1 Project Administration Instructions PAI No Revised December 2014 Page 1 of 10 SPECIFIC REQUIREMENTS FOR RECRUITING CONSULTANTS BY THE EXECUTING AGENCY 1. This project administration instruction (PAI) explains the specific procedures for recruiting consulting services that executing agencies (EAs) administer under loan projects, grant financed projects, or delegated technical assistance (TA) of the Asian Development Bank (ADB). With respect to delegated TA projects that take the form of an enhanced partnership covered by a Memorandum of Understanding (MOU) between ADB and the recipient government, the recruitment process still follows the procedures outlined in this PAI, except when ADB signs the contract. Read this PAI with PAI 2.01 on general policies, PAI 2.02 on preparatory work, and PAI 2.03 on general procedures. A. Responsibilities of the EA, ADB s Project Unit, and Loan Consulting Services Unit 2. PAI 2.01 defines the general responsibilities of the EA and ADB in recruiting consulting services that the EA administers. Specific responsibilities for the EA, ADB staff, and project units follow: 3. The EA prepares the (i) procurement plan for the entire project under PAI 3.01 (paras 8-11) and 1.05 (para 5); (ii) consultant recruitment plan for each recruitment under PAI 2.03; (iii) related draft terms of reference (TOR); and (iv) cost estimate. PAI 2.03 details these. undertakes recruitment actions including shortlisting, preparing and issuing requests for proposal (RFP) when applicable; evaluating the proposals when proposals are required; and negotiating and signing the contract with the selected consultants. PAI 2.03 details these actions. Under certain circumstances, when justified, the EA may request ADB to adopt the responsibilities for some recruitment actions, as in paras 12, 14 of PAI 2.01 and para 1 of this PAI. supervises and manages the implementation of the consultant contract under PAI ADB s project unit assists the EA in preparing the procurement plan, the consultant recruitment plan, draft TOR, and cost estimate. It then incorporates these in the project administration manual (Section VI. C) for loan and grant projects, or Concept/TA Paper for delegated TAs. reviews the shortlist, draft RFP (when applicable), proposal evaluation report (when applicable), the EA s recommendation for contract award, and draft negotiated contract. It seeks endorsement from the Operations Services and Financial Management Department (OSFMD), when required, and notifies the EA of ADB s decisions or comments on these submissions, as in this PAI. assists the EA in managing the implementation of the consultant contract, and with OSFMD reviews and endorses the EA s submissions on issues related to contract implementation (such as contract variations). 5. The Loan Consulting Services Unit (LCU) serves as OSFMD s focal point for handling and communicating with project units and EAs on matters related to consulting services that EAs administer. LCU s functional coverage includes consulting services for loan projects and for those financed by grants and delegated TAs for which the EA recruits the consultants. The LCU advises on and supports project units in reviewing EA submissions for the consulting services that EAs administer.

2 Revised December 2014 Page 2 of 10 comments on EA submissions that project units endorsed for OSFMD staff approval. If the approval is not granted or is granted with conditions, LCU advises specific actions for that project unit or EA. communicates with the EA directly on actions the EA needs to take for recruiting consulting services it administers. LCU consults the project unit and updates it with any communication about such justified or emergency cases. assists OSFMD staff in charge of capacity building to develop training materials (including case studies) on consultant recruitment for project units and EAs. B. Advance Contracting 6. To shorten the time for consultant recruitment, the EA may use advance contracting as part of the normal procedure if (i) ADB management approves the further processing of the project; (ii) TOR and budget for the assignment are sufficiently clear to permit consultants to submit informed expressions of interest (EOIs) and, if shortlisted, technical and financial proposals; and (iii) OSFMD has endorsed the project procurement plan for recruiting the consultants. This means that the EA may draft the RFP, shortlist consultants and evaluate them, if the recruitment advertisement has been posted and EOIs received. However, the EA may not sign a contract with a firm before the financing agreement has taken effect, unless ADB management has also approved retroactive financing. The project unit should advise the EA that advance contracting is part of the normal procedure, and that ADB s support for advance contracting or retroactive financing does not commit ADB to approve the loan/grant project or to finance the recruitment costs. 7. When financing agreement effectivity is imminent, the EA starts contract negotiations with the selected consultant once ADB s Board of Directors approves the project. If retroactive financing has not been approved for the project, the contract should not be signed until the financing agreement becomes effective. C. Advertising (Consulting Services Recruitment Notice) 8. PAI 2.03 outlines the general requirements for posting a consulting services recruitment notice (CSRN). The EA posts the CSRN in the Business Opportunities section of ADB s website before shortlisting. For this purpose, the EA sends an to csrn@adb.org, with a copy to the concerned project unit staff, stating all projects under its administration. Once OSFMD receives this, it pre-registers the EA so that an account may be created for the EA for the CSRN posting. The EA s user ID and password will be ed to the EA. The minimum posting time for each CSRN is 30 days. The EA may also advertise the requirement in other appropriate media, including a local newspaper or international trade publication. ADB then provides the EA with a standard template for the CSRN that it could follow for the advertisement. D. Consultant s Expression of Interest 9. To ensure that expressions of interest (EOIs) contain sufficient information to allow EAs to decide on the shortlisting. EAs request EOIs using the standard EOI form. The Business Opportunities website has a link to a standard EOI form for loans/grants that firms can download, complete, and send to the EA. The CSRN template also provides for the EA address (preferably including an address), where consultants can write to obtain a standard EOI form. The standard EOI form may be submitted as hard or electronic copy. By requiring submission of a standard EOI form, the EA can evaluate all consultants for shortlisting using uniform documents containing the same type of information. National regulations and the EA may require additional information from national firms such as company registration and tax reference numbers to be submitted at the EOI stage. This information can be included as an appendix to the standard EOI form.

3 Revised December 2014 Page 3 of PAI 2.03 (paras 4-8, 10, 16-17) explains how consultants should prepare EOIs and how they should be evaluated during shortlisting. E. Recruiting Consulting Firms 11. The EA follows the general procedures in PAI 2.03 and the following specific requirements to submit the documents for each major step of the recruitment process for ADB s review and approval. a) Preparing Shortlist, RFP and Consultant Recruitment Activities Monitoring Sheet Submission The EA establishes a consultant selection committee (CSC) under PAI 2.01 (para 25) that initiates recruitment as follows: Generate a long list primarily based on the EOIs received, and prepare the shortlisting criteria. Prepare a short list following the shortlisting criteria and eligibility requirement in PAI Prepare the narrative technical proposal evaluation criteria or EOI evaluation criteria, if the recruitment is based on Consultants Qualifications Selection (CQS). Prepare an RFP, which would include the datasheet, summary evaluation sheet form, and personnel evaluation sheet form. Provide the data required for the Consultant Recruitment Activities Monitoring (CRAM) sheet. 13. The EA then s the following documents, usually referred to as Submission 1, to ADB (through the project unit) for approval: (i) budget; (ii) long list; (iii) proposed shortlist; (iv) narrative technical proposal evaluation criteria; (v) draft RFP with the data sheet, summary evaluation sheet form, personnel evaluation sheet form, and TOR; (vi) draft contract; and (vii) draft CRAM sheet. The EA uses ADB s standard submission form (Submission 1) available on ADB s website or provided by the project unit. The EA submits the standard submission form in MS Word version. This also includes a checklist of documents that the EA completes. This submission applies to all selection methods for recruiting firms; provided that, for CQS, the EOI evaluation criteria will be submitted instead of the narrative technical proposal evaluation criteria; and for single-source selection (SSS), the justification and approval for the use of SSS should be submitted (see PAI 2.02, paras 35-38), excluding proposed shortlist and draft CRAM sheet (as these are not applicable). b) ADB's Review of the EA s Submission Subject to Section F of this PAI, upon receipt of the EA s Submission 1, the project unit immediately forwards an electronic copy of the submission to the LCU, with a copy to the OSFMD director. The project unit ensures that the EA completed all documents required in the submission form. If the EA has not forwarded them all, the project unit immediately asks the EA to submit these to ADB. Once completed, OSFMD reviews the submission and provides comments in the comment fields of ADB s standard submission form. OSFMD may directly input corrections in the EA s submitted documents, provided it explains them in the comment fields. 15. The project unit conducts its own parallel review of the submission and submits its comments to the LCU for consolidation. For complex issues, OSFMD or the project unit may request a CSC to review the documents and resolve any pending issues. Once all comments have been consolidated, the authorized OSFMD staff signs the submission and forwards it to the project unit who will fax or them to the EA.

