1 Measurement and Verification Operational Guide Whole Building Applications

2 Copyright State of NSW and Office of Environment and Heritage With the exception of photographs, the State of NSW and Office of Environment and Heritage are pleased to allow this material to be reproduced in whole or in part for educational and non-commercial use, provided the meaning is unchanged and its source, publisher and authorship are acknowledged. Specific permission is required for the reproduction of photographs. The Office of Environment and Heritage (OEH) has compiled this guideline in good faith, exercising all due care and attention. No representation is made about the accuracy, completeness or suitability of the information in this publication for any particular purpose. OEH shall not be liable for any damage which may occur to any person or organisation taking action or not on the basis of this publication. Readers should seek appropriate advice when applying the information to their specific needs. Every effort has been made to ensure that the information in this document is accurate at the time of publication. However, as appropriate, readers should obtain independent advice before making any decision based on this information. Published by: Office of Environment and Heritage NSW 59 Goulburn Street, Sydney NSW 2000 PO Box A290, Sydney South NSW 1232 Phone: (02) (switchboard) Phone: (environment information and publications requests) Phone: (national parks, climate change and energy efficiency information, and publications requests) Fax: (02) TTY: (02) Website: Report pollution and environmental incidents Environment Line: (NSW only) or See also ISBN OEH 2012/0993 December 2012 Printed on environmentally sustainable paper

3 Table of contents i Contents 1 Your guide to successful M&V projects Using the M&V Operational Guide The Whole Building Applications (this guide) Understanding M&V concepts Introducing key M&V terms Best practise M&V process Getting started Proposed whole building ECM(s) Decide approach for pursuing M&V M&V design and planning M&V design Prepare M&V plan Data collection, modelling and analysis Measure baseline data Develop energy model and uncertainty Implement ECM(s) Measure post retrofit data Savings analysis and uncertainty Finish Reporting Project close and savings persistence M&V Examples Examples from the IPMVP Examples from this guide Appendix A: Example scenario A food processing plant Getting started Summary of M&V plan Baseline model development Developing the energy model for electricity Validating the regression outputs Developing the energy model for natural gas Calculating combined energy savings and uncertainty Reporting results Appendix B: Example scenario B commercial building Getting started Summary of M&V plan Baseline model development Calculating electricity savings from Model Uncertainty analysis for Model Reporting results from Model Reporting results from Model

4

5 Your guide to successful M&V projects 1 1 Your guide to successful M&V projects The Measurement and Verification (M&V) Operational Guide has been developed to help M&V practitioners, business energy savings project managers, government energy efficiency program managers and policy makers translate M&V theory into successful M&V projects. By following this guide you will be implementing the International Performance Measurement and Verification Protocol (IPMVP) across a typical M&V process. Practical tips, tools and scenario examples are provided to assist with decision making, planning, measuring, analysing and reporting outcomes. But what is M&V exactly? M&V is the process of using measurement to reliably determine actual savings for energy, demand, cost and greenhouse gases within a site by an Energy Conservation Measure (ECM). Measurements are used to verify savings, rather than applying deemed savings or theoretical engineering calculations, which are based on previous studies, manufacturerprovided information or other indirect data. Savings are determined by comparing post-retrofit performance against a business as usual forecast. Across Australia the use of M&V has been growing, driven by business and as a requirement in government funding and financing programs. M&V enables: calculation of savings for projects that have high uncertainty or highly variable characteristics verification of installed performance against manufacturer claims a verified result which can be stated with confidence and can prove return on investment demonstration of performance where a financial incentive or penalty is involved effective management of energy costs the building of robust business cases to promote successful outcomes In essence, Measurement and Verification is intended to answer the question, how can I be sure I m really saving money? Using the M&V Operational Guide The M&V Operational Guide is structured in three main parts; Process, Planning and Applications. Process Guide: The Process Guide provides guidance that is common across all M&V projects. Practitioners new to M&V should start with the Process Guide to gain an understanding of M&V theory, principles, terminology and the overall process. Planning Guide: The Planning Guide is designed to assist both new and experienced practitioners to develop a robust M&V Plan for your energy savings project, using a step-by-step process for designing a M&V project. A Microsoft Excel tool is also available to assist practitioners to capture the key components for a successful M&V Plan. Applications Guides: Seven separate application-specific guides provide new and experienced M&V practitioners with advice, considerations and examples for technologies found in typical commercial and industrial sites. The Applications Guides should be used in conjunction with the Planning Guide to understand application-specific considerations and design choices. Application Guides are available for. 1 Source: 1.1

6 2 Measurement and Verification Operational Guide Application Guides are available for: Lighting Motors, pumps and fans Commercial heating, ventilation and cooling Commercial and industrial refrigeration Boilers, steam and compressed air Whole buildings Renewables and cogeneration Figure 1: M&V Operational Guide structure 1.2 The Whole Building Applications (this guide) The Whole Building Applications Guide provides specific guidance for conducting M&V for large and/or multiple projects throughout a site. It is designed to be used in conjunction with the Process Guide, providing tips, suggestions and examples specific to conducting evaluation using a facility boundary. 1.2

7 Your guide to successful M&V projects 3 The Whole Building Applications Guide is presented as follows: Understanding M&V concepts Getting started M&V design and planning Data collection, modelling and analysis Finish References to examples of M&V projects Example whole building scenario A Example whole building scenario B Section 2 presents a high level diagram of the best practise M&V process. Section 3 provides a discussion on key things that need to be considered when getting your M&V project started. Section 4 provides guidance on how to design and plan your whole building M&V project and key considerations, potential issues and suggested approaches. Section 5 provides guidance on data collection, modelling and analysis for your whole building M&V project. Section 6 provides a discussion on reporting M&V outcomes, ongoing M&V and ensuring savings persist over time. Section 7 provides a reference list of example projects located within the IPMVP and throughout this guide. Appendix A illustrates the M&V process using a worked example of a food processing plant project Appendix B illustrates the M&V process using a worked example of a commercial building project 1.2

8 4 Measurement and Verification Operational Guide 2 Understanding M&V concepts 2.1 Introducing key M&V terms The terms listed in Table 1 below are used throughout this guide and are introduced here to assist with initial understanding. Refer to Section 4 within the Process Guide for a full definition and explanation. Table 1: Key M&V terms M&V Term Definition Examples Measurement boundary A notional boundary that defines the physical scope of a M&V project. The effects of an ECM are determined at this boundary. Whole facility, sub facility, lighting circuit, mechanical plant room, switchboard, individual plant and equipment etc. Energy use Energy used within the measurement boundary. Electricity, natural gas, LPG, transport fuels, etc Key parameters Data sources relating to energy use and independent variables that are measured or estimated which form the basis for savings calculations. Instantaneous power draw, metered energy use, efficiency, operating hours, temperature, humidity, performance output etc. M&V Options Four generic approaches for conducting M&V which are defined within the IPMVP. These are known as Options A, B, C and D. Routine adjustments Routine adjustments to energy use that are calculated based on analysis of energy use in relation to independent variables. Energy use may be routinely adjusted based on independent variables such as ambient temperature, humidity, occupancy, business hours, production levels, etc. Non routine adjustments Once-off or infrequent changes in energy use or demand that occur due to changes in static factors Energy use may be non routinely adjusted based on static factors such as changes to building size, facade, installed equipment, vacancy, etc. Unanticipated events can also temporarily or permanently affect energy use. Examples include natural events such as fire, flood, drought or other events such as equipment failure, etc. Interactive effects Changes in energy use resulting from an ECM which will occur outside our defined measurement boundary. Changes to the HVAC heat load through lighting efficiency upgrades, interactive effects on downstream systems due to changes in motor speed/pressure/flow, etc. Performance Output performance affected by the ECM. System/equipment output (e.g. compressed air), comfort conditions, production, light levels, etc. 2.1

9 Understanding M&V concepts Best practise M&V process The following figure presents the best practise M&V process which is how the rest of the Whole Building Applications Guide is structured. Refer to the Process Guide for detailed guidance on the M&V processes. Figure 2: Best practise M&V process with references to M&V Process Guide 2.2

10 6 Measurement and Verification Operational Guide 3 Getting started 3.1 Proposed whole building ECM(s) Whole building projects In previous sections we have discussed M&V for various applications with most guidance relating to Option A and B boundaries. Within this section we focus on a facility/sub-facility level boundaries using Options C or D. Whole building analysis is often preferred for the following reasons: Often utilises existing metering, energy invoices and other business data Can determine actual savings in relation to cost and usage from energy bills Enables multiple ECMs to be evaluated within a single M&V exercise which: Reduces M&V costs Avoids additionality issues Encompasses all interactive effects Useful where the baseline period would otherwise be too short as existing data covering a longer period can be used Ongoing M&V can be performed Can usually be conducted as a desktop exercise. Whole building M&V has its drawbacks, which include: Savings must be greater than 10% of usage at the project boundary (i.e. site) to be claimable Effects of individual ECMs cannot be separately evaluated Baseline period is 12 months or more, and post-retrofit period is typically 6 months or more Relies on our ability to create an energy model for the facility, which may be difficult for complex sites or those that cannot be explained in relation to independent variables Key points to note When considering an M&V, it is important to understand the nature of the site and proposed EMC(s) (what, where, when, why, how much) and the project benefits (e.g. energy, demand, greenhouse gas and cost savings). Option C Key points to note when getting started using Option C are: The proposed ECMs should be reviewed to ensure that combined savings is estimated to exceed 10% of the site s total energy use. Where multiple fuels are involved this should extend to each fuel individually. The advantage of analysing fuels individually is that different models can be created, using only those independent variables and static factors that apply. Alternatively, analysis may be conducted on total energy, which is a combination of all fuels. In addition to energy use, the identification of the right key parameters is important. Prior to modelling, all potential parameters should be identified. Data availability and quality should be assessed. Where data deficiencies exist for important variables, additional effort may be required to collect better data. This may require searching for alternate data sources, identifying a proxy, or choosing a measurement period for which suitable data is available. An Option D approach could also be considered. 3.1

11 Getting started 7 The nature of the ECMs to be implemented is only somewhat important. It is a good idea to understand the type of ECM and the areas it may affect, however with a facility level boundary it will not alter the data that is collected. Consideration should be made if the ECM involves changes to independent variables to ensure that the developed model will provide a realistic adjusted baseline once the project is implemented. Measurement periods are typically 12 months or more for baseline data and 6 months or more for post-retrofit data. Ongoing M&V may be considered, assuming that ongoing data for energy use, independent variables and static factors can be collected and that the baseline energy model is still valid. Using an ongoing approach, the effects of a staged implementation program can be progressively reported. Determine the desired level of uncertainty (precision + confidence). Determine the required and desirable M&V outcomes. Savings accuracy is dependent on the accuracy input data and the accuracy of the developed model. Option D Key points to note when getting started using Option D are: Computer simulation software is used to predict the facility energy use. This is applicable for new buildings and for retrofits where baseline data cannot be obtained. Energy use is predicted by inputting all key characteristics of the building, including: Physical properties of building materials (walls, floors, roof, windows, partitions, doors, insulation) Site specific information, including location, reflectivity of external surfaces, wind conditions, shading from external objects Infiltration rates (how well the building is sealed) Internal loads, including occupancy density, metabolic rate (activity levels and clothing) Occupancy patterns (occupation levels at various times) Equipment details (energy using equipment including size, power draw, equipment usage patterns and control strategies, heat output) Lighting details (types, numbers, locations of lights and/or lighting density, heat output, operating schedules) Air conditioning / refrigeration equipment (type and operation, electrical loads, coefficients of performance, operating schedules and control strategies) Data for independent variables and process loads (e.g. weather/temperature, wind, rainfall, process equipment and corresponding heat loads, raw material inputs, and production outputs) Determine the desired level of uncertainty (precision + confidence). Determine the required and desirable M&V outcomes. Accuracy is determined from the uncertainties associated with data collection, combined with the calibration error between the developed model and the actual energy use data. When the building is modelled, various scenarios are considered, known as Off-Axis or what if scenarios. Examples include: Part of building switches from 9am-5pm operation to 24/7. Variable air volume dampers get stuck open Tri-generation system has to be shut down. Accurate computer modelling and calibration against actual usage are key challenges. Simulation results must match for both usage and demand from monthly data. Modelling incorporates 12 months of data, usually in hourly or half-hourly increments. Ongoing M&V may be considered, assuming that ongoing data for energy use, independent variables and static factors can be collected and that the baseline energy model is still valid. 3.1

12 8 Measurement and Verification Operational Guide 3.2 Decide approach for pursuing M&V Once the nature of the M&V project is scoped and the benefits assessed, the form of the M&V can be determined. Decide which M&V approach you wish to pursue: 1. Conduct project-level M&V 2. Conduct program-level M&V using a sample based approach incorporating project level M&V supplemented with evaluation within the program population. 3. Adopt a non-m&v approach in which savings are estimated, or nothing is done. 3.2

13 M&V design and planning 9 4 M&V design and planning 4.1 M&V design M&V Option Option C is the most common form of facility based analysis, which involves the development of an energy model from historical meter/billing data combined with data for independent variables across the site. Option D is used where there is no baseline data. The site is modelled in detail, usually via specialised energy modelling software. The model is built from the bottom up, including a full asset list and equipment ratings, operating schedules, control strategies, and data for sitebased independent variables. Both options involve a long-term approach for conducting M&V Measurement boundary Either facility level boundary using Option C or Option D. Option D may also be used in conjunction with an ECM boundary. The energy system s usage must be separated from the rest of the facility using a permanent meter Key parameters For whole building M&V we need to consider the key parameters shown in the diagram and table below. Routine Adjustments Non Routine Adjustments Energy Use Equipment, Energy System, Functional Area of Whole Facility Performance M&V Option Interactive Effects 4.1

14 10 Measurement and Verification Operational Guide Table 2: key parameters to be considered when conducting M&V for whole building projects Parameter Energy use Description Energy use is typically obtained from the site s incoming revenue meter or from energy invoices. Measurement periods may be short, such as 15/30 minute interval data for electricity or natural gas, through to monthly or quarterly invoices. Where billing periods are long, meters can be read periodically (e.g. weekly, monthly) to segment billing periods into shorter time intervals. Bulk fuels (e.g. diesel, petrol, LPG, coal, etc) are often stockpiled on site, which may lead to differences between the fuel s purchase and subsequent use. It is important that data is captured for the time period (quantities and dates/times) when the fuel is used. This may require downstream metering (e.g. fuel pump readings taken when vehicles are filled, rather than relying on bulk fuel purchases which may be periodic or sporadic). Internal sub-metering can be used to describe a portion of a facility (e.g. buildings within a larger campus) or major energy systems. Routine adjustments and performance outputs via independent variables The identification of independent variables that affect a site is an important step for assessing sites using Options C or D. It is important to consider variables that may influence use across the measurement boundary, and these may include variables that are within the site s control as well as those that occur naturally. Examples of independent variables include: Weather including ambient temperature, humidity, rainfall, wind speed/direction Operating hours daily/weekly/seasonal operating schedules Occupancy staff, students, patients, shoppers, tenants, visitors, etc System loads/ activity levels heating/cooling requirements, temperature set points, work required from equipment, etc Input raw materials temperatures, purity, density, moisture content, etc Production types and amounts product quantities, volumes, weight, etc Where a site engages in multiple activities, data for each may be required in order to effectively model site energy use. With all independent variables it is important that the range of possible values is known. Non-routine adjustments via static factors Given the long-term approach taken when using Option C and D, the effects of non-routine adjustments may become significant and require once off or permanent adjustments. The identification and collection of data relating to static factors may assist with identifying or adjusting outlying data points, or with making a permanent step change in modelling forecast figures. Typical static factors include material and permanent changes to independent variables listed above, as well as: Change in product mix (e.g. plant stops making product A and start making product B) Equipment retrofits (either directly related to energy or not) Production schedule/shift changes Building changes (renovation, extension, facade changes, etc) Extreme and infrequent weather events (flood, fire, cyclone, etc) Effects of ECMs Interactive effects Since total facility energy consumption is captured within the measurement boundary, interactive effects between energy systems will be accounted for. 4.1

15 M&V design and planning Operating cycle When using Option C or D, the baseline period is 12 months or more, and post-retrofit period is typically 6 months or more Additionality Since total facility energy consumption is captured within the measurement boundary, additionality will not be an issue for the M&V project. 4.2 Prepare M&V plan The next step of the M&V process is to prepare an M&V plan which is based on the M&V design and the time, resources and budget necessary to complete the M&V project. Refer to the Planning Guide for further guidance on preparing an M&V plan. The table below outlines issues commonly found when conducting M&V on whole building projects and provides suggested approaches for addressing them in you M&V plan and when executing the M&V project. Table 3: Considerations, issues and suggested approach for whole building projects Consideration Issue Suggested Approach Modelling software and modelling/simulation skills Insufficient skill or familiarity with complex modelling tools Seek formal training on use of specific software packages. The software vendor is a useful place to start enquiries. OR Engage a suitably qualified professional to conduct the analysis Difficult sites to model Certain site types Consider variations to linear regression, including: Multivariable regression Non-linear curves Stepped regression Separate regression for each fuel type Consider alternatives to regression including bottom up energy use models using Option D. Validating regression models Understanding the process for validating regression models Refer to the Process Guide for further information. 4.2

16 12 Measurement and Verification Operational Guide 5 Data collection, modelling and analysis 5.1 Measure baseline data Measurement data sources, measurement tools and techniques The following provides general guidance on measurement and data collection: Conduct baseline measurement in line with the prepared M&V plan prior to implementing the project. Ensure appropriate records are kept including the placement of measuring equipment and take lots of photographs. Collect any associated data required for calculating baseline energy use or adjustments for independent variables. Measurement should consider period demand and, where applicable, measurement should be made during any and all relevant demand periods Conducting measurements Option C The following provides guidance on the approach and placement for conducting measurements specific to Option C: Energy use measurements will be conducted using permanent metering. Data for independent variables should also be collected using ongoing, robust and quality assured processes. Data may be collected electronically from control systems (e.g. BMS, SCADA systems), or be the result from manual counts or surveys. Meter calibration should be considered periodically. Option D Under Option D, measurements are taken only within the post-retrofit period. 5.2 Develop energy model and uncertainty This is the most critical step when using Option C or D, as we aim to develop an energy model that explains the baseline energy use as accurately as possible. Spreadsheets may be adequate for simple models however specialised regression analysis software may be required for models that involve multiple independent variables and the adjustment of weather data against target temperature balance points. Where possible it is a good idea to develop the energy model prior to implementing the ECM in case problems arise, that may require a delay or change or M&V Option from C to either A, B or D. When using Option D, data for relevant inputs described in are input into the building simulation program. The software produces a simulated energy output at either daily or hourly frequency. Separate models will need to be developed; one with the ECMs and one without. Uncertainty can be introduced into the energy model due to inaccuracies of measurement equipment and regression modelling errors. These inaccuracies need to be quantified as an overall uncertainty statement which includes a precision and confidence level. Refer to the Process Guide for further guidance on calculating and expressing uncertainty. 5.1

17 Data collection, modelling and analysis Implement ECM(s) Implement the ECM. Under Option C, this may have already occurred, which shouldn t be an issue if a successful energy model has been determined. Ensure that appropriate commissioning has been conducted to confirm that the ECMs are operating as expected. Under Option D, the new building is constructed or the ECM is implemented. 5.4 Measure post retrofit data Option C Conduct post-retrofit measurement in line with the prepared M&V plan using the same techniques as for the baseline (section 5.1). Collect any associated data required for calculating post-retrofit energy use or adjustments based on independent variables (e.g. monthly heating and/or cooling degree days). Confirm data integrity and completeness. Option D Post-retrofit data for energy use, independent variables and static factors is collected, allowing a suitable time to commission the building or bed in a new ECM. Measurements are taken only within the post-retrofit period. Energy use measurements will be conducted using permanent metering. Data for independent variables should also be collected using ongoing, robust and quality assured processes. Data may be collected electronically from control systems (e.g. BMS, SCADA systems), or be the result from manual counts or surveys. Meter calibration should be considered periodically. 5.5 Savings analysis and uncertainty Savings equations Option C The energy model previously developed is now used to forecast across the post-retrofit the business as usual consumption which would have occurred without the ECM. This is achieved by applying the various data inputs specified by the model for independent variables and static factors. Savings are then calculated by subtracting the business as usual forecast from the actual savings from the metered energy use. From an uncertainty point of view, billed energy data is considered 100% accurate. Other uncertainties will be dependent on the modelling uncertainty, plus those from data collection. The general equation for energy savings is: Energy Savings = (Baseline Energy Post-Retrofit Energy) ± Adjustments 5.3

18 14 Measurement and Verification Operational Guide Option D Calibrate the building simulation against post-retrofit energy use and conditions to calculate savings: Both developed simulation models (simulation models with and without ECMs) are recalibrated using data from the post-retrofit period for all key independent variables. The installed equipment and controls, internal heat loads and other characteristics are confirmed and adjusted. Changes are applied to both models as required, based on the concept of calibrating the model that contains the ECMs (i.e. as built model) so that it accurately reflects the metered energy use from the measurement boundary. It should confirm that it appropriately describes both the energy use and demand profile from monthly data. 12 months of post-retrofit data is used to calibrate the model. Actual weather data is also used. Once off or short term measurement of individual equipment may assist with appropriately calibrating the model for complex systems. The calibration error is determined at a monthly level using the as-built model and the actual energy data. Calibration errors are applied to the baseline model in order to incorporate uncertainty within savings. Savings are calculated in one of two ways: Actual savings = Actual energy use calibrated baseline model, OR Normalised savings = calibrated as-built model calibrated baseline model Actual savings are determined for the post-retrofit period, by applying the appropriate data to the baseline model. Normalised savings can be determined using any set of data for independent variables (e.g. 10 year average weather patterns), once the models are calibrated. The data is applied to both models Extrapolation Extrapolate the calculated savings for the measured period as required Uncertainty Estimate the savings uncertainty, based on the measurement approach, placement, impact of variables, length of measurement and equipment used. Refer to the Process Guide for further guidance on calculating and expressing uncertainty. 5.5

19 Finish 15 6 Finish 6.1 Reporting Prepare an outcomes report summarising the M&V exercise. Ensure any extrapolated savings are referred to as estimates, as the actual savings only apply to the measurement period. Energy uncertainty is expressed with the overall precision and confidence level. 6.2 Project close and savings persistence Under Option C, ongoing M&V can be conducted regularly as required by collecting independent variables and inserting them into the energy model. Typically under Option D, the first year of data forms the baseline of an ongoing Option C M&V approach. 6.1

20 16 Measurement and Verification Operational Guide 7 M&V Examples Both the IPMVP and this guide contain several worked example M&V projects. These are provided to assist readers with applying M&V concepts in real world situations, and to demonstrate the design and analytical components of successful M&V projects. 7.1 Examples from the IPMVP The table below lists the example M&V projects that can be found within the IPMVP. Table 4: Example M&V projects from the IPMVP M&V Project Name IPMVP Option Location Pump/Motor Efficiency Improvement A Volume 1: Appendix A A-2 Pump/Motor Demand Shifting B Volume 1: Appendix A A-2-1 Lighting fixture upgrade A Volume 1: Appendix A A-3 Lighting control A Volume 1: Appendix A A-3-1 Lighting new fixtures and dimming B Volume 1: Appendix A A-3-2 Compressed-Air Leakage Management B Volume 1: Appendix A A-4 Turbine/Generator Set Improvement B Volume 1: Appendix A A-5 Boiler Efficiency Improvement A Volume 1: Appendix A A-6 Multiple ECMs with metered baseline data C Volume 1: Appendix A A-7 Whole facility energy accounting relative to budget C Volume 1: Appendix A A-7-1 Multiple ECMs in a building without energy meters in the baseline period D Volume 1: Appendix A A-8 New building designed better than code D Volume 1: Appendix A A-9 Solar water heating test A Volume 3: Renewable Energy Direct measurement centralised solar hot water heater B Volume 3: Renewable Energy Indirect measurement residential solar hot water heater B & D Volume 3: Renewable Energy Building integrated photovoltaic system D Volume 3: Renewable Energy Solar Water Heating D Volume 3: Renewable Energy 7.1

21 M&V Examples Examples from this guide The table below lists the example M&V projects that can be found within this guide. Table 5: Example M&V projects from the M&V Operational Guide M&V Project Name IPMVP Option Location M&V design examples A, B, C, D Process: Appendix A Demand and cost avoidance calculation example Regression modelling and validity testing Lighting fixture replacement within an office tenancy Lighting fixture and control upgrade at a function centre Lighting fixture retrofit incorporating daylight control Pump retrofit and motor replacement Car park ventilation involving CO monitoring and variable speed drive on fans Replacement an inefficient gas boiler with a high efficiency one Upgrade freezer controls within a food processing plant Compressed air leak detection within a manufacturing site using sampling analysis Steam system leak detection within a food processing site using regression analysis Multiple ECMs involving compressed air and steam system optimisation, combined with lighting controls at a cannery Commercial building air conditioning central plant upgrade Evaluate performance efficiency of a newly installed cogeneration unit a a school Installation of a cogeneration plant at a hospital Use of solar hot water system on a housing estate n/a n/a A A B A B C B B B C C D C B Process: Appendix A Process: Appendix E Applications: Lighting Scenario A Applications: Lighting Scenario B Applications: Lighting Scenario C Applications: Motors, Pumps and Fans Scenario A Applications: Motors, Pumps and Fans Scenario B Applications: Heating, Ventilation and Cooling Scenario A Applications: Commercial and Industrial Refrigeration Scenario A Applications: Boilers, Steam and Compressed Air Scenario A Applications: Boilers, Steam and Compressed Air Scenario B Applications: Whole Buildings Scenario A Applications: Whole Buildings Scenario B Applications: Renewables and Cogeneration Scenario A Applications: Renewables and Cogeneration Scenario B Applications: Renewables and Cogeneration Scenario C 7.2

22 18 Measurement and Verification Operation Guide Appendix A: Example scenario A food processing plant The scenario below provides details of how Option C is used to measure and verify the savings from multiple ECMs across a manufacturing plant. A food processing plant in a regional town prepares and packages a range of tinned and snap frozen vegetable products grown in the local area. The plant operates year-round, however activity in a given month is seasonal based on the produce and consumer spending patterns. The plant consists of several production lines, some of which serve multiple products throughout the year. Broad beans, which are the plant s most popular product is highly seasonal and is only produced for 5 months of the year. The basic process involves food preparation (skinning, dehusking, etc), cooking, and either snap freezing and packaging, or canning. A centralised set of boilers provide hot water and steam for cooking and sterilisation, whilst a set of air compressors provide compressed air for operating much of the machinery. The site is a significant energy user and receives monthly invoices for electricity and natural gas. At present there is no sub-metering of energy use across the site. Following an energy audit, the Site Manager has gained approval to proceed with implementing several ECMs across the site. At first the low cost measures are to be implemented and once savings can be verified, capital will be available for more significant upgrades. The identified ECMs are mostly small to medium and include: 1. Adding a heat exchanger to capture waste heat from the air compressor system to pre-heat boiler feedwater. 2. Reducing compressed air and steam delivery pressures 3. Introducing occupancy based lighting controls for seldom used areas When combined together, the Site Manager estimates that the above ECMs will reduce site energy use by around 15%. Each ECM relates to a different energy system, and there is the potential to assess each individually. Monthly energy use is highly variable, which the Site Manager believes is due to changes in product output, however she cannot be sure. The Site Manager is only interested in determining combined savings, and does not have the funds available to invest in temporary metering. More importantly, the Site Manager seeks to develop an approach for conducting M&V that will apply into the future as more ECMs are implemented. For these reasons, an Option C approach is to be used to verify savings. Management are interested in savings to a confidence of 90%. Appendix A

23 Appendix A: Example scenario A food processing plant 19 Getting started Budget The potential savings (15% of site usage) from these projects are significant, however the site is has complex, interlinked manufacturing processes. Due to the difficulty of defining appropriate project measurement boundaries, combined with the fact that the Site Manager does not have funds for temporary metering, an Option C approach has been adopted which simply involves desktop analysis using existing data. It is anticipated that the analysis can be conducted and savings calculated within 12 hours. A nominal budget of $2,500 of time has been set aside. Measurement boundary The measurement boundary is the combination of electrical and natural gas supplies that supply the facility. Both fuels will be affected by the proposed ECMs. Although the Site Manager is only interested in overall savings, separate analysis will be conducted for electricity and natural gas in order to calculate cost savings. Identification of key parameters After working at the site for a number of years in various roles, the Site Manager has developed her opinion regarding the variables that may affect energy use. She hasn t conducted detailed analysis before to determine these, and so she plans on collecting data for the following variables and attempting various models to find the best combinations of data. The variables to be investigated include: Variable Metered electricity and natural gas use Data source Monthly electricity invoices Ambient air temperature (heating and cooling degree days) Daily figures for maximum and minimum air temperatures from the Bureau of Meteorology Production figures for various product lines, divided into: Canned Mixed Vegetables Broad beans Peas Other production (combined) Monthly site reports which include data compiled from shift-based production outputs The plant operates continuously, and so operating hours will not be considered. However some products are highly seasonal, which will be reflected in the monthly production volumes. Timing Baseline data is available for the last 3 years. The ECMs are due to be implemented during September 2010, and so the period just prior has been chosen. The baseline period will consist of the 12 months between September 2009 and August Interactive effects There are no interactive effects due to the choice of a facility based measurement boundary. Appendix A

24 20 Measurement and Verification Operational Guide Summary of M&V plan The key elements of the project s M&V plan in summary are: Item Project Summary Plan Implementation of the following ECMs on central service equipment: waste heat capture from the air compressor system to pre-heat boiler feedwater pressure reduction strategy for compressed air and steam systems occupancy based control of lighting in seldom used areas Required Outcome To confirm savings in excess of 15% with a 90% confidence level in order to convince management to invest in more capital intensive energy efficiency projects. Budget $2,500 (1 day of desktop analysis) M&V Option C Whole Facility Measurement Boundary Total incoming electrical and natural gas supplies being fed to the BeanCo Central West Processing Plant, located in 23 Rabie Road, Parkes, NSW. Key Measurement Parameters Other Parameters to consider Data for the following key parameters will be collected and modelled in order to determine the most relevant factors affecting energy use: Metered electricity and natural gas use Ambient temperature (in the form of heating/cooling degree days) Monthly production figures for processed goods Canned mixed vegetables Broad beans Peas Other food products None identified Potential interactive effects None identified Approach for conducting measurement and collecting data Energy use data will be collected directly from energy invoices. Ambient temperature data will be sourced for the nearest weather station from the Bureau of Meteorology. Production data will be obtained from monthly reports, which are compiled from daily shift data. Measurement equipment required Existing revenue meter and energy invoice data Measurement period 12 month base year period, 1 month project implementation, and 6+ month post-retrofit measurement. Appendix A

25 Appendix A: Example scenario A food processing plant 21 Item Approach for calculating results Plan Separate energy models for electricity and natural gas will be developed using regression analysis to explain baseline energy use in regard to relevant independent variables. As the relationship between independent variables and energy use is unknown and potentially complex, several energy models will be tested to identify the variable (or combination of variables) that best describe energy use for each fuel type. A preferred energy model will be selected for each fuel type, based on highest R 2 value, satisfying regression validity tests and having the smallest standard error. Once the ECM has been implemented, post-retrofit data for these variables will be entered into the fuel specific models in order to forecast the adjusted baseline or business-as-usual energy use. Savings are calculated by taking the difference in the adjusted baseline and actual energy use data on a monthly basis. Cost savings are calculated by applying the following energy rates: Natural gas - $7.30 / GJ Electricity - $0.18 / kwh Baseline model development The decision was made to conduct the modelling using Microsoft Excel. As it is not clear which variables will best explain monthly energy use, several scenarios will be modelled and compared. A spreadsheet was developed that contained the following elements: Monthly baseline historical data for the key energy use parameters in independent variables Daily weather maximum and minimum temperatures for the local weather station HDDs and CDDs that have been derived from ambient temperature data, as described within Section within the Process Guide. The baseline site data is summarised below: Month Energy use Production Data (tonnes) Total Electricity (kwh) Natural Gas (GJ) Canned Mixed Vegetables Broad beans Peas Other Production Production (tonnes) B1 537,825 3, B2 496,767 2, B3 696,798 3, B4 498,189 2, B5 653,955 2, B6 1,069,023 4, ,459 B7 712,298 3, B8 898,471 4, ,992 Appendix A

26 22 Measurement and Verification Operational Guide Month Energy use Production Data (tonnes) Total Production Peas (tonnes) Electricity (kwh) Natural Gas (GJ) Canned Mixed Vegetables Broad beans Other Production B9 882,253 5, ,024 B10 466,539 3, B11 451,487 4, B12 488,450 2, In addition to the data above, weather data was collected from the Bureau of Meteorology for the nearest weather station. From the average daily temperatures, values for Heating Degree Days (HDDs) and Cooling Degree Days (CDDs) were computed. Initial values for HDD and CDD balance points were chosen, and were added into the analysis spreadsheet as reference values in linked cells. The balance points were adjusted as part of tuning various energy models so that the R 2 value was maximised for each energy model. The LINEST() function is used to conduct multivariable linear regression on a dataset to produce a function describing y in terms of x 1 to n in the form: where: y = b + m 1 x 1 + m 2 x m n x n y = energy use b = baseload energy use (without influence of any variables) also known as y-intercept x 1 to n = data for independent variables 1 to n m 1 to n = coefficients determined by the function that correspond to each x variable It accepts an array of y-values (i.e. energy use) and corresponding arrays of x-values (data for independent variables) and produces various outputs as shown below: Coefficients and standard errors for the baseload energy use (b) and each independent variable (m 1 to n ) Coefficient of determination (R 2 ), and Adjusted R 2 which describe the appropriateness of fit for the regression model Standard error for y Developing the energy model for electricity Seven different regression models were calculated, each incorporating a different combination of parameters as shown in the table below. Appendix A

27 Appendix A: Example scenario A food processing plant 23 Scenario Electricity (kwh) Canned Mixed Vegetables Production(tonnes) Broad Beans Total Production (tonnes) Ambient temperature Peas Other HDDs CDDs 1 Yes Yes Yes Yes Yes - 3 Yes Yes - Yes 4 Yes Yes Yes Yes Yes 5 Yes Yes Yes Yes Yes Yes Yes - 7 Yes Yes Yes Yes - - Yes - The combinations above were selected as the analysis proceeded. As each model was developed, the t-stats for each coefficient were examined to see which variables were providing a strong correlation. Any coefficient with a t-stat value less than 2 was further examined in subsequent models. In addition, changes in R 2 provided a guide as to how each model reacted to inclusion of new variables, based on a base model involving total production. Refer to Help within Microsoft Excel for assistance with using the LINEST() function. An example of the output using the input data above for Scenario 6 is shown below: coefficients R 2 standard error for y standard errors for coefficients The output above equates to the following: Energy use = 334, t-stats calculated separately x (HDD) x (Canned Mixed Vegetables (tonnes)) + 1, x (Broad Beans (tonnes)) The R 2 value is and the standard error is 55, Each model was generated in turn using the LINEST() function. Appendix A

28 24 Measurement and Verification Operational Guide Validating the regression outputs As described in Section 6.5.1, each model must be validated to confirm that it can be used. This involves equating some additional attributes and confirming their validity. The attributes to be reviewed are: Attribute Description and Validity Test R 2 Must be 0.75 or higher. Output from LINEST() function Adjusted R 2 t-statistic for each coefficient To be evaluated when multiple independent variables are used. Values should be 0.75 or higher. Calculated as follows: (n 1) Adjusted R 2 = 1 (1 R 2 ) (n k 1) Where: R 2 = the value calculated from LINEST() n = number of data points in sample size k = number of coefficients within the regression model Determine the validity of each x coefficient. Values must be greater than 2. Calculated as follows: Each t-stat is calculated as follows: t Xn = coefficient Xn standard error Xn Absolute mean bias (MBE) Determines the overall bias in the regression estimate. MBE values should be < 0.005%. Calculated as follows: MBE = (modelled n actual n ) n Where: n = the number of samples modelled n = predicted value for sample item n actual n = actual value for sample item n Monthly Mean Error CV(RMSE) Related to the standard error of the model. CV(RMSE) values should be < Calculated as follows: CV(RMSE) = standard error for y average(actual values) Appendix A

29 Appendix A: Example scenario A food processing plant 25 In our example above: Adjusted R 2 (12 1) = 1 ( ) (12 3 1) = For our three coefficients in the example above: t canned mixed vegetables = = 4.07 t broad beans = 1, = t HDDs = = 2.05 MBE is calculated by first determining the modelled energy values by using the data for independent variables. Modelled values are then subtracted from actual values to calculate the difference for each measurement. These residuals are summed and divided by the number of data points to determine the MBE, as follows: Month Actual energy Example Scenario 6 modelled energy Residual (modelled actual) B1 537, ,614 15,789 B2 496, ,050 8,283 B3 696, ,419-46,379 B4 498, ,030 45,841 B5 653, ,301 77,346 B6 1,069,023 1,005,560-63,463 B7 712, ,574-50,724 B8 898, ,046 43,575 B9 882, ,876 9,623 B10 466, ,269-14,270 B11 451, ,067 26,580 B12 488, ,249-52,201 Sum x Average 654, And, MBE is calculated as follows: MBE = = CV(RMSE) is calculated for the example above as follows: CV(RMSE) = 53, , = Appendix A

30 26 Measurement and Verification Operational Guide Validity tests for each of the seven models were conducted. The results are shown in the table below. Conditional formatting is used to highlight test results. Each value is coloured green if it passes the validity test and red if it fails. Scenarios 5 and 6 pass all the validity tests. Scenario 6 was selected from the table above as the preferred scenario as it had the highest R 2 and Adjusted R 2 values and the lowest standard error. Summarising the electricity model The output from the LINEST() function for Scenario 6 is shown below. From the above the energy model describes monthly energy use as: Electricity use(kwh) = 334,633 + ( HDDs) + ( Canned Mixed Vegetables) + (1, Broad Beans) And the standard error is ± 53, kwh Calculating electricity savings The ECM was implemented in September Following a number of months, the savings were calculated for the ECM by forecasting the adjusted baseline by applying post-retrofit data to the baseline energy model. This is shown in the table below. Appendix A

Measurement and Verification Operational Guide

Measurement and Verification Operational Guide Measurement and Verification Operational Guide Commercial Heating, Ventilation and Cooling Applications Copyright State of NSW and Office of Environment and Heritage With the exception of photographs,

More information

PROTOCOL FOR BUILDING ENERGY ANALYSIS SOFTWARE For Class 3, 5, 6, 7, 8 and 9 buildings

PROTOCOL FOR BUILDING ENERGY ANALYSIS SOFTWARE For Class 3, 5, 6, 7, 8 and 9 buildings PROTOCOL FOR BUILDING ENERGY ANALYSIS SOFTWARE For Class 3, 5, 6, 7, 8 and 9 buildings Version 2006.1 AUSTRALIAN BUILDING CODES BOARD JANUARY 2006 TABLE OF CONTENTS Foreword 1. Scope 2. Purpose and context

More information

ENERGY EFFICIENCY AUDITING

ENERGY EFFICIENCY AUDITING GUIDANCE NOTE ON ENERGY EFFICIENCY AUDITING July 2003 ENVIRONMENTAL PROTECTION AGENCY An Ghníomhaireacht um Chaomhnú Comhshaoil PO Box 3000, Johnstown Castle, Co.Wexford, Ireland Telephone: +353-53-60600

More information

NSW Air Quality Monitoring Network: Quality Assurance Procedures

NSW Air Quality Monitoring Network: Quality Assurance Procedures NSW Air Quality Monitoring Network: Quality Assurance Procedures Copyright State of NSW and Office of Environment and Heritage With the exception of photographs, the State of NSW and Office of Environment

More information

EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency

EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency TM EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency Agenda Our Vision and Mission EnergySTEP, Our approach to Energy Efficiency Capabilities Case Study Incentives

More information

Building Energy Management: Using Data as a Tool

Building Energy Management: Using Data as a Tool Building Energy Management: Using Data as a Tool Issue Brief Melissa Donnelly Program Analyst, Institute for Building Efficiency, Johnson Controls October 2012 1 http://www.energystar. gov/index.cfm?c=comm_

More information

ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B

ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B GOALS OF THE ENERGY AUDIT Clearly identify types and costs of energy use Understand how energy is being used--and possibly wasted Identify

More information

Prudential plc. Basis of Reporting: GHG emissions data and other environmental metrics.

Prudential plc. Basis of Reporting: GHG emissions data and other environmental metrics. Prudential plc. Basis of Reporting: GHG emissions data and other environmental metrics. This Basis of Reporting document supports the preparation and reporting of GHG emissions data and other environmental

More information

APPENDIX 2. Summary Report: Heating and Cooling Energy Adjustment for HUD-52667 Spreadsheet Model

APPENDIX 2. Summary Report: Heating and Cooling Energy Adjustment for HUD-52667 Spreadsheet Model APPENDIX 2 Summary Report: Heating and Cooling Energy Adjustment for HUD-52667 Spreadsheet Model Jason Glazer GARD Analytics, Inc. Prepared for the U.S. Department of Housing & Urban Development, Office

More information

M & V Guidelines for HUD Energy Performance Contracts Guidance for ESCo-Developed Projects 1/21/2011

M & V Guidelines for HUD Energy Performance Contracts Guidance for ESCo-Developed Projects 1/21/2011 M & V Guidelines for HUD Energy Performance Contracts Guidance for ESCo-Developed Projects 1/21/2011 1) Purpose of the HUD M&V Guide This document contains the procedures and guidelines for quantifying

More information

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing

More information

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched

More information

ENERGY MANAGEMENT. for INDUSTRY AND BUSINESS

ENERGY MANAGEMENT. for INDUSTRY AND BUSINESS ENERGY MANAGEMENT for INDUSTRY AND BUSINESS [Principles of Energy Management] Denis Cooke Denis Cooke & Associates Pty Limited Phone + 61 2 9871 6641 Fax +61 2 9614 1723 Email: denis@decoa.com.au Web Site

More information

Chapter 1.3 Energy management & audit

Chapter 1.3 Energy management & audit Chapter 1.3 Energy management & audit Part I: Objective type questions and answers 1. The judicious and effective use of energy to maximise profits and enhance competitive positions. This can be the definition

More information

The Business Case Annual fuel cost savings of 26% worth more than 28,000 Annual fuel savings of 1.3million kwh Annual CO2 savings of over 245 tonnes

The Business Case Annual fuel cost savings of 26% worth more than 28,000 Annual fuel savings of 1.3million kwh Annual CO2 savings of over 245 tonnes North Lanarkshire Council The Business Case Annual fuel cost savings of 26% worth more than 28,000 The Sir Matt Busby Sports Complex is an important local facility for the people of Bellshill, North Lanarkshire.

More information

Measurement & Verification Plan

Measurement & Verification Plan Measurement & Verification Plan University of Florida UF-# Project Name City, Florida Insert Project Rendering/Photo Here Prepared By: University of Florida Department of Facilities, Planning & construction

More information

National Grid, NSTAR, Western Massachusetts Electric Company, Unitil, and Cape Light Compact

National Grid, NSTAR, Western Massachusetts Electric Company, Unitil, and Cape Light Compact National Grid, NSTAR, Western Massachusetts Electric Company, Unitil, and Cape Light Compact 2013 Commercial and Industrial Electric Programs Free-ridership and Spillover Study February 17, 2015 National

More information

ENERGY SAVINGS ACTION PLAN 2014 2018

ENERGY SAVINGS ACTION PLAN 2014 2018 Environment Unit ENERGY SAVINGS ACTION PLAN 2014 2018 LISA MILLER ENVIRONMENT MANAGER JOHN HAZELTON ENERGY & WATER SUSTAINABILITY PROJECTS ENGINEER FACILITIES MANAGEMENT DIVISION MAY 2014 APPROVED BY:

More information

Process and Energy Audits at Water and Wastewater Facilities. Thomas Devine, CAP, CEM, LEED AP April 25 2012

Process and Energy Audits at Water and Wastewater Facilities. Thomas Devine, CAP, CEM, LEED AP April 25 2012 Process and Energy Audits at Water and Wastewater Facilities Thomas Devine, CAP, CEM, LEED AP April 25 2012 Presentation Outline Types of Audits Benchmarking Submetering Data Collection/Information Gathering

More information

Environmental Management systems guidelines Risk-based licensing. www.epa.nsw.gov.au

Environmental Management systems guidelines Risk-based licensing. www.epa.nsw.gov.au Environmental Management systems guidelines Risk-based licensing www.epa.nsw.gov.au State of NSW, Environment Protection Authority. The Environment Protection Authority (EPA) and the State of NSW are pleased

More information

2013 Energy Savings Results for the Commercial Real Estate Cohorts

2013 Energy Savings Results for the Commercial Real Estate Cohorts April 28, 2014 REPORT #E14-281 2013 Energy Results for the Commercial Real Estate Cohorts Prepared by: Cadmus 720 SW Washington St. Portland, OR 97205 Northwest Energy Efficiency Alliance PHONE 503-688-5400

More information

Climate and Weather. This document explains where we obtain weather and climate data and how we incorporate it into metrics:

Climate and Weather. This document explains where we obtain weather and climate data and how we incorporate it into metrics: OVERVIEW Climate and Weather The climate of the area where your property is located and the annual fluctuations you experience in weather conditions can affect how much energy you need to operate your

More information

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)

More information

EVALUATING SOLAR ENERGY PLANTS TO SUPPORT INVESTMENT DECISIONS

EVALUATING SOLAR ENERGY PLANTS TO SUPPORT INVESTMENT DECISIONS EVALUATING SOLAR ENERGY PLANTS TO SUPPORT INVESTMENT DECISIONS Author Marie Schnitzer Director of Solar Services Published for AWS Truewind October 2009 Republished for AWS Truepower: AWS Truepower, LLC

More information

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,

More information

Recommendations for Measuring and Reporting Overall Data Center Efficiency

Recommendations for Measuring and Reporting Overall Data Center Efficiency Recommendations for Measuring and Reporting Overall Data Center Efficiency Version 2 Measuring PUE for Data Centers 17 May 2011 Table of Contents 1 Introduction... 1 1.1 Purpose Recommendations for Measuring

More information

Process and Impact Evaluation of Roseville Electric s Residential New Construction, HVAC Retrofit and Commercial Custom Rebate Programs: FY2007/08

Process and Impact Evaluation of Roseville Electric s Residential New Construction, HVAC Retrofit and Commercial Custom Rebate Programs: FY2007/08 Process and Impact Evaluation of Roseville Electric s Residential New Construction, HVAC Retrofit and Commercial Custom Rebate Programs: FY2007/08 Submitted to: Roseville Electric February 27, 2009 Final

More information

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries

More information

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division Engineering Department Public Works Division August 14 th, 2014 Table of Contents 1.0 Current State of Corporate Energy Management... 3 1.1 Energy Data Management... 3 1.2 Energy Supply Management... 3

More information

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances Heating, ventilation and air conditioning equipment A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Introduction 03 Background 03 Setting the scene 03 Benefits of purchasing ETL

More information

GAS HEATING IN COMMERCIAL PREMISES

GAS HEATING IN COMMERCIAL PREMISES ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.

More information

Small Business Services. Custom Measure Impact Evaluation

Small Business Services. Custom Measure Impact Evaluation National Grid USA Small Business Services Custom Measure Impact Evaluation March 23, 2007 Prepared for: National Grid USA Service Company, Inc. 55 Bearfoot Road Northborough, MA 01532 Prepared by: RLW

More information

Impact Evaluation of the Retrocommissioning, Operation & Maintenance, and Business Sustainability Challenge Programs

Impact Evaluation of the Retrocommissioning, Operation & Maintenance, and Business Sustainability Challenge Programs Impact Evaluation of the Retrocommissioning, Operation & Maintenance, and Business Sustainability Challenge Programs Prepared for: The Connecticut Energy Efficiency Board by Michaels Energy Evergreen Economics

More information

University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008

University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008 University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008 Contents Welcome and Introduction Chapter 1: Data centre energy recap Chapter 2: Co-generation Chapter 3: CTC case study

More information

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit? Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green

More information

Draft consolidated baseline and monitoring methodology ACM00XX

Draft consolidated baseline and monitoring methodology ACM00XX Draft consolidated baseline and monitoring methodology ACM00XX Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

Exemplary Retrofitting of an Old School in Stuttgart - EROS -

Exemplary Retrofitting of an Old School in Stuttgart - EROS - Exemplary Retrofitting of an Old School in Stuttgart - EROS - City of Stuttgart, Summary The objective of the project was to demonstrate the potentials of a retrofitting process for a typical school in

