2 Table of Contents Table of Contents FOREWORD...3 EXECUTIVE SUMMARY INTRODUCTION ELECTRICITY SUB SECTOR Overview of the Electricity Sub-Sector Scope of the Infrastructure Audits Audit Findings Electricity Generation Infrastructure Electricity Transmission Infrastructure Electricity Distribution Infrastructure Electricity Supply Infrastructure Major Incidents in the Electricity Sub-Sector Significant Electricity Blackout of 18th June Infrastructure Developments in the Electricity Sub Sector Regulatory Inspections pertaining to Planned Projects Kariba North Bank Extension Project Maamba Thermal Power Project Kafue Gorge Lower Power Project Challenges and Prospects In The Electricity Sub Sector PETROLEUM SUB-SECTOR Overview of the petroleum sub sector Tazama Pipeline Single Point Mooring (SPM) Tank Farm at Kigamboni in Dar es Salaam Pump stations Pipeline Pigging Stations Cathodic Protection Stations (CPS) Indeni Petroleum Refinery Ndola Fuel Terminal Transportation Road Transportation Rail transportation Bulk Storage Facilities (Depots) OMC owned depots Government owned depots Consumer sites Retail Sites Conventional Retail Sites Rural Filling Station Liquefied Petroleum Gas (LP Gas) Storage and Filling Facilities Infrastructure Developments in the Petroleum Sub-Sector Petroleum infrastructure under construction Proposed petroleum infrastructure approved in CONCLUSION

3 Foreword FOREWORD It is said that 'Energy is the backbone of any economy' and this maxim is certainly true for Zambia. In order to capture the full benefits of energy there must be robust and quality energy infrastructure. The existence of quality energy infrastructure is even more important at a time like this when Zambia has recorded massive economic development which has led to an increase in demand for energy products and services. In the 2011 to 2013 Strategic Business Plan, one of the Goals of the Energy Regulation Board (ERB) is 'To ensure the provision of quality energy services and products by the licensees'. In fulfillment of this goal, the ERB undertakes inspections of various energy infrastructure in the country to ascertain whether they are in compliance with the requirements stipulated in various Zambian technical standards. The results of these inspections form a basis for recommendations to licensed entities, Government and other stakeholders for the improvement of the infrastructure. Whereas the ERB has been monitoring the state of infrastructure and compiling reports on the same since its inception, this is the first report that is being published. The report highlights the state of energy infrastructure in Zambia and recommendations for corrective action where applicable. I am pleased to inform the general public that we have recorded improvements in the state of energy infrastructure as evidenced by the 'world-class' service stations that are being built in various parts of the country. The old days of dilapidated 'Fiat' tankers are now long gone. Another area that has seen tremendous improvement is the upgrading of electricity connections to former mine townships on the Copperbelt. The up rating and rehabilitation of existing power stations is a major development to note. These positive developments should lead to the provision of quality electricity to various sectors of the economy. I would like to commend the various stakeholders for appreciating the need for improvement of energy infrastructure in the country. It is my hope that this report will meet the intended objective of ensuring that the general public is informed about key developments in the energy sector. 3

4 Executive Summary EXECUTIVE SUMMARY 1.0 INTRODUCTION In its continued quest to provide guidance to the energy sector, the Energy Regulation Board (ERB) conducted infrastructure inspections in both the electricity and petroleum subsectors with respect to licensing, compliance monitoring and environmental impact assessments. This report presents the findings from the infrastructure inspections covering the period January to December ELECTRICITY SUBSECTOR The report is as stated in subsequent pages. 2.1 Inspections In the electricity subsector, seven (07) hydro, six (06) off grid diesel power stations and five (05) major substations were inspected for compliance to applicable standards. In addition, electricity distribution network infrastructure was inspected in all the nine (09) provinces. The combined available power generation capacity of the inspected stations with respect to installed capacity is as shown in Table 1. The national installed generation capacity stood at 1860MW. Table1: Available Power Generation Capacity ZESCO continued to implement the Power Rehabilitation Project (PRP) during the course of the year with a view to alleviating power shortages in the short term. In the medium to long term, new electricity generation projects such as the 360 MW Kariba North Bank extension, 120MW Itezhi-tezhi, 700 MW Kafue Gorge Lower and 300MW coal fired power plant at Maamba were being planned. ZESCO has a shareholder interest in all these projects except for the 300MW coal fired power plant at Maamba. Furthermore, new transmission networks will also be required for evacuation of power from these planned electricity generation projects. The available generation capacity at the diesel power stations inspected during 2010 was found to be very low due to maintenance challenges associated with securing spare parts for the old equipment. Therefore regular load shedding continued to be exercised in the districts supplied by diesel power generation plants during the course of the year. 1 Isolated diesel generation is made up of off grid diesel generation stations located in Lukulu, Luangwa, Zambezi, Mufumbwe, Mwinilunga, Kabompo, Shangombo, Chavuma and Kaputa districts. 4

5 The security of supply for consumers supplied from Kabwe step down substation and Kafue Town substation was a source of concern because they both had only one (01) transformer instead of two. In addition, the faulty 330kV breakers for the transformer T210 and the Kabwe- Pensulo line at Pensulo substation remained a major threat to the security of supply for consumers fed via this transmission substation. The compliance rates for substations in the respective provincial distribution networks were as shown in Table 2. Table 2: Compliance Rate for Substation in Provincial Distribution Networks Technical Audits for North-Western and Southern Provinces did not include distribution networks, hence the absence of compliance rates for these two provinces. Technical anomalies noted at the substations included absence of critical components such as voltage transformers, automatic voltage regulators, emergency communication facilities, fire protection cover and a lack of colour coding for equipment. 2.2 Electricity Metering As at the end of December 2010, 307,455 out of a total of 411,117 ZESCO customers were metered representing a metered customer proportion of 74.78%. Metering is one of the Key Performance Indicators that has been set for ZESCO by the ERB. 2.3 Power Blackouts Most parts of the country experienced a power blackout on 18th June 2010 due to a bypass scheme failure at the ZESCO Leopard's Hill substation. The incident was investigated by a Technical Committee constituted by the ERB culminating into the issuance of Regulatory Directives to ZESCO Management in December Rural Electrification Two (02) Rural Electrification projects in Eastern province were recommended for approval by the ERB during the year. In addition, the ERB recommended for approval the proposed electricity transmission line to be constructed between the Lunsemfwa Power Station and the Mkushi copper mine. 3.0 PETROLEUM SUBSECTOR An efficient supply chain of petroleum products is a prerequisite for sustainable economic development. However, this supply chain needs to be supported by up to standard infrastructure in order to provide products of acceptable quality in a safe manner that promotes environmental protection. The main components of the Zambian supply chain are the TAZAMA Pipeline, INDENI Refinery, Road and Rail Transportation, depots, retail and consumer sites. By December 2010, the state of the aforementioned infrastructure was as presented in the subsequent subsections. 5

6 3.1 TAZAMA Pipeline During 2010, the TAZAMA Pipeline conveyed about 700,000 metric tonnes of feed stock to INDENI Refinery at an average pumping rate of 105m3/hour. This was below the design capacity of 1,100,000 metric tonnes per annum at a pumping rate of 160 m3/hr, thereby translating into capacity utilisation of 64%. The low capacity utilisation rate was attributed to poor state of some sections of the pipeline especially on the Tanzanian side. However, in an effort to increase the pumping rate to 115 m3/hr, TAZAMA Pipeline Limited continued to implement the project of replacing 22km of the weak sections of the pipeline. 3.2 INDENI Refinery The Refinery continued to be the main source of finished products for a total of days out of 365 days in the year 2010, thereby representing 81% equipment availability. This was against the 66% equipment availability recorded for the year The improvement was ascribed to steady supply of feedstock and regular equipment maintenance. Despite the improvement in terms of equipment availability, the refinery's consumption and losses rate stood at 8.93% during 2010 against the design rate of 7.0%. Higher than design consumption and losses rate meant that the refinery operated at a lower level of efficiency than the efficiency rate. This reduction in the efficiency was attributed to poor state of infrastructure at the refinery. However, in the quest to improve on the losses, INDENI Refinery embarked on a project to automate some of the refinery instrumentation equipment. Even with these efforts, the refinery is still not able to produce Low Sulphur Gas Oil (LSGO) and 95 octane petrol despite the increase in demand of the two products. In order for the refinery to produce the two (02) products, installation of a desulphuriser and an isomeriser would be necessary, respectively. 3.3 Ndola Fuel Terminal (NFT) Storage and handling of petroleum products in large quantities as the case is at NFT poses major risks in terms of safety, environmental protection, health and product quality. In order to mitigate against the aforesaid risks, availability of up to standard infrastructure at NFT is cardinal. Regrettably, the general status of infrastructure at the facility was still poor during the year However, in the quest to improve the state of infrastructure, TAZAMA Petroleum Products Limited refurbished three (03) tanks and one (01) custody transfer meter for refined products between INDENI and NFT in line with the company's five (05) year plan. The company was yet to modernise the gantries and install modern meters. 3.4 Transportation Transportation of petroleum products to consumers ought to be conducted in a safe manner that does not compromise the health of persons that come into contact with the products, ensures environmental protection and product quality. In 2010, the main mode of conveyance for petroleum products was by road and very little by rail despite the high cost of road transportation (US$180/tonne) in comparison with rail (US$83/tonne). This was mainly due to poor state of railway infrastructure and the respective protracted turnaround time compared to road. However, the poor state of the roads especially in outlying areas continued to pose a challenge to the safe conveyance of petroleum products by road. In order to ensure safe conveyance of petroleum products, the ERB in collaboration with Zambia Bureau of Standards (ZABS), inspected 326 tankers during the routine annual tanker certification exercise conducted in the first quarter of The aforementioned tankers were inspected to compliance with ZS 371: Road Tank Vehicles for Petroleum Based Flammable Liquids Specification. Out of these, 321 were found to be compliant representing compliance rate of 98.5%. The non compliant tankers were barred from transporting petroleum products because they did not have all the features that would address all safety, environmental, health and product quality risks associated with 6

7 the transportation of petroleum products. By December 2010, 38 more tankers were certified for new licenses and inclusions, bringing the total number of licensed tankers to Bulk storage Availability of adequate and technically up to standard bulk storage facilities in the country is one of the key prerequisites to security of supply of petroleum products. In the Zambian context, bulk storage mainly refers to OMC NFT, depots, Government owned depots and large consumer facilities such as those situated at the mines. The status of these facilities by the end of 2010 was as highlighted in the subsequent sections; OMC depots One of the requirements for issuance of a distribution license by the ERB is an up to standard bulk Storage facility with a minimum capacity of 250m3.By the end of 2010, the combined national storage capacity for white products among OMCs increased from 35,303m3 in 2009 to 37,393m3,representing an increase of 5.9%. This followed commissioning of new constructed 1,090m3 and 1,000m3 capacity bulk storage facilities by Mount Meru in Lusaka and Oryx Oil in Ndola, respectively. The levels of technical compliance for most of these depots were found to be acceptable. In the case of Liquefied Petroleum Gas (LPG), the available total storage capacity among OMCs stood at 60 tonnes comprising 40 tonnes in Lusaka and 20 tonnes in Kitwe, respectively. With the ongoing promotion of LPG as an alternative source of energy by the Government of Republic of Zambia (GRZ), it is gratifying to note that by December 2010, construction of 20 tonnes and 50 tonnes LPG storage facilities were in progress in Kitwe and Lusaka by Oryx Oil and African Gases, respectively Government owned depot Most of the GRZ owned depots, whose infrastructures were in a state of non compliance with the technical requirements, remained non operational during the year However, in the quest to promote security of supply, GRZ embarked rehabilitation of bulk storage facility on Buyantanshi Road in Lusaka during Further, plans were also under way to rehabilitate more facilities countrywide and construct a new one in Mpika Consumer facilities The consumer facilities situated at the mines (ie Lumwana, Kansanahi and Albidon) and Zambia Sugar were compliant with the technical requirements. However, the facility at TAZARA station in Kapiri Mposhi fell short of the requirements thereby posing a risk to safety and environment. 4.0 Retail sites By the end of December 2010, there were a total of 195 conventional retail sites spread all over the country with a combined compliance level of 85.5% against 73% recorded in In an attempt to increase the availability of petroleum products in fuel deficit areas, the ERB continued to engage Citizen Economic Empowerment Commission (CEEC) in relation to financing of Rural Filling Stations. During the course of 2010, the CEEC evaluated 21 proposals for construction and operation of Rural Filling Station. By December 2010, no decision had been made on the projects. 5.0 CONCLUSION Generally, the infrastructure in the energy sector had a number of shortcomings. However, it was evident that with investment, equipment recapitalisation and continuous regulatory monitoring, the situation did improve and would continue to improve with more efforts from stakeholders. 7

8 Introduction 1.0 INTRODUCTION The Energy Regulation Act, Cap 436, of the Laws of Zambia gives the Energy Regulation Board the mandate to monitor the efficiency and performance of energy undertakings. One of the roles of the ERB in fulfilling this mandate is to ensure technical compliance of licensed undertakings through effective technical regulation of energy infrastructure and operations. The ERB conducts technical regulation through the development and enforcement of technical standards, codes of practice and specifications. In order to ensure that licensed undertakings comply with relevant and applicable codes and standards, the ERB conducts various types of audits including license application inspections, routine infrastructure compliance audits of existing energy infrastructure, Environmental Impact Assessment(EIA) inspections, Incident Investigation inspections and product quality monitoring. In these audits, the licensed undertakings are monitored with respect to set standards covering environment, performance, service, quality, safety and reliability of energy supplies. This state of infrastructure report describes the energy sector in 2010 with a focus on the operations and state of infrastructure of regulated entities in the year under review. It principally outlines the findings of the technical audits of infrastructure and operations of licensed undertakings carried out in It also highlights infrastructure developments and major incidents in the year under review as well as the major challenges facing the sector. The report is divided into two main sections i.e. the Electricity sub-sector and the Petroleum sub-sector. 2.0 ELECTRICITY SUB SECTOR 2.1 Overview of the Electricity Sub-Sector There are presently five domestic players in the Electricity Supply Industry (ESI) in Zambia namely ZESCO Limited, Copperbelt Energy Corporation (CEC), Lunsemfwa Hydro Power Company (LHPC), North Western Energy Company (NWEC) and Zengamina Power Limited (ZPL). ZESCO Limited is a state-owned, vertically integrated utility involved in the generation, transmission, distribution and supply of electricity throughout the country. CEC is a private company that owns part of the transmission and distribution network on the Copperbelt province. CEC purchases bulk power from ZESCO and supplies this power to the mines on the Copperbelt province. LHPC is an Independent Power Producer (IPP) located in the Central province involved in the generation, distribution and supply of electricity. NWEC is a privately owned utility that is involved in the distribution and supply of electricity to the non mining areas within and around the Lumwana mine area in the North Western province. ZPL is a privately owned off grid utility that is involved in the generation, distribution and supply of electricity to the Kalene area in Figure 1: Key Participants of the Zambian Electricity Supply industry the North-Western province. The figure below outlines the main players in the Zambian ESI and their interaction. 8

9 The country's hydropower resource potential stands at an estimated 6,000 mega watts (MW) while the installed capacity is about 1,860 MW as indicated in Table 1 below. Table 1 - Current Installed Electricity Generation Capacity 2 Isolated diesel generation is made up of off grid diesel generating stations located in the following districts: Lukulu, Luangwa, Zambezi, Mufumbwe, Mwinilunga, Kabompo, Shangombo, Chavuma and Kaputa 9

10 3 For a district, the sample chosen typically included the bulk supply substation plus some distribution substations. 10

11 The electricity sub-sector has experienced continued growth in electricity demand over the past five years. This has primarily been driven by the strong growth in mining, industrial and domestic demand. These rapid developments in power demand have put pressure on existing generation capacity that has been constrained by the ongoing Power Rehabilitation Project (PRP). This in turn has resulted in power shortages that have led to increased load shedding. On completion of the power rehabilitation project (PRP) by ZESCO Ltd, the power shortages are expected to be alleviated in the short term. In the medium to long term, new generation projects are planned for the ESI including the 360MW Kariba North Bank Extension project, the 120MW Itezhi- Tezhi Power Project, the MW Kafue Gorge Lower power project and the 300MW coal-fired power plant at Maamba. Construction of new transmission networks will also be required to facilitate the evacuation of this additional power to the consumers. 2.2 Scope of the Infrastructure Audits The ERB conducted various types of regulatory inspections which informed this report. The main types of regulatory inspections conducted were routine audits and Environmental Impact Assessment audits. Routine audits were those planned in advance and involved checking the utility infrastructure for compliance against engineering standards and prudent utility practice. Environmental Impact Assessment audits were conducted so as to analyse the effect upon the environment posed by a proposed energy infrastructure. With respect to a transmission line for example, the inspection sought to establish whether the proposed line route would be the best as compared to other alternative routes. The purpose of the routine audits was to physically ascertain the conditions prevailing at the various infrastructure covering generation, transmission, distribution and supply of electricity. The routine audits were conducted in the framework of an audit manual and checklist formulated by the ERB with the intention of establishing whether the infrastructure was compliant with the stipulated license conditions, regulations and applicable standards and codes of practice. Electricity generation infrastructure including the hydropower plants at Kafue Gorge, Kariba North Bank, Victoria Falls, Lusiwasi, Lunsemfwa, Mulungushi, Musonda Falls and Chishimba Falls and the isolated diesel generating plants at Lukulu, Shangombo, Kabompo, Mufumbwe, Chavuma, Zambezi and Mwinilunga were covered during these audits. With the exception of the plants at Mulungushi, Lunsemfwa and Zengamina, the generation infrastructure inspected is owned and operated by ZESCO Ltd. The transmission infrastructure covered under these audits included the major substations at Pensulo, Kabwe Step-down both of which are owned by ZESCO Ltd and most of the 220/66kV substations on the CEC network. The approach taken for distribution infrastructure audits was to conduct provincial onsite visits to the 3 bulk supply stations in the main towns of the provinces and randomly selected samples of the distribution infrastructure and holding meetings with the respective utility's responsible personnel. All the nine provinces were covered under the distribution infrastructure audits. 2.3 Audit Findings Electricity Generation Infrastructure Kafue Gorge Power Station At the Kafue Gorge Hydro Power Station, all the six generators were in operation at the time of the inspection in November 2009; the installed capacity was 990 MW and the available capacity was also 990 MW. 11

12 Kariba North Bank Power Station Only three out of the four generators at Kariba North Bank Hydro Power Station were in operation at the time of the inspection in November 2010; the installed capacity was 690 MW and the available capacity was 540 MW. The non-operational generator was out of service for the Power Rehabilitation Project (PRP) works. It was established that only the runners on generators 1 and 2 had been up rated from 150 MW to 180 MW implying that even when the PRP would be completed, this station will not be able to generate at the full installed capacity i.e. despite increasing the station's installed capacity from 600 MW to 720 MW, the station will only be able to deliver an available capacity of no more than 660 MW. The maximum available capacity of the station will therefore only be about 92% and not 100% Victoria Falls Power Station Of the 13 generators at the Victoria Falls Hydro Power Station, only 12 were operational at the time of the inspection in November The thirteenth generator ( a 10 MW machine) had not successfully been commissioned at the completion of the PRP works because its stator windings got burnt. It was established that the restoration works for this generator were in progress. The installed capacity of this station remained at 108 MW and the available capacity stood at 98 MW Lusiwasi Power Station Only three out of the four generators were in operation at the time of the audit. The installed capacity at the plant is 12 MW while the available capacity is only about 6 MW. The generator that was out of service had a worn out bearing. The other three machines were not able to generate up to full capacity due to problems associated with the aging of the equipment such as worn out turbine runners, leakages in the cooling water system and overheating. Due to obsolesce of the machines, sourcing of spares has proved to be very difficult Mulungushi Power Station The plant has an installed capacity of 28 MW made up of a 1 x 10 MW unit and 3 x 6 MW units. All the units were in service at the time of the audit. The power station recently underwent refurbishment involving the upgrade of the intake canal, installation of a new 10 MW generator, (complete with new runner and associated controls) to replace the old 2.5 MW machine. Thus far the new machine has been able to achieve an availability of 92% since its commissioning in Chishimba Falls Power Station The station has eight machines in two schemes. The first scheme called A Station was commissioned in 1959 and has four 300 kw unit machines while the second scheme called B Station was commissioned in 1974 and has four 1200 kw unit machines. Currently, all the machines are running and plans are in place to synchronise the station to the national grid. A new relay panel for the new circuit breaker and charger for control and protection has been installed at the station. The substation is also scheduled for some improvements involving the installation of an isolator, a breaker, current transformers and a protection cubicle. Though the water available for generation is adequate, the old machines running are unable to generate up to full capacity. One of the two transformers at Kasama 33/11kV substation is to be dedicated to Chishimba Fall Power Station Musonda Falls Power Station Musonda Falls Power Station is a mini hydro power station with an installed capacity of 5MW consisting of five machines each rated at 1 MW. Machine No.4 was due to be taken out of service due to uncontrolled vibrations that have persisted causing cracks in different places within the power house. Due to lack of readily available spare parts for the machines, maintenance is not robust and the 12

13 machines are only able to generate 4 MW Lukulu Diesel Fuelled Generating Plant The installed capacity at the Lukulu Diesel Generation Station was 576kW. However, the available capacity was only 480kW due to inability of the two installed generators to generate at the respective peak rated capacities. These two machines are not sufficient to cater for the demand in the district and as such load rationing has been put in place to cater for all customers Shangombo Diesel Fuelled Generating Plant The installed capacity at Shangombo Diesel Generation was 640kW. The available capacity was only 320kW as one of the generators was out of service at the time of the audit. The recorded maximum demand was 122 kw against an installed generation capacity of 640 KW (and an available capacity of 320 KW). However, load shedding was carried out by the utility in its quest to limit the amount of diesel used for electricity generation Kaputa Diesel Fuelled Generating Plant The installed capacity at the Kaputa Diesel Generation Station was 600 kw consisting of a 400 kw generator and a 200 kw generator. These generators are not sufficient and as a result there is constant load shedding. During peak hours, customers with huge loads such as hammer mills are asked to be off. Supply hours are from 05:00hrs in the morning to midnight Mwinilunga Diesel Fuelled Generating Plant The installed capacity is 1480 kw consisting of two 740 kw generators. Both machines were installed and commissioned in The recorded maximum demand was 881kW. Only one machine is switched on during normal demand while the second machine is switched on during peak period. Power is supplied from 06:00 hours to 24:00 hours Kabompo Diesel Fuelled Generating Plant The installed capacity for this station is 720 kw. The machine was installed in Maximum demand for this plant has been recorded at 800kW. During peak time, the water works being a large customer is load shed to save about 100KW. Supply hours are from 06:00 hours to 24:00 hours Zambezi Diesel Fuelled Generating Plant The plant has an installed capacity of 1280 kw consisting of two 640 kw generators. The machines were installed in The maximum load recorded so far is 720kW. One machine runs from 07:00 hours while the other machine is switched on during peak time (from about 18:30 to 22:00 hours) Luangwa Diesel Fuelled Generating Plant This plant was not inspected in However, in 2009 the installed capacity for this station stood at 1280 kw. There were two installed generators each with a capacity of 640 kw. The district maximum demand was in the order of 232 kw Electricity Transmission Infrastructure Pensulo substation Pensulo receives its supply from Kabwe Step-down substation via a 330kV line. Two 65 MVA, 330/66kV transformers are installed at this station. There are also two 36.3 MVAr shunt reactors at this station; these shunt reactors are used to control the voltage on the receiving end of the incoming 330 kv 13

14 transmission line that feeds the substation. It is however noted that security of supply at the station is compromised due to the faulty 330kV breaker for transformer T210. As a result, this transformer is now being protected by the bus coupler. The 330kV breaker on the Kabwe Pensulo line at Pensulo is also defective due to a faulty closing coil and is in a permanently closed position such that protection for the line is only done by the 330kV breaker at Kabwe step-down. It was also noted that the station does not have an emergency black start generator. Because the foregoing omissions compromise the security of supply, electricity customers fed via this transmission substation are made to experience unnecessary power outages which ordinarily they shouldn't have experienced had the substation had all equipment in working order. Another issue of concern is the theft of counterpoise wire on the Pensulo Mpika line rendering it susceptible to faults during storms Kabwe Step-down substation The substation is fed by supplies from LHPC via 2 x 66kV lines and from the ZESCO grid via 3 x 330kV lines from Leopards Hill substation. The station presently has only one 65MVA, 330/88kV transformer as the other one was relocated to Kafue Town substation to replace the 330/88kv transformer that got burnt at Kafue Town substation in This has made the scheduling of maintenance on this lone transformer very challenging. A new replacement transformer has since been procured and was expected to be commissioned by December At the time of the inspection, one of the compressors was defective and was out of service. Further, the emergency black start generator had not yet been wired to start automatically and the battery for the generator was being kept in the control room due to security concerns. This compromises preparedness for emergency situations Michelo 220/66kV Substation Located in Chililabombwe district, this is a modern substation well equipped with a new protection system in place. It has 2 120MVA transformers and a Mulsifyre fire protection system. The substation has a new line to Karavia and the commissioning of the 220kV equipment at the substation has helped improve system stability and reliability in the area Luano 220/66kV substation This substation has a total capacity of 6 65MVA. The six transformers are in good condition and do not have oil leaks. The protection system is tested on a quarterly basis and the station even has a backup control room in place. Most of the equipment labels are legible and in good repair. In addition, danger or warning signs are visible in appropriate places Kansuswa 220/66kV Substation This substation has a total capacity of 4 85MVA. All the transformers have oil spill containment tanks in place and do not have leaks. All the breakers are operational and in good condition; the protection system is in place and tested quarterly. The station fence is intact with danger/ warning signs in place. The electric shock treatment guide and first aid kit are available Electricity Distribution Infrastructure Western Province The configuration of the electricity infrastructure in Western province is radial, such that electricity flows into the area from the south. There is a ZESCO 66 kv transmission line that extends from 14

15 Livingstone district in Southern province into Western province, passing through Sesheke, Senenga, and Mongu before terminating in Kaoma district. An 11 kv distribution line connects Mongu district to Kalabo district. Furthermore, there is a ZESCO 220 kv transmission line connecting Livingstone and Sesheke districts. Also, a cross border 220 kv interconnector exists between Zambia and Namibia extending from Sesheke district in Zambia to Katima Mulilo district in Namibia. Shangombo and Lukulu districts are supplied from their respective diesel based electricity generation plants. Because of the 66 kv transmission voltage level, voltages in this province are low especially when the 220 kv transmission line between Livingstone and Sesheke is out of service. Kaoma being at the terminal end of the power line experiences the lowest voltages. Electricity distribution infrastructure in Mongu, Senenga, Kaoma and Kalabo were inspected during October 2010 covering the respective bulk supply and selected distribution substations. Some critical substation components such as voltage transformers, automatic voltage regulators, and emergency communication facilities are missing at some locations. Furthermore, the bulk supply substations continue to operate without firm capacity. The average substation compliance was found to be 57%. There was 10 MVA of installed capacity at the Mongu bulk supply substation; the September 2010 maximum demand was 6.6 MVA indicating that the substation was capable of meeting the local peak demand. Kalabo district is in effect a part of the Mongu distribution network drawing its power via an 11 kv distribution line from the Mongu bulk supply substation; the September 2010 maximum demand for Kalabo district was 521 KVA. The installed capacity at the Kaoma bulk supply substation was 2.5 MVA; the September 2010 maximum demand was 1.6 MVA indicating that the substation was capable of meeting the local peak demand. At the Senanga bulk supply substation the installed capacity was 2.5 MVA; the September 2010 maximum demand was 1.1 MVA. In Shangombo district, the September 2010 maximum demand was 122 kw against an installed generation capacity of 640 KW (and an available capacity of 320 KW). However, load shedding was carried out by the utility in its quest to limit the amount of diesel used for electricity generation. In Lukulu district, the September 2010 maximum demand was estimated to be in the region of 600 KVA against an installed generation capacity of 720 KVA. Load shedding was carried out by the utility on account of reduced available capacity as well as to limit the amount of diesel used for electricity generation Eastern Province With the exception of Lundazi and Chama, Eastern province is fed from Zambia national power grid via Msoro substation. Lundazi and Chama are supplied from the Malawian national grid. Msoro gets its supply from Pensulo substation and Lusiwasi substation through two 66kV lines. There are three 66kV lines from Msoro supplying Chipata bulk supply substation, Azele bulk supply station and Mfuwe. Nyimba, Petauke, Sinda, Katete and Chadiza are supplied by radial lines from the Azele 66/33kV substation Electricity distribution infrastructure in Chipata, Nyimba, Petauke, Sinda, Katete, Chadiza, Chama, Lundazi and Mambwe was inspected. The inspections covered bulk supply substation and distribution infrastructure. Due to the radial nature of the network in the region and the fact that power to the region is transmitted over a long distance by a 66kV line, the region usually suffers depressed voltage during peak periods. There is also the problem of faulty electrical protection equipment such as circuit breakers and protection relays at most of the sites. It is noted that most bulk supply substation lack redundancy in terms of transformer capacity thereby compromising system reliability and security of supply. In addition, bulk supply substations continue to operate without adequate fire protection equipment. As with most regions, there are no records of maintenance at most sites. The average substation compliance was found to be 53%. 15

16 In Nyimba district the transformer installed capacity at the bulk supply substation was 2.5 MVA against a maximum demand of 1.0 MVA. In Sinda district, the transformer installed capacity at the bulk supply substation was 2.5 MVA against a maximum demand of 1.23 MVA. In Mfuwe district the transformer installed capacity at the bulk supply substation was 2.5 MVA against a maximum demand of 1.5 MVA. In Chipata district, the transformer installed capacity at the bulk supply substation was 15 MVA against a maximum demand of 13.0 MVA. In Lundazi district, the transformer installed capacity at the bulk supply substation was 2.2 MVA against a maximum demand of 2.0 MVA. There was no bulk metering equipment installed at Petauke, Katete and Chadiza; therefore the maximum demand could not be ascertained. For Chama district, the maximum demand data was not available Central Province Central province is fed from the national grid at Kabwe step-down and Pensulo substations and from Lunsemfwa Hydropower Company (LHPC) at Kabwe step down substation. Kabwe, Kapiri-Mposhi and parts of Mkushi are fed from the 88kv network from Kabwe Step-down substation. Serenje is fed via a 66kV line from Pensulo substation. This 66kV line has been extended into Mkushi to supply a new substation called Mkushi Central. The audits of distribution infrastructure in Central Province covered Kabwe, Kapiri-Mposhi, Mumbwa, Serenje and Mkushi. Kapiri-Mposhi and parts of Mkushi which receive power from Kapiri-Mposhi experience low voltages due to the low voltages experienced on the 88kV network from Kabwe into Kapiri-Mposhi. The Mkushi distribution network is experiencing transformer capacity constraints due to the ever increasing demand. The Kabwe-Kapiri Mposhi 88kV line has continued to operate without a circuit breaker at the Kapiri-Mposhi end. Most of the sites are operating without adequate firefighting equipment. The average substation compliance was found to be 59%. In Mumbwa district, the transformer installed capacity at the bulk supply substation was 5 MVA against a maximum demand of 3 MVA. In Serenje district, the transformer installed capacity at the bulk supply substation was 5 MVA against a maximum demand of 1.5 MVA. In Kapiri Mposhi district, the transformer installed capacity was 40 MVA against a maximum demnd of 32.5 MVA. In Mkushi Central, the transformer installed capacity was 20 MVA against a maximum demand of 8 MVA Lusaka Province Lusaka province of Zambia is normally supplied with electrical power from a 132kV backbone ring connecting Roma, Coventry, Waterworks, Lusaka West and Leopards Hill substations. The power is then stepped down at these substations further to 33kV and 11kV for distribution to various customers in Lusaka.The main sources of power are Kafue Gorge and Kariba North power stations. Power from Kafue Gorge and Kariba North power stations is transmitted via four 330kV lines (two from each power station) to Leopards Hill 330/132/88 kv substation and one 330kV line from Kafue Gorge to Kafue West substation. Kafue West is then linked to Lusaka West and Leopards Hill substations via two 330kV lines. The Lusaka Province audits covered the following bulk supply stations: - Coventry, Roma, Waterworks, Chongwe, UNZA, Matero and Liverpool It was established that there is generally a problem of construction of facilities under the Lusaka West Liverpool 33kV lines in the heavy industrial area. The area around Matero substation has also been encroached by the mushrooming residential dwellings which will make future expansion of the substation very difficult. The dc battery system at Chongwe was found to be in a bad state and needs replacement. It was also 16

17 observed that equipment labeling in most of the substations is not legible. As with most other ZESCO installations, the firefighting equipment was inadequate and in some cases was overdue for service. The average compliance level was determined to be 68% Southern Province The district of Livingstone is supplied by a 33 kv distribution line fed from the Zambian interconnected electricity grid via the Victoria Falls Power station substation. A radial 33kV distribution line runs from Livingstone supplying Zimba district, parts of Kalomo and Choma districts. Furthermore, a 220kV transmission line runs from the Victoria Falls Power Station in Livingstone to Muzuma substation in Choma and then extends to the Kafue Town Transmission substation in Kafue District. A 33kV radial line from Muzuma substation supplies Choma town and extends to supply parts of Kalomo. Another 33kV line from Choma supplies Namwala district and extends up to Itezhi-Tezhi where it terminates. Maamba District is fed via an 88 kv transmission line that runs from Muzuma substation to the Maamba bulk supply substation. Sinazongwe District is supplied by a 33 kv distribution line that runs from the Maamba bulk supply substation to the Sinazongwe bulk supply substation. Mazabuka District is supplied by an 88 kv radial transmission line that runs from the Kafue Town transmission substation to the Mazabuka bulk supply substation. Kafue district is supplied from the Kafue Town substation and from the Leopards substation in Lusaka. A 33kV radial distribution line from Mazabuka supply substation supplies electricity to Monze district. Chirundu district is supplied via an 88 kv transmission line from the Leopards Hill substation in Lusaka. The only distribution infrastructure inspected was the Itezhi-Tezhi bulk supply substation. The facility was not compliant to electricity standards; among other findings, the phases did not have the relevant colour coding and there were no emergency communication facilities. The installed capacity at this bulk supply substation as at October 2010 was 2.5 MVA. However, the substation maximum demand could not be ascertained because the facility did not have bulk metering equipment Northern Province Northern Province gets its supply from the national grid via the long, radial 66kV line from Pensulo substation. The audits covered electricity distribution infrastructure in the following districts:- Kasama, Mpika, Mpulungu, Mbala, Mporokoso, Luwingu, Nakonde, Isoka and Chinsali. Substations in the province are characterised by lack of firm capacity at most bulk supply substations, transformer oil leaks, defective circuit breakers and inadequate electrical protection for the transformers. The fighting protection for the transformers and other substation equipment is also inadequate. It was also noted that some stations have defective dc (battery) systems that need to be replaced. The province has continued to experience low voltages during peak periods due to the long and radial nature of the supply from Pensulo substation. Sub-standard practices such as placing of ground mounted transformers on rails instead of standard plinths were also noticed. The fencing for most of the outdoor substations and ground mounted transformers also needs attention. The average compliance level was determined to be 68%. In Mpulungu district, the transformer installed capacity at the bulk supply substation was 2.5 MVA against a maximum demand of 2.1 MVA. In Mbala district, the transformer installed capacity at the bulk supply substation was 5 MVA against a maximum demand of 2 MVA. In Mporokoso district, the transformer installed capacity at the bulk supply substation was 0.5 MVA against a maximum demand of 0.3 MVA. In Isoka district, the transformer installed capacity at the bulk supply substation was 5 MVA against a maximum demand of 1.2 MVA. In Chinsali district, the transformer installed capacity at the bulk supply substation was 5 MVA against a maximum demand of 1.6 MVA. There was no maximum demand data available for Kasama, Luwingu, Nakonde and Mpika Luapula Province 17

