Malaysia State Government Data Center Construction
|
|
|
- Charla Johnston
- 10 years ago
- Views:
Transcription
1 Malaysia State Government Data Center Construction
2 1 Project Background Malaysia state government plans to construct new data center in 2013 to carry more government internal data communication and provide server hosting service for some specific commercial users. The new data center construction needs to consider the high availability, high redundancy, high bandwidth, and high scalability. Malaysia state government has been using Maipu devices for years. Maipu high-end switch S6800 series, access switch S3300 series, and S3200 series have been used to provide LAN solution for the government. MP1800 router series has also been used as CPE devices and been extensively deployed in different areas of the Malaysia government. To be confident of Maipu stable product lines and good technical support, through deep communication with the government project team, customer of Malaysia state government decide to use the network devices from all from Maipu. For Maipu, this chance means confidence and also challenge.
3 2 Project Solution 2.1 Topology In the new data center LAN, deploy two SM A switches and use the virtual stacking technology to simplify the network. In the new data center WAN, deploy a MP7500E-08 switch as the MPLS P device and SM6800 Core switch.
4 2.2 Description According to the Malaysia state government new data center construction plan, the LAN uses two-layer network design: access layer and core layer. In the core layer, two SM A switches and Maipu virtual stacking technology are used to simplify the network and improve the LAN bandwidth utilization rate. In the access layer, SM4300 switches, SM TP switches, and SM TC switches are used. The access switches will also use the virtual stacking technology that the LACP link aggregation is used to connected up to the core switch and down to the server in the future. In the LAN, two MSG4000-X1 high-performance firewalls are adopted to protect the data switching participated by all servers. At the Internet egress port of the new data center, another MSG4000-X1 will be adopted to ensure the access validity. The MAN adopts the MPLS protocol to interconnect with the old data center. A MP7500E serves as the P device of the new data center, a SM A as the PE device, and a MP2824 router as another PE service. The PE devices will increase with the service increasing. Detailed design principle: 1) All devices deployed in the new data center use the redundant power system and redundant upper connection configuration to improve the device and network reliability. 2) Two SM A core switches use the Maipu VST (Virtual Stacking Technology) to change the multi-ring topology brought by the traditional MSTP spanning tree networking to a simpler and clearer tree topology. This also solves the defect that the spanning tree networking bandwidth cannot be 100% utilized. 3) All data switching participated by all servers need two HA MSG4000-X1 firewalls to ensure the validity and reliability of all data accessing the server. The firewall can also track the data interaction information based on user, time, and data with powerful statistics function.
5 3 Case Effect Malaysia state government new data center construction has high availability, high redundancy, high bandwidth, and high scalability features to ensure the stable and efficient running of the government interval office service and external service hosting service. The success application of Maipu high-end switch and router in Malaysia government new data center shows that both Maipu products and solutions are completely qualified for the entire network construction of the enterprise data center. In addition, the high-end communication devices break the monopoly situation of the traditional manufactures and displays Malaysia state government's high recognition for Maipu communication, technology strength, product and service.
PowerLink Bandwidth Aggregation Redundant WAN Link and VPN Fail-Over Solutions
Bandwidth Aggregation Redundant WAN Link and VPN Fail-Over Solutions Find your network example: 1. Basic network with and 2 WAN lines - click here 2. Add a web server to the LAN - click here 3. Add a web,
VPLS lies at the heart of our Next Generation Network approach to creating converged, simplified WANs.
Virtual Private LAN Service (VPLS) A WAN that thinks it s a LAN. VPLS is a high security, low latency means to connect sites or services either point-to-point or as a mesh. We use Virtual Private LAN Service
Non-blocking Switching in the Cloud Computing Era
Non-blocking Switching in the Cloud Computing Era Contents 1 Foreword... 3 2 Networks Must Go With the Flow in the Cloud Computing Era... 3 3 Fat-tree Architecture Achieves a Non-blocking Data Center Network...
APPENDIX 8 TO SCHEDULE 3.3
EHIBIT Q to Amendment No. 60 - APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT EHIBIT Q to Amendment No.
Increase Simplicity and Improve Reliability with VPLS on the MX Series Routers
SOLUTION BRIEF Enterprise Data Center Interconnectivity Increase Simplicity and Improve Reliability with VPLS on the Routers Challenge As enterprises improve business continuity by enabling resource allocation
Bandwidth-based load-balancing with failover. The easy way. We need more bandwidth.
Bandwidth-based load-balancing with failover. The easy way. We need more bandwidth. Presenter information Tomas Kirnak Network design Security, wireless Servers, Virtualization Mikrotik Certified Trainer
NETWORKING FOR DATA CENTER CONVERGENCE, VIRTUALIZATION & CLOUD. Debbie Montano, Chief Architect [email protected]
NETWORKING FOR DATA CENTER CONVERGENCE, VIRTUALIZATION & CLOUD Debbie Montano, Chief Architect [email protected] DISCLAIMER This statement of direction sets forth Juniper Networks current intention
Interconnecting Cisco Networking Devices: Accelerated (CCNAX) 2.0(80 Hs) 1-Interconnecting Cisco Networking Devices Part 1 (40 Hs)
Interconnecting Cisco Networking Devices: Accelerated (CCNAX) 2.0(80 Hs) 1-Interconnecting Cisco Networking Devices Part 1 (40 Hs) 2-Interconnecting Cisco Networking Devices Part 2 (40 Hs) 1-Interconnecting
Description: Objective: Upon completing this course, the learner will be able to meet these overall objectives:
Course: Building Cisco Service Provider Next-Generation Networks, Part 2 Duration: 5 Day Hands-On Lab & Lecture Course Price: $ 3,750.00 Learning Credits: 38 Description: The Building Cisco Service Provider
Huawei One Net Campus Network Solution
Huawei One Net Campus Network Solution 2 引 言 3 园 区 网 面 临 的 挑 战 4 华 为 园 区 网 解 决 方 案 介 绍 6 华 为 园 区 网 解 决 方 案 对 应 产 品 组 合 6 结 束 语 Introduction campus network is an internal network of an enterprise or organization,
Layer 3 Network + Dedicated Internet Connectivity
Layer 3 Network + Dedicated Internet Connectivity Client: One of the IT Departments in a Northern State Customer's requirement: The customer wanted to establish CAN connectivity (Campus Area Network) for
Objectives. Explain the Role of Redundancy in a Converged Switched Network. Explain the Role of Redundancy in a Converged Switched Network
Implement Spanning Tree Protocols LAN Switching and Wireless Chapter 5 Objectives Explain the role of redundancy in a converged network Summarize how STP works to eliminate Layer 2 loops in a converged
Top-Down Network Design
Top-Down Network Design Chapter Five Designing a Network Topology Copyright 2010 Cisco Press & Priscilla Oppenheimer Topology A map of an internetwork that indicates network segments, interconnection points,
Layer T and Layer C: Collapsing Communications Networks into Transport and Cloud Services
Layer T and Layer C: Collapsing Communications Networks into Transport and Cloud Services March 20, 2015 JJ Summary Rick Talbot Current Analysis Principal Analyst, Optical Infrastructure Rapid network
TRILL for Data Center Networks
24.05.13 TRILL for Data Center Networks www.huawei.com enterprise.huawei.com Davis Wu Deputy Director of Switzerland Enterprise Group E-mail: [email protected] Tel: 0041-798658759 Agenda 1 TRILL Overview
APPENDIX 8 TO SCHEDULE 3.3
APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE
Deploying Brocade VDX 6720 Data Center Switches with Brocade VCS in Enterprise Data Centers
WHITE PAPER www.brocade.com Data Center Deploying Brocade VDX 6720 Data Center Switches with Brocade VCS in Enterprise Data Centers At the heart of Brocade VDX 6720 switches is Brocade Virtual Cluster
What s New in VMware vsphere 5.5 Networking
VMware vsphere 5.5 TECHNICAL MARKETING DOCUMENTATION Table of Contents Introduction.................................................................. 3 VMware vsphere Distributed Switch Enhancements..............................
Network Virtualization
Network Virtualization Petr Grygárek 1 Network Virtualization Implementation of separate logical network environments (Virtual Networks, VNs) for multiple groups on shared physical infrastructure Total
The Road to Cloud Computing How to Evolve Your Data Center LAN to Support Virtualization and Cloud
The Road to Cloud Computing How to Evolve Your Data Center LAN to Support Virtualization and Cloud Introduction Cloud computing is one of the most important topics in IT. The reason for that importance
Data Center Networking Designing Today s Data Center
Data Center Networking Designing Today s Data Center There is nothing more important than our customers. Data Center Networking Designing Today s Data Center Executive Summary Demand for application availability
MPLS-TP. Future Ready. Today. Introduction. Connection Oriented Transport
MPLS-TP Future Ready. Today Introduction As data traffic started dominating telecom networks, there was a need for transport data networks, as opposed to transport TDM networks. Traditional transport technologies
ALCATEL-LUCENT ENTERPRISE DATA CENTER SWITCHING SOLUTION Automation for the next-generation data center
ALCATEL-LUCENT ENTERPRISE DATA CENTER SWITCHING SOLUTION Automation for the next-generation data center A NEW NETWORK PARADIGM What do the following trends have in common? Virtualization Real-time applications
Flow Analysis Versus Packet Analysis. What Should You Choose?
Flow Analysis Versus Packet Analysis. What Should You Choose? www.netfort.com Flow analysis can help to determine traffic statistics overall, but it falls short when you need to analyse a specific conversation
WHITE PAPER. Copyright 2011, Juniper Networks, Inc. 1
WHITE PAPER Network Simplification with Juniper Networks Technology Copyright 2011, Juniper Networks, Inc. 1 WHITE PAPER - Network Simplification with Juniper Networks Technology Table of Contents Executive
CARRIER MPLS VPN September 2014
CARRIER MPLS VPN September 2014 SERVICE OVERVIEW The International MPLS IP-VPN service provides a full range of VPN connectivity solutions, including: Carrier MPLS IP VPN: dedicated to operators looking
DEPLOYMENT GUIDE. This document gives a brief overview of deployment preparation, installation and configuration of a Vectra X-series platform.
This document gives a brief overview of deployment preparation, installation and configuration of a Vectra X-series platform. Traffic Requirements The Vectra X-series platform detects threats and attacks
November 2013. Defining the Value of MPLS VPNs
November 2013 S P E C I A L R E P O R T Defining the Value of MPLS VPNs Table of Contents Introduction... 3 What Are VPNs?... 4 What Are MPLS VPNs?... 5 What Are the Benefits of MPLS VPNs?... 8 How Do
NEED NETWORK VISIBILITY? www.netusage.net TOTAL NETWORK VISIBILITY
NEED NETWORK VISIBILITY? Look Inside >>>>>> www.netusage.net TOTAL NETWORK VISIBILITY Netusage in the enterprise Your Top 10 Network Dilemmas 1. Do you know at any point in time what applications are
Rohde & Schwarz R&S SITLine ETH VLAN Encryption Device Functionality & Performance Tests
Rohde & Schwarz R&S Encryption Device Functionality & Performance Tests Introduction Following to our test of the Rohde & Schwarz ETH encryption device in April 28 the European Advanced Networking Test
Cisco Certified Network Professional - Routing & Switching
Cisco Certified Network Professional - Routing & Switching Information Course Price 5,265 No. Vouchers: Course Code 0 Vouchers CCNP-RS No. Courses: 3 1/9 Implementing Cisco IP Routing Information Length:
Introduction. What is a Remote Console? What is the Server Service? A Remote Control Enabled (RCE) Console
Contents Introduction... 3 What is a Remote Console?... 3 What is the Server Service?... 3 A Remote Control Enabled (RCE) Console... 3 Differences Between the Server Service and an RCE Console... 4 Configuring
SummitStack in the Data Center
SummitStack in the Data Center Abstract: This white paper describes the challenges in the virtualized server environment and the solution Extreme Networks offers a highly virtualized, centrally manageable
Meraki Stacking. White Paper
White Paper Meraki Stacking OCTOBER 2015 This document describes the benefits of Meraki Stacking technology and how it can be used to manage a distributed network. In addition, this document will cover
PR03. High Availability
PR03 High Availability Related Topics NI10 Ethernet/IP Best Practices NI15 Enterprise Data Collection Options NI16 Thin Client Overview Solution Area 4 (Process) Agenda Overview Controllers & I/O Software
Addressing Scaling Challenges in the Data Center
Addressing Scaling Challenges in the Data Center DELL PowerConnect J-Series Virtual Chassis Solution A Dell Technical White Paper Dell Juniper THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY
CLOUD NETWORKING FOR ENTERPRISE CAMPUS APPLICATION NOTE
CLOUD NETWORKING FOR ENTERPRISE CAMPUS APPLICATION NOTE EXECUTIVE SUMMARY This application note proposes Virtual Extensible LAN (VXLAN) as a solution technology to deliver departmental segmentation, business
Introducing Brocade VCS Technology
WHITE PAPER www.brocade.com Data Center Introducing Brocade VCS Technology Brocade VCS technology is designed to revolutionize the way data center networks are architected and how they function. Not that
Demonstrating the high performance and feature richness of the compact MX Series
WHITE PAPER Midrange MX Series 3D Universal Edge Routers Evaluation Report Demonstrating the high performance and feature richness of the compact MX Series Copyright 2011, Juniper Networks, Inc. 1 Table
A Link Load Balancing Solution for Multi-Homed Networks
A Link Load Balancing Solution for Multi-Homed Networks Overview An increasing number of enterprises are using the Internet for delivering mission-critical content and applications. By maintaining only
VPLS Technology White Paper HUAWEI TECHNOLOGIES CO., LTD. Issue 01. Date 2012-10-30
Issue 01 Date 2012-10-30 HUAWEI TECHNOLOGIES CO., LTD. 2012. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of
White Paper. Network Simplification with Juniper Networks Virtual Chassis Technology
Network Simplification with Juniper Networks Technology 1 Network Simplification with Juniper Networks Technology Table of Contents Executive Summary... 3 Introduction... 3 Data Center Network Challenges...
Lab 5.5.3 Developing ACLs to Implement Firewall Rule Sets
Lab 5.5.3 Developing ACLs to Implement Firewall Rule Sets All contents are Copyright 1992 2007 Cisco Systems, Inc. All rights reserved. This document is Cisco Public Information. Page 1 of 8 Device Interface
Migrate from Cisco Catalyst 6500 Series Switches to Cisco Nexus 9000 Series Switches
Migration Guide Migrate from Cisco Catalyst 6500 Series Switches to Cisco Nexus 9000 Series Switches Migration Guide November 2013 2013 Cisco and/or its affiliates. All rights reserved. This document is
Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards
Redundancy = Protection from Network Failure. Redundancy Standards WP-31-REV0-4708-1/5 Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards For a very
Cisco Virtualized Multiservice Data Center Reference Architecture: Building the Unified Data Center
Solution Overview Cisco Virtualized Multiservice Data Center Reference Architecture: Building the Unified Data Center What You Will Learn The data center infrastructure is critical to the evolution of
Switching Solution Creating the foundation for the next-generation data center
Alcatel-Lucent Enterprise Data Center Switching Solution Creating the foundation for the next-generation data center a new network paradigm What do the following trends have in common? Virtualization Real-time
Juniper / Cisco Interoperability Tests. August 2014
Juniper / Cisco Interoperability Tests August 2014 Executive Summary Juniper Networks commissioned Network Test to assess interoperability, with an emphasis on data center connectivity, between Juniper
ethernet services for multi-site connectivity security, performance, ip transparency
ethernet services for multi-site connectivity security, performance, ip transparency INTRODUCTION Interconnecting three or more sites across a metro or wide area network has traditionally been accomplished
ALCATEL-LUCENT ENTERPRISE DATA CENTER SWITCHING SOLUTION Automation for the next-generation data center
ALCATEL-LUCENT ENTERPRISE DATA CENTER SWITCHING SOLUTION Automation for the next-generation data center A NEW NETWORK PARADIGM What do the following trends have in common? Virtualization Real-time applications
Virtual Private LAN Service
Virtual Private LAN Service Authors Kireeti Kompella, Juniper Networks, 1194 N Mathilda Avenue, Sunnyvale, CA 94089, USA E-mail : [email protected] Jean-Marc Uzé, Juniper Networks, Espace 21, 31 Place
Cox Business. L2 / L3 and Network Topology Overview. February 1, 2011
Cox Business L2 / L3 and Network Topology Overview February 1, 2011 Layer 3 / Layer 2 Comparo Protocol Architecture Control Change: Adding sites Change: IP changes Faults: Management Faults: Calls Layer
MITEL. NetSolutions. Flat Rate MPLS VPN
MITEL NetSolutions Flat Rate MPLS VPN A Comprehensive, Intelligent Network-based Solution Businesses today demand an ever-evolving list of requirements of their networks. From connecting branch locations
TRILL Large Layer 2 Network Solution
TRILL Large Layer 2 Network Solution Contents 1 Network Architecture Requirements of Data Centers in the Cloud Computing Era... 3 2 TRILL Characteristics... 5 3 Huawei TRILL-based Large Layer 2 Network
Leased Line + Remote Dial-in connectivity
Leased Line + Remote Dial-in connectivity Client: One of the TELCO offices in a Southern state. The customer wanted to establish WAN Connectivity between central location and 10 remote locations. The customer
Nationwide WAN + VoIP connectivity
Nationwide WAN + VoIP connectivity Client: Multi-state network of universities based in a Southern state. Customer's requirement: The customer wanted to establish WAN connectivity between the Head office
EXINDA NETWORKS. Deployment Topologies
EXINDA NETWORKS Deployment Topologies September 2005 :: Award Winning Application Traffic Management Solutions :: :: www.exinda.com :: Exinda Networks :: [email protected] :: 2005 Exinda Networks Pty Ltd.
TRILL for Service Provider Data Center and IXP. Francois Tallet, Cisco Systems
for Service Provider Data Center and IXP Francois Tallet, Cisco Systems 1 : Transparent Interconnection of Lots of Links overview How works designs Conclusion 2 IETF standard for Layer 2 multipathing Driven
IP Telephony Deployment Models
CHAPTER 2 Sections in this chapter address the following topics: Single Site, page 2-1 Multisite Implementation with Distributed Call Processing, page 2-3 Design Considerations for Section 508 Conformance,
SummitStack in the Data Center
SummitStack in the Data Center Abstract: This white paper describes the challenges in the virtualized server environment and the solution that Extreme Networks offers a highly virtualized, centrally manageable
Chapter 1 Reading Organizer
Chapter 1 Reading Organizer After completion of this chapter, you should be able to: Describe convergence of data, voice and video in the context of switched networks Describe a switched network in a small
Switching in an Enterprise Network
Switching in an Enterprise Network Introducing Routing and Switching in the Enterprise Chapter 3 Version 4.0 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 1 Objectives Compare the types of
Software Defined Network Application in Hospital
InImpact: The Journal of Innovation Impact: ISSN 2051-6002 : http://www.inimpact.org Special Edition on Innovation in Medicine and Healthcare : Vol. 6. No. 1 : pp.1-11 : imed13-011 Software Defined Network
Simplifying the Data Center Network to Reduce Complexity and Improve Performance
SOLUTION BRIEF Juniper Networks 3-2-1 Data Center Network Simplifying the Data Center Network to Reduce Complexity and Improve Performance Challenge Escalating traffic levels, increasing numbers of applications,
Data Center Infrastructure of the future. Alexei Agueev, Systems Engineer
Data Center Infrastructure of the future Alexei Agueev, Systems Engineer Traditional DC Architecture Limitations Legacy 3 Tier DC Model Layer 2 Layer 2 Domain Layer 2 Layer 2 Domain Oversubscription Ports
SSVP SIP School VoIP Professional Certification
SSVP SIP School VoIP Professional Certification Exam Objectives The SSVP exam is designed to test your skills and knowledge on the basics of Networking and Voice over IP. Everything that you need to cover
Large-Scale Distributed Systems. Datacenter Networks. COMP6511A Spring 2014 HKUST. Lin Gu [email protected]
Large-Scale Distributed Systems Datacenter Networks COMP6511A Spring 2014 HKUST Lin Gu [email protected] Datacenter Networking Major Components of a Datacenter Computing hardware (equipment racks) Power supply
CONTROL LEVEL NETWORK RESILIENCY USING RING TOPOLOGIES. Joseph C. Lee, Product Manager Jessica Forguites, Product Specialist
CONTROL LEVEL NETWORK RESILIENCY Written by: Joseph C. Lee, Product Manager Jessica Forguites, Product Specialist DANGER 65 65 65 65 65 65 65 65 EtherNet/IP 1 3 4 5 6 LINK 1 LINK MOD NET 15 14 13 1 11
State of Texas. TEX-AN Next Generation. NNI Plan
State of Texas TEX-AN Next Generation NNI Plan Table of Contents 1. INTRODUCTION... 1 1.1. Purpose... 1 2. NNI APPROACH... 2 2.1. Proposed Interconnection Capacity... 2 2.2. Collocation Equipment Requirements...
WAN Migration Techniques
Jan 2014, HAPPIEST MINDS TECHNOLOGIES WAN Migration Techniques Lalit Kumar SHARING. MINDFUL. INTEGRITY. LEARNING. EXCELLENCE. SOCIAL RESPONSIBILITY. 2 Copyright Information This document is exclusive property
Data Center Solution V100R001C00. Network Design Guide. Issue 01. Date 2011-08-31 HUAWEI TECHNOLOGIES CO., LTD.
V100R001C00 Issue 01 Date 2011-08-31 HUAWEI TECHNOLOGIES CO., LTD. . 2011. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written
Going Critical. How to Design Advanced Security Networks for the Nation s Infrastructure. w w w. G a r r e t t C o m. C o m
Going Critical How to Design Advanced Security Networks for the Nation s Infrastructure Going Critical: Networks for Physical Security Increasing concerns and market growth Asset protection Public safety
Figure 41-1 IP Filter Rules
41. Firewall / IP Filter This function allows user to enable the functionality of IP filter. Both inside and outside packets through router could be decided to allow or drop by supervisor. Figure 41-1
Analyze hop-by-hop path, devices, interfaces, and queues Locate and troubleshoot problems
Visualization, Management, and Control for Cisco IWAN Data sheet Overview Intelligent WAN is a Cisco solution that enables enterprises to realize significant cost savings by moving to less expensive transport
Transform Your Business and Protect Your Cisco Nexus Investment While Adopting Cisco Application Centric Infrastructure
White Paper Transform Your Business and Protect Your Cisco Nexus Investment While Adopting Cisco Application Centric Infrastructure What You Will Learn The new Cisco Application Centric Infrastructure
ICTTEN6172A Design and configure an IP- MPLS network with virtual private network tunnelling
ICTTEN6172A Design and configure an IP- MPLS network with virtual private network tunnelling Release: 1 ICTTEN6172A Design and configure an IP-MPLS network with virtual private network tunnelling Modification
H3C SR8800 RPR Technology White Paper
H3C 00 RPR Technology White Paper Keywords: RPR, IP ring network Abstract: Resilient Packet Ring (RPR) is an international standard for establishing IP ring networks, offering a highly efficient and reliable
ADVANCED NETWORK CONFIGURATION GUIDE
White Paper ADVANCED NETWORK CONFIGURATION GUIDE CONTENTS Introduction 1 Terminology 1 VLAN configuration 2 NIC Bonding configuration 3 Jumbo frame configuration 4 Other I/O high availability options 4
software networking Jithesh TJ, Santhosh Karipur QuEST Global
software defined networking Software Defined Networking is an emerging trend in the networking and communication industry and it promises to deliver enormous benefits, from reduced costs to more efficient
Sustainable Network Resource Management System for Virtual Private Clouds
Sustainable Network Resource Management System for Virtual Private Clouds Takahiro Miyamoto Michiaki Hayashi Kosuke Nishimura KDDI R&D Laboratories Inc. Cloud computing environment Infrastructure as a
Lab 4.5.2 Diagramming Intranet Traffic Flows
Lab 4.5.2 Diagramming Intranet Traffic Flows Objective Device Designation Device Name Address Subnet Mask Discovery Server Business Services 172.17.1.1 255.255.0.0 R1 FC-CPE-1 Fa0/1 172.17.0.1 Fa0/0 10.0.0.1
EVOLVING ENTERPRISE NETWORKS WITH SPB-M APPLICATION NOTE
EVOLVING ENTERPRISE NETWORKS WITH SPB-M APPLICATION NOTE EXECUTIVE SUMMARY Enterprise network managers are being forced to do more with less. Their networks are growing in size and complexity. They need
Jive Core: Platform, Infrastructure, and Installation
Jive Core: Platform, Infrastructure, and Installation Jive Communications, Inc. 888-850-3009 www.getjive.com 1 Overview Jive hosted services are run on Jive Core, a proprietary, cloud-based platform. Jive
CHAPTER 10 LAN REDUNDANCY. Scaling Networks
CHAPTER 10 LAN REDUNDANCY Scaling Networks CHAPTER 10 10.0 Introduction 10.1 Spanning Tree Concepts 10.2 Varieties of Spanning Tree Protocols 10.3 Spanning Tree Configuration 10.4 First-Hop Redundancy
OVERLAYING VIRTUALIZED LAYER 2 NETWORKS OVER LAYER 3 NETWORKS
OVERLAYING VIRTUALIZED LAYER 2 NETWORKS OVER LAYER 3 NETWORKS Matt Eclavea ([email protected]) Senior Solutions Architect, Brocade Communications Inc. Jim Allen ([email protected]) Senior Architect, Limelight
SSVVP SIP School VVoIP Professional Certification
SSVVP SIP School VVoIP Professional Certification Exam Objectives The SSVVP exam is designed to test your skills and knowledge on the basics of Networking, Voice over IP and Video over IP. Everything that
Development of the FITELnet-G20 Metro Edge Router
Development of the Metro Edge Router by Tomoyuki Fukunaga * With the increasing use of broadband Internet, it is to be expected that fiber-tothe-home (FTTH) service will expand as the means of providing
Troubleshooting and Maintaining Cisco IP Networks Volume 1
Troubleshooting and Maintaining Cisco IP Networks Volume 1 Course Introduction Learner Skills and Knowledge Course Goal and E Learning Goal and Course Flow Additional Cisco Glossary of Terms Your Training
Virtual PortChannels: Building Networks without Spanning Tree Protocol
. White Paper Virtual PortChannels: Building Networks without Spanning Tree Protocol What You Will Learn This document provides an in-depth look at Cisco's virtual PortChannel (vpc) technology, as developed
Planning for Information Network
Planning for Information Network Lecture 5: Designing IP Addressing in the Network II Assistant Teacher Samraa Adnan Al-Asadi 1 Subnetting the Subnet When contiguous 1s are added to the default mask, making
Network Security Topologies. Chapter 11
Network Security Topologies Chapter 11 Learning Objectives Explain network perimeter s importance to an organization s security policies Identify place and role of the demilitarized zone in the network
IP, Ethernet and MPLS
IP, Ethernet and MPLS Networks Resource and Fault Management Andre Perez ISTE WILEY Table of Contents Preface xi Chapter 1. Network Operation 1 1.1. Basic concepts 1 1.1.1. Layered structure 1 1.1.2. LANs
Data Center Convergence. Ahmad Zamer, Brocade
Ahmad Zamer, Brocade SNIA Legal Notice The material contained in this tutorial is copyrighted by the SNIA unless otherwise noted. Member companies and individual members may use this material in presentations
TÓPICOS AVANÇADOS EM REDES ADVANCED TOPICS IN NETWORKS
Mestrado em Engenharia de Redes de Comunicações TÓPICOS AVANÇADOS EM REDES ADVANCED TOPICS IN NETWORKS 2008-2009 Exemplos de Projecto - Network Design Examples 1 Hierarchical Network Design 2 Hierarchical
Flexible Modular Data Center Architecture Simplifies Operations
Flexible Modular Data Center Architecture Simplifies Operations INTRODUCTION In today s ever changing IT world, technology moves at the speed of light. In response, IT and Facility stakeholders need data
Designing Cisco Network Service Architectures ARCH v2.1; 5 Days, Instructor-led
Designing Cisco Network Service Architectures ARCH v2.1; 5 Days, Instructor-led Course Description The Designing Cisco Network Service Architectures (ARCH) v2.1 course is a five-day instructor-led course.
CloudEngine Series Data Center Switches. Cloud Fabric Data Center Network Solution
Cloud Fabric Data Center Network Solution Cloud Fabric Data Center Network Solution Product and Solution Overview Huawei CloudEngine (CE) series switches are high-performance cloud switches designed for