMISSION MAIN

27

28 SECTION 1 - INTRODUCTION FKAA is the only potable water purveyor within the Florida Keys. There are no other competing utilities. However, FKAA is presently precluded by its rules from serving anyone in certain environmentally sensitive areas. Excluded areas are limited to National Wildlife Refuges and certain hardwood hammock lands. Additionally, FKAA is under contract with the U.S. Department of Defense (DoD) to provide up to 2.4 million gallons per day (mgd) of potable water to DoD facilities located at Key West, Boca Chica, and throughout the Keys. 1.4 Report Organization The Master Plan includes nine sections, which are organized as follows: Executive Summary, presents key issues and final capital improvement recommendations including a 20-year financial strategy (2006 through 2025). Section 1, Introduction, presents a brief purpose of the Master Plan and a summary of existing water infrastructure. Section 2, Population and Water Demand Forecast Summary, presents population and water demand forecasts for the planning period ( ). Section 3, Water Supply System, describes FKAA s water supply system, and presents recommendations for water supply options to meet projected demands. Section 4, Water Treatment System, discusses the current facilities for water treatment and the impact of current or anticipated drinking water standards. This section also presents recommendations for water treatment options to meet projected demands. Section 5, Water Transmission System, describes FKAA s current transmission main and booster pump station system and recommended improvements. Section 6, Water Distribution System, presents a discussion of the FKAA distribution mains, ground storage, and pumping system network and proposed improvements. Section 7, Capital Improvement Program, presents a detailed layout of proposed improvements and new projects. Section 8, Strategic Financial Plan, presents a 20-year financial strategic model. Section 9, Works Cited, provides complete references for documents cited in this Master Plan. Appendix A, Justification for Projected Per Capita Water Demand in the FKAA Service Area Appendix B, Drinking Water Regulations Update Appendix C, Proposed Water Facilities Improvements Appendix D, Transmission System Capital Cost Estimates Appendix E, Distribution System Capital Cost Estimates Appendix F, Wastewater Reuse Background Information WPB DOC/ WD DFB

29 SECTION 2 Population and Water Demand Forecast Summary 2.1 Introduction The development of accurate population projections and water use demands for the Florida Keys is challenging because of the high number of seasonal residents (those residing in the Keys for 6 months or less), and day visitors (from cruise ships docking in Key West or visitors from the mainland). The population projections developed by the Monroe County Planning Department (MCPD) and used in the U.S. Army Corps of Engineers (USACE) Florida Keys Carrying Capacity Study (USACE, 2003) are used as the basis for the majority of population projections developed by other agencies, and were also used for this analysis. The MCPD permanent and seasonal population projections were used to develop a functional population (permanent plus seasonal) for FKAA s service area through The projected population was then multiplied by FKAA s projected per capita demand to project customer demand in the service area. The per capita demand is projected to increase as the changing demographics of the Keys result in higher individual water use (for example, redevelopment of existing property usually involves some level of irrigation or other water-consuming amenities where none previously existed). 2.2 Projected Population Permanent Population The MCPD permanent population projections include the most appropriate and applicable information and are viewed as the basis of future projections in this Plan. From 1990 through 1995, the permanent population of Monroe County increased from 78,856 to 79,200 (0.4 percent); from 1995 through 2000, it increased from 79,200 to 79,589 (0.5 percent); and from 2000 through 2005, it increased from 79,589 to 81,701 (2.7 percent). GNV DOC/ WB DFB

30 SECTION 2 - POPULATION AND WATER DEMAND FORECAST SUMMARY The MCPD data in the USACE Carrying Capacity Study (USACE, 2003) project a permanent population of 79,589 for 2000; 81,701 in 2005; 83,400 in 2010; 83,799 in 2015; 84,200 in 2020; and 84,603 in Exhibit 2-1 summarizes the MCPD permanent population projections. The permanent population is projected to grow at an overall average rate of 1.2 percent for each 5-year period from 2005 through 2025, with a higher rate (2.1 percent from 2005 to 2010) and a lower rate (0.5 percent) thereafter as Monroe County nears build-out Seasonal Population The MCPD seasonal population projections in the USACE Carrying Capacity Study (USACE, 2003) also were used to project the seasonal population for Monroe County. Although there are no exact counts of the seasonal population, the MCPD developed historical seasonal population projections for 1990, 1995, and The MCPD projected that the 1990 seasonal population of 70,493 increased by 1.1 percent to a 1995 population of 71,266, and further increased by 3.1 percent to a 2000 seasonal population of 73,491.The MCPD continues these seasonal population projections in 5-year increments starting with a seasonal population of 73,737 in 2005; 74,533 in 2010; 74,712 in 2015; 74,891 in 2020; and 75,071 in The seasonal population is projected to increase at an overall average rate of 0.4 percent for each 5-year period from 2005 through 2025, with a 1.1 percent increase between 2005 and 2010 and a 0.24 percent increase from 2010 through Functional Population The term functional population is a concept that incorporates three elements of population: permanent residents, seasonal visitors, and day visitors. Because of the unique nature of the Keys, which has an economy based on seasonal tourism, it is appropriate to use one population number that incorporates these three separate population components. In 2004 and 2005, CH2M HILL developed population projections for the FKAA service area. The population projections were based on those developed by the Monroe County Planning Department, and combined the permanent population with the seasonal population to form a functional population that was used to estimate water demand. As part of this effort, CH2M HILL contacted the agencies or municipalities listed in Exhibit 2-1 to determine if they could provide data that could be used to develop population projections for the FKAA service area. Ultimately, it was decided to use the functional population projections developed by Monroe County. Exhibit 2-2 presents the MCPD permanent, seasonal, and functional populations between 1990 and For this Plan, the functional population value is used in all per capita calculations and estimates. There are approximately 3.6 people per customer account within FKAA s service area using functional population as the basis. Exhibit 2-3 summarizes the percent change in the functional population in 5-year intervals, starting in GNV DOC/ WB DFB

31 SECTION 2 - POPULATION AND WATER DEMAND FORECAST SUMMARY EXHIBIT 2-1 Sources of Population Projection Data Agency or Municipality Type of Data Contact Person Data Source Comments University of Florida Bureau of Economic and Business Research (BEBR) Permanent Population Projections N/A 2003 Annual Report Projections for the entire state of Florida by county from 2000 through Monroe County Planning Department Permanent and Seasonal Population Projections N/A 2004 Comprehensive Plan and Facilities Capacity Assessment Seasonal and permanent population projections were based off 1990 US Census and updated with the 2000 US Census numbers for the entire county. Monroe County Tourist Development Council (TDC) Hotel, Cruise Ship, and Airline Data Jessica Mazzola, Director of Market Research Three Penny Revenue Report, Call Counts, Trend Report and Airline Passenger Data Report FY 2004 The most detailed seasonal data, but did not account for the day trip visitor. Islamorada Permanent Population Projections Patrick Small, Principal Planner 2003 Comprehensive Plan Developed based on the US Census. Key Colony Beach Permanent and Seasonal Population Projections Clyde Burnett, Mayor 1992 Comprehensive Plan Developed based on the US Census. Key West Permanent and Seasonal Population Projections Ty Symrowski, City Planner 1994 Comprehensive Plan Developed based on the US Census. Layton Permanent and Seasonal Population Projections Norm Anderson, City Council N/A Developed based on the US Census. Marathon Permanent and Seasonal Population Projections Katie Parker, Planner 2003 Comprehensive Plan Developed based on the US Census. U.S. Census Permanent Population Estimates N/A 2000 Census Estimates Permanent population estimates for 2000 by county. South Florida Water Management District (SFWMD) Population and Water Demand Projections N/A Lower East Coast Regional Water Supply Plan (LEC RWSP) (2003) Draft data from November U.S. Army Corps of Engineers (USACE) Permanent and Seasonal Population Projections N/A Carrying Capacity Study (2003) Included constraints on growth and environmental factors. Note: N/A = not applicable GNV DOC/ WB DFB

32 SECTION 2 - POPULATION AND WATER DEMAND FORECAST SUMMARY EXHIBIT 2-2 Monroe County Historic and Projected Population Projections Year Permanent Population Seasonal Population Functional Population (Permanent + Seasonal + Day Visitors) ,856 70, , ,925 70, , ,994 70, , ,062 70, , ,131 71, , ,200 71, , ,278 71, , ,356 71, , ,433 71, , ,511 71, , ,589 73, , ,011 73, , ,434 73, , ,856 73, , ,279 73, , ,701 73, , ,041 73, , ,381 74, , ,720 74, , ,060 74, , ,400 74, , ,480 74, , ,560 74, , ,639 74, , ,719 74, , ,799 74, , ,879 74, , ,959 74, , ,040 74, , ,120 74, , ,200 74, , ,281 74, , ,361 74, , ,442 74, , ,522 75, , ,603 75, ,674 GNV DOC/ WB DFB

33 SECTION 2 - POPULATION AND WATER DEMAND FORECAST SUMMARY EXHIBIT Year Historic and Projected Percent Changes in Functional Population Percent Change in 5-Year Period Functional Population % % 2.3 Historic Water Production CH2M HILL reviewed the raw water pumpage records from the FKAA s Florida City wellfield from 1990 through These data, obtained from the FKAA s previous water use permit (WUP) applications, Monthly Operating Reports (MORs), and Monthly Production Reports (MPRs), are summarized in Exhibit 2-4. Exhibit 2-5 summarizes the same data for finished water; however, because of limited continuous annual historic data, a summary from 2000 to 2005 is presented. Unlike population growth, which increased less than 2 percent for each 5-year period from 1990 through 2005 (Exhibit 2-3), the average-day raw water demand for the FKAA service area increased much more rapidly. From 1990 to 1995, the average-day raw water demand for the service area increased from mgd to mgd, an increase of 16.7 percent. From 1995 to 2000, the average-day demand increased by 21.2 percent, from mgd to mgd. From 2000 to 2005, average-day demand increased by only 4.0 percent, from mgd to mgd. As seen in Exhibits 2-4 and 2-5, the 2000 drought with water restrictions resulted in significantly lower demands in 2001 (the year in which water restrictions were fully implemented). It is also possible that reduction in travel following the September 11, 2001, terrorist attacks resulted in less tourism. GNV DOC/ WB DFB

34 SECTION 2 - POPULATION AND WATER DEMAND FORECAST SUMMARY EXHIBIT 2-4 Historic Raw Water Production Year Annual Demand (MG) Average Daily Demand (mgd) Max Day Demand (mgd) Average Monthly Demand (MG) Per Capita Demand (gpcd) , , , , , , , , , , , , , , , , Notes: MG=million gallons mgd=million gallons per day gpcd=gallons per capita per day per capita=functional population EXHIBIT 2-5 Historic Finished Water Production Year Annual Demand (MG) Average Daily Demand (mgd) Max Day Demand (mgd) Average Monthly Demand (MG) Per Capita Demand (gpcd) , a 5, , , , , Notes: a 2001 maximum day for historic finished water was higher than maximum day for raw water (Exhibit 2-3) because of higher pumpage from storage tanks at Florida City during peak hours. MG=million gallons mgd=million gallons per day gpcd=gallons per capita per day per capita=functional population GNV DOC/ WB DFB

WATER SUPPLY FACILITIES WORK PLAN

WATER SUPPLY FACILITIES WORK PLAN City of Miami Water Supply Facilities Work Plans CITY OF MIAMI, FLORIDA WATER SUPPLY FACILITIES WORK PLAN Prepared By: City of Miami Planning Department April, 2010 April, 2010 i City of Miami Water Supply

More information

A Long-Range Plan: Melbourne s Drinking Water Supply

A Long-Range Plan: Melbourne s Drinking Water Supply April 2002 A Long-Range Plan: Melbourne s Drinking Water Supply The long-term water supply of South Brevard County must be dependable, flexible, and affordable. With those goals in mind, we continue to

More information

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida GWPC September 27, 2015 Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Miami-Dade Water and Sewer Department Ed Rectenwald, P.G. MWH

More information

Keys Wastewater Plan

Keys Wastewater Plan Keys Wastewater Plan Prepared By: Monroe County Engineering Division 1100 Simonton Street, Suite 2216 Key West, FL 33040 At the Request of: Florida House of Representatives Environment and Natural Resources

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

Update on Aquifer Storage and Recovery

Update on Aquifer Storage and Recovery Update on Aquifer Storage and Recovery Dean Powell Bureau Chief Water Supply Bureau Governing Board Workshop September 2013 Objectives Discuss the basics of aquifer storage and recovery (ASR) technology

More information

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT CHAPTER 14 RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT Grace Johns and Lisa A. McDonald Economic analysis methods have been used in Florida to identify positive

More information

Canal Water Quality Restoration in the Florida Keys: One More Piece of the Puzzle in the Overall Restoration of South Florida

Canal Water Quality Restoration in the Florida Keys: One More Piece of the Puzzle in the Overall Restoration of South Florida Canal Water Quality Restoration in the Florida Keys: One More Piece of the Puzzle in the Overall Restoration of South Florida George Neugent Monroe County Commissioner Mike Forster Islamorada Village of

More information

INTERSTAGE ENERGY RECOVERY TURBINE APPLICATION MARCO ISLAND, FLORIDA

INTERSTAGE ENERGY RECOVERY TURBINE APPLICATION MARCO ISLAND, FLORIDA IWC-00-15 INTERSTAGE ENERGY RECOVERY TURBINE APPLICATION MARCO ISLAND, FLORIDA JULIA NEMETH, PE Harn R/O Systems, Incorporated Venice, Florida STEVEN DURANCEAU, PHD, PE Boyle Engineering Corporation Orlando,

More information

Water Utility Financial Plan and Rates Study

Water Utility Financial Plan and Rates Study FINAL March 2015 Prepared for City of Fresno, California Water Utility Financial Plan and Rates Study Submitted by F I N A L Water Utility Financial Plan and Rates Study Prepared for City of Fresno, California

More information

Florida Keys Aqueduct Authority s Budget and Financial Plan 2016

Florida Keys Aqueduct Authority s Budget and Financial Plan 2016 Florida Keys Aqueduct Authority s Budget and Financial Plan 2016 Florida Keys Aqueduct Authority s Budget and Financial Plan 2016 Florida Keys Aqueduct Authority s Budget and Financial Plan 2016 Florida

More information

Florida Keys Aqueduct Authority s Budget and Financial Plan 2015

Florida Keys Aqueduct Authority s Budget and Financial Plan 2015 Florida Keys Aqueduct Authority s Budget and Financial Plan 2015 Florida Keys Aqueduct Authority s Budget and Financial Plan 2015 Florida Keys Aqueduct Authority s Budget and Financial Plan 2015 Florida

More information

Design Criteria & Service Goals

Design Criteria & Service Goals 4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on

More information

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Revised May 2007 CAPITAL FACILITIES FINANCIAL PLAN 2007-2012 CLARK COUNTY 20-YEAR GROWTH MANAGEMENT

More information

Facing The Challenges In Houston s Water System: Past, Present, and Future

Facing The Challenges In Houston s Water System: Past, Present, and Future Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory

More information

PROJECT NAME BACKGROUND STATUS

PROJECT NAME BACKGROUND STATUS Utilities Department Projects This report reflects the status of Utility Capital Improvement Projects, Rehabilitation and Maintenance Programs of the City s water, wastewater, and reclaimed infrastructure

More information

Task F: Financial Plan

Task F: Financial Plan Task F: Financial Plan Comprehensive Water Master Plan DWSD Contract No. CS-1278 Final Report For Submittal to Detroit Water and Sewerage Department June 2004 IN ASSOCIATION WITH CDM Task F: Financial

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Description A micro-hydro project at SCWD s Graham Hill Water Treatment Plant (WTP) would replace an exisiting non-operational

More information

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on

More information

Vista Ridge Water Transmission & Purchase Agreement

Vista Ridge Water Transmission & Purchase Agreement Vista Ridge Water Transmission & Purchase Agreement Doug Evanson Senior Vice President/Chief Financial Officer Rates Advisory Committee Concentric Sources of Supply Canyon Lake Trinity Aquifer CRWA Lake

More information

Attachment 6: Monitoring, Assessment, and Performance Measures

Attachment 6: Monitoring, Assessment, and Performance Measures Attachment 6: Monitoring, Assessment, and Performance Measures Contents Monitoring, Assessment and Performance Measures... 1 Monitoring, Assessment and Performance Measures Attachment 6 presents the anticipated

More information

Tampa Bay Seawater Desalination Plant

Tampa Bay Seawater Desalination Plant Tampa Bay Seawater Desalination Plant Project History How The Plant Works Desal Fun Facts 2575 Enterprise Road, Clearwater, FL 33763-1102 Phone: 727.796.2355 / Fax: 727.791.2388 www.tampabaywater.org Tampa

More information

Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2)

Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2) SECTION 2 Description of Master Plan Alternatives The six alternatives that constitute the building blocks of the IRWP Master Plan are as follows: Indoor Water Conservation (EIR Alternative 1) I&I Reduction

More information

2015 ANNUAL OPERATING AND FINANCIAL PLAN

2015 ANNUAL OPERATING AND FINANCIAL PLAN 2015 ANNUAL OPERATING AND FINANCIAL PLAN TABLE OF CONTENTS 2015 ANNUAL OPERATING AND FINANCIAL PLAN Executive Summary... 3 Summary... 7 Revenue and Expenditure Overview... 15 2015 Enterprise Financial

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

Many directors of public enterprises

Many directors of public enterprises Management & Careers The Finance Director s Role in Helping Public Enterprises Look their Best By Bryan A. Mantz Finance directors of public enterprises face special challenges; developing expertise in

More information

CENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research

CENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research CENTRAL ARIZONA SALINITY STUDY ---- Phase I Technical Appendix O Municipal TDS Research Introduction Water availability and quality are among the world s most important environmental issues. Demand for

More information

Cost Guidelines Model User Manual

Cost Guidelines Model User Manual Cost Guidelines Model User Manual Guidelines for Preparing Cost Estimates of Water Supply and Conservation Projects Prepared by Hazen and Sawyer For the Southwest Florida Water Management District Final

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

AQUIFER STORAGE RECOVERY

AQUIFER STORAGE RECOVERY AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges

More information

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES

More information

Key cost factors include: Year: 2010. Engineering News Record Construction Cost Index: 8645. AACE Cost Estimate Classification: 4.

Key cost factors include: Year: 2010. Engineering News Record Construction Cost Index: 8645. AACE Cost Estimate Classification: 4. CHAPTER NO. 9 This chapter includes financial information for the proposed CSO control alternatives for the Barton and Murray CSO basins. Estimated project costs are provided, including construction, engineering,

More information

July 2012 Report No. 12-042

July 2012 Report No. 12-042 John Keel, CPA State Auditor An Audit Report on The Water Infrastructure Fund at the Water Development Board Report No. 12-042 An Audit Report on The Water Infrastructure Fund at the Water Development

More information

A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN

A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN Florida Department of Economic Opportunity Division of Community Development Bureau of Community Planning September 2007. Revised July

More information

Real-time energy and water quality management system designed for success!

Real-time energy and water quality management system designed for success! Real-time energy and water quality management system designed for success! Texas Water 2012 San Antonio, TX April 13, 2012 Manuel Perez Energy Manager Peter Martin Vice President Brian Skeens Global Technology

More information

Preserve the Tax-Exempt Status of Municipal Bonds

Preserve the Tax-Exempt Status of Municipal Bonds The, and its members, support the preservation of the existing tax-exempt status of municipal bonds. Specifically, FAC supports legislative provisions that: Uphold the tax-exempt status of municipal bonds.

More information

Water and Wastewater Challenges for San Antonio 2013

Water and Wastewater Challenges for San Antonio 2013 Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce Water Operations Growth

More information

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005. 6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.

More information

RESOLUTION NO. BE IT RESOLVED by the City Council (the Council ) of the City of Ashland (the City ) that: Section 1. Findings

RESOLUTION NO. BE IT RESOLVED by the City Council (the Council ) of the City of Ashland (the City ) that: Section 1. Findings RESOLUTION NO. A RESOLUTION OF CITY OF ASHLAND, JACKSON COUNTY, OREGON, AUTHORIZING THE ISSUANCE OF WATER REVENUE BONDS FOR A TOTAL OF NOT TO EXCEED $5,975,000, AND PROVIDING FOR PUBLICATION OF NOTICE.

More information

DeSoto County is not a water service provider and does not operate any

DeSoto County is not a water service provider and does not operate any Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are

More information

CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN

CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN 2005 URBAN WATER MANAGEMENT PLAN Mayor Linda J. Briskman Vice Mayor Stephen P. Webb City Council Jimmy Delshad Frank M. Fenton Barry Brucker City Manager Roderick J. Wood Director of Public Works David

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

WATER AND WASTEWATER UTILITY RATE STUDY CITY OF

WATER AND WASTEWATER UTILITY RATE STUDY CITY OF WATER AND WASTEWATER UTILITY RATE STUDY CITY OF MAY 2013 WATER AND WASTEWATER UTILITY RATE STUDY FOR CITY OF YREKA 701 4 TH STREET YREKA, CA 96097 JOB NO. 69.39 MAY 2013 PREPARED BY: TABLE OF CONTENTS

More information

Other Rev., 1.39% CIC, 9.82% Meter Sales, 1.45% Interest, 0.82% Connection Fees, 5.16% Penalty Charges, 2.35% OU User Fees, 3.48%

Other Rev., 1.39% CIC, 9.82% Meter Sales, 1.45% Interest, 0.82% Connection Fees, 5.16% Penalty Charges, 2.35% OU User Fees, 3.48% Budgeted Water Revenue, By Major Source Connection Fees, 5.16% Penalty Charges, 2.35% CIC, 9.82% Meter Sales, 1.45% Interest, 0.82% Other Rev., 1.39% OU User Fees, 3.48% Res'l User Fees, 63.53% Industry/Inst.

More information

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division

More information

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT.

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. ABSTRACT Steve Shoaf, City Of Asheville Nicholas Dierkes, Brown and Caldwell Understanding how well our Utilities

More information

Tampa Bay Water (A Regional Water Supply Authority) Year Ended September 30, 2015 With Reports of Independent Certified Public Accountants

Tampa Bay Water (A Regional Water Supply Authority) Year Ended September 30, 2015 With Reports of Independent Certified Public Accountants F INANCIAL S TATEMENTS, R EQUIRED S UPPLEMENTARY I NFORMATION, AND C OMPLIANCE S ECTION Tampa Bay Water Year Ended September 30, 2015 With Reports of Independent Certified Public Accountants Ernst & Young

More information

Capital Improvement Program Monthly Status Report for June 2014

Capital Improvement Program Monthly Status Report for June 2014 Capital Improvement Program Monthly Status Report for June 2014 August 7, 2014 This report provides a summary of the progress and accomplishments of the Capital Improvement Program (CIP) for the San José-Santa

More information

Financial and Business Metrics Report as of August 31, 2015

Financial and Business Metrics Report as of August 31, 2015 Financial and Business Metrics Report as of August 31, 2015 Sammamish Plateau Water and Sewer District will provide safe, efficient, and reliable AS OF water MARCH and sewer 31, 2007 services by being

More information

Unified Costing Model User s Guide

Unified Costing Model User s Guide Unified Costing Model User s Guide FINAL VERSION 1.0 May 2013 Prepared for: Texas Water Development Board Prepared by: The Unified Costing Model (UCM) for Regional Water Planning is not intended to be

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

City of Sacramento, California Department of Utilities. March 2011

City of Sacramento, California Department of Utilities. March 2011 Department of Utilities Utility Rate Study March 2011 March, 2011 page i TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 SECTION I: INTRODUCTION... 13 SECTION II: FINANCIAL POLICIES... 15 A. Defining Revenue

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply

More information

# 14-28: Water Enterprise Plan Development

# 14-28: Water Enterprise Plan Development City of Beverly Hills Public Works Services Department 345Foothill Road Beverly Hills, CA. 90210 # 14-28: Water Enterprise Plan Development Request for Proposal For Professional Planning and Engineering

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Water Equipment Technologies. Advanced Membrane Technologies for Solving Worldwide Water Problems

Water Equipment Technologies. Advanced Membrane Technologies for Solving Worldwide Water Problems Water Equipment Technologies Advanced Membrane Technologies for Solving Worldwide Water Problems ITT Flowtronex production facility located in Dallas, Texas. Our Company Our Company ITT WATER EQUIPMENT

More information

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste 3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square

More information

James City Service Authority Five Forks Water Treatment Facility

James City Service Authority Five Forks Water Treatment Facility W e w o r k i n p a r t n e r s h i p w i t h a l l c i t i z e n s t o a c h i e v e a q u a l i t y a n d r e l i a b l e w a t e r s o u r c e. Design Team n Jcsa Owner/Operator n Buchart Horn Prime

More information

CITY OF FT. MYERS TO CITY OF CAPE CORAL REUSE RIVER CROSSING PROJECT INFORMATION 10/25/2013

CITY OF FT. MYERS TO CITY OF CAPE CORAL REUSE RIVER CROSSING PROJECT INFORMATION 10/25/2013 CITY OF FT. MYERS TO CITY OF CAPE CORAL REUSE RIVER CROSSING PROJECT INFORMATION 10/25/2013 The River Crossing Project would allow the City of Ft. Myers to eliminate their current National Pollutant Discharge

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

San Diego Water Resources Mix and Drought Planning

San Diego Water Resources Mix and Drought Planning Supply Reliability for San Diego through a Diverse Water Resources Mix and Drought Planning Dana L. Friehauf, San Diego County Water Authority DWR/NWRI Drought Response Workshop November 6, 2012 1990-91:

More information

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014

Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014 Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014 Recap of Question & Answer Session Sorted by topic not necessarily in

More information

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility Adam Zacheis, Project Manager Carollo Engineers Topics 1. Background - Mesa Water District (Mesa) Water

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main MokeWISE Program Scope of Work: April 2015 Abstract... 2 Background Information... 2 Calaveras Public Utility District... 2 Water Rights... 2 Water Supply... 2 Project Information... 3 Project Description...

More information

Water Treatment Facilities in Washington County Capacity Analysis November 9, 2005

Water Treatment Facilities in Washington County Capacity Analysis November 9, 2005 Water Treatment Facilities in Washington County Analysis November 9, 2005 Analysis Methodology: The capacity analysis was completed based on the respective 2004 average daily flow (ADF) for each water

More information

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the

More information

Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority

Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority September 2009 Prepared by: AECOM Jones & Henry Engineers, LTD Lockwood, Andrews and Newnam, Inc. O'Malia Consulting ROWE

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: Corralitos Creek Water Supply and Fisheries Enhancement Project Project

More information

Improving the Resilience of a Municipal Water Utility Against the Likely Impacts of Climate Change A Case Study: City of Pompano Beach Water Utility

Improving the Resilience of a Municipal Water Utility Against the Likely Impacts of Climate Change A Case Study: City of Pompano Beach Water Utility Improving the Resilience of a Municipal Water Utility Against the Likely Impacts of Climate Change A Case Study: City of Pompano Beach Water Utility By Frederick Bloetscher, Ph.D., P.E. Daniel E. Meeroff,

More information

Sample Business Application - How to Apply For a Colorado Water Project

Sample Business Application - How to Apply For a Colorado Water Project COLORADO WATER RESOURCES AND POWER DEVELOPMENT AUTHORITY WATER REVENUE BONDS PROGRAM LOAN APPLICATION A. Applicant (Governmental Entity) I. GENERAL INFORMATION Name Phone # Address Fax # B. Designated

More information

Addressing Declining Elevations in Lake Mead

Addressing Declining Elevations in Lake Mead Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station

More information

Texas Commission on Environmental Quality Page 1 Chapter 291 - Utility Regulations Rule Project No. 2009-032-290-PR

Texas Commission on Environmental Quality Page 1 Chapter 291 - Utility Regulations Rule Project No. 2009-032-290-PR Texas Commission on Environmental Quality Page 1 The Texas Commission on Environmental Quality (TCEQ, agency, or commission) proposes new 291.160-291.162. BACKGROUND AND SUMMARY OF THE FACTUAL BASIS FOR

More information

LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15

LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 1 EMERGENCY OVERVIEW The Lake Don Pedro Community Services District (LDPCSD) provides domestic potable water service to 1450 connections

More information

The 2007 Flood Relief Package and Natural Resources Grants

The 2007 Flood Relief Package and Natural Resources Grants 2007 Special Session Fiscal Summary of Disaster Relief Money Matters 07.07 October 2007 Flood Relief...1 I-35W Bridge Disaster Relief...6 Other Statewide Disaster Relief...6 Fiscal Analysis Department

More information

Build America. Water Revenue Debt Total Year

Build America. Water Revenue Debt Total Year DEBT SERVICE The city has four types of debt currently outstanding. Two general obligation bonds secured by the city s authority to levy property taxes; A Build America Bond (BAB) for transportation projects

