1 Activity Code Version 6.11, dated November 2015 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the Audit Specific Independence Determination (w/p 34) prior to starting any work on this assignment. (Note: Because staff is sometimes added to on-going audits, supervisors should ensure that all individuals who are directing, performing audit procedures, or reporting on this audit as a member of the audit team who are performing as a consultant have signed this work paper. For example, an FAO may add additional auditors (e.g. FAO technical specialist) to the audit assignment or may need to consult with an internal specialist (e.g., industrial engineers, and operations research specialists) as the audit progresses.) Purpose and Scope The major objectives of this audit are to obtain an understanding of the accounting system to appropriately complete the Preaward Survey of Prospective Contractor Accounting System, SF 1408, and to opine as to whether the design of the contractor s system is acceptable for the award of a prospective Government contract. DCAA FLAs have worked with the buying commands to have contractors fill out a checklist asserting they meet the SF 1408 criteria, and providing a narrative describing how they meet each criterion. Once they receive this assertion, they are sending a request to DCAA for audit, with this assertion attached. If the request for audit does not include an assertion from the contractor, contact the CO to determine if one was prepared already. If the CO did not have the contractor prepare the assertion, the auditor should ask the contractor to complete this assertion so that it can be used during the performance of the risk assessment (a proforma letter with the checklist is available as an OAG). This audit involves only the evaluation of the design effectiveness, not the operating effectiveness of the system. Procedures performed to evaluate design effectiveness include a mix of inquiry of appropriate personnel, observation of the entity's operations, and inspection of relevant documentation. Walkthroughs that include a combination of these procedures ordinarily are sufficient to evaluate the effectiveness of the design. Detailed testing of transactions, and reperformance of the controls are not necessary when testing the design effectiveness. If requested to perform a Preaward Survey of Prospective Contractor Accounting System Audit on a contractor that has an active Government contract, the auditor should check the files to determine if prior work has been performed that will provide the contracting officer Page 1 of 11
2 the information necessary to fill in the SF 1408 without the completion of the preaward audit (e.g., if a prior preaward or post contract award accounting system audit has been performed). If prior information does exist, contact the contracting officer to determine if the prior report will meet their needs. Additionally, if there are known system deficiencies or voucher processing problems, this information should be provided to the contracting officer as well. Auditors should not issue an opinion stating the design is acceptable for award when there are known deficiencies in the operating effectiveness. If this is a follow up request to a previous preaward accounting system survey, determine whether a follow up is appropriate. If the previous preaward was completed less than 12 months ago, and the contractor s system has not changed, it would be appropriate to perform a follow up to the previous preaward. The auditor should modify the audit program appropriately, and be sure to issue a follow-up preaward report available as an OAG. If the previous preaward accounting system survey was performed more than 12 months ago, and/or the contractor s system has changed, a full preaward audit should be performed. Be sure to coordinate with the contracting officer if a determination is made that a follow up is not appropriate. If requested to perform a Preaward Survey of Prospective Contractor Accounting System Audit on a contractor that has not yet established their accounting structure, policies and procedures, and a plan for implementation, the auditor should contact the contracting officer to inform them that the SF 1408 cannot be completed because the contractor is unable to demonstrate that the design is capable of accomplishing the criteria. An audit should not be performed in these circumstances. Note: This does not include situations where the contractor has designed it systems but has not purchased or implemented the accounting software package. If the request is for a Preaward Accounting System Survey for a proposed subcontract, the auditor should determine what effort the prime contractor has taken to determine if the accounting system is acceptable. FAR indicates the prime contractor is generally responsible for prospective subcontractors. Therefore, the audit may not be necessary unless there are circumstances such as the subcontractor formally denying access to the prime contractor. Other Planning Considerations Prior to commencing the audit, review guidance that may impact the audit and adjust the scope and procedures appropriately. Guidance to review includes CAM, open MRDs, FAQ training material, guidebooks, etc. available on the DCAA Intranet. References 1. CAM 5-200, Pre-Award Surveys and Adequacy of Accounting System for Contractual Requirements 2. FAR 9.105, Procedures (for determination of contractor s responsibility) Page 2 of 11
3 3. FAR 9.106, DFARS , PGI , Preaward Surveys 4. FAR (g), Quarterly Limitation on Payments Statement (FPI contracts); and FAR , Limitation of Cost. 5. AICPA Attestation Standards AT Section , Evaluating Design Effectiveness B-1 Preliminary Steps WP Reference Version 6.11, dated November Research and Planning a. Review the audit request and contact the Contracting Officer (CO) to ensure that the audit scope addresses any customer concerns that will impact the assessment of audit risk and adjust the audit scope and associated audit procedures accordingly (CAM a.). b. Obtain information on the proposed Government contract (e.g., type and amount of contract, special contract provisions, etc.). Contact the CO/PCO/buying command as determined necessary to discuss any questions or concerns that were identified. c. Review the perm file and any prior audits, and document any issues impacting the current scope of audit. If a perm file does not exist or is not current, provide a list of items (e.g., organizational charts, financial statements, policies and procedures, etc.) to be obtained during the field visit to the contractor in advance of the entrance conference, so