Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario

Size: px
Start display at page:

Download "Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario"

Transcription

1 258 SUNVIEW STREET Functional Servicing and Storm Water Management Report Project Location: 258 Sunview Street Waterloo, Ontario Prepared for: 258 Sunview Inc. 815 Bridge Street West Waterloo, ON N2V 2M7 March 31, 2015 Revised July 17, 2015 MTE File No.:

2 TABLE OF CONTENTS 1.0 INTRODUCTION EXISTING CONDITIONS Existing Topography Existing Servicing Water Sanitary Storm PROPOSED GRADING AND SERVICING STRATEGY Proposed Grading Proposed Servicing Water Sanitary Storm STORM WATER MANAGEMENT CRITERIA Methodology Stormwater Management Catchment Parameters Water Quantity Modeling Results Water Quality Control Erosion & Sediment Control CONCLUSIONS AND RECOMMENDATIONS FIGURES FIGURE 1 - PRE-DEVELOPMENT CATCHMENT AREAS... 6 FIGURE 2 - POST-DEVELOPMENT CATCHMENT AREAS... 7 TABLES TABLE 4.1 CATCHMENT PARAMETERS... 5 TABLE 4.2 CBMH1 STAGE-STORAGE-DISCHARGE INFORMATION... 8 TABLE 4.3 CBMH2 STAGE-STORAGE-DISCHARGE INFORMATION... 9 TABLE 4.4 SUMMARY OF FLOWS... 9 M:\40037\Reports\MTE Reports\FSR & SWM_July \ FSSWM_July doc

3 APPENDICES APPENDIX A APPENDIX B APPENDIX C APPENDIX D CALCULATIONS MIDUSS OUTPUT CITY STAFF CORRESPONDENCE GEOTECHNICAL REPORT DRAWINGS Existing Conditions and Removals Plan MTE Drawing No. C Encl. Functional Site Grading and SWM Plan MTE Drawing No. C Encl. Functional Site Servicing Plan MTE Drawing No. C Encl.

4 1.0 INTRODUCTION MTE Consultants Inc. has been retained by 258 Sunview Inc. to complete a Functional Servicing and Storm Water Management (FSSWM) Report for three new multi-storey residential apartment buildings to be constructed at Sunview Street (herein referred to as 258 Sunview Street) in the City of Waterloo in support of the Zoning By- Law Amendment Application. The Zoning By-Law Amendment Application, as detailed in the planning report prepared by GSP Group, seeks to remove the Holding Provision on the site; to permit sharing of the permitted density across the entire development; to utilize the Density Bonusing to increase density by approximately 20%; and to permit site specific regulations relating to parking spaces for non-residential use, minimum tower separation, and maximum tower height. The site is located to the northwest of the intersection of Sunview Street and University Avenue West. The property is bound to the west by the Sunview Street right-of-way and to the north, south, and east by existing residential development. For the exact location of the site refer to the key plan located on the enclosed engineering drawings. The proposed development for the site is the construction of a 6-storey and two 12- storey apartment buildings, each with associated parking. The proposed buildings are intended to have non-residential uses on the ground floor fronting Sunview Street. The proposed buildings B and C are designed to also have an at-grade parking area underneath the southeastern sections of the buildings. Due to a 3 m wide walkway dedication between proposed buildings A and B, the subject site will be treated as two separate legal lots. The purpose of this report is to document the opportunities and constraints for the subject property with respect to servicing, grading and storm water management in support of the Zoning By-Law Amendment Application. 2.0 EXISTING CONDITIONS 2.1 Existing Topography The site encompasses an area of ha and comprises of nine single family residential lots facing Sunview Street, each with associated driveways and grassed backyard space. In the existing condition, surface runoff from the site currently drains towards Sunview Street and on towards the south. There is approximately 6.3 metres of elevation difference between the north east and south west corners of the site. Functional Servicing and SWM Report 258 Sunview Street -1- MTE File No July 17, 2015

5 2.2 Existing Servicing Water The existing buildings facing Sunview Street are currently serviced by the existing 150 mm diameter municipal watermain along Sunview Street. The closest municipal fire hydrant is located in the Sunview Street right-of-way between lot numbers 262 and 264. It is approximately 65 m away from the proposed building C at the south end of the property Sanitary There is an existing 200 mm diameter sanitary sewer along Sunview Street that services the buildings on this street and drains towards the south. There are four existing manholes in front of the site. The manhole adjacent to the north property line is at the high point of the road and is approximately 3.0 m deep. There are two manholes located approximately 17 m apart at the middle of the site. The last manhole is situated adjacent to the south property line. These three downstream manholes are each approximately 2.5 m deep Storm There is an existing 250 mm diameter storm sewer along Sunview Street that drains towards the south. The closest existing manhole is located in front of the site near the midpoint of the frontage and is approximately 2.0 m deep. 3.0 PROPOSED GRADING AND SERVICING STRATEGY Preliminary grading and servicing strategies for the proposed development have been developed based on the topographic survey and the conceptual Site Plan prepared by ASP Design Group Inc. and dated June 8, Please refer to MTE Drawings C2.1 - Functional Site Grading and SWM Plan and C2.2 - Functional Site Servicing Plan for details. As mentioned previously, the dedication of the proposed 3 m wide pedestrian walkway between the proposed buildings A and B will separate the subject site into two separate legal lots. Due to this, the development will be treated as two individual sites. Functional Servicing and SWM Report 258 Sunview Street -2- MTE File No July 17, 2015

6 3.1 Proposed Grading The proposed grading strategy respects the existing grades along all property lines and provides barrier free access from Sunview Street to the principle building entrances. The slope across portions of the proposed sidewalk running east-west across the building frontage mimics the existing slope on Sunview Street and so is greater than 5% in areas. In the proposed condition, the parking areas will be on average one metre higher than the elevations of Sunview Street. To accommodate the proposed Site Plan, retaining walls will be required along most of the eastern property line behind proposed buildings B and C. The height of these walls will be finalized during detailed design. 3.2 Proposed Servicing Water The water demand information for the proposed development was submitted to the Region of Waterloo and used to generate a municipal water model along Sunview Street. Upon receipt of the Region s modeling results, a water distribution analysis was completed by MTE. The three main water demands that need to be achieved for this development are a maximum fire flow of 302 L/s, an average day demand of 1.37 L/s, and a maximum day demand of 1.98 L/s. Refer to MTE s Water Distribution Analysis Report dated July 7, 2015, for more information. The analysis concluded that in order to achieve these domestic and fire flows for all three buildings, the existing 150 mm diameter watermain along Sunview Street is to be upgraded to a 300 mm diameter watermain between Hickory Street West and University Avenue West. Two new 200 mm diameter connections to this municipal watermain will be required in order to service the proposed development. A water meter chamber will be installed inside the proposed building C, which will then service building B. Refer to MTE s Water Distribution Analysis Report dated July 7, 2015, for more information. The existing fire hydrant within the Sunview Street right-of-way, located between the proposed buildings A and B, will be relocated in front of building B, as shown on MTE Drawing C2.2, and utilized for the fire protection of all three buildings. Sunview Street will likely be utilized as the fire route for this development. This will be confirmed during detailed design. Functional Servicing and SWM Report 258 Sunview Street -3- MTE File No July 17, 2015