4 Revised December 2014 Page 4 of The EA is requested to submit another set of Submission 1 if there are concerns with its original submission. Each version of every submission has to be dated. OSFMD states in the standard submission form if it has approved a particular submission from the EA. 17. The LCU monitors each step in the CRAM sheet and coordinates with the project unit to ensure that the review of the EA s submission is accomplished within the allotted period. c) Sending RFP to Consulting Firms 18. After ADB approves the EA s submission, the EA then sends official copies of the RFP to the shortlisted consultants with a copy to the project unit. The shortlisted consultants acknowledge receiving the RFP and any notice from the EA (i.e., extension of proposal deadline submission). The shortlisted consultants also advise the EA if they intend to submit proposals. Shortlisted consultants submit any queries to the EA in writing. The EA sends any answers, information, or amendments to all shortlisted consultants, copied to the project unit, without disclosing the source of the query. Any proposed amendment needs ADB s prior approval, issued by the project unit after consultation with OSFMD. 19. To give shortlisted firms reasonable time to address amendments to the RFP in their proposals, the EA may extend the deadline for submitting proposals, subject to ADB's prior approval. d) Evaluating Technical Proposals and Preparing Evaluation Report Submission The EA forms a CSC to evaluate technical proposals received following the procedures in PAI The CSC prepares minutes of its evaluation meeting and a report of its evaluation, describing the strengths and weaknesses of each proposal. 21. Unless the EA s procurement plan provides otherwise, the EA s the evaluation report containing the following technical evaluation documents to ADB (through the project unit) for approval: (i) completed summary evaluation sheet, highlighting any proposal that scored less than 750 points out of 1,000; (ii) completed personnel evaluation sheet for each proposal; (iii) narrative comments on the strengths and weaknesses of each proposal; (iv) minutes of the EA's CSC evaluation meeting(s); and (v) updated CRAM sheet. The EA uses ADB s standard submission form (Submission 2) available on ADB s website or from the ADB project unit. The EA submits ADB s standard submission form in MS Word format. This submission applies to all selection methods for recruiting firms; provided that, for CQS and SSS, the technical evaluation documents are submitted together with the financial evaluation documents. e) ADB's Review of the EA s Submission Subject to Section F of this PAI, the procedures and requirements in paras of this PAI apply to reviewing Submission 2. However, for CQS and SSS, the review of the EA s technical evaluation documents occurs with the review of the EA s financial evaluation documents. For complex issues, OSFMD or the project unit may request a CSC to review the documents and resolve any pending issues. f) Opening and Evaluating the Financial Proposal(s), and Recommending Contract Award Submission Cost-based selections (quality and cost-based selection [QCBS], fixed-budget selection [FBS], and least-cost selection [LCS]) require public opening of the financial proposals. These are opened and evaluated as in PAI QBS method requires separate submission of the first ranked firm s financial proposal, which is submitted and opened as in PAI CQS method requires the financial proposal be submitted with the technical proposal, but is only reviewed in preparation for contract negotiations. Such proposal is opened and reviewed as in PAI SSS method adopts the same procedure as CQS for submitting, opening, and reviewing the financial proposal.

5 Revised December 2014 Page 5 of Unless the EA s procurement plan provides otherwise, the EA s the following financial evaluation documents to ADB (through the project unit) for approval: (i) completed financial evaluation and overall ranking forms; (ii) narrative comments on the financial evaluation, noting any corrections to the financial proposal(s); and (iii) updated CRAM sheet. The EA uses ADB s standard submission form (Submission 3) available on ADB s website or from the ADB project unit. The EA submits ADB s standard submission form in MS Word format. This submission requirement applies to all selection methods for recruiting firms, except QBS; provided that, for CQS and SSS, the technical evaluation documents are submitted with the financial evaluation documents. g) ADB's Review of the EA s Submission Subject to Section F of this PAI, the procedure and requirements in paras of this PAI apply to reviewing Submission 3. However, for CQS and SSS, the EA s technical evaluation documents are reviewed with the EA s financial evaluation documents. For complex issues, OSFMD or the project unit may request a CSC to review the documents and resolve any pending issues. h) Preparing for Contract Negotiation 26. Before contract negotiation, the EA checks the eligibility and performance records of each member of the team proposed by the selected firm. The EA obtains from ADB a copy of ADB s sanction and suspension list due to integrity violations or poor performance, as well as the terrorism list recognized by ADB. 27. The EA invites the first-ranked consultant to negotiate a contract with the EA, as in PAI The selected consultant confirms the availability of its proposed personnel, provides clarifications and corrections to its proposal, and replaces personnel when appropriate, as in PAI i) Submitting the Negotiated, Unsigned Contract Submission The EA negotiates a contract with the first-ranked consultant as in PAI When the negotiation is face-to-face, the EA prepares minutes of the important points of agreement. 30. If the EA and the consultant cannot agree, the EA may terminate the current negotiations with ADB s prior approval, and start negotiations with the next-ranked consultant, and so on until an agreement is reached. The project unit requests OSFMD's endorsement each time the EA requests to terminate contract negotiations and to start negotiations with the next-ranked firm. 31. Unless the EA s procurement plan provides otherwise, the EA s the draft negotiated contract and the minutes of the contract negotiations to ADB (through the project unit) for approval. The EA uses ADB s standard submission form (Submission 4) available on ADB s website or from the project unit. The EA submits ADB s standard submission form in MS Word format. This submission requirement applies to all selection methods for recruiting firms. j) ADB's Review of the EA s Submission The project unit immediately reviews the EA s submission to ascertain that the negotiated terms and conditions are satisfactory; request comments from OSFMD, the Controller s Department (CTL), and the Office of the General Counsel (OGC) after identifying the specific issue/s of concern; and

6 Revised December 2014 Page 6 of 10 require the EA to incorporate the revisions, changes, or amendments that the project unit considers necessary. 33. Once the documents are considered in order, the project unit formally advises the EA of ADB s approval. k) Finalizing the Contract 34. After receiving ADB s approval of the draft negotiated contract, the EA signs the contract, obtains the consultant s signature, and submits a copy of the signed contract to ADB (through the project unit). The EA also submits the following information to ADB for posting on its website: names of the shortlisted consultants who submitted proposals; scores of their technical proposals; prices in their financial proposals (for QCBS and LCS); overall ranking (for QCBS); name of the consultant selected; and cost, duration, and summary scope of the contract. 35. After receiving the signed contract, the project unit verifies that it is substantially the same as the draft negotiated contract it approved earlier. The project unit sends copies of the signed contract to OSFMD, CTL, and OGC. 36. After completing the selection, the EA debriefs the shortlisted consultants, when so requested by the consultant concerned, regarding how their ranking was determined. l) Issuing Notice to Proceed 37. The EA then makes the contract effective by sending the consultant a written notice to proceed, copied to ADB (through the project unit). F. Approving Authorities for EA Submissions 38. Notwithstanding Section A and subsections (b), (e), and (g), of Section E, all project units shall review and approve Submission 1, Submission 2 and Submission 3 for all contracts valued at $5 million and below, provided the reviewing staff are duly accredited under PASS or have successfully completed the relevant OSFMD-LCU training module for loan consulting submissions review. This ceiling applies to any resident mission (RM) with a resident OSFMD procurement specialist or a national procurement officer. The project unit director approves the unit s reviews of Submission 1, Submission 2 and Submission 3. RMs with no resident OSFMD procurement specialist or national procurement officer shall review and approve Submissions 1 and 2 for all contracts valued at $600,000 and below, while OSFMD shall review and approve Submission Approval of all submissions above the ceilings as in para 38 of this PAI remain OSFMD s responsibility. OSFMD directors or their authorized representatives approve such submissions. 40. OSFMD regularly assesses project unit and RM capacity and performance to update the review thresholds and ascertain the readiness of project units to fully review and approve Submissions 1, 2, and 3 under specific circumstances. OSFMD periodically reviews thresholds for each project unit or RM and compares assessed project unit or RM capacity. G. Recruiting Individual Consultants

7 Revised December 2014 Page 7 of 10 a) Selecting and Approving the Shortlist 41. Before an individual consulting assignment is scheduled to start, the EA prepares a short list of at least three qualified candidates. At the EA s request, the project unit may provide the names and qualifications of suitable candidates from the CMS. The EA may also advertise for suitable candidates, in addition to the CSRN posting requirement in PAI The EA ranks the candidates and submit their names and qualifications, with the draft contract, to ADB (through the project unit) for approval. The project unit reviews the EA s submission documents; consults with OSFMD, if necessary, after identifying concerns; requests comments from CTL, OGC, and/or other department or office after identifying concerns; approves the EA s submission or identifies needed revisions, changes, or amendments that the project unit considers necessary; prepares a note to file summarizing the issues raised and the decisions taken; and advises the EA of ADB s decision. b) Negotiating the Contract 43. After ADB approves the ranked short list and the draft contract, the EA negotiates with the firstranked candidate. If the negotiations fail, the EA obtains ADB s approval to terminate the current negotiations and start negotiations with the next-ranked candidate, and so on until agreement is reached. The EA then sends a copy of the draft negotiated contract to ADB (through the project unit) for approval. c) Reviewing the EA s Draft Negotiated Contract 44. The project unit immediately reviews the EA s submission. The project unit ascertains that the negotiated terms and conditions are satisfactory; requests comments from OSFMD, CTL, and OGC after identifying concerns; and requires the EA to incorporate any revisions that the project unit considers necessary. 45. Once the documents are considered to be in order, the project unit formally advises the EA of ADB s approval.