the contractor has additional time to gather the information. Update the permanent file (See CAM ). d. Review permanent file to determine if previous audits included findings and recommendations that impact the subject matter under audit (GAGAS 5.06). If there were findings, auditors should document this information in the risk assessment and perform the following procedures: (1) During the entrance conference, ask contractor management if corrective actions were taken to address findings and recommendations reported in previous DCAA audits (e.g., questioned costs, business system deficiencies, CAS audits) that are relevant to the subject matter of audit. If yes, have contractor explain corrective actions taken and determine if additional audit procedures should be included in the fieldwork to test the corrective actions. (2) Document the results of the inquiry and the impact of the corrective actions to the subject matter under audit. (Note: The purpose of this question is to follow up with contractor on Page 3 of 11
4 relevant prior DCAA audit findings that could have a material effect on the subject matter of audit.) e. Review permanent file to determine if the contractor has previously provided other studies or audits (e.g., summary listing of internal audits or external audit reports) that directly relate to the subject matter under audit (GAGAS 5.06). If there are no other studies or audits, document that information in the work papers and perform the procedures below. (If you do not perform the following procedures, you must document your justification for the departure.) (1) During the entrance conference: Ask contractor management if internal audits were performed. If yes, request contractor provide a summary listing of the internal audits that would assist us in understanding and evaluating the efficacy of the internal controls relevant to the subject matter of the audit. Ask contractor management if other types of audits or studies were performed by other than DCAA (e.g., other Government audit agencies, consultants, Independent Public Accountants, etc.) that would impact the subject matter under audit. If yes, have contractor explain what type of audits or studies were performed, if there were any related findings or recommendations, and any contractor corrective actions taken as a result. (2) If the review of the perm file or the contractor identifies relevant internal audits: Determine if access to these reports is necessary to complete the evaluation of the relevant internal controls to support the risk assessment or audit procedures related to the subject matter of the audit. There must be a nexus between the internal audit reports and the scope of this specific assignment. Document the results of the determination in writing. If assignment is at a major contractor location, coordinate with the CAC or FAO point of contact (POC) for internal audit reports to request the contractor provide access to the reports. If assignment is at a non-major contractor and the FAO does not have a designated POC, the auditor should request the contractor provide access to the internal audit reports. The request, issued by the CAC, FAO POC or auditor, should include information on how the internal audit report is relevant to the DCAA audit. Place a copy of the request in the assignment administrative work papers. Page 4 of 11
5 (3) If the review of the perm file or the contractor identifies relevant other audits or studies: Obtain publicly available information for the relevant other Government agency audits (e.g., websites for DoD IG or other IGs, service audit agencies, etc.). Make appropriate adjustments to your risk assessment and planned procedures based on the reported findings. (4) Document the results of the inquiries including the response received from contractor s for any request for access to internal audit reports. (If access was not granted this should include the contractor s rationale or justification for not granting access). (5) Determine if additional audit procedures are needed to address any identified risk. (Note: The purpose of this question is to discover any new audit leads that could affect the scope of current audit.) f. Electronically transmit an acknowledgement/notification to the ACO/Buying Command notifying them of the commencement of the risk assessment and that the expected completion date will be provided in the formal acknowledgement/notification once the risk assessment is complete. (CAM 2-303). The acknowledgement/notification process should be within the timeframe and in accordance with the procedures in CAM g. Issue a notification letter to the contractor regarding the audit in accordance with CAM h. Review the contractor s assertion and narrative describing how they meet the SF 1408 criteria if applicable. The review of this assertion will allow the auditor to make preliminary judgments to obtain an understanding of the controls the contractor has in place, and determine if there are potential noncompliances that could occur. If the contractor does not submit an assertion, the auditor will need to request the contractor describe how they meet the SF 1408 criteria in order to make these preliminary judgments. Any areas of risk identified should be documented, and the necessary audit procedures to address those risk areas should be performed during the fieldwork in C-1. Note: It is important to remember that a smaller, less complex entity might achieve its control objectives in a different manner from a larger, more complex organization (e.g., they may have less employees which limits their opportunities to segregate duties). In these cases, the auditor should evaluate whether the contractor has implemented alternative controls that are effective (e.g., an outside Page 5 of 11
6 accountant s quarterly review, payroll and/or billing invoices prepared by external service). i. If this audit is being performed as a follow-up, document the procedures performed to determine that continual reliance can be placed on the worked performed under the initial preaward audit (e.g., what was done to ensure no changes have taken place that would impact the areas we are not specifically looking at in the follow-up). j. During the entrance conference, or other appropriate meeting, make inquiries of contractor management regarding knowledge of any fraud or suspected fraud affecting the subject of this audit, managements awareness of allegations of fraud or suspected fraud affecting this audit, and management s understanding about the risks of fraud relevant to this audit. Note: This discussion and any data submitted should be documented in the working papers. k. Based on the team's understanding of the criteria, subject matter, and the contractor and its environment, hold a planning meeting with the audit team (at a minimum, Supervisor and Auditor) to discuss and identify potential noncompliances, due to error or fraud, that could materially affect the subject matter. The discussion should include: relevant prior audit experience (e.g., questioned cost, relevant reported estimating or accounting system deficiencies), relevant aspects of the contractor and its environment, risk of material noncompliance due to fraud (e.g., the extent of incentives, pressures and opportunities to commit and conceal fraud, and the propensity to rationalize misstatements), other known risk factors, the audit team s understanding of relevant internal controls, inquiries to the contractor regarding its fraud management plans and controls. Document fraud risk factor/indicators (see - Sources of Fraud Risk Factors below) that are present and could materially affect the subject matter. If Fraud risk factors are present, document specific audit procedures designed to address the increased risk of material noncompliance due to fraud. Page 6 of 11
7 Communication among audit team members about the risk of material misstatement due to error or fraud should continue as needed throughout the audit. Sources of Fraud Indicators: GAGAS Appendix Section A.10 Examples of Indicators of Fraud Risk ( AU-C 240.A75 (Appendix A)- Consideration of Fraud in a Financial Statement Audit, Examples of Fraud Risk Factors ( oadabledocuments/au-c pdf) DoDIG s Contract Audit Fraud Scenarios and Resources website ( (To access the Sources of Fraud Indicators, copy and paste the web address shown above into the address block in Internet Explorer.) 2. Entrance Conference and Preparation Arrange and conduct an entrance conference (see CAM 4-302). Explain to the contractor's representatives that as issues are developed during the audit, they will be furnished to the contractor for factfinding and timely resolution. This process should facilitate reduced audit cycle time and efforts to respond to and issue the audit report. If applicable, include a follow up with contractor management on: a. corrective actions that address previous DCAA audit findings and recommendations (step 1e), b. other studies or audits that impact the subject matter under audit (step 1f). 3. Initial Risk Assessment Using the information obtained in steps 1 and 2, prepare an initial risk assessment to determine the scope of the examination (W/P B). C-1 Preaward Survey (SF 1408) WP Reference Version 6.11, dated November 2015 Prepare Preaward Survey of Prospective Contractor Accounting System (SF 1408) by completing the following audit steps. The latest version of Page 7 of 11
8 the SF 1408 can be obtained at: In WP B-1, the auditor reviewed the contractor assertion or description of how the contractor meets the SF 1408 criteria to assist them in understanding the controls the contractor has in place, and determining if there are potential noncompliances that could occur. In this section, the auditor will determine, based on the contractor s assertion, and the walkthrough/demonstration (or observations, inquires, and inspections if the system is not implemented), if the contractor s system is suitably designed for award of a prospective contract. When performing the following audit steps, it is important to remember that procedures performed to evaluate design effectiveness may include a mix of inquiry of appropriate personnel, observation of the entity s operations, and inspection of relevant documentation (e.g., policies and procedures, prospective reports, and general ledger examples). Transaction testing is not required. If a contractor s system has been implemented, a documented walkthrough/demonstration of the system is ordinarily sufficient to evaluate design effectiveness. If the contractor has designed the system, but has not yet implemented the system, the evaluation of the effectiveness of the design of the system will need to include a mix of inquiries, observation, and inspection. This may include discussions with responsible personnel, review of written policies and procedures, charts of account, etc. Note: Inquiry alone is not sufficient, observation, and/or inspection of documentation is necessary as well. 1. Generally Accepted Accounting Principles. Through inquiry, observation and/or inspection, determine if the contractor s accounting system is designed to be in accordance with GAAP (e.g., does the contractor have or intend to have an accrual basis accounting system, dual entry accounting, a general ledger they plan to post costs to, and the ability to generate basic financial reports). (SF 1408, Section II, 1) 2. Proper segregation of costs. Through inquiry, observation and/or inspection, determine if the system is designed to preclude direct charging of indirect expenses and indirect charging of direct contract costs. (SF 1408, Section II, 2a) 3. Direct costs by contract. Through inquiry, observation and/or inspection, determine that the contractor s system is designed to produce a subsidiary job cost ledger which accumulates costs by contract at a level of detail consistent with that used by the prospective contractor in its proposal. (SF 1408, Section II, 2b) Page 8 of 11
9 4. Allocation of indirect costs. Through inquiry, observation and/or inspection, determine that the system is designed to accumulate indirect costs in logical groupings. Determine that the groupings are allocated based on benefits accrued to intermediate and final cost objectives. Is the cost accounting system documented, with a written description of the contents of bases and pools? (SF 1408, Section II, 2c) 5. Accumulation of costs under general ledger control. Through inquiry, observation and/or inspection, determine if the contractor s system is designed to allow the contractor s job cost ledger, or its equivalent, to be reconcilable and routinely posted to the general ledger control accounts (e.g. totals for direct labor, direct material, subcontracts, other direct costs). (SF 1408, Section II, 2d) 6. Timekeeping system. Through inquiry, observation, and/or inspection, determine that the system is designed to allow labor charging to intermediate and final cost objectives based on a timekeeping document (paper or electronic timecards). Also ensure that the contractor has policies, procedures or instructions that require timesheets be completed and certified by the employees and approved by the employees supervisors. (SF 1408, Section II, 2e) 7. Labor distribution. Through inquiry, observation and/or inspection, determine if the system is designed so that labor cost distribution records (i) are reconcilable to payroll records and (ii) can be reconciled to and from the cost accumulation records in labor subsidiary or general ledger accounts. (SF 1408, Section II, 2f) 8. Interim determination of costs. Through inquiry, observation and/or inspection, determine that the contractor posts, or plans to post, contract costs at least monthly to books of account. (SF 1408, Section II, 2g) 9. Exclusion of Unallowables. Through inquiry, observation and/or inspection, discuss and document the contractor s plan to identify and exclude unallowable costs if the contract is awarded. (SF 1408, Section II, 2h) 10. Costs by Contract Line Item: If the prospective contract requires costs to be reported by CLIN or unit, determine what level is required. Through inquiry, observation and/or inspection, determine if the contractor s system is designed to be expanded to the requisite level of detail (i.e. costs can be accumulated by sub accounts within the job cost ledger and includes details by multiple contract line items specified by the contract). (SF 1408, Section II, 2i) 11. Preproduction Costs (Applies primarily to manufacturing contracts): Through inquiry, observation and/or inspection, determine if the contractor s system is designed to routinely segregate preproduction Page 9 of 11
10 from production costs in order to assist in repricing or follow-on contract pricing. (SF 1408, Section II, 2j) 12. Limitation of Costs: Through inquiry, observation and/or inspection determine if the contractor s system is designed so that interim indirect expense rates can be readily calculated from the books of accounts and are routinely monitored. Who is responsible for monitoring total contract expenditure against contract limitations on price or cost, and how frequently is this reviewed? Are controls in place to ensure compliance with the reporting requirements of FAR (g) or FAR ? (SF 1408, Section II, 3a) 13. Billings (e.g. progress payments, public vouchers): (CAM ) (SF 1408, Section II, 3b and FAR ) a. Is the system designed so that billings can be reconciled to the cost accounts for both current and cumulative amounts claimed? b. Through inquiry, observation and/or inspection, determine if the contractor has procedures to ensure that subcontractor and vendor costs are only included in billings if payment to the subcontractor or vendor will be made in accordance with the terms and conditions of the subcontract or invoice and ordinarily within 30 days of the contractor s payment request to the Government? 14. Adequate, Reliable Data: Based on the procedures above, summarize on WP C your conclusions on whether the contractor s system is designed to produce cost information at a sufficient level of detail for use in pricing follow-on contracts? (SF 1408, Section II, 4) A-1 Concluding Steps WP Reference Version 6.11, dated November Summary Steps a. If there are open or partially completed items, follow-up and resolve them at this time and summarize audit results. b. Complete, index and cross reference working papers. c. Summarize and document the results of audit. Accounting system in operation. Is the accounting system in full operation? If not, which portions are in operation and what is the status of implementing the full accounting system? (SF 1408, Section II, 5) d. Obtain final supervisory auditor/manager review of the working papers and audit results. After management approval, hold and document an exit conference with the contractor representative in accordance with the procedures specified in CAM Page 10 of 11
11 e. Prepare draft report and SF 1408 to be furnished as part of the audit report. The narrative section of the SF 1408 should only include the following statement See DCAA Audit Report No. (insert audit report number), dated (insert date) for information supporting this form. f. Update the permanent file. Page 11 of 11
Preaward Survey of Prospective Contractor Accounting System
Activity Code 17740 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Purpose and Scope The major objectives of this audit are to obtain an understanding of the accounting
Post Award Accounting System Audit at Nonmajor Contractors
Activity Code 17741 Version 3.1, dated November 2015 B-01 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors Audit Specific Independence Determination Members of the audit
Master Document Audit Program. Version 1.5, dated September 2015 B-01 Planning Considerations
Activity Code 11070 Version 1.5, dated September 2015 B-01 Planning Considerations Accounting System Audit Audit Specific Independence Determination Members of the audit team and internal specialists consulting
Master Document Audit Program. Activity Code 19404 Compliance Audit CAS 404 Version 5.15, dated November 2015 B-1 Planning Considerations
Activity Code 19404 Compliance Audit CAS 404 B-1 Planning Considerations Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete
Master Document Audit Program. Activity Code 19409 Compliance Audit CAS 409 Version 5.16, dated November 2015 B-1 Planning Considerations
Activity Code 19409 Compliance Audit CAS 409 B-1 Planning Considerations Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete
Post Award Accounting System Audit at Nonmajor Contractors
Activity Code 17740 B-1 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors To provide general guidance for the audit of the adequacy and suitability of nonmajor contractor
Master Document Audit Program. or Interviews. Version 3.21, dated April 2016 B-1 Planning Considerations
Activity Code 10310 Version 3.21, dated April 2016 B-1 Planning Considerations Non-Major Contractors Labor Floor Checks or Interviews Audit Specific Independence Determination Members of the audit team
MAAR 13 Purchase Existence and Consumption
Activity Code 10320 B-1 Planning Considerations MAAR 13 Purchase Existence and Consumption Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this
Master Document Audit Program
Activity Code 11510 B-1 Planning Considerations Information Technology General System Controls Audit Specific Independence Determination Members of the audit team and internal specialists consulting on
Accounting System Requirements
Accounting System Requirements Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily
Master Document Audit Program. Version No. 2.9, updated November 2015 B-1 Planning Considerations
Activity Code B-1 Planning Considerations Cost Realism Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the Audit Specific
Activity Code 12500 Material Management and Accounting System (MMAS) Version 9.10, dated September 2015 B-1 Planning Considerations