18 Luapula Province primarily receives electricity from the national grid via the radial 66kV network which emanates from Pensulo substation. In addition to the supply from the national grid, Mansa and immediate surrounding areas also receives power from Musonda Falls Power Station via a 33kV radial line. The audits covered distribution infrastructure in Mansa, Samfya, Mbereshi, Kawambwa and Nchelenge. The electricity infrastructure in Luapula province is, in general, in need of investment to ensure refurbishment of existing infrastructure and embarking on an expansion programme to meet the ever increasing demand. As was noticed in other provinces, bulk supply substations in the province are characterised by lack of firm capacity. Due to the nature of the supply from the national grid from a long and predominantly radial 66kV network, the province experiences low voltages in most areas especially during peak periods. Another area of concern is the bad state of repair of fencing for most outdoor substations. This poses a safety hazard to the general public. The average compliance level was determined to be 60%. In Mansa dsitrict, the transformer installed capacity at the bulk supply substation was 5 MVA against a maximum demand of 2 MVA. In Mbereshi district, the transformer installed capacity at the bulk supply substation was 3 MVA against a maximum demand of 1.5 MVA. There were no metering equipment installed at the bulk supply substation in Samfya district and therefore the maximum demand could not be ascertained. Further, no data was available for Kawambwa district Copperbelt Province Supply for the ZESCO distribution is primarily supplied from the national grid at Kitwe 330/220 kv and Luano 330/220kV substations and wheeled through the CEC network. Audits for electricity distribution infrastructure on the Copperbelt covered Ndola, Luanshya, Kitwe, Mufulira, Chingola and Chililabombwe. The majority of the distribution networks in the ex-mine townships are unsafe and need replacement with standard three phase four-wire systems. In areas where these standard networks exist, lack of consistent maintenance is evident. Houses in most ex-mine townships have no individual earth while neutral earthing is not present at some substations. Fuses in some feeder pillars have been replaced with thick wires while the majority of feeder pillars are not secured. Most of the distribution substations either lack the requisite fencing and in most cases where the fencing is in place, there are no locking facilities. The state of infrastructure in CEC substations is generally in good condition. Safety standards are adhered to and this is even reflected by minimal accidents recorded annually. It is however noted that the 66/11kV substations do not have adequate firefighting equipment. Some of these substations have not been provided with adequate drainage nor spill containment facilities. The average compliance level for the CEC infrastructure inspected was found to be 85% North-Western Province The electricity distribution audits covered Kabompo, Mufumbwe, Chavuma, Zambezi and Mwinilunga which are served by diesel fuelled power stations. These have, up until recently, provided unreliable power supply at a high cost to ZESCO in terms of fuel used to run them. Inspections conducted at three of the five diesel fuelled stations generally showed notable improvement in the power supply situation. This is because all the five districts now have two new diesel powered machines running except Kabompo which has only one machine running at the moment. The detail pertaining to these machines is captured under the section on electricity generation infrastructure Electricity Supply Infrastructure Metering In an effort to reduce losses and metering backlog, ZESCO has embarked on loss reduction strategies 18

19 which have included installation of meters, ring-fencing the branches and door to door inspections to abate electricity thefts. Credit meters being recovered from the pre-payment installation projects in Lusaka and the Copperbelt are being installed in the other regions to dismantle the metering backlog. ZESCO also procured some single phase credit meters from China (the shanghai meters) for the metering exercise but these proved to be problematic and most of them have since been recovered from the system. As at end of December 2010, the largest electricity utility, ZESCO Limited had a total of 411, 117 customers out of which 103, 662 customers were not metered indicating a 25% unmetered proportion. To ensure accountability for the power received in each of the branches, ring-fencing of the branches has been instituted by placing bulk metering at interface points at which the branches receive the power. This has so far been done in Central province and some areas in Southern Province The ERB as part of its Key Performance Indicators (KPIs) monitoring framework has set targets for ZESCO which include metering and distribution losses among others. It is planned that these targets automatically feed into the tariff determination process as a way of further incentivizing the utility. 2.4 Major Incidents in the Electricity Sub-Sector Significant Electricity Blackout of 18th June 2010 On 18th June 2010, a system disturbance occurred within the ZESCO electricity network and resulted in significant electricity black out that affected most parts of the country. The ERB constituted Technical Committee investigated this blackout and, among other findings, established that the incident was initiated by a fault at the Leopards Hill substation when the bypass scheme failed. Further, the committee concluded that the current protection philosophy at Kafue Gorge and Kariba North Bank power stations on the ZESCO 330 kv transmission system developed under the Power Rehabilitation Project (PRP) were adequate. However, the committee reported that the performance of the generator transformers at the Kafue Gorge power station installed under PRP had been unsatisfactory as evidenced by the several premature failures. The ERB constituted technical committee recommended among others, that ZESCO undertakes a detailed study of the cause of failure and if necessary review and overhaul the bypass system at Leopard Hill substation and at other substations. The committee further noted that ZESCO had already initiated a process to procure four new transformers from other manufacturers to replace the generator transformers at the Kafue Gorge power station. It was also recommended that ZESCO takes additional immediate steps to resolve the matter with the initial equipment supplier. The committee's recommendations were adopted by the ERB and Regulatory Board Directives were issued to the ZESCO Management in December Infrastructure Developments in the Electricity Sub Sector Regulatory Inspections pertaining to Planned Projects i). Proposed Itezhi-Tezhi Electricity Generation Project The nature of this inspection was a regulatory familiarisation visit. The proposed project is a 120 MW hydropower plant, benefiting from the use of an existing dam and a reservoir infrastructure. The Project will use the existing intake and upstream part of the diversion tunnel as the intake and headrace tunnel, and the downstream part of the diversion tunnel as a tailrace tunnel. New facilities will include a short penstock, a valve chamber, a machinery hall, transformer gallery, access tunnel to the machinery hall, and a switchyard. The power station will consist of two (2) generators of 60 MW each which will be developed as a surface powerhouse. The generator voltage is expected to be 11 kv which will be stepped-up to 220kV. The power is 19

20 Petroleum Sub-Sector 3.0 PETROLEUM SUB-SECTOR 3.1 Overview of the petroleum sub sector The availability and cost of quality petroleum products on the Zambian market is strongly dependent on the existence of sound and suitably located infrastructure support. Currently, petroleum in Zambia is imported as either commingled feedstock or finished products to service the market through a supply chain as illustrated below. Figure 2: The Zambian Petroleum Chain The entire chain above, just like the rest of the energy sector in Zambia, is regulated by the Energy Regulation Board (ERB) in accordance with the provisions of the Energy Regulation Act Cap 436 of the Laws of Zambia. In doing so, various technical standards and guidelines have been developed to provide direction in the sub sector focusing on safety, environmental protection, health and product quality. Compliance with the said standards form part of the licence conditions. 3.2 Tazama Pipeline The 1710 km TAZAMA pipeline and associated infrastructure was set up in 1968 and is jointly owned by the Governments of Tanzania and Zambia with a shareholding of 33% and 67% respectively. The pipelines consist of a series of 8 inches (8 ) and 12 inches (12 ) sections. The pipeline is used for conveying commingled feedstock from the tank farm at Kigamboni (Dar-es-Salaam) in Tanzania to the INDENI Petroleum Refinery in Ndola, Zambia. The design throughput for the pipeline is 1.1 million 3 metric tonnes per year at an average flow rate of 160 m /hour. The pipeline was originally designed to transport white products but was later converted to the crude mode in 1973 when Indeni Refinery came on stream. 20

Financing Options To Enable RET Deployment By Langiwe Chandi

Financing Options To Enable RET Deployment By Langiwe Chandi Financing Options To Enable RET Deployment By Langiwe Chandi A Presentation at the Experts Meeting on RETS and Green Energy For Rural Development 9-11 February 2010 Geneva Content Energy Profile Renewable

More information

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid Presentation by Energy Regulation Board, Zambia 79 th IEC General Assembly Workshop for Industrialising

More information

Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA

Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT

More information

Investment Incentives for Renewable Energy in Southern Africa: Case study of Zambia

Investment Incentives for Renewable Energy in Southern Africa: Case study of Zambia Investment Incentives for Renewable Energy in Southern Africa: Case study of Zambia H. Walimwipi, Snow Systems Zambia December 2012 www.iisd.org/tkn 2013 The International Institute for Sustainable Development

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

Zambia National Vulnerability Assessment Committee in collaboration with the SADC FANR Vulnerability Assessment Committee

Zambia National Vulnerability Assessment Committee in collaboration with the SADC FANR Vulnerability Assessment Committee VAC ZAMBIA Vulnerability Assessment Committee Zambia National Vulnerability Assessment Committee in collaboration with the SADC FANR Vulnerability Assessment Committee VAC SADC FANR Vulnerability Assessment

More information

The profile and productivity of Zambian businesses

The profile and productivity of Zambian businesses The profile and productivity of Zambian businesses June 2010 Acknowledgements The Zambia Business Survey was designed and implemented by a public-private partnership comprised of the Government of the

More information

ZAMBIA HEALTH MANAGEMENT INFORMATION SYSTEM (HMIS): TECHNICAL ASSISTANCE IN INFORMATION SYSTEMS

ZAMBIA HEALTH MANAGEMENT INFORMATION SYSTEM (HMIS): TECHNICAL ASSISTANCE IN INFORMATION SYSTEMS ZAMBIA HEALTH MANAGEMENT INFORMATION SYSTEM (HMIS): TECHNICAL ASSISTANCE IN INFORMATION SYSTEMS Zambia 14 July-September 1, 1997 Mary Church BASICS Technical Directive: 0 19-ZA-0 1-033 USAID Contract Number:

More information

Geneva, 17-19 March 2009 COUNTRY REPORT: MALAWI

Geneva, 17-19 March 2009 COUNTRY REPORT: MALAWI CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Multi-Year Expert Meeting on Services, Development and Trade: The Regulatory and Institutional

More information

Electricity market drivers

Electricity market drivers Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

Grain Traders Association of Zambia

Grain Traders Association of Zambia GRAIN TRADERS ASSOCIATION OF ZAMBIA EXPERIENCES, CHALLENGES & OPPORTUNITIES IN GRAIN TRADING IN ZAMBIA Chisamba Protea Lodge, Lusaka, Zambia 6 March, 2010 1 Grain Traders Association of Zambia Established

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long

More information

Inclusive Education for children with visual impairment in Zambia: A situational analysis

Inclusive Education for children with visual impairment in Zambia: A situational analysis AFR 023 Inclusive Education for children with visual impairment in Zambia: A situational analysis Joseph S Munsanje Country Representative Sight Savers International Zambia Dr D Kalabula Head of Unit and

More information

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services SpecialistS IN ELECTRICAL SUPPORT SERVICES TO MINING, UTILITIES & industry Ampcontrol is committed to supporting our customers to maintain efficient

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

ICM Project Station Infrastructure and Equipment

ICM Project Station Infrastructure and Equipment EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

Operational perspective on the Electricity Distribution Industry (EDI) turnaround

Operational perspective on the Electricity Distribution Industry (EDI) turnaround 2008 Electricity Distribution Maintenance Summit Day 1: 9 June 2008 Operational perspective on the Electricity Distribution Industry (EDI) turnaround by Dr Willie de Beer, Chief Operations Officer, EDI

More information

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.

More information

POWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends

POWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends POWER NETWORKS 2014-15 Electricity Network Tariffs and Charges and Future Price Trends August 2014 Power and Water Corporation Table of Contents 1 Business Characteristics... 3 2 2014 Network Price Determination...

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG IP THE INSTITUTE OF PETROLEUM Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG MODEL CODE OF SAFE PRACTICE PART 9 ISBN 0 471 91612 9 First'printed 1987 Reprinted October

More information

Adoption and intensity of adoption of conservation farming practices in Zambia

Adoption and intensity of adoption of conservation farming practices in Zambia Adoption and intensity of adoption of conservation farming practices in Zambia Aslihan Arslan, Nancy McCarthy, Leslie Lipper, Solomon Asfaw and Andrea Cattaneo ESA Working paper No. 13-01 April 2013 Agricultural

More information

AIS Power Reliability

AIS Power Reliability Case Study AIS Power Reliability How a Wayward Raccoon Sparked a Major Power Distribution System Upgrade Company executives welcome open, frank discussion and want to address all questions and concerns

More information

The function of a power station is to deliver

The function of a power station is to deliver CHAPTER CHAPTER 3 Variable Load on Power Stations 3.1 Structure of Electric Power System 3.2 Variable Load on Power Station 3.3 Load Curves 3.4 Important Terms and Factors 3.5 Units Generated per Annum

More information

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES The Electricity, Gas, Water and Waste Services Division comprises units engaged in the provision of electricity; gas through mains systems; water; drainage; and sewage services. This division also includes

More information

New Zealand Energy Statistics December 2005 quarter

New Zealand Energy Statistics December 2005 quarter Image description. Hot Off The Press. End of image description. Embargoed until 10:45am 8 March 2006 New Zealand Energy Statistics December 2005 quarter Highlights In the December 2005 quarter: Hydro and

More information

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities Yves Muyange Director General Energy Water & Sanitation Authority Rwanda: A Thousand hills between the two Major Drainage Basins

More information

TARIFF AND GOVERNANCE ASSESSMENT

TARIFF AND GOVERNANCE ASSESSMENT Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Tariff Assessment 1. Introduction TARIFF AND GOVERNANCE ASSESSMENT 1. Electricity tariffs in Bangladesh are unbundled

More information

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories: Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission

More information

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

SSE s criteria used for GHG emissions reporting

SSE s criteria used for GHG emissions reporting SSE s criteria used for reporting 1 Introduction This document details the annual greenhouse gas emissions reporting approach used by SSE Plc to report the tonnes of carbon dioxide equivalent (CO2e) during

More information

ATTACHMENT G. Network Operating Agreement

ATTACHMENT G. Network Operating Agreement ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

REPORT. of the AUDITOR GENERAL ON THE ACCOUNTS FOR THE FINANCIAL YEAR ENDED

REPORT. of the AUDITOR GENERAL ON THE ACCOUNTS FOR THE FINANCIAL YEAR ENDED REPORT of the AUDITOR GENERAL ON THE ACCOUNTS FOR THE FINANCIAL YEAR ENDED 31st DECEMBER 2007 2 TABLE OF CONTENTS Page Introduction... 1 Audit Scope and Methodology... 1 Institutional Development... 1

More information

Emergency Telephone Systems

Emergency Telephone Systems Standard Issued Date: 22 May 2014 Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by the NSW Government and its

More information

EdM ZESA Eskom. Transaction Advisory Services for the

EdM ZESA Eskom. Transaction Advisory Services for the EdM ZESA Eskom Transaction Advisory Services for the MO-ZI-SA TRANSMISSION PROJECT Terms of Reference for the consulting services for Feasibility Studies up to Financial Close 11 December 2014 TOR_MOZISA-11

More information

Energy White Paper at a glance

Energy White Paper at a glance and Science Energy White Paper at a glance WWW. i Energy White Paper at a glance The Australian Government made an election commitment to deliver an Energy White Paper to give industry and consumers certainty

More information

RCP2 Portfolio Overview Document

RCP2 Portfolio Overview Document RCP2 Portfolio Overview Document Portfolio: Expenditure Class: Base Capex Expenditure Category: Grid Replacement & Refurbishment As at date: 15 November 2013 Expenditure Forecast Real 2012/13 NZ$ (m) 2015-2016

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

Kyrgyzstan: Power Generation & Transmission

Kyrgyzstan: Power Generation & Transmission Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...

More information

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA

More information

Funded by the European Union SOLAR TECHNICIAN

Funded by the European Union SOLAR TECHNICIAN SOLAR TECHNICIAN Communities in Pakistan are facing continuously rising energy prices and a chronic shortage or non-availability of grid electricity. Consequently, there is a growing demand for solar systems

More information

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission Power transformers Generator step-up and system intertie power transformers Securing high-quality AC transmission Generator step-up transformers Built to withstand continuous full load Generator step-up

More information

Reliability Modeling Software Defined

Reliability Modeling Software Defined Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights

More information

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Issued: August 2009 SIZED UP TO 100 KVA TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Applicability... 1 1.2 Definitions...

More information

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION 1 EFFICIENT ELECTRICAL ENERGY TRANSMISSION

More information

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Mark Siira ComRent International 1 8/1/2013 Agenda Introduction Overview of Load Bank Testing Benefits

More information

BC Hydro. Electric Distribution System Cost of Service Study

BC Hydro. Electric Distribution System Cost of Service Study BC Hydro Electric Distribution System Reimer Consulting Group Inc. Arnie Reimer May 7, 2010 Table of Contents 1. Executive Summary... 3 2. BC Hydro Electric Distribution System... 4 2.1. General Description...

More information

The Application of Circuit Breakers to Reduce Downtime in Datacentres

The Application of Circuit Breakers to Reduce Downtime in Datacentres The Application of Circuit Breakers to Reduce Downtime in Datacentres Tim Campbell BEng MIET. Marketing Manager, Terasaki Electric (Europe) Ltd. Abstract Circuit breakers fulfil several functions in the

More information

HYDROMATRIX Jebel Aulia - Sudan

HYDROMATRIX Jebel Aulia - Sudan HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

EPCOR Distribution & Transmission Inc.

EPCOR Distribution & Transmission Inc. Decision 3478-D01-2015 Victoria E511S Substation Expansion February 17, 2015 Alberta Utilities Commission Decision 3478-D01-2015 Victoria E511S Substation Expansion Proceeding 3478 Application 1610934-1

More information

Customer Installation Safety Plan. March 2015

Customer Installation Safety Plan. March 2015 Customer Installation Safety Plan March 2015 Document History Issue No. Date Approved By Summary of Changes 1 June 2014 Chief Engineer Updated and revised in line with requirement for biennial review under

More information

City of Buffalo Municipal Electric Utility Energy Emergency Response

City of Buffalo Municipal Electric Utility Energy Emergency Response City of Buffalo Municipal Electric Utility Energy Emergency Response Table of Contents Page 1. Goals 2 2. Types of Energy Emergencies..3 3. Utility Emergency Operating Plans.4 4. Link to General Reliability/Outage

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016 Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)

More information

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation Committee on the Northern Territory s Energy Future Electricity Pricing Options Submission from Power and Water Corporation October 2014 Power and Water Corporation 1. INTRODUCTION On 21 August 2014, the

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

Nuclear Power Plant Electrical Power Supply System Requirements

Nuclear Power Plant Electrical Power Supply System Requirements 1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines

More information

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM PRESENTATION SUMMARY Introduction-Power situation in Kenya Off-grid

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Investment Brief for the Electricity Sector in Ghana

Investment Brief for the Electricity Sector in Ghana Investment Brief for the Electricity Sector in Ghana Overview Ghana s economy growth decelerated sharply to an estimated 4.2% in 2014, down from 7.4 % in 2013. Manufacturing and oil production from the

More information

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY 16 TH MARCH 2015 by Eng. Patrice Tsakhara Principal Engineer Small Power Projects

More information

FINSCOPE Zambia 2009. FinScope Zambia 2009 M & N ASSOCIATES LIMITED

FINSCOPE Zambia 2009. FinScope Zambia 2009 M & N ASSOCIATES LIMITED FINSCOPE Zambia 2009 FinScope Zambia 2009 The Government of the Republic of Zambia (GRZ) has been committed to reforming the country s financial sector for several years. Financial access is now a priority

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Provincial Renewable Energy Project (RRP SOL 46014) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Grid-connected electricity is generated and

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) OUTLINE OF PRESENTATION (ECG) 2 Introduction Map of Operational Area Company Mandate,

More information

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your

More information

Market Growth and New Regulations Demand Network Modernization

Market Growth and New Regulations Demand Network Modernization CASE ESB NETWORKS: POLE TOP COMMUNICATION INCREASES EFFICIENCY IN IRELAND Viola s solution for remotely operating pole-top reclosers and switches increases reliability, cuts operating costs and helps to

More information

Emergency Response Planning for Small Waterworks Systems

Emergency Response Planning for Small Waterworks Systems P U B L I C H E A L T H P R O T E C T I O N Emergency Response Planning for Small Waterworks Systems Ministry of Health and Ministry Responsible for Seniors P U B L I C H E A L T H P R O T E C T I O N

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

Year 2014 15. A perspective

Year 2014 15. A perspective Year 2014 15 Delhi Distribution Business What Determines Electricity Tariff What Determines Electricity Tariff A perspective Contents Electricity Value Chain What determines tariff Power Purchase & Transmission

More information

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects

More information

SECTION 8 Industrial Facilities Field Investigation

SECTION 8 Industrial Facilities Field Investigation SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

FACT SHEET. NEM fast facts:

FACT SHEET. NEM fast facts: (NEM) operates on one of the world s longest interconnected power systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055 Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights

More information

Georgia Emergency Operations Plan. Emergency Support Function # 12 Annex Energy

Georgia Emergency Operations Plan. Emergency Support Function # 12 Annex Energy Emergency Support Function # 12 Annex Energy 2015 E S F C o o r d i nator and Support Ag e n c i e s ESF C oordi na t or Georgia Environmental Finance Authority P rima ry Agenc y Georgia Department of

More information

SWIMMING POOL HEAT PUMP

SWIMMING POOL HEAT PUMP SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN Yun CHEN SMEPC,State Grid China daddygirl@126.com ABSTRACT From the background of intelligent distribution network construction,

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

Wind & Mini-hydro Projects in Tanzania

Wind & Mini-hydro Projects in Tanzania Godfrey H. Chibulunje Principal Technical Engineer Electricity Division chibulunje@ewura.go.tz Energy and Water Utilities Regulatory Authority (EWURA) Tanzania Wind & Mini-hydro Projects in Tanzania Presentation

More information

Drives and motors. A guide to using variable-speed drives and motors in data centres

Drives and motors. A guide to using variable-speed drives and motors in data centres Drives motors A guide to using variable-speed drives motors in data centres The power behind the data Private public businesses, from banks to supermarkets, to telecommunications companies internet providers

More information

Construction Services

Construction Services Construction Services Construction Turning innovative ideas into delivered solutions At Golder Associates we strive to be the most respected global company providing consulting, design, and construction

More information

Tasmanian Transmission Revenue Proposal

Tasmanian Transmission Revenue Proposal Tasmanian Transmission Revenue Proposal An overview for Tasmanian electricity consumers Regulatory control period 1 July 2014 30 June 2019 Tasmanian Networks Pty Ltd About TasNetworks We are Tasmania s

More information