More information

gasnetworks.ie Methodology for forecasting gas demand

gasnetworks.ie Methodology for forecasting gas demand gasnetworks.ie Methodology for forecasting gas demand 1 Contents 1 Introduction 2 1.1 Scope of the report 3 1.2 Use and publication of the forecasts 4 1.3 Structure of the document 5 2 Conceptual background

More information

HEATING, VENTILATION & AIR CONDITIONING

HEATING, VENTILATION & AIR CONDITIONING HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating

More information

Data Center Industry Leaders Reach Agreement on Guiding Principles for Energy Efficiency Metrics

Data Center Industry Leaders Reach Agreement on Guiding Principles for Energy Efficiency Metrics On January 13, 2010, 7x24 Exchange Chairman Robert Cassiliano and Vice President David Schirmacher met in Washington, DC with representatives from the EPA, the DOE and 7 leading industry organizations

More information

Carbon Management Plan

Carbon Management Plan E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open

More information

Energy Audits. Good energy management begins with an energy audit

Energy Audits. Good energy management begins with an energy audit Energy Audits Good energy management begins with an energy audit Effective management of energy-consuming systems can lead to significant cost and energy savings as well as increased comfort, lower maintenance

More information

OEH Energy Efficient HVAC for Business Training Course

OEH Energy Efficient HVAC for Business Training Course OEH Energy Efficient HVAC for Business Training Course www.environment.nsw.gov.au/training Presenter: Chris Warris, BCW Carbon and Energy Agenda for Today Overview of OEH Energy Efficiency Training Program

More information

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency Randy Mead, C.E.M, CMVP Introduction Chilled water plant efficiency refers to the total electrical energy it

More information

250 St Georges Tce, Perth, WA (QV1)

250 St Georges Tce, Perth, WA (QV1) 250 St Georges Tce, Perth, WA (QV1) Building Profile Building Construction date 1991 Refurbishment date Owner Building Size Refurbishment Team Building Management Awards Ratings QV.1, 250 St Georges Terrace,

More information

Energy Efficiency Measurement & Verification

Energy Efficiency Measurement & Verification PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 02 Effective Date: 12/17/2015 Prepared by PJM Forward Market Operations PJM 2015 PJM 2008 Revision, Effective Date: i Table of Contents

More information

APPENDIX 15. Review of demand and energy forecasting methodologies Frontier Economics

APPENDIX 15. Review of demand and energy forecasting methodologies Frontier Economics APPENDIX 15 Review of demand and energy forecasting methodologies Frontier Economics Energex regulatory proposal October 2014 Assessment of Energex s energy consumption and system demand forecasting procedures

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

Pulling the Levers on Existing Buildings: A Simple Method for Calibrating Hourly Energy Models

Pulling the Levers on Existing Buildings: A Simple Method for Calibrating Hourly Energy Models 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116,part 2). For personal use only. Additional reproduction,

More information

Energy and Water Efficiency Management Practice Guide

Energy and Water Efficiency Management Practice Guide Carbonproof Energy and Water Efficiency Management Practice Guide The material provided in this guide has been produced in conjunction with our partner Energetics Pty Ltd. 2011 Energetics Pty Ltd and AgriFood

More information

Optimising Energy Use in Cities through Smart Decision Support Systems

Optimising Energy Use in Cities through Smart Decision Support Systems Optimising Energy Use in Cities through Smart Decision Support Systems Energy Management for Sustainable Action Plans, Brussels, 18 June 2015 Siegfried Zoellner, Coordinator, ICLEI European Secretariat

More information

Feasibility Study Proposal & Report Guide. Industrial Optimization Program

Feasibility Study Proposal & Report Guide. Industrial Optimization Program Feasibility Study Proposal & Report Guide Industrial Optimization Program Table of contents 1.0 Industrial Optimization Program overview 2 2.0 Feasibility Study offer eligibility 2 3.0 Purpose of the Feasibility

More information

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation Energy Conservation and Demand Management Plan Township of Wellesley: 2014-2019 The Township of Wellesley will strive to continually reduce our total energy consumption and associated greenhouse gases

More information

Solar Decathlon Load Profiling. Project Report

Solar Decathlon Load Profiling. Project Report Solar Decathlon Load Profiling Project Report Prepared by Alexander Kon Alexander Hobby Janice Pang Mahan Soltanzadeh Prepared for TTP 289: A Path to Zero Net Energy 6/10/14 Executive Summary The U.S.

More information

Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland

Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland Subtropical Cities September 2006 Design for Energy Efficiency in Commercial Buildings in Queensland Contents Typical Building Constraints & Requirements Understanding Energy Consumption in Buildings HVAC

More information

Top 10 Energy Efficiency Opportunities

Top 10 Energy Efficiency Opportunities Top 10 Energy Efficiency Opportunities 1 Federal Utility Partnership Working Group San Francisco, 5/22/2013 Siva Sethuraman Customer Energy Solutions PG&E 2 Whole Building A comprehensive, performance-based

More information

Business Energy Challenge Method Statement and Data Tool User Guide

Business Energy Challenge Method Statement and Data Tool User Guide Business Energy Challenge Method Statement and Data Tool User Guide Introduction... 1 Objectives... 2 Portfolio rules... 2 Using the spreadsheet - inserting location data for more than 2 locations... 3

More information

3-D Modeller Rendered Visualisations

3-D Modeller Rendered Visualisations Recognised energy Dynamic Simulation Modelling (DSM) software DesignBuilder is a user interface to the EnergyPlus DSM. EnergyPlus builds on the most popular features and capabilities of BLAST and DOE-2

More information

Engineering Department. Public Works Division. August 14th, 2014

Engineering Department. Public Works Division. August 14th, 2014 Corporate Energy Conservation and Demand Management Plan 201,) C000ui Ontaria,Canada "Ontario's Feel Good Town' Engineering Department Public Works Division August 14th, 2014 Corporate Energy Conservation

More information

Introduction to the London Energy Efficiency Fund (LEEF)

Introduction to the London Energy Efficiency Fund (LEEF) Executive Summary Introduction to the London Energy Efficiency Fund (LEEF) 1. The London Green Fund (LGF) is a 100m Fund comprising of 50m from the London 2007-13 European Regional Development Fund (ERDF)

More information

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 To achieve GREEN MARK Award Pre-requisite Requirement All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied

More information

WATER. Water Management Protect your building from water damage. Intent. Information & Tips

WATER. Water Management Protect your building from water damage. Intent. Information & Tips Water Management Protect your building from water damage If not managed properly, rain can drain into unwanted areas damaging your roof, windows, walls and facade. Eliminate water damage to your property

More information

Tips on Saving Energy in Your Business

Tips on Saving Energy in Your Business Fact Sheet #3 Tips on Saving Energy in Your Business In this fact sheet you will discover: Quick and easy changes to save energy. Cost effective ways to reduce your heating, cooling, lighting and office

More information

Verification of NSW Energy Efficiency Programs. Charles Xu

Verification of NSW Energy Efficiency Programs. Charles Xu Evaluation Measurement & Verification of NSW Energy Efficiency Programs Charles Xu Overview Evaluation objective / rationale for reliable information First stage savings verification outcomes Current activities

More information

Sika Sarnafil World Class Roofing and Waterproofing

Sika Sarnafil World Class Roofing and Waterproofing The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.

More information

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances Heating, ventilation and air conditioning (HVAC) equipment A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Boost Introduction your cash flow 03 1. Background Check it s on the

More information

Opportunities for Low Carbon Growth in South East Melbourne

Opportunities for Low Carbon Growth in South East Melbourne Opportunities for Low Carbon Growth in South East Melbourne 2012 South East Melbourne is an industrial and commercial hub that has the potential to reduce emissions and reap the financial benefits. South

More information

Chelsea s energy saving campaign

Chelsea s energy saving campaign What s this all about? We take our responsibility for our environmental impact seriously and are committed to reducing waste and costs. We have already made huge progress in monitoring and reporting on

More information

Module 7: Energy Monitoring, Targeting & Reporting

Module 7: Energy Monitoring, Targeting & Reporting Module 7: Energy Monitoring, Targeting & Reporting Energy information management is the next issue raised in the energy management matrix, and it is especially important as a component of any effective

More information

BOMA BESt Assessment Overview

BOMA BESt Assessment Overview BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of

More information

REDUCING UNCERTAINTY IN SOLAR ENERGY ESTIMATES

REDUCING UNCERTAINTY IN SOLAR ENERGY ESTIMATES REDUCING UNCERTAINTY IN SOLAR ENERGY ESTIMATES Mitigating Energy Risk through On-Site Monitoring Marie Schnitzer, Vice President of Consulting Services Christopher Thuman, Senior Meteorologist Peter Johnson,

More information

Building Management Systems

Building Management Systems Building Management Systems Summary A well designed and managed Building Management System (BMS) provides great opportunities for improvements in energy efficiency by: Enabling building managers to provide

More information

ENERGY EFFICIENCY EXPERTS. MCW's. Environmental Record. Green Design REDUCING OUR CLIENTS' ENVIRONMENTAL FOOTPRINT

ENERGY EFFICIENCY EXPERTS. MCW's. Environmental Record. Green Design REDUCING OUR CLIENTS' ENVIRONMENTAL FOOTPRINT ENERGY EFFICIENCY EXPERTS MCW's Environmental Record Green Design ENERGY EFFICIENCY EXPERTS Green Design The MCW Group of Companies have created the largest block of verified carbon emissions savings of

More information

Recommendations for Measuring and Reporting Overall Data Center Efficiency

Recommendations for Measuring and Reporting Overall Data Center Efficiency Recommendations for Measuring and Reporting Overall Data Center Efficiency Version 1 Measuring PUE at Dedicated Data Centers 15 July 2010 Table of Contents 1 Introduction... 1 1.1 Purpose Recommendations

More information

MICRO HYDRO FOR THE FARM AND HOME

MICRO HYDRO FOR THE FARM AND HOME MICRO HYDRO FOR THE FARM AND HOME How much can I expect to save? This depends entirely on the available flow, available head (fall) and the duration that the flow is available. Some farms struggle to maintain

More information

Heating, ventilation and air conditioning zone controls

Heating, ventilation and air conditioning zone controls Technology information leaflet ECA762 Heating, ventilation and air conditioning zone controls A guide to equipment eligible for Enhanced Capital Allowances Contents Introduction 01 Background 01 Setting

More information

school energy consumption assessment

school energy consumption assessment school energy consumption assessment understanding our school s energy use Adapted from EcoSpark s Wattwize: Teacher Guide, Handout #1, available at ecospark.ca. The energy consumption assessment offers

More information

FINANCIAL SUPPORT PROGRAMS

FINANCIAL SUPPORT PROGRAMS 9 FINANCIAL SUPPORT PROGRAMS 108 9 FINANCIAL SUPPORT PROGRAMS 9 FINANCIAL SUPPORT PROGRAMS There are a number of Government support mechanisms to help reduce the barriers to undertaking action on energy

More information

ENERGY STAR Data Verification Checklist

ENERGY STAR Data Verification Checklist ENERGY STAR Data Verification Checklist 86 ENERGY STAR Score 1 Sample Property Primary Function: Office Gross Floor Area (ft²): 200,000 Built: 1980 For Year Ending: 04/30/2013 Date Generated: 06/28/2013

More information

SEVEN REASONS FOR ENERGY ACCOUNTING

SEVEN REASONS FOR ENERGY ACCOUNTING SEVEN REASONS FOR ENERGY ACCOUNTING Before you can manage energy costs, you have to know what they are! Energy accounting provides feedback on how much energy your organization uses, and how much it costs.

More information

Further electricity cost increases with the introduction of the Carbon Pollution Reduction Scheme

Further electricity cost increases with the introduction of the Carbon Pollution Reduction Scheme Responding to electricity cost increases Dr Darren Oemcke, CEO Provisor Karl Forsyth, Principal Provisor Electricity costs have been on the rise with increases this year of between 16% and 36% for Provisor

More information

Green Guide for Businesses Strategy: Energy

Green Guide for Businesses Strategy: Energy Green Guide for Businesses Strategy: Energy Reduce Energy Use in New and Existing Businesses - In the United States buildings account for: o 72% of electricity consumption, o 39% of energy use, o 38% of

More information

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011 Introduction As more companies and government organizations prepare greenhouse gas (GHG) inventories that reflect the emissions directly and indirectly associated with their operations, they increasingly

More information

A Cover HVAC ENERGY EFFICIENT

A Cover HVAC ENERGY EFFICIENT A Cover HVAC ENERGY EFFICIENT EQUIPMENT toolkit 1 CONTENTS AND PARTNERS 2 Introduction 3 equipment & processes 3 Optimise operating settings 2 upgrade equipment 4 Seal the building 5 Rearrange air conditioning

More information

REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM

REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM With the support of: info@3e.eu www.3e.eu PRESENTATION CONTENT Outline Objective Background Energy efficiency: examples in 3 sectors Residential: electric

More information

Catalyst RTU Controller Study Report

Catalyst RTU Controller Study Report Catalyst RTU Controller Study Report Sacramento Municipal Utility District December 15, 2014 Prepared by: Daniel J. Chapmand, ADM and Bruce Baccei, SMUD Project # ET13SMUD1037 The information in this report

More information

Environmental sustainability BBC Environment Targets: Performance 2014/15

Environmental sustainability BBC Environment Targets: Performance 2014/15 Environmental sustainability BBC Environment s: Performance 2014/15 BBC Environmental targets The data over the following pages reflects the BBC s continued commitment to reducing environmental impacts

More information

Vitocaldens 222-F Compact Gas-Hybrid appliance

Vitocaldens 222-F Compact Gas-Hybrid appliance Vitocaldens 222-F Compact Gas-Hybrid appliance Heating systems Industrial systems Refrigeration systems 2/3 Vitocaldens 222-F: The future-proof energy-source mix in one appliance Choosing Vitocaldens

More information

Condensing Boiler Efficiency

Condensing Boiler Efficiency Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2

More information

Daikin Altherma Hybrid Heat Pump

Daikin Altherma Hybrid Heat Pump your comfort. our world. Daikin Altherma Hybrid Heat Pump Smart heating technology for the best of both worlds Heating Integrated Solutions Ventilation Air Conditioning Refrigeration Forward thinking About

More information

Natural gas heating versus split system heating and the current and future viability of the Natural gas network

Natural gas heating versus split system heating and the current and future viability of the Natural gas network Natural gas heating versus split system heating and the current and future viability of the Natural gas network Discussion Paper: Energy Consumer Reference Council meeting 7. August 2015 While ActewAGL

More information

Analysis of data centre cooling energy efficiency

Analysis of data centre cooling energy efficiency Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe

More information

Energy Saving Fact Sheet Energy Management

Energy Saving Fact Sheet Energy Management Energy Saving Fact Sheet Energy Management Energy it s much more manageable than you think Energy is not an unmanageable overhead it is one of the largest controllable costs in most organisations. Cutting

More information

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial facilities commonly occupy spaces with ceilings ranging between twenty and thirty feet in height.

More information

Connecticut Energy Efficiency Fund Home Performance Program Application (Tier II)

Connecticut Energy Efficiency Fund Home Performance Program Application (Tier II) 9111 05-10 Connecticut Energy Efficiency Fund Home Performance Program Application (Tier II) This application is for energy efficiency retrofit proposals for existing residential unit(s). The application

More information

Connecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2014

Connecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2014 Connecticut Housing Finance Authority Construction Guidelines: Energy Conservation 2014 These Guidelines are effective on January 1, 2014 I. Energy Conservation Guidelines Building materials, components,

More information

Daikin Altherma Hybrid Heat Pump

Daikin Altherma Hybrid Heat Pump Daikin Altherma Hybrid Heat Pump Smart technology for the best of both worlds NATIONAL HEAT PUMP 19 JUNE 2014 ICC BIRMINGHAM WINNER Forward thinking Now is the time to rethink the way we heat our homes

More information

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Table of Contents Our Commitment to Energy Conservation...1 1.0 Introduction...2 2.0 Energy Supply in Ontario...3 2.1 Energy Supply

More information

Buildings Performance Database

Buildings Performance Database DOE Building Technologies Program Buildings Performance Database 10/9/12 Cody Taylor Cody.Taylor@ee.doe.gov Elena Alschuler Elena.Alschuler@ee.doe.gov 1 API Standard Data Taxonomy API Data Platforms and