Activity Code 12500 Material Management and Accounting System (MMAS) Version 9.10, dated September 2015 B-1 Planning Considerations Audit Specific Independence Determination Members of the audit team and
Master Document Audit Program. Progress Payment, Percentage of Completion. Version 5.8, dated November 2015 B-1 Planning Considerations
Activity Code 17500 Version 5.8, dated November 2015 B-1 Planning Considerations Progress Payment, Percentage of Completion Audit Specific Independence Determination Members of the audit team and internal
Pre-Award Accounting Systems
Pre-Award Accounting Systems 2013 National SBIR Conference Christopher Andrezze, CPA Special Assistant to the Deputy Director May 16, 2013 The views expressed in this presentation are DCAA's views and
Master Document Audit Program. Activity Code 19500 Cost Impact Statement (Price Adjustment) Version 4.17, dated April 2016 B-1 Planning Considerations
Activity Code 19500 Cost Impact Statement (Price Adjustment) Version 4.17, dated April 2016 B-1 Planning Considerations Audit Specific Independence Determination Members of the audit team and internal
Master Document Audit Program. Version 1.8, dated November 2015. B-01 Planning Considerations
Activity Code 11060 Control Environment Version 1.8, dated November 2015 B-01 Planning Considerations Audit Specific Independence Determination Members of the audit team and internal specialists consulting
Master Document Audit Program. Version 4.14, dated November 2015 B-1 Planning Considerations
Activity Code 17200 B-1 Planning Considerations Claim Audit, Other Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the
Master Document Audit Program. Version 1.14, dated November 2015
Activity Code 11010 Billing Audit Version 1.14, dated November 2015 Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the
What Exactly is an Acceptable Accounting System?
What Exactly is an Acceptable Accounting System? Kristen Soles, CPA Member Stephanie Widzinski, CPA Senior Manager September 27, 2012 Agenda Review DFARS Business System Rule What Agency is Responsible
WELCOME. Accounting Systems for DOD Contracts
WELCOME Accounting Systems for DOD Contracts Moderator: Layli Pietri, Small Business Manager, Balfour Beatty Construction Speaker: Kay Papin, Government Compliance Manager, McCarthy Group Inc. Accounting
Master Document Audit Program. Version 4.7, dated November 2015 B-1 Planning Considerations
Activity Code 10110 Version 4.7, dated November 2015 B-1 Planning Considerations A-133 Audit Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this
Preaward and Post Award Accounting System Audits. November 17, 2011 Pikes Peak NCMA Roland Wick
Preaward and Post Award Accounting System Audits November 17, 2011 Pikes Peak NCMA Roland Wick OVERVIEW This presentation will provide: 1. The basic criteria for the Preaward and Post Award accounting
Master Document Audit Program. Business System Deficiency Report Assignment. Version No. 1.3, dated June 2014 B-1 Planning Considerations
Activity Code 11090 B-1 Planning Considerations Business System Deficiency Report Assignment Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this
January 2004 5(1) CHAPTER 5. Table of Contents
January 2004 5(1) Paragraph CHAPTER 5 Table of Contents 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems Page 5-001 Scope of Chapter... 501 5-100
October 14, 2015 5(1)
October 14, 2015 5(1) Paragraph CHAPTER 5 Table of Contents 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems Page 5-001 Scope of Chapter... 501 5-100
Preaward Survey of Prospective Contractor Accounting System Checklist
PRE-AWARD SURVEY (SF 1408) OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM Date: XX/XX/201X Company Name, Contract Number, and Full Address: Commercial and Government Agency (CAGE) Code Number: (found at http://www.dlis.dla.mil/cage_welcome.asp)
Accounting System Requirements
Basic Financial Requirements for Government Contracting The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Accounting System Requirements
Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012
Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 1 Panelists Robert A. ( Rob ) Burton, Partner, Venable LLP A 30-year veteran
Basic Financial Requirements for Government Contracting
Basic Financial Requirements for Government Contracting 2014 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
PAS 730.3.B.2.4 April 24, 2012 12-PAS-012(R)
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO April 24, 2012 MEMORANDUM FOR REGIONAL DIRECTORS, DCAA DIRECTOR,
Accounting Systems: Complying with FAR Requirements. John S. Sroka, CPA Acquisition Cost/Price Analyst
Accounting Systems: Complying with FAR Requirements John S. Sroka, CPA Acquisition Cost/Price Analyst Background Information FAR Requirements FAR Part 9: Contractor Qualifications FAR Part 16: Cost-reimbursement
Master Document Audit Program
Activity Code 19416 Incurred Insurance Cost and CAS 416 and FAR Compliance B-1 Planning Considerations Audit Specific Independence Determination Members of the audit team and internal specialists consulting
CHAPTER 2. 2-000 Preaward Surveys of Prospective Contractor Accounting Systems
CHAPTER 2 2-000 Preaward Surveys of Prospective Contractor Accounting Systems 2-101 Preaward Survey Overview A preaward survey is an evaluation, usually made by the cognizant contract administration office,
Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference
Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference November 29-30, 2006 t Defense Contract Audit Agency Established in 1965 Separate Agency of the Department of Defense
DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency
DCAA Guidelines How the SBIR firm can work effectively with the Defense Contract Audit Agency Today s Presenters OUTLINE Presenter Introduction DCAA & DCMA DCAA Overview Types of DCAA Audits What it takes
Certificate of Accounting, Billing and Property System Adequacy
Certificate of Accounting, Billing and Property System Adequacy This certifies that, to the best of my knowledge and belief, Contractor s Accounting, Billing and/or Property System and related internal
Master Document Audit Program. Version 2.1, dated February 2016 B-1 Planning Considerations
Activity Code 10100 Version 2.1, dated February 2016 B-1 Planning Considerations Post Year End Incurred Cost Audit Audit Specific Independence Determination Members of the audit team and internal specialists
THE DCAA AUDIT BECOMING DCAA COMPLIANT
THE DCAA AUDIT Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible for supervising all Department of Defense (DoD) contracts.
Slide 1. Slide 2. Slide 3 Standard Form 1408 ACCOUNTING SYSTEM ESSENTIALS
Slide 1 Slide 2 ACCOUNTING SYSTEM ESSENTIALS P r e p a r e d f o r Alliance Northwest 2014 By T e r r y S. N u z z o, C P A, C G M A P a c i f i c N o r t h w e s t C o n s u l t a n t s, L L C Slide 3
DEFENSE CONTRACT AUDIT AGENCY
DEFENSE CONTRACT AUDIT AGENCY Fundamental Building Blocks for an Acceptable Accounting System Presented by Sue Reynaga DCAA Branch Manager San Diego Branch Office August 24, 2011 Report Documentation Page
Financial Management Guide for Government Contractors
Financial Management Guide for Government Contractors Overview You are a Government Contractor or wish to be a Government Contractor. Congratulations. It is important you know that the challenges facing
Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012
Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 2012 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200
How to Survive a DCAA Audit
How to Survive a DCAA Audit www.paulgunn.com 1 How to Survive a DCAA Audit - Overview Areas of interest and expectations of a typical audit: 1. Introduction o 2. The DCAA and Types of audits 3. Preparing
Chapter 6 Labor-Charging Systems and Other Considerations
6 Chapter 6 Labor-Charging Systems and Other Considerations The purpose of this chapter is to provide interpretive guidance only. This chapter is not intended to be authoritative or to supersede the FAR.
DCAA and the Small Business Innovative Research (SBIR) Program
Defense Contract Audit Agency (DCAA) DCAA and the Small Business Innovative Research (SBIR) Program Judice Smith and Chang Ford DCAA/Financial Liaison Advisors NAVAIR 2010 Small Business Aviation Technology
October 1, 2015 4(1)
October 1, 2015 4(1) Paragraph CHAPTER 4 Table of Contents 4-000 General Audit Requirements Page 4-001 Scope of Chapter... 401 4-100 Section 1 --- FAO Coordination with Procurement and Contract Administration
Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope
Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with
GOVERNMENT ACCOUNTING REQUIREMENTS
GOVERNMENT ACCOUNTING REQUIREMENTS Basic Accounting Systems Time Reporting DCAA Encounters CRITICAL ELEMENTS OF AN ACCOUNTING SYSTEM Designed in Accordance with GAAP Proper Segregation of Direct and Indirect
Thank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com.
Thank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com. Before we begin just a few notes: During the presentation lines
DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks
DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks Breakout Session #: B04 Presented by: Michael E. Steen, CPA Date: July
Presented by Albert D. Goldwasser, CPA Government Contractor Consultant
Presented by Albert D. Goldwasser, CPA Government Contractor Consultant Agenda DCAA s Objectives Accounting 101 Indirect Cost Allocations SF 1408 Passing the DCAA Audit References What does the DCAA want?
July 6, 2015 11(1) CHAPTER 11
July 6, 2015 11(1) CHAPTER 11 Table of Contents Paragraph Page 11-000 Audit of Contractor Compliance with Contract Financial Management Requirements 11-001 Scope of Chapter... 1101 11-100 Section 1 ---
Direct and Indirect Labor. The Scenario
Direct and Indirect Labor The Scenario Risk Assessment-Research and Planning: The auditor was assigned to perform a floor check audit for a medium sized contractor during the end of the third quarter of
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO PSP 730.8.B.1/2010-003 February 18, 2011 11-PSP-003(R) MEMORANDUM
Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP)
Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) NH Presentation October 20, 2010 Presented by: Fred Kline, MBA, CPA Tom Martin MBA, CPA Malcolm Young,
DOECAA Spring Conference Presentation. Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule
DOECAA Spring Conference Presentation Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule Mary Karen Wills, CPA Director/Leader, BRG Government Contracts 2014 Berkeley Research Group
Review of Audits Issued by the Defense Contract Audit Agency in FY 2012 and FY 2013
Report No. DODIG-2014-109 Inspector General U.S. Department of Defense SEPTEMBER 8, 2014 Review of Audits Issued by the Defense Contract Audit Agency in FY 2012 and FY 2013 INTEGRITY EFFICIENCY ACCOUNTABILITY
Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies
Inspector General U.S. Department of Defense Report No. DODIG-2016-001 OCTOBER 1, 2015 Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies INTEGRITY
Uncompensated Overtime
Uncompensated Overtime 1 Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk
Implementing a FAR Part 31 Compliant Cost Accounting System
Implementing a FAR Part 31 Compliant Cost Accounting System Breakout Session #: F11 Presented by: Robert E. Jones, CFCM, CCCM Date: July 23, 2013 Time: 4:00 PM 5:15 PM Agenda 1. Choosing a System 2. Designing
GAO DEFENSE CONTRACT AUDITS. Actions Needed to Improve DCAA's Access to and Use of Defense Company Internal Audit Reports
GAO United States Government Accountability Office Report to the Committee on Armed Services, U.S. Senate December 2011 DEFENSE CONTRACT AUDITS Actions Needed to Improve DCAA's Access to and Use of Defense
DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219. PPS June 26, 2012 INFORMATION FOR CONTRACTORS
DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 PPS June 26, 2012 DCAA MANUAL NO. 7641.90 INFORMATION FOR CONTRACTORS 1. PURPOSE. This manual supersedes
DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System
DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System Breakout Session A Alfred J. Massey, Western Region, Special Programs Manager,
FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013)
FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013) "It's never too early to prepare for your incurred cost submission (A webinar sponsored by Pleasant Valley Business Solutions) 1 Objective Know
WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA
WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA The DCAA Audit Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible
REAL-TIME LABOR EVALUATIONS. The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
REAL-TIME LABOR EVALUATIONS The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations 1 Real-Time Labor Evaluation What is a Real-Time Labor Evaluation?
ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS
ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS Mendocino County Page 1 of 5 INTRODUCTION The purpose of this brochure is to outline for you, a potential contractor with the California State
INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006
INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006 1. MANAGEMENT REVIEWS The contractor should have policies and procedures for periodic monitoring of the billing
Material Transfers and Material Management and Accounting System (MMAS)
Material Transfers and Material Management and Accounting System (MMAS) The Scenario Risk Assessment-Research and Planning: The auditor was assigned an audit of major contractor MIL s Material Management
Government Contractor Business Systems and Overview of System Assessments
Government Contractor Business Systems and Overview of System Assessments Agenda Overview of business systems rules and environment today 3 rd party assessments Practical solutions Contractor perspective
AN AUDIT OF INTERNAL CONTROL OVER FINANCIAL REPORTING THAT IS INTEGRATED WITH AN AUDIT OF FINANCIAL STATEMENTS:
1666 K Street, NW Washington, D.C. 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org STAFF VIEWS AN AUDIT OF INTERNAL CONTROL OVER FINANCIAL REPORTING THAT IS INTEGRATED WITH AN
CONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE
BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE By Eric Sobota, Kelley Doran and Barron Avery Contractors that work for the Department of Energy (DOE) under agreements
National Science Foundation 4201 Wilson Boulevard Arlington, Virginia 22230
National Science Foundation 4201 Wilson Boulevard Arlington, Virginia 22230 Office of Inspector General MEMORANDUM. DATE: September 30, 2011 TO: FROM: SUBJECT: Jeffrey M. Lupis, Director Division of Acquisition
September 16, 2015 6(1) CHAPTER 6
September 16, 2015 6(1) CHAPTER 6 Paragraph Table of Contents 6-000 Incurred Costs Audit Procedures Page 6-001 Scope of Chapter... 601 6-100 Section 1 --- Introduction to Incurred Cost Audit Objectives
Review of Consultant/Professional Services Cost Accounts
Review of Consultant/Professional Services Cost Accounts 1 Table of Contents Risk Assessment Research and Planning Entrance Conference Preliminary Analytical Procedures Results from Preliminary Analytical
DCAA Audit R 4 Rights to Records, Requirements & Remedies
San Diego Chapters Present DCAA Audit R 4 Rights to Records, Requirements & Remedies A Seminar with Panel Discussion and Audience Participation February 18, 2009 This Morning s Agenda 8:30 Introduction
SCOPE OF WORK FOR PERFORMING INTERNAL CONTROL AND STATUTORY/REGULATORY COMPLIANCE AUDITS FOR RECIPIENTS OF SPECIAL MUNICIPAL AID
SCOPE OF WORK FOR PERFORMING INTERNAL CONTROL AND STATUTORY/REGULATORY COMPLIANCE AUDITS FOR RECIPIENTS OF SPECIAL MUNICIPAL AID State of New Jersey Department of Community Affairs Division of Local Government
NCMA MEETING PREPARING FOR A DCAA PRICE PROPOSAL AUDIT JUNE 8, 2011
NCMA MEETING 1 PREPARING FOR A DCAA PRICE PROPOSAL AUDIT JUNE 8, 2011 Denise M. Hunt DCAA LM Mt. Laurel Resident Office Forward Pricing Technical Specialist DCAA OVERVIEW AND PRICE PROPOSAL AUDIT PROCESS
Women Accessing Capital Training 207:
Women Accessing Capital Training 207: Setting up an Accounting System For Government Contractors Course Instructor: Michelle Hoffman, CPA CEO, Hoffman CFO Consulting The Voice for Women in Business in
Presenting the Numbers: Accounting Systems for Government Contractors
Presenting the Numbers: Accounting Systems for Government Contractors William D. Craven, CPA Senior Cost/Price Analyst CH2M HILL Plateau Remediation Company William D. Craven, CPA, CMA, CIA Cost/Price
WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT
WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT Presented by: Laura Davis OVERVIEW Why Do I Need a Compliant Accounting System Auditor s Judgment Definitions Key Components Audits How to be prepared for an audit
GOVERNMENT CONTRACTING MICROSOFT DYNAMICS AX AND
GOVERNMENT CONTRACTING AND MICROSOFT DYNAMICS AX White paper on Government Contracting requirements and considerations in planning for a Dynamics AX implementation. 1 Government Contracting and Microsoft
Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions
Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions Nicole Mitchell, CPA Donna Dominguez Aronson LLC May 1, 2013 2013 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland
Federal Regulatory Compliance Best Practices Washington Technology Webcast. September 27, 2012
Federal Regulatory Compliance Best Practices Washington Technology Webcast September 27, 2012 Agenda Topic Minutes Regulatory compliance overview 5 Major areas of financial compliance risk 15 Best practices
Department of Defense MANUAL
Department of Defense MANUAL NUMBER 7600.07 August 3, 2015 IG DoD SUBJECT: DoD Audit Manual References: See Enclosure 1 1. PURPOSE. This manual: a. Reissues DoD 7600.07-M (Reference (a)) in accordance
How to Survive a DCAA Pre-Award Audit
How to Survive a DCAA Pre-Award Audit February 27, 13 Presented by: Paul H. Calabrese Senior Manager 301-214-4137 pcalab@rubino.com Bio http://www.rubino.com/company/staff/11- paul_h_calabrese/view LinkedIn
INSTRUCTION NUMBER 7640.02 August 22, 2008
Department of Defense INSTRUCTION NUMBER 7640.02 August 22, 2008 IG DoD SUBJECT: Policy for Follow-up on Contract Audit Reports References: See Enclosure 1 1. PURPOSE. This Instruction: a. Reissues DoD
SCHEDULES OF CHAPTER 40B MAXIMUM ALLOWABLE PROFIT FROM SALES AND TOTAL CHAPTER 40B COSTS EXAMINATION PROGRAM
7/30/07 SCHEDULES OF CHAPTER 40B MAXIMUM ALLOWABLE PROFIT FROM SALES AND TOTAL CHAPTER 40B COSTS Instructions: EXAMINATION PROGRAM This Model Program lists the major procedures and steps that should be
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security 1. PURPOSE This memorandum sets forth an understanding of contract audit coverage and related audit
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO PAS 730.3.B.2 July 23, 2009 09-PAS-014(R) MEMORANDUM FOR REGIONAL
DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include verification for completeness
Accounting Principles Critical to Success Presented By: C. P. Krishnan. www.cakintl.com
Accounting Principles Critical to Success Presented By: C. P. Krishnan Basic Accounting You Need to Know Assets, Liabilities, Equity, Income, & Expenses Assets Includes what you have and what people owe
Bulletin 2006-007. Date Issued: June 28, 2006. All Public Offices Independent Public Accountants. Betty Montgomery Ohio Auditor of State
Date Issued: June 28, 2006 Bulletin 2006-007 TO: FROM: All Public Offices Independent Public Accountants Betty Montgomery Ohio Auditor of State SUBJECT: Public Contracting/Required Financial Reviews (Sections
DEFENSE CONTRACT AUDIT AGENCY CHECKLIST FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include an assessment for completeness
GAO DCAA AUDITS. Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated
GAO United States Government Accountability Office Report to Congressional Addressees July 2008 DCAA AUDITS Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated
Performing Audit Procedures in Response to Assessed Risks and Evaluating the Audit Evidence Obtained
Performing Audit Procedures in Response to Assessed Risks 1781 AU Section 318 Performing Audit Procedures in Response to Assessed Risks and Evaluating the Audit Evidence Obtained (Supersedes SAS No. 55.)
Tel. 202.332.3566 Fax 202.332.3672 www.martinwallcpa.com MANAGEMENT LETTER
Tel. 202.332.3566 Fax 202.332.3672 www.martinwallcpa.com MANAGEMENT LETTER In planning and performing our audit of the financial statements of the U.S. Nuclear Waste Technical Review Board (NWTRB) for
Current Initiatives May 2015
DHG 20 th Annual Government Contracting Update Current Initiatives May 2015 Mr. