User experience prototype requirements PROJECT MANAGEMENT PLAN
|
|
- Charles Gibbs
- 8 years ago
- Views:
Transcription
1 Tallinn University Institute of Informatics User experience prototype requirements PROJECT MANAGEMENT PLAN Authors Roger Puks Erkki Saarnit Ekaterina Shafeeva Maria Angelica Medina Angarita Lecturer Peeter Normak, PhD Tallinn, fall 2015
2 Introduction A team of four students of the Human Computer Interaction master programme of Tallinn University, have identified the need to develop requirements for a user interface in the period corresponding to the academic fall semester of 2015, by conducting an extensive literature review and analysing previous similar projects to model structured requirements that can be used for prospective user experience research studies. This expressed needs analysis derived from a review of the previous efforts to understand user experience, group brainstorming, different observations of the team regarding their experience in user interface and an understanding of some of the students needs from the department of informatics in Tallinn University. Project Management Approach The Project Manager, Erkki Saarniit, has the overall authority and responsibility for managing and executing this project according to the Project Plan. The project team will consist of members with experience in programming, graphic design and user experience. The project manager will also work with all resources to perform the project planning. All project and additional management plans will be reviewed and approved by the project sponsor before they are executed in order to have better performance (10 Tips for Project Management Prosperity, 2015). Objective The main goal for the project is to develop the requirements for a user interface prototype, which is needed for a Tallinn University research project to assess the influence of web interface interactions on user experience across different devices. Project Scope Project Purpose & Justification 1
3 The project has been created to speed up the workflow of development and design teams when creating user interface prototypes. The objectives of this project are as follows: To study different interface elements in order to gain input. To create a set of user interface prototype requirements through different means. To evaluate the final outcome in a hypothetical project. Project Description The project shall be divided into three standalone milestones, with the final milestone being the successful production of the examples of user interface prototype requirements. The initial milestones of the project are as follows: Understanding needs, interviewing and further studies Investigating devices and interfaces Developing requirements for designers and developers, writing user stories Feedback, debriefing and next steps Project deliverables The following deliverables must be met upon the successful completion of the project. Any changes to these deliverables must be approved by both the project manager as well as the sponsor. A detailed study on different UI elements across various devices. Set of usable UI prototype requirements. Staffing Management Plan Most of the work within this project will be performed internally in the team. Staffing requirements include the following: Project Manager (1 position) the project manager will be responsible for the principal management for the Project. However, all the team members will aid with the planning, creating, and managing all work activities, variances, tracking, reporting, communication, performance evaluations and internal coordination. Also, all resources must be approved by the manager 2
4 before beginning any project work. Other responsibilities include assisting with risk identification, determining impacts of change requests, and weekly status reporting. Programmer (1 position) the programmer will be responsible for coding assessment and for assisting the Project Manager for checking quality control and assurance of technological standards. He will also be responsible for maintaining quality control and assurance logs throughout the project. UX designer (1 position) the UX designer will be responsible for creating and tracking quality control and assurance standards. She should also compile all project documentation and reporting into organizational formats regarding UX. Graphic designer (1 position) the graphic designer is responsible for creating any type of visual support the project needs. She will also be responsible for ensuring all graphical needs are met by the actual end-users of the prototype. All testing resources should be coordinated. The project team list is the following: Name Title Skype Erkki Saarniit Project Maria Angelica Medina Angarita Graphic Ekaterina Shafeeva UX Roger Puks In addition to the main team, external experts will be used to get feedback to the idea and prototype s requirements, and to help iterating the project to next steps. Milestone List The below chart lists the major milestones for the UX requirements Project. This chart consists only of major project milestones and smaller milestones are not included on this chart but are 3
5 included to the project time-schedule. If there are any scheduling delays or any approved changes to these milestones, then the project team will be informed by the project manager. Milestone schedule MILESTONE DESCRIPTION DATE Complete Requirements Gathering All requirements are determined and presented in class (Needs Analysis, Project Plan, Risk Analysis) 15/10/2015 Developing requirements for designers and developers, writing user stories Initial requirements set is made and iterated at least two times with the help of external experts 20/11/2015 Feedback and debriefing, next steps Final iteration done with external experts; examples of requirements done and validated with experts 08/12/2015 Communications Management Plan This Communications Management Plan sets the communications scope for this project. This plan identifies and defines the roles of UX requirements project team members as they approach the communications and will be updated according to communication change. The communications matrix which is presented in the plan maps the communication requirements of this project. The Project Manager will take the lead role in ensuring effective communications on this project. The communications requirements are documented in the Communications Matrix below. The Communications Matrix will be used as the guide for what form of communication to use in what situation. Communication management plan: Communication Description Frequency Format Participants/ Deliverable Owner Type Distribution Everyday discussions Questions and answers to daily issues when needed Skype Project team Answers to questions in Project Manager 4
6 Skype Weekly Status Report summary of project status Weekly Project team Status Report Project Manager Weekly Project Team Meeting Meeting to review action register and status Weekly Skype Project team Updated Action Register Project Manager Project Bi-Weekly Review (PBWR) Present metrics and status to team Every two weeks In Person Project team Status and Metric Presentation Project Manager Project Gate Reviews Present closeout of project phases and kickoff next phase when needed In Person Project team Phase completion report and phase kickoff Project Manager Technical Design Review Review of any technical designs or work associated with the when needed In Person Project team Technical Design Package Project Manager project Communication Conducts Meetings (face-to-face) All the meeting will be scheduled in advance be Project manager and at least the 2 days prior to any scheduled meeting agenda should be send to all participants. The meeting participants include timekeeper (this role requires to ensure that the team follow the agenda) and the recorder (this role requires to take all the notes during the meeting and send it to all team members after the meeting). should be sent to the correct project participants according to the communication matrix above based on its content. The Project Manager should be included on any pertaining to the project. Informal Communications (Skype): On a daily basis, the members of the team communicate on Skype about the updates on the project. All members of the team live under the same time schedule, but in different physical locations, therefore the chat is the best option to discuss everyday issues. 5
7 Project Scope Management Plan The objective of the project will rely on creating a solution to discrepancies between different UI web models, leaving out user experience or user engagement evaluations, nor any other evaluation of a current trend. The management scope for the UX requirements Project will not be the sole responsibility of the Project Manager. The Project Manager and all team members will establish and approve documentation for measuring project scope which includes deliverable quality checklists and work performance measurements. Proposed scope changes may be initiated by the Project Manager or any member of the project team. Resource Calendar The UX requirements Project will require all project team members for the entire duration of the project although levels of effort will vary as the project progresses. The Project is scheduled to last about 2 months with 8 hour work weeks. Fig. 1. Project plan Time-table. 6
8 Plans for dissemination/exploitation of the results Through several iterative sessions, the project is expected to conclude with a thoroughly constructed set of requirements for preparing, designing and finalising web user interface prototype. The iterativeness of the work process shall guarantee that all challenges met during the work process shall be dealt with before finalizing the results and finishing the project. The short term goal of the project shall be for the user interface requirements to be created and released, with them emphasizing on design, meaning that the requirements could be useful for various different segments of web development - online commerce, gaming, tools etc. The long term goal would be for these requirements to remain valid for as long as possible. Creating a set of user interface requirements that remain valid indefinitely cannot be done, since the field is ever-changing. Potential impacts Due to the informatic nature of the project, and regarding different aspects of the project environment (PESTLE analysis), there are three main areas in which the project can influence the most: economical, social and technological. Market and user opportunities The market can be considered as the community of web developers. Consequently, the requirements for the prototype are based on the needs of web developers. Furthermore, the needs of web developers are influenced about new technological possibilities, which, in this case, are limited by different standards used in web, such as capabilities of HTML, CSS and JavaScript, but also operation systems and web browsers. Social impact The social need of such prototypes is based on the community of web developers. Higher interaction level among developers and larger wide-spread codebase allows to save time and 7
9 money and helps developer to focus on the main functionality, at the same time using the newest technological capabilities. Socially all counterparties of the web development, starting from the investor and ending with the end user, are really interested the the solution that is provide is stable. Usually it means that sufficient number of people have tested some solution in different devices, and, therefore, the production versions are considered stable and probably easily scalable. Economical advantage As mentioned before, effective web development means higher efficiency and lower development costs. Nevertheless, the sponsors of projects need to balance between the budget and the scope of the project. It means that actually not only what, but also how to develop, is an economic decision that financiers of the project need to understand. Usually the sponsors are not aware of technical details and it is difficult to tell whether one solution that take more time is actually financially better than the other version that takes less development hours. Hence, the research of the prototype will actually try to find out which effort has more influence of user experience, and which has less. The later held research that is not part of this project will target to answer some of those questions. The end results should be to give the investor some idea of what extra work is worth the hours. In order to develop such prototypes so that they could be studied accordingly, sufficient rules and requirements need to be set for designers and developers in order to reach the wanted end result. Budget Due to the academic character of the project, there is no obvious expressed necessity for sponsors, and the time invested by the students will not be translated into financial statements. In the case of needing a high sum of money (which is not seen by any means necessary in any aspect of the project), authorities of the department of informatics of Tallinn University will be contacted. Nevertheless, we can assess the price of such work would be around 50 EUR per hour, and considering the amount of hours spent, which is 164, we can calculate 50x164 = 8200 EUR. 8
10 The following list contains a summary budget based on the planned cost components and estimated costs required for the successful completion of the project. Combined hours of work from all the team members 8200 EUR Communal services of the Interaction Lab 50 EUR Technological instruments 2000 EUR TOTAL budget EUR None of the budget items will be actually paid out to anyone. The estimates are based on the assumption that if the project would be outsourced, what could be the project costs. Risk Management Plan In a case of a risk, a methodical process by which the project team identified, scored, and ranked the various risks was considered, however, it was never necessary to take it into account. Every effort was made to proactively to identify the risks before they occur to implement a mitigation strategy, however, the risks that were presented were either expected or quickly solved. Weaknesses such as the lack of time by some of the group members or threats like the lack of experts time were relieved by planning the resources ahead and carefully. Even when there 9
11 were only bi weekly personal meetings, the communication on skype and was constant, having a casual character on the first and formal in the former. One of the other difficulties that were expected was how to contact experts in the field. Most of them had busy schedules and could only agree to cooperate if they could see they could also benefit from the results of the project. However, this was expected and the project was taken into accomplishment without any damage. Not being able (or not coming up with the idea on time) to communicate the progress of the project didn't allow us to receive appropriate feedback from our classmates, which at the end didn't cause a big impact to the project, however, it may have been useful and perhaps change the outcome of the project to a more inter-institutional result. Summary Using different frameworks and libraries has become increasingly popular amongst developers due to the fact that it allows them to save valuable time and effort on something that has already been done by someone. The same logic goes for user interface requirements during each project, even if the UI characteristics remain the same, different teams tend to re-evaluate these interfaces, often coming up with identical results. This is the reason why there is a need to create a set of user interface requirements that could be used every time a certain standard type of UI is bound to be created. What this project has achieved can be considered as a successful set of requirements in order to provide a better understanding of how to design web prototypes. In a matter of a couple of months we were able to conduct in deep research from different and various sources and to organize the actions of the team members at the same time. We also had to learn how to check our behaviour and progress in order to have better control and to have better direction (Mochal 2015). References 10 Tips for Project Management Prosperity. (n.d.). University Alliance. Retrieved November, 2015, from 10
12 Mochal, T. (n.d.). 10 best practices for successful project management - TechRepublic. Retrieved November, 2015, from 11
13 Appendix 1. Needs analysis Technological performance gap As hardware gets more advanced each year and the web becomes more popular, including sophisticated platforms for developing usable systems, web developers are constantly moving towards focusing on the essence of the solutions such as functionality, rather than small technological details. Therefore, different libraries are being more used. In other words, developers do not have to reinvent the wheel. If someone has already developed a working solution, which on community based open source development gets better each week, there is no need for a developer to write code for simple yet technically complicated functionality, e.g. the number of lines of code needed to make a smooth slider is probably in hundreds of thousands, similar to the number of hours spent on writing it. When using libraries, such code can be easily written with one line of code and one minute of time spent on it, making development quicker, cheaper and more effective. Prospective content of the project A detailed set of requirements for constructing user experience prototypes to evaluate the engagement using different web interfaces. At the end of the project, a list of requirements along with, possibly, a mock up of a prototype exemplifying them would be presented. Requirements Financial Due to the academic character of the project, there is no obvious expressed necessity for sponsors, and the time invested by the students will not be translated into financial statements. In the case of needing a high sum of money (which is not seen by any means necessary in any aspect of the project), authorities of the department of informatics of Tallinn University will be contacted. 12
14 Technologies necessary for running the project. Every member of the time already has a computer for conducting the literature review and the Interactive Laboratory of Tallinn University contains as well many instruments (such as eyetracking technologies) to execute different experiments. The team of students that are part of the group also posses experience in User experience evaluation, user engagement, and information architecture, necessary to finalize the project. Expected performance To determine the success of the project, it would be necessary to put it in the service of web developers, researchers and the public to implement several user experience evaluations. The mock up of the prototype should also work accordingly. SWOT analysis The main strength of the project is the amount of the experience combined of the members of the group in the design of user interfaces. Two of the most important opportunities are the chance to contribute to the advancement of HCI and help classmates and other HCI students to finalize their user experience research projects. However, weaknesses such as the lack of time by some of the group members or threats like the lack of sponsors must be relieved by asking for the help of higher authorities in the department of informatics of Tallinn University. Prospective needs analysis Regarding the technological part, the project for developing specifications for the prototype, the preliminary work needs to analyse what are the actual needs of web developers and decision makers in this area, e.g. what topics in web development process mostly raise conflicts between scope and budget. This should give an answer to what kind of prototype would be most beneficial for the development project community. In the future, the wide selection of different devices should be studied e.g. what type of devices are used mostly for web browsing, especially for web interactions (as the scope must be limited 2 or 3 devices should be chosen for the research). 13
15 In the interest of relating the previous two aspects and start writing requirements, the last phase of specifying the project details is to find the combinations of web interface interactions and devices, which would give a clear set for what prototype to develop and how to develop it. 14
User experience prototype requirements FINAL REPORT
Tallinn University Institute of Informatics User experience prototype requirements FINAL REPORT Authors Roger Puks Erkki Saarnit Ekaterina Shafeeva Maria Angelica Medina Angarita Lecturer Peeter Normak,
More informationPROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
More informationLMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012
PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 TABLE OF CONTENTS INTRODUCTION... 2 PROJECT MANAGEMENT APPROACH... 2 PROJECT SCOPE... 2 MILESTONE LIST... 2 SCHEDULE BASELINE
More informationTDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books are provided as an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews can not be printed. TDWI strives
More informationDevelopment Methodologies Compared
N CYCLES software solutions Development Methodologies Compared Why different projects require different development methodologies. December 2002 Dan Marks 65 Germantown Court 1616 West Gate Circle Suite
More informationPROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
More information<project name> COMMUNICATIONS PLAN
COMMUNICATIONS PLAN Version [n.n Month Day, Year] Project Sponsor: [Name of Business Sponsor] Project Manager: [Name of Project Manager] Project Number: [Number Assigned to the Project] Document History
More informationEmpirical Development of a Mobile Application: UVA- Wise Undergraduate Software Engineering Capstone Project
Empirical Development of a Mobile Application: UVA- Wise Undergraduate Software Engineering Capstone Project I. Weissberger, S. Showalter, T. Deel, M. Ward, M. Whitt, and A. Qureshi University of Virginia
More informationTime Monitoring Tool Software Development Plan. Version <1.1>
Time Monitoring Tool Software Development Plan Version Revision History Date Version Description Author 10/01/01 1.0 First Draft Sabrina Laflamme 12/01/01 1.1 Completion of Document John Lemon Page
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More informationProject Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
More informationCommonwealth of Massachusetts CommonWay Schedule Management Guidelines. Common Values - Common Goals Common Way. Schedule Management.
Schedule Management Values - Goals Schedule Management Schedule Management v1.0 1 of 6 10/27/2010 Schedule Management Values - Goals Table of Contents 1 Schedule Management Guideline... 3 1.1 Determine
More informationBank Selection & Relationship Management From RFPs to Scorecards
Bank Selection & Relationship Management From RFPs to Scorecards Mark K. Webster, CPA, CCM, Partner Daniel L. Blumen, CTP, Partner Treasury Alliance Group LLC Agenda Overview Bank Selection The RFP Process
More informationThe 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
More informationPHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
More informationTable of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose
1 2 Author s Preface The Medialogist s Guide to Project Time Management is developed in compliance with the 9 th semester Medialogy report The Medialogist s Guide to Project Time Management Introducing
More informationMGMT 4135 Project Management. Chapter-4. Defining the Project
MGMT 4135 Project Management Chapter-4 Where We Are Now Chapter-4 Steps for Chapter-4 Step-1 Scope Step-2 Establishing Project Priorities Step-3 Creating the Work Breakdown Structure Step-4 Integrating
More informationPROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
More informationA Software Engineering Model for Mobile App Development
APPENDIX C A Software Engineering Model for Mobile App Development As we mentioned early in the book (see Chapter 1), to successfully develop a mobile software solution you should follow an engineering
More informationA Structured Approach to Teaching Web Development A. R. Harriger 1, and D. M. Woods 2 1 Computer (Information Systems) Technology Department, Purdue University, USA, E-mail: arharriger@tech.purdue.edu;.
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More informationTen Steps to Comprehensive Project Portfolio Management Part 8 More Tips on Step 10 By R. Max Wideman Benefits Harvesting
August 2007 Ten Steps to Comprehensive Project Portfolio Management Part 8 More Tips on Step 10 By R. Max Wideman This series of papers has been developed from our work in upgrading TenStep's PortfolioStep.
More informationHow To Test For Elulla
EQUELLA Whitepaper Performance Testing Carl Hoffmann Senior Technical Consultant Contents 1 EQUELLA Performance Testing 3 1.1 Introduction 3 1.2 Overview of performance testing 3 2 Why do performance testing?
More information(Refer Slide Time: 01:52)
Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This
More informationEMC PERSPECTIVE. Adopting an Agile Approach to OSS/BSS Development
EMC PERSPECTIVE Adopting an Agile Approach to OSS/BSS Development Reader ROI The agile software methodology is different from the traditional approach in that requirements gathering and analysis, design,
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE Table of Contents Introduction... 3 Project Execution and Control Phase Overview... 3 Activities and Documents in the Execution
More informationInformation Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
More informationSwirl. Multiplayer Gaming Simplified. CS4512 Systems Analysis and Design. Assignment 1 2010. Marque Browne 0814547. Manuel Honegger - 0837997
1 Swirl Multiplayer Gaming Simplified CS4512 Systems Analysis and Design Assignment 1 2010 Marque Browne 0814547 Manuel Honegger - 0837997 Kieran O' Brien 0866946 2 BLANK MARKING SCHEME 3 TABLE OF CONTENTS
More informationDevelop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
More informationIntroduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
More informationIMEO International Mass Event Organization based on Recent Experience of Euro 2012
IMEO International Mass Event Organization based on Recent Experience of Euro 2012 1. Name of the project: Project Management 2. Leader of the workshop (materials' author): Szymon Włochowicz 1 Objectives
More informationWhen companies purchase an integrated learning
Feature 2. Project team members are required to perform their regular responsibilities in addition to committing their time to the implementation. Organizations can overcome these challenges if they find
More informationTop Management Control Functions for Information Systems in Small and Medium Enterprises
Informatica Economică vol. 13, no. 4/2009 109 Top Management Control Functions for Information Systems in Small and Medium Enterprises Uma VIJAYAKUMAR Practicing Chartered Accountant, Tiruchirappalli &
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
More informationMSU Libraries Website Report: Home Page Color Scheme & Mobile Information Architecture. Prepared by: Daniel Bedich, Irfan Mir, and Nick Simon
MSU Libraries Website Report: Home Page Color Scheme & Mobile Information Architecture Prepared by: Daniel Bedich, Irfan Mir, and Nick Simon Submission Date: 04-30-15 Contents 1.0 Executive Summary 2.0
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationComplex Proposal Development Best Practices
Introduction Complex Proposal Development Best Practices As grant application requirements become increasingly complex, and teams pursuing funding become increasingly diverse, the need for thoroughly planning
More informationProcess Methodology. Wegmans Deli Kiosk. for. Version 1.0. Prepared by DELI-cious Developers. Rochester Institute of Technology
Process Methodology for Wegmans Deli Kiosk Version 1.0 Prepared by DELI-cious Developers Rochester Institute of Technology September 15, 2013 1 Table of Contents 1. Process... 3 1.1 Choice... 3 1.2 Description...
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationOnline Libraries Website Redesign
Online Libraries Website Redesign Project Management Plan Dr. Ray Uzwyshyn, Ph.D. MBA MLIS 2013 Contents 2 Scope Statement... 3 Assumptions and Constraints... 3 Project Deliverables... 4 Schedule 8 Week
More informationBest Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
More informationSoftware Quality Assurance Plan. Introduction
Software Quality Assurance Plan Introduction Scope and intent of Software Quality Assurance (SQA) activities The SQA team s objective is to ensure that the product does not deviate far from the original
More informationUsing Web-based Tools to Enhance Student Learning and Practice in Data Structures Course
Using Web-based Tools to Enhance Student Learning and Practice in Data Structures Course 1. Introduction Chao Chen January 2014 The purpose of this project is to enhance student learning and practice in
More informationD6 INFORMATION SYSTEMS DEVELOPMENT. SOLUTIONS & MARKING SCHEME. June 2013
D6 INFORMATION SYSTEMS DEVELOPMENT. SOLUTIONS & MARKING SCHEME. June 2013 The purpose of these questions is to establish that the students understand the basic ideas that underpin the course. The answers
More informationOFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0
OFFICE OF THE CIO PROCEDURE Informational VERSION: 1.0 Purpose Project Management of Major or Large NDUS Information Technology Projects Project Managers Guide/Checklist This procedural process will ensure
More informationCommunication and Multimedia Design. Minor in User Experience Design
Communication and Multimedia Design Minor in User Experience Design Experience Communication and Multimedia Design in Amsterdam! Communication and Multimedia Design Amsterdam puts design at the core of
More informationSoftware Quality Assurance and Maintenance for Outsourced Software Development Nelly Maneva Institute of Mathematics and Informatics, BAS, 1113 Sofia, Bulgaria Email: neman@math.bas.bg and American University
More informationProject and Operational processes, Key differences. Gotchas when deploying projects into operations
Project and Operational processes, Key differences. Gotchas when deploying projects into operations Purpose of this Presentation Assist the smooth implementation of projects into production I ve heard
More informationProcess Improvement Program Project Process
Process Improvement Program Project Process 1 P a g e 12/3/2014 The Process Improvement Program is part of the City of Fort Lauderdale s FL 2 STAT Approach to Exponential Improvement. Its objective is
More informationSoftware Project Management
Software Project Management Software Project Planning Vivek Bhatnagar Assoc Professor Who needs software? Most software is built in organizations for people with specific needs. A stakeholder is a anyone
More informationInput, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
More informationBonus Report: Five Checklists to Make Outsourcing a Breeze
Bonus Report: Five Checklists to Make Outsourcing a Breeze Deanna Maio http://delegatedtodone.com NOTICE: You Do NOT Have the Right to Reprint or Resell this Course! You Also MAY NOT Give Away, Sell or
More informationA solid partner when developing websites, self-service bureaus and information systems for the finance sector.
