1 1. Introduction and concepts Strategy development and planning are closely related. Both are concerned with the future activities of a project or organisation. Where planning is meant to identify concrete activities, strategy development is more concerned with the future direction, rather than with concrete objectives and activities. A strategy is a translation of the organisations mission into aims, and provides ideas how these aims could be pursued. As there may be various ways, depending on the environment, strategy development provides a choice among alternatives. Planning is then the concrete translation of the chosen strategy into concrete objectives, activities and related means. Some key differences between planning and strategy development are given in table below: Table 1. Some key differences between Planning and Strategy Development Strategy development Searching direction Innovation (search for new) Synthesis Aims/visions Ideas Long term Attention to strengths and opportunities Expansion/forward orientation/anticipation Allowing intuition, including soft information Planning Concrete (direction is given) Rearranging old ideas Analysis Objectives Actions Short term Problem solving (weaknesses, threats) Consolidations/past - present orientation prediction/reaction Rational, using hard information is a specific method to develop strategies. It is a method based on the analysis of strengths, weaknesses, opportunities and threats (SWOT). It generates a number of realistic alternatives and provides a prioritisation. The SWOT framework has been developed as a simple tool for analysis within a strategic planning process. However, a SWOT analysis is never the first nor the last step, but has its designated place within the cycle of analysis, planning and evaluation. The SWOT analysis combines an internal analysis of a project (Strengths and Weaknesses) with an external analysis (Opportunities and Threats). It therefore has to be based on a sound knowledge of the present factors and actors in the working environment, as well as on a sound analysis of the internal resources and functioning of the organisation. In other words - as prerequisite to do a SWOT analysis - the environment needs to be scanned and the institutional setting needs to be analysed in order to identify opportunities and threats, while simultaneously the internal organisation needs to be analysed to identify its strengths and weaknesses. Various ID/OS instruments can be used in the process. The figure below shows the position of SWOT and Strategic Orientation in relation to different ID/OS tools and concepts within the planning cycle. ref: DI Page 1 (9)

2 Figure 1. Place of SWOT and Strategic Orientation in Strategic Planning Strategic Planning: from SWOT to Action Plan Formulation Appraisal Environmental Scan Identification Insitutional Setting Opportunies & Threats OT In-depth analysis of e strategically important strengths/ weaknesses Mission/ Objectives Alternative Strategies Strategic Orientation Strategic Plan (Action) Planning Integrated Organisation Model SW Strengths & Weaknesses Financing Monitoring Implementation Evaluation Implementation It follows that strategic orientation can be used: as a basis for a strategic plan including objectives, activities and means; to identify a direction for further analysis and investigation of major strengths and weaknesses, necessary to seize an opportunity or to reduce a threat. 2. The SWOT analysis The SWOT analysis consists of two parts: The external analysis of the environment to identify opportunities and threats, and the internal analysis of the organisation to identify the existing strengths and weaknesses. 2.1 External analysis of opportunities and threats The external analysis is described in a dynamic sense taking into account the actual situation (existing threats, non-exploited opportunities) as well as possible trends and developments. However, in order to include them in the analysis, they have to be realistic with clear indications and without major speculations. Moreover, the effect on the performance of the organisation should be substantial. An opportunity can be defined as an external fact or development that, if taken advantage of, can substantially contribute to the realisation of the organisation s mission. Examples of opportunities are new possibilities for cooperation, a new target group or demands for new services. ref: DI Page 2 (9)

3 Opportunities for development organisations may exist or arise in the event of: gaps in the service/product delivery to the target group (non-existence of certain goods or services, or non-availability in certain locations); favourable trends (increase in incomes, growth of urban population with specific needs for more sophisticated products; weaknesses shown by other development organisations (low quality, high costs); better access to new methodologies/technologies; potential for improved cooperation. In relation to target group oriented opportunities the following table can be considered: Table 2. Opportunities related to products/services and target groups Present products/services New products/services present target groups project intensification product/service development new target groups project replication project diversification A threat can be defined as an external fact or development that has or can have a substantial negative effect on an organisation s performance. Threats are challenges posed by unfavourable trends or developments in the environment that will lead to the erosion of the organisation's position, if no corrective action is taken. Threats to development projects/organisations can be found in for example: other projects/organisations coming in with similar products/services social, economic and cultural development affecting the direct needs of target groups collaborators changing their strategy, activities and target groups diminishing capability of collaborators (e.g. diminishing implementing capacity) changes in donor policies changes in availability of resources (man power, inputs, etc.) changes in government policies and regulations Opportunities and threats can be identified in a number of ways. Instruments that can be useful for identification of opportunities and threats are: institutiogramme network matrices environmental scan problem tree ref: DI Page 3 (9)

4 Essential in whether or not to include a factor in the analysis is: the relevance of the factor for the performance of the project the probability that the fact/development is or will become true the influence the project has to address the factor 2.2 Internal analysis The internal situation is discussed on the basis of the existing situation and explores existing strengths and weaknesses and not future ones. An organisation s strengths and weaknesses are an organisation s internal critical factors that determine its performance. A strength is therefore defined as an internal characteristic that contributes substantially to the realisation of the organisation s mission. A strength is any existing internal asset (management, staff capacity/motivation, knowledge, resources, business links, etc.) which will help to exploit opportunities (or to meet demands) and to fight off threats. A weakness is an internal characteristic that negatively and substantially influences the functioning of the organisation. Weaknesses are internal conditions that erode the organisation s position, hamper cooperation with others or obstruct the exploitation of opportunities. To identify strengths and weaknesses systematically, the following tools may be useful: IOM (balance between the components (outputs, inputs, structure, systems, staff, etc.) criteria for judgement (suitability, legitimacy, effectiveness, continuity, sustainability, flexibility, efficiency) process analysis problem tree 3. Strategic Orientation: the process 3.1 Introduction to Strategic Orientation Identifying strengths, weaknesses, opportunities and threats is not enough. Depending on their joint pattern strategic choices have to be made. Strategic Orientation is a way to combine/match strengths, weaknesses, opportunities and threats in order to arrive at a number of strategic options from which a choice can be made. 3.2 Steps in strategic orientation Strategic Orientation can be done individually, but it is much more effective when carried out in a participatory exercise involving all major stakeholders of the project/organisation. The strategy s rational and consequences can then be understood and accepted by all decision-makers and field workers. The proposed procedure therefore aims at reaching consensus among the stakeholders concerning strategic the choices. ref: DI Page 4 (9)

5 1. Define the entity or problem area 2. Identification of strengths, weaknesses, opportunities and threats from internal analysis: strengths and weaknesses external analysis: opportunities and threats based on joint discussion or brainstorm 3. Developing strategic options For each opportunity and each threat generate concrete strategic options (concrete objectives/aims) that would make advantage of this opportunity or that would reduce the threat. 4. Select the 4-5 best options Method 1: develop one or more criteria to select the best options and apply the criteria to the options. Often criteria will follow from a basic question; Method 2: select the 5 best options using consensus or using voting by participants. 5. Matching the strategic options with strengths and weaknesses Use the Strategic Orientation Matrix. Identify for each of the options which strengths can be used and which weaknesses should be reduced to be able to realise this option. 6. Formulate tentative strategies Select now the 2 or 3 options that have the most strengths and relatively few weaknesses; Formulate major tentative strategies for these options. 7. Follow-up Identify areas for further investigation (e.g. further analysis of the cost-effectiveness of the tentative strategies formulated); It is often possible to continue with the formulation of a project plan based on the strategies identified. 3.3 Limitations The strength of the above-described model is that it is logical approach to identify major strategic choices. When used in a participatory way, it assists in generating consensus among the stakeholders, providing a good basis for implementation of the project plan. However, the adequacy of the strategic choices depends on the adequacy of the strengths, weaknesses, opportunities and threats identified in the analysis phase and the ability of participants to draw relations between the strategic options and the strengths and weaknesses. It requires good knowledge of the situation to develop an adequate project plan from the strategies formulated. ref: DI Page 5 (9)

6 Annex 1: Example Strategic Orientation ISPA Institutional Strengthening of Private Agriculture - Romania Step 1. Define Entity / Basic Question Basic Question: How can ISPA develop into a financially sustainable farmers' organisation while delivering substantial and relevant services to its members? Step 2. Identification of major Strengths, Weaknesses, Opportunities and Threats Strengths Flexibility to start new (related) activities ISPA has good image ISPA offers quality Quality related payment (milk, etc.) Unique service package Weaknesses Scattered locations of Dependency on small number of processors High operating costs Weak planning & task division Limited management capacity Opportunities High demand for input supply New/other clients for potatoes and milk Access to cheese processing expertise & funds farmers interest in ISPA activities Threats Monopoly position of LACTIS (dairy company) Non payment of clients Still weak relations with farmers Uncertain access to finance extension activities Resistance of elephants ref: DI Page 6 (9)

7 Step 3+4. Develop Strategic Options + select the best options Major opportunity/threat Major Strategic Options Effect on sustainability High demand for input supply Increase sales Input supply High /establish new New/other clients for potatoes and milk Increase purchase & sales of potatoes. High Access to cheese processing expertise & funds. Monopoly position of LACTIS (dairy company) Non payment of clients Increase milk collection Establish own milk processing unit High Improve contracts + more strict High follow up Still weak relations with farmers. Increase membership promotion & High Farmers interest in ISPA activities activities. Uncertain access to finance Survey on sources Medium extension activities Resistance of elephants Use government relations Low 5. Matching Strategic Options with Strengths and Weaknesses Strategic Orientation Matrix Strategic options Expand input supply Expand potato sales & milk Establish own milk processing unit Increase membership promotion Strengths collection & activities 1. Flexibility to start new ++ + (related) activities 2. ISPA has good image ISPA offers quality Quality related payment (milk, etc.) Improve contracts + follow up 5. Unique service package Weaknesses 1. Scattered locations of Dependency on small ++ number of processors 3. High operating costs Weak planning & task division. 5. Limited management capacity Total Difference S-W = using this strength/ removing this weakness has some effect on this strategic option ++ = using this strength/ removing this weakness has substantial effect on this strategic options +++ = using this strength/ removing this weakness has a major effect on this strategic option ref: DI Page 7 (9)

8 6. Formulate Tentative Strategies 1. Increase Membership promotion using quality related payment and unique service package while improving planning and monitoring 2. Expand Potato sales and milk collection using ISPA s good image and emphasising quality while reducing operating costs and improving planning and monitoring 3. Expand Input supply using the flexibility to start new activities and ISPA unique service package (to attract customers) while reducing operating costs and improving planning and monitoring ref: DI Page 8 (9)

9 MDF copyright 2010 Step 7. Logical Framework for implementation Overall Objective Project Purpose Intervention Logic Improved income agricultural producers To improve support to agricultural producers Indicators Sources of verification Assumptions Difference between market price and ISPA price to Agr. Producers Purchases from Agr. Prod. Intermediate Results Indicators of results 1. Input supply established No of established No of customers per centre Sales Gross result Net result Return on investment 2. Potato marketing and milk collection expanded No of established No of customers per centre Sales Gross result Net result Return on investment (ROI) 3. Financial position strengthened Net result Net result econ. activities Liquidity ROI of economic activities Existence of relations with potential donors. 4. Membership of Agricultural Producers strengthened No of members. No of locations No of members per location Number of services used by members Source of verification Activities 1.1 To analyse fin. feasibility input supply 2.1. Establish new milk collection (5) 3.1 Organise the accounting system 4.1. Improve use of payment days for information and extension 1.2 To develop logistic system input supply 1.3. To develop administr. system input supply 2.2. Identify more reliable partners 2.3. Improve delivery and transport planning 3.2 Improve regular financial analysis and planning and improve monitoring. 3.3 Assess reduction of administration costs and review costs/hour 4.2 Improve information at input supply 4.3 Improve extension and mobilisation capacity Improve contracts and follow up on contracts 3.4 Identify and assess new economic activities Identify financial sources for members services 4.4 Re-define relations with other extension agencies 4.5 Develop relation with cattle breeders organisation ref: DI Page 9 (9)

Problem Tree Analysis

Problem Tree Analysis Problem Tree Analysis What is it? The Problem Tree method is a planning method based on needs, however it is not a mechanical translation of problems into objectives. While going through the process, taking

More information

Using the logical framework matrix

Using the logical framework matrix Using the logical framework matrix Defining the M&E Strategy for a programme/project A logical framework Clearly defined results and risks Performance indicators and means of verification An M&E plan for

More information

Evaluation of six development NGOs accredited by the Minister of Foreign and European Affairs of the Grand Duchy of Luxembourg

Evaluation of six development NGOs accredited by the Minister of Foreign and European Affairs of the Grand Duchy of Luxembourg Evaluation of six development NGOs accredited by the Minister of Foreign and European Affairs of the Grand Duchy of Luxembourg Synthesis report of the evaluation Extract of the final version dated November,

More information

Extending the EU Policy on Strengthening the Functioning of Supply Chains to ACP-EU Trade Relations and Beyond: The Case of the Dairy Sector

Extending the EU Policy on Strengthening the Functioning of Supply Chains to ACP-EU Trade Relations and Beyond: The Case of the Dairy Sector Extending the EU Policy on Strengthening the Functioning of Supply Chains to ACP-EU Trade Relations and Beyond: The Case of the Dairy Sector Policy Coherence and the CAP Series May 2012 1. The evolution

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

Monitoring and Evaluation of. Interventions

Monitoring and Evaluation of. Interventions Monitoring and Evaluation of Sports in Development (SiD) Interventions presented by: Pamela K. Mbabazi, Ph.D. Faculty of Development Studies, Department of Development Studies Mbarara University of Science

More information

Workshop on Strategic Plan for Implementation of Quality Culture within Higher Learning Institutions in East Africa

Workshop on Strategic Plan for Implementation of Quality Culture within Higher Learning Institutions in East Africa Workshop on Strategic Plan for Implementation of Quality Culture within Higher Learning Institutions in East Africa January 21-22, 2010 General Strategic Planning Joseph A. Kuzilwa Module Objectives The

More information

PROJECT MANAGEMENT TRAINING MODULES

PROJECT MANAGEMENT TRAINING MODULES PROJECT MANAGEMENT TRAINING MODULES KENYA PROJECTS ORGANIZATION < Projects Solutions Provider > Macjo Arcade, 4 th Flr., Suite 15E P.O Box, 3029 00200, Nairobi - Kenya Tel: 254 (0)202319748 Mob: 0725 788

More information

Self-Assessment Process: Belgium- Walloon Case Study. November 2012

Self-Assessment Process: Belgium- Walloon Case Study. November 2012 Self-Assessment Process: Belgium- Walloon Case Study November 2012 Self-Assessment Process: Belgium-Walloon Case Study Executive Summary In September 2011, the National Support Unit of the Walloon Network

More information

National Guide for the Health Sector Policy and Strategic plan Development

National Guide for the Health Sector Policy and Strategic plan Development REPUBLIC OF RWANDA MINISTRY OF HEALTH P.O. Box 84 KIGALI www.moh.gov.rw National Guide for the Health Sector Policy and Strategic plan Development April 2014 i Table of Contents Acronyms... iv FOREWORD...

More information

PARC. Evaluation Series No.1 The Logical Framework

PARC. Evaluation Series No.1 The Logical Framework PERFORMANCE ASSESSMENT RESOURCE CENTRE PARC Evaluation Series No.1 The Logical Framework By w PARC Evaluation Series No. 1: The Logical Framework Looking back over the last year and the conferences where

More information

Project on Provision of Legal Training Components for Legal Institutions of Iraq. Training session on Strategic Planning

Project on Provision of Legal Training Components for Legal Institutions of Iraq. Training session on Strategic Planning Project on Provision of Legal Training Components for Legal Institutions of Iraq Training session on Strategic Planning 24, 25 and 26 October, 2010 Erbil Explanatory Note Prepared by: Mrs. Denise Colonna

More information

Terms of Reference (TOR) For Impact Evaluation of ANN Project

Terms of Reference (TOR) For Impact Evaluation of ANN Project Terms of Reference (TOR) For Impact Evaluation of ANN Project Post Title: Rural Aquaculture Development (Impact Evaluation) Expert (International) Location: Oshakati Extension Office and Omahenene Inland

More information

Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules.

Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules. Strategic Marketing Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules. To gain the CIM Level 6 Diploma in Professional Marketing a pass in both mandatory

More information

Livelihoods and Food Security Trust Fund (LIFT) Skills and Vocational Training in Rakhine State

Livelihoods and Food Security Trust Fund (LIFT) Skills and Vocational Training in Rakhine State Livelihoods and Food Security Trust Fund (LIFT) Skills and Vocational Training in Rakhine State Ref no: LIFT/2015/6/Skills and Vocational Training in Rakhine State Release date: 23 December 2015 Deadline:

More information

FOREIGN AFFAIRS PROGRAM EVALUATION GLOSSARY CORE TERMS

FOREIGN AFFAIRS PROGRAM EVALUATION GLOSSARY CORE TERMS Activity: A specific action or process undertaken over a specific period of time by an organization to convert resources to products or services to achieve results. Related term: Project. Appraisal: An

More information

GENERAL GUIDELINES FOR DEVELOPING A BUSINESS PLAN

GENERAL GUIDELINES FOR DEVELOPING A BUSINESS PLAN GENERAL GUIDELINES FOR DEVELOPING A BUSINESS PLAN August 2012 Table of contents Introduction... 3 1. Executive Summary... 3 2. Business Summary... 3 2.1 Company Summary... 3 2.2 Management Summary... 3

More information

Monitoring, Evaluation and Learning Plan

Monitoring, Evaluation and Learning Plan Monitoring, Evaluation and Learning Plan Cap-Net International Network for Capacity Building in Sustainable Water Management November 2009 The purpose of this document is to improve learning from the Cap-Net

More information

Designing Projects and Project Evaluations Using The Logical Framework Approach

Designing Projects and Project Evaluations Using The Logical Framework Approach Designing Projects and Project Evaluations Using The Logical Framework Approach written by Bill Jackson for the IUCN Monitoring and Evaluation Initiative October 1997 Founded in 1948 as the International

More information

Logical Framework Analysis and Problem tree. 21 st March 2013

Logical Framework Analysis and Problem tree. 21 st March 2013 Logical Framework Analysis and Problem tree 21 st March 2013 Overview Explanation of purpose and benefits of Logical Frameworks Develop a problem tree analysis linking roots causes effects (exercise) Logic

More information

The Enterprise Project Tollgate Process

The Enterprise Project Tollgate Process McMaster University Xerox Centre for Engineering Entrepreneurship and Innovation xceei.mcmaster.ca The Enterprise Project Tollgate Process June 2014 Contents Enterprise Project Tollgate Process... 2 Appendix

More information

Year 2000 Business Continuity Planning: Guidelines for Financial Institutions Introduction

Year 2000 Business Continuity Planning: Guidelines for Financial Institutions Introduction Year 2000 Business Continuity Planning: Guidelines for Financial Institutions Introduction The purpose of this paper is to help financial institutions, in particular their senior management, address business

More information

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013. Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for

More information

Part 1. MfDR Concepts, Tools and Principles

Part 1. MfDR Concepts, Tools and Principles Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international

More information

Technical Support Facility for West and Central Africa. Regional Training on Strategic and Operational Planning in HIV and AIDS.

Technical Support Facility for West and Central Africa. Regional Training on Strategic and Operational Planning in HIV and AIDS. Technical Support Facility for West and Central Africa Regional Training on Strategic and Operational Planning in HIV and AIDS 6-9 April 2010 Accra, Ghana Background UNAIDS Technical Support Facility for

More information

Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules.

Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules. Module Specification: Strategic Marketing Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules. To gain the CIM Level 6 Diploma in Professional Marketing a

More information

MDF Tool: Environmental scan

MDF Tool: Environmental scan Environmental scan What is it? The environmental scan provides a systematic overview of the external factors that are important to the organisation (or sector) and indicates whether the organisation can

More information

Elements of Business Environment

Elements of Business Environment 1 Elements of Business Business Business environment is a combination of the words business-environment. Business includes all activities connected with production, trade, banking, insurance, finance,

More information

THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini)

THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini) PAGE 1 THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini) Ing. Guido Mattu More than 25 years experience in Engineering and Project Management activities

More information

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference Policy Learning Mechanisms in Support of Cluster Development

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference Policy Learning Mechanisms in Support of Cluster Development SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME 3 rd Call for Proposals Terms of reference Policy Learning Mechanisms in Support of Cluster Development March 2011 1. Background Networking activities

More information

Introduction to Monitoring and Evaluation. Using the Logical Framework Approach

Introduction to Monitoring and Evaluation. Using the Logical Framework Approach Introduction to Monitoring and Evaluation Using the Logical Framework Approach Developed and Presented by: Umhlaba Development Services Umhlaba Development Services Noswal Hall, Braamfontein, Johannesburg,

More information

company mission organisational objectives business objectives/business strategy marketing objectives marketing strategy operational objectives

company mission organisational objectives business objectives/business strategy marketing objectives marketing strategy operational objectives Key Issues marketing planning process marketing audit SWOT analysis strategic management strategic planning business objectives Ashridge mission model Ansoff matrix BCG matrix strategic thrust strategic

More information

Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund

Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund EUROPEAN COMMISSION AGRICULTURE DIRECTORATE-GENERAL Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund

More information

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,

More information

The definition of stakeholders includes both winners and losers and those involved or excluded from decision-making processes.

The definition of stakeholders includes both winners and losers and those involved or excluded from decision-making processes. Stakeholder analysis is the identification of (key) stakeholders in a planning or change process, an assessment of their interests and the way in which these interests are likely to affect the planning

More information

Existing Analytical Market Assessment Tools - Definitions

Existing Analytical Market Assessment Tools - Definitions Existing Analytical Market Assessment Tools - Definitions November, 2003 This list of market assessment tools was prepared by Development Alternatives Inc. (DAI) as an internal working document to support

More information

Corruption Risk Assessment Topic Guide

Corruption Risk Assessment Topic Guide Corruption Risk Assessment Topic Guide Contents What is corruption risk assessment? Purpose and context of the assessments Assessment approaches Data sources Key issues and challenges Examples of promising

More information

A Risk Management Standard

A Risk Management Standard A Risk Management Standard Introduction This Risk Management Standard is the result of work by a team drawn from the major risk management organisations in the UK, including the Institute of Risk management

More information

GLOSSARY OF EVALUATION TERMS

GLOSSARY OF EVALUATION TERMS Planning and Performance Management Unit Office of the Director of U.S. Foreign Assistance Final Version: March 25, 2009 INTRODUCTION This Glossary of Evaluation and Related Terms was jointly prepared

More information

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual Equal Rights and Treatment for Roma in Moldova and Ukraine Project Management Methodology Manual WELCOME TO THE COUNCIL OF EUROPE PROJECT MANAGEMENT METHODOLOGY In July 2001, the Council of Europe launched

More information

workforce planning toolkit a guide for workforce planning in small to medium sized victorian public sector organisations

workforce planning toolkit a guide for workforce planning in small to medium sized victorian public sector organisations 1 workforce planning toolkit a guide for workforce planning in small to medium sized victorian public sector organisations workforce planning toolkit a guide for workforce planning in small to medium

More information

Formulate Goals and Strategies At-A-Glance

Formulate Goals and Strategies At-A-Glance Formulate Goals and Strategies At-A-Glance During the Formulate Goals and Strategies phase of the MAPP Process, participants take the strategic issues identified in the previous phase and formulate goal

More information

STRATEGIC PLANNING BACKGROUND AND PRACTICE

STRATEGIC PLANNING BACKGROUND AND PRACTICE Module 2 STRATEGIC PLANNING BACKGROUND AND PRACTICE 1 John Glazebrook STRATEGIC PLANNING Introducing SWAp for Environment Belgrade, 24-25 July 2012 Today Look at Why do Strategic Planning? A mixture of

More information

Logical Framework Planning Matrix: Turkish Red Crescent Organisational Development Programme

Logical Framework Planning Matrix: Turkish Red Crescent Organisational Development Programme Logical Framework Planning Matrix: Turkish Red Crescent Organisational Development Programme Indicators Sources of verification Assumption/risks Overall Goal The Turkish Red Crescent as a key part of civil

More information

Assessment frameworks for the higher education accreditation system Programme assessment (limited/extensive)

Assessment frameworks for the higher education accreditation system Programme assessment (limited/extensive) Assessment frameworks for the higher education accreditation system Programme assessment (limited/extensive) 22 November 2011 Contents 1 Structure of the system 5 3 Limited programme assessment 7 3.1

More information

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Contents Page 7.0 MONITORING, REPORTING AND EVALUATION See the New M & E Framework. 7.1 Policy framework 7.1.1 General policy statements 7.1.2 Coverage

More information

Template: Performance Evaluation Form - Executive Director/ Chief Executive Officer

Template: Performance Evaluation Form - Executive Director/ Chief Executive Officer Template: Performance Evaluation Form - Executive Director/ Chief Executive Officer Note: This document is provided for information purposes only. Health professional associations making use of this resource

More information

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE DEVELOPMENT ASSISTANCE COMMITTEE PARIS, 1991 DAC Principles for Evaluation of Development Assistance Development Assistance Committee Abstract: The following

More information

NGO Self-assessment through a SWOT exercise

NGO Self-assessment through a SWOT exercise NGO Self-assessment through a SWOT exercise Step 1: Analyse your NGO s Capacity > page 2 Step 2: Do the SWOT Exercise > page 5 Step 3: Make a Strategic Plan > page 8 Step 4: Implement, Monitor, Evaluate

More information

Drafting a business plan

Drafting a business plan How are you going to do it? Drafting a business plan Background A business plan sets out the business case for a particular project, organisation or venture. It states how you will go about running a specific

More information

PERFORMANCE MONITORING & EVALUATION TIPS CONDUCTING DATA QUALITY ASSESSMENTS ABOUT TIPS

PERFORMANCE MONITORING & EVALUATION TIPS CONDUCTING DATA QUALITY ASSESSMENTS ABOUT TIPS NUMBER 18 1 ST EDITION, 2010 PERFORMANCE MONITORING & EVALUATION TIPS CONDUCTING DATA QUALITY ASSESSMENTS ABOUT TIPS These TIPS provide practical advice and suggestions to USAID managers on issues related

More information

Identifying critical barriers to CSO development effectiveness

Identifying critical barriers to CSO development effectiveness Identifying critical barriers to CSO development effectiveness In order to develop meaningful advocacy strategies at the international, national and local levels, it is first essential to identify, analyse

More information

THE PROCESS OF PLANNING AND INSTITUTIONAL FRAMEWORK FOR POVERTY REDUCTION STRATEGY: THE CASE OF UGANDA.

THE PROCESS OF PLANNING AND INSTITUTIONAL FRAMEWORK FOR POVERTY REDUCTION STRATEGY: THE CASE OF UGANDA. THE PROCESS OF PLANNING AND INSTITUTIONAL FRAMEWORK FOR POVERTY REDUCTION STRATEGY: THE CASE OF UGANDA. By Margaret Kakande Poverty Analyst Ministry of Finance, Planning and Economic Development, Government

More information

The New Programming Period 2007-2013. Working Document No.1

The New Programming Period 2007-2013. Working Document No.1 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 INDICATIVE GUIDELINES

More information

NETWORK SUSTAINABILITY 1. Guillermo Rivero, Financial Services Manager, Pact HQ. USA. 2006.

NETWORK SUSTAINABILITY 1. Guillermo Rivero, Financial Services Manager, Pact HQ. USA. 2006. NETWORK SUSTAINABILITY 1 1 This document has been written by Alfredo Ortiz, Country Director Pact Ecuador & LAC Regional Coordinator, and Guillermo Rivero, Financial Services Manager, Pact HQ. USA. 2006.

More information

European Dairy Industry The European Dairy Industry 2015 2020 Towards 2020 A Syndicated Research Proposal A Syndicated Research Proposal

European Dairy Industry The European Dairy Industry 2015 2020 Towards 2020 A Syndicated Research Proposal A Syndicated Research Proposal European The European Dairy Dairy Industry Industry 2015 Towards 2020 2020 A Syndicated Syndicated Research Research Proposal Proposal Removing Challenges, the Strategies shackles and Change A Company

More information

Project Management and the Organisational Strategy

Project Management and the Organisational Strategy Project Management and the Organisational Strategy An ESI International White Paper Tel: +44 (0) 20 7017 7100 www.esi-emea.com Table of Contents Project Management and the Organisational Strategy 2 An

More information

SMEs Development in the Devolved Governance System

SMEs Development in the Devolved Governance System Policy Brief SMEs Development in the Devolved Governance System Policy Options for Institutional and Regulatory Reforms in Kenya No. 1/2013 David Ong olo & Samson Odhiambo Small and Medium Enterprises

More information

I N T R O D U C T I O N THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES.

I N T R O D U C T I O N THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES. I N T R O D U C T I O N Public Procurement means: THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES. This process includes purchasing, hiring, leasing or any other contractual

More information

Step 1: Analyze Data. 1.1 Organize

Step 1: Analyze Data. 1.1 Organize A private sector assessment combines quantitative and qualitative methods to increase knowledge about the private health sector. In the analytic phase, the team organizes and examines information amassed

More information

RiskManagement ESIEE 06/03/2012. Aloysius John March 2012

RiskManagement ESIEE 06/03/2012. Aloysius John March 2012 RiskManagement MOTIS ESIEE 06/03/2012 Aloysius John March 2012 Risk Management is a Introduction Process for Project manager to identify factors that may more or less affect the success or the achievement

More information

PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS

PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS 1 Table of Contents Background A. Criteria B. Definition C. Rationale D. Initiator E. Timing F. Planning G. Involvement of the Independent

More information

6 Project Planning Matrix (PPM) - Overview (in brief)

6 Project Planning Matrix (PPM) - Overview (in brief) COMIT: ZOPP - PPM (Overview) 76 6 Project Planning Matrix (PPM) - Overview (in brief) 6.1 What is a PPM? The PPM provides a one-page summary: Why What How Which How Where a project is carried out (= who/what

More information

Making business simple...

Making business simple... Making business simple... Introduction 2 Contents Every business needs a Marketing Plan. This guide has been created to assist you in putting your Marketing Plan together. This guide will help you to indicate

More information

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection

More information

Strategic Planning. Strategic Planning

Strategic Planning. Strategic Planning 4 Strategic Planning Strategic Planning 1 4 TABLE OF CONTENTS Strategic Planning 3... What is Strategic Planning? 3... Why do Strategic Planning? 4... Assessing Your Strategic Planning 5... Developing

More information

COMPREHENSIVE COMMUNITY SERVICES

COMPREHENSIVE COMMUNITY SERVICES COMPREHENSIVE COMMUNITY SERVICES Strategic Plan July 2013 June 2015 Contents Vision and Mission 3 Leadership Philosophy 4 Strengths, Weaknesses, Opportunities and Threats (SWOT Analysis) 5 Goals 6 Strategies

More information

SOLUTION: BUSINESS MANAGEMENT, MAY 2014. (b) Factors to consider when deciding on the appropriate structure for an organization include the following:

SOLUTION: BUSINESS MANAGEMENT, MAY 2014. (b) Factors to consider when deciding on the appropriate structure for an organization include the following: SOLUTION 1 (a) The structure of an organization defines the patterns of communication, the system of control and the command structure. (b) Factors to consider when deciding on the appropriate structure

More information

ROADMAP. A. Context and problem definition

ROADMAP. A. Context and problem definition TITLE OF THE INITIATIVE ROADMAP Commission Communication on EU Risk management and supply chain security LEAD DG RESPONSIBLE UNIT TAXUD B2 DATE OF ROADMAP 10 / 2012 This indicative roadmap is provided

More information

EAST AFRICA DAIRY DEVELOPMENT EADD II PROGRAM, TANZANIA Terms of Reference for Tanzania Dairy Consumer Study

EAST AFRICA DAIRY DEVELOPMENT EADD II PROGRAM, TANZANIA Terms of Reference for Tanzania Dairy Consumer Study EAST AFRICA DAIRY DEVELOPMENT EADD II PROGRAM, TANZANIA Terms of Reference for Tanzania Dairy Consumer Study 1. BACKGROUND The East Africa Dairy Development Project (EADD) is a regional industry development

More information

DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES

DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES Ref. Ares(2014)571140-04/03/2014 DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES EXECUTIVE SUMMARY January 2014 TABLE OF CONTENTS Introduction 1. RATIONALE FOR BUDGET SUPPORT 1.1 What is Budget Support?

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The finance sector in Bangladesh is diverse,

More information

National Standards for Headteachers

National Standards for Headteachers Guidance Organisation & Management National Standards for Headteachers Staff Management Status: Information Date of issue: 10/2004 Ref: DfES/0083/2004 Contents Introduction 2 Shaping the Future 6 Leading

More information

Basic qualification requirements for Federal Administration managers and executives

Basic qualification requirements for Federal Administration managers and executives Basic qualification requirements for Federal Administration managers and executives Basic qualification requirements for managers and executives Basic qualification requirements are minimum requirements

More information

EXHIBIT CC. Identifying Management Level Knowledge, Skills and Abilities. Executive Core Competencies (ECCs)

EXHIBIT CC. Identifying Management Level Knowledge, Skills and Abilities. Executive Core Competencies (ECCs) EXHIBIT CC Identifying Management Level Knowledge, Skills and Abilities Executive Core Competencies (ECCs) ECC One: Leading Change ECC Two: Leading People ECC Three: Results Driven ECC Four: Business Acumen

More information

TRIBES STRATEGIC PLANNING WORKSHOPS NW & AK TTAP

TRIBES STRATEGIC PLANNING WORKSHOPS NW & AK TTAP STRATEGIC PLANNING WORKSHOP OVERVIEW Strategic Planning is a process to effectively direct government and business activities through critical problem solving. Strategic Planning is an effective means

More information

HRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 3rd edition

HRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 3rd edition HRM Human Resource Management Rapid Assessment Tool for Health Organizations A Guide for Strengthening HRM Systems 3rd edition . Human Resource Management Rapid Assessment Tool Copyright 2005, renewed

More information

MARKETING PLAN. Ing. Eleonóra Veresová, PhD. Všeobecná úverová banka, Trebišov branch. The Strategic Marketing Process, Actions and Information 3

MARKETING PLAN. Ing. Eleonóra Veresová, PhD. Všeobecná úverová banka, Trebišov branch. The Strategic Marketing Process, Actions and Information 3 MARKETING PLAN Ing. Eleonóra Veresová, PhD. Všeobecná úverová banka, Trebišov branch Businesses operating in market conditions can have positive or negative results. The reason for failure can be the assertion

More information

Logical Framework: Making it Results-Oriented

Logical Framework: Making it Results-Oriented 1 of 11 2001-04-05 09:58 Logical Framework: Making it Results-Oriented Table of Contents 1. Introduction 2. Purpose of Guide 3. The LFA Process 4. The Logical Framework Structure 5. The Vertical Logic

More information

To introduce Logical Framework Analysis (LFA) and its uses. To become familiar with the main steps involved in conducting an LFA

To introduce Logical Framework Analysis (LFA) and its uses. To become familiar with the main steps involved in conducting an LFA Adapted in part from Designing Projects and Project Evaluations Using The Logical Framework Approach by Bill Jackson Objectives To introduce Logical Framework Analysis (LFA) and its uses To become familiar

More information

RELATIONAL DIAGRAM OF MAIN CAPABILITIES. Strategic Position position (A) Strategic Choices choices (B) Strategic Action action (C)

RELATIONAL DIAGRAM OF MAIN CAPABILITIES. Strategic Position position (A) Strategic Choices choices (B) Strategic Action action (C) Business Analysis (P3) September 2015 to August 2016 Syllabus AIM FR (F7) BA (P3) AB (F1) APM (P5) PM (F5) To apply relevant knowledge, skills, and exercise professional judgement in assessing strategic

More information

EXAM EXEMPLAR QUESTIONS

EXAM EXEMPLAR QUESTIONS Level 6 Professional Diploma in Procurement and Supply PD2 - Corporate and business strategy EXAM EXEMPLAR QUESTIONS QUESTIONS AND INDICATIVE ANSWER CONTENT Page 1 of 8 QUALIFICATIONS 2013 QUESTIONS AND

More information

SEE Project Generation. South East Europe Transnational Programme Kick off conference. Budapest, 28 March 2008

SEE Project Generation. South East Europe Transnational Programme Kick off conference. Budapest, 28 March 2008 SEE Project Generation South East Europe Transnational Programme Kick off conference Budapest, 28 March 2008 What is a project? A project is defined by the need to achieve fixed objectives with limited

More information

OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013

OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013 OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013 Advisory Committee on Equal Opportunities Between Women and Men July 2006 1 Opinion 1 on GENDER DIMENSION IN

More information

Gap analysis: an assessment of service users needs in a given field of service compared with services currently available.

Gap analysis: an assessment of service users needs in a given field of service compared with services currently available. NONPROFIT BUSINESS PLANNING PROJECT Available tools and approaches for planning One of the main purposes of the Nonprofit Business Planning Project is to contextualize current ways of thinking about planning.

More information

Strategic Plan Development Workshop. A facilitation guide. Girls Not Brides: The Global Partnership to End Child Marriage

Strategic Plan Development Workshop. A facilitation guide. Girls Not Brides: The Global Partnership to End Child Marriage Strategic Plan Development Workshop A facilitation guide Girls Not Brides: The Global Partnership to End Child Marriage February 2016 1 Table of Contents Introduction... 3 Workshop agenda... 4 Before you

More information

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS 7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION

More information

UNIVERSITY BOARD SKILLS REVIEW MATRIX 2014. Page 1 of 5

UNIVERSITY BOARD SKILLS REVIEW MATRIX 2014. Page 1 of 5 UNIVERSITY BOARD SKILLS REVIEW MATRIX 2014 Each key skill is linked to relevant strategic objectives and/or the Board s Statement of Primary Responsibilities. To assist with the assessment of Board Members

More information

Blackblot PMTK Marketing Review. <Comment: Replace the Blackblot logo with your company logo.>

Blackblot PMTK Marketing Review. <Comment: Replace the Blackblot logo with your company logo.> Company Name: Product Name: Date: Contact: Department: Location: Email: Telephone: Blackblot PMTK Marketing Review Document Revision History:

More information

1. Background and business case

1. Background and business case 1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons

More information

P3M3 Portfolio Management Self-Assessment

P3M3 Portfolio Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction

More information

AUDIT OF INFORMATION TECHNOLOGY Management (Action Plan) Responses February 2005 # PRIORITY DESCRIPTION MANAGEMENT RESPONSE

AUDIT OF INFORMATION TECHNOLOGY Management (Action Plan) Responses February 2005 # PRIORITY DESCRIPTION MANAGEMENT RESPONSE AUDIT OF INFORMATION TECHNOLOGY Management (Action Plan) Responses February 2005 # PRIORITY DESCRIPTION MANAGEMENT RESPONSE Ref: Chapter 3.1 GOVERNANCE FRAMEWORK Information Technology Steering Committee

More information

Guide for the Development of Results-based Management and Accountability Frameworks

Guide for the Development of Results-based Management and Accountability Frameworks Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and

More information

PARTICIPATORY EVALUATION (PE) MANDAKINI PANT

PARTICIPATORY EVALUATION (PE) MANDAKINI PANT 9 PARTICIPATORY EVALUATION (PE) PARTICIPATORY EVALUATION (PE) Structure 9.1 Introduction 9.2 Purpose and Function of Evaluation 9.3 Historical Context 9.4 Participatory Monitoring and Evaluation Process

More information

Strategic Planning OVERVIEW. Brief description

Strategic Planning OVERVIEW. Brief description OVERVIEW Brief description This toolkit provides a model for taking an organisation through a strategic planning process. It covers planning to do strategic planning, covering the background issues that

More information

Monitoring and Evaluation Framework and Strategy. GAVI Alliance 2011-2015

Monitoring and Evaluation Framework and Strategy. GAVI Alliance 2011-2015 Monitoring and Evaluation Framework and Strategy GAVI Alliance 2011-2015 NOTE TO READERS The 2011-2015 Monitoring and Evaluation Framework and Strategy will continue to be used through the end of 2016.

More information

Management Seminar on Global Assessments, Yalta, 23-25 September 2009. Macedonian experience with the use of Global Assessment

Management Seminar on Global Assessments, Yalta, 23-25 September 2009. Macedonian experience with the use of Global Assessment United Nations Economic Commission for Europe Management Seminar on Global Assessments, Yalta, 23-25 September 2009 Macedonian experience with the use of Global Assessment MSc Blagica Novkovska, Director

More information

What is the Global Innovation Platform. Challenge Driven Innovation

What is the Global Innovation Platform. Challenge Driven Innovation What is the Global Innovation Platform Global Innovation Platform (GIP) is the eco-system booster for challenge driven innovation, tailor-made for cities, regions and companies. By integrating an innovative

More information

Project/programme planning Guidance manual

Project/programme planning Guidance manual Project/programme planning Guidance manual strategy2020 Strategy 2020 voices the collective determination of the International Federation of Red Cross and Red Crescent Societies (IFRC) to move forward

More information

Project Risk Management

Project Risk Management Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management

More information