7 3.2.2 Sanitary It is proposed that building A will be serviced by a 200 mm diameter sanitary sewer complete with new manhole at the municipal main on Sunview Street. Building B will be connected to building C within the site, wherein the combined sanitary service for both buildings will be connected to the existing manhole, within the Sunview Street right-ofway, in front of the most southerly point of the subject site. The service sizes and inverts will be confirmed at detailed design. Based on correspondence with City staff, we understand that there are no capacity constraints in the sanitary sewer along Sunview Street. Please refer to Appendix D for this correspondence. A sanitary flow design sheet has been prepared to determine the flows anticipated to be generated by the proposed development. Under the existing site zoning, (a combination of (H) NMU-6 and (H) NMU-12), the maximum anticipated peak sanitary flow rate is calculated to be 8.12 L/s. Under the proposed zoning, (H) NMU-12, the maximum anticipated peak sanitary flow rate for the proposed building is calculated to be 8.10 L/s. The proposed buildings have 340 total bedrooms. All flow calculations assumed 1.5 persons per bedroom and a Harmon Peaking Factor. Refer to Appendix A for all sanitary design calculations Storm A storm sewer system will be installed on-site to collect rooftop runoff from all three buildings and runoff from the common driveways and parking areas. Although the subject site is treated as two separate lots when it comes to water and sanitary servicing, it will be treated as one site for storm servicing purposes. An easement through the 3 m wide walkway dedication will be required to allow the proposed storm sewer to run between the parking areas of building A and B. The runoff collected in the storm sewers will be directed to the OGS unit located adjacent to the southern property line and on to the municipal storm sewer in the Sunview Street right-of-way, complete with new manhole. Runoff from the frontage of the property will flow towards the Sunview Street right-of-way. 4.0 STORM WATER MANAGEMENT CRITERIA The stormwater management design criteria for the subject site, as established by the City of Waterloo, are as follows: i) attenuation of the post-development peak flows for the 2, 5, and 100 year storm events to the pre-development (existing) peak flows; and ii) implementation of water quality controls. Functional Servicing and SWM Report 258 Sunview Street -4- MTE File No July 17, 2015

8 4.1 Methodology In order to successfully complete the storm water management design for this site, the following specific tasks were undertaken: i) calculated the allowable runoff rates using MIDUSS NET; ii) determined the percent impervious of the site and catchment parameters for inclusion in MIDUSS modeling; iii) calculated post-development runoff hydrographs using MIDUSS NET; and iv) revised the site grades to attain the required storage for runoff control. 4.2 Stormwater Management Catchment Parameters The following table summarizes the catchments used in the modeling of the site. The post development condition was separated into seven catchment areas: building A, the building A parking area, building B, the building B parking area, building C, the building C parking area, and the uncontrolled area. Figure 1.0 illustrates the limits of the predevelopment catchment area. Figure 2.0 illustrates the limits of the post development catchment areas. TABLE 4.1 CATCHMENT PARAMETERS # Catchment Area (ha) Pre-Development Catchment Area % Impervious Pervious CN Impervious CN Slope (%) Flow Length (m) 101 Entire site Post Development Catchment Areas 201 Building A Building A Parking Area Building B Building B Parking Area Building C Building C Parking Area Uncontrolled A geotechnical investigation was undertaken by Chung & Vander Doelen Engineering Ltd. A complete copy of their report is included in the submission package for the City of Waterloo s records. The investigation revealed that the site is mainly comprised of sandy silt, silty sand, and silty clay till. Therefore, a pervious CN of 75 for grass areas is appropriate. Refer to Appendix E for the complete geotechnical report. Functional Servicing and SWM Report 258 Sunview Street -5- MTE File No July 17, 2015

9

10

11 4.3 Water Quantity Modeling Results In order to achieve the storm water management requirements for the site, runoff generated from catchments 201 and 202 will be conveyed to catchbasin-manhole CBMH1, located in the parking area of building A, wherein the flow will be controlled by a 75 mm diameter casting plate and a 6.0 m wide weir in the driveway of building A. Runoff from catchments 203 to 205 will be conveyed to catchbasin-manhole CBMH2, located in the main driveway at the rear of buildings B and C, wherein the flow will be controlled with the installation of a 105 mm diameter on-line orifice plate on the outlet pipe and a 2.0 m wide weir in the driveway entrance between buildings B and C. Storage volume for the orifices and the weirs will be provided within the parking area and one length of oversized pipe. The maximum depth of ponding permitted within the parking area by grading is 0.30 m. In addition, three (3) flow control roof drains, single notch, are proposed to be installed on the roof of the proposed building A. Buildings B and C will each require four (4) single notch flow control roof drains. This will help to further reduce the post development runoff from the site. The flow equation for the orifice and the weir is included in Appendix A. Refer to Appendix B for the MIDUSS NET output. The following tables illustrate the stagestorage-discharge relationship of the storm system. TABLE 4.2 CBMH1 STAGE-STORAGE-DISCHARGE INFORMATION Elevation (m) Head (m) Orifice/Weir Flow (m 3 /s) Volume (m 3 ) Remarks Invert of 750 mm outlet pipe Invert of 75 mm casting orifice Top of grate of CBMH Contour Contour Contour Contour Contour m wide weir Overflow Functional Servicing and SWM Report 258 Sunview Street -8- MTE File No July 17, 2015

12 TABLE 4.3 CBMH2 STAGE-STORAGE-DISCHARGE INFORMATION Elevation (m) Head (m) Orifice/Weir Flow (m 3 /s) Volume (m 3 ) Remarks Invert of 105 mm orifice Top of grate of CBMH Contour Contour Contour Contour m wide weir Overflow With the addition of the 75 mm casting orifice plate, the 105 mm diameter online orifice plate, and the 6.0 m wide and 2.0 m wide weirs, the post development runoff from the controlled portion of the site for the 2, 5, and 100 year storm events is controlled to m 3 /s, 0.042m 3 /s, and m 3 /s respectively. The following table summarizes the flows generated by the whole site. Please note that these flow rates are subject to change at detailed design. TABLE 4.4 SUMMARY OF FLOWS 2 year Storm Event Modeling Condition (m 3 /s) 5 year Storm Event (m 3 /s) Pre-development Post Development year Storm Event (m 3 /s) The maximum ponding elevation around CBMH1 in for the 2 year storm event is This represents 15 cm of ponding depth within the parking area. For the 5 year storm event, the maximum ponding elevation is This represents 19 cm of ponding depth within the parking area. For the 100 year storm event, the maximum ponding elevation is This represents 27 cm of ponding depth within the parking area, with no overflow over the weir. There is no ponding within the parking area around CBMH2 during the 2 and 5 year storms. For the 100 year storm event, the maximum ponding elevation is This represents 23 cm of ponding depth within the parking area, with no overflow over the weir. As above, the ponding values are subject to change at detailed design. Functional Servicing and SWM Report 258 Sunview Street -9- MTE File No July 17, 2015

13 4.4 Water Quality Control A Stormceptor Model STC 300 will be installed on the storm sewer system to provide water quality control for the site. The chosen unit is expected to provide Level 2 water quality control. (Refer to Appendix A for the sizing output from the Stormceptor Expert program.) The Stormceptor will require regular annual maintenance to ensure it is operating properly. The owner will enter into a maintenance agreement with a suitable contractor to complete this work. In addition, all the storm structures will have a 600 mm sump. 4.5 Erosion & Sediment Control In order to minimize the effects of erosion during the grading of the site, sediment control fencing will be installed: as shown on the enclosed engineering drawing, around any stockpiles and around the catchbasins during construction. Any sediment that is tracked onto the road way during the course of construction will be cleaned by the contractor. To help minimize the amount of mud being tracked onto the road way, a mud mat will be installed at the primary construction entrance. These measures will be shown on the detailed design drawings. Functional Servicing and SWM Report 258 Sunview Street -10- MTE File No July 17, 2015

14

15 CALCULATIONS APPENDIX A

16 CALCULATIONS Orifice Equation (MIDUSS NET) Q = C c p/4 D5 sqrt(2g(h-2/3d)) where C c coefficient of contraction H head relative to the invert of the orifice D orifice diameter g gravitational acceleration Weir Equation (MIDUSS NET) Q cr = B sqrt(g) y cr 3/2 where y cr = 2/3 (H-Z) where B weir breadth g gravitational acceleration H head relative to the invert of the weir Z weir sill elevation

17 258 Sunview Street Sanitary Flow Rate Analysis Waterloo, Ontario Project #: Date: July 17, 2015 Date Printed: 7/17/2015 By: CJC Maximum with Existing Zoning (H) NMU-6 & (H) NMU-12 Development Information Sanitary Flow Calculations Development Information Proposed Buildings Sanitary Flow Calculations Zoning Maximum Density Site Area Population 1 Average Flow Peaking Factor 2 Peak Flow # of Bedrooms Population 1 Average Flow Peaking Factor 2 Peak Flow p/ha ha # of people L/s L/s # of people L/s L/s (H) NMU (H) NMU TOTALS FOR SITE TOTALS FOR SITE Assumptions: 1 Calculated using the City of Waterloo By-Law No Maximum Density - (H) NMU bedrooms/ha Maximum Density - (H) NMU bedrooms/ha Note: The criteria for "Maximum Density" given by the City of Waterloo are expressed in bedrooms/ha. In order to convert them to p/ha, a density of 1.5 people/bedroom was assumed. 2 Taken from Region of Waterloo and Area Municipalities Design Guidelines and Supplemental Specifications for Municipal Services (DGSSMS) (Region of Waterloo, February 2012) Sanitary peak Flow (residential) L/s/p 3 Residential Harmon Peaking Factor Formula F=1+(14/(4+P^0.5)) Where P = population (in thousands)

18 258 Sunview Street WATER DISTRIBUTION ANALYSIS Waterloo, Ontario Project #: Date: July 17, 2015 Date Printed: 7/17/2015 By: CJC Node ID / Area ID / Building # F.F.E. (m.a.s.l.) Development Information 1 Description # of Units Population Bldg Area (1 st Floor) Total Bldg Area Building Volume Ontario Building Code K V S tot Q F F C A F Fire Flow 2 Domestic Flow 3,4 Fire Underwriters Survey (2) Occupancy Reduction (3) Sprinkler Protection (4) Building Exposure F F Fire Flow (Max OBC/FUS) MOE Guidelines Average Day Max Day Peak Hour # of people m 2 m 2 m 3 m 3 L L/min L/s m 2 L/min L/min L/s L/s L/s L/s L/s L/s L/s L/s A Apartment , , ,805 1, ,000-15% -30% 50% 3, B Apartment ,256 27, , ,325 9, ,256 17,000-15% -30% 50% 17, C Apartment ,238 26, , ,309 9, ,238 17,000-15% -30% 55% 18, TOTALS FOR SITE Max Fire Flow = 150 Max Fire Flow = Minimum Hour Max Day + Fire Flow Sum of Maximum Day Flows + Largest Fire Flow (L/s) = 304 Assumptions: 1 All building areas and populations are based on the Site Plan by GSP Design Group Inc. Assumed 1.77 persons per unit as per Region of Waterloo Water and Wastewater Monitoring Report All buildings are classified as occupancy group C (Residential Occupancy) 3 Average Daily Demands for each building are based on "Tri City Water Distribution Master Plan Final Report" by AECOM, Dated May 2009 : Residential = 225 L/cap/day 4 Peaking Factors based on "Design Guidelines for Drinking-Water Systems " (MOE, 2008): Average Day = 1 Maximum Day = 2.75 Peak Hour = 4.13 Minimum Hour = 0.4

19 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Date 3/13/2015 Project Name 258 Sunview Street Project Number Location Waterloo Designer Information Company Contact Notes N/A MTE CJC Rainfall Name WATERLOO WELLINGTON A State ON ID 9387 Years of Records 1970 to 2003 Latitude 43 27'N Longitude 80 23'W Water Quality Objective TSS Removal (%) 70 Drainage Area Total Area (ha) 0.51 Imperviousness (%) 98 The Stormceptor System model STC 300 achieves the water quality objective removing 70% TSS for a Fine (organics, silts and sand) particle size distribution. Upstream Storage Storage Discharge (ha-m) (L/s) 0 0 Stormceptor Sizing Summary Stormceptor Model TSS Removal % STC STC STC STC STC STC STC STC STC STC STC STC Stormceptor Design Summary - 1/2

20 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Fine (organics, silts and sand) Particle Size Distribution Specific Settling Specific Settling Particle Size Distribution Gravity Velocity Gravity Velocity µm % m/s µm % m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences Inlet Pipe Configuration STC 300 STC 750 to STC STC 9000 to 6000 STC Single inlet pipe 75 mm 25 mm 75 mm Multiple inlet pipes 75 mm 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., Stormceptor Design Summary - 2/2

21 MIDUSS OUTPUT APPENDIX B

22 PRE-DEVELOPMENT

23 Q:\40037\MIDUSS\ PRE-2yr.out Page 1 Printed at 14:56 on 26 Jun " MIDUSS Output >" 2 " MIDUSS version Version 2.25 rev. 473" 3 " MIDUSS created Sunday, February 07, 2010" 4 " 10 Units used: ie METRIC" 5 " Job folder: Q:\40037\MIDUSS" 6 " Output filename: PRE-2yr.out" 7 " Licensee name: Admin" 8 " Company " 9 " Date & Time last used: 3/10/2015 at 2:28:17 PM" 10 " 31 TIME PARAMETERS" 11 " Time Step" 12 " Max. Storm length" 13 " Max. Hydrograph" 14 " 32 STORM Chicago storm" 15 " 1 Chicago storm" 16 " Coefficient A" 17 " Constant B" 18 " Exponent C" 19 " Fraction R" 20 " Duration" 21 " Time step multiplier" 22 " Maximum intensity mm/hr" 23 " Total depth mm" 24 " 6 002hyd Hydrograph extension used in this file" 25 " 33 CATCHMENT 101" 26 " 1 Triangular SCS" 27 " 1 Equal length" 28 " 1 SCS method" 29 " 101 PRE-DEVELOPMENT SITE" 30 " % Impervious" 31 " Total Area" 32 " Flow length" 33 " Overland Slope" 34 " Pervious Area" 35 " Pervious length" 36 " Pervious slope" 37 " Impervious Area" 38 " Impervious length" 39 " Impervious slope" 40 " Pervious Manning 'n'" 41 " Pervious SCS Curve No." 42 " Pervious Runoff coefficient" 43 " Pervious Ia/S coefficient" 44 " Pervious Initial abstraction" 45 " Impervious Manning 'n'" 46 " Impervious SCS Curve No." 47 " Impervious Runoff coefficient" 48 " Impervious Ia/S coefficient" 49 " Impervious Initial abstraction" 50 " c.m/sec" 51 " Catchment 101 Pervious Impervious Total Area " 52 " Surface Area hectare" 53 " Time of concentration minutes" Q:\40037\MIDUSS\ PRE-2yr.out Page 2 Printed at 14:56 on 26 Jun " Time to Centroid minutes" 55 " Rainfall depth mm" 56 " Rainfall volume c.m" 57 " Rainfall losses mm" 58 " Runoff depth mm" 59 " Runoff volume c.m" 60 " Runoff coefficient " 61 " Maximum flow c.m/sec" 62 " 40 HYDROGRAPH Add Runoff " 63 " 4 Add Runoff " 64 " " 65 " 38 START/RE-START TOTALS 101" 66 " 3 Runoff Totals on EXIT" 67 " Total Catchment area hectare" 68 " Total Impervious area hectare" 69 " Total % impervious " 70 " 19 EXIT"

24

25 Q:\40037\MIDUSS\ PRE-5yr.out Page 1 Printed at 14:57 on 26 Jun " MIDUSS Output >" 2 " MIDUSS version Version 2.25 rev. 473" 3 " MIDUSS created Sunday, February 07, 2010" 4 " 10 Units used: ie METRIC" 5 " Job folder: Q:\40037\MIDUSS" 6 " Output filename: PRE-5yr.out" 7 " Licensee name: Admin" 8 " Company " 9 " Date & Time last used: 3/10/2015 at 2:32:51 PM" 10 " 31 TIME PARAMETERS" 11 " Time Step" 12 " Max. Storm length" 13 " Max. Hydrograph" 14 " 32 STORM Chicago storm" 15 " 1 Chicago storm" 16 " Coefficient A" 17 " Constant B" 18 " Exponent C" 19 " Fraction R" 20 " Duration" 21 " Time step multiplier" 22 " Maximum intensity mm/hr" 23 " Total depth mm" 24 " 6 005hyd Hydrograph extension used in this file" 25 " 33 CATCHMENT 101" 26 " 1 Triangular SCS" 27 " 1 Equal length" 28 " 1 SCS method" 29 " 101 PRE-DEVELOPMENT SITE" 30 " % Impervious" 31 " Total Area" 32 " Flow length" 33 " Overland Slope" 34 " Pervious Area" 35 " Pervious length" 36 " Pervious slope" 37 " Impervious Area" 38 " Impervious length" 39 " Impervious slope" 40 " Pervious Manning 'n'" 41 " Pervious SCS Curve No." 42 " Pervious Runoff coefficient" 43 " Pervious Ia/S coefficient" 44 " Pervious Initial abstraction" 45 " Impervious Manning 'n'" 46 " Impervious SCS Curve No." 47 " Impervious Runoff coefficient" 48 " Impervious Ia/S coefficient" 49 " Impervious Initial abstraction" 50 " c.m/sec" 51 " Catchment 101 Pervious Impervious Total Area " 52 " Surface Area hectare" 53 " Time of concentration minutes" Q:\40037\MIDUSS\ PRE-5yr.out Page 2 Printed at 14:57 on 26 Jun " Time to Centroid minutes" 55 " Rainfall depth mm" 56 " Rainfall volume c.m" 57 " Rainfall losses mm" 58 " Runoff depth mm" 59 " Runoff volume c.m" 60 " Runoff coefficient " 61 " Maximum flow c.m/sec" 62 " 40 HYDROGRAPH Add Runoff " 63 " 4 Add Runoff " 64 " " 65 " 38 START/RE-START TOTALS 101" 66 " 3 Runoff Totals on EXIT" 67 " Total Catchment area hectare" 68 " Total Impervious area hectare" 69 " Total % impervious " 70 " 19 EXIT"

26

27 Q:\40037\MIDUSS\ PRE-100yr.out Page 1 Printed at 14:57 on 26 Jun " MIDUSS Output >" 2 " MIDUSS version Version 2.25 rev. 473" 3 " MIDUSS created Sunday, February 07, 2010" 4 " 10 Units used: ie METRIC" 5 " Job folder: Q:\40037\MIDUSS" 6 " Output filename: PRE-100yr.out" 7 " Licensee name: Admin" 8 " Company " 9 " Date & Time last used: 3/10/2015 at 2:34:07 PM" 10 " 31 TIME PARAMETERS" 11 " Time Step" 12 " Max. Storm length" 13 " Max. Hydrograph" 14 " 32 STORM Chicago storm" 15 " 1 Chicago storm" 16 " Coefficient A" 17 " Constant B" 18 " Exponent C" 19 " Fraction R" 20 " Duration" 21 " Time step multiplier" 22 " Maximum intensity mm/hr" 23 " Total depth mm" 24 " 6 100hyd Hydrograph extension used in this file" 25 " 33 CATCHMENT 101" 26 " 1 Triangular SCS" 27 " 1 Equal length" 28 " 1 SCS method" 29 " 101 PRE-DEVELOPMENT SITE" 30 " % Impervious" 31 " Total Area" 32 " Flow length" 33 " Overland Slope" 34 " Pervious Area" 35 " Pervious length" 36 " Pervious slope" 37 " Impervious Area" 38 " Impervious length" 39 " Impervious slope" 40 " Pervious Manning 'n'" 41 " Pervious SCS Curve No." 42 " Pervious Runoff coefficient" 43 " Pervious Ia/S coefficient" 44 " Pervious Initial abstraction" 45 " Impervious Manning 'n'" 46 " Impervious SCS Curve No." 47 " Impervious Runoff coefficient" 48 " Impervious Ia/S coefficient" 49 " Impervious Initial abstraction" 50 " c.m/sec" 51 " Catchment 101 Pervious Impervious Total Area " 52 " Surface Area hectare" 53 " Time of concentration minutes" Q:\40037\MIDUSS\ PRE-100yr.out Page 2 Printed at 14:57 on 26 Jun " Time to Centroid minutes" 55 " Rainfall depth mm" 56 " Rainfall volume c.m" 57 " Rainfall losses mm" 58 " Runoff depth mm" 59 " Runoff volume c.m" 60 " Runoff coefficient " 61 " Maximum flow c.m/sec" 62 " 40 HYDROGRAPH Add Runoff " 63 " 4 Add Runoff " 64 " " 65 " 38 START/RE-START TOTALS 101" 66 " 3 Runoff Totals on EXIT" 67 " Total Catchment area hectare" 68 " Total Impervious area hectare" 69 " Total % impervious " 70 " 19 EXIT"

28 POST-DEVELOPMENT

29 Q:\40037\MIDUSS\ POST-2yr.out Page 1 Printed at 14:57 on 26 Jun " MIDUSS Output >" 2 " MIDUSS version Version 2.25 rev. 473" 3 " MIDUSS created Sunday, February 07, 2010" 4 " 10 Units used: ie METRIC" 5 " Job folder: Q:\40037\MIDUSS" 6 " Output filename: POST-2yr.out" 7 " Licensee name: Admin" 8 " Company " 9 " Date & Time last used: 3/30/2015 at 2:02:20 PM" 10 " 31 TIME PARAMETERS" 11 " Time Step" 12 " Max. Storm length" 13 " Max. Hydrograph" 14 " 32 STORM Chicago storm" 15 " 1 Chicago storm" 16 " Coefficient A" 17 " Constant B" 18 " Exponent C" 19 " Fraction R" 20 " Duration" 21 " Time step multiplier" 22 " Maximum intensity mm/hr" 23 " Total depth mm" 24 " 6 002hyd Hydrograph extension used in this file" 25 " 33 CATCHMENT 201" 26 " 1 Triangular SCS" 27 " 1 Equal length" 28 " 1 SCS method" 29 " 201 BUILDING A" 30 " % Impervious" 31 " Total Area" 32 " Flow length" 33 " Overland Slope" 34 " Pervious Area" 35 " Pervious length" 36 " Pervious slope" 37 " Impervious Area" 38 " Impervious length" 39 " Impervious slope" 40 " Pervious Manning 'n'" 41 " Pervious SCS Curve No." 42 " Pervious Runoff coefficient" 43 " Pervious Ia/S coefficient" 44 " Pervious Initial abstraction" 45 " Impervious Manning 'n'" 46 " Impervious SCS Curve No." 47 " Impervious Runoff coefficient" 48 " Impervious Ia/S coefficient" 49 " Impervious Initial abstraction" 50 " c.m/sec" 51 " Catchment 201 Pervious Impervious Total Area " 52 " Surface Area hectare" 53 " Time of concentration minutes" Q:\40037\MIDUSS\ POST-2yr.out Page 2 Printed at 14:57 on 26 Jun " Time to Centroid minutes" 55 " Rainfall depth mm" 56 " Rainfall volume c.m" 57 " Rainfall losses mm" 58 " Runoff depth mm" 59 " Runoff volume c.m" 60 " Runoff coefficient " 61 " Maximum flow c.m/sec" 62 " 40 HYDROGRAPH Add Runoff " 63 " 4 Add Runoff " 64 " " 65 " 54 POND DESIGN" 66 " Current peak flow c.m/sec" 67 " Target outflow c.m/sec" 68 " 17.6 Hydrograph volume c.m" 69 " 11. Number of stages" 70 " Minimum water level metre" 71 " Maximum water level metre" 72 " Starting water level metre" 73 " 0 Keep Design Data: 1 = True; 0 = False" 74 " Level Discharge Volume" 75 " " 76 " " 77 " " 78 " " 79 " " 80 " " 81 " " 82 " " 83 " " 84 " " 85 " " 86 " 1. ROOFTOP" 87 " Roof area Store area Area/drain Drain flow Roof slope" 88 " hectare hectare sq.metre L/min/25mm g H:1V" 89 " " 90 " Using 3 roofdrains on roofstorage area of 490. square metre" 91 " Peak outflow c.m/sec" 92 " Maximum level metre" 93 " Maximum storage c.m" 94 " Centroidal lag hours" 95 " c.m/sec" 96 " 40 HYDROGRAPH Next link " 97 " 5 Next link " 98 " " 99 " 33 CATCHMENT 202" 100 " 1 Triangular SCS" 101 " 1 Equal length" 102 " 1 SCS method" 103 " 202 PARKING LOT - BLDG A" 104 " % Impervious" 105 " Total Area" 106 " Flow length"

30 Q:\40037\MIDUSS\ POST-2yr.out Page 3 Printed at 14:57 on 26 Jun " Overland Slope" 108 " Pervious Area" 109 " Pervious length" 110 " Pervious slope" 111 " Impervious Area" 112 " Impervious length" 113 " Impervious slope" 114 " Pervious Manning 'n'" 115 " Pervious SCS Curve No." 116 " Pervious Runoff coefficient" 117 " Pervious Ia/S coefficient" 118 " Pervious Initial abstraction" 119 " Impervious Manning 'n'" 120 " Impervious SCS Curve No." 121 " Impervious Runoff coefficient" 122 " Impervious Ia/S coefficient" 123 " Impervious Initial abstraction" 124 " c.m/sec" 125 " Catchment 202 Pervious Impervious Total Area " 126 " Surface Area hectare" 127 " Time of concentration minutes" 128 " Time to Centroid minutes" 129 " Rainfall depth mm" 130 " Rainfall volume c.m" 131 " Rainfall losses mm" 132 " Runoff depth mm" 133 " Runoff volume c.m" 134 " Runoff coefficient " 135 " Maximum flow c.m/sec" 136 " 40 HYDROGRAPH Add Runoff " 137 " 4 Add Runoff " 138 " " 139 " 54 POND DESIGN" 140 " Current peak flow c.m/sec" 141 " Target outflow c.m/sec" 142 " 31.2 Hydrograph volume c.m" 143 " 10. Number of stages" 144 " Minimum water level metre" 145 " Maximum water level metre" 146 " Starting water level metre" 147 " 0 Keep Design Data: 1 = True; 0 = False" 148 " Level Discharge Volume" 149 " " 150 " E " 151 " E " 152 " " 153 " " 154 " " 155 " " 156 " " 157 " " 158 " " 159 " 1. WEIRS" Q:\40037\MIDUSS\ POST-2yr.out Page 4 Printed at 14:57 on 26 Jun " Crest Weir Crest Left Right" 161 " elevation coefficie breadth sideslope sideslope" 162 " " 163 " 1. HOR. ORIFICES" 164 " Orifice Orifice Orifice Number of" 165 " invert coefficie diameter orifices" 166 " " 167 " Peak outflow c.m/sec" 168 " Maximum level metre" 169 " Maximum storage c.m" 170 " Centroidal lag hours" 171 " c.m/sec" 172 " 40 HYDROGRAPH Combine 1" 173 " 6 Combine " 174 " 1 Node #" 175 " CBMH BEHIND BLDG B" 176 " Maximum flow c.m/sec" 177 " Hydrograph volume c.m" 178 " " 179 " 40 HYDROGRAPH Start - New Tributary" 180 " 2 Start - New Tributary" 181 " " 182 " 33 CATCHMENT 203" 183 " 1 Triangular SCS" 184 " 1 Equal length" 185 " 1 SCS method" 186 " 203 BUILDING B" 187 " % Impervious" 188 " Total Area" 189 " Flow length" 190 " Overland Slope" 191 " Pervious Area" 192 " Pervious length" 193 " Pervious slope" 194 " Impervious Area" 195 " Impervious length" 196 " Impervious slope" 197 " Pervious Manning 'n'" 198 " Pervious SCS Curve No." 199 " Pervious Runoff coefficient" 200 " Pervious Ia/S coefficient" 201 " Pervious Initial abstraction" 202 " Impervious Manning 'n'" 203 " Impervious SCS Curve No." 204 " Impervious Runoff coefficient" 205 " Impervious Ia/S coefficient" 206 " Impervious Initial abstraction" 207 " c.m/sec" 208 " Catchment 203 Pervious Impervious Total Area " 209 " Surface Area hectare" 210 " Time of concentration minutes" 211 " Time to Centroid minutes" 212 " Rainfall depth mm"

31 Q:\40037\MIDUSS\ POST-2yr.out Page 5 Printed at 14:57 on 26 Jun " Rainfall volume c.m" 214 " Rainfall losses mm" 215 " Runoff depth mm" 216 " Runoff volume c.m" 217 " Runoff coefficient " 218 " Maximum flow c.m/sec" 219 " 40 HYDROGRAPH Add Runoff " 220 " 4 Add Runoff " 221 " " 222 " 54 POND DESIGN" 223 " Current peak flow c.m/sec" 224 " Target outflow c.m/sec" 225 " 25.7 Hydrograph volume c.m" 226 " 11. Number of stages" 227 " Minimum water level metre" 228 " Maximum water level metre" 229 " Starting water level metre" 230 " 0 Keep Design Data: 1 = True; 0 = False" 231 " Level Discharge Volume" 232 " " 233 " " 234 " " 235 " " 236 " " 237 " " 238 " " 239 " " 240 " " 241 " " 242 " " 243 " 1. ROOFTOP" 244 " Roof area Store area Area/drain Drain flow Roof slope" 245 " hectare hectare sq.metre L/min/25mm g H:1V" 246 " " 247 " Using 4 roofdrains on roofstorage area of 710. square metre" 248 " Peak outflow c.m/sec" 249 " Maximum level metre" 250 " Maximum storage c.m" 251 " Centroidal lag hours" 252 " c.m/sec" 253 " 40 HYDROGRAPH Next link " 254 " 5 Next link " 255 " " 256 " 33 CATCHMENT 204" 257 " 1 Triangular SCS" 258 " 1 Equal length" 259 " 1 SCS method" 260 " 204 PARKING LOT - BLDG B" 261 " % Impervious" 262 " Total Area" 263 " Flow length" 264 " Overland Slope" 265 " Pervious Area" Q:\40037\MIDUSS\ POST-2yr.out Page 6 Printed at 14:57 on 26 Jun " Pervious length" 267 " Pervious slope" 268 " Impervious Area" 269 " Impervious length" 270 " Impervious slope" 271 " Pervious Manning 'n'" 272 " Pervious SCS Curve No." 273 " Pervious Runoff coefficient" 274 " Pervious Ia/S coefficient" 275 " Pervious Initial abstraction" 276 " Impervious Manning 'n'" 277 " Impervious SCS Curve No." 278 " Impervious Runoff coefficient" 279 " Impervious Ia/S coefficient" 280 " Impervious Initial abstraction" 281 " c.m/sec" 282 " Catchment 204 Pervious Impervious Total Area " 283 " Surface Area hectare" 284 " Time of concentration minutes" 285 " Time to Centroid minutes" 286 " Rainfall depth mm" 287 " Rainfall volume c.m" 288 " Rainfall losses mm" 289 " Runoff depth mm" 290 " Runoff volume c.m" 291 " Runoff coefficient " 292 " Maximum flow c.m/sec" 293 " 40 HYDROGRAPH Add Runoff " 294 " 4 Add Runoff " 295 " " 296 " 40 HYDROGRAPH Copy to Outflow" 297 " 8 Copy to Outflow" 298 " " 299 " 40 HYDROGRAPH Combine 1" 300 " 6 Combine " 301 " 1 Node #" 302 " CBMH BEHIND BLDG B" 303 " Maximum flow c.m/sec" 304 " Hydrograph volume c.m" 305 " " 306 " 40 HYDROGRAPH Start - New Tributary" 307 " 2 Start - New Tributary" 308 " " 309 " 33 CATCHMENT 205" 310 " 1 Triangular SCS" 311 " 1 Equal length" 312 " 1 SCS method" 313 " 205 BUILDING C" 314 " % Impervious" 315 " Total Area" 316 " Flow length" 317 " Overland Slope" 318 " Pervious Area"

32 Q:\40037\MIDUSS\ POST-2yr.out Page 7 Printed at 14:57 on 26 Jun " Pervious length" 320 " Pervious slope" 321 " Impervious Area" 322 " Impervious length" 323 " Impervious slope" 324 " Pervious Manning 'n'" 325 " Pervious SCS Curve No." 326 " Pervious Runoff coefficient" 327 " Pervious Ia/S coefficient" 328 " Pervious Initial abstraction" 329 " Impervious Manning 'n'" 330 " Impervious SCS Curve No." 331 " Impervious Runoff coefficient" 332 " Impervious Ia/S coefficient" 333 " Impervious Initial abstraction" 334 " c.m/sec" 335 " Catchment 205 Pervious Impervious Total Area " 336 " Surface Area hectare" 337 " Time of concentration minutes" 338 " Time to Centroid minutes" 339 " Rainfall depth mm" 340 " Rainfall volume c.m" 341 " Rainfall losses mm" 342 " Runoff depth mm" 343 " Runoff volume c.m" 344 " Runoff coefficient " 345 " Maximum flow c.m/sec" 346 " 40 HYDROGRAPH Add Runoff " 347 " 4 Add Runoff " 348 " " 349 " 54 POND DESIGN" 350 " Current peak flow c.m/sec" 351 " Target outflow c.m/sec" 352 " 25.7 Hydrograph volume c.m" 353 " 11. Number of stages" 354 " Minimum water level metre" 355 " Maximum water level metre" 356 " Starting water level metre" 357 " 0 Keep Design Data: 1 = True; 0 = False" 358 " Level Discharge Volume" 359 " " 360 " " 361 " " 362 " " 363 " " 364 " " 365 " " 366 " " 367 " " 368 " " 369 " " 370 " 1. ROOFTOP" 371 " Roof area Store area Area/drain Drain flow Roof slope" Q:\40037\MIDUSS\ POST-2yr.out Page 8 Printed at 14:57 on 26 Jun " hectare hectare sq.metre L/min/25mm g H:1V" 373 " " 374 " Using 4 roofdrains on roofstorage area of 710. square metre" 375 " Peak outflow c.m/sec" 376 " Maximum level metre" 377 " Maximum storage c.m" 378 " Centroidal lag hours" 379 " c.m/sec" 380 " 40 HYDROGRAPH Combine 1" 381 " 6 Combine " 382 " 1 Node #" 383 " CBMH BEHIND BLDG B" 384 " Maximum flow c.m/sec" 385 " Hydrograph volume c.m" 386 " " 387 " 40 HYDROGRAPH Confluence 1" 388 " 7 Confluence " 389 " 1 Node #" 390 " CBMH BEHIND BLDG B" 391 " Maximum flow c.m/sec" 392 " Hydrograph volume c.m" 393 " " 394 " 54 POND DESIGN" 395 " Current peak flow c.m/sec" 396 " Target outflow c.m/sec" 397 " Hydrograph volume c.m" 398 " 8. Number of stages" 399 " Minimum water level metre" 400 " Maximum water level metre" 401 " Starting water level metre" 402 " 0 Keep Design Data: 1 = True; 0 = False" 403 " Level Discharge Volume" 404 " " 405 " " 406 " " 407 " " 408 " " 409 " " 410 " " 411 " " 412 " 1. WEIRS" 413 " Crest Weir Crest Left Right" 414 " elevation coefficie breadth sideslope sideslope" 415 " " 416 " 1. ORIFICES" 417 " Orifice Orifice Orifice Number of" 418 " invert coefficie diameter orifices" 419 " " 420 " Peak outflow c.m/sec" 421 " Maximum level metre" 422 " Maximum storage c.m" 423 " Centroidal lag hours" 424 " c.m/sec"

33 Q:\40037\MIDUSS\ POST-2yr.out Page 9 Printed at 14:57 on 26 Jun " 40 HYDROGRAPH Combine 2" 426 " 6 Combine " 427 " 2 Node #" 428 " DDICBMH" 429 " Maximum flow c.m/sec" 430 " Hydrograph volume c.m" 431 " " 432 " 40 HYDROGRAPH Start - New Tributary" 433 " 2 Start - New Tributary" 434 " " 435 " 33 CATCHMENT 206" 436 " 1 Triangular SCS" 437 " 1 Equal length" 438 " 1 SCS method" 439 " 206 PARKING LOT - BLDG C" 440 " % Impervious" 441 " Total Area" 442 " Flow length" 443 " Overland Slope" 444 " Pervious Area" 445 " Pervious length" 446 " Pervious slope" 447 " Impervious Area" 448 " Impervious length" 449 " Impervious slope" 450 " Pervious Manning 'n'" 451 " Pervious SCS Curve No." 452 " Pervious Runoff coefficient" 453 " Pervious Ia/S coefficient" 454 " Pervious Initial abstraction" 455 " Impervious Manning 'n'" 456 " Impervious SCS Curve No." 457 " Impervious Runoff coefficient" 458 " Impervious Ia/S coefficient" 459 " Impervious Initial abstraction" 460 " c.m/sec" 461 " Catchment 206 Pervious Impervious Total Area " 462 " Surface Area hectare" 463 " Time of concentration minutes" 464 " Time to Centroid minutes" 465 " Rainfall depth mm" 466 " Rainfall volume c.m" 467 " Rainfall losses mm" 468 " Runoff depth mm" 469 " Runoff volume c.m" 470 " Runoff coefficient " 471 " Maximum flow c.m/sec" 472 " 40 HYDROGRAPH Add Runoff " 473 " 4 Add Runoff " 474 " " 475 " 40 HYDROGRAPH Copy to Outflow" 476 " 8 Copy to Outflow" 477 " " Q:\40037\MIDUSS\ POST-2yr.out Page 10 Printed at 14:57 on 26 Jun " 40 HYDROGRAPH Combine 2" 479 " 6 Combine " 480 " 2 Node #" 481 " DDICBMH" 482 " Maximum flow c.m/sec" 483 " Hydrograph volume c.m" 484 " " 485 " 40 HYDROGRAPH Confluence 2" 486 " 7 Confluence " 487 " 2 Node #" 488 " DDICBMH" 489 " Maximum flow c.m/sec" 490 " Hydrograph volume c.m" 491 " " 492 " 40 HYDROGRAPH Copy to Outflow" 493 " 8 Copy to Outflow" 494 " " 495 " 40 HYDROGRAPH Combine 3" 496 " 6 Combine " 497 " 3 Node #" 498 " TOTAL SITE" 499 " Maximum flow c.m/sec" 500 " Hydrograph volume c.m" 501 " " 502 " 40 HYDROGRAPH Start - New Tributary" 503 " 2 Start - New Tributary" 504 " " 505 " 33 CATCHMENT 207" 506 " 1 Triangular SCS" 507 " 1 Equal length" 508 " 1 SCS method" 509 " 207 UNCONTROLLABLE RUNOFF" 510 " % Impervious" 511 " Total Area" 512 " Flow length" 513 " Overland Slope" 514 " Pervious Area" 515 " Pervious length" 516 " Pervious slope" 517 " Impervious Area" 518 " Impervious length" 519 " Impervious slope" 520 " Pervious Manning 'n'" 521 " Pervious SCS Curve No." 522 " Pervious Runoff coefficient" 523 " Pervious Ia/S coefficient" 524 " Pervious Initial abstraction" 525 " Impervious Manning 'n'" 526 " Impervious SCS Curve No." 527 " Impervious Runoff coefficient" 528 " Impervious Ia/S coefficient" 529 " Impervious Initial abstraction" 530 " c.m/sec"

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT

More information

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace City of Toronto Toronto & North York District Prepared For: Oxford Properties Group 130 Adelaide Street

More information

Preliminary Servicing & Stormwater Management Report

Preliminary Servicing & Stormwater Management Report Prepared By: Hart Subdivision, City of Guelph Preliminary Servicing & Stormwater Management Report GMBP File: 112-155 May 22, 2015 GUELPH OW EN SOUND LISTOW EL KITCHENER EXETER HAMILTON GTA 650 W OODLAW

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT Proposed Residential and Commercial Development AT 177 Cross Avenue Town of Oakville Prepared for Salmona Tregunno Inc. Jun 18, 2012 REVISIONS 1 st

More information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission GolfNorth Properties 400 Golf Course Road Conestoga, ON N0B1N0 R.J. Burnside & Associates Limited 6990 Creditview

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy Prepared by: AECOM 410 250 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975

More information

Site Grading, Erosion Control, Servicing & Stormwater Management Guidelines

Site Grading, Erosion Control, Servicing & Stormwater Management Guidelines Site Grading, Erosion Control, Servicing & Stormwater Management Guidelines SECTION 41 DEVELOPMENT AGREEMENTS (Site Plans) Development & Technical Services Engineering Development Division Revised April

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE This page is intentionally left blank Contents 1 Introduction 1 11 Background 1 12 Requirements for Managing Peak Runoff at Source 1 13 On-site

More information

629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District. Functional Servicing and Stormwater Management Report June 2013 13029

629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District. Functional Servicing and Stormwater Management Report June 2013 13029 629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District Functional Servicing and Stormwater Management Report June 2013 13029 Executive Summary This Functional Servicing and Stormwater

More information

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows: THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code

More information

The City of STORM DRAINAGE SYSTEM Section 12 Grande Prairie Page 1 of 41 SECTION 12 STORM DRAINAGE SYSTEM

The City of STORM DRAINAGE SYSTEM Section 12 Grande Prairie Page 1 of 41 SECTION 12 STORM DRAINAGE SYSTEM Grande Prairie Page 1 of 41 1. GENERAL SECTION 12 STORM DRAINAGE SYSTEM The storm sewers shall be designed as a separate system and consider both the minor and major drainage. There shall be of sufficient

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT

PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT High Park Bayview Inc. c/o GWL Realty Advisors Inc. GRENADIER SQUARE DEVELOPMENT CITY OF TORONTO PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT LEA PROJECT #: 9114 NOV.2012 (REV. NOV. 2013) www.lea.ca

More information

City of West Linn Public Works Design Standards 2010. Table of Contents

City of West Linn Public Works Design Standards 2010. Table of Contents City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario. Stormwater Management Design Brief Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario Prepared For: 1319 Kanata Tires & Rims June 30, 2015 Report No: FS-15-013-REP.02 Stormwater

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

CONTENT COPY OF ORIGINAL

CONTENT COPY OF ORIGINAL Ministry of the Environment Ministère de l Environnement Access Self Storage Inc. 100 Canadian Road Toronto, Ontario M1R 4Z5 AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 8701-9A4QC7 Issue Date: August

More information

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Technical and Engineering Guidelines for Stormwater Management Submissions

Technical and Engineering Guidelines for Stormwater Management Submissions Technical and Engineering Guidelines for Stormwater Management Submissions Prepared By: Ganaraska Region Conservation Authority This page is intentionally left blank CONTENTS PAGE 1 Introduction 1 1.1

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water 1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012 JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken

More information

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by:

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by: Breslau Settlement Plan Preliminary Servicing and Stormwater Management Report December 2015 Prepared by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone 905 475 1900

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Downspout to storm sewer. Leaky laterals

Downspout to storm sewer. Leaky laterals Flooded street Surface water through MH top Blocked street catch basin Cracked MH or sewer Property line Downspout to storm sewer BREATHERS Leaky laterals Weeping Tile to sanitary or storm sewer BASEMENT

More information

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding. Background & Issues To provide guidelines and requirements for Developers, the Community and the Shire s Planning and Sustainability officers for connection to the Shire s Stormwater Drainage Disposal

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Storm Drainage Systems 11.9-1

Storm Drainage Systems 11.9-1 Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of

More information

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Chapter 5.0. Stormwater Credits for Innovative Site Planning Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

SECTION 7 UNDERDRAIN SERVICE

SECTION 7 UNDERDRAIN SERVICE SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations

More information

How To Define Tss

How To Define Tss Demonstration of the Effect of Particle Size on Design & Performance of Stormwater Quality Systems nd National Low Impact Development Conference, March 1-14, 7 Scott Perry Stormwater Specialist Imbrium

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

CHAPTER 4 STORM DRAINAGE SYSTEMS

CHAPTER 4 STORM DRAINAGE SYSTEMS CHAPTER 4 STORM DRAINAGE SYSTEMS 4.1 Overview... 4-1 4.1.1 Introduction... 4-1 4.1.2 Inlet Definition... 4-1 4.1.3 Criteria... 4-1 4.2 Pavement Drainage... 4-2 4.2.1 Introduction... 4-2 4.2.2 Storm Drain

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Permeable Pavement Treatment Capacity

Permeable Pavement Treatment Capacity Permeable Pavement Treatment Capacity April 20 2011 This investigation will analyze the pollutant removal capacity of various types of permeable paving techniques. Daniel Sullivan Joseph Fleury Contents

More information

Town of Beaumont. Lot Grading Guidelines

Town of Beaumont. Lot Grading Guidelines Town of Beaumont Lot Grading Guidelines LOT GRADING APPROVAL PROCESS Lot Grading Guidelines... 3 Introduction... 3 Purpose... 3 Definitions... 3 Lot Grading... 3 Lot Grading Plan... 3 Lot Grading Certificate...

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is ~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

Kitchener s Stormwater Utility

Kitchener s Stormwater Utility Kitchener s Stormwater Utility Nick Gollan, C.E.T. City of Kitchener TRIECA Conference March 26, 2012 Presentation Agenda 1. Stormwater Funding Review 2. Stormwater Rate 3. Stormwater Credit Policy 4.

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

DECISION/DIRECTION NOTE

DECISION/DIRECTION NOTE DECISION/DIRECTION NOTE Title: Proposed rezoning new residential zone PDE file MPA1500006 150 Stavanger Drive Date Prepared: April 12, 2016 Report To: Chair and Members, Planning and Development Committee

More information

Site Development Information Worksheet for single family residential development

Site Development Information Worksheet for single family residential development Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS TDOT DESIGN DIVISION DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS August 1, 2012 CHAPTER 7 STORM DRAINAGE SYSTEMS SECTION 7.01 INTRODUCTION 7.01 INTRODUCTION...7-1 SECTION 7.02 DOCUMENTATION PROCEDURES

More information

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII)

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) ARTICLE II STORM DRAINAGE (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) SECTION 2.1 Standard Provisions Standard Provisions All construction for storm drainage in the development

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN

WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN Background WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT MARCH 2011 TABLE OF CONTENT Summary Report 1. Background 2. Flood Investigation Process 3. Public Input 4. Level of Service Objective

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

For the purpose of this environmental compliance approval, the following definitions apply:

For the purpose of this environmental compliance approval, the following definitions apply: Ministry of the Environment Ministère de l Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 4126-8RYRF9 Issue Date: May 8, 2012 Quinte Healthcare Corporation 265 Dundas Street East Belleville, Ontario

More information

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy

More information

CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS

CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS Note: All questions and comments should be directed to the Hydraulics Unit Supervisor, Environmental Services Section. Revised November 2015 Road Storm Drainage Systems

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

ADS Water Quality Units

ADS Water Quality Units ADS Water Quality Units Engineered structures for storm water pollutant removal Water Quality Units Standards for storm water quality will necessarily vary by location and land use. The most targeted sources

More information

Engineering Department

Engineering Department Engineering Department Site Plan Review Application 1025 31st St SE PO Box 5006 Minot, ND 58702 engineers@minotnd.org (701) 857-4100 Contact Information Developer/Property Owner Address City State Zip

More information