OPUS ONLINE A solid partner when developing websites, self-service bureaus and information systems for the finance sector. www.opus.ee Opus Online Opus is a high-end web development company based in Tallinn,
More informationProject Risk Management
Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management
More informationOverview. The Concept Of Managing Phases By Quality and Schedule
The Project Management Dashboard: A Management Tool For Controlling Complex Projects Project Management White Paper Series--#1001 John Aaron, Milestone Planning And Research, Inc. 5/14/01 Overview The
More informationProject Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
More informationDeveloping a Load Testing Strategy
Developing a Load Testing Strategy Michele Ruel St.George Bank CMGA 2005 Page 1 Overview... 3 What is load testing?... 4 Scalability Test... 4 Sustainability/Soak Test... 4 Comparison Test... 4 Worst Case...
More informationStep by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
More informationBrillig Systems Making Projects Successful
Metrics for Successful Automation Project Management Most automation engineers spend their days controlling manufacturing processes, but spend little or no time controlling their project schedule and budget.
More informationTeam 4Loop. Project: Smart Fitness Trainer. Department of Computer Science and Engineering University of Texas at Arlington
Project Charter Project Name: Smart Fitness Trainer Department of Computer Science and Engineering University of Texas at Arlington Project Charter Team 4Loop Project: Smart Fitness Trainer Late Updated:
More informationBefore getting started, we need to make sure we. Business Intelligence Project Management 101: Managing BI Projects Within the PMI Process Group
PMI Virtual Library 2010 Carole Wittemann Business Intelligence Project Management 101: Managing BI Projects Within the PMI Process Group By Carole Wittemann, PMP Abstract Too many times, business intelligence
More information15 Principles of Project Management Success
15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.
More informationCommunication and Multimedia Design. Minor User Experience Design Minor Design Thinking and Doing
Communication and Multimedia Design Minor User Experience Design Minor Design Thinking and Doing Experience Communication and Multimedia Design in Amsterdam! Communication and Multimedia Design Amsterdam
More informationMetadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita
Metadata-Based Project Management System. A Case Study at M-Files Corporation Iulia Adomnita University of Tampere School of Information Sciences Computer Science M.Sc. Thesis Supervisors: Timo Poranen,
More informationThe Quality Assurance Centre of Excellence
The Quality Assurance Centre of Excellence A X I S T E C H N I C A L G R O U P A N A H E I M H E A D Q U A R T E R S, 300 S. H A R B O R, B L V D. S U I T E 904, A N A H E I M, CA 92805 PHONE :( 714) 491-2636
More informationProject Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
More informationProject Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
More informationGuide 4 Keeping records to meet corporate requirements
Guide 4 Keeping records to meet corporate requirements This guidance has been produced in support of the good practice recommendations in the Code of Practice on Records Management issued by the Lord Chancellor
More informationBusiness Intelligence Project Management 101
Business Intelligence Project Management 101 Managing BI Projects within the PMI Process Groups Too many times, Business Intelligence (BI) and Data Warehousing project managers are ill-equipped to handle
More informationPlanning user documentation - a guide for software project managers
Planning user documentation - a guide for software project managers By Carol Johnston. Introduction A Guide to the Project Management Body of Knowledge (PMBOK Guide) 2000 Edition is the main sourcebook
More informationProject Management Topics
S E C T I O N II T W O Project Management Topics SECTION II: PROJECT MANAGEMENT TOPICS TABLE OF CONTENTS Introduction 3 1. PROJECT TRIAGE 5 1.1 Gather the Data 7 1.2 Review and Analyze the Data 10 1.3
More informationUnderstand why, when and how-to to formally close a project
Project Closure Purpose: Understand why, when and how-to to formally close a project Audience: Project managers, project sponsors, team members and other key stakeholders Learning Objectives: Describe
More information<Business Case Name> <Responsible Entity> <Date>
(The entity Chief Information Officer, Chief Financial Officer and Business Area programme Lead must sign-off the completed business case) Signed: Date:
More informationCOURSE TITLE. Project Management for Web designers + Developers CE 2444C INSTRUCTOR. Todd Mariani tmariani@reciprocalpress.
COURSE TITLE Project Management for Web designers + Developers CE 2444C INSTRUCTOR Todd Mariani tmariani@reciprocalpress.com MEETING TIMES Tuesday 7-10pm Oct 4-Dec 6 COURSE DESCRIPTION This course is ideal
More informationDevelopment and Acquisition D&A
Federal Financial Institutions Examination Council FFIEC Development and Acquisition D&A APRIL 2004 IT EXAMINATION H ANDBOOK Development and Acquisition Booklet April 2004 TABLE OF CONTENTS INTRODUCTION...
More informationCSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012
King Saud University College of Computer & Information Sciences Department of Computer Science CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012 1- Decomposing
More informationSOFTWARE DEVELOPMENT PLAN
SOFTWARE DEVELOPMENT PLAN This document outline is based on the IEEE Standard 1058.1-1987 for Software Project Management Plans. This is the controlling document for managing a software project, and it
More informationQuick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
More informationStudent and Academic Support Services Assessment Information Packet
Student and Academic Support Services Assessment Information Packet Assessment Plan and Status Report Format for Student and Academic Support Services Review Schedule Examples of Assessment Activities
More informationPMAP. Project Management At Penn PMAP
Project Management At Penn 1 Fundamentals Course Objective To provide you with an overview of Topics Project Management at Penn () Project Governance Phases & Project Management Activities Project Management
More informationComputer Science Department CS 470 Fall I
Computer Science Department CS 470 Fall I RAD: Rapid Application Development By Sheldon Liang CS 470 Handouts Rapid Application Development Pg 1 / 5 0. INTRODUCTION RAD: Rapid Application Development By
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationIntroduction to Systems Analysis and Design
Introduction to Systems Analysis and Design What is a System? A system is a set of interrelated components that function together to achieve a common goal. The components of a system are called subsystems.
More informationSOFTWARE PROJECT MANAGEMENT
SOFTWARE PROJECT MANAGEMENT http://www.tutorialspoint.com/software_engineering/software_project_management.htm Copyright tutorialspoint.com The job pattern of an IT company engaged in software development
More informationIn an ERP implementation how the entire organization works changes forever
Whether you re upgrading from a legacy based system or automating from scratch, selecting and deploying the right ERP solution is something organizations must get right. An ERP pervades through the entire
More informationCOMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Document Information Document Title Amendment History Document Version Date Author/Reviewer Modifications 5/28/2014 Page i 2014 CSG
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationProject Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project
More informationThe Software Process. The Unified Process (Cont.) The Unified Process (Cont.)
The Software Process Xiaojun Qi 1 The Unified Process Until recently, three of the most successful object-oriented methodologies were Booch smethod Jacobson s Objectory Rumbaugh s OMT (Object Modeling
More informationPMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
More informationTen Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.
August 2007 Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R. Max Wideman This series of papers has been developed from our work
More informationStakeholder management and. communication PROJECT ADVISORY. Leadership Series 3
/01 PROJECT ADVISORY Stakeholder management and communication Leadership Series 3 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes,
More informationTemplate K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
More informationHow to Select and Implement an ERP System
How to Select and Implement an ERP System Prepared by 180 Systems Written by Michael Burns 180 Systems WHAT IS ERP?... 3 ANALYSIS... 4 VENDOR SELECTION... 6 VENDOR DEMONSTRATIONS... 8 REFERENCE CALLS...
More informationSCRUM BODY OF KNOWLEDGE (SBOK Guide)
A Guide to the SCRUM BODY OF KNOWLEDGE (SBOK Guide) 2013 Edition A Comprehensive Guide to Deliver Projects using Scrum TABLE OF CONTENTS TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Overview of Scrum...
More informationThe Role of Knowledge Based Systems to Enhance User Participation in the System Development Process
The Role of Knowledge Based Systems to Enhance User Participation in the System Development Process Gian M Medri, PKBanken, Stockholm Summary: Computers are a fact of life today, even for the public in
More informationDecision Maker's Guide - Evaluation Checklist for ITSM Solutions High Level Requirements
Decision Maker's Guide - Evaluation Checklist for ITSM Solutions High Level Requirements Ability to support a 24x7 service desk operation Ability to provide workflow capabilities for efficient incident,
More information