ScienceDirect. Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process
|
|
|
- Doreen Hamilton
- 10 years ago
- Views:
Transcription
1 Available online at ScienceDirect Procedia Engineering 69 ( 2014 ) th DAAAM International Symposium on Intelligent Manufacturing and Automation, 2013 Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process Amol Singh* IIM Rohtak, Rohtak Haryana India Abstract This paper presents a hybrid algorithm that integrates the project priority (or criticality) with project schedule development for multi-project scheduling problem under resource constrainedsituation. The objective here is to minimize the project make-span as well as the penalty cost when some projects carry higher priority. Since the problem is NP hard, we solve this problem by integrating the project priority with the activity priority. The project schedule is generated using a hybrid algorithm based on priority rules and AHP. The proposed algorithm is demonstrated to be better than existing priority rules. The effectiveness of the proposed algorithm is validated with computational results The Authors. Published by Elsevier Ltd The Authors. Published by Elsevier Ltd. Open access under CC BY-NC-ND license. Selection and peer-review under responsibility of DAAAM International Vienna. Selection and peer-review under responsibility of DAAAM International Vienna Keywords: project management; hybrid algorithm; resource constrained projects; scheduling 1. Introduction Project management is asystem of managing nine knowledge areas pertaining to projects time, cost, scope, quality, risk, procurement, human resource, communication, and integration. Integration of these nine knowledge areas makes the project management a complex decision making process.a project manager always has a pressure to satisfy the demand of its stakeholders in terms of cost, quality, time and scope. A typical project management problem consists of planning and scheduling decisions. In theplanning process, project manager distributes the total project work into manageable activities. The manager estimatesdemand forvariety of resources and time of all the activities involved in the project. Further, he develops the Gantt chart and assigns the resources to the project * Corresponding author. Tel.: ; fax: address: [email protected] The Authors. Published by Elsevier Ltd. Open access under CC BY-NC-ND license. Selection and peer-review under responsibility of DAAAM International Vienna doi: /j.proeng
2 726 Amol Singh / Procedia Engineering 69 ( 2014 ) activities to generate the resource profiles.he performs the required resource levelingby contracting, subcontracting and allocating overtime resources.project scheduling is the process of allocation of the given resources to the project activities to determine the start time and finish time of each activity. If resources are adequate but the demand varies widely over the life of the project, it may be desirable to even out resource demand by delaying noncritical activities (using slack) to lower peak demand and thus, increase the resource utilization. This process is known as resource leveling or smoothing. On the other hand, if resources are not adequate to meet the peak demands, the late start of some of the activities must be delayed, and the duration of the project may be increased. This process is known as resource constrained scheduling. Most of the projects handling industries have limited resources and if they have multiple projects and each project has a priority level then it makes the solution process more complex. The allocation of scare resources to multiple projects, where each project has different priority level, is the major objective of the problem. This problem has to be solvedby considering several compromises to get the desired level of near optimality. In this paper, a new hybrid algorithm approach has been proposed to solve the resource constrained multi-project scheduling problem under the priority level of projects (RCMPS). The remainder of the paper is organizedas follow. Section 2 presents a literature review on project scheduling and identifies research issues which form the basis for the problem formulation. Section 3 describes the problem and presents the conceptual model.section 4 describesthe approach to solve the RCMPS problem.section 5 reports the case study and computational experiments. Section 6 concludes the study and indicates the scope for future research. Nomenclature N number of projects T variety of resources used by multiple projects O n number of activities in project n where, n = { 1, 2.N}. K n number of resource types required by project n where n = { 1, 2.N}. C n criticality index of project n where, n = { 1, 2.N}. R kon number of K type of resource required to accomplish the o th activity of Project n K on type of resource required to accomplish the work of activity o of project n GA genetic algorithm FCFS first come first serve MINSLKminimum slack first RCMPS resource constrained multiple project schedule MAXTWK maximum total work content SASP shortest activity from the shortest project MINLFT minimum latest finish time RCMPS resource constrained multi-project problem 2. Literature review Scheduling and allocation of resources for multiple projects is a non-polynomial (NP) hard problem and more difficult than a single project [1]. Traditional optimization methods have been used in the literature to solve the multi project scheduling problems.in a pioneering work in this category, Pritsker et al. [2],reported a zero-one programming approach to solve the multi-project scheduling problem. Mohanty and Siddiq [3] investigated the problem by assigning the due dates to the multiple projects. They used an integer programming for generating the schedule and a simulation mechanism for testing the heuristic rules to choose the best schedule. Deckro [4] formulated the multiproject scheduling problem as a general integer programming model and used a decomposition approach to solve the large size of problems. Jolayemi [5] used integer programming approach for project scheduling and considered penalty and reward function in the formulation of objective function. A common feature of these studies is that project scheduling problems of small sizes can be solved by the traditional optimization techniques. However, as the number of projects and size of the projectin terms of number of
3 Amol Singh / Procedia Engineering 69 (2014 ) activities increase, the problem becomes more complex.further, the complexity increases when variety of resources is considered.in this context,it is not feasible to developthe projects schedules by using the traditional optimization techniques. The benefit of traditional optimization techniques cannot be utilized for generating the schedule of multiple projects simultaneously. Accordingly, researchers have developed several heuristic and Meta heuristic methods for multi project scheduling. Presently,several efforts are being made to find out the more efficient algorithms to generate the multi-project schedules [6]. These efforts are being made to increase the efficiency of the heuristics methods, extending the scope of the problems with heuristic methods and developing new methods with inferior computation time [7]. Some researchers have used artificial intelligent techniques to generate the resource constrained project schedules [8]. However, as the number and size of the projects increase, the computational efficiency of these methods also decreases. Kim et al. [9] applied a combined genetic algorithm to generate the schedule of the multi- projects scheduling problem. They minimized the total project completion time and any penalties for a general delay. Kumanan, et al. [10] used GA with heuristic method for generating the schedule of multi-projects and the performance of the generated schedule was measured against project completion time. Damak et al. [11] also used GA with a local search strategy to generate the schedule of multiple projects with resource constraints and project delay was considered as the performance measure to measure the performance of the schedule. Chen [12] reported that there is a need to develop efficient methods to enhance the quality and computational efficiency of the solutions of resource constrained multiple project scheduling problems. The key challenge for all project managers is to meet the pressure from project sponsors to complete the project within the deadline and under approved budget. In this situation, it is critically important to find out the solution of multiple project resource constrained scheduling problems. Project managers have to pass on the instructions to the project team members to complete their task in a timely manner to meet the deadline of the projects. In this context, priority rules are the most efficient methods to generate the schedules rapidly and are very simple in application. Several priority rules have been reported in the literature.vidya et al. [13] provide a succinct review of multi project scheduling techniques. Fendley [14] used multiprojects with three and five projects and considered three efficiency measurements in the computational analysis, namely, project slippage, resource utilization, and in-process inventory. They concluded that the priority rule MINSLK showedmostefficient with the three response variables. Kurtulus and Davis [15] designed multi-project scheduling problem where projects had 34 to 63 activities and resource requirement for each activity was between 2 and 6 units. They devised six new priority rules and showed MAXTWK and SASP as the best algorithms to schedule multi-projects when the objective was to minimize the mean project delays,which were measured in relation to the unconstrained critical path duration. Kurtulus and Narula [16] modified the earlier rules proposedby Kurtulus and Davis [15]by adding the penalties due to project delay. They investigated multi-project scheduling problem with three projects in which the number of activities varied between 24 and 33 and for small-sized and large-sized problems, respectively. They studied four new priority rules, namely, Maximum Duration and Penalty, Maximum Penalty, Maximum Total Duration Penalty, and simultaneously Slack and Penalty. They concluded that the priority rule Maximum Penalty was the best algorithm to minimize the sum of the project weighted delays. Dumond and Mabert [17] studied the problem of assigning due dates to the projects in a multi-project environment. In their work, each project was assigned 6 to 49 activities with the resource requirements comprising one to three types of resources. They considered five resource allocation heuristics. They reported that the priority rule FCFS with the strategy Scheduled Finish Time Due Date rule was the best algorithm for minimizing the mean completion time, the mean lateness, the standard deviation of lateness and minimizing the total tardiness. Lawrence and Morton [18] studied the due date setting problem of scheduling multiple resource-constrained projects with the objective of minimizing weighted tardiness costs. They developedsome new policies and tested these policies against a number of dispatching scheduling rules reported in the literature. Christodoulou [19]optimise the allocation of resources by use of entropy metric.shankar and Nagi [20] proposed a two-stage hierarchical approach consisting of planning and scheduling stages. They usedlinear programing for the planning stage and simulated annealing forthe resource schedule stage. Lova et al. [21] developed a multi-criteria heuristic that consisted of several algorithms based on feasible schedules. They showed that the method improved the feasibility of the multi-project schedule obtained from heuristic methods based on the priority rules, MAXTWK and MINLFT, and also the project management software Microsoft Project, Time Line, and Project Scheduler.Dalfard and Ranjbar[22] used simulating annealing approach for generating the schedule of resource constrainedmultiple project problems.the computational results were compared with 20 existed priority rules in terms of project completion time. They showed that the simulated annealing approach yielded better results than priority rules. Saleru [23] developed the resource constrained project schedule of a software industry by using the project management software (primavera). Zheng et al. [24] proposed
4 728 Amol Singh / Procedia Engineering 69 ( 2014 ) an algorithm for generating the schedule of resource constrained multiple project problems. They investigated the robustness of the algorithm in terms of various project parameters such as order strength, resource constraint and uncertainty level. Their results demonstrated the effectiveness of the solution algorithm and showed that these three parameters indeed have evident impacts on the robustness and make-span of projects. Observations and research issues From the literature survey,a couple of observations can be made in order to devisethe problem formulation in the present study. Firstly, most of the reported projects scheduling methods are applicable in scheduling of all activities of a single project. There is a need for research on scheduling of multiple projects [25]. Secondly, scheduling and allocation of resources for multiple projects is more difficult than single project. Thus, there is a need to develop more efficient algorithms in terms of computation time and quality of solutions to generate the multiple project schedules for complex problems. Thirdly, most of the researchers have considered single variety of resource for generating the schedules in multi project environment. However, in real life problemsan activity needs more than one resource. Thus, there is a scope of research on multi-project scheduling by considering a variety of resources. For addressing these research issues, three major tasks are outlined. Firstly, a complex multi project scheduling problem with resource constrainedenvironment is considered. The considered multi project with resource constrained environment is briefly described in section 3. The performance of multi-project with resource constrainedschedule is enhanced in terms of customer requirement by integrating the project criticality index with the activity priority index. Secondly, an efficient hybrid algorithm has been developed for generating the schedule of multi-project resource constrained problem. This algorithm integrates the project criticality index with the activity priority. Thirdly, in order to address the real requirement of the projects, a variety of resources are considered for each activity during the schedule development. 3. Problem description and projected model formulation Project schedule is the base line plan for monitoring and controlling the project activities and it is the main tool for project management. In recent years, projects have become increasingly pervasive in companies. In the global business environment thedevelopment of new machinery and equipment s, new production processes and computer support systems leads to the development of new products, services, and processes.this unique work is accomplished through projects.companieshaveseveral projects in their portfolio,some projects carry higher priority than others or a customer sends in a request to complete his project early. In the present study, this aspect is considered and the project priorities areintegrated with the schedule development activity under a variety of resource constrainedconditions.the problem consists of a set of N numberof projects, where,n th project comprises of O n number of activities, where, n = {1, 2.N}. Each project has a priority level or criticality index (C n ), where,n = { 1, 2.N}. These activities requirek on number of resource types, where,o = {1, 2.O} and where, n = { 1, 2.N}.The activities are interrelated by two types of constraints including precedence constraint, where successor activity forces the completion of its predecessor activity before its start and resource constraints, where the processing of the activity is subjected to the availability of resource with limited capacity. Activity o n, while being processed requires R kon units of resource K,where, k = {1, 2.K on }, o = {1, 2.On} and n = {1, 2.N}. All resource types have a limited availability at any given point of time.the main objective of the present study on resource constrained multi-project scheduling problem is to determine the start time and completion time of all activities (project schedule) in order to improve some performance measures underlimited resource availability condition, criticality index of each project,and precedence constraints.the make-span and cost deviation is considered as the performance measures during the performance evaluation of the multi-project schedule. 4. Methodology The priority index of the projects is determined by using the analytic hierarchy process (AHP). This process was devised by Sathy [26] as a mathematical procedure to assign weights to N projects using a scheme of pairwise comparisons.the steps of this procedure are described as follow: Step 1:Analytic hierarchy process (AHP) initially divides a complex multicriteria decision-making problem into a hierarchy of interrelated decision criteria, and decision alternatives. The criteria and alternatives are arranged in a hierarchical structure similar to a family tree with decision alternatives at the bottom and criteria above the bottom level as shown in Fig 1.
5 Amol Singh / Procedia Engineering 69 (2014 ) Goal Level 0 Criteria Urgency Risk NPV Growth Level 1 Projects Project 1 Project 2 Project 3 Project 4 Project 5 Level 2 Fig. 1. AHP hierarchy. Step 2:Acomparison among the alternatives and criteria is then made. Once the problem is decomposed and the hierarchy is constructed, prioritization procedure starts in order to determine the relative importance of the criteria within each level. The pairwise judgment starts from the second level and finishes at the lowest level. In each level, the criteria are compared pairwise according to their levels of influence and based on the specified criteria at the higher level.the pairwise comparison at each level is preceded by a conversion process of intangible into number by using a scale. The numerical values of for each project with respect to a criterion are shown in Table 1. Table 1. Values of m performance measures for n projectsafter converting intangibles into numbers. Projects Criteria C 1 C 2 C m P 1 A 11 A 12 A 1N P 2 A 21 A 22 C 2N P N A N1 A N2 A NN The result of the pairwise comparison on n alternatives (projects) with respect to each considered criteria is summarized in an (n, n) evaluation matrix as shown in Table 2. It may be noted that if the criterion is cost criterion then reciprocal of each value is considered for pairwise comparison as given in the Table below. Table 2. Pairwise comparison matrix or normalization matrix. P 1 P 2 P m P 1 A 11/A 11 A 12/A 22 A 1N/A NN P 2 A 21/A 11 A 22A 22 C 2N/A NN P N A N1/A 11 A N2/A 22 A NN/A NN Step 3:Compute the weightage decision matrix. The column sum of Table 2 is computed and each value of the column is divided by its column sum. This matrix is known as weightage decision matrix. Once the
6 730 Amol Singh / Procedia Engineering 69 ( 2014 ) weightage decision matrix is determined, the row wise average is computed of the weightage decision matrix. These values denote the weights of the N projects with respect to the considered criteria. Step 4: Repeat step 2 and 3 for each criteria and compute the weights of the projects with respect to all considered criteria.similarly, compute the weights of criteria by using the step 2 and 3. Step 5: Compute the priority index of each project. Illustratively, if W u and W g are the weights of urgency and growth, (W p1u,w p2u ) and (W p1g, W p1g ) are the weights of project 1 and 2 with respect to urgency and growth. The priority index of project 1 and 2 is computed as shown by equations 1 and 2. Urgency (W u ) Growth (W g ) Project 1(W p1u ) Project 2 (W p2u ) Project 1 (W p1g ) Project 2 (W p1g ) Priority index of project 1 = (W u W p1u ) + (W g W p1g ) (1) Priority index of project 2 = (W u W p1u ) + (W g W p1g )(2) It may be noted that the project manager can use the weights of the criteria as per the urgency of the projects or customer requirements during the schedule development. Step 6: The priority index or criticality index of each projects computed in step 5 is used in combination with the activitypriority index computed by thebest reported dispatching rule to decide the priority of the project activities for resource allocations. In this study,four best reported rules i. e. EDDF, MINSLK, MAXSP, MINWCS are considered for generating the schedule of multi project resource constrained problems. Step 7: The performance of the project schedule is measured in terms of the make-span. Make-span of a project is the difference between the completion date of last activity and start date of the project.the overall makespan of multi-projects is the maximum make-span of the considered projects. In addition the performance of the multi-project schedule is also measured in terms of total cost deviation in relation to the unconstrained critical path duration. The total cost deviation is computed by using the following relation: i N C [ ( MS) pc] [ overall ( MS) ic] (3) i 1 Where, δc = total cost deviation, δ(ms) = deviation in the make-span of a project, pc = penalty cost, overall(ms) = overall deviation in make-span of multi-projects,ic = indirect cost. 5. Case study A projectcompanyhas five projects includingp 1, P 2, P 3, P 4 and P 5 in his portfolio and wants to develop the schedule of these projects. These five projects were selected by using the four criteria including urgency of the project, net present value (NPV), risk, and growth. The performance of these projects in relation withfour criteria is given in Table 3.Project manager has been asked to develop the schedule of these projects by using the project priority index or project criticality factor. The project manager develops the work breakdown structure of the projects and estimates the activities and their predecessors,activity duration, and resource requirement of each project. This information of all the projects is shown in Tables 4 to 8. The company has 35 resources of each variety.
7 Amol Singh / Procedia Engineering 69 (2014 ) Table 3. Project performance of different criteria. Projects Criteria Urgency NPV Risk Growth P 1 Very High 40 Low Good P 2 High 30 Low Good P 3 High 50 High Excellent P 4 Low 60 Medium Poor P 5 Low 20 Medium Good Table 4. Activity duration, predecessor and resource requirement for project 1. Activity Predecessor Duration Resource 1 Resource 2 Resource 3 Resource , , , , , Table 5. Activity duration, predecessor and resource requirement for project 2. Activity Predecessor Duration Resource 1 Resource 2 Resource 3 Resource , , ,3, , Table 6. Activity duration, predecessor and resource requirement for project 3. Activity Predecessor Duration Resource 1 Resource 2 Resource 3 Resource , ,3,
8 732 Amol Singh / Procedia Engineering 69 ( 2014 ) , , Table 7. Activity duration, predecessor and resource requirement for project 4. Activity Predecessor Duration Resource 1 Resource 2 Resource 3 Resource , , ,3, , Table 8. Activity duration, predecessor and resource requirement for project 5. Activity Predecessor Duration Resource 1 Resource 2 Resource 3 Resource , , , , , The priority index of the projects is computed by using steps 1to 5 ofproposed methodology given in section4. The computed projects priorities orcriticality index under different weights of the criterion is given in table 9. Table 9. Projects criticality index under different weightage of criteria. Projects Equal weights Urgency =0.7, NPV = 0.1, Risk = 0.1, Growth = 0.1 Urgency =0.1, NPV = 0.7, Risk = 0.1, Growth = 0.1 Urgency =0.1, NPV = 0.1, Risk = 0.7, Growth = 0.1 Urgency =0.1, NPV = 0.1, Risk = 0.1, Growth = 0.7 P P P P P The five levels of projectspriorities given in Table 9 are used to develop the five set of schedules as discussed in step 6 of section 4. These five set of schedules are shown in Fig.2. During the performance analysis of the proposed algorithm, it is considered that penalty cost of urgent project and rest of the projects are $5000 and $1000 per day respectively. The daily operating expenses or indirect cost of each project is $1000 per day. The penalty cost of a project is computed by the multiplication of deviation in make-span of a projectto the penalty cost. The deviation in project make-span is measured in relation to the unconstrained critical path duration. The overall deviation of the projects make-span is computed and is multiplied by the operating expenses per day for computing the overall deviation in the indirect cost. These costs are summed up and given in the last row of Table 10. The data given in Table 10 validate the effectiveness of the proposed algorithm.
9 Amol Singh / Procedia Engineering 69 (2014 ) priority set 5 projects Makespan priority set 4 priority set 3 priority set 2 priority set 1 Fig. 2. Make span of project schedules with five set of project priorities. Table 10. Comparative analysis of the proposed algorithm (WPA) with the best priority rule (WBPR) by considering deviation in cost. Project Cost Cost Cost Cost WBPR WPA WBPR WPA WBPR WPA WBPR WPA P P P P P Over all Make-span Total cost * * * * * Penalty cost and indirect cost obtained by the proposed method, + Penalty cost and indirect cost obtained by the existed priority rule 6. Conclusion and future research directions In this study, an attempt was made to integrate the project priorities with the project schedule development. Ahybrid algorithm was developed to accomplish this task. The reported algorithm is a new method for generating the schedule of any multi-project resource constrained scheduling problem where, each project has a defined criticality. The proposed method was validated with a case studyunder various scenarios. Experimental results were compared with existingpriority dispatching rules. Experimental results showed the superiority of the proposed method with the existing priority dispatching rules under different operating conditions. In real project management environment, a penalty is imposed if a project completes after its due date. Some projects carry higher penalty than others. In this context, project manager can make a tradeoff among the projects penalties and can develop the cost effective project schedule, which satisfies the customer requirements. In this context, the proposed algorithm would be beneficial for project manager s to deal with these conditions.in the future, research could explore the possibility of integrating other knowledge areas including risk management and procurement management with the project schedule development.
10 734 Amol Singh / Procedia Engineering 69 ( 2014 ) References [1] Garey, M. R., Johnson, D. S., Computers and intractability a guide to the theory of NP completeness, W. H. Freeman and Company, New York, [2] Pritsker, A., Allan, B., Watters, L. J., Wolfe, P. M., Multiproject scheduling with limited resources: A zero-one programmingapproach, Management Science, 16, (1969), [3] Mohanthy, R. P., Siddiq M. K., Multiple projects multiple resources-constrained scheduling: Some studies. International Journal of Production Research, 27 (1989), [4] Deckro, R. F., Winkofsky, E. P., Hebert, J. E., Gagnon, R., A decomposition approach to multi-project scheduling, European Journal of Operational Research, 51, (1991), [5] Jolayemi, J. K., scheduling of projects under penalty and reward arrangements: A mixed integer programming model and its varients, Academy of Information and Management Science Journal, 15, (2012), [6] Gawiejnowicz, S., Lin, B.M.T., Scheduling time-dependent jobs under mixed deterioration, Applied Mathematics and Computation, 216, (2010), [7] Rezaie, K., Ostadi, B. A., Mathematical model for optimal and phased implementation of flexible manufacturing systems, Applied Mathematics and Computation, 184, (2007), [8] Ranjbar, M., Kianfar, F., Shadrokh, S., Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm., Applied Mathematics and Computation, 196, (2008), [9] Kim, K.W., Yun, Y.S., Yoon, J.M., Gend, M., Yamazaki, G., Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling, Computers & Industrial Engineering, 56, (2005), [10] Kumanan, S., Jegan Jose, G., Raja, K., Multi-project scheduling using a heuristic and a genetic algorithm, International Journal of Advanced Manufacturing Technology, 31, (2006), [11] Damak, N. Jarboui, B., Siarry, P., Loukil, T., Differential evolution for solving multi-mode resource constraint scheduling problems, Computer and Operations research, 36, (2009), [12] Chen, R. M., Reducing network and computation complexities in neural based real-time scheduling scheme, Applied Mathematics and Computation, 217, (2011), [13] Vidya, S. S., Suguna, M., Sharmila, D., A study on multi project resource constrained project Scheduling using Meta heuristic approach, International Journal of Computer Science and Mobile Computing, 2, (2013), [14] Fendley, L. G., Towards the development of a complete multi-project scheduling system, Journal of Industrial Engineering, 19, (1968), [15] Kurtulus, I. S., Davis, E. W., Multi-project scheduling: Categorization of heuristic rules Performance, Management Science, 28, (1982), [16]Kurtulus, I. S., Narula, S. C., Multi-project scheduling: Analysis of project performance, IIE Transactions, 17, (1985), [17] Dumond, j., Mabert, V. A., Evaluating project scheduling and due date assignment procedures: An experimental analysis, Management Science, 34, (1988), [18] Lawrence, S. R., Morton, T. E., Resource-constrained multi-project scheduling with tardy costs: Comparing myopic bottleneck and resource pricing heuristics, European Journal of Operational Research, 64, (1993), [19] Christodoulou, S.E., Tezias, E.S., Galaras, K.A., Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project's duration and cost, International Journal of Project Organisation and Management, 4, (2012), [20] Shankar, V., Nagi, R., A flexible optimization approach to multi-resource, multi-project planning and scheduling, In Proceedings of 5th Industrial Engineering Research Conference, Minneapolis, MN, USA, [21] Lova, A., Maroto, C., Tormos, P., A multicriteria heuristic method to improve resource allocation in multiproject scheduling, European Journal of Operational Research, 127, (2000), [22] Dalfard, V. M., Ranjbar, V., Multi project scheduling with resource constraints & priority rules by the use of simulated annealing algorithm, Technical Gazette, 19, (2012), [23] Saleru, C., Resource allocation in project management, International Journal of Economic Practices and theories, 2, (2012), [24] Zheng, Z., Shumin, L., Ze, G., Yueni, Z., Resource constraint multi project scheduling with priority and uncertain activity durations, International Journal of Computational intelligence, 6, (2013), [25] Erel, E., Ghosh, J. B., Customer order scheduling on a single machine with family setup times: complexity and algorithm, Applied Matthematics and Computation, 185 (2007) [26] Saaty, T. L., Analytical Hierarchy Process, McGraw Hill Company, NY, USA, 1980.
A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS
A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS B. Kanagasabapathi 1 and K. Ananthanarayanan 2 Building Technology and Construction Management Division, Department of Civil
MULTI-PROJECTS SCHEDULING WITH RESOURCE CONSTRAINTS & PRIORITY RULES BY THE USE OF SIMULATED ANNEALING ALGORITHM
MULTI-PROJECTS SCHEDULING WITH RESOURCE CONSTRAINTS & PRIORITY RULES BY THE USE OF SIMULATED ANNEALING ALGORITHM Vahid Majazi Dalfard, Vahid Ranjbar ISSN 1330-3651 UDC/UDK 004.421:658.513 Original scientific
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM J. F. GONÇALVES, J. J. M. MENDES, AND M.G.C. RESENDE ABSTRACT. This paper presents a genetic algorithm (GA) for the Resource
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
European Journal of Operational Research 127 (2000) 408±424 www.elsevier.com/locate/dsw A multicriteria heuristic method to improve resource allocation in multiproject scheduling Antonio Lova *, Concepcion
Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management
Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management N. Trautmann, P. Baumann Department of Business Administration,
A Hybrid Heuristic Rule for Constrained Resource Allocation in PERT Type Networks
World Applied Sciences Journal 7 (10): 1324-1330, 2009 ISSN 1818-4952 IDOSI Publications, 2009 A Hybrid Heuristic Rule for Constrained Resource Allocation in PERT Type Networks Siamak Baradaran and S.M.T.
Project Scheduling: PERT/CPM
Project Scheduling: PERT/CPM CHAPTER 8 LEARNING OBJECTIVES After completing this chapter, you should be able to: 1. Describe the role and application of PERT/CPM for project scheduling. 2. Define a project
A genetic algorithm for resource allocation in construction projects
Creative Construction Conference 2015 A genetic algorithm for resource allocation in construction projects Sofia Kaiafa, Athanasios P. Chassiakos* Sofia Kaiafa, Dept. of Civil Engineering, University of
The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem
Available online at www.sciencedirect.com International Journal of Project Management 27 (2009) 493 500 www.elsevier.com/locate/ijproman The effectiveness of resource levelling tools for Resource Constraint
Scheduling Resources and Costs
Student Version CHAPTER EIGHT Scheduling Resources and Costs McGraw-Hill/Irwin Copyright 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Gannt Chart Developed by Henry Gannt in 1916 is used
Abstract Title: Planned Preemption for Flexible Resource Constrained Project Scheduling
Abstract number: 015-0551 Abstract Title: Planned Preemption for Flexible Resource Constrained Project Scheduling Karuna Jain and Kanchan Joshi Shailesh J. Mehta School of Management, Indian Institute
Resource Dedication Problem in a Multi-Project Environment*
Noname manuscript No. (will be inserted by the editor) Resource Dedication Problem in a Multi-Project Environment* Umut Beşikci Ümit Bilge Gündüz Ulusoy Abstract There can be different approaches to the
STUDY OF PROJECT SCHEDULING AND RESOURCE ALLOCATION USING ANT COLONY OPTIMIZATION 1
STUDY OF PROJECT SCHEDULING AND RESOURCE ALLOCATION USING ANT COLONY OPTIMIZATION 1 Prajakta Joglekar, 2 Pallavi Jaiswal, 3 Vandana Jagtap Maharashtra Institute of Technology, Pune Email: 1 [email protected],
OPTIMIZATION MODEL OF EXTERNAL RESOURCE ALLOCATION FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS
OPTIMIZATION MODEL OF EXTERNAL RESOURCE ALLOCATION FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS Kuo-Chuan Shih Shu-Shun Liu Ph.D. Student, Graduate School of Engineering Science Assistant Professor,
How to do AHP analysis in Excel
How to do AHP analysis in Excel Khwanruthai BUNRUAMKAEW (D) Division of Spatial Information Science Graduate School of Life and Environmental Sciences University of Tsukuba ( March 1 st, 01) The Analytical
Using Primavera Software in Resource Allocation and Project Evaluation of Construction Projects
Using Primavera Software in Resource Allocation and Project Evaluation of Construction Projects Hamed Ziaidoostan 1, Hamidreza Ghaneh 2, Matin Amanin 3, Mohamadmahi Gholipoor 4 1,2,3,4-M A Student of Business
Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY
Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY This chapter highlights on supply chain performance measurement using one of the renowned modelling technique
A Computer Application for Scheduling in MS Project
Comput. Sci. Appl. Volume 1, Number 5, 2014, pp. 309-318 Received: July 18, 2014; Published: November 25, 2014 Computer Science and Applications www.ethanpublishing.com Anabela Tereso, André Guedes and
MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process
MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process Business Intelligence and Decision Making Professor Jason Chen The analytical hierarchy process (AHP) is a systematic procedure
Problems, Methods and Tools of Advanced Constrained Scheduling
Problems, Methods and Tools of Advanced Constrained Scheduling Victoria Shavyrina, Spider Project Team Shane Archibald, Archibald Associates Vladimir Liberzon, Spider Project Team 1. Introduction In this
A. O. Odior Department of Production Engineering University of Benin, Edo State. E-mail: [email protected]
2012 Cenresin Publications www.cenresinpub.org APPLICATION OF PROJECT MANAGEMENT TECHNIQUES IN A CONSTRUCTION FIRM Department of Production Engineering University of Benin, Edo State. E-mail: [email protected]
Comparative Analysis of FAHP and FTOPSIS Method for Evaluation of Different Domains
International Journal of Research Studies in Computer Science and Engineering (IJRSCSE) August 2015, PP 58-62 ISSN 2349-4840 (Print) & ISSN 2349-4859 (Online) www.arcjournals.org Comparative Analysis of
High-Mix Low-Volume Flow Shop Manufacturing System Scheduling
Proceedings of the 14th IAC Symposium on Information Control Problems in Manufacturing, May 23-25, 2012 High-Mix Low-Volume low Shop Manufacturing System Scheduling Juraj Svancara, Zdenka Kralova Institute
ANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS
ISSN 1726-4529 Int j simul model 8 (2009) 1, 16-26 Original scientific paper ANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS Palcic, I. * & Lalic, B. ** * University of Maribor,
A Beam Search Heuristic for Multi-Mode Single Resource Constrained Project Scheduling
A Beam Search Heuristic for Multi-Mode Single Resource Constrained Project Scheduling Chuda Basnet Department of Management Systems The University of Waikato Private Bag 3105 Hamilton [email protected]
USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORITIZE PROJECTS IN A PORTFOLIO
USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORIZE PROJECTS IN A PORTFOLIO Ricardo Viana Vargas, MSc, IPMA-B, PMP Professor Fundação Getúlio Vargas (FGV) Brasil Professor Fundação Instituto
Project Time Management
Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.
Application of the Multi Criteria Decision Making Methods for Project Selection
Universal Journal of Management 3(1): 15-20, 2015 DOI: 10.13189/ujm.2015.030103 http://www.hrpub.org Application of the Multi Criteria Decision Making Methods for Project Selection Prapawan Pangsri Faculty
Operational Research. Project Menagement Method by CPM/ PERT
Operational Research Project Menagement Method by CPM/ PERT Project definition A project is a series of activities directed to accomplishment of a desired objective. Plan your work first..then work your
Resources Management
Resources Management. Introduction s we have seen in network scheduling, the basic inputs to criticalpath analysis are the individual project activities, their durations, and their dependency relationships.
Axiomatic design of software systems
Axiomatic design of software systems N.P. Suh (1), S.H. Do Abstract Software is playing an increasingly important role in manufacturing. Many manufacturing firms have problems with software development.
Multi-Mode Resource Constrained Multi-Project Scheduling and Resource Portfolio Problem
Multi-Mode Resource Constrained Multi-Project Scheduling and Resource Portfolio Problem Umut Beşikci a, Ümit Bilgea, Gündüz Ulusoy b, a Boğaziçi University, Department of Industrial Engineering, Bebek,
Optimal Scheduling for Dependent Details Processing Using MS Excel Solver
BULGARIAN ACADEMY OF SCIENCES CYBERNETICS AND INFORMATION TECHNOLOGIES Volume 8, No 2 Sofia 2008 Optimal Scheduling for Dependent Details Processing Using MS Excel Solver Daniela Borissova Institute of
MULTI-PROJECT SCHEDULING WITH 2-STAGE DECOMPOSITION 1
MULTI-PROJECT SCHEDULING WITH 2-STAGE DECOMPOSITION 1 Anıl Can Sabancı University, Orhanlı, Tuzla 34956 Istanbul, Turkey [email protected] Gündüz Ulusoy Sabancı University, Orhanlı, Tuzla 34956 Istanbul,
COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES
COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES JULIA IGOREVNA LARIONOVA 1 ANNA NIKOLAEVNA TIKHOMIROVA 2 1, 2 The National Nuclear Research
Clustering and scheduling maintenance tasks over time
Clustering and scheduling maintenance tasks over time Per Kreuger 2008-04-29 SICS Technical Report T2008:09 Abstract We report results on a maintenance scheduling problem. The problem consists of allocating
Evaluating Simulation Software Alternatives through ANP
Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 2011 Evaluating Simulation Software Alternatives through ANP
ScienceDirect. Project Prioritization and Portfolio Performance Measurement in Project Oriented Organizations
Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scienc es 119 ( 2014 ) 339 348 27 th IPMA World Congress Project Prioritization and Portfolio Performance Measurement
Unit 4: Time Management (PMBOK Guide, Chapter 6)
(PMBOK Guide, Chapter 6) The questions on this topic focus heavily on scheduling techniques, network diagrams, Gantt charts, the critical path, compressing the schedule, PERT, and float. You may or may
ScienceDirect. Model Planning Production and Logistics Activities in Business Networks
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 69 ( 2014 ) 370 376 24th DAAAM International Symposium on Intelligent Manufacturing and Automation, 2013 Model Planning Production
A Service Revenue-oriented Task Scheduling Model of Cloud Computing
Journal of Information & Computational Science 10:10 (2013) 3153 3161 July 1, 2013 Available at http://www.joics.com A Service Revenue-oriented Task Scheduling Model of Cloud Computing Jianguang Deng a,b,,
CLIENT-CONTRACTOR BARGAINING ON NET PRESENT VALUE IN PROJECT SCHEDULING WITH LIMITED RESOURCES
CLIENT-CONTRACTOR BARGAINING ON NET PRESENT VALUE IN PROJECT SCHEDULING WITH LIMITED RESOURCES Nursel Kavlak 1, Gündüz Ulusoy 1 Funda Sivrikaya Şerifoğlu 2, Ş. Đlker Birbil 1 1 Sabancı University, Orhanlı,
A Development of the Effectiveness Evaluation Model for Agile Software Development using the Balanced Scorecard
, March 13-15, 2013, Hong Kong A Development of the Effectiveness Evaluation Model for Agile Development using the Balanced Scorecard Sunisa Atiwithayaporn 1, Wanchai Rivepiboon 2 Abstract Most of standard
Using Analytic Hierarchy Process (AHP) Method to Prioritise Human Resources in Substitution Problem
Using Analytic Hierarchy Process (AHP) Method to Raymond Ho-Leung TSOI Software Quality Institute Griffith University *Email:[email protected] Abstract In general, software project development is often
SCHEDULING RESOURCE CONSTRAINED PROJECT PORTFOLIOS WITH THE PRINCIPLES OF THE THEORY OF CONSTRAINTS 1
Krzysztof Targiel Department of Operations Research University of Economics in Katowice SCHEDULING RESOURCE CONSTRAINED PROJECT PORTFOLIOS WITH THE PRINCIPLES OF THE THEORY OF CONSTRAINTS 1 Introduction
Resource Allocation and Scheduling
90 This section is about the general overview of scheduling and allocating resources. Assigning people and machines to accomplish work (work on tasks). Resource Allocation: Time-Constrained. Assigning
IDENTIFYING AND PRIORITIZING THE FINANCING METHODS (A HYBRID APPROACH DELPHI - ANP )
IDENTIFYING AND PRIORITIZING THE FINANCING METHODS (A HYBRID APPROACH DELPHI - ANP ) Pezhman Arzhang 1, Naser Hamidi 2 1 MSc.Business Administration, Department of Business Management, Qazvin Branch, Islamic
Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur
Module 11 Software Project Planning Lesson 29 Staffing Level Estimation and Scheduling Specific Instructional Objectives At the end of this lesson the student would be able to: Identify why careful planning
5. Creating a Gantt Chart
5. Creating a Gantt Chart Whilst the network diagram is a useful way to describe how tasks are linked to each other, the Gantt chart is used to display the schedule of a project. The Gantt chart is the
TABLE OF CONTENTS CHAPTER DESCRIPTION PAGE
vii TABLE OF CONTENTS CHAPTER DESCRIPTION PAGE TITLE DECLARATION DEDICATION ACKNOWLEDGEMENT ABSTRACT ABSTRAK LIST OF CONTENTS LIST OF FIGURES LIST OF TABLES LIST OF APPENDICES i ii iii iv v vi vii xii
ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS
ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS Chapter 3 of Systems Analysis and Design in a Changing World explains the techniques and steps required to build a project schedule
An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy Logic: Case Studies of Life and Annuity Insurances
Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 126 An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy
The Problem of Scheduling Technicians and Interventions in a Telecommunications Company
The Problem of Scheduling Technicians and Interventions in a Telecommunications Company Sérgio Garcia Panzo Dongala November 2008 Abstract In 2007 the challenge organized by the French Society of Operational
PBL: Project Management. Competency: Project Definition
Competency: Project Definition 1. Define project management and the context of modern project management. 2. Describe how to manage projects throughout the five major process groups. 3. Define the characteristics
ARTIFICIAL INTELLIGENCE METHODS IN EARLY MANUFACTURING TIME ESTIMATION
1 ARTIFICIAL INTELLIGENCE METHODS IN EARLY MANUFACTURING TIME ESTIMATION B. Mikó PhD, Z-Form Tool Manufacturing and Application Ltd H-1082. Budapest, Asztalos S. u 4. Tel: (1) 477 1016, e-mail: [email protected]
GASolver-A Solution to Resource Constrained Project Scheduling by Genetic Algorithm
Vol. 4, No. 2, 23 GASolver-A Solution to Resource Constrained Project Scheduling by Genetic Algorithm Dr Mamta Madan Professor(Comp science) Vivekananda Institute of Professional Studies, Affiliated to
Constraints Propagation Techniques in Batch Plants Planning and Scheduling
European Symposium on Computer Arded Aided Process Engineering 15 L. Puigjaner and A. Espuña (Editors) 2005 Elsevier Science B.V. All rights reserved. Constraints Propagation Techniques in Batch Plants
Work Breakdown Structure (WBS)
Work Breakdown Structure (WBS) The building blocks of a schedule start with a Work Breakdown Structure (WBS). The WBS is a hierarchical reflection of all the work in the project in terms of deliverables.
Project Scheduling to Maximize Fuzzy Net Present Value
, July 6-8, 2011, London, U.K. Project Scheduling to Maximize Fuzzy Net Present Value İrem UÇAL and Dorota KUCHTA Abstract In this paper a fuzzy version of a procedure for project scheduling is proposed
Performance Analysis of a Selected System in a Process Industry
Research Article International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347-5161 2014 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Performance
Selection of Database Management System with Fuzzy-AHP for Electronic Medical Record
I.J. Information Engineering and Electronic Business, 205, 5, -6 Published Online September 205 in MECS (http://www.mecs-press.org/) DOI: 0.585/ijieeb.205.05.0 Selection of Database Management System with
March 30, 2007 CHAPTER 4
March 30, 07 CHAPTER 4 SUPPORTING PLANNING AND CONTROL: A CASE EXAMPLE Chapter Outline 4.1 Background What was the cause of the desperation that lead to the development of the Program Evaluation and Review
Why is SAS/OR important? For whom is SAS/OR designed?
Fact Sheet What does SAS/OR software do? SAS/OR software provides a powerful array of optimization, simulation and project scheduling techniques to identify the actions that will produce the best results,
Criticality of Schedule Constraints Classification and Identification Qui T. Nguyen 1 and David K. H. Chua 2
Criticality of Schedule Constraints Classification and Identification Qui T. Nguyen 1 and David K. H. Chua 2 Abstract In construction scheduling, constraints among activities are vital as they govern the
An Illustrated Guide to the ANALYTIC HIERARCHY PROCESS
An Illustrated Guide to the ANALYTIC HIERARCHY PROCESS Dr. Rainer Haas Dr. Oliver Meixner Institute of Marketing & Innovation University of Natural Resources and Applied Life Sciences, Vienna http://www.boku.ac.at/mi/
The work breakdown structure can be illustrated in a block diagram:
1 Project Management Tools for Project Management Work Breakdown Structure A complex project is made manageable by first breaking it down into individual components in a hierarchical structure, known as
PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited
PROJECT TIME MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT WHAT DOES THE TIME MANAGEMENT AREA ATTAIN? Manages the project schedule to ensure timely completion of
Project Management Chapter 3
Project Management Chapter 3 How Project Management fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis
The Project Scheduling and Decision Mechanism Based on the Multi-Resource Leveling
EPPM, Singapore, 20-21 Sep 2011 The Project Scheduling and Decision Mechanism Based on the Multi-Resource Leveling Abstract Hsiang-Hsi Huang 1, Jia-Chen Shiu 2, Tai-Lin Chen 3 Except for optimizing the
Project Time Management
Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
Resource grouping selection to minimize the maximum over capacity planning
2012 International Conference on Industrial and Intelligent Information (ICIII 2012) IPCSIT vol.31 (2012) (2012) IACSIT Press, Singapore Resource grouping selection to minimize the maximum over capacity
WORK PROGRAM GUIDELINES
Project Managed Change Program WORK PROGRAM GUIDELINES JABATAN KERJA RAYA MALAYSIA Cawangan Pengurusan Projek Kompleks (PROKOM) Ibu Pejabat JKR Malaysia 2 Document Ownership Section No Section Amendment
A Quality Based Method to Analyze Software Architectures
www.ijcsi.org A Quality Based Method to Analyze Software Architectures Farzaneh Hoseini Jabali, Sayed Mehran Sharafi and Kamran Zamanifar3 Computer Department, Islamic Azad University, Naafabad Branch,
Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration
Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration Prof. M. Rammohan Rao Former Dean Professor Emeritus Executive Director, Centre for Analytical
Lecture Slides for Managing and Leading Software Projects. Chapter 5: Project Planning Techniques
Lecture Slides for Managing and Leading Software Projects Chapter 5: Project Planning Techniques developed by Richard E. (Dick) Fairley, Ph.D. to accompany the text Managing and Leading Software Projects
A decision support tool for subcontractor multi-project resource allocation
icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) A decision support tool for subcontractor multi-project
Improve Net Present Value using cash flow weight
2011 2 nd International Conference on Construction and Project Management IPEDR vol.15 (2011) (2011) IACSIT Press, Singapore Improve Net Present Value using cash flow weight Vacharee Tantisuvanichkul 1
Information Security and Risk Management
Information Security and Risk Management by Lawrence D. Bodin Professor Emeritus of Decision and Information Technology Robert H. Smith School of Business University of Maryland College Park, MD 20742
A joint control framework for supply chain planning
17 th European Symposium on Computer Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 A joint control framework for supply chain planning
Integrated maintenance scheduling for semiconductor manufacturing
Integrated maintenance scheduling for semiconductor manufacturing Andrew Davenport [email protected] Department of Business Analytics and Mathematical Science, IBM T. J. Watson Research Center, P.O.
EXAM EXEMPLAR QUESTIONS
Level 6 Professional Diploma in Procurement and Supply PD5 - Programme and project management EXAM EXEMPLAR QUESTIONS QUESTIONS AND INDICATIVE ANSWER CONTENT Page 1 of 10 QUALIFICATIONS 2013 QUESTIONS
Pearson Education Limited 2003
156 Activities Activity 9.1 (PP. 357 358) [Project planning exercise] You are required to construct a project plan for the following information system development project. Your objective is to schedule
Supplier Performance Evaluation and Selection in the Herbal Industry
Supplier Performance Evaluation and Selection in the Herbal Industry Rashmi Kulshrestha Research Scholar Ranbaxy Research Laboratories Ltd. Gurgaon (Haryana), India E-mail : [email protected]
Using Analytic Hierarchy Process Method in ERP system selection process
Using Analytic Hierarchy Process Method in ERP system selection process Rima Tamošiūnienė 1, Anna Marcinkevič 2 Abstract. IT and business alignment has become of the strategic importance and the enterprise
A new Environmental Performance Index using analytic hierarchy process: A case of ASEAN countries
Article A new Environmental Performance Index using analytic hierarchy process: A case of ASEAN countries Wan Khadijah Wan Ismail, Lazim Abdullah Department of Mathematics, Faculty of Science and Technology,
Software Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling
Software Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling Vivek Kurien1, Rashmi S Nair2 PG Student, Dept of Computer Science, MCET, Anad, Tvm, Kerala, India
1 st year / 2014-2015/ Principles of Industrial Eng. Chapter -3 -/ Dr. May G. Kassir. Chapter Three
Chapter Three Scheduling, Sequencing and Dispatching 3-1- SCHEDULING Scheduling can be defined as prescribing of when and where each operation necessary to manufacture the product is to be performed. It
Available online at www.sciencedirect.com. ScienceDirect. Procedia CIRP 40 (2016 ) 390 395
Available online at www.sciencedirect.com ScienceDirect Procedia CIRP 40 (2016 ) 390 395 13th Global Conference on Sustainable Manufacturing - Decoupling Growth from Resource Use A Heuristic Approach to
Backward Scheduling An effective way of scheduling Warehouse activities
Backward Scheduling An effective way of scheduling Warehouse activities Traditionally, scheduling algorithms were used in capital intensive production processes where there was a need to optimize the production
Chapter 3 Managing the Information Systems (IS) Project
Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project
Chapter 6. (PMBOK Guide)
Chapter 6 Project Time Management (PMBOK Guide) Mohammad A. Rajabi Dept. of Geomatics Eng., University it of Th Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: [email protected] ir Homepage: