1 1 Can companies that are subcontractors (or were subcontractors at any time) on HIX or MHBE PMO projects be a part of a bid team for Please refer to Section Firms that are prime contractors on the HIX IT this QA/QC contract? And for companies that are currently subs implementation team or the MHBE PMO are not eligible to perform the services (with contracts that may be expiring), could they cancel their existing requested in this RFP, and proposals from such firms will not be evaluated. sub work to perform QA/QC work if they bid on win the QA/QC contract? 2 Can an individual that is employed at a company that is involved in the HIX project (but the employee himself has no involvement with the HIX project) be part of a bid team? (Meaning, the employee would be bid as a team member, and if the QA/QC Contractor wins Yes the bid, this employee would resign from his current company and join the QA/QC s contractor s company (and sign a statement that he would show no preferential bias towards his former co-workers in his new QA/QC & IV&V role)? 3 Page 14, 1.4 Contract Duration. Can the State please confirm the The Contract resulting from this RFP shall be for a period for one (1) year contract duration? What is listed in this section does not match what beginning on or about July 1, 2014 and ending on June 30, At the sole is listed on page 8 (1.1.3), in Attachment A (#3) and Schedule A option of the MHBE, the contract period may be extended for up to two (1) year (cost table). periods. 4 Page 18, 1.22 Standard Contract Exceptions. This section states Any exceptions to this RFP or the contract must be submitted with the proposal, that exceptions to the RFP must be submitted in a separate section in a separate section clearly marked exceptions as part of the Offerors of the proposal. Does the State have a preference for where this Executive Summary section should be? 5 Page 18, 1.25 Minority Business Enterprises. The State has set a The Procurement Officer without proper submission of a request for waiver my MBE participation goal of 30%. If a proposer utilizes MBE deem the bid non-responsive and determine the Offeror is not reasonably subcontractors, but does not reach the intended goal of 30%, would susceptible of being selected for award. that disqualify the proposer? 6 Yes. Please refer to page 24 - Due to the nature of the tasks performed by the Page 24, 2.1 Overview of the QA/QC IV&V Work Effort. Can the QA/QC IV&V vendor, the QA/QC IV&V vendor will be precluded from state clarify if the preclusion from development, implementation, or development, implementation, or hosting projects for the Maryland Health hosting projects for the MHBE statement in the last paragraph on the Benefit Exchange. The QA/QC IV&V vendor will be precluded both as the page, flows down to sub-contractors? prime and as a subcontractor Page 1

2 7 Page 26, 2.3.A. Project Team Composition. Does the State require that each member of the project team have the qualifications and All project team members performing IVV and QA services and the experience listed in 1-6, or do those requirements apply to the team project/program manager must meet all 6 qualifications listed. as a whole? 8 Page 32, 3. Q. Quality Assurance, Quality Control (QA/QC). Can the Prior experience in requesting and/or administering federal grants, particularly State clarify the extent of the activity to assist in identifying if the skill those issued by CMS. Understanding of federal grant reporting requirements set requires grant funding writing or financial expertise? and assessing whether those requirements have been met by grantees. 9 Page 53, 3.2 Proposals. Would the State accept CDs that contain versions of the proposals in PDF format, instead of searchable Word No, proposal submission must meet the requirements of the RFP format? 10 Page 54, 3.4 Technical Proposal. In the second paragraph in this section, it states that resumes are included in the page limit for the proposal. In Section 1.16 (Economy of Preparation), it states the Excluded in page limit. resumes are excluded from the page limit. Could the State please clarify and confirm which statement is accurate? 11 Page 54, C.1 Executive Summary. The executive summary is required to include a copy of the PMP certificate or equivalent. Does Yes this mean that proposers are to include copies of PMP certificates for each staff member proposed? 12 Page 55, F.1 Prime Contractor and Subcontractor Experience and Capabilities. The RFP requires that we submit three examples of projects that you have completed that were similar in scope to the one defined in the scope of work in this RFP. Each of the three Reference contact information is sufficient, if reference letters are available examples must include a reference For each project that we they may be included but are not required provide, are we required to submit a reference letter from that project, or just reference contact information that the State could use at a later time? 13 Page 61, 4.1 Evaluation Criteria. Could the State elaborate on the evaluation criteria, Criteria for evaluating the technical proposal in descending order of importance. Technical receives greater weighting than price. Page 2

3 14 This form is used if, for any reason, the apparent successful bidder or offeror is unable to achieve the contract goal for certified MBE participation, the bidder or offeror may request, in writing, a waiver and this form among other things would Page 99, Attachment D-6. When are we required to submit be provided. The D6 is submitted with your proposal. A list of minority Attachment D-6? Should this be included in our submission, or at subcontractors found to be unavailable. This list should be accompanied by an the time of apparent award? MBE unavailability certification (MBE Attachment D6) signed by the minority business enterprise, or a statement from the apparent successful bidder or offeror that the minority business refused to give the written certification. 15 The state is currently transferring the Deloitte solution used by the Please clarify. state of Connecticut, and retrofitting it for Maryland. Is this softheon solution offered for HIX Implementation? 16 The initial phase of this effort ends November 15, Is the Plan Management is scheduled to go-live October 1, Membership Go-Live planned for Nov. 15, 2014? 17 The scope of this contract will focus entirely on the transfer project Yes, about 3,000 effort. Are there any existing test strategy, test scenarios and test cases from Connecticut state available to re-use? 18 The State of Maryland has elected to establish a single IT infrastructure to evaluate eligibility for Exchange plans (including the Small Business Health Options Program (SHOP) Medicaid, Maryland Children s Health Program (MCHP), and advance premium tax credits and cost-sharing reductions. Is Eligibility determination and interface with the State Tax system in scope of testing or only from the process of enrollment? The CT solution will encompass plan management, eligibility and enrollment, but will not include SHOP Test Strategy. Are there any schedules in place now? What are the test methodology and processes used in the current test strategy? Are you looking for a techno-managerial candidate to drive the test strategy or looking more for Program Management experience? The project started less than 30 days ago and is currently in the gap analysis phase. Program management experience with prior UAT management experience. Page 3

4 21 How does the exchange differ from the existing MHBE is transferring the solution from Connecticut. The solution encompasses both MAGI and QHP eligibility and enrollment. 22 For the new project there are currently none. How many vendors are participating currently in the testing program? 23 Can you please provide a list of the 5 challenges that exist in the The RFP defines the requirements and deliverables. current project for which you are looking for the solution? 24 Is all the testing being performed manually or will any automation We expect to utilize automated testing to the degree possible. tools be used? 25 What is the test management tool used for the project? Junit and Rational 26 What defect management tools will be used in the project? JIRA 27 Each contract has a set of defined requirements and performance measures. How is the performance of existing vendors measured in the project? 28 Are there any tools used for requirement traceability by the vendors? Yes 29 What current release management processes are used in the project? The project is in the gap analysis phase. There are no established relapse processes at this time. 30 How many major and minor releases are planned in the release Two management process? 60 Can the project be executed with an onsite-offshore model or does it No, offshore is not permitted. Unless otherwise specified by the Contract need to be100% onsite? Monitor, resources will be located onsite 61 What support is available to the testing team to understand the requirements? Requirements documents and other documentation will be made available, along with about 3,000 test scripts. 62 Is documentation available with detailed information to understand Yes, and will be provided to the successful offeror the requirement details to the vendors? 63 What is the process followed to co-ordinate with Marketplace We do not understand your question. requirements/processes? 64 How many carriers are expected to participate in the exchange? Four 65 What volume of members is expected to enroll in this program? During open enrollment, approximately 327,000 people enrolled. In addition, approximately 950,000 will be migrated from other systems in a phased manner. Page 4

5 66 There are major milestones defined in approximately 2 week increments from What are the current milestone dates for the November 14 go-live? through go-live. 67 What are the environments planned to test HIX Implementation? System test, UAT, and Staging 68 Who will be responsible to configure Group and LOB plans in test The IVV/QA vendor will be expected to provide support. environments? 69 What is the system used to load membership? Please clarify 70 Is only Enrollment in scope, or is Claims processing also included in Enrollment the scope? 71 What is the financial management solution used for billing the Carriers currently bill membership? 72 If referring to deducibles, co-pay, and co-insurance, we do not do any physical How many accumulator prefixes do you currently have? claims tracking 73 How many plans you are offering? 45 medical plans and 20 stand-alone dental plans on the Individual Exchange 74 How many Product Categories you are offering? Three: HMO, PPO, and POS 75 See the answer to question #73. Please clarify the difference between How many products you are offering? products and plans. 76 How many Service IDs you using currently? Please clarify 77 No. The Exchange does not assign PCPs. We defer to carriers carriers for Are you using Auto PCP Assignment application? this function. 78 Can a member have more than one PCP provider at the same time,( No. The Exchange does not assign PCPs. We defer to carriers carriers for e.g., Internal Medicine and OB/GYN)? this function. 79 Can a provider have more than one specialty? Yes. 80 How many provider networks do you currently have? Approximately six 81 How often is provider information updated and/or verified? Provider information is collected every two weeks by MHBE's provider search vendor, CRISP. Consumers will be able to link to provider information from the HIX. 82 How often is provider information updated and/or verified? Are there There are no known technology issues. any known issues? 83 How often is provider information updated and/or verified? Are there Same as above any known issues? Page 5