More information

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable

More information

Innovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha

Innovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha Innovative Water Technologies Programs 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha The following presentation is based upon professional research and analysis

More information

LONG TERM OBLIGATION (LTO) FINANCING POLICY A Strategy for the Acquisition or Replacement of City Assets

LONG TERM OBLIGATION (LTO) FINANCING POLICY A Strategy for the Acquisition or Replacement of City Assets PURPOSE CITY OF LINDSBORG LONG TERM OBLIGATION (LTO) FINANCING POLICY A Strategy for the Acquisition or Replacement of City Assets The Long-Term Obligation Financing (LTO) Policy Statement sets forth comprehensive

More information

SECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4

SECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4 SECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4 Capital Budget CAPITAL BUDGET 1999 2013 RECOMMENDED EXECUTIVE

More information

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS WATER AND SEWER BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: PHYSICAL ENVIRONMENT DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS PROGRAM DESCRIPTION: This program

More information

PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System

PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT GOAL 1: Ensure that the City's sanitary sewer system will provide an effective, efficient and environmentally sound method of wastewater collection,

More information

Market Analysis for Padre Boulevard Initiative in the Town of South Padre Island, TX

Market Analysis for Padre Boulevard Initiative in the Town of South Padre Island, TX Market Analysis for Padre Boulevard Initiative in the Town of South Padre Island, TX Prepared for Gateway Planning Group Spring 2010 TXP, Inc. 1310 South 1st Street; Suite 105 Austin, Texas 78704 (512)

More information

Agencies should use the following categories when requesting capital projects:

Agencies should use the following categories when requesting capital projects: Capital Improvements State agencies maintain buildings of various agencies all over the state. Given the financial commitment the state s facilities demand, expenditure requests for capital projects are

More information

Technical Memorandum 9B Approach to Incorporating Cost Risk into the Economic Model - FINAL

Technical Memorandum 9B Approach to Incorporating Cost Risk into the Economic Model - FINAL City of Hillsboro Capital Improvement Master Planning Services Water Supply Evaluation Project To: Dave Carlson, Project Manager, Black & Veatch Carmen Nale, P.E., Black & Veatch From: Nicki Pozos, P.E.,

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

East Niles Community Services District 2010 Urban Water Management Plan

East Niles Community Services District 2010 Urban Water Management Plan East Niles Community Services District 60182838.401 June 2011 East Niles Community Services District Timothy P. Ruiz, PE - General Manager AECOM Joshua T. Nord, PE - District Engineer 5001 E. Commercenter

More information

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story Cover Story Making Connections in Miami: County improves plants, integrates cooling loops One of the many issues facing cities, towns and campuses throughout North America is the challenge of replacing

More information

Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities

Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities Link to the on-line presentation: http://prezi.com/jjmaeumpxtaj/?utm_campaign=share&utm_medium=copy&rc=ex0share

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

COLONIAS INFRASTRUCTURE BOARD COLONIAS INFRASTRUCTURE PROJECT FUND PROJECT SELECTION AND MANAGEMENT POLICIES

COLONIAS INFRASTRUCTURE BOARD COLONIAS INFRASTRUCTURE PROJECT FUND PROJECT SELECTION AND MANAGEMENT POLICIES COLONIAS INFRASTRUCTURE BOARD COLONIAS INFRASTRUCTURE PROJECT FUND PROJECT SELECTION AND MANAGEMENT POLICIES I. PURPOSE The purpose of the Colonias Infrastructure Board is to help address inadequate infrastructure

More information

WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM

WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM EPD Guidance Document AUGUST 2007 TABLE OF CONTENTS Part 1: OVERVIEW OF WATER METERING 3 SUMMARY 3 NECESSITY OF METERS 3 TYPES OF WATER METERS 4

More information

Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay

Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay DRAFT - August 24, 2000 Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay Introduction In 1999, the Southwest Florida Water Management

More information

WATER UTILITY REFERENCE MANUAL

WATER UTILITY REFERENCE MANUAL Utility Plant and Accumulated Depreciation Capitalization Policy Costs are capitalized in the utility plant accounts, rather than being expensed in the current year, if: the service life is more than one

More information

SANITARY SEWER MASTER PLAN

SANITARY SEWER MASTER PLAN SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS

More information