WATER WORKS Januar y 2013

Size: px
Start display at page:

Download "WATER WORKS Januar y 2013"

Transcription

1 WATER WORKS Januar y 2013

2 TABLE OF CONTENTS 1.- Company Presentation. 2.- Contractos Classification. 3.- Quality Certifications. 4.- Most important projects information.

3 1.- Company Presentation.

4 Avda. Juan Carlos I nº55 Edificio JC1 Planta Murcia (Spain) Tf: international@aquiline.es Dear Sirs, It is our pleasure to introduce to your Excellency our company to offer all our services as a construction company for all those projects you consider could match with our profile and experience. Our companies group raised to the 27th position in the ranking of construction companies in Spain, having carried out some of the most important projects developed in our country. I am proud to say that our company is financially provided and dispose of the bank guarantees that could be required to undertake these projects. At the same time, our company is provided with first line technology and our own equipment that allows us to undertake the most complex tasks. Our workforce formed by more than 200 people, counts with more than 50 university graduates, including Architects, Building Engineers, Civil Engineers, Telecommunications Engineers, Mining Engineers, Economists and Industrial Engineers. We have experience in almost all construction activities and we have already done projects of the following various sectors: Houses. Elderly homes and hall of residences. Hotels and Office Buildings. Malls. Parkings. Auditoriums and business centers. Museums, concert halls and libraries. Penitentiary. Schools, colleges and research centers. Hospitals and health care centers. Page 1

5 Avda. Juan Carlos I nº55 Edificio JC1 Planta Murcia (Spain) Tf: international@aquiline.es Electric Power and Wind Generation Stations. Roads and highways. Bridges and intersections. Water and wasting conductions. Hydraulic facilities. Stadiums and sports facilities. Pools and sport centers. Urbanizations and residencial areas. Golf Resorts. Waste treatment plants and rubbish dump. Water Treatment Plant. Desalination Plant. Railway facilities. Cemeteries. Warehouses. Ports and y promenades. Historic Building Remodeling. Channeling and supplying works, oil-bearing and gas facilities. We are looking forward to share our experiences in developing your region for better and successful projects. Yours faithfully. Eduardo Pérez García Chairman AQUILINE FOR PROJECTS AND CONTRACTS S.L. Page 2

6 Company information Proyect Managing Company name: Aquiline For Projects and Contracts S.L. Construction Company name: Infraestructuras Terrestres S.A. (Intersa) CR number: B Nationality: Spanish Street: Avenida Juan Carlos I nº55 Edf. JC1 Planta 16 Zip Code: City: Murcia Country: Spain Website: Chairman / President: Eduardo Pérez García CEO: Eduardo Pérez García Country Operations Manager: Ernesto Ruiz Hernández Main activities: Civil Works: Roads and highways, water treatment, watercourse channels, coastline works, harbors, hydro/electric works, housing developments, seaside works, winds farms Buildings: Hospitals, universities, schools, sport complex, shopping malls, business auditoriums, residential constructions, monument rehabilitation CONSOLIDATED ANNUAL STATEMENTS Permanent employees: Total employees: Sales volume (million ): Gross profit (million ): World activities/offices Yes No Countries: Spain,Saudi Arabia, Qatar, Brazil, Iraq. Contact information Company Contact: Ernesto Ruiz Hernández Company Contact Title: Chief Operating Officer Phone: Fax: Mobile: ernesto.ruiz@aquiline.es

7 ORGANIZATION CHART INTERNATIONAL PROJECTS

8 2.- Contractor Classification.

9 2. Contractor Classification 2.1. Public Works Contractor 2.2. Public Services Contractor 2.3. Adif 2.4. Repsol

10 2.1. Public Works Contractor

11

12 Plaza de Valparaiso number Madrid Tel: Fax: MINISTRY OF ECONOMY AND FINANCE GOVERNMENT PROCUREMENT ADVISORY BOARD File num.: R/ Company: INFRAESTRUCTURAS TERRESTRES S.A Tax ID: A Address: Avda Mariano Rojas 26 City: 3009 Murcia Province: Murcia THE SUBDIRECTOR GENERAL OF CONTRACTOR CLASSIFICATION AND CONTRACT REGISTRATION CERTIFIES that the company whose data is indicated above, as a WORKS CONTRACTOR, in the Official Register of Classified Companies with the classifications listed below. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. A 01 F A 02 F A 03 F A 04 F B -- E B 01 F B 02 F B 03 F B 04 E C -- F C 01 F C 02 F C 03 F C 04 F C 05 F C 06 F C 07 F C 08 F C 09 F D -- C D 01 D D 02 C D 03 C D 04 C D 05 F E 01 F E 03 F E 04 F E 05 F E 06 F E 07 F E 02 F E 07 F G -- F G 01 F G 02 F G 03 F G 04 F G 05 F G 06 F I 01 E I 05 E I 06 E I 08 D I 09 E J 01 E J 02 E J 04 E J 05 E K 01 E K 02 E K 03 E K 04 E K 05 E K 06 E K 07 D K 08 E K 09 E It is declared for the purposes in the legislation on Public Sector Contracts that I hereby issue this certification in Madrid on 27 january (signature and stamp) Signed: José Luis Cueva Calabia.

13 2.2. Public Services Contractor

14

15 Plaza de Valparaiso number Madrid Tel: Fax: MINISTRY OF ECONOMY AND FINANCE GOVERNMENT PROCUREMENT ADVISORY BOARD File num.: R/ Company: INFRAESTRUCTURAS TERRESTRES S.A Tax ID: A Address: Avda Mariano Rojas 26 City: 3009 Murcia Province: Murcia THE SUBDIRECTOR GENERAL OF CONTRACTOR CLASSIFICATION AND CONTRACT REGISTRATION CERTIFIES that the company whose data is indicated above, as a SERVICES CONTRACTOR, in the Official Register of Classified Companies with the classifications listed below. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. O 01 D O 02 D O 03 D O 04 D P 01 B P 02 B It is declared for the purposes in the legislation on Public Sector Contracts that I hereby issue this certification in Madrid on 24 February (signature and stamp) Signed: José Luis Cueva Calabia.