6 84 If a PCP provides services under both designations (e.g., PCP and MHBE does not oversee provider contracting or credentialing their specialty Internal Medicine and Cardiologist), do they have different contracts for each? 85 Please clarify. For consumers, the standard ACA-required demographic Is there any unusual or unique demographic information? information is collected as part of the application process. 86 Can you please provide a list of all identifiers for a provider, e.g., No. Information will be provided to the successful offeror NPI, PIN, State specific provider ID or any cross-reference # s? 87 Please provide a list of all vendors and consulting firms utilized and Any information deemed relevant will be provided to the successful offeror their accountabilities. 88 Please provide available documentation summarizing current Documentation will be provided to the successful offeror business applications. 89 Please provide available documentation or schematics identifying Documentation will be provided to the successful offeror. There are currently 8 current application interfaces. interfaces that are planned 90 Please provide a general overview of the system interfaces amongst Documentation will be provided to the successful offeror each application. 91 Is a complete inventory of all of the interfaces available, including Yes, and will be provided to the successful offeror EDI? 92 Please summarize any concerns and risks perceived in converting to The IVV/QA vendor is responsible for the requirements defined in the RFP. the new system. 93 Can you provide a report extract inventory? No 94 Is there full documentation of all interfaces and extensions? No 95 Yes. All resources will be onshore and unless otherwise specified by the Are there any restrictions to using off-shore resources? contract monitor work onsite 96 Can vendors bid on only a portion of the RFP? No 97 What platform (databases, Operating Systems) and programming Java-based development for custom processes. DB2 coupled with both Windows and languages are used for developing the custom processes? Red Hat operating systems support the solution. 98 What process documentation do you have, including FD, DD, and Unit Test Plan? Can you share the documents? Documents will be shared with the successful bidder 99 What percentage of your configuration is required for testing validation? Please clarify - the entire application and all changes will be tested 100 What is the expected enrollment, claims-processing volume/month? cross-reference prior question 101 Do you have any licenses for automation testing tools (e.g., QTP/UFT Rational Test, etc.?) If yes, what version(s)? Yes, Junit Page 6

7 102 Do you have any licenses for performance testing tools (e.g., LoadRunner, etc.?) If yes, what version(s)? 103 Do you have a regression test suite? If so, what percentage is manual testing and what percentage is automated? 104 Do you have any performance bench-marks/slas that need to be met or exceeded? If yes, can you please state? Yes, IBM Rational Performance Tester. Version Yes. 50% manual and 50% automated. Please clarify the question. This is for IVV/QA services for the transfer of a system. When the maintenance and hosting contracts are awarded there will be SLA's. 105 How many releases are planned for the Go-Live? How many of these releases are major vs. minor releases, that is, include defect fixes only vs. defects and enhancements? Please provide the number of enhancements Two major releases or defects in each release. 106 Please provide a list of the current functional modules utilized today and any known modules or functionality to be implemented as part of the upgrade (such as Membership, Premium Billing, Claims, Accounts Payable, or Plan Management, Eligibility, Enrollment others). 107 Please specify the different database technologies currently in use in the solution. DB2 for OLTP and SQL Server for reporting databases 108 Please provide a list/count of interfaces, by functional area, that are expected to be impacted as part of the upgrade (that is, ID card interface, The first release will include approximately 8 interfaces. Specifics will be EOB/EOP interface, Standard HIPAA X12 Transactions, and others). provided to the successful offeror Please provide any known or expected interfaces. 109 Do you have an integrated external workflow product? No 110 What level of support is expected from the services vendor during UAT? Please refer to page 41 section 8 and page 32 item X 111 Is the vendor expected to provide a UAT test strategy? Please refer to page 32 item x 112 Vendor will have responsibilities related to coordination. Please refer to page Is the vendor responsible for testing and coordination with trading partners? 41 section 8 and page 32 item X 113 Please clarify the question. We produce standard EDI transactions for 834s What is your preprocessing for HIPAA process? and will also provide an enrollment file to the Medicaid Management Information System 114 Can you describe your claims processing life cycle and what the vendor should be responsible for (HIPAA Gateway, EDI, Compliance, XC, etc.)? 115 Is the vendor expected to provide all incident management for the life of the project? Vendor will send 834 and 8001 transactions including add, change, terminations and cancellations. please refer to section Page 7

8 116 Is the vendor responsible for environment management? No 117 What version of EDI Transaction sets are currently in place? 834 and 8001 transactions, however, this is a new system 118 Is there a test tool available to support EDI (e.g., 83X, 27X) data creation? Web services on the EDI support testing processes. There is not a dedicated test tool. 119 Will we be required to support the business users in UAT Testing? If so what are their work schedules? 120 How many dedicated test environments are available for this effort and how often can they be refreshed with prod data? 121 Would we be provided with a defect management team or will we be responsible for managing the testing defects? Please see page 32 item X and "The Vendor s onsite working hours shall be consistent with those of MHBE and the implementation Contractor. It is expected that when needed, the Vendor shall be required to work evenings, nights, weekends, holidays, and other non-standard work hours as dictated by the work." There will be multiple test environments. The refresh schedule is not established. The vendor will not be provided a "defect team". Please refer to page 32 item In section 3.4 outlining the required items to be in VOLUME I TECHNICAL Yes, attachment K should be submitted - page 63 - ATTACHMENT K NON- PROPOSAL, you list the following ATTACHMENTS: B, D-1, G-1, H, I, J and DISCLOSURE FORMS FOR SOLICITATION J-1 and Certificate of Insurance. In the list and description of Attachments in This form is to be submitted with the Technical Proposal. Section 5, you show ATTACHMENT K Non-disclosure Forms for Solicitation with the description This form is to be submitted with the Technical Proposal. Can you please clarify whether ATTACHMENT K is a required form for this submission or not? Page 8

9 123 Yes Section 1.22 of the RFP states: By submitting an offer in response to this RFP, an Offeror, if selected for award, shall be deemed to have accepted the terms and conditions of this RFP and the Contract, attached herein as Attachment A. Any exceptions to this RFP or the contract must be submitted with the proposal, in a separate section clearly marked exceptions. Exceptions may not contain any financial information. All financial information shall be included in the financial proposal. Exceptions to the solicitation or Contract made by the Offeror may result in rejection of the Offeror s proposals. Section 1.9 of the RFP states that questions and exceptions to the RFP and Contract can be provided prior to the Preproposal Conference and then later states that all questions and exceptions will be accepted until May 6 at 3:00PM. Can an Offeror raise specific exceptions to the RFP and Contract terms with submission of its proposal (as stated in Section 1.22) even if the specific exception had not been previously raised prior to May 1 (Pre-proposal Conference) or May 6? 124 If an Offeror s proposal includes a term or condition that takes exception to a requirement in the RFP or the Contract, and if the State declines the proposed term or condition and does not reach a negotiated agreement concerning the requirement with the Offeror, can the State nevertheless require the Offeror to (i) enter into a contract with the State and (ii) comply with the original requirement as it appears in the RFP? In other words, if the State declines the proposed exception and if the parties fail to reach a negotiated agreement with respect to the term or condition, can the Offeror at that point withdraw its proposal without being required to enter into an agreement with the State that adheres to the original requirement as stated in the RFP? 125 Section designates various items as preliminary deliverables and states that they are due within 15 business days of receipt of Notice to Proceed. In Section ) regarding items to include in the technical proposal it states to Include all deliverables denoted as Preliminary. Please clarify when the preliminary deliverables are due: within 15 business days of receipt of notice to proceed or with the RFP response. Vendor's may be determined non-susceptible for awarded based on exceptions and failed negotiations. If the State is unable to come to terms with the selected offeror, the State would move to the next qualified bidder. For each deliverable it indicates when the deliverable should be submitted. The preliminary staffing plan, transition out plan, and project management plan are due with the response for example Other deliverables are due NTP plus the specified number of days. Please see page 45 Section C Deliverable Table Page 9

10 126 It is MHBE's intention to hold the QA/QC IVV vendor responsible for the Is the intent of the QA/QC IV&V contract to hold the QA/QC IV&V vendor responsible for the SI vendor delivering the Connecticut HIX solution on time requirements and deliverables described in the RFP. and with the quality described in MHBE s contract with the SI vendor? 127 Please provide more information regarding what tasks the QAQC IV & V vendor would have in the project schedule listed in A). This section indicates that this project schedule should include all major tasks required to complete the project. Could you explain why the QA/QC IV &V vendor would be providing this information in their project schedule and not the SI vendor? For each deliverable it indicates when the deliverable should be submitted. The preliminary staffing plan, transition out plan, and project management plan are due with the response for example Other deliverables are due NTP plus the specified number of days. Please see page 45 Section C Deliverable Table 128 Section I) mentions a transition out plan. How long does MHBE The transistion is expected to be 90 days and would be included in the base envision that the transition out should last? Is the transition out time period in contract period. addition to the one year that the project is expected to last? 129 All, unless determined by the contract monitor. Which members of the QA/QC IV&V vendor staff are required to be onsite? 130 Sections 1.1.4, 2.1 and 2.3 of the RFP all state that the successful Offeror (or the QA/QC IV&V vendor) will be precluded from bidding on or providing certain other work and projects. Specifically, only section states that the successful Offeror will be precluded from bidding on infrastructure. If a manufacturer of computer equipment (desktops, laptops, servers, storage etc.) is the successful Offeror, will that company be precluded from bidding on providing such computer equipment either (i) directly or (ii) through a reseller? 131 The QA/QC IV&V vendor was not involved in designing or developing the system being implemented. Question 1: Does the scope of Section 2.5 require that the vendor validate that the State and its HIX vendors methodology meets applicable law? Question 2: Does the scope of Section 2.5 require that the vendor validate that the State and its HIX vendors design of the system meets applicable law? No, this refers to hosting, network and data center services. Please see page 47 Page 10

11 Yes it is acceptable to use the same numbering as the SOW. The RFP states The RFP sections should be numbered for ease of reference, i.e., Section 1 Title and Table of Contents, Section 2 Transmittal Letter, Section 3 Proposed Services, etc. The next sentence then states In addition to the instructions below, the Offeror s Technical Proposal should be organized and numbered in the same manner as this RFP. According to the statement in Section 3.4.1, the bidder s response should include a Section 3 Proposed Services. Within this section, there will be a subsection called 3.2 Proposed Solution. The majority of this section will be MHBE s SOW and the bidder s description of its solution and responses to items in the SOW. Is it acceptable for the bidder to use the same numbering scheme from the SOW (e.g QA/QC IV&V Project Team Composition) behind a cover page titled 3.2 Proposed Solution in the response, or is the State looking for an item-by-item convention such as or ? Regarding Section 3.2 PROPOSALS, page 53: An electronic version of Volume I- Technical Proposal and Volume II- Financial Proposal, both in searchable Word (Version 2007 or newer) format shall also be submitted as separate files for each "Volume", labeled Volume I-Technical Proposal and Volume II-Financial Proposal with the unbound originals, technical or financial volumes, as appropriate. Electronic media is to be submitted on CD and shall bear a label on the outside containing the RFP number and name, the name of the Offeror and the volume number. A second electronic version of Volume I and Volume II in searchable Word (Version 2007 or newer) format shall be submitted on CD for Public Information Act (PIA) requests. This copy shall be redacted so that confidential and/or proprietary information has been removed (see section 1.20). Our research indicates that there is no redaction solution supported by Microsoft for Word 2007 or newer versions. Would it be permissible to provide searchable Adobe PDF format for the electronic copies provided? Searchable Adobe PDF format for the electronic copies is not and acceptable CD format for Public Information Act (PIA). Please redact or remove your confidential and/or proprietary information using searchable Word (Version 2007 or newer) format. Page 11

12 134 RFP Section F RFP Section F RFP Section RFP Section F.1- Prime Contractor and Subcontractor Experience and Capabilities. Please clarify if all subcontractors are also required to provide 3 project references the same as the prime contractor. RFP Section F.2- Prime Contractor and Subcontractor Experience and Capabilities. Please clarify if all subcontractors are also required to provide a list of all contracts it currently holds or has held within the past five years with any government entity of the State of Maryland. Are resumes excluded from the total page limit? Are the requirements for RFP section 2.3.1, QA/QC IV&V PROJECT TEAM COMPOSITION, apply to each team member? What is the role of the General Contractor, QSSI? Are they on the Evaluation Panel for this opportunity? 138 If the prime is an African American, Woman owned MBE, can it count towards the MBE subcontractor participation goal for one or more of the designations, e.g., African American Owned or Woman Owned? 139 Will the incoming QA/QC IV&V vendor be precluded from bidding on the PMO procurement for the Maryland Health Benefit Exchange as a prime or subcontractor? 140 Will the QA/QC IV&V vendor be solely responsible for all project QA/QC functions or will the QA/QC IV&V contractor perform the QA/QC function in conjunction with MHBE QA/QC staff? The Prime must provide 3 project references. In addition, the prime and may also include subcontractor references if desired in addition to the 3 required references for the prime. The Prime must provide a list of all contractors in holds or has held within the past five years. Resumes are excluded Already addressed. QSSI provides development, mainteannce, operation and hosting for the existing HIX. They also provide support to the MHBE PMO. Evaluation Committee members are confidential. One only. Yes. The vendor will be responsible for the all requirements of the statement of work. Page 12

13 141 Section C states that "The QA/QC IV&V vendor shall facilitate the creation of common project repositories as directed by MHBE." Does the MHBE currently have an electronic library/repository in place to support the project or is the QA/QC IV&V vendor responsible for providing the electronic library to serve as the repository? 142 Section C states that "The Executive Summary shall include a copy of the PMI PMP certificate or equivalent. Please clarify which project personnel require PMPs? 143 Please confirm the Year designations for the Base Period, Option Period 1 and Option Period 2 in Schedule A Summary Statement Attachment M states that "Key Personnel identified by the Exchange for the scope of work described in Section 2 of this RFP shall be located onsite at the Exchange Office in Baltimore, Maryland." Will MHBE provide office furniture, access to printers and networks, conference room as needed for the QA/QC IV&V vendor's use. Will MHBE provide the QA/QC IV&V vendor with any required hardware, software and network capabilities for access to State networks and tools in order to perform the QA/QC IV&V functions. Could the State clarify the types of other contracted entities and State agencies contributing to the overall effort that may fall within the scope of support? Already addressed. All QA/QC team members. All IV&V team members. Already addressed. Yes to space. No, you have to provide your own laptop. However, your laptop must meet minimum security standards and will be subject to evaluation and approval by the State's designated security team. Also, you are responsible for providing project management software. Such as Microsoft Project, etc. Department of Health and Mental Hygiene, Department of Human Resources, Department of Information Technology, the PMO support vendors, the System Integrator, and all other vendor entities with which MHBE works to support the transfer system project Page 13

14 Standard Contract Exceptions Minority Business Enterprises A Project Team Composition C Required Deliverables Project Deliverables ID M This section describes the procedures for submitting exceptions to the RFP or the Contract with the proposal. But it goes on to say that exceptions to the solicitation or Contract made by the Offeror may result in rejection of the Offeror s proposals. Are we correct in understanding that an Offeror is permitted to take exceptions in its proposal, which will not result in automatic rejection but could result in rejection depending on the nature of the exceptions? Can the State clarify what kinds of exceptions are likely to lead to rejection? Can the State clarify if the WBE staffing requirement is annualized or a total project duration? Could the State please clarify the qualifications and experience that Already addressed. each team member must have? Of the requirements that are listed in #1-6, does EACH person have to meet ALL of those? Would a team meet the requirements if they had those qualifications collectively instead of individually? Is this table a complete list of all expected and required deliverables? No. Can the State clarify the expected completion of this deliverable be weekly thereafter or monthly thereafter? By submitting an offer in response to this RFP, an Offeror, if selected for award, shall be deemed to have accepted the terms and conditions of this RFP. If the Offeror takes exceptions and those exceptions are not accepted by MHBE or an acceptable negotiated version of the exception cannot be reached MHBE has the right to deem the proposal not suseptible for award or if move to the next best qualified offeror. Offerors will be given an opportunity to clarify, withdraw or negotiate exceptions. Duration of the project and based on the total project value Initial submission + future submissions are on a weekly or monthly frequency. Page 14

15 Insurance Requirement In the first paragraph, the Contractor must provide certificates of insurance and evidence of the payment of premiums. We request an exception to the requirement to provide evidence of the payment of premiums. We can provide current certificates of insurance, but we would not provide evidence of payment. Presenting evidence of payment of premiums in addition to current certificates is redundant. We also consider the amount of our premiums to be confidential information. Will the State agree to remove the requirement to provide evidence of the payment of premiums, or make this section of the RFP negotiable? No Insurance Requirement 2.9 Insurance Requirement Is the State willing to modify this paragraph to replace Employee Theft Insurance with Crime/Employee Theft Insurance? In the last paragraph, we request an exception to modify the first sentence to read as shown: The State shall be named as an additional named insured on the policies with the exception of Worker s Compensation, Professional Liability/E&O and Crime/Employee Theft Insurance. We can name the State as an additional insured on our policies, but the State cannot be the named insured. Also, due to the nature of these policies, we cannot name the State as an additional insured on Worker s Compensation, Professional Liability/E&O or Crime/Employee Theft insurance. Will the State agree to modify this sentence or make this section of the RFP negotiable? We will consider it. We will consider modifying it and/or negotiating this section. Page 15

16 Insurance Requirement In the last paragraph, we request an exception to delete the third sentence and replace it with the following as shown: All insurance policies shall be endorsed to include a clause that requires that the insurance carrier provide the Contract Monitor, by certified mail, not less than 60 days advance notice of any non-renewal, cancellation, or expiration. Offeror will provide thirty (30) days advance notice by certified mail of any cancelation or material change in coverage to the Contract Monitor. Our insurance carriers will not guarantee notice to anyone other than the named insured. We understand that this is now the industry standard practice. As a result, we do not have policies that can be endorsed to require notice to the Contract Monitor. However, we can agree that we will provide 30 days advance notice of cancelation or material changes to the Contract Monitor. Will the State agree to modify this sentence or make this section of the RFP negotiable? Yes, we will negotiate F Prime Contractor and Subcontractor Experience and Capabilities 156 Schedule A Are each of the MBEs and subcontractors in the proposal submission required to submit three project examples and information regarding state of Maryland experience? Schedule A shows a base period of 24 months (through July 2016), but the information in Section (page 57) states the period of performance for this FFP cost proposal will be for one (1) year. Which is correct? Already addressed. The Contract resulting from this RFP shall be for a period for two (1) year beginning on or about July 1, 2014 and ending on June 30, At the sole option of the MHBE, the contract period may be extended for up to two (1) year periods. 157 Attachment A, 6. Exclusive Use We request an exception to add language to this section clarifying that Contractor will retain ownership of its pre-existing and The state will not modify, but on a case-by-case basis negotiate, based on the independently developed intellectual property. Will the State agree to successful vendor's property (during the course of the contract). modify this section of the Contract or make it negotiable? Page 16