8 Revised December 2014 Page 8 of 10 d) Finalizing the Contract 46. After receiving the signed contract, the project unit checks that it is substantially the same as the draft negotiated contract it approved earlier. The project unit sends copies of the signed contract to OSFMD, CTL, and OGC. H. Requesting ADB Assistance in Selecting the Consultant 47. When the borrower/recipient requests ADB in writing to take responsibility for selecting a consultant, the project unit consults OSFMD and submits the request to the project unit s head of department for approval. The borrower/recipient should adequately justify such a request and explain its necessity. ADB s proposed participation in the recruitment should be set out in the procurement plan and the RRP. If the request is made after the loan/grant is approved, it will be regarded as a change in implementation arrangements and will be dealt with as in PAI If approved, OSFMD informs ADB s Board of Directors of the change in implementation arrangements in the quarterly portfolio update. In all such cases, ADB generally takes responsibility only for selecting the consultant, and the EA retains the responsibility for negotiating and signing the contract with the consultant, issuing the notice to proceed, and supervising the consultant s services. I. Monitoring the Consultant Recruitment Process 48. The EA, the project unit, and OSFMD use CRAM for EA administered consulting services to monitor the activities in consultant recruitment and to avoid delays. A preliminary CRAM schedule for the recruitment based on the anticipated consultant mobilization timetable is included as an annex to the procurement plan. 49. The CRAM schedule identifies the main activities in the recruitment process, the responsible unit, the time normally required for each activity, and the target dates for completing each activity. The EA, project unit, and OSFMD staff complete each activity and monitor the recruitment process. They use CRAM to identify delays and to act promptly to get the recruitment process back on schedule. 50. The LCU monitors all CRAM schedules, checks the status of progress regularly, and ensures that the project unit and OSFMD update the CRAM promptly for the activities within their responsibilities. The LCU also monitors each step in the CRAM schedule and coordinates with the project unit to ensure that OSFMD, the project unit or the EA accomplish each activity within the allotted period. For this, the project unit appoints a staff as CRAM coordinator, who coordinates all CRAM related data inputs and updates with the LCU and EA. 51. When a planned activity is not completed on schedule, the LCU reminds the responsible project unit staff. The staff must explain the delay in the CRAM schedule. 52. The LCU sends a monthly report on each project unit s CRAM status to the project unit director. The project unit directors monitor recruitment activities for all the loans/grants under their supervision, and act to overcome delays in recruitment. a) Creating a CRAM Schedule 53. During the loan/grant fact-finding mission, the project unit officer explains to the EA how to use the CRAM system to monitor the recruitment process. The officer gives the EA a sample CRAM schedule and discusses the consultant recruitment schedule, based on the time standards set for each activity shown in the CRAM system. The officer asks the EA to assign a staff who will be responsible for maintaining the CRAM schedule and monitoring recruitment.

9 Revised December 2014 Page 9 of When the EA schedules and advises ADB of the date for the CSRN posting, the project unit creates a CRAM schedule for the assignment by entering the following information in the system: loan/grant number and name; contract budget; selection method; type of technical proposal; EA s name and contact person; project division; project unit officer; EA and ADB staff responsible for maintaining the CRAM and monitoring recruitment; responsible OSFMD officer; and shortlisting date. 55. When the project unit enters the CSRN posting date into the CRAM schedule, the system automatically generates a recruitment schedule, including the planned dates for each activity and the cumulative number of days from shortlisting. The number of calendar days required for each activity is based on norms for each selection method and type of technical proposal. b) Accessing the CRAM system 56. Staff may access the CRAM system in the Consulting Services Reference database in Lotus Notes: Open Lotus Notes and click file > Database > Open. Select LNADBG1/ADB from the list of servers. Select Consulting Serv. Reference from the list of databases. Select 5. Loan/Grants Monitoring. c) Monitoring the Recruitment Activities and Updating the CRAM Schedule 57. The project unit sends a copy of the preliminary CRAM schedule for the assignment to the EA. The EA s CSC shortlisting meeting then discusses and confirms the CRAM schedule. If the EA is required to submit its CSC meeting documents to ADB for approval, the EA includes this in the CRAM. 58. If ADB approves the EA s submissions (depending on the selection method), the project unit sends the EA an updated CRAM schedule. 59. The EA staff monitors the recruitment and reports to the ADB project unit officer the date when each activity is completed and the reason for any delays. The ADB project unit staff enters the completion dates in column 6 of the CRAM schedule. Planned dates cannot be changed. 60. Columns 8 and 9 of the CRAM schedule show the difference in days between the planned and actual dates for completing each activity, and the difference between the planned and actual days from shortlisting. When an activity is completed later than the planned date, the ADB project unit staff explains in column 11 of the CRAM the delay and the EA and ADB action needed to get recruitment back on schedule. The upper right corner of the CRAM schedule shows the date it was last updated. 61. The CRAM schedule shows different recruitment activities for each selection method and type of technical proposal. d) Maintaining CRAM Records

10 Revised December 2014 Page 10 of When the recruitment process is completed, the project unit makes a hard copy of the CRAM and retains it in the project file. 63. OSFMD keeps completed CRAM records in the CRAM database and evaluates them annually. If required, OSFMD proposes recommendations for streamlining the recruitment process. 64. OSFMD monitors the application of CRAM and maintains the CRAM system. Staff should report any problems with the system to OSFMD. 65. List of Appendices: Appendix 1 is a Checklist of Actions for the Fact-Finding Missions to Help EAs Recruit Consultants. Appendix 2 is a Flowchart of Activities for Recruiting Consulting Firms under EA Administered Consulting Services (QCBS, QBS, FBS and LCS). Appendix 3 is a Flowchart of Activities for Recruiting Consulting Firms under EA Administered Consulting Services (CQS). Appendix 4 is a Flowchart of Activities for Recruiting Consulting Firms under EA Administered Consulting Services (SSS). Appendix 5 is a Flowchart of Activities for Recruiting Individual Consultants under EA Administered Consulting Services Appendix 6 is a Flowchart of the CRAM process for EA Administered Consulting Services. Appendix 7 contains the various forms for the CRAM schedule, depending on the selection method. Appendix 8 contains ADB s standard submission forms for Submission 1, Submission 2 and Submission 3, depending on the selection method.

11 Appendix 1 Checklist of Actions for the Fact-Finding Missions to Help EAs Recruit Consultants 1. Explain ADB s procedures for recruiting consultants to the EA. 2. Give the EA the following standard documents: CRAM schedule; names of consultants from the CMS (if the borrower asks); sample RFP, including the covering letter, background information, and TOR; sample forms for evaluating consultants' technical and financial proposals, including the narrative evaluation criteria for technical proposals; sample contracts for firms and individuals; performance evaluation forms for consulting firms and individual consultants; and Guidelines on the Use of Consultants by Asian Development Bank and Its Borrowers. The harmonized RFP for recruiting consulting firms for loan/grant projects is available on the ADB website. 3. Agree with the EA on the scope of the services required; the number of contracts; whether consulting firms, individual consultants, or both will be engaged under each contract; and the allocation of person-months to international and national consultants. Then agree on the procedures the EA will use to recruit the consultants, including the selection method and the type of technical proposal. 4. Help the EA to prepare the CRAM, TOR, and RFP. 5. Discuss any anticipated problems and what additional help the EA will need from ADB to engage the consultants. 6. If possible and if not already done, obtain the documents required in the EA s first submission to ADB for approval. These include the proposed recruitment schedule; shortlisting criteria; shortlist; RFP, together with the detailed TOR and background information; evaluation criteria for the technical proposals; contract; and format for evaluating the consultant s performance.

12 Appendix 2a, Page 1

13 Appendix 2a, Page 2

14 Appendix 2b, Page 1

15 Appendix 2b, Page 2

16 Appendix 2c, Page 1

17 Appendix 3a, Page 1

18 Appendix 3a, Page 2

19 Appendix 3b, Page 1

20 Appendix 3b, Page 2

21 Appendix 3c, Page 1

22 Appendix 3c, Page 2

23 Appendix 4a, Page 1

24 Appendix 4a, Page 2

25 Appendix 4b, Page 1

26 Appendix 4b, Page 2

27 Appendix 4c, Page 1

28 Appendix 4c, Page 2

29 Appendix 5, Page 1

30 Appendix 5, Page 2

31 Appendix 6

32 Appendix 7a

33 Appendix 7b

34 Appendix 7c

35 Appendix 7d

36 Appendix 7e

37 Appendix 7f

38 Issued in January 2011 Appendix 7g

39 Appendix 7h

40 Appendix 7i

41 Appendix 7j

42 Appendix 7k

43 Appendix 7l

44 Issued in December 201 Appendix 7m

45 Appendix 7n

46 Issued in January 2011 Appendix 7o

47 For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: PAI No Appendix 8a, Page 1 Executing Agency Consulting Recruitment Submission 1: Shortlisting of Consulting Firms and Request for Proposals (QCBS/QBS/FBS/LCS) Part A [To be completed by the Executing Agency] Loan/Grant (Country) (No.): Title Package/Component: This is the: [indicate whether 1 st, 2 nd, 3 rd, etc.] request for review Name of Executing Agency (EA): Report Submitted by: Name: Signature: Designation: Date Submitted: Date of EA Consultant Selection Committee-Shortlisting (CSC-SL) Meeting: Checklist of Attached Documents (For 1 st Review): In case of succeeding reviews, please attach only the information or documents requested in the latest review. Attachment 1: Latest Uploaded Procurement Plan Yes No [Procurement plan must be within a year and for each loan, not MFF. Attach approval memo for individual changes in the procurement plan] Attachment 2: Budget for consulting services including details of Yes No provisional sums and contingency Attachment 3: Longlist of Consulting Firms Yes No Attachment 4: Narrative Evaluation Criteria (NEC) Yes No [EA to prepare the NEC. Provide weights for each criterion in the summary evaluation sheet and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria in NEC.] Attachment 5: Draft Request for Proposals (RFP) with Terms of Yes No Reference (TOR), Data Sheet, Summary and Personnel Evaluation Sheets 1 and Draft Contract Attachment 6: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 7: Minutes of EA CSC-SL Meeting Yes No Attachment 8: Updated Consultant Recruitment Activities Monitoring (CRAM) Yes No Sheet [Project Unit to update CRAM sheet in Consulting Services Reference (Lotus Notes) before submitting this Submission 1 review to LCU. Indicate in the CRAM the reasons for any delay, and remedial action taken.] 1 The appropriate templates can be downloaded from the ADB website in the following link: Include the Attachment: Grounds for Disqualification of an Expert.

48 Appendix 8a, Page 2 Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in a table format. Please provide additional rows in the table below, if required.] Name Ministry/Department/Agency Designation * Is there any consultant in the EA s CSC Meeting? Yes No If Yes, please state whether potential or actual conflict of interest exists EOIs via CMS-CSRN (30 days) Yes No Date of Posting: Deadline of EOI Submission: [For reduced period of advertisement (less than 30 days) or waiver of advertisement, please attach the formal approval] 2. Number of EOIs Received: 3. Advance Action? Yes No 4. Retroactive Financing? Yes No (If yes, please attach the document approving retroactive financing) 5. Loan Approval Date: 6. Loan Effective Date: 7. Loan Closing Date: 8. Estimated Contract Duration (in months): 9. Budget for this consulting services: US$ Estimated Maximum 10. Shortlisting: 2 International Shortlist National Shortlist * * (Please attach document approving the national shortlisting) 11. Method of Selection: FBS LCS QBS QCBS 12. (For QCBS) Quality Cost Ratio: 80:20 70:30 90:10 Document/s to support quality-cost ratio of 70:30 or 90:10: 1 2 The EA should confirm that the consultant in the EA s CSC Meeting does not have any ongoing business associations (whether direct or indirect) with any of the firms in the shortlist. The same requirements for ordinary selection still apply to national shortlisting except geographic spread as waived in the Guidelines on the Use of Consultants by ADB and Its Borrowers, para. 2.9.

49 Appendix 8a, Page Shortlisting criteria*: [Apply the following criteria for the shortlisting of consulting firms for loan/grant projects]: (i) Eligibility (ii) Management competence (iii) Technical competence (iv) Geographic spread (for international assignments) * Additional criteria should have ADB s prior approval. a) b) c) 14. Proposed Shortlist: Firm Name (Full Name not Acronym)/ Country of Incorporation 1 Nature of Association (Indicate if the firm is Lead, JV Partner, or Subconsultant) Nature of Organization [Indicate if Private Consulting Firm, State- Owned (SOE) or NGO] Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO a) Six (6) firms with wide geographic spread (no more than 2 firms from Yes No any 1 member country, and at least 1 firm from developing member country). If No, justification/s for proposed shortlist: b) Checking of Conflict of Interest [in accordance with the Guidelines on the Use of Consultants by ADB and Its Borrower (CG)]: i) Conflict between consulting activities [CG 1.11(a)] Yes No ii) Conflict among consulting assignments [CG 1.11(b)] Yes No 1 Corporations or companies must be incorporated in an ADB Member Country. Partnerships or non-corporations must be duly registered or legally established in an ADB Member Country. These include universities, institutions, public sector organizations, and NGOs.

50 Appendix 8a, Page 4 iii) Relationship with borrower s staff [CG 1.11(c)] Yes No If Yes, state relationship & whether potential or actual conflict of interest exists. c) Did any of the shortlisted firms participate in upstream assignment such Yes No as PPTA or other assignment regardless of financing source from which the firm may derive an unfair competitive advantage to this assignment? [RFP Section 2 (ITC), para. 4, Data Sheet 4.1, and CG 1.12] If yes, state the name of the firm and complete RFP Data Sheet Proposed Modifications on Contract Forms: [Revision/s for additional provision/s or deletion of certain provision/s in the General Conditions of the Contract (GCC) is not permissible. Instead, the Project Unit should advise the EA to incorporate revision/s through the Special Conditions of Contract (SCC) and changes should be reviewed by the Office of the General Counsel (OGC) prior to Submission 1.] State proposed revision/s and attach OGC s review in this Submission 1 document. 16. Type of Contract to be used: Time-Based Lump-Sum

51 Appendix 8a, Page 5 Part B [ADB Comments on EA s Submission] 1. Comments on Part A: a) b) c) 2. Shortlisting Criteria: a) b) c) 3. Shortlist: a) b) c) 4. Narrative Evaluation Criteria (NEC): a) b) c) 5. Request for Proposals (RFP): a) Section 1: Letter of Invitation (LOI): i) ii) iii) iv) b) Section 2: Data Sheet: i) ii) iii) iv) c) Summary and Personnel Evaluation Sheets (SES and PES): i) ii) iii) iv)

52 Appendix 8a, Page 6 d) Section 7: Terms of Reference (TOR): i) ii) iii) iv) e) Special Conditions of Contract (SCC): i) ii) iii) iv) 6. Other Issues: a) b) c) 7. Advance Reminders for Submission 2 Review: Please refer to the Guide in Reviewing Submission 2 for detailed instructions. a) In reference to SRFP Section 1, LOI, para. 7(a), the Project Unit should request the EA to secure a confirmation of withdrawal in writing from a shortlisted firm if the EA did not receive its proposal on the submission. b) Copy of confirmation of withdrawal from the Consultant should be attached in Submission 2. Unless the status of shortlisted Consultants which were not evaluated is clarified with evidence, ADB will not be able to process Submission 2. c) EA should confirm approval if there is a change (dropping/removal or addition) in the original association with reference to Section 1, LOI, paras. 4 and 7(b). d) EA must ensure that the firm that submits the proposal is the same legal entity that submitted the EOI. If the proposal received has a different legal entity from the shortlisted one, the proposal should be rejected. This also applies when a parent company, a group of firm, a subsidiary, or a local affiliate of the shortlisted firm submits the proposal. e) The EA should ensure that evaluation is conducted taking into account the issues on disqualification (see Grounds for Disqualification of an Expert attachment to SES/PES). f) If there is an expert proposed by multiple firms for the same position, the EA should evaluate the expert in accordance with the CV. This may result in uniform rating for the said expert if the same CV is used or otherwise different ratings if the CVs submitted by the firms for the expert were different. g) If there is more than 1 expert proposed by the firm for 1 position, the lowest rating among the experts evaluated should be applied and reflected in the PES/SES.

53 Appendix 8a, Page 7 8. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking: a) Any of the shortlisted firms (including their Joint Venture Yes No Partner/s or Sub-consultant/s) in ADB Anticorruption Sanction Lists and Terrorism Lists? If Yes, state the name of the consulting firm/s: b) PER of the firms in the shortlist (including their Joint Venture Yes No Partner/s or Sub-consultant/s) checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit] c) External ADB auditor included in the shortlist? Yes No If Yes, please obtain clearance from OAI before proceeding. 9. Checking of Conflict of Interest [in accordance with the Guidelines on the Use of Consultants by ADB and Its Borrowers (CG)]: a) Conflict between consulting activities [CG 1.11(a)] Yes No b) Conflict among consulting assignments [CG 1.11(b)] Yes No c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)] Yes No If Yes, state relationship & whether potential or actual conflict of interest exists: Reminders for the Project Unit 1. Subject to Section F of PAI 2.05, upon receipt of the EA s Submission 1, the Project Unit ensures that the EA submitted complete documents required (Checklist of Attached Documents) in the submission form before immediately forwarding an electronic copy of the submission to OSFMD- LCU (see PAI 2.05, paragraph 14). 2. The Project Unit should assist the EA to obtain and use the latest version of the Standard RFP without modification or omission of the standard provisions. 3. The Project Unit should ensure that the submission is consistent with the latest/updated procurement plan. 4. The Project Unit will send an updated CRAM sheet to the EA for its monitoring of the recruitment activities. 5. The Project Unit will send to OSFMD a request for posting the shortlist in the ADB website with the following information: the names of the shortlisted firms; the name of the EA and its contact details listed in LFIS/GFIS ALS704 under the EA Loan Address section; and the RFP date. 6. The Project Unit will convey the above decisions and recommendations to the EA.

54 Appendix 8a, Page 8 Prepared by: Signature above Printed Name OSFMD (If applicable) Date Signature above Printed Name Project Unit Note: When OSFMD review is required, the Project Unit Officer signs the review document after the OSFMD Officer signs it. Approved: Yes No Date Approved by: Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) Date Disclaimer: The review and approval of this submission document is conducted independently and must not serve as a precedent for future reviews. Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

55 For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: PAI No Appendix 8b, Page 1 Executing Agency Consulting Recruitment Submission 1: Evaluation of Expressions of Interest and Request for Proposals (CQS) Part A [To be completed by the Executing Agency] Loan/Grant (Country) (No.): Title Package/Component: This is the: [indicate whether 1 st, 2 nd, 3 rd etc.] request for review Name of Executing Agency (EA): Report Submitted by: Name: Signature: Designation: Date Submitted: Date of EA Consultant Selection Committee- Expressions of Interest (CSC-EOI) Evaluation Meeting: Checklist of Attached Documents (For 1 st Review): In case of succeeding reviews, please attach only the information or documents requested in the latest review. Attachment 1: Latest Uploaded Procurement Plan Yes No [Procurement plan must be within a year and for each loan, not MFF. Attach approval memo for individual changes in the procurement plan] Attachment 2: Budget for consulting services including details of Yes No provisional sums and contingency Attachment 3: Longlist of Consulting Firms Yes No Attachment 4: Expressions of Interest (EOI) 1 and Evaluation Criteria 2 [EA to prepare the EOI evaluation criteria. EA to provide weights for each criterion in the evaluation sheet for EOI and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria.] Yes No Attachment 5: Duly Filled EOI Evaluation Sheet 3 for all EOIs Submitted Yes No Attachment 6: Narrative Evaluation Criteria (NEC) Yes No [EA to prepare the NEC for Biodata Technical Proposal (BTP). Provide weights for each criterion in the summary evaluation sheet and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria in NEC.] Attachment 7: Draft Request for Proposals (RFP) with Terms of Reference Yes No (TOR), Data Sheet, Summary and Personnel Evaluation Sheets for BTP 4 and Draft Contract Attachment 8: Copy of approval for CQS selection method if not stated Yes No in the RRP/Procurement Plan Attachment 9: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 10: Minutes of the EA CSC-EOI Evaluation Meeting Yes No EOI standard template can be downloaded from the ADB website in the following link: This may be modified to match requirements. Management competence criterion includes nomination and very brief background & experience of firm s director responsible for this assignment, and, if applicable, the rationale for proposed Joint Venture Partnership/Sub-consulting. Evaluation sheet for EOIs in MSExcel format can be obtained from ADB Project Unit upon request. The template for BTP can be downloaded from the ADB website in the following link: Include the Attachment: Grounds for Disqualification of an Expert.

56 Appendix 8b, Page 2 Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in a table format. Please provide additional rows in the table below, if required.] Name Ministry/Department/Agency Designation * Is there any consultant in the EA s CSC Meeting? Yes No If Yes, please state whether potential or actual conflict of interest exists EOIs via CMS-CSRN (30 days) Yes No Date of Posting: Deadline of EOI Submission: [For reduced period of advertisement (less than 30 days) or waiver of advertisement, please attach the formal approval] 2. Number of EOIs Received: 3. Advance Action? Yes No 4. Retroactive Financing? Yes No (If yes, please attach the document approving retroactive financing) 5. Loan Approval Date: 6. Loan Effective Date: 7. Loan Closing Date: 8. Estimated Contract Duration (in months): 9. Budget for this consulting services (not exceeding US$200,000): US$ Justification in special case where budget exceeds US$200,000: 1 The EA should confirm that the consultant in the EA s CSC Meeting does not have any ongoing business associations (whether direct or indirect) with any of the firms in the shortlist.

57 Appendix 8b, Page Result of EOI Evaluation: [Note: EA to list the names of 3 consulting firms with highest ranked EOIs including the country and scores in the table below.] Nature of Association Firm Name (Full Name not Acronym)/ Country of Incorporation 1 Score (Indicate if the firm is Lead, JV Partner, or Subconsultant) Nature of Organization [Indicate if Private Consulting Firm, State- Owned (SOE) or NGO] Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO a) Checking of Conflict of Interest [in accordance with the Guidelines on the Use of Consultants by ADB and Its Borrower (CG)]: i) Conflict between consulting activities [CG 1.11(a)] Yes No ii) Conflict among consulting assignments [CG 1.11(b)] Yes No iii) Relationship with borrower s staff [CG 1.11(c)] Yes No If Yes, state relationship & whether potential or actual conflict of interest exists. b) Did any of the shortlisted firms participate in upstream assignment such Yes No as PPTA or other assignment regardless of financing source from which the firm may derive an unfair competitive advantage to this assignment? [RFP Section 2 (ITC), para. 4, Data Sheet 4.1, and CG 1.12] If yes, state the name of the firm and complete RFP Data Sheet Name of the Consulting Firm/Country with the Highest EOI Score: 12. Proposed Modifications on Contract Forms: [Revision/s for additional provision/s or deletion of certain provision/s in the General Conditions of the Contract (GCC) is not permissible. Instead, the Project Unit should advise the EA to incorporate revision/s through the Special Conditions of Contract (SCC) and changes should be reviewed by the Office of the General Counsel (OGC) prior to Submission 1.] State proposed revision/s and attach OGC s review in this Submission 1 document. 13. Type of Contract to be used: Time-Based Lump-Sum 1 Corporations or companies must be incorporated in an ADB Member Country. Partnerships or non-corporations must be duly registered or legally established in an ADB Member Country. These include universities, institutions, public sector organizations, and NGOs.

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI No. 2.04 Page 1 of 15 SPECIFIC REQUIREMENTS FOR RECRUITING CONSULTANTS BY ADB 1. This project administration instruction (PAI) explains the specific procedures for

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI No. 2.02 Page 1 of 10 PREPARING FOR CONSULTANT RECRUITMENT 1. This project administration instruction (PAI) guides the recruiting party in preparing for consultant

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI No. 2.03 Page 1 of 15 GENERAL PROCEDURE FOR SELECTING AND ENGAGING CONSULTANTS 1. This project administration instruction (PAI) contains general procedures for the

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI No. 2.06 Page 1 of 7 CONSULTANT CONTRACT MANAGEMENT A. Introduction 1. This project administration instruction (PAI) provides guidelines for the management of consulting

More information

Standard Request for Proposals. Selection of Consultants

Standard Request for Proposals. Selection of Consultants STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants The Islamic Development Bank March 2012 This document is subject to copyright. This document may be used and reproduced

More information

Standard Request for Proposals Selection of Consultants

Standard Request for Proposals Selection of Consultants STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants September 2012 This document is subject to copyright. This document may be used and reproduced for non-commercial

More information

Guidelines on. The Use of Consultants by Asian Development Bank and Its Borrowers

Guidelines on. The Use of Consultants by Asian Development Bank and Its Borrowers Guidelines on The Use of Consultants by Asian Development Bank and Its Borrowers March 2013 Guidelines on The Use of Consultants by Asian Development Bank and Its Borrowers March 2013 2013 Asian Development

More information

Principles and Procedures. Applicable to. The Procurement of. Consulting Services. Under. Transaction Advisory Services Provided by

Principles and Procedures. Applicable to. The Procurement of. Consulting Services. Under. Transaction Advisory Services Provided by Principles and Procedures Applicable to The Procurement of Consulting Services Under Transaction Advisory Services Provided by Asian Development Bank November 2013 This document has been prepared for ADB

More information

Selection of Consultants By the World Bank

Selection of Consultants By the World Bank STANDARD REQUEST FOR PROPOSALS Selection of Consultants By the World Bank The World Bank Washington, D.C. March 2007 CONTENTS Preface... iv Section 1. Letter of Invitation... 7 Section 2. Instructions

More information

Guidelines (Rules) for the Procurement of Services 1

Guidelines (Rules) for the Procurement of Services 1 Southern African Development Community Project Preparation and Development Facility Guidelines (Rules) for the Procurement of Services 1 Revision 1 November 2013 1 Adapted from the African Development

More information

CONSULTANTS. African Development Bank. Rules and Procedures for the Use of Consultants. Procurement and Fiduciary Services Department

CONSULTANTS. African Development Bank. Rules and Procedures for the Use of Consultants. Procurement and Fiduciary Services Department CONSULTANTS African Development Bank Rules and Procedures for the Use of Consultants Procurement and Fiduciary Services Department May 2008 Edition, Revised July 2012 Those wishing to submit comments or

More information

Country of Incorporation 2

Country of Incorporation 2 Expression of Interest (EOI) Consulting Firms Project Number Project Name Project Country I. Consulting Firm Information CMS No. 1 / date: Country of Incorporation: 2 Consultant Name: EOI Submission Authorized

More information

Procurement Policy Office

Procurement Policy Office Procurement Policy Office (Established under section 4 of the Public Procurement Act 2006) Ref: SC/EG37/07-12 Evaluation Guide (Consultancy Services) Procurement Policy Office Ministry of Finance and Economic

More information

SAMPLE FORM OF EVALUATION REPORT SELECTION OF CONSULTANTS

SAMPLE FORM OF EVALUATION REPORT SELECTION OF CONSULTANTS SAMPLE FORM OF EVALUATION REPORT SELECTION OF CONSULTANTS The World Bank Washington, D.C. October 1999 iii Preface 1 Consultants 2 employed by Bank Borrowers and financed by the World Bank or under

More information

PAI 5.08 Revised in June 2011 Page 2 of 8

PAI 5.08 Revised in June 2011 Page 2 of 8 Project Administration Instructions PAI 5.08 Page 1 of 8 PROJECT PERFORMANCE MONITORING A. Introduction 1. This project administration instruction (PAI) describes how the performance of ADB financed and

More information

GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS

GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS Japan International Cooperation Agency (JICA) December 2006 (Amended December 2009) version 1.0 CONTENTS INTRODUCTION...

More information

[Indicate name of Procuring Entity]

[Indicate name of Procuring Entity] THE REPUBLIC OF RWANDA [Indicate name of Procuring Entity] STANDARD REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS FOR SMALL SERVICES Title of the Tender: Tender Reference Number: Procurement Method: Date

More information

Consulting Services Operations Manual

Consulting Services Operations Manual Consulting Services Operations Manual Consulting Services Operations Manual Consulting Services Operations Manual 2008 Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines

More information

Project Management Consultant for Jaipur Smart City Project

Project Management Consultant for Jaipur Smart City Project Edited by C. Fletcher (Aug 10, 2011) For submission to HOPs (July 28, 2011) REQUEST FOR PROPOSALS RFP No.: 1 of 2016-17 (International Competitive Bidding) Project Management Consultant for Jaipur Smart

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Table of Contents March 2012 REQUEST FOR PROPOSALS DISASTER RECOVERY/BUSINESS CONTINUITY SERVICES Soliciting detailed proposals for the development of plans to meet a variety of contingencies REQUEST FOR

More information

REQUEST FOR PROPOSALS, SELECTION OF CONSULTANTS

REQUEST FOR PROPOSALS, SELECTION OF CONSULTANTS REPUBLIC OF RWANDA MINISTRY OF ENVIRONMENT AND LANDS REQUEST FOR PROPOSALS, SELECTION OF CONSULTANTS Title of Tender: TO UPDATE & RESOURCES MINISTRY OF CONSULTANCY SERVICES UPGRADE THE WATER DATABASEFOR

More information

Policies for the Selection and Contracting of Consultants financed by the Inter-American Development Bank GN-2350-9 March 2011

Policies for the Selection and Contracting of Consultants financed by the Inter-American Development Bank GN-2350-9 March 2011 Policies for the Selection and Contracting of Consultants financed by the Inter-American Development Bank GN-2350-9 March 2011 Table of Contents Acronyms... iii I. Introduction... 1 Purpose... 1 General

More information

CLASSIFICATION: PUBLIC GUIDELINES SELECTION AND EMPLOYMENT OF CONSULTANTS UNDER IBRD LOANS AND IDA CREDITS & GRANTS BY WORLD BANK BORROWERS

CLASSIFICATION: PUBLIC GUIDELINES SELECTION AND EMPLOYMENT OF CONSULTANTS UNDER IBRD LOANS AND IDA CREDITS & GRANTS BY WORLD BANK BORROWERS CLASSIFICATION: PUBLIC GUIDELINES SELECTION AND EMPLOYMENT OF CONSULTANTS UNDER IBRD LOANS AND IDA CREDITS & GRANTS BY WORLD BANK BORROWERS January 2011 Copyright 2011 The International Bank for Reconstruction

More information

Business Opportunities Seminar

Business Opportunities Seminar Business Opportunities Seminar In Finland, Norway, Denmark, Ireland and The Netherlands (22 29 September 2015) Presented by: Rustam Abdukayumov Senior Procurement Specialist Operations Services and Financial

More information

Request for Proposals (RFP)

Request for Proposals (RFP) GOVERNMENT OF TAMILNADU Commissionerate of Municipal Administration 6 th Floor, Ezhilagam Annexe Building, Chepauk, Chennai - 600005 Tel: +91 44-044-28549924 Name of Project: Procurement of Hosted Exchange

More information

Standard Tender Evaluation Format. Selection Of Consultants

Standard Tender Evaluation Format. Selection Of Consultants STANDARD TENDER DOCUMENTS Standard Tender Evaluation Format Selection Of Consultants Public Procurement Board Accra, Ghana. i Preface 1 Procurement under projects financed from the Public Funds of the

More information

ADB Consulting Opportunities. Vienna, Austria

ADB Consulting Opportunities. Vienna, Austria ADB Consulting Opportunities Vienna, Austria 10-11 November 2015 Presented by: Walter Poick Director, Procurement Division 2 Operations Services and Financial Management Department Why pursue ADB-Financed

More information

Road Safety and Transport Authority Ministry of Information and Communications Royal Government of Bhutan

Road Safety and Transport Authority Ministry of Information and Communications Royal Government of Bhutan S T A N D A R D R E Q U E S T F O R P R O P O S A L S P r o c u r e m e n t o f Consult i n g S e r vices Road Safety and Transport Authority Ministry of Information and Communications Royal Government

More information

ADB Business Opportunities for Consultants. Presentation by Galia Ismakova, Senior Procurement Specialist, COSO April 2011

ADB Business Opportunities for Consultants. Presentation by Galia Ismakova, Senior Procurement Specialist, COSO April 2011 ADB Business Opportunities for Consultants Presentation by Galia Ismakova, Senior Procurement Specialist, COSO April 2011 Regional Multi-lateral Development Bank with HQ in Manila, Philippines Asian Development

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI No. 2.07 Page 1 of 5 CONSULTANT PERFORMANCE EVALUATION A. Introduction 1. This project administration instruction (PAI) provides policies and procedures for evaluating

More information

Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments

Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments REQUEST FOR PROPOSALS Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments Public Procurement Board Accra, Ghana September 2003 i CONTENTS INTRODUCTION AND INSTRUCTIONS...1 SECTION

More information

INSTRUCTIONS FOR REQUESTS FOR CONTRACT VARIATION (FORMAT FOR PRESENTING REVISED COST ESTIMATES)

INSTRUCTIONS FOR REQUESTS FOR CONTRACT VARIATION (FORMAT FOR PRESENTING REVISED COST ESTIMATES) INSTRUCTIONS FOR REQUESTS FOR CONTRACT VARIATION (FORMAT FOR PRESENTING REVISED COST ESTIMATES) Requests for Contract Variation should be used by consultants for the variation of contracts that have already

More information

REQUEST FOR PROPOSALS For. Establishment & Management of Citizen Help Desk

REQUEST FOR PROPOSALS For. Establishment & Management of Citizen Help Desk 1 REQUEST FOR PROPOSALS For Establishment & Management of Citizen Help Desk October 2012 Karnataka Health System Development & Reform Project PHI Building, Sheshadri Road, K.R.Circle, Bangalore -560 001

More information

Guidelines Selection and Employment of Consultants by World Bank Borrowers

Guidelines Selection and Employment of Consultants by World Bank Borrowers Guidelines Selection and Employment of Consultants by World Bank Borrowers January 1997 Revised September 1997, January 1999, and May 2002 Guidelines Selection and Employment of Consultants by World Bank

More information

Project Implementation: Procurement & Contract Management. April 2012

Project Implementation: Procurement & Contract Management. April 2012 & Contract Management April 2012 & Contract Management We would like to acknowledge the contribution of the Programme Management Department in the preparation of this presentation that will introduce some

More information

LAHORE WASTE MANAGEMENT COMPANY Company Established under Section 42 of Companies Ordinance 1984

LAHORE WASTE MANAGEMENT COMPANY Company Established under Section 42 of Companies Ordinance 1984 REQUEST FOR PROPOSAL (RFP) HIRING OF SERVICES OF ENGINEERING CONSULTING FIRM For CONSTRUCTION SUPERVISION FOR THE PROJECT DEVELOPMENT OF STORM WATER DRAINAGE SYSTEM ALONG BOUNDARY WALL OF LAKHODAIR LANDFILL

More information

Manual of Policies and Procedure of Employment of Consultants

Manual of Policies and Procedure of Employment of Consultants Manual of Policies and Procedure of Employment of Consultants CONTENTS Chapter Description Page No I Introduction 1-4 II Expression of Interest 5-6 III Selection of Consultants 7-18 IV Other Methods

More information

GUIDELINES: SELECTION AND EMPLOYMENT OF CONSULTANTS BY WORLD BANK BORROWERS

GUIDELINES: SELECTION AND EMPLOYMENT OF CONSULTANTS BY WORLD BANK BORROWERS GUIDELINES: SELECTION AND EMPLOYMENT OF CONSULTANTS BY WORLD BANK BORROWERS May 2004 Revised October 1, 2006 & May 1, 2010 This is a MS Word version of the official Consultant Guidelines. If altered, this

More information

World Bank Procurement Guidelines and Business Opportunities

World Bank Procurement Guidelines and Business Opportunities World Bank Procurement Guidelines and Business Opportunities Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group November 2011 1 AGENDA The Role of the Bank and the Borrower

More information

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project REQUEST FOR PROPOSALS For The Kelowna and Vernon Hospitals Project VOLUME 2 of 4 Instructions to Proponents Closing Time: Delivery Address: 3:00 pm (local time) Thursday, March 6,2008 Kelowna and Vernon

More information

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE

More information

THE GOVERNMENT OF THE COMMONWEALTH OF THE BAHAMAS

THE GOVERNMENT OF THE COMMONWEALTH OF THE BAHAMAS THE GOVERNENT OF THE COONWEALTH OF THE BAHAAS REQUEST FOR PROPOSAL FOR IPLEENTATION OF AN INTEGRATED ELECTRONIC PROCUREENT AND SUPPLIER REGISTRY SOFTWARE SOLUTION 22 July 2014 Loan/Reference No.ATN/E12661-BH

More information

Guidelines on the Evaluation of Technical and Financial Proposals and Preparation of Evaluation Reports Selection and Employment of Consultant

Guidelines on the Evaluation of Technical and Financial Proposals and Preparation of Evaluation Reports Selection and Employment of Consultant Guidelines on the Evaluation of Technical and Financial Proposals and Preparation of Evaluation Reports Selection and Employment of Consultant Public Procurement Regulatory Authority P.O. Box 49, Dar es

More information

EMPLOYEES OLD-AGE BENEFITS INSTITUTION

EMPLOYEES OLD-AGE BENEFITS INSTITUTION EMPLOYEES OLD-AGE BENEFITS INSTITUTION HEAD OFFICE, G.P.O. BUILDING I.I. CHUNDRIGAR ROAD, KARCHI REQUEST FOR PROPOSAL FOR HUMAN RESOURCE CONSULTANCY SERVICES A. INVITATION TO BID The Employees Old-Age

More information

ISLAMIC DEVELOPMENT BANK. Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING

ISLAMIC DEVELOPMENT BANK. Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING ISLAMIC DEVELOPMENT BANK Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING June, 2005 Table of Contents 1. General Principles... 1 1.1 Purpose of the Guidelines... 1 1.3 Relationship

More information

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

North American Development Bank. Model Prequalification Document: Prequalification of Contractors North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried

More information

North American Development Bank. Model Bidding Document: Consultant Services

North American Development Bank. Model Bidding Document: Consultant Services North American Development Bank Model Bidding Document: Consultant Services MODEL DOCUMENTS Sample letter of invitation Outline for typical Terms of Reference Supplementary information for consultants

More information

Video Production Services for the Ontario College of Trades (the College)

Video Production Services for the Ontario College of Trades (the College) Video Production Services for the Ontario College of Trades (the College) Request for Proposal (RFP) No. OCOT/CM/2014-03 Date Issued: 14 April 2014 1 TABLE OF CONTENTS A. INTRODUCTION...4 1. Objective...

More information

Democratic Socialist Republic of Sri Lanka GUIDELINES SELECTION & EMPLOYMENT OF CONSULTANTS

Democratic Socialist Republic of Sri Lanka GUIDELINES SELECTION & EMPLOYMENT OF CONSULTANTS Democratic Socialist Republic of Sri Lanka GUIDELINES SELECTION & EMPLOYMENT OF CONSULTANTS August 2007 National Procurement Agency of Sri Lanka Level 22 West Tower World Trade Centre Colombo 1 ii iii

More information

APPLIED SCIENCE COOPERATIVE AGREEMENT STANDARD OPERATING PROCEDURES FOR PTRs, GRANTS & TECHNOLOGY TRANSFER STAFF

APPLIED SCIENCE COOPERATIVE AGREEMENT STANDARD OPERATING PROCEDURES FOR PTRs, GRANTS & TECHNOLOGY TRANSFER STAFF APPLIED SCIENCE COOPERATIVE AGREEMENT STANDARD OPERATING PROCEDURES FOR PTRs, GRANTS & TECHNOLOGY TRANSFER STAFF Purpose: This standard operating procedure assists the Applied Science personnel in performing

More information

IFAD Guidelines on Project Audits

IFAD Guidelines on Project Audits IFAD Guidelines on Project Audits Approval Audit Committee One Hundred Twenty-First Meeting Rome, 21 November 2011 Guidelines on Project Audits Approved by the Executive Board One Hundred-Fourth Meeting

More information

PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)

PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01) PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS (Ref No. Secy/PPC/CVL/01) Inland Water Transport Development Company (IWTDC) No. 34-A, Street 27, Valley Road, Westridge, Rawalpindi Ph # 051-5491494-95,

More information

BANK OF UGANDA REPUBLIC OF UGANDA

BANK OF UGANDA REPUBLIC OF UGANDA BANK OF UGANDA REPUBLIC OF UGANDA 37/45 KAMPALA ROAD, P.O. BOX 7120, KAMPALA; Telephone: 256-414-258441/6 or 258061, Telex: 61069/61344; Fax: 256-414-233818 Web site: www.bou.or.ug; E-mail address: info@bou.or.ug

More information

REQUEST FOR EXPRESSION OF INTEREST (EoI)

REQUEST FOR EXPRESSION OF INTEREST (EoI) REQUEST FOR EXPRESSION OF INTEREST (EoI) For Hiring of Consultant for the Preparation of Financial Management and Procurement Manual (FMPM) For UP Pro-Poor Tourism Development Project of Department of

More information

Electronic Selection of Consultants

Electronic Selection of Consultants Electronic Selection of Consultants User Guide for Consulting Firms Version 3 This User Guide was produced by the Operations and Corporate Procurement Groups and the Information Solutions Group Global

More information

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized P145617:PK Sindh Public Sector Management Reform Project Government of Sindh (Finance Department) Individual Consultants Procurement Activities

More information

REQUEST FOR PROPOSALS (RFP) PL/RFP/2012/O/034

REQUEST FOR PROPOSALS (RFP) PL/RFP/2012/O/034 REQUEST FOR PROPOSALS (RFP) PL/RFP/2012/O/034 Software Development of Database for Energy Statistics International Renewable Energy Agency Abu Dhabi, UAE November, 2012 1 Section 1: Letter of Invitation

More information

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM 1 Standard Bidding Document Version Control v0-1 STANDARD REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS/FIRM Introduction

More information

STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS)

STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS) STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS) Pre-qualification Ref: Issue Date: [Insert Title of Project] [Insert Reference] [Insert Date] Public Procurement Authority

More information

Consultancy Service Tools For Promoting Entrepreneurship In Renewable Energy Access In Rural Areas

Consultancy Service Tools For Promoting Entrepreneurship In Renewable Energy Access In Rural Areas REQUEST FOR PROPOSALS (RFP) PL/RFP/2012/O/036 Consultancy Service Tools For Promoting Entrepreneurship In Renewable Energy Access In Rural Areas International Renewable Energy Agency Abu Dhabi, UAE November,

More information

National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP)

National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP) National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP) Operating Manual Please check the CRN Website for the latest version. Version: 6.0 Status: Consultation in

More information

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No. 政 府 總 部 發 展 局 工 務 科 香 港 特 別 行 政 區 政 府 The Government of the Hong Kong Special Administrative Region Works Branch Development Bureau Government Secretariat 香 港 添 馬 添 美 道 2 號 政 府 總 部 西 翼 1 8 樓 18/F, West

More information

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014

More information

Price quotes must be received no later than October 16, 2015 at 3:00 p.m. at the above address.

Price quotes must be received no later than October 16, 2015 at 3:00 p.m. at the above address. Request for Price Quotes For the provision of technical writing for the delivery of a policy and procedural manual for the Dutchess County Workforce Investment Board Issue Date September 24, 2015 Deadline

More information

LOAN DISBURSEMENT HANDBOOK FOR IFAD DIRECTLY SUPERVISED PROJECTS

LOAN DISBURSEMENT HANDBOOK FOR IFAD DIRECTLY SUPERVISED PROJECTS Version 1.01 LOAN DISBURSEMENT HANDBOOK FOR IFAD DIRECTLY SUPERVISED PROJECTS (when IFAD s General Conditions for Agricultural Development Financing apply) CONTENTS ACRONYMS...6 INTRODUCTION...7 1. BASIC

More information

How To Write A Project Plan

How To Write A Project Plan Flood Emergency Reconstruction Project (RRP PAK 44372) Project Administration Manual Project Number: 44372 Loan Number: {LXXXX} March 2011 Islamic Republic of Pakistan: Flood Emergency Reconstruction Project

More information

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya PRE-QUALIFICATION TENDER NO. IPSTC/PREQ/2014/2015/043 FOR PROVISION OF PLUMBING SERVICES FOR 2014/2015 July, 2014

More information

REQUEST FOR PROPOSALS FOR BANKING SERVICES

REQUEST FOR PROPOSALS FOR BANKING SERVICES I. INTRODUCTION A. Objectives REQUEST FOR PROPOSALS FOR BANKING SERVICES The Your Nonprofit, a nonprofit corporation is seeking competitive proposals for various banking services. It is the Organization's

More information

BANK OF UGANDA REPUBLIC OF UGANDA

BANK OF UGANDA REPUBLIC OF UGANDA BANK OF UGANDA REPUBLIC OF UGANDA 37/45 KAMPALA ROAD, P.O. BOX 7120, KAMPALA; Telephone: 256-414-258441/6 or 258061, Telex: 61069/61344; Fax: 256-414-233818 Web site: www.bou.or.ug; E-mail address: info@bou.or.ug

More information

Applicants: How to apply for a Commonwealth PhD Scholarship

Applicants: How to apply for a Commonwealth PhD Scholarship Applicants: How to apply for a Commonwealth PhD Scholarship Log On/Register Apply for a Scholarship A. Application Details B. Personal Information C. Career To Date D. References E. Endorsement F. Proposed

More information

Guide to procurement of consulting services

Guide to procurement of consulting services Guide to procurement of consulting services Last updated: April 2014 Table of contents Preliminary remarks 4 1. Implementation of German contribution to an international cooperation measure by consulting

More information

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING 4887 EOI REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING Expressions of Interest will be received at the Information Counter, Main Floor, Richmond City Hall, addressed to the

More information

Guide for Applicants. Call for Proposal:

Guide for Applicants. Call for Proposal: Guide for Applicants Call for Proposal: COSME Work Programme 2014 TABLE OF CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 II.2.1.

More information

GOVERNMENT OF JAMAICA HANDBOOK OF PUBLIC SECTOR PROCUREMENT PROCEDURES VOLUME 3 OF 4 PROCEDURES FOR THE PROCUREMENT OF CONSULTING SERVICES

GOVERNMENT OF JAMAICA HANDBOOK OF PUBLIC SECTOR PROCUREMENT PROCEDURES VOLUME 3 OF 4 PROCEDURES FOR THE PROCUREMENT OF CONSULTING SERVICES GOVERNMENT OF JAMAICA HANDBOOK OF PUBLIC SECTOR PROCUREMENT PROCEDURES VOLUME 3 OF 4 PROCEDURES FOR THE PROCUREMENT OF CONSULTING SERVICES Ministry of Finance & the Public Service Revised March 2014 Ministry

More information

PROCUREMENT STANDARD OPERATING PROCEDURES (SOP)

PROCUREMENT STANDARD OPERATING PROCEDURES (SOP) PROCUREMENT STANDARD OPERATING PROCEDURES (SOP) TABLE OF CONTENTS 1. RESPONSIBILITY 1.1 Responsibility for Acquisition 1.2 Responsibility for Procurement Planning 2. REQUISITION 2.1 Requisitions for Supplies,

More information

STATE OF MAINE DEPARTMENT OF EDUCATION RFP # 201205322 PAYROLL SERVICES FOR TEMPORARY RESOURCES

STATE OF MAINE DEPARTMENT OF EDUCATION RFP # 201205322 PAYROLL SERVICES FOR TEMPORARY RESOURCES STATE OF MAINE DEPARTMENT OF EDUCATION RFP # 201205322 PAYROLL SERVICES FOR TEMPORARY RESOURCES RFP Coordinator: Jeff Mao, Learning Technology Policy Director Department of Education 23 State House Station

More information

REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES

REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES Appointment to the New Jersey Building Authority Capital Budget Modeling and Advisory Services State Fiscal Years 2016, 2017 and 2018 Issued by the

More information

World Bank Group Electronic Selection of Consultants

World Bank Group Electronic Selection of Consultants World Bank Group Electronic Selection of Consultants User Guide for Consulting Firms Version 1 Table of Contents Introduction... 1 Create World Bank Group and EConsult accounts... 1 Create an EConsult

More information

Consolidated I&T Data Centre - P3 Canada Fund

Consolidated I&T Data Centre - P3 Canada Fund STAFF REPORT ACTION REQUIRED Consolidated I&T Data Centre - P3 Canada Fund Date: January 16, 2012 To: From: Wards: Reference Number: Government Management Committee Deputy City Manager & Chief Financial

More information

Prequalification Document for Procurement of Works

Prequalification Document for Procurement of Works STANDARD PROCUREMENT DOCUMENT Prequalification Document for Procurement of Works Caribbean Development Bank September 2007 ii Foreword This Standard Procurement Document Prequalification Document for Procurement

More information

Guide for Applicants COSME calls for proposals 2015

Guide for Applicants COSME calls for proposals 2015 Guide for Applicants COSME calls for proposals 2015 CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 Consortium coordinator... 4

More information

Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers

Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers ISSUE DATE: April 26 th, 2013 RESPONSE DUE DATE: May

More information

Procurement of Goods

Procurement of Goods i S T A N D A R D B I D D I N G D O C U M E N T S F O R P R O C U R E M E N T & I M P L E M E N T A T I O N O F E R P S O L U T I O N I N S E L E C T E D U N I V E R S I T I E S ( H E C / IT/ TA/ E R P

More information

REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR. The Design and Development of the Zimbabwe Diaspora Website

REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR. The Design and Development of the Zimbabwe Diaspora Website FPU.SR- 19.5 REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR The Design and Development of the Zimbabwe Diaspora Website Prepared by Number 4 Duthie Road, Alexandra

More information

Rastriya Beema Company Ltd Ramshahpath, Kathmandu. Terms of Reference For Development & Implementation of Integrated Software System

Rastriya Beema Company Ltd Ramshahpath, Kathmandu. Terms of Reference For Development & Implementation of Integrated Software System Rastriya Beema Company Ltd Ramshahpath, Kathmandu Terms of Reference For Development & Implementation of Integrated Software System 1. Background In this age of information and technology, the importance

More information

CHAPTER 5 SMALL PURCHASES

CHAPTER 5 SMALL PURCHASES PIM 98-033 CHAPTER 5 SMALL PURCHASES In this Chapter look for... 5. General 5.1 Competitive Requirements 5.2 Charge Cards for Small Purchases (Deleted) 5.3 Single Quotation 5.4 Deleted 5.5 Deleted 5.6

More information

PUBLIC PROCUREMENT SYSTEM AND REFORM IN AFGHANISTAN Anwar M. Raufi

PUBLIC PROCUREMENT SYSTEM AND REFORM IN AFGHANISTAN Anwar M. Raufi Anwar M. Raufi 1729 OUTLINE OF THE CONTENTS OF THE TOPIC TO BE PRESENTED 1- Procurement system of Afghanistan before ten years, i.e. before 2001. Afghanistan had a series of provisions regulating procurement

More information

Request for proposals (RFP) The supply of a computer based Library Management System for the CSIR. RFP No. 579/29/05/2015

Request for proposals (RFP) The supply of a computer based Library Management System for the CSIR. RFP No. 579/29/05/2015 Request for proposals (RFP) The supply of a computer based Library Management System for the CSIR RFP No. 579/29/05/2015 Date of Issue: 15 May 2015 Closing Date: Friday, 29 th May 2015 Place: Tender box,

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014 the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

North American Development Bank. Model Bidding Document: Procurement of Goods, Works and Services

North American Development Bank. Model Bidding Document: Procurement of Goods, Works and Services North American Development Bank Model Bidding Document: Procurement of Goods, Works and Services Preface These model bidding documents have been prepared by the North American Development Bank (the Bank)

More information

Request for Proposals Community Engagement and Business Development Consultant Contractor Loan Fund May 16, 2016.

Request for Proposals Community Engagement and Business Development Consultant Contractor Loan Fund May 16, 2016. Request for Proposals Community Engagement and Business Development Consultant Contractor Loan Fund May 16, 2016 Table of Contents I. PROJECT DESCRIPTION AND BACKGROUND II. SCOPE OF SERVICES III. BENEFITS

More information

Mechanical Engineering Program. Policies and Procedures

Mechanical Engineering Program. Policies and Procedures Mechanical Engineering Program Policies and Procedures For M.S. and Ph.D. Degrees in Mechanical Engineering At the University of California, Merced Submitted by: Ashlie Martini Chair of the Mechanical

More information

REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL ADVISORY SERVICES

REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL ADVISORY SERVICES REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL ADVISORY SERVICES Appointment to the NJ Tobacco Settlement Financing Corporation Credit Enhancement Transaction Winter 2014 Issued by the State of New Jersey Treasurer

More information

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway

More information

RFP Milestones, Instructions, and Information

RFP Milestones, Instructions, and Information This Request for Proposal is being issued by the Lower Colorado River Authority (LCRA). LCRA is a conservation and reclamation district of the State of Texas created pursuant to Article XVI, Section 59,

More information

Appendix D. Reference to days in Appendix D is to be taken to mean calendar days unless otherwise indicated.

Appendix D. Reference to days in Appendix D is to be taken to mean calendar days unless otherwise indicated. Appendix D Teacher and Principal Appointment Procedures The procedures set out in this appendix are designed to provide fair and impartial procedures for candidates for appointment and a Board of Management

More information

VICTIMS SUPPORT PROGRAMME. Guidance Note on the Recruitment of Staff G3/VSP

VICTIMS SUPPORT PROGRAMME. Guidance Note on the Recruitment of Staff G3/VSP VICTIMS SUPPORT PROGRAMME Guidance Note on the Recruitment of Staff G3/VSP Version 1.0 Effective Date 19 th August 2013 1 Contents 1. Introduction and Background... 3 2. Recruitment Code... 4 3. The Recruitment

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REPUBLIC OF RWANDA RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA) MULTINATIONAL BURUNDI/RWANDA/TANZANIA DAR ES SALAAM-ISAKA KIGALI/KEZA-MUSONGATI RAILWAY PROJECT TRANSACTION ADVISORY REQUEST FOR PROPOSALS

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 3.08 13 August 2014 ELECTRONIC PROCUREMENT 1. Executing agencies and implementing agencies may use electronic systems to conduct procurement on ADB-financed contracts