16 2.3. Adif

17

18

19 ADIF Procurement and Contracting Madrid 09/06/2009 Ref: DCC-MGH-JLR INFRAESTRUCTURAS TERRESTRES S.A (INTERSA) D. Alberto G. Martin Recio Avda Mariano Rojas Murcia RE: ADIF Supplier Classification System (SCP) Having reviewed and evaluated the Classification File sent by this company for inclusion in the Classified Companies Register, an in application of the provisions of the the SCP Procedures, the Classification Committee constituted for the purpose has adopted the following agreements: First the CLASSIFICATION of INFRAESTRUCTURAS TERRESTRES, S.A. (INTERSA) with Tax ID A , in the following activity subsectors: SUBSECTOR NAME CATEGORY OAFA REHAB METAL BRIDGES AND OVERPASSES D OAFB REHAB NON METAL BRIDGES/OVERPASSES C OAFD BRIDGE BUILDING C OAG TREATMENT OF ROAD INSFRASTRUCTURES A OAKA BUILDING OF OVERPASSES D OAKB BUILDING OF UNDERPASSES D The resolution of this notification brings the administrative procedure to an and this decision may be appealed, within two months of the day following reception of this document, before the Central Courts of the Jurisdiction of the Litigant. Notwithstanding the foregoing, an appeal for reversal may optionally be lodged within one month before the same body that pronounced the resolution hereby notified, as per the provision of articles 116 and 117 of Law 30/1992 of 26 November, of the Legal Regime of the Public Administration and of the Common Administrative Procedures, or lodge any other appeal deemed appropriate. Likewise and as per the provisions of Law 31/2007 of 30 October, and under the procedure provided in articles 103 and following, an objection may be lodge with the Secretary of State for Infrastructures within 10 working days of the day following reception of this notification. DIRECTOR OF PROCURMENT AND CONTRACTING (SIGNATURE ILLEGIBLE) Jesus Mª Campo Campo (Official Stamp of Dept of Infrastructures Railways before and after the text)

20 2.4. Repsol

21

22 REPSOL LOGO Director of the Cartagena Refinery General Downstream Directorate INFRAESTRUCTURAS TERRESTRES S.A (INTERSA) Avda Mariano Rojas Murcia Re: Classification of Contractors Dear Sirs Cartagena, 10 February 2009 It is our pleasure to inform you that having carried out the visit to your offices and facilities and completed the process of Approval, you are now included in Repsol's Approved Supplier List. This Approval process took account of all your capacities as a contracting company (safety management, quality, training, resources etc.), and therefore to maintain its validity you must inform us of any change that might have a significant impact on these aspects. The approval awarded will be valid for a maximum of 3 (three) years, and covers activity in the activity area: Civil Engineering Work. This approval is reserved exclusively for the internal work of our organization, which involves a commitment to guaranteeing confidentiality of the information we provide to your company. With nothing further to add in this matter, we congratulate you for exceeding the minimum requirements established for the execution of work in our plants and facilities and we would like to use this opportunity to send our kindest regards. Yours truly, (Signature) José Francisco Vázquez González Director of the Cartagena Industrial Complex Valle de Escombreras, s/n Cartagena Spain Tel Fax

23 3. Certificates of quality, safety and environment

24

25

26

27

28

29 4. Most important projects information

30 EXPERIENCE IN WATER WORKS PROJECT Completion of the modernization of water infrastructure sector VIII of the irrigated areas of Lorca and Guadalentin Valley (Murcia) CLIENT BUDGET (EUROS) START DATE TERMINATION DATE M. MEDIO AMBIENTE. DG AGUA ,25 sep-07 mar-10 DESCRIPTION Transport network and sector primary irrigation VIII, sub II, Cazalla-Tamarchete, for irrigable area of Ha with the execution of the following lines: ml tube Ø HACC between 1000 and 1300 mm, 6044 ml FRP pipe between 500 and 900 mm diameter and 21,506 ml oriented PVC pipe between 200 and 400 mm diameter. Other actions: 3 hincas low road Ø 161 ml HA 1200, 1300 and 1600 mm tubing murky armbands with 14,013 ml HA with Ø from 800 to 1500 mm, 2 careada masonry dams, paving roads and replacement service affected service. Writing Project and execution of services in support of sanitation and wastewater treatment plant Alcazares (Murcia) M. MEDIO AMBIENTE. DG HIDRÁULICAS ,78 dec-06 may-09 Construction of a sewage treatment plant in Los Alcazares (Murcia) and ancillary works. Designed to serve a population of 28,400 population equivalent 120,000 in low season and high season population equivalent, with flow rates of 9,000 and 22,500 debug m3/day respectively. The new WWTP has 3 lines with tertiary biological treatment by filtration and ultraviolet reuse of treated water for irrigation, with enough room to expand to a fourth line in the future. Includes enforcement of sanitation ancillary works a drain and a water collection basement to prevent the introduction of brackish water in the main sanitation. The implementation of the new WWTP is performed on existing impoundment facilities, transforming one of the rafts in treated water tank. The new design reduces the environmental impact by placing the equipment likely to generate bad odors in closed and equipped with anti-odor filters. Denitrification plant of L'Eliana, Valencia. M. MEDIO AMBIENTE. ACUAMED ,89 jun-08 **In progress Denitrification plant construction on a plot of m2 with connecting to the same of the four water supply wells present. The whole facility has: Arrival Deposit raw water; deposits treated water quality 1 and 2 and 11,024 m denitrification plant iron pipe in different diameters.

31 EXPERIENCE IN WATER WORKS PROJECT WWTP Valley even collectors Baños and Mendigo (Murcia) CLIENT BUDGET (EUROS) START DATE EL VALLE GOLF RESORT, S.L ,50 nov-04 sep-06 TERMINATION DATE DESCRIPTION WWTP new plant with a flow of 1,400 m3/day, with a debugging system using biological treatment with ultrafiltration equipment with membrane technology. Works factory, concrete tanks, membrane tanks, concrete pipes and other electromechanical installations. Use in sewage purification Golf urbanization of 60.2 hectares Works include water collection sump sanitation and transport to WWTP (2.9 km approx) and treated water flow regulating reservoir for distribution irrigation (4.8 km approx). Design, writing, design and construction of WWTP of Jumilla (Murcia) CARM. C. AGRICULTURA Y AGUA ,27 nov-04 jun-07 WWTP new plant for a population of 125,000 and a flow rate equivalent to treat 12,000 m3/day, with treatment system using biological treatment and extended aeration activated sludge with nitrification-denitrification and dephosphatation with tertiary treatment and UV disinfection, which allows the reuse of treated water. The facilities are of advanced design in terms of both organic contaminant removal, such as nitrogen, phosphorus and pathogens, exceeding the levels set by the EU for water clarity. The works have been designed to minimize the impact on the landscape and environment in the area, with several items enclosed buildings and deodorized. La Torre WWTP even collectors Torre- Pacheco (Murcia) LA TORRE RESORT DEVELOPMENT, S.L. (POLARIS WORLD) ,04 jan-05 jun-07 WWTP new plant with a flow of 8,500 m3/day, with a debugging system using biological treatment with ultrafiltration equipment with membrane technology. Works factory, concrete tanks, membrane tanks, concrete pipes and other electromechanical installations. Use in wastewater treatment of development with golf course. Works include water collection sump sanitation and transport to WWTP (4.9 km approx) and discharge of treated water for irrigation distribution swamp (7.1 km approx). Design, writing, design and construction of the WWTP of Caravaca de la Cruz (Murcia) CARM. C. AGRICULTURA Y AGUA ,52 dec-02 juni05 WWTP new plant for a population of 86,272 inhabitants at a rate equivalent to treat 8,000 m3/day. The treatment system is designed biological treatment of activated sludge with tertiary treatment carousel for disinfection by ultraviolet radiation and mechanical sludge dewatering by gravity sludge thickener.

32 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET (EUROS) START DATE TERMINATION DATE WWTP of Abarán (Murcia) CARM. C. AGRICULTURA Y AGUA ,32 may-00 may-02 WWTP Condado de Alhama, Alhama de Murcia. POLARIS WORLD ,61 jun-07 feb-09 DESCRIPTION WWTP new plant with a flow of 4,500 m3/day, with a debugging system using activated sludge biological treatment without tertiary treatment. Works factory, concrete tanks, concrete pipes and other electromechanical installations. New WWTP plant treatment system using activated sludge biological treatment with BRM type membrane technology for a population equivalent of 36,000 inhabitants and a flow of 9,000 m3/day. Works factory, concrete tanks, bioreactor, membrane tanks, rolling well and pumping treated water reservoir, sludge treatment, pretreatment and service buildings and other electrical and electromechanical. Reuse of treated water for irrigation. Channelling Benipila Rambla de Cartagena (Murcia) M. MEDIO AMBIENTE. ACUASEGURA ,11 oct-02 mar-04 Channelling 1.554m of Rambla de Benipila (last 525m MD only) by trapezoidal section 1.6 H/1V slope (base: 27m and h = 4.25 m) embankment core formed by HA m +0.4 m masonry. (Q500 = 586 m3/sg). Forwarding Rambla Quarry 278m, connected upstream of the gazebo with Benipila Rambla. (Q500 = 260 m3/ sg). Glorieta Paules: (Rint: Rext 32.1 m and 50.1 m) high on the Rambla Benipila c / 2 structures: Two batteries on the display lights continuously and 12 m; Board inverted T beams prefabricated edge 45cm, 5.5 m above floor of the channel; Channelling low rectangular structure c / drywall. Service roads on foot slope: 5m 1.072m wide. Margins Drainage: Slope wells up every 75m c / Tube H ø400 + flap, three wells interconnected c / H ø200; manual valve c / pit in well + low esplanade football field c / HA Ø1000 tube. Footbridge: demolition of existing e inst. a metal, adapted to the new channeling.

33 EXPERIENCE IN WATER WORKS PROJECT Construction, commissioning, maintenance of the wastewater treatment plant of urbanization Mar Menor Golf Resort Torre Pacheco. Water supply Mar Menor. (Murcia) CLIENT BUDGET (EUROS) START DATE TERMINATION DATE MAR MENOR GOLF RESORT ,46 may-08 oct-09 DESCRIPTION WWTP for a flow of 1,880 m3/day, with a debugging system using activated sludge biological treatment with extended aeration system and tertiary treatment BRM ultrafiltration membranes for water reuse for irrigation. Gravity thickener sludge. Works factory, concrete tanks, concrete pipes and other facilities electromecánicas.red supply to urbanization Mar Menor II, consisting of 1,200 ml of ductile iron pipe D = 400 mm. 770 ml of D = 300 mm. and ml of D = 250 mm. Booth and pumping installations and replacement of affected services Improvement and modernization of irrigation in the Community Irrigation Canal del Páramo. Sectors V and VII. Headworks and pumping station Sector VII (Leon) JCYL. ITACYL ,45 dec-07 may-09 The work consists in breaking the raft and the execution of an intake with a filter station, then mounted a GRP pipe of Ø 2000 mm and a length of 1800 m to the pumping station. This is a building with all the facilities required for pumping. Execution of works of water supply project reusable water irrigation for the town of Getafe (Madrid) CAM. CANAL DE ISABEL II ,90 dec-06 dec-07 Red for the reuse of water for irrigation. He built a tank and other facilities run existing two. Each tank will have a water distribution network, a total of 37,227 m iron pipe between 100 and 300 mm in diameter. Affected will be reset and paving services Construction Project of the transfers authorized by Art. 13 of Law 10/2001 of July 5, National Hydrological Plan. Section 41, subsection 1: Siphon End Home Segura Aqueduct Campos del Rio (Murcia) Waste water collector and Senda de Granada Guadeloupe in Murcia. Hydroelectric Power in Berberin, Calasparra (Murcia) TRASAGUA ,73 mar-04 mar-05 AYTO. MURCIA. EMUASA ,79 jul-05 jul-06 MITYC. IDAE ,67 sep-04 jul-05 Regrown channel over a length of 6500 meters and a height of 1.20 meters on both sides of the channel, means of mass concrete executed slipform machine. Replacement 10 overpasses over the channel. Waste water collector with a length of 4.2 km in 90 class pipe and cement HA SR, ø 600, 800 and 1000mm and corrugated PE 700 and 930mm dia, two pumping stations remotely controlled a 70m jacking with tube Steel ø 1600 for the passage of the A-30. It entubará 420 ml of HA Alfatego ditch class Ø1000 SR 90 and cement. Includes the replacement of 1,485 ml of water supply pipe in FD ø 100 ø 150 and 160mm PE. Headworks, canal approx. 1500ml inner section 7.5 * 3.2 m and thickness 0.25 m in HA, with spillway forebay side turbine building of the plant, access road to it and discharge chamber

34 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET TERMINATION START DATE DESCRIPTION (EUROS) DATE Works for irrigation use of treated water from the WWTP Orgegia, Pantanet-Etasa stretch. Mutxamel municipal Terms and Alicante. BRAVO MEDITERRANEA, S.L ,78 apr-04 aug-05 Pressure pipe, Civil engineering, Electromechanical equipment. Improvement and modernization of irrigation of the dimension 120 of the Community of Irrigators of Campo de Cartagena and rural roads Conditioning TM service Albudeite. (Murcia) CARM. C. AGRICULTURA Y AGUA ,65 apr-08 nov-09 The works seek to modernize the irrigation of the Irrigation Area Cota-120, covering the tt.mm. Cartagena, Murcia, Torre Pacheco, San Javier and San Pedro del Pinatar (not affected by the works). The relationship of actions is: - Execution of pumping station "Canal Cola". 3 groups are installed 345 kw. - Driving to "Drive Aljorra" of 5,753 m in length, 800 mm in pipe Ø HACC. - Conduit in "Channel Aljorra" of 3,565 ml, Ø 400, 600 and 700 mm in FRP pipe. - Execution of main driving unfolding ml PVC pipe, Ø 315 mm. - Execution of piping to existing service reservoir of 577 ml GRP pipe Ø 400 mm. - Execution of chests of service (6), rush (3), sectioning (1), for installation of suction cups 4 "(26), and to install drainage (5). - Installation of two output ultrasonic flowmeters to Pumping Station and bypass valve box. - Replacement of affected services and corrective measures environmental impact. Earthworks. Construction of wastewater tank Alguazas. (Murcia) CARM. C. AGRICULTURA Y AGUA ,36 nov-08 oct-09 Construction of reservoir with a capacity of 8,466 m3 for rainwater storage for later driving to the treatment plant. The foundation is done through screen walls and piles HA ICC of an approximate length of 17 m with sludge ventoníticos and a slab of 1.5 m thick. They share 15 pumps for cleaning and water oxygenation funds, and 4 breast pumps for emptying Tank Construction storms for the Cañares and Real Tertia, the Tertia (Murcia) UNITED GOLF RESORT ,63 dec-06 may-07 Storms tank of 7,250 m3 concrete building (725 m2 in plan and 10 m high) built by foundation slab 50 cm deep and 45cm screen walls and 15m deep with bombs building structure reinforced concrete waffle slab, grinding equipment equipped with self-cleaning bars, flow meters, aeration system with submersible pump and cleaning and deodorizing biological system to 12,000 m3/ hr

35 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET START DATE TERMINATION DESCRIPTION (EUROS) DATE General collector roof drainage Vinalopó River in Elche (Alicante) AYTO. ELCHE ,05 aug-01 Faug-02 Distribution network sprinkler in the land consolidation II Soto de Cerrato (Palencia) JCYL. ITACYL ,80 aug-09 **In progress Manifolds with concrete pipe diameters 2.00 and 2.50 with a section dug into mine and another 600 ml portion executed by jacking 1,100 ml The work consists of the irrigation pipeline and pvc frp pipe diameter 800 mm maximum Rolling Reservoir tank storms and ultraviolet disinfection channel of the WWTP of Yecla. Building Deodorization alivaiadero dehydration and storm tank in WWTP (Murcia) CARM. C. AGRICULTURA Y AGUA ,08 mar-08 may-09 The works consist of: - The execution of a casket delivery to storm tank and another tank rolling - Executing a rolling tank 30x18x3x75 m (2,000 m3) before entering the raw water well. - Building a storm tank of 3,000 m3 capacity in total comprising three channels 30x9, 66x3, 75 m with overflow between. - The execution of a pumping pit emptied. - The construction of a covered reservoir tertiary lamination 20x10x4, 3 m with a useful capacity of 860 m3. - Installing a disinfection treatment by ultraviolet lamps at the output of treated water. The team consists of 5 modules with 8 lamps w 250 each. - The intalacion centrifuge sludge new addition to the existing one. The work is completed with urbanization, several studies in the former waterworks, electrical installation and installation of control and automation, and the installation of emergency power. Potable water tank for Construction "Condado de Alhama". Alhama de Murcia (Murcia) ALHAMA GOLF RESORT, S.L ,02 jan-08 sep-08 Construction of a drinking water reservoir for the urb. Condado de Alhama. The structure consists of prefabricated prestressed concrete beams and slab of concrete prefabricated honeycomb plate. Impervious coatings are formed of two-component epoxy resins. Protection-component epoxy paint walls Supply to Aledo. (Murcia) M. MEDIO AMBIENTE. MCT ,35 sep-04 jan-06 Resupply Aledo (50 l / sec) by ditch driving helical weld steel pipe: ø ml 12'' (323.9 mm) ml ø 8'' (219.1 mm), pumping station w / 2 pumps of 245 kw and 380 mca + HA cylindrical tank and cover 5000m3 + junction Hollowcore ASAT, CT & LSBT.

36 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET TERMINATION START DATE (EUROS) DATE DESCRIPTION Proposed solution sewage disposal - rain collector Ha-1600 mm (s2) along the general system gg-ss4 to Reguerón channel and its connection with the S1. (Murcia) URDECON ,80 april-09 **In progress Sewage outfall of the WWTP of Jumilla (Murcia) Calasparra supply expansion. (Murcia) CARM. C. AGRICULTURA Y AGUA ,79 dec-05 dec-06 M. MEDIO AMBIENTE. MCT ,97 nov-01 apr-03 Connection Emissary town of Jumilla with the new WWTP, using class THA 135 Ø 1,000 mm, with a length of 5,495 ml. Works manufactures: collector connecting Arqueta existing outfall manhole entry and two rainwater overflows one before delivery to the WWTP and one in the middle. Running piling 35 ml Ø 1,000 rd junction with. Jumilla ring. Conditioning access to the WWTP with the improvement or creation of roads with gravel layer of 20 cm and 5 cm of MBC. Ventilation elements each 250m, consisting of brickwork with metal grilles and air entry HDPE pipe ø 315 and air outlet chimney with tapered galvanized pipe ø zero mm for exhaust. The works consist primarily of installing buried in trench 18 kilometers of ductile iron pipe with diameter: 13.1 km DN 300 mm and DN 200 mm 5.0. New channel to the hydroelectric central in Hoya Garcia, Cieza (Murcia) NUEVOS RIEGOS "EL PROGRESO", S.A ,93 nov-99 feb-00 Expansion tank connection with branches Aljorra Campo de Cartagena. (Murcia) M. MEDIO AMBIENTE. MCT ,45 aug-02 sep-03 Extending south supply network, 3000m3 Carrascoy deposits, Alhama de Murcia AYTO. ALHAMA DE MURCIA ,47 jul-04 nov-04 Construction of approx. 1 km concrete channel open rectangular section. Earthworks, carbon steel pipes with 1500 mm diameter helical welding. Groups pumping concrete structures. Valves and special items. Deposit HA "in situ" of 3000 m3, valves and 4,495 ml HDPE pipe ø 155mm, PN16, including valves, meters, elbows, tees and other hydraulic parts Cortao Cabezo Espinardo Collector. (Murcia) CARM. C. AGRICULTURA Y AGUA ,37 apr-97 jan-98 Sanitation collectors with mass concrete pipes and armed various diameters. Horizontal Jacking under the highway. Resetting services firm.