17 Attachment A, 7. Patents, Copyrights, Intellectual Property Attachment A, 27. Liability Attachment F, Section E. The MHBE declines to amend the proposed change to the standard contract We request an exception to add language to this section to provide provisions. that Contractor s obligations in this section will not apply to the extent that a claim of infringement is caused by, relates to or arises out of (a) the State s failure to use the Contractor s services as permitted under this Contract, or (b) the State s configuration or use of the Contractor s services in combination with other software, equipment, services, processes, elements, components or systems that are not provided by Contractor. Will the State agree to modify this section of the Contract or make it negotiable? We request an exception to add a limitation of liability provision that (a) limits the Contractor s liability under the Contract, and (b) excludes Contractor s liability or responsibility for any lost profits/revenues or any special, indirect, incidental, consequential or punitive damages. Will the State agree to modify this section of the Contract or make it negotiable? This requires posting of a notice of Living Wage Rates, etc. For employees working onsite at the Exchange, will the State be responsible for posting this notice? If all employees and subcontractor employees working under the contract are salaried, can an Offeror be granted an exception from posting this notice at the Offeror s facilities where work on the contract is performed? The MHBE declines to amend the proposed change to the standard contract provisions. The MHBE declines to amend the proposed change to the standard contract provisions. Page 17

18 Attachment H, Section 4. E) Attachment J Trading Partner Agreement This section indicates that subrecipients of federal funds from SAMHSA (Substance Abuse and Mental Health Services Administration) or NIH (National Institute of Health) are prohibited from paying any direct salary at a rate in excess of Executive Level 1 per year. Will the successful Offeror be a subrecipient of federal funds from SAMHSA or NIH? If not, will the State agree to remove this provision from the resulting contract? If so, can the State provide a citation to specific federal laws or regulations that explain what Executive Level 1 salary rate is? We have some concerns about the requirements of the Trading Partner Agreement, particularly related to including attempts to gain unauthorized access to a system in the definition of an Incident. We are part of a large electronic transaction processing company, and we carefully monitor the security of our systems. However, it is impractical for us to report unauthorized attempts because of the pervasiveness pings and other unsuccessful efforts to penetrate our information systems that occur on a daily basis. Reporting all attempts would quickly render such reports meaningless. We would not agree to report Incidents as defined if it applies to our systems. However, based on the nature of the requested services, we believe it is unlikely that we would have a need to store PII on our information systems or equipment. Please identify which parts of the requested services will require or result in the Contractor having access to PII and for what purpose? Can the State confirm that the Contractor will not be required to store or process any PII on the Contractor s systems or equipment in order to provide the requested services? It is not anticipated that the successful Offeror will be a subrecipient of federal funds from SAMHSA or NIH and the State declines to remove this provision from the resulting contract. No, we cannot confirm this. It is possible that team members may have access to and store documents on laptops that may have PII, or the project library. Gaining unauthorizied access would apply to State systems or trading partner systems or laptops that have MHBE PII on them. The offeror should at all times know where project data is stored and the nature of that data and take proper measures to secure and protect the data. Page 18

19 Attachment J, Section B.3. Attachment J, Section C.2. Attachment J, Section C.2. Attachment J, Section D.3. We request an exception to either eliminate attempts to gain unauthorized access from the definition of Incident, or to clarify that Incidents are limited to unauthorized attempts to access the State s systems. We believe that it is impractical to report attempted, unauthorized acces to our systems because of the pervasiveness of pings and other unsuccessful efforts to penetrate our information systems that occur on a daily basis. We also believe that there will be no need for the Contractor to store PII on its systems. Will the State agree to modify this section of the Trading Partner Agreement or make it negotiable? This section is an agreement to make uses and disclosures and requests for PII consistent with MHBE s policies and procedures regarding minimum necessary use of PII. Can the State provide copies of, or access to, MHBE s policies and procedures regarding minimum necessary use of PII so that we can review those? No. See question 162 The successful offeror will have access to the policies and procedures. proposing offerors must comply with these requirements This section is an agreement to make uses and disclosures and requests for PII consistent with MHBE s policies and procedures regarding minimum necessary use of PII. We request an exception to add that have been provided to Trading Partner in writing after No. MHBE s policies. We cannot agree to follow policies and procedures unless we know what they are. Will the State agree to modify this section of the Trading Partner Agreement or make it negotiable? In the first sentence of this section, the Trading Partner shall use privacy and security standards at least as protective as MHBE has established and implemented for itself. Can the State provide copies These will be provided to the successful offeror of, or access to, MHBE s privacy and security standards so that we can review those? All Page 19

20 Attachment J, Section D.3. Attachment J, Section D.7. Attachment J, Section 8.a. In the first sentence of this section, the Trading Partner shall use privacy and security standards at least as protective as MHBE has established and implemented for itself. We request an exception to add and provided to Trading Partner in writing to the end of this sentence. Will the State agree to modify this section of the Trading Partner Agreement or make it negotiable? In the second sentence of this section, the Trading Partner agrees to report to MHBE any Incident of which it becomes aware without unreasonable delay, and in no case later than five (5) calendar days after the Incident. We request an exception to this requirement. Due to the way Incident is defined, an Incident could include attempts to gain unauthorized access to the Trading Partner s systems regardless of whether any PII is on the Trading Partner s systems. We wish to add language to the Trading Partner Agreement to clarify that the Trading Partner will not be required to report attempts to gain unauthorized access to Trading Partner s systems. Will the State agree to modify this section of the Trading Partner Agreement or make it negotiable? See answer to question 162 In this section a report of a Breach of unsecured PII must be made within 15 days after the Incident constituting the Breach is first known. Due to the way Incident is defined, an Incident could include attempts to gain unauthorized access to the Trading Partner s systems regardless of whether any PII is on the Trading Partner s systems. We request an exception to clarify that the Trading Partner will not be required to report attempts to gain unauthorized access to the Trading Partner s systems. Will the State agree to modify this section of the Trading Partner Agreement or make it negotiable? No. Only state systems or trading partner systems that housed MHBE data would be subject to report. We will, however, not modify the reporting requirement Page 20

21 Attachment J, Section 8.d. Attachment J, Section G. 172 Attachment K 173 Attachment K, Second Recital This section requires the Trading Partner s report to include a draft letter to notify individuals of a Breach. We request an exception to eliminate this requirement. Based on the nature of the requested services, we are not proposing that any PII will be on our information systems or equipment. If our understanding of the requested services is correct, any Breach of PII will occur on the State s systems or equipment. Furthermore, we do not believe that HIPAA requires Trading Partners to issue notices of a Breach. Will the State agree to eliminate this section of the Trading Partner Agreement or make it negotiable? Under this section MHBE is entitled to reimbursement and indemnification from the Trading partner for costs and expenses incurred as a result of Trading Partner s breach. We request an exception to make this section subject to a cap on the Trading Partner s liability and an exclusion of special, indirect, incidental, consequential or punitive damages. Will the State agree to modify this section of the Trading Partner Agreement or make it negotiable? Section 5 of the RFP indicates that this form is to be submitted with the Technical Proposal, and yet the attachment itself indicates Award in the title and it recites that the Contractor has been awarded a contract. Also Attachment K is not listed as required in Section 3.4 of the RFP. Is Attachment K to be completed and submitted with the Technical Proposal? If so, can we modify the recital that says the Contractor has been awarded a contract and other parts of the NDA to clarify that this is contingent upon award of a contract? In this section, the Contractor and its employees, agents, and subcontractors may be given access to Confidential Information. Will the State agree to also allow access to Contractor s affiliates? No, there will be no exception. See question 162. In addition, if there is no trading partner system or equipment that has PII then the vendor will never have to use this draft letter. We will consider modified language. Attachment K is not required to be submitted your proposal. Only upon prior written approval and following the Contractor's submission of a justification request. Page 21

22 Attachment K, Section 1. Attachment K, Section 2. Attachment K, Section 3 We request an exception to modify the definition of Confidential No for (a). We will consider changes for (b). Information so that it (a) includes either party s confidential information, and (b) excludes information that is generally available to the public, was already known to the recipient, or was independently developed by the recipient. Will the State agree to modify this section of the Non-Disclosure Agreement or make it negotiable? No, we will not modify the language to make it mutual nor will we make it We request an exception to (a) make these confidentiality obligations negotiable. mutual, and (b) allow disclosure that is required by judicial proceedings, investigations or other legal process, provided that the party required to disclose first makes a reasonable effort (if allowed by law) to consult with the other party to take reasonable steps to protect or limit disclosure. Will the State agree to modify this section of the Non-Disclosure Agreement or make it negotiable? We request an exception to eliminate this section and replace it with Yes, we will make it negotiable. language that allows the Contractor to share Confidential Information with its employees, affiliates, agents, advisors or subcontractors in connection with providing the services, provided that Contractor s employees, affiliates, agents, advisors or subcontractors with access to the State s Confidential Information will comply with the confidentiality provisions of this Agreement. Will the State agree to modify this section of the Non-Disclosure Agreement or make it negotiable? Page 22

23 177 Attachment K, Sections 4, 5 and Attachment M Page 7, Section 1.1 Page 25, Section 2.2-A Page 25, Section 2.2-A Page 30, Section 3-D We request an exception to make the obligations of these sections mutual. We also request an exception to provide in Section 6 that if return of the Confidential Information is not feasible, the parties may retain Confidential Information subject to the obligations of this Non- Disclosure Agreement until the Confidential Information is destroyed in accordance with commercially reasonable records retention policies. Will the State agree to modify these sections of the Non- Disclosure Agreement or make them negotiable? The attachment states that key personnel shall be located onsite for the project. Is the Exchange providing office space for those positions? If so, how many people could comfortably work in that space? The RFP states The initial phase of this effort ends November 15, To ensure proper alignment of our proposed project schedule to that of the SI Vendor, would MHBE please provide a general timeline for the SI Vendor contract? The RFP states adherence to the State of Maryland s SDLC methodology. This ten-phase methodology differs from the sixphase methodology discussed in Attachment L (section 2.6.7). To ensure we are aligned with the SI Vendor, can we assume that only the Single Release COTS phases apply to this project? No key personnel shall be onsite. The exchange will provide cubicles or other space as needed. We have sufficient space to accommodate up to 20 people. June 15, tentative date for CMS Design Gate Review August 15, tentative date to begin Interface and Carrier Testing September 1, UAT Please see amended RFP. The RFP states project management documents provided by the There is only a SI SI vendor and COTS teams. The RFP defines the SI vendor, but not the COTS teams; would MHBE please define which vendor(s) make up the COTS teams? The RFP states The QA/QC IV&V vendor shall be responsible for MHBE PMO members and stakeholders that may be invited to attend providing project management training or coordinating training classes for the MHBE PMO and its designees. Can the MHBE PMO please define the term its designees? Page 23

State Medicaid HIT Plan RFP #20100308. Responses to Submitted Questions. Section 1.1 of the RFP states in part the following.

State Medicaid HIT Plan RFP #20100308. Responses to Submitted Questions. Section 1.1 of the RFP states in part the following. State Medicaid HIT Plan RFP #20100308 Responses to Submitted Questions Question # RFP Section # RFP Page # Question Response Section 1.1 of the RFP states in part the following. 1 1.1 5 "This Request for

More information

Request for Resumes (RFR) CATS II Master Contract. All Master Contract Provisions Apply

Request for Resumes (RFR) CATS II Master Contract. All Master Contract Provisions Apply Section 1 General Information RFR Number: (ADPICS PO Number) Functional Area (Enter One Only) N00B1400375 Functional Area 10 IT Management Consulting Services Position Title/s or Service Type/s (Short

More information

Request for Proposal Hewlett Packard Network Switches and Peripherals

Request for Proposal Hewlett Packard Network Switches and Peripherals Request for Proposal Hewlett Packard Network Switches and Peripherals Vernon Public Schools, Connecticut BID # VPS-FY16-003 Inquiries: Robert Sigan Director of Information Technology rsigan@vernon-ct.gov

More information

REQUEST FOR PROPOSAL (RFP) BID# 7547367 UPGRADE EXISTING NEXTGEN ELECTRONIC MEDICAL RECORDS SYSTEM (EMR/EPM/EDR/KPM)

REQUEST FOR PROPOSAL (RFP) BID# 7547367 UPGRADE EXISTING NEXTGEN ELECTRONIC MEDICAL RECORDS SYSTEM (EMR/EPM/EDR/KPM) REQUEST FOR PROPOSAL (RFP) BID# 7547367 UPGRADE EXISTING NEXTGEN ELECTRONIC MEDICAL RECORDS SYSTEM (EMR/EPM/EDR/KPM) SUBMISSION DEADLINE: Wednesday, January 15, 2014 at 11:00 AM (ET) PRE-BID CONFERENCE:

More information

Business Intelligence Data Analyst

Business Intelligence Data Analyst Business Intelligence Data Analyst REQUEST FOR QUOTATION Minority Business Enterprise (MBE) ONLY State Term Schedule Page 1 of 12 Table of Contents INTRODUCTION AND BACKGROUND...3 PURPOSE OF THE REQUEST

More information

Document Reference. Section Number. Question # Section Heading. The IV&V Contractor will provide. project management services to the III.B.4.

Document Reference. Section Number. Question # Section Heading. The IV&V Contractor will provide. project management services to the III.B.4. Addendum 1 s and Answers Independent Verification and Validation (IV&V) Services Bureau of Health Services Financing RFP 3000003817 Proposal Due Date/Time: January 6, 2016, 4:00 p.m. CT Heading in 1 RFP

More information

Senior Business Intelligence Project Manager

Senior Business Intelligence Project Manager Senior Business Intelligence Project Manager R E Q U E S T F O R Q U O T A T I O N State Term Schedule Page 1 of 14 Table of Contents INTRODUCTION AND BACKGROUND...3 PURPOSE OF THE REQUEST FOR QUOTATION...3

More information

REQUEST FOR PROPOSAL: A NEW AUDITING SOLUTION FOR WINDOWS FILE AND DATABASE SERVERS

REQUEST FOR PROPOSAL: A NEW AUDITING SOLUTION FOR WINDOWS FILE AND DATABASE SERVERS REQUEST FOR PROPOSAL: A NEW AUDITING SOLUTION FOR WINDOWS FILE AND DATABASE SERVERS Issued: TABLE OF CONTENTS 1. Introduction...3 1.1 Purpose...3 1.2 Background...3 1.3 Scope of Work...3 1.4 Current Infrastructure...3

More information

Description: Publication Date: 9/21/2015. Closing Date/Time: Open Until Contracted

Description: Publication Date: 9/21/2015. Closing Date/Time: Open Until Contracted Description: The New River Valley Regional Jail Authority (NRVRJA) values and appreciates the contributions and efforts of its employees. Toward this end, the NRVRJA is committed to providing a supportive,

More information

Lawrence Livermore National Laboratory

Lawrence Livermore National Laboratory Lawrence Livermore National Laboratory Supply Chain Management Department Attention: To All Offerors June 16, 2016 Subject: Request for Proposal (RFP) Number B617524 Lawrence Livermore National Security,

More information

CAP CONSULTING SERVICES AGREEMENT

CAP CONSULTING SERVICES AGREEMENT CAP CONSULTING SERVICES AGREEMENT This Agreement is made on this day of, by and between the College of American Pathologists, a not-for-profit Illinois corporation with offices at 325 Waukegan Road, Northfield,

More information

RFP-00118 ADDENDUM NO. 1

RFP-00118 ADDENDUM NO. 1 INTERNAL SERVICES DEPARTMENT PROCUREMENT MANAGEMENT SERVICES 111 NW 1 ST Street Suite 1300 Miami, Florida 33128-1974 Telephone: 305-375-4725 Fax: (305) 375-5688 RFP-00118 ADDENDUM NO. 1 DATE: March 26,

More information

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016 NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016 Notice is hereby given that the Board of Education of the Newburgh Enlarged City School District,

More information

Document Management System Request for Proposal

Document Management System Request for Proposal Request for Proposal W240 N3065 Pewaukee Rd Pewaukee, WI 53072 Contact: Robert Kewan Director of Information Technology 262-691-6001 kewan@pewaukee.wi.us PROPOSALS DUE Friday May 13, 2016 NO LATER THAN

More information

Senior Security Analyst

Senior Security Analyst Senior Security Analyst REQUEST FOR QUOTATION Minority Business Enterprise (MBE) ONLY State Term Schedule Page 1 of 13 Table of Contents INTRODUCTION AND BACKGROUND...3 PURPOSE OF THE REQUEST FOR QUOTATION...3

More information

SEALED BID REQUEST FOR INFORMATION

SEALED BID REQUEST FOR INFORMATION Department of Buildings and General Services Purchasing & Contract Administration 10 Baldwin St. Agency of Administration Montpelier VT 05633 [phone] 802-828-2210 [Fax] 802-828-2222 www.bgs.state.vt.us

More information

Page 1 of 12 Document Effective Date Solicitation Terms & Conditions 08/08/2008 Purchase Order Terms and Conditions 01/01/2009 Special Provisions 01/01/2009 STATE OF COLORADO SOLICITATION INSTRUCTIONS/

More information

Audit Management Software Solution

Audit Management Software Solution 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of

More information

REQUEST FOR BENEFIT BROKERAGE AND CONSULTING SERVICES

REQUEST FOR BENEFIT BROKERAGE AND CONSULTING SERVICES REQUEST FOR BENEFIT BROKERAGE AND CONSULTING SERVICES July 25, 2012 I. INTRODUCTION The Corporation for Public Broadcasting (CPB) is interested in selecting an experienced firm specializing in benefit

More information

CWRU REC Answers to RFQ

CWRU REC Answers to RFQ CWRU REC Answers to RFQ 1) Should consultant resumes be included in the intent propose due on 9/24 or just include them in the actual proposal for 10/1? I have four resumes that I could present today based

More information

REQUEST FOR PROPOSAL FOR EMPLOYEE BENEFIT BROKERAGE CONSULTING SERVICES City of Poway

REQUEST FOR PROPOSAL FOR EMPLOYEE BENEFIT BROKERAGE CONSULTING SERVICES City of Poway REQUEST FOR PROPOSAL FOR EMPLOYEE BENEFIT BROKERAGE CONSULTING SERVICES City of Poway I. INVITATION The City of Poway is interested in obtaining the services of a professional, highly qualified benefits

More information

SAMPLE RETURN POLICY

SAMPLE RETURN POLICY DISCLAIMER The sample documents below are provided for general information purposes only. Your use of any of these sample documents is at your own risk, and you should not use any of these sample documents

More information

Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers

Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers ISSUE DATE: April 26 th, 2013 RESPONSE DUE DATE: May

More information

LEGAL SERVICES CORPORATION REQUEST FOR PROPOSAL FOR DEVELOPMENT OF E-LEARNING TRAINING COURSE

LEGAL SERVICES CORPORATION REQUEST FOR PROPOSAL FOR DEVELOPMENT OF E-LEARNING TRAINING COURSE LEGAL SERVICES CORPORATION REQUEST FOR PROPOSAL FOR DEVELOPMENT OF E-LEARNING TRAINING COURSE OCTOBER 14, 2015 INTRODUCTION Legal Services Corporation (LSC) invites your company to submit a proposal for

More information

ATTACHMENT A - STATEMENT OF WORK REQUEST FOR PROPOSALS FOR INDEPENDENT BENEFIT CONSULTING, ACTUARIAL AND AUDITING SERVICES DMS-13/14-018

ATTACHMENT A - STATEMENT OF WORK REQUEST FOR PROPOSALS FOR INDEPENDENT BENEFIT CONSULTING, ACTUARIAL AND AUDITING SERVICES DMS-13/14-018 4050 Esplanade Way Tallahassee, Florida 32399-0950 Tel: 850.488.2786 Fax: 850. 922.6149 Rick Scott, Governor Craig J. Nichols, Agency Secretary ATTACHMENT A - STATEMENT OF WORK REQUEST FOR PROPOSALS FOR

More information

Infrastructure Technical Support Services. Request for Proposal

Infrastructure Technical Support Services. Request for Proposal Infrastructure Technical Support Services Request for Proposal 15 May 2015 ISAAC reserves the right to reject any and all proposals, with or without cause, and accept proposals that it considers most favourable

More information

REQUEST FOR PROPOSAL (RFP) BID# 7548495 MARINA AND LAND LEASE MANAGEMENT SYSTEM. SUBMISSION DEADLINE: Tuesday, April 15, 2014 at 11:00 AM (ET)

REQUEST FOR PROPOSAL (RFP) BID# 7548495 MARINA AND LAND LEASE MANAGEMENT SYSTEM. SUBMISSION DEADLINE: Tuesday, April 15, 2014 at 11:00 AM (ET) REQUEST FOR PROPOSAL (RFP) BID# 7548495 MARINA AND LAND LEASE MANAGEMENT SYSTEM SUBMISSION DEADLINE: Tuesday, April 15, 2014 at 11:00 AM (ET) PRE-BID CONFERENCE: NO YES Mandatory: NO YES: Any vendor who

More information

CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Community Service Grants Business Process Analysis

CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Community Service Grants Business Process Analysis CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Community Service Grants Business Process Analysis Deadline for response: May 8, 2013 5 p.m. EST RFP AT A GLANCE The Corporation for Public Broadcasting

More information

SOLICITATION NO. (MDM0031020679) Vendor Question Responses Due - 05/20/2014

SOLICITATION NO. (MDM0031020679) Vendor Question Responses Due - 05/20/2014 SOLICITATION NO. (MDM0031020679) Vendor Question Responses Due - 05/20/2014 # Reference Section / Page Number Clarifying Question MHBE's Response 1 Key Dates Table, Page 7 The schedule included in the

More information

Master Services Agreement (MSA) Managed Network Services (MNS) and Network Monitoring Services (NMS)

Master Services Agreement (MSA) Managed Network Services (MNS) and Network Monitoring Services (NMS) Master Services Agreement (MSA) Managed Network Services (MNS) and Network Monitoring Services (NMS) BridgeConnex, ( BCX ) and Customer Name (as written in Statement of Work) agree that all support, consulting

More information

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN The Delmar School District (DSD) is seeking the professional services of a Construction Management (CM) firm for the

More information

CONSULTING SERVICES AGREEMENT

CONSULTING SERVICES AGREEMENT CONSULTING SERVICES AGREEMENT THIS AGREEMENT ("Agreement") is entered into on / /, between SCWOA ("Consultant"), a CA corporation with its principal place of business located at PO Box 1195, Pacifica,

More information

Request for Proposal For: PCD-DSS Level 1 Service Provider St. Andrew's Parish Parks & Playground Commission Bid Deadline: August 17, 2015 at 12 Noon

Request for Proposal For: PCD-DSS Level 1 Service Provider St. Andrew's Parish Parks & Playground Commission Bid Deadline: August 17, 2015 at 12 Noon Request for Proposal For: PCD-DSS Level 1 Service Provider St. Andrew's Parish Parks & Playground Commission Bid Deadline: August 17, 2015 at 12 Noon Request for Proposal P a g e 2 Table of Contents 1.

More information

CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Moderated Online Focus Groups and Data Analysis

CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Moderated Online Focus Groups and Data Analysis CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Moderated Online Focus Groups and Data Analysis I. OVERVIEW The Corporation for Public Broadcasting ( CPB ) is seeking proposals to conduct moderated

More information

CITY OF LANCASTER RFP NO. 621-15 LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M.

CITY OF LANCASTER RFP NO. 621-15 LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M. CITY OF LANCASTER RFP NO. 621-15 LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE July 24, 2015 BY 11:00 A.M. SUBMIT TO: Office of the City Clerk Lancaster City Hall 44933 Fern Avenue

More information

Request for Proposal Environmental Management Software

Request for Proposal Environmental Management Software Request for Proposal Date Issued: November 4, 2010 Due Date: December 1, 2010 @ 2:00:00 p.m. (local time), Contact Information: Jeff Yanew Planning & Engineering Telephone: (780) 418-6615 Fax: (780) 458-1974

More information

REQUEST FOR QUOTE (RFQ)

REQUEST FOR QUOTE (RFQ) REQUEST FOR QUOTE (RFQ) Texas Guaranteed Student Loan Corporation (referred to herein as TG ) is a private, nonprofit corporation that promotes public access to higher education and student success in

More information

Fund for Public Health in New York 291 Broadway, 17th Floor, New York, NY 10007 Phone: (212) 266-7821 Fax: (212) 693-1856 www.fphny.

Fund for Public Health in New York 291 Broadway, 17th Floor, New York, NY 10007 Phone: (212) 266-7821 Fax: (212) 693-1856 www.fphny. Fund for Public Health in New York 291 Broadway, 17th Floor, New York, NY 10007 Phone: (212) 266-7821 Fax: (212) 693-1856 www.fphny.org Medical Billing and Coding Training Program Request for Proposals

More information

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING 4887 EOI REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING Expressions of Interest will be received at the Information Counter, Main Floor, Richmond City Hall, addressed to the

More information

PARTICIPATION AGREEMENT For ELECTRONIC HEALTH RECORD TECHNICAL ASSISTANCE

PARTICIPATION AGREEMENT For ELECTRONIC HEALTH RECORD TECHNICAL ASSISTANCE PARTICIPATION AGREEMENT For ELECTRONIC HEALTH RECORD TECHNICAL ASSISTANCE THIS AGREEMENT, effective, 2011, is between ( Provider Organization ), on behalf of itself and its participating providers ( Providers

More information

IC 27-8-15 Chapter 15. Small Employer Group Health Insurance

IC 27-8-15 Chapter 15. Small Employer Group Health Insurance IC 27-8-15 Chapter 15. Small Employer Group Health Insurance IC 27-8-15-0.1 Application of certain amendments to chapter Sec. 0.1. The following amendments to this chapter apply as follows: (1) The addition

More information

Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP)

Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP) Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP) DEPARTMENT OF INFORMATION TECHNLOGY CENTRAL COLLECTIONS UNIT S (CCU) COLUMBIA ULTIMATE BUSINESS SYSTEM (CUBS) MODERNIZATION

More information

Harvey County. Electronic Health Records and Payment Management System Request for Proposal. May 18, 2015

Harvey County. Electronic Health Records and Payment Management System Request for Proposal. May 18, 2015 Harvey County Electronic Health Records and Payment Management System Request for Proposal May 18, 2015 Harvey County 800 N. Main St., PO Box 687 Newton, KS 67114 1 Harvey County is currently soliciting

More information

Rollstone Bank & Trust Business Online Bill Pay Agreement

Rollstone Bank & Trust Business Online Bill Pay Agreement Rollstone Bank & Trust Business Online Bill Pay Agreement By choosing to use the Rollstone Bank & Trust Online Bill Pay, you agree to the terms and conditions in this Agreement. Please read this Agreement

More information

Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services

Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services 1. Questions with specific reference to documentation in the RFP Question/ Clarification What else does the application environment

More information

Request for Proposal No. 15-01 Moving Services

Request for Proposal No. 15-01 Moving Services Request for Proposal No. 15-01 Moving Services March 30, 2015 Closing Location Main Switchboard Peterborough County-City Health Unit 10 Hospital Drive, Peterborough, ON K9J 8NM1 Closing date and time Responses

More information

Health Care Policy and Financing

Health Care Policy and Financing Department of Health Care Policy and Financing RFP # HCPFJC0606MMIS#2 Colorado Department of Health Care Policy and Financing Questions and Responses RFP # HCPFJC0606MMIS#2 MMIS Takeover and Fiscal Agent

More information

RFP YH08-0009 Third Party Liability Services Offerors Questions and AHCCCS Responses June 2, 2008

RFP YH08-0009 Third Party Liability Services Offerors Questions and AHCCCS Responses June 2, 2008 Offerors s and AHCCCS Responses No. RFP Page Number RFP Section Number and Title RFP Response 1 General Bidder's Library I noticed on the AHCCCS website that there is a bidder s library for. Yes, a few

More information

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply Section 1 General Information RFR Number: (Reference BPO Number) Functional Area (Enter One Only) M00B2400359 10 - IT Management Consulting Services Labor Category/s A single support staff or support groups

More information

Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP)

Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP) Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP) MARYLAND DEPARTMENT OF THE ENVIRONMENT OFFICE OF INFORMATION TECHNOLOGY WEB REVAMP PROJECT PROJECT MANAGEMENT SUPPORT SERVICES

More information

EPS EFT Enrollment Authorization Agreement

EPS EFT Enrollment Authorization Agreement EPS EFT Enrollment Authorization Agreement Optum is improving service to you by replacing paper checks and Explanation of Benefits (EOBs) with the Optum EPS solution. Get a head start by enrolling today!

More information

Request for Proposal Permitting Software

Request for Proposal Permitting Software Request for Proposal Permitting Software Date Issued: October 7, 2015 Proposals Due no later than: 2:00pm EST on November 10, 2015 Page 1 of 10 Revised 10/5/2015 TABLE OF CONTENTS Section I Introduction

More information

EXPERIENTIAL EDUCATION AGREEMENT BETWEEN THE ADMINISTRATORS OF THE TULANE EDUCATIONAL FUND, THROUGH ITS COMMUNITY FOR PUBLIC SERVICE AND

EXPERIENTIAL EDUCATION AGREEMENT BETWEEN THE ADMINISTRATORS OF THE TULANE EDUCATIONAL FUND, THROUGH ITS COMMUNITY FOR PUBLIC SERVICE AND EXPERIENTIAL EDUCATION AGREEMENT BETWEEN THE ADMINISTRATORS OF THE TULANE EDUCATIONAL FUND, THROUGH ITS COMMUNITY FOR PUBLIC SERVICE AND THIS EXPERIENTIAL EDUCATION AGREEMENT ( Agreement ) is made by and

More information

ADDENDUM NO. 1 TO RFP 9600-61: Locum Tenens Referrals

ADDENDUM NO. 1 TO RFP 9600-61: Locum Tenens Referrals ADDENDUM NO. 1 TO RFP 9600-61: Locum Tenens Referrals Date: March 18, 2015 To: All Vendors Interested in RFP # 9600-61 From: Kristen Aldrich, Deputy Purchasing Agent, NMC Contracts Division Subject: Addendum

More information

ITEM 639.30030002 DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

ITEM 639.30030002 DOCUMENT CONTROL MANAGEMENT DESCRIPTION: DESCRIPTION: Under this item the Contractor shall provide an individual(s), designated the Document Control Specialist. The Document Control Specialist shall use a software to prepare, status, electronically

More information

THE UNIVERSITY OF UTAH INDEPENDENT CONTRACTOR SERVICES AGREEMENT INSTRUCTIONS

THE UNIVERSITY OF UTAH INDEPENDENT CONTRACTOR SERVICES AGREEMENT INSTRUCTIONS THE UNIVERSITY OF UTAH INDEPENDENT CONTRACTOR SERVICES AGREEMENT INSTRUCTIONS Contracting for Independent Contractor services with the University of Utah may require completion of the following: Employee/Independent

More information

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES General Terms of Public Procurement in Service Contracts January 2015 Contents Introduction...3 Issues to be observed in applying...5 General Terms of Public Procurement in Service Contracts ()...9 1 Definitions...9

More information

City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software

City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software RFP GENERAL INFORMATION RFP Notification: Notice is hereby given that proposals will be received by the City of Bellevue,

More information

STAMFORD PUBLIC SCHOOLS PURCHASING DEPARTMENT P.O. BOX 9310 STAMFORD, CT 06904 (203) 977-5011 E-RATE CONSULTING SERVICES FOR STAMFORD PUBLIC SCHOOLS

STAMFORD PUBLIC SCHOOLS PURCHASING DEPARTMENT P.O. BOX 9310 STAMFORD, CT 06904 (203) 977-5011 E-RATE CONSULTING SERVICES FOR STAMFORD PUBLIC SCHOOLS MAIL BIDS TO: STAMFORD PUBLIC SCHOOLS PURCHASING DEPARTMENT P.O. BOX 9310 STAMFORD, CT 06904 (203) 977-5011 RFP 14-08 REQUESTING DEPT: PURCHASING TITLE OF RFP: E-RATE CONSULTING SERVICES FOR STAMFORD PUBLIC

More information

City of Mercer Island

City of Mercer Island City of Mercer Island MOBILE ASSET DATA COLLECTION: Pavement Condition Index Deflection Testing Sign Inventory Sign Retroreflectivity Contact Information: Leah Llamas, GIS Coordinator The City of Mercer

More information

6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7.

6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7. HHC Program Manager Request for Proposals (RFP) for Consulting Services Project # 6161 Questions & Answers Date: October 1, 2015 1. Q: In CR#2017007 would schedule outsourcing be considered as an appropriate

More information

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project REQUEST FOR PROPOSALS For The Kelowna and Vernon Hospitals Project VOLUME 2 of 4 Instructions to Proponents Closing Time: Delivery Address: 3:00 pm (local time) Thursday, March 6,2008 Kelowna and Vernon

More information

Medicaid Eligibility and Enrollment (EE) Implementation Advanced Planning Document (IAPD) Template. Name of State Medicaid Agency:

Medicaid Eligibility and Enrollment (EE) Implementation Advanced Planning Document (IAPD) Template. Name of State Medicaid Agency: Name of State: Name of State Medicaid Agency: Name of Contact(s) at State Medicaid Agency: E-Mail Address(es) of Contact(s) at State Medicaid Agency: Telephone Number(s) of Contact(s) at State Medicaid

More information

CITY OF CHILLICOTHE REQUEST FOR PROPOSALS

CITY OF CHILLICOTHE REQUEST FOR PROPOSALS CITY OF CHILLICOTHE REQUEST FOR PROPOSALS The City of Chillicothe is accepting sealed proposals for a Financial and Payroll software system for the Chillicothe Auditor s office. Proposal Must Be Sealed,

More information

CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019

CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019 CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019 Pursuant to Florida Statutes, Chapter 287, The City of Bonita Springs hereinafter referred to as the City, will accept sealed Responses for Qualifications and

More information

REQUEST FOR PROPOSALS (RFP) FOR RECORDKEEPING MODERNIZATION PROJECT MANAGEMENT OVERSIGHT

REQUEST FOR PROPOSALS (RFP) FOR RECORDKEEPING MODERNIZATION PROJECT MANAGEMENT OVERSIGHT REQUEST FOR PROPOSALS (RFP) FOR RECORDKEEPING MODERNIZATION PROJECT MANAGEMENT OVERSIGHT Issue Date: January 5, 2015 Proposal Deadline: Monday, February 2, 2015, 4 p.m. ET Written Question Deadline Monday,

More information

Service Agreement Hosted Dynamics GP

Service Agreement Hosted Dynamics GP Service Agreement Hosted Dynamics GP This is a Contract between you ( Company ) and WebSan Solutions Inc. ( WebSan ) of 245 Fairview Mall Drive, Suite 508, Toronto, ON M2J 4T1, Canada. This contract applies

More information

City of Powell Request for Proposals for a Total Compensation Survey

City of Powell Request for Proposals for a Total Compensation Survey City of Powell Request for Proposals for a Total Compensation Survey Section I The City of Powell is soliciting proposals from qualified consulting firms, experienced in the development of a job evaluation

More information

TOWN OF GLASTONBURY PROFESSIONAL SERVICES PROCUREMENT NOTICE REQUEST FOR PROPOSAL MERCHANT PAYMENT PROCESSING SERVICES RPGL # 2010-36

TOWN OF GLASTONBURY PROFESSIONAL SERVICES PROCUREMENT NOTICE REQUEST FOR PROPOSAL MERCHANT PAYMENT PROCESSING SERVICES RPGL # 2010-36 TOWN OF GLASTONBURY PROFESSIONAL SERVICES PROCUREMENT NOTICE REQUEST FOR PROPOSAL MERCHANT PAYMENT PROCESSING SERVICES RPGL # 2010-36 The Town of Glastonbury will be accepting proposals from qualified

More information

CHAPTER 11 APPEALS AND DISPUTES

CHAPTER 11 APPEALS AND DISPUTES CHAPTER 11 APPEALS AND DISPUTES In this Chapter look for... 11. General 11.1 Deleted 11.2 Administrative Appeals 11.3 Disputes 11.4 Alternative Dispute Resolution (ADR) 11. General. The Virginia Public

More information

TOWN OF CANTON, CONNECTICUT REQUEST FOR PROPOSALS FOR ARCHITECTURAL/ENGINEERING CONSULTANT SERVICES

TOWN OF CANTON, CONNECTICUT REQUEST FOR PROPOSALS FOR ARCHITECTURAL/ENGINEERING CONSULTANT SERVICES TOWN OF CANTON, CONNECTICUT REQUEST FOR PROPOSALS FOR ARCHITECTURAL/ENGINEERING CONSULTANT SERVICES The Town of Canton is soliciting proposals from professional architectural/engineering consultants for

More information

TABLE OF CONTENTS. Section 1: Minimum Qualifications 4. Section 2: Guidelines and General Information 5

TABLE OF CONTENTS. Section 1: Minimum Qualifications 4. Section 2: Guidelines and General Information 5 AUGUST 17, 2015 NOTICE INVITING PROPOSALS FOR THE CITY OF BEVERLY HILLS, COMMUNITY SERVICES DEPARTMENT RECREATION MANAGEMENT SOFTWARE SYSTEM The City of Beverly Hills invites prospective respondents to

More information

Responses to this RFP will be due on or before November 14, 2013, as described below in Sections III. and V.

Responses to this RFP will be due on or before November 14, 2013, as described below in Sections III. and V. SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Request for Proposals for Professional Insurance Brokerage Services RFP Date: October 25, 2013 Response Deadline: November 14, 2013 I. Introduction The Southern

More information

Covered California. Terms and Conditions of Use

Covered California. Terms and Conditions of Use Terms and Conditions of Use Contents: Purpose Of This Agreement Privacy Policy Modification Of This Agreement Permission To Act On Your Behalf How We Identify You Registration Additional Terms For Products

More information

Schedule 15 CSA Web Hosting Agreement

Schedule 15 CSA Web Hosting Agreement Schedule 15 This Hosting Agreement ( Agreement ) for the Customer Service Application is made as of, 2012 (the Effective Date ) by and between the Washington Metropolitan Area Transit Authority (the "Authority"

More information

State Health Benefit Plan Procurement Policy

State Health Benefit Plan Procurement Policy State Health Benefit Plan Procurement Policy 1. Introduction 1.1 Purpose The mission of the Department of Community Health (DCH) Office of Procurement Services (OPS) is to obtain quality goods and services

More information

LIVINGSTON COUNTY, MICHIGAN REQUEST FOR PROPOSAL Web/IVR Based Self-Service Employee Benefits System RFP # LC-07-02

LIVINGSTON COUNTY, MICHIGAN REQUEST FOR PROPOSAL Web/IVR Based Self-Service Employee Benefits System RFP # LC-07-02 LIVINGSTON COUNTY, MICHIGAN REQUEST FOR PROPOSAL Web/IVR Based Self-Service Employee Benefits System RFP # LC-07-02 1. INTRODUCTION & GENERAL INFORMATION Livingston County Purchasing is requesting sealed

More information

RBI ASSET MANAGEMENT STANDARD CONDITIONS OF BUSINESS

RBI ASSET MANAGEMENT STANDARD CONDITIONS OF BUSINESS RBI Asset Management (Pty) Ltd P O Box 7192 Halfway House 1685 Tel: 011 805 7933 Fax: (086) 675-9194 E-mail: geoff@rbi.co.za RBI ASSET MANAGEMENT STANDARD CONDITIONS OF BUSINESS 1. DEFINITIONS These Conditions,

More information

REQUEST FOR INFORMATION No. AGO.RFI.001. ediscovery Tool. Issued: August 13, 2012. Responses Requested by: Friday, September 7, 2012

REQUEST FOR INFORMATION No. AGO.RFI.001. ediscovery Tool. Issued: August 13, 2012. Responses Requested by: Friday, September 7, 2012 REQUEST FOR INFORMATION No. AGO.RFI.001 ediscovery Tool Issued: August 13, 2012 Responses Requested by: Friday, September 7, 2012 It is the intent of the Washington Attorney General s Office to issue a

More information

Merchant Account Services

Merchant Account Services COLORADO MOUNTAIN COLLEGE Request for Proposal Number #466-10 Merchant Account Services Due: July 31, 2010 at 4:00 PM Mountain Time COLORADO MOUNTAIN COLLEGE INVITATION TO BID #466-10 Merchant Account

More information

Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement

Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement Page 1 3-804 Professional Services and Construction A. Project Delivery Methods 1. A university may procure design services, construction and construction services, as applicable, under any of the following

More information

Project Management Procedures

Project Management Procedures 1201 Main Street, Suite 1600 Columbia, South Carolina 29201 Project Management Procedures Start Up The grant becomes effective upon return of one copy of the grant award executed by the Chief Executive

More information

HIPAA BUSINESS ASSOCIATE AGREEMENT

HIPAA BUSINESS ASSOCIATE AGREEMENT HIPAA BUSINESS ASSOCIATE AGREEMENT This HIPAA Business Associate Agreement ("BA AGREEMENT") supplements and is made a part of any and all agreements entered into by and between The Regents of the University

More information

City of Pittsburgh, PA - Request For Proposals and procurement Process

City of Pittsburgh, PA - Request For Proposals and procurement Process CITY OF PITTSBURGH REQUEST FOR PROPOSALS AND QUOTE For Professional Services in support of: 1) the development of City of Pittsburgh requirements for a Workforce Management System, 2) review of the City

More information

REQUEST FOR PROPOSALS. 403(b) Retirement Plan Investment Analysis and Consulting. July 2012

REQUEST FOR PROPOSALS. 403(b) Retirement Plan Investment Analysis and Consulting. July 2012 REQUEST FOR PROPOSALS 403(b) Retirement Plan Investment Analysis and Consulting July 2012 I. Investment Analysis and Consulting The Corporation for Public Broadcasting ( CPB ) is seeking proposals for

More information

STATE OF WEST VIRGINIA BOARD OF RISK AND INSURANCE MANAGEMENT REQUEST FOR PROPOSAL RFP# 05122010

STATE OF WEST VIRGINIA BOARD OF RISK AND INSURANCE MANAGEMENT REQUEST FOR PROPOSAL RFP# 05122010 STATE OF WEST VIRGINIA BOARD OF RISK AND INSURANCE MANAGEMENT REQUEST FOR PROPOSAL RFP# 05122010 Fiscal Year 2011 1 TABLE OF CONTENTS Part 1 - Informational...3 Part 2 - Operating Environment...8 Part

More information

BID SPECIFICATION PACKAGE

BID SPECIFICATION PACKAGE REQUEST FOR PROPOSALS: E-RATE TELEPHONE SYSTEM & COMPLETE INTERNAL CONNECTIONS BID SPECIFICATION PACKAGE FOR: HOUSTON GATEWAY ACADEMY, INC. REQUEST FOR PROPOSAL Telephone System for Houston Gateway Academy,

More information

Request for Proposal (RFP) K3311 Disaster Recovery as a Service (DRaaS)

Request for Proposal (RFP) K3311 Disaster Recovery as a Service (DRaaS) 1. SCHEDULE EVENT Request for Proposal (RFP) K3311 Disaster Recovery as a Service (DRaaS) DATES & TIME Issue Solicitation April 27, 2015 Question & Answer Period April 27 May 4, 2015 Complaint Period Begins

More information

Solicitation Information February 26, 2016

Solicitation Information February 26, 2016 Solicitation Information February 26, 2016 RFP#7550347 TITLE: SEARCH FOR AFFORDABLE CARE ACT TAX REPORTING SOLUTION Submission Deadline: Monday, March 21, 2016 @ 11:30 AM (Eastern Time) Questions concerning

More information

TOWN OF STRATFORD PURCHASING DEPARTMENT STRATFORD, CONNECTICUT REQUEST FOR PROPOSAL. Subject: Payroll Processing Services for Stratford Library

TOWN OF STRATFORD PURCHASING DEPARTMENT STRATFORD, CONNECTICUT REQUEST FOR PROPOSAL. Subject: Payroll Processing Services for Stratford Library TOWN OF STRATFORD PURCHASING DEPARTMENT STRATFORD, CONNECTICUT REQUEST FOR PROPOSAL RFP No. 2014-027 Issued: March 24, 2014 Subject: Payroll Processing Services for Stratford Library The Town of Stratford

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL CITY OF MUKILTEO 11930 Cyrus Way Mukilteo, Washington 98275 425-263-8030 www.ci.mukilteo.wa.us REQUEST FOR PROPOSAL IT SERVICES ACQUISTION SCHEDULE The Acquisition Schedule is as follows, with all times

More information

Request for Proposals WEB-BASED GRANT MANAGEMENT SOFTWARE FOR THE CITY OF MOUNTAIN VIEW S CDBG AND HOME PROGRAMS

Request for Proposals WEB-BASED GRANT MANAGEMENT SOFTWARE FOR THE CITY OF MOUNTAIN VIEW S CDBG AND HOME PROGRAMS COMMUNITY DEVELOPMENT DEPARTMENT NEIGHBORHOOD PRESERVATION DIVISION 500 Castro Street Post Office Box 7540 Mountain View, California 94039 7540 650 903 6379 FAX 650 962 8502 Request for Proposals WEB-BASED

More information

Technical Help Desk Terms of Service

Technical Help Desk Terms of Service Technical Help Desk Terms of Service This esecuritel Technical Help Desk Terms of Service (the Agreement ) is provided in connection with the eligible tablet enrolled in either the Advanced Protection

More information

Questions and Answers for Request for Proposal for Consumer Decision Support Tools for the MNsure Website

Questions and Answers for Request for Proposal for Consumer Decision Support Tools for the MNsure Website Questions and Answers for Request for Proposal for Consumer Decision Support Tools for the MNsure Website 1. It has been reported in the press that MNsure will not be paying outside vendors for online

More information

IT Optimization Consulting Services for Organizational Change Management (OCM)

IT Optimization Consulting Services for Organizational Change Management (OCM) IT Optimization Consulting Services for Organizational Change Management (OCM) April 5, 2013 REQUEST FOR QUOTATION MINORITY BUSINESS ENTERPRISE (MBE) PREFERRED State Term Schedule Table of Contents 1.

More information

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SECURITY CONSULTING BID INSTRUCTIONS

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SECURITY CONSULTING BID INSTRUCTIONS REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SECURITY CONSULTING BID INSTRUCTIONS NOVA SCOTIA LIQUOR CORPORATION 93 CHAIN LAKE DRIVE HALIFAX, NOVA SCOTIA B3S 1A3 NSLC REFERENCE NO: SR-39-H-15 NSLC Contact:

More information

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT is made and entered into this day of, 2007, by and between the University of Washington ( Owner ) and, ( Project

More information

REQUEST FOR PROPOSAL For Retirement Investment Advisor Services Bid Number: 032315 March 2, 2015

REQUEST FOR PROPOSAL For Retirement Investment Advisor Services Bid Number: 032315 March 2, 2015 Fresno Economic Opportunities Commission (Fresno EOC or Agency) is soliciting proposals to establish a contract with one (1) qualified and experienced Retirement Investment Advisory Firm to handle the

More information

Electronic Medical Record (EMR) Request for Proposal (RFP)

Electronic Medical Record (EMR) Request for Proposal (RFP) Electronic Medical Record (EMR) Request for Proposal (RFP) SAMPLE Proposal Due: [INSERT DESIRED DUE DATE] Table of Contents SECTION 1 RFP INFORMATION... 2 I. Introduction... 2 A. Purpose and Background...

More information

52.07 Implementation of agreements reached under M.G.L. c. 32B, 21 to 23

52.07 Implementation of agreements reached under M.G.L. c. 32B, 21 to 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 NEW REGULATIONS 801 CMR 52.00 MUNICIPAL HEALTH INSURANCE 52.01 General provisions

More information