1 Preaward and Post Award Accounting System Audits November 17, 2011 Pikes Peak NCMA Roland Wick

2 OVERVIEW This presentation will provide: 1. The basic criteria for the Preaward and Post Award accounting system audits performed by DCAA, and 2. Overview on how to support these DCAA Audits to achieve an adequate system.

3 What is a Preaward Audit? A preaward survey of a contractor s accounting system is an examination of the accounting system at either a major or a non-major contractor before contract award. To determine if the accounting system is acceptable for accumulating costs under a prospective government contract Limited to obtaining an understanding of the design of the system to complete the SF 1408

4 Federal Acquisition Regulation (FAR) Preaward Review-Why Performed? Is requested by contracting officers to meet requirements of FAR Part Policy. (a) Purchases shall be made from, and contracts shall be awarded to, responsible prospective contractors Obtaining information. (a) Before making a determination of responsibility, the contracting officer shall possess or obtain information sufficient to be satisfied that a prospective contractor currently meets the applicable standards in (b)(1) Generally, the contracting officer shall obtain information regarding the responsibility of prospective contractors, including requesting preaward surveys when necessary (see 9.106), promptly after a bid opening or receipt of offers. However, in negotiated contracting, especially when research and development is involved, the contracting officer may obtain this information before issuing the request for proposals.

5 What is a Post Award Accounting System Audit? An examination of a non-major accounting system after contract award. The objective is to determine if the system is adequate for accumulating and billing costs on Government contracts.

6 Post Award Generally, is for a follow-up on the preaward or no preaward completed. Normally this is a DCAA initiated audit (not requested) More comprehensive steps to test billings, trace costs to source documents, assess internal control activities. (See MAAR 1 and MAAR 3). However, this is not an internal control audit. (CAM 5-203)

7 What is the Audit Criteria? The basic criteria for both audits rests in the Standard Form (SF)1408 in FAR Part 53. There is added criteria in the Post Award Audit but all requirements generally link to the 1408 criteria. Main emphasis for added effort in Post Award is billing reviews related to limitation of payments.

8

9 Added Criteria for Post Award Verify that the contractor is up to date on its submission of incurred cost proposals in accordance with contract terms. (FAR (d)(2)). Verify indirect costs are billed at approved rates (or rates specified in the contract) by evaluating a sample of current invoices (public vouchers and progress payment requests) and evaluating a current contractor billing. Verify that the contractor adjusts billing rates to reflect actual year end allowable rates. Verify/test that interim billings are either prepared directly from the cost accounting records or from other records which are reconciled to the cost accounting records by cost element for all cost-reimbursable work.

10 Added Criteria Post Award Determine that billings are based on current contract provisions. The total amount billed should not exceed any contract, work order, funding limitation, or any other contract ceiling amount. Identify controls which provide for review of contract billing provisions. For time and material and labor hour contracts, total labor costs billed will not reconcile to the contractor s cost accounting records. Consequently, verify that (a) direct labor hours billed reconcile to the cost accounting records and (b) direct labor has been billed at appropriate contract rates.) Verify that billings can be reconciled to the cost accounts for both current and cumulative amounts claimed.

11 Added Criteria Verify that the contractor has procedures to ensure that subcontractor and vendor costs are only included in billings if payment to the subcontractor or vendor will be made in accordance with the terms and condition of the subcontract or invoice and ordinarily within 30 days of the contractor s payment request to the Government. Verify that the contractor has procedures in place to ensure that interim vouchers include fixed fee and cost withholds in accordance with FAR and , when appropriate. Test the contractor s reconciliation of booked to billed costs. If the contractor is authorized to direct bill, perform additional steps, if applicable, to test the contractor s continued eligibility for direct billing as part of this audit.

12 Is this Similar to new DFARS Business System Accounting System Requirements ? YES! c) System criteria. The Contractor s accounting system shall provide for (1) A sound internal control environment, accounting framework, and organizational structure; (2) Proper segregation of direct costs from indirect costs; (3) Identification and accumulation of direct costs by contract; (4) A logical and consistent method for the accumulation and allocation of indirect costs to intermediate and final cost objectives; (5) Accumulation of costs under general ledger control; (6) Reconciliation of subsidiary cost ledgers and cost objectives to general ledger; (7) Approval and documentation of adjusting entries; (8) Periodic monitoring of the system; (9) A timekeeping system that identifies employees labor by intermediate or final cost objectives; (10) A labor distribution system that charges direct and indirect labor to the appropriate cost objectives;

13 New DFARS Requirements (11) Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account; (12) Exclusion from costs charged to Government contracts of amounts which are not allowable in terms of Federal Acquisition Regulation (FAR) part 31, Contract Cost Principles and Procedures, and other contract provisions; (13) Identification of costs by contract line item and by units (as if each unit or line item were a separate contract), if required by the contract; (14) Segregation of preproduction costs from production costs, as applicable;

14 New DFARS Requirements (15) Cost accounting information, as required (i) By contract clauses concerning limitation of cost (FAR ), limitation of funds (FAR ), or allowable cost and payment (FAR ); and (ii) To readily calculate indirect cost rates from the books of accounts; (16) Billings that can be reconciled to the cost accounts for both current and cumulative amounts claimed and comply with contract terms; (17) Adequate, reliable data for use in pricing follow-on acquisitions; and (18) Accounting practices in accordance with standards promulgated by the Cost Accounting Standards Board, if applicable, otherwise, Generally Accepted Accounting Principles.

15 DCAA Audit of Non-Major Contractors Could/Will Change as DCAA Develops new Non Major Audit Programs DCAA is currently working on this plan.

16 How To Support The Audit? Take each line item on the 1408 and audit program and separately document that process. Put the documentation in a folder by each criteria. Pre Award Must demonstrate design is acceptable. Post Award ---Must show system is working as designed. Fill out the ICQ (Internal Control Questionnaire)

17 What to Provide for Support? Generally Accepted Accounting Principles. Pre Award and Post Award ICQ, flowcharts, audited or reviewed financial statements (if available), written accounting policies, organization charts, chart of accounts. Show the overall system process and flow of the recording processes.

18 Proper segregation of costs. Both Pre and Post Award. Provide chart of accounts and written accounting policies. How does the contractor define direct and indirect costs? Provide written policies which state contractor procedures.

19 Direct costs by contract Both Pre and Post. Provide policies on how contract numbers are established, provide job cost numbers in the system, show the cost element breakout at the job cost level, show current and cumulative costs, provide job cost reports. DCAA will select billing/invoice, if possible, in the pre award, to trace direct costs downward into records to job cost record and then for (i) labor to the time cards and labor distribution verification and (ii) materials and ODC to invoices/checks receipts/source documents. This will occur in detail for Post Award review.

20 Allocation of indirect costs. Both pre and post. Provide cost accounts that record indirect costs by pool. Provide written policies on pools and bases, to include description of pool/base elements, and the methodology for calculating indirect rates. Provide current rates and pools and bases that tie directly to the accounting records. Provide interim indirect rates and final year-end actual indirect rates.

21 Accumulation of costs under general ledger control Both pre and post. Pick specific job cost report, trace it to the higher level of total job cost report summary, trace that top level job cost summary to the income statement COGS. Assure the income statement for that period ties to the balance sheet (retained earnings).

22 Timekeeping system. Time cards and labor distribution. Both audits. Provide the total labor distribution report for all jobs. Select the same job cost report from above and trace labor to that section of the distribution report. From the specific labor distribution report for that job cost report trace selected labor to time cards. Assure time cards support hours in the labor distribution. Provide selected payroll records to assure effective labor rates are applied for all hours worked. Assure that costs computed in labor distribution are correct (all hours worked and rates applied correctly).

23 Interim determination of costs. Both audits. Provide bank to cash reconciliation for the balance sheet selected for the job cost to income statement to balance sheet trace. This should show the accounting system is currently posted. (Also verified in trace of current vouchers to source records).

24 Exclusion of Unallowables. Both audits. Provide written policies on FAR 31 exclusion. Provide the accounts in the chart of accounts that accumulate unallowable costs. Demonstrate indirect pools have no unallowable accounts and that bases include appropriate unallowables as required under FAR 31.

25 Costs by Contract Line Item Demonstrate the numbering system to allow lower level codes to contract charges. Demonstrate all cost elements, down to the lowest level, are incurred and recorded by line item, for each specific contract in the detailed job cost ledgers.

26 Limitation of Costs/Billings: Preaward- Demonstrate you have policies, contract briefing forms, and show indirect rates are readily calculated from records. Explain and document who monitors these rates, who will monitor limitation of billings, who will review costs vs billings? Does the contractor have controls or procedures that would provide that interim billings of direct cost are prepared directly from the books and records, excluding unallowable costs? Does the contractor have procedures to ensure that subcontractor and vendor costs are only included in billings if payment to the subcontractor or vendor will be made in accordance with the terms and conditions of the subcontract or invoice and ordinarily within 30 days of the contractor s payment request to the Government? Can billings be reconciled to the cost accounts for both current and cumulative amounts claimed?

27 Limitation of Costs/Billings: Post Award- Same but expanded steps to show these limitation activities are occurring. Briefing of contracts, current reviews of rates, current review of costs vs. billings. indirect costs are billed at approved rates Costs on selected vouchers (CPFF/CPAF/CPIF) must trace directly from voucher to the costs in the job cost records. Vouchers will be selected to trace directly to job cost, then down to labor distribution, then to time cards, with verification of labor rate applied. Materials and ODC will be tested downward to assure source records support costs billed. Is math correct? T&M. T&M rates must trace to contract, hours must trace to job cost, ODC elements must trace. Fee and profit must meet contract and FAR limits. Cost and Fee limitations correct?

28 Adequate, Reliable Data: If the costs are properly recorded and accumulated this will be accepted. If the costs do not reconcile or are not in detail to allow cost element bid support per FAR part 15 then this criteria will fail.

29 Common Failures Software is not open or started. Indirect rate structure is not developed. Vouchers do not trace directly to job cost report. No time cards for officers and owners. All time is not reported. (Total Time) Cash to bank does not reconcile. Total of job cost reports does not reconcile to income statement. Funding and cost limitations are not correct. No billing to cost reconciliation is performed. No contract briefing cards.

30 Summary/Questions The Pre award and Post award audits are based on the same FAR 1408 criteria. Organization of data by specific criteria in the audit programs is the best way to approach the audit. Limitation of cost analysis is significantly expanded in Post award steps. Discuss all issues with DCAA. Make sure you fully understand what DCAA is reporting and saying. Errors and misunderstandings happen, so you need to assure all issues are fully explained and understood.

Post Award Accounting System Audit at Nonmajor Contractors

Post Award Accounting System Audit at Nonmajor Contractors Activity Code 17740 B-1 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors To provide general guidance for the audit of the adequacy and suitability of nonmajor contractor

More information

Accounting System Requirements

Accounting System Requirements Accounting System Requirements Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily

More information

Preaward Survey of Prospective Contractor Accounting System

Preaward Survey of Prospective Contractor Accounting System Activity Code 17740 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Purpose and Scope The major objectives of this audit are to obtain an understanding of the accounting

More information

WELCOME. Accounting Systems for DOD Contracts

WELCOME. Accounting Systems for DOD Contracts WELCOME Accounting Systems for DOD Contracts Moderator: Layli Pietri, Small Business Manager, Balfour Beatty Construction Speaker: Kay Papin, Government Compliance Manager, McCarthy Group Inc. Accounting

More information

Post Award Accounting System Audit at Nonmajor Contractors

Post Award Accounting System Audit at Nonmajor Contractors Activity Code 17741 Version 3.1, dated November 2015 B-01 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors Audit Specific Independence Determination Members of the audit

More information

Pre-Award Accounting Systems

Pre-Award Accounting Systems Pre-Award Accounting Systems 2013 National SBIR Conference Christopher Andrezze, CPA Special Assistant to the Deputy Director May 16, 2013 The views expressed in this presentation are DCAA's views and

More information

What Exactly is an Acceptable Accounting System?

What Exactly is an Acceptable Accounting System? What Exactly is an Acceptable Accounting System? Kristen Soles, CPA Member Stephanie Widzinski, CPA Senior Manager September 27, 2012 Agenda Review DFARS Business System Rule What Agency is Responsible

More information

DEFENSE CONTRACT AUDIT AGENCY

DEFENSE CONTRACT AUDIT AGENCY DEFENSE CONTRACT AUDIT AGENCY Fundamental Building Blocks for an Acceptable Accounting System Presented by Sue Reynaga DCAA Branch Manager San Diego Branch Office August 24, 2011 Report Documentation Page

More information

Slide 1. Slide 2. Slide 3 Standard Form 1408 ACCOUNTING SYSTEM ESSENTIALS

Slide 1. Slide 2. Slide 3 Standard Form 1408 ACCOUNTING SYSTEM ESSENTIALS Slide 1 Slide 2 ACCOUNTING SYSTEM ESSENTIALS P r e p a r e d f o r Alliance Northwest 2014 By T e r r y S. N u z z o, C P A, C G M A P a c i f i c N o r t h w e s t C o n s u l t a n t s, L L C Slide 3

More information

Accounting System Requirements

Accounting System Requirements Basic Financial Requirements for Government Contracting The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Accounting System Requirements

More information

How To Audit A Government Contractor

How To Audit A Government Contractor Activity Code 17740 Version 6.11, dated November 2015 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Audit Specific Independence Determination Members of the audit

More information

Master Document Audit Program. Version 1.5, dated September 2015 B-01 Planning Considerations

Master Document Audit Program. Version 1.5, dated September 2015 B-01 Planning Considerations Activity Code 11070 Version 1.5, dated September 2015 B-01 Planning Considerations Accounting System Audit Audit Specific Independence Determination Members of the audit team and internal specialists consulting

More information

Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012

Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 2012 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200

More information

WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT

WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT Presented by: Laura Davis OVERVIEW Why Do I Need a Compliant Accounting System Auditor s Judgment Definitions Key Components Audits How to be prepared for an audit

More information

GOVERNMENT ACCOUNTING REQUIREMENTS

GOVERNMENT ACCOUNTING REQUIREMENTS GOVERNMENT ACCOUNTING REQUIREMENTS Basic Accounting Systems Time Reporting DCAA Encounters CRITICAL ELEMENTS OF AN ACCOUNTING SYSTEM Designed in Accordance with GAAP Proper Segregation of Direct and Indirect

More information

Preaward Survey of Prospective Contractor Accounting System Checklist

Preaward Survey of Prospective Contractor Accounting System Checklist PRE-AWARD SURVEY (SF 1408) OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM Date: XX/XX/201X Company Name, Contract Number, and Full Address: Commercial and Government Agency (CAGE) Code Number: (found at http://www.dlis.dla.mil/cage_welcome.asp)

More information

Accounting Systems: Complying with FAR Requirements. John S. Sroka, CPA Acquisition Cost/Price Analyst

Accounting Systems: Complying with FAR Requirements. John S. Sroka, CPA Acquisition Cost/Price Analyst Accounting Systems: Complying with FAR Requirements John S. Sroka, CPA Acquisition Cost/Price Analyst Background Information FAR Requirements FAR Part 9: Contractor Qualifications FAR Part 16: Cost-reimbursement

More information

Basic Financial Requirements for Government Contracting

Basic Financial Requirements for Government Contracting Basic Financial Requirements for Government Contracting 2014 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations

More information

FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013)

FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013) FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013) "It's never too early to prepare for your incurred cost submission (A webinar sponsored by Pleasant Valley Business Solutions) 1 Objective Know

More information

Certificate of Accounting, Billing and Property System Adequacy

Certificate of Accounting, Billing and Property System Adequacy Certificate of Accounting, Billing and Property System Adequacy This certifies that, to the best of my knowledge and belief, Contractor s Accounting, Billing and/or Property System and related internal

More information

CHAPTER 2. 2-000 Preaward Surveys of Prospective Contractor Accounting Systems

CHAPTER 2. 2-000 Preaward Surveys of Prospective Contractor Accounting Systems CHAPTER 2 2-000 Preaward Surveys of Prospective Contractor Accounting Systems 2-101 Preaward Survey Overview A preaward survey is an evaluation, usually made by the cognizant contract administration office,

More information

Thank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com.

Thank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com. Thank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com. Before we begin just a few notes: During the presentation lines

More information

DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency

DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency DCAA Guidelines How the SBIR firm can work effectively with the Defense Contract Audit Agency Today s Presenters OUTLINE Presenter Introduction DCAA & DCMA DCAA Overview Types of DCAA Audits What it takes

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006

INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006 INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006 1. MANAGEMENT REVIEWS The contractor should have policies and procedures for periodic monitoring of the billing

More information

Federal Regulatory Compliance Best Practices Washington Technology Webcast. September 27, 2012

Federal Regulatory Compliance Best Practices Washington Technology Webcast. September 27, 2012 Federal Regulatory Compliance Best Practices Washington Technology Webcast September 27, 2012 Agenda Topic Minutes Regulatory compliance overview 5 Major areas of financial compliance risk 15 Best practices

More information

Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP)

Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) NH Presentation October 20, 2010 Presented by: Fred Kline, MBA, CPA Tom Martin MBA, CPA Malcolm Young,

More information

THE DCAA AUDIT BECOMING DCAA COMPLIANT

THE DCAA AUDIT BECOMING DCAA COMPLIANT THE DCAA AUDIT Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible for supervising all Department of Defense (DoD) contracts.

More information

How to Survive a DCAA Audit

How to Survive a DCAA Audit How to Survive a DCAA Audit www.paulgunn.com 1 How to Survive a DCAA Audit - Overview Areas of interest and expectations of a typical audit: 1. Introduction o 2. The DCAA and Types of audits 3. Preparing

More information

DCAA and the Small Business Innovative Research (SBIR) Program

DCAA and the Small Business Innovative Research (SBIR) Program Defense Contract Audit Agency (DCAA) DCAA and the Small Business Innovative Research (SBIR) Program Judice Smith and Chang Ford DCAA/Financial Liaison Advisors NAVAIR 2010 Small Business Aviation Technology

More information

Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference

Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference November 29-30, 2006 t Defense Contract Audit Agency Established in 1965 Separate Agency of the Department of Defense

More information

Chapter 6 Labor-Charging Systems and Other Considerations

Chapter 6 Labor-Charging Systems and Other Considerations 6 Chapter 6 Labor-Charging Systems and Other Considerations The purpose of this chapter is to provide interpretive guidance only. This chapter is not intended to be authoritative or to supersede the FAR.

More information

DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL

DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include verification for completeness

More information

Financial Management Guide for Government Contractors

Financial Management Guide for Government Contractors Financial Management Guide for Government Contractors Overview You are a Government Contractor or wish to be a Government Contractor. Congratulations. It is important you know that the challenges facing

More information

Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions

Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions Nicole Mitchell, CPA Donna Dominguez Aronson LLC May 1, 2013 2013 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland

More information

How to Survive a DCAA Pre-Award Audit

How to Survive a DCAA Pre-Award Audit How to Survive a DCAA Pre-Award Audit February 27, 13 Presented by: Paul H. Calabrese Senior Manager 301-214-4137 pcalab@rubino.com Bio http://www.rubino.com/company/staff/11- paul_h_calabrese/view LinkedIn

More information

DCAA Current Trends and Practices. SCS GovCon Seminar October 24, 2013

DCAA Current Trends and Practices. SCS GovCon Seminar October 24, 2013 DCAA Current Trends and Practices SCS GovCon Seminar October 24, 2013 What s Hot 2 Incurred Cost Submissions Requirements Common Deficiencies Closer Cost Scrutiny Travel Costs Restructuring Costs Consultant

More information

ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS

ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS Mendocino County Page 1 of 5 INTRODUCTION The purpose of this brochure is to outline for you, a potential contractor with the California State

More information

Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012

Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 1 Panelists Robert A. ( Rob ) Burton, Partner, Venable LLP A 30-year veteran

More information

GOVERNMENT CONTRACTING MICROSOFT DYNAMICS AX AND

GOVERNMENT CONTRACTING MICROSOFT DYNAMICS AX AND GOVERNMENT CONTRACTING AND MICROSOFT DYNAMICS AX White paper on Government Contracting requirements and considerations in planning for a Dynamics AX implementation. 1 Government Contracting and Microsoft

More information

Presenting the Numbers: Accounting Systems for Government Contractors

Presenting the Numbers: Accounting Systems for Government Contractors Presenting the Numbers: Accounting Systems for Government Contractors William D. Craven, CPA Senior Cost/Price Analyst CH2M HILL Plateau Remediation Company William D. Craven, CPA, CMA, CIA Cost/Price

More information

Presented by Albert D. Goldwasser, CPA Government Contractor Consultant

Presented by Albert D. Goldwasser, CPA Government Contractor Consultant Presented by Albert D. Goldwasser, CPA Government Contractor Consultant Agenda DCAA s Objectives Accounting 101 Indirect Cost Allocations SF 1408 Passing the DCAA Audit References What does the DCAA want?

More information

DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System

DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System Breakout Session A Alfred J. Massey, Western Region, Special Programs Manager,

More information

Implementing a FAR Part 31 Compliant Cost Accounting System

Implementing a FAR Part 31 Compliant Cost Accounting System Implementing a FAR Part 31 Compliant Cost Accounting System Breakout Session #: F11 Presented by: Robert E. Jones, CFCM, CCCM Date: July 23, 2013 Time: 4:00 PM 5:15 PM Agenda 1. Choosing a System 2. Designing

More information

Government Contractor Business Systems and Overview of System Assessments

Government Contractor Business Systems and Overview of System Assessments Government Contractor Business Systems and Overview of System Assessments Agenda Overview of business systems rules and environment today 3 rd party assessments Practical solutions Contractor perspective

More information

Surviving a DCAA. Audit. Nicole Mitchell, CPA Director Aronson LLC. March 29, 2011

Surviving a DCAA. Audit. Nicole Mitchell, CPA Director Aronson LLC. March 29, 2011 Surviving a DCAA Incurred Cost Submission Audit Nicole Mitchell, CPA Director Aronson LLC March 29, 2011 2011 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200

More information

DOECAA Spring Conference Presentation. Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule

DOECAA Spring Conference Presentation. Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule DOECAA Spring Conference Presentation Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule Mary Karen Wills, CPA Director/Leader, BRG Government Contracts 2014 Berkeley Research Group

More information

Accounting Principles Critical to Success Presented By: C. P. Krishnan. www.cakintl.com

Accounting Principles Critical to Success Presented By: C. P. Krishnan. www.cakintl.com Accounting Principles Critical to Success Presented By: C. P. Krishnan Basic Accounting You Need to Know Assets, Liabilities, Equity, Income, & Expenses Assets Includes what you have and what people owe

More information

WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA

WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA The DCAA Audit Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible

More information

Objectives of the Incurred Cost Audit

Objectives of the Incurred Cost Audit 36 Contract Management March 2011 Government contractors who incur costs on behalf of the government via contracts, grants, loans, or other contract vehicles are subject to incurred cost audits by the

More information

Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers

Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Curtis Matthews, Managing Partner Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Findley Gillespie, Senior Manager May 18, 2011 1 The material appearing in this presentation

More information

Public Vouchers. Further information is available in the Information for Contractors Manual under Enclosure 5

Public Vouchers. Further information is available in the Information for Contractors Manual under Enclosure 5 Public Vouchers Further information is available in the Information for Contractors Manual under Enclosure 5 The views expressed in this presentation are DCAA's views and not necessarily the views of other

More information

Women Accessing Capital Training 207:

Women Accessing Capital Training 207: Women Accessing Capital Training 207: Setting up an Accounting System For Government Contractors Course Instructor: Michelle Hoffman, CPA CEO, Hoffman CFO Consulting The Voice for Women in Business in

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF LABOR AND ACCOUNTING CONTROLS Version No. 4.2 June 2006

INTERNAL CONTROL MATRIX FOR AUDIT OF LABOR AND ACCOUNTING CONTROLS Version No. 4.2 June 2006 INTERNAL CONTROL MATRIX FOR AUDIT OF LABOR AND ACCOUNTING CONTROLS Version No. 4.2 June 2006 Control Objectives ExampleControl Activities Audit Procedures 1. MANAGEMENT REVIEWS Monitor the overall integrity

More information

Enprise Job Costing and DCAA Compliance

Enprise Job Costing and DCAA Compliance April 2014 Author: Document Version: Product: Product Version: SAP Version: Localization: Enprise Solutions 1.5.0 Enprise Job Costing All versions All current versions North America 2014 Enprise Solutions

More information

DCAA Compliant Accounting Systems

DCAA Compliant Accounting Systems DCAA Compliant Accounting Systems State Designated as Florida s Principal Provider of Business Assistance [ 288.001, Fla. Stat.] Helping Businesses Grow & Succeed About Your Presenter Jenny W. Clark With

More information

PAS 730.3.B.2.4 April 24, 2012 12-PAS-012(R)

PAS 730.3.B.2.4 April 24, 2012 12-PAS-012(R) DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO April 24, 2012 MEMORANDUM FOR REGIONAL DIRECTORS, DCAA DIRECTOR,

More information

January 2004 5(1) CHAPTER 5. Table of Contents

January 2004 5(1) CHAPTER 5. Table of Contents January 2004 5(1) Paragraph CHAPTER 5 Table of Contents 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems Page 5-001 Scope of Chapter... 501 5-100

More information

Submitting a Quality Report. Presented by Laura Davis, Strategic Consulting Solutions, Inc.

Submitting a Quality Report. Presented by Laura Davis, Strategic Consulting Solutions, Inc. Submitting a Quality Report Presented by Laura Davis, Strategic Consulting Solutions, Inc. Started in 2004 Based in Oak Ridge, TN Offices in Charleston, SC & Fayetteville, NC Focus on Government Contracting

More information

Uncompensated Overtime

Uncompensated Overtime Uncompensated Overtime 1 Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk

More information

You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List.

You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List. Page 1 of 5 You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List. View my feeds DCAA News Thursday, May 28, 2009,

More information

CONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE

CONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE By Eric Sobota, Kelley Doran and Barron Avery Contractors that work for the Department of Energy (DOE) under agreements

More information

October 14, 2015 5(1)

October 14, 2015 5(1) October 14, 2015 5(1) Paragraph CHAPTER 5 Table of Contents 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems Page 5-001 Scope of Chapter... 501 5-100

More information

Managing Cost Type Contracts

Managing Cost Type Contracts Managing Cost Type Contracts October 9, 2013 By: Tom Marcinko Donna Dominguez 2013 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200 P 301.231.7630 F www.aronsonllc.com

More information

January 2004 6(1) CHAPTER 6. Table of Contents

January 2004 6(1) CHAPTER 6. Table of Contents January 2004 6(1) Paragraph CHAPTER 6 Table of Contents 6-000 Incurred Costs Audit Procedures Page 6-001 Scope of Chapter... 601 6-100 Section 1 --- Introduction to Incurred Cost Audit Objectives 6-101

More information

September 16, 2015 6(1) CHAPTER 6

September 16, 2015 6(1) CHAPTER 6 September 16, 2015 6(1) CHAPTER 6 Paragraph Table of Contents 6-000 Incurred Costs Audit Procedures Page 6-001 Scope of Chapter... 601 6-100 Section 1 --- Introduction to Incurred Cost Audit Objectives

More information

DEFENSE CONTRACT AUDIT AGENCY CHECKLIST FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL

DEFENSE CONTRACT AUDIT AGENCY CHECKLIST FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include an assessment for completeness

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7 INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically

More information

DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219

DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO PSP 730.8.B.1/2010-003 February 18, 2011 11-PSP-003(R) MEMORANDUM

More information

Labor Costs Interpretive Guidance Labor Costs: Timekeeping, Direct Labor Base, Labor Transfers & Direct to Indirect Labor Ratio

Labor Costs Interpretive Guidance Labor Costs: Timekeeping, Direct Labor Base, Labor Transfers & Direct to Indirect Labor Ratio Labor Costs Interpretive Guidance Labor Costs: Timekeeping, Direct Labor Base, Labor Transfers & Direct to Indirect Labor Ratio External Audits Architectural and Engineering (A&E) Contracts This Document

More information

Cracking the ICE: Ensuring a Compliant Incurred Cost Submission. Carlos Alvarado, VP, FP&A

Cracking the ICE: Ensuring a Compliant Incurred Cost Submission. Carlos Alvarado, VP, FP&A Cracking the ICE: Ensuring a Compliant Incurred Cost Submission Carlos Alvarado, VP, FP&A Agenda Introduction Incurred Cost Proposal ICE Model Leveraging Reporting Applications Inadequacy Letters Q&A 2

More information

If you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure to

If you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure to How do I survive an audit of an incurred cost submission? If you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure

More information

Master Document Audit Program. Version 1.14, dated November 2015

Master Document Audit Program. Version 1.14, dated November 2015 Activity Code 11010 Billing Audit Version 1.14, dated November 2015 Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the

More information

Master Document Audit Program. Version 4.7, dated November 2015 B-1 Planning Considerations

Master Document Audit Program. Version 4.7, dated November 2015 B-1 Planning Considerations Activity Code 10110 Version 4.7, dated November 2015 B-1 Planning Considerations A-133 Audit Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this

More information

INCURRED COST ELECTRONICALLY (ICE) MANUAL

INCURRED COST ELECTRONICALLY (ICE) MANUAL INCURRED COST ELECTRONICALLY (ICE) MANUAL TABLE OF CONTENTS VERSION 2.0.1c A. INTRODUCTION 1. Purpose 2. Benefits of Using ICE 3. Hardware/Software Requirements B. ICE SOFTWARE APPLICATIONS PACKAGE 1.

More information

Presented by: Laura Davis, President Strategic Consulting Solutions, Inc. PDS Consulting Solutions, LLC November 12, 2015

Presented by: Laura Davis, President Strategic Consulting Solutions, Inc. PDS Consulting Solutions, LLC November 12, 2015 Presented by: Laura Davis, President Strategic Consulting Solutions, Inc. PDS Consulting Solutions, LLC November 12, 2015 Agenda Introductions RFP Process Types of Costs Pricing of Direct Costs Pricing

More information

MDA Small Business Industry Day

MDA Small Business Industry Day MDA Small Business Industry Day SBIR Proposal Preparation By: John Swan Contracting Officer Missile Defense Agency August 14, 2015 Agenda Introduction - John Swan Accounting System Audits - John Swan Cost

More information

How to Establish an SBIR Accounting System that Can Withstand a Government Audit

How to Establish an SBIR Accounting System that Can Withstand a Government Audit In cooperation with Connecticut Innovations 4/16/14 How to Establish an SBIR Accounting System that Can Withstand a Government Audit Edward G. Jameson, CPA Managing Partner Jameson & Company, CPAs www.jamesoncpa.com

More information

What Documents are required at Pre-award Audit of an agreement or sub-agreement. How to Avoid Common Proposal Mistakes

What Documents are required at Pre-award Audit of an agreement or sub-agreement. How to Avoid Common Proposal Mistakes January 29, 2015 What Documents are required at Pre-award Audit of an agreement or sub-agreement How to Avoid Common Proposal Mistakes How to Avoid Common Invoice Mistakes Pre-Award Review New Agreement/Sub-agreement:

More information

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with

More information

DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks

DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks Breakout Session #: B04 Presented by: Michael E. Steen, CPA Date: July

More information

Current Initiatives May 2015

Current Initiatives May 2015 DHG 20 th Annual Government Contracting Update Current Initiatives May 2015 Mr. Ken Saccoccia Deputy Director Page 1 One Agency One Mission DCAA Overview Priorities and Better Buying Power Small Business

More information

DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219. PPS June 26, 2012 INFORMATION FOR CONTRACTORS

DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219. PPS June 26, 2012 INFORMATION FOR CONTRACTORS DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 PPS June 26, 2012 DCAA MANUAL NO. 7641.90 INFORMATION FOR CONTRACTORS 1. PURPOSE. This manual supersedes

More information

National Science Foundation 4201 Wilson Boulevard Arlington, Virginia 22230

National Science Foundation 4201 Wilson Boulevard Arlington, Virginia 22230 National Science Foundation 4201 Wilson Boulevard Arlington, Virginia 22230 Office of Inspector General MEMORANDUM. DATE: September 30, 2011 TO: FROM: SUBJECT: Jeffrey M. Lupis, Director Division of Acquisition

More information

AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING

AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING 1. NICRA - What is a NICRA? - Who has a NICRA? - Do I need a NICRA? - How do I get a NICRA? 2. INDIRECT

More information

COST PLUS AWARD FEE CONTRACT ADMINISTRATION DESKGUIDE

COST PLUS AWARD FEE CONTRACT ADMINISTRATION DESKGUIDE COST PLUS AWARD FEE CONTRACT ADMINISTRATION DESKGUIDE 1. Introduction. This Guide does not cover all aspects of administering a cost plus award fee (CPAF) contract. As all of the Directorates of Contracting

More information

Are you in Compliance with the Financial Rules for 8(a) Companies?

Are you in Compliance with the Financial Rules for 8(a) Companies? Are you in Compliance with the Financial Rules for 8(a) Companies? Sales Less than $1M Withdrawals exceeding $250,000 are considered excessive. Compiled financial statements are required within 90 days

More information

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION TECHNICAL ASSISTANCE GRANTS STATE ASSISTANCE CONTRACT RECORD KEEPING AND PAYMENT GUIDE 1.0 ACCOUNTING SYSTEM

More information

Audit Expectations for Small Businesses

Audit Expectations for Small Businesses Audit Expectations for Small Businesses DEFENSE CONTRACT CONSULTING Joseph A. Dalton, CGFM/CFE/CAP Over 31 Years -Supervisory/Auditor Service- DCAA Retired Captain, U. S. Naval Reserve 1996 BUSINESS NO.

More information

4 Essentials to Becoming a Successful Government Contractor

4 Essentials to Becoming a Successful Government Contractor 4 Essentials to Becoming a Successful Government Contractor Synergy Business Solutions W H I T E P A P E R RULES TOOLS CONTROLS SCHOOLS How to tap expertise and systems to pass government audits and fulfill

More information

Incurred Cost Submissions - It's Not Too Early!

Incurred Cost Submissions - It's Not Too Early! Incurred Cost Submissions - It's Not Too Early! March 28, 2013 David Eck and Todd W. Bishop Dixon Hughes Goodman LLP Agenda Treat Incurred Cost Submissions like a Project Why an Incurred Cost Submission?

More information

How to Establish an SBIR Accounting System that Can Withstand a Government Audit

How to Establish an SBIR Accounting System that Can Withstand a Government Audit In cooperation with Connecticut Innovations 2/27/14 How to Establish an SBIR Accounting System that Can Withstand a Government Audit Edward G. Jameson, CPA Managing Partner Jameson & Company, CPAs www.jamesoncpa.com

More information

Audit Report. MDRC Contract Close Out on Contract Number SS00-06-60075

Audit Report. MDRC Contract Close Out on Contract Number SS00-06-60075 Audit Report MDRC Contract Close Out on Contract Number SS00-06-60075 A-15-13-13101 April 2014 MEMORANDUM Date: April 3, 2014 Refer To: To: From: The Commissioner Inspector General Subject: MDRC Contract

More information

Are You Looking to Sell Your Products & Services to the US Government? Overview

Are You Looking to Sell Your Products & Services to the US Government? Overview Are You Looking to Sell Your Products & Services to the US Government? What You Need to Know About Accounting, Compliance, and Reporting! 1 FICPA Overview The US Government is the largest consumer of goods

More information

Incurred Cost Submissions

Incurred Cost Submissions Incurred Cost Submissions Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily the

More information

DCAA Audit R 4 Rights to Records, Requirements & Remedies

DCAA Audit R 4 Rights to Records, Requirements & Remedies San Diego Chapters Present DCAA Audit R 4 Rights to Records, Requirements & Remedies A Seminar with Panel Discussion and Audience Participation February 18, 2009 This Morning s Agenda 8:30 Introduction

More information

Time-and-Materials and Labor-Hour Contracts The New Policies

Time-and-Materials and Labor-Hour Contracts The New Policies Time-and-Materials and Labor-Hour Contracts The New Policies Overview: Time-and-materials and labor-hour (T&M/LH) contracts are the least preferred contract types, but they may play an important role in

More information

The Essential Role of Adequate Accounting Systems for Government Contractors

The Essential Role of Adequate Accounting Systems for Government Contractors The Essential Role of Adequate Accounting Systems for Government Contractors Jerrold Rosenberg, CPA, CFP Judith H. Lasley, CPA John Pace, CPA, CVA February 29, 2012 American Legion Washington Conference

More information

Business Systems: Update on Proposed Rules

Business Systems: Update on Proposed Rules Business Systems: Update on Proposed Rules Presented By: Mark Burroughs, Partner Topics Review of Business System requirements Observations on areas of focus by the government Enforcement of significant

More information

BEDFORD PUBLIC SCHOOLS BUSINESS OFFICE PROCEDURES MANUAL

BEDFORD PUBLIC SCHOOLS BUSINESS OFFICE PROCEDURES MANUAL BEDFORD PUBLIC SCHOOLS BUSINESS OFFICE PROCEDURES MANUAL Revised 3-27-2014 TABLE OF CONTENTS Section 1: Section 2: Section 3: Section 4: Section 5: Section 6: Section 7: Section 8: Section 9: Cash Management

More information

CONSULTANT AUDIT GUIDE

CONSULTANT AUDIT GUIDE CONSULTANT AUDIT GUIDE TABLE OF CONTENTS Preface Page 2 Part I. Introduction Page 4 Part II. Definitions Page 6 Part III. Role of the State External Auditor in Accepting Overhead Audits Performed by Others

More information