37 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET TERMINATION FECHA INICIO DESCRIPTION (EUROS) DATE General collectors in the Albujón and Aljorra, TM Cartagena (Murcia) CARM. C. AGRICULTURA Y AGUA ,80 aug-06 jul-07 The work is divided into the following actions: - Section 1: From the end point of the Albujón sanitation and Las Lomas to the WWTP 1. Reinforced concrete pipe Ø 500 mm and 125 m in length. - WWTP 1: It has 3 submersible pumps 22 kw-section 2: Driving Ebara pressure from 1 to Las Lomas, based on HDPE Ø 315 mm and 1,590 ml.- Section 3: Section in severity from the previous drive to old WWTP Aljorra concrete pipes of 500 and 800 mm, and a length of 2,041 ml. - Section 4: In half the gravity from sanitation to the old Aljorra WWTP with concrete pipe Ø 600 mm length and 520 ml. - Spillway to be constructed in the junction point of the section 3 with section 4. Mozoncillo. Emissary and WWTP. (Salamanca) JCYL. C. MEDIO AMBIENTE ,45 sep-09 **In progress Construction of WWTP outfall and Mozoncillo (Segovia). The project consists of civil works of the WWTP, building, electrical and mechanical. The pipes are mostly PVC. Modernizing irrigation irrigation community "Baroness" in Orihuela (Alicante) SEIASA MESETA SUR ,12 apr-04 jan-05 Modernization of irrigation Modernizing irrigation irrigators heredamiento Molina de Segura, E. reservoir area (Murcia) CARM. DG REGADÍOS ,98 jul-01 aug-02 Reservoir for water supply, pressure pipes, pumps, automation and remote mechanisms irrigation. Expansion tank Mazarrón (Murcia) M. MEDIO AMBIENTE. MCT ,20 sep-02 sep-03 Pipeline, water tank, and urbanization. Supply tailings Valley. Phases II, III and IV, Cartagena (Murcia) Making drinking water from pooling Taibilla and delivery channels to drive deposit PEI Alhama de Murcia for residential water supply pp Sector US "Condado de Alhama" (Murcia) AQUAGEST LEVANTE ,15 feb-06 jun-06 ALHAMA GOLF RESORT, S.L ,83 nov-08 oct-09 Pipeline, water tank, and urbanización.colocación of 2,336 meters FD pipe Ø 500 mm and 1,223 ml FD pipe Ø 250 mm, including valves and accessories. Implantation consumption control system along the entire network. Emergency works to save water by waterproofing performances in some sections of the valley ditches high. Broken ditch. (Murcia) M. MEDIO AMBIENTE. CH SEGURA ,15 nov-08 mar-10 The channel has a length of 0.5 km rectangular section. The foundation is solved with a slab of 30 cm. thick with a width of 2.50 m and two walls 20 cm thick light of 2.00 m between them. and 2.00 m high. A gate is placed for taking water to facilitate control thereof. Supplying the valley and San Jose Obrero, Cartagena. (Murcia) AQUAGEST LEVANTE ,18 jul-04 nov meters FD pipe ø 100 to 500mm including valves, Woltman meters, elbows, tees and other hydraulic parts

38 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET TERMINATION START DATE DESCRIPTION (EUROS) DATE Rainwater collector Calle Real de Cartagena. (Murcia) AQUAGEST LEVANTE ,00 jun-03 oct-03 Demolition firm, trench excavation, with exhaustion, shoring and piling where necessary to pipe fitting ø HA , HDPE, PVC and Ductile Iron in the town. External drainage of rainwater CTCC AES, tailings, Cartagena. (Murcia) Large surface drainage on the embankment on the right side of the Oak Tunnel. (Alicante) Potable water tank of 5,000 m3 in the "Aigua Rius" in Elda. (Alicante) Project 05/03 Variant new Channel Alicante, section III, Part 1, in Elche (Alicante) INITEC ,75 apr-04 may-04 M. FOMENTO. DG FERROCARRILES ,47 jan-02 may-02 GENERALITAT VALENCIANA ,26 may-01 may-02 M. MEDIO AMBIENTE. MCT ,00 may-03 dec-03 Stormwater network outside the Power Plant, by HA pipe ø class Earthworks, drainage networks concrete channels. Gabion walls and breakwaters. Earthworks, reinforced concrete structures. Supply pipes, boilers and valves. Waterproofing. Jacking made with reinforced concrete pipe 3000 mm diameter Class IV, interior treatment and injection of joints with cement mortar and dismantling of all the above and even demolition of reinforced concrete parts, completely finished, clean and ready to house inside steel pipe. Channelling Rambla del Derramador in Elda. (Alicante) Renewal messed networks in the City center of Torre Pacheco. (Murcia) Deposit and Drive for drinking water Cotillas Towers. (Murcia) Extension of Supply to Fortuna (Murcia) AYTO. ELDA ,81 mar-99 sep-99 AYTO. TORRE PACHECO ,07 sep-04 feb-05 CARM. C. AGRICULTURA Y AGUA ,25 dec-97 sep-98 Earthworks, Channelling promenade with gabion factory works. Replacement of 7,280 ml PE pipe ø 90 and 200, PN 16 and FD 125 Water tanks. Ductile iron pipe discharge M. MEDIO AMBIENTE. MCT ,50 sep-02 nov-03 Conduit casting, pump and water tank Collector Ronda Avenue. (Alicante) AYTO. ELDA ,11 mar-99 sep-99 Manifolds with mass concrete pipes. Drive and sewage pumping. Resetting services firm. Supply and distribution pipes Tallante bulges and Ports, Cartagena. (Murcia) Renewal arterial pipe DN 800 DN 600 matubo with fair stretch Paterna cemetery. (Valencia) AQUAGEST LEVANTE ,42 jul-04 nov-04 AGUAS DE VALENCIA ,92 apr-10 **In progress 2800 meters FD pipe ø 100 to 300mm including valves, meters, elbows, tees and other hydraulic parts 1,000 m3 tank park in Paterna pigeon shooting. (Alicante) AQUAGEST LEVANTE ,95 Pending ** Driving water transport between the tank and Sucina Trajectum Meuse. (Murcia) AYTO. MURCIA. EMUASA ,14 aug-06 mar-07 Driving buried in trench 6225 meters FD pipe ø 300 mm k-9, which runs largely on the service road of the C-3319, not including supply of pipe. System expansion Lorca Puerto Lumbreras and Eagles. Expanding the starter elevation (Murcia) Channelling Canyon Phase I La Cala Finestrat (Alicante) M. MEDIO AMBIENTE. MCT ,31 feb-02 aug-02 GENERALITAT VALENCIANA ,18 oct-00 jul-01 installation of potable water pumping with powerful pumps Earthworks, roadworks. Masonry walls, irrigation network.

39 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET TERMINATION START DATE DESCRIPTION (EUROS) DATE Potable water tank of 6000 m3 in Altea (Alicante) Abanilla siphon Extension on Canal del Segura (Murcia) Collector and WWTP Homes Galiana. Hondon de los Frailes. (Alicante) GENERALITAT VALENCIANA ,38 nov-98 jun -99 M. MEDIO AMBIENTE. MCT ,88 aug-02 aug-03 DIP. ALICANTE. PROAGUAS COSTABLANCA ,44 nov-01 jun-02 Earthworks, reinforced concrete structures. Supply pipes, boilers and valves. Waterproofing. Helicosoldado steel pipe of large diameter. Concrete structures. Valves and special items Earthworks, reinforced concrete pipes. Wastewater treatment station (flow = 210 m3 / d). Sewerage and collector, drive existing network, reactor - separator, pumping house and grounds. Channel utilization Hydraulic and Hydroelectric San Diego, municipality of Isso (Albacete). ELECTRO SAN DIEGO, S.A ,87 jun-00 dec-00 Channelling Rambla La Melva. (Alicante) AYTO. ELDA ,94 mar-01 oct-01 Channelling and right bank stabilization Jalon town of Benichembla Tranche (Alicante) Water Supply District of St. Joseph the Worker. (Murcia) GENERALITAT VALENCIANA ,29 apr-98 nov-98 AYTO. CIEZA ,38 mar-99 dec-99 New tank Rojales (Alicante) M. MEDIO AMBIENTE. MCT ,45 aug-96 dec-97 Canal Refurbishment concrete and conditioning in power plant. Earthworks, Channelling boardwalk with concrete walls. Earthworks, reinforced concrete walls and precast. Supply and sewage pipelines. Gardening. Demolition firm with cobblestone sidewalks pavements, supply replenishment. Pipeline pressure pipe welded steel helical ø 1500 mm. Concrete structures. Valves and special parts. Local improvement. Replacement pipes 0 and 1 section of the motorway Murcia - Alicante. (Murcia) Channelling boulevard "El Sapo" from the Railways Alicante-La Encina P.E.R.I. Elda Vinalopó River. (Alicante) Improving Network potable water Hondon de las Nieves. (Alicante) Improved supply network in districts of Alhama de Murcia Fitness and slope protection against erosion in the Jewish Rambla Abarán Barranco. (Murcia) Expansion tank Guardamar del Segura. (Alicante) Emergency works to repair damage from flooding in the Rambla de Benipila in Cartagena. (Murcia) Red Gold Jug supply-path of the Turkeys, Alhama de Murcia. (Murcia) M. FOMENTO. DG CARRETERAS ,51 dec-94 sep-95 AYTO. ELDA ,29 mar-98 dec-98 Supply lines. Casting pipes Ø 700 and Ø 350 and Ø 700 Fiberglass. Horizontal Jacking Ø 1000 mm, under the highway A-7 Excavations and large diameter pipe and concrete frames. DIP. ALICANTE ,48 jun-98 oct-98 Cast iron pipes, valves and special pieces. AYTO. ALHAMA DE MURCIA ,81 jul-04 nov-04 CARM. C. AGRICULTURA Y AGUA ,66 feb-00 nov-00 M. MEDIO AMBIENTE. MCT ,40 jun-96 jul-97 M. MEDIO AMBIENTE. CH SEGURA ,99 mar-01 jun-01 AYTO. ALHAMA DE MURCIA ,90 jul-04 nov meters of 160mm dia HDPE pipe, PN16, including valves, counters, elbows, tees and other hydraulic parts Channelling promenade with reinforced concrete caissons, replacement services and urbanization Pipeline pressure pipe welded steel coil. Concrete structures. Valves and special parts. Earthwork, masonry walls, replacement of services 3264 meters of 160mm dia HDPE pipe, PN16, including valves, meters, elbows, tees and other hydraulic parts

40 EXPERIENCE IN WATER WORKS PROJECT CLIENT BUDGET TERMINATION START DATE (EUROS) DATE DESCRIPTION Construction of a reservoir, reinforced concrete rectangular and 3,000 cubic meters capacity and New deposit Cox (Alicante) M. MEDIO AMBIENTE. MCT ,12 aug-96 jul-97 connecting the pipes helicosoldado steel pressure. Supply Expanding the Vega Baja del Segura. New deposit Callosa de Segura. (Alicante) M. MEDIO AMBIENTE. MCT ,16 sep-00 oct-01 Construction of new reservoir and water supply improvement Ondara. (Alicante) GENERALITAT VALENCIANA ,33 jan-01 jul-01 Extension of supply to Ceuti. (Murcia) M. MEDIO AMBIENTE. MCT ,98 sep-94 mar-95 Concrete structures. Valves and special parts Earthworks, reinforced concrete structures. Supply pipes, boilers and valves. Waterproofing. Earthworks, reinforced concrete structures. Supply pipes, boilers and valves. Waterproofing. Excavation in trenches. Supply line. Fibrocement Ø 350. Reinforced concrete manholes and valves. Construction project 01/08 flow measuring uptake of ETAP balsón campotejar in Molina de Segura. (Murcia) M. MEDIO AMBIENTE. MCT ,16 apr-10 **In progress Situ concrete manhole 8.5 x 5 x 4.1 m, equipped with lighting and flow measurement equipment, valves and a dismantling, everything in diameter 1500 mm. Arroyo's Gollizo Conditioning Riopar. (Albacete) District Collector Raft General Lino spillway in Molina de Segura. (Murcia) Connections between the pumping stations of the emissaries head North in La Manga. (Murcia) M. MEDIO AMBIENTE. CH SEGURA ,32 mar-00 oct-00 CARM. C. AGRICULTURA Y AGUA ,15 feb-00 may-00 CARM. C. AGRICULTURA Y AGUA ,11 feb-99 apr-99 Channelling promenade with masonry. Works factory and street furniture. Manifolds with PVC pipes large diameter factory Works, firm demolition, excavation and shoring. Polyethylene Pipes. Excavations in trench systems water table reduction. Boiler installations and fittings. Enhanced channeling of Rambla del shedder in Elda. (Alicante) AYTO. ELDA ,15 sep-98 jan-99 Earthworks, Channelling promenade with gabion factory works. Replacing dn 80 mm pipe for drinking water in Torre Pacheco. (Murcia) Improving the supply network and improving sanitation network C / Huerta Zuera girl. (Zaragoza) Automation drinking water network, Phase II in the Port of Cartagena. (Murcia) POLARIS WORLD ,03 Pending ** 0 AYTO. ZUERA ,32 Pending ** 0 M. FOMENTO. AUTORIDAD PORTUARIA DE CARTAGENA ,79 feb-01 may-01 Excavations in trench, iron pipes, valves and automation Repair of infrastructure between PK13, 150 and 16,500 Crevillente channel. Municipality of Crevillente. (Alicante) M. MEDIO AMBIENTE. CH SEGURA ,00 nov-00 dec-00 Infrastructure repair, by digging, sanitizing, waterproofing and concrete slab replacement. General Networking Replacement of drinking water in the hamlet of Comala of Molina de Segura. (Murcia) Emergency Works for the construction of a new collector output of Alzira-Carcaixent Edar. (Valencia) AYTO. MOLINA DE SEGURA ,80 feb-98 jun-98 Red water supply districts with PE pipe High Density GENERALITAT VALENCIANA. EPSAR ,14 dec-08 apr-09 0

41 EXPERIENCE IN WATER WORKS PROJECT Drinking water redotación lower area of Tertia-Lorca (Murcia) CLIENT BUDGET (EUROS) START DATE TERMINATION DATE AYTO. LORCA ,84 FEaug-97 Pressure Pipe Conduit. DESCRIPTIONN Bending the Major Azarbe Zarandona. (Murcia) AYTO. MURCIA ,49 may-95 oct-95 Concrete structures and slabs. Forward Rambla Cañadica in Aledo. (Murcia) CARM. C. AGRICULTURA Y AGUA ,63 dec-96 dec-97 Sanitation collectors with mass concrete pipes and armed various diameters. Resetting services firm. Forward irrigation pipe located on the northwestern edge of the AI "West" Sewer. (Murcia) Channelling promenade in University Campus area. (Murcia) Court of reeds and weeds, and conditioning in several wadis. (Murcia) Platform Conditioning and aqueduct pipe replacement in the Sierra of Water (Albacete). M. VIVIENDA. SEPES ,83 apr-01 jun-01 AYTO. MURCIA ,98 jul-99 aug-99 M. MEDIO AMBIENTE. CH SEGURA ,97 nov-01 dec-01 M. MEDIO AMBIENTE. CH SEGURA ,61 jul-01 aug-01 Earthworks and pipes with PVC pipes Reinforced concrete pipes Ø Works factory and earthmoving Clearing, clearing of vegetation, clearing drag materials. Channelling masonry platform and pipeline. Upgrade and refurbishment of channels in UNIVERSIDAD DE MURCIA ,94 oct-97 nov-97 Earthworks, roadworks Espinardo. (Murcia) Condictioning several on-site reservoir Mayes, Repair walls and various fittings. Municipal District of eyes (Murcia) M. MEDIO AMBIENTE. CH SEGURA ,75 nov-01 dec-01 Sewerage of runway, gutters and sidewalks in the section III, the main channel of the righthand margin of Alhama de Murcia. (Murcia) M. MEDIO AMBIENTE. CH SEGURA ,88 jan-01 feb-01 Clearing and preparation of curbs and sidewalks.

42 CLIENT: AGUAS DE LA CUENCA DEL SEGURA, S.A. WORK: Channelling Benipila Rambla de Cartagena. Murcia

43 CLIENT: NUEVOS RIEGOS EL PROGRESO S.A. PROJECT: New channel for Hoya Hydroelectric Garcia. Murcia

44 CLIENT: AYTO. ELDA WORK: Channelling boulevard "El Sapo" from the Railways Alicante-La Encina P.E.R.I. Vinalopó River. Alicante

45 CLIENT: TRASAGUA WORK: channel screed Tajo - Segura River Fields. Murcia

46 CLIENT: MINISTERIO DE MEDIO AMBIENTE - MANCOMUNIDAD DE LOS CANALES DEL TAIBILLA WORKS: Expansion tank Guardamar del Segura. Alicante CLIENT: REGIÓN DE MURCIA, CONSEJERÍA DE MEDIO AMBIENTE - D.G. DEL AGUA PROJECT: Deposit and Drive for drinking water supply "Cotillas Towers". Murcia

47 CLIENT: RIEGOS DEL VINALOPÓ, S.L. WORK: Hydropower in the Acequia de Berberin, Calasparra. Murcia

48 CLIENT: MINISTERIO DE MEDIO AMBIENTE -DG. AGUA WORK: Infrastructure Modernization hydraulic sector of Lorca and Valle VIII Guadalentin

49 CLIENT: MINISTERIO DE MEDIO AMBIENTE - ACUAMED PROJECT: Plant denitrification of L'Eliana, Valencia

50 CLIENT: JUNTA DE CASTILLA Y LEON WORK: Modernization Channel Paramo, sections V and VII

51 CLIENT: MINISTERIO MEDIO AMBIENTE. ACUAMED. WORK: Section 41 of the NHP. Cumulated 1: Start End Sifon Segura Aqueduct Campos del Rio

52 CLIENT: AYUNTAMIENTO DE ALHAMA DE MURCIA WORK: Supply Network Expansion. Carrascoy deposit 3,000 m3 in Alhama de Murcia

53 CLIENT: REGIÓN DE MURCIA, - D.G. DE REGADIOS WORK: Modernization irrigated areas irrigators heredamiento Molina de Segura. Reservoir Area E.

54 CLIENT: AYTO. ELDA WORK: Channelling Ramble The Melva in Alicante

55 CLIENT: GENERALITAT VALENCIANA WORK: Potable water tank of 6000 m3 in Altea. Alicante

56 CLIENT: MINISTERIO DE MEDIO AMBIENTE D. G. O. HIDRÁULICAS WORK: WWTP of Los Alcazares. (Murcia)

57 CLIENT: MINISTERIO DE MEDIO AMBIENTE D. G. O. HIDRÁULICAS WORK: WWTP of Los Alcazares. (Murcia)

58 CLIENT: LA TORRE RESORT DEVELOPMENT, S.L. (POLARIS WORLD) WORK: WWTP of La Torre, Torre Pacheco. (Murcia)

59 CLIENT: LA TORRE RESORT DEVELOPMENT, S.L. (POLARIS WORLD) WORK: WWTP of La Torre, Torre Pacheco. (Murcia)

60 CLIENT: EL VALLE GOLF RESORT, S.L. WORK: WWTP of El Valle, Baños y Mendigo. (Murcia)

61 CLIENT: EL VALLE GOLF RESORT, S.L. WORK: WWTP of El Valle, Baños y Mendigo. (Murcia)

62 CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA WORK: WWTP of Jumilla. (Murcia)

63 CLIENT: POLARIS WORLD WORK: WWTP of Condado de Alhama, Alhama de Murcia (Murcia)

64 CLIENT: POLARIS WORLD WORK: WWTP of Condado de Alhama, Alhama de Murcia (Murcia)

65 CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA WORK: WWTP of Caravaca de la Cruz. (Murcia)

66 CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA WORK: WWTP of Caravaca de la Cruz. (Murcia)

67 CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA WORK: WWTP of Caravaca de la Cruz. (Murcia)

68 CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA WORK: WWTP of de Abarán. (Murcia)

69 CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA WORK: WWTP of Abarán. (Murcia)

70 CLIENT: ESAMUR WORK: Adaptation and improvement Abanilla WWTP. (Murcia)

71 CLIENT: GENERALITAT VALENCIANA WORK: Improving WWTP Hondon de las Nieves. (Alicante)

72 CLIENT: GENERALITAT VALENCIANA WORK: Improving WWTP Hondon de las Nieves. (Alicante)

73 MAIN OFFICES: Avda. Juan Carlos I, 55. Edificio JC1. Planta Murcia (SPAIN - EU). Telephone:

1.- Company Presentation. 2.- Contractor Classification. 3.- Quality Certifications. 4.- Work experience more important. 5.- Projects Information

1.- Company Presentation. 2.- Contractor Classification. 3.- Quality Certifications. 4.- Work experience more important. 5.- Projects Information HEALTH January 2013 TABLE OF CONTENTS 1.- Company Presentation 2.- Contractor Classification 3.- Quality Certifications 4.- Work experience more important 5.- Projects Information 1. Company Presentation

More information

EDUCATIVE CENTERS January 2013

EDUCATIVE CENTERS January 2013 EDUCATIVE CENTERS January 2013 TABLE OF CONTENTS 1.- Company Presentation 2.- Contractor Classification 3.- Quality Certifications 4.- Work experience more important 5.- Projects Information 1 1. Company

More information

BUILDINGS January 2013

BUILDINGS January 2013 BUILDINGS January 2013 TABLE OF CONTENTS 1.- Company Presentation 2.- Contractor Classification 3.- Quality Certifications 4.- Work experience more important 5.- Projects Information 1. Company Presentation

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

Jay R. Smith Mfg. Co.

Jay R. Smith Mfg. Co. Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation Technical Support for Procurement and Project Management and Private Sector Participation to the Ministry of Water and Irrigation, Water Authority of Jordan and the Jordan Valley Authority Support for

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is ~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

SECTION 108 - INLETS 108.1 INLET LOCATIONS

SECTION 108 - INLETS 108.1 INLET LOCATIONS Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND

More information

Sewerage Operation and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section

Sewerage Operation and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section Sewerage Operation and Maintenance Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section About the sewer system facilities About the operation and

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

SECTION 15 FLOODPLAIN MANAGEMENT

SECTION 15 FLOODPLAIN MANAGEMENT SECTION 15 15.1 Purpose Certain areas of the City of Gardiner, Maine, are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

CHAPTER 32 PLUMBING CODE

CHAPTER 32 PLUMBING CODE CHAPTER 32 PLUMBING CODE 32.01 DEFINITION Plumbing for the purpose of this chapter is hereby defined as follows: (a) As is stated in Section 145.01 (1), (a), (c), (d), and (e) of the Wisconsin Statutes.

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Module 3: Sewer Material Lecture 3: Sewer Material

Module 3: Sewer Material Lecture 3: Sewer Material Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting

More information

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m.

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. Needs Assessment and Recommendation - Wholesale Water Utility Billing and Information Management Software Application

More information

Module 3 : Sewer Material. Lecture 3 : Sewer Material

Module 3 : Sewer Material. Lecture 3 : Sewer Material 1 P age Module 3 : Sewer Material Lecture 3 : Sewer Material 2 P age 3.1 Important Factors Considered for Selecting Material for Sewer Following factors should be considered before selecting material for

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES 1.0 GENERAL 1.1 Article 12 of the Suffolk County Sanitary Code requires that toxic/hazardous material

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

District Cooling Best Practices Piping Systems

District Cooling Best Practices Piping Systems District Cooling Best Practices Piping Systems International District Cooling Conference January 14-17, 2007 Abu Dhabi, United Arab Emirates Bryan Kleist Agenda Chiller Water Piping Materials Pipe Insulation

More information

Real Estate Dossier. Intermodal Station Area Master Plan of Zaragoza G-44-2 Area. El Portillo Area Master Plan of Zaragoza G-19-1 Area

Real Estate Dossier. Intermodal Station Area Master Plan of Zaragoza G-44-2 Area. El Portillo Area Master Plan of Zaragoza G-19-1 Area Real Estate Dossier Intermodal Station Area Master Plan of Zaragoza G-44-2 Area El Portillo Area Master Plan of Zaragoza G-19-1 Area Arcosur Area Master Plan of Zaragoza 89/3 Area Zaragoza Alta Velocidad

More information

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

GRP Pipe systems. for Water, Sewage and Industrial Applications

GRP Pipe systems. for Water, Sewage and Industrial Applications GRP Pipe systems for Water, Sewage and Industrial Applications AMIANTIT Group of Companies The AMIANTIT Group is an internationally operating organization with a track record of growth-oriented success.

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

New River Cleanup. Progress & Emerging Threats

New River Cleanup. Progress & Emerging Threats C R W Q New River Cleanup Progress & Emerging Threats C B California Regional Water Quality Control Board- Colorado River Basin Jose L. Angel, Principal Engineer, Assistant Executive Officer 1 New River

More information

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated

More information

Septic Tank to Cistern Conversions. Saving Water & Saving Money

Septic Tank to Cistern Conversions. Saving Water & Saving Money Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater

More information

SECTION 221413 FACILITY STORM DRAINAGE PIPING

SECTION 221413 FACILITY STORM DRAINAGE PIPING SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

Introduction to the Envision Sustainability Rating System

Introduction to the Envision Sustainability Rating System THE ENVISION RATING SYSTEM Introduction to the Envision Sustainability Rating System Russell Moore, PE, ENV SP Richard Gomez, PE, MSEM, ENV SP test APWA Public Works Conference Richmond, CA November 2015

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

Presenting the Cubierta Solar Project

Presenting the Cubierta Solar Project Presenting the Cubierta Solar Project Sale of Cubierta Solar warehouses at the Alhama de Murcia Industrial Estate (Spain) TURN KEY PROMOTION INTRODUCTION Introduction What is Cubierta Solar? It is a sustainable

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

APPLICATION FOR NEW CONSTRUCTION

APPLICATION FOR NEW CONSTRUCTION CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT

More information

Sewage Compliance Form Instructions

Sewage Compliance Form Instructions CITY OF JOHNSTOWN DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT 401 MAIN STREET ROOM 200 JOHNSTOWN, PA 15901 814-533-2017 FAX 814-539-5816 RENEE K. DALY DIRECTOR Sewage Compliance Form Instructions 1)

More information

Suffolk County Department of Health Services. Division of Environmental Quality

Suffolk County Department of Health Services. Division of Environmental Quality Suffolk County Department of Health Services Division of Environmental Quality Guidelines For the Construction of Storage Areas for Portable Containers ~~~~ Clare B. Bradley, M.D., M.P.H. Suffolk County

More information

FLOOD DAMAGE PREVENTION ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated

More information

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance 02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP CONTENTS 1. Site address... 3 2. Background... 4 3. Scope of work... 4 4. General conditions... 5 4.1 Materials,

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco

More information

Sewerage Management System for Reduction of River Pollution

Sewerage Management System for Reduction of River Pollution Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

SHORELINE SANITATION

SHORELINE SANITATION Septic System Report On:

More information

Facing The Challenges In Houston s Water System: Past, Present, and Future

Facing The Challenges In Houston s Water System: Past, Present, and Future Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

See Appendix A for additional information, or contact ASTM directly.

See Appendix A for additional information, or contact ASTM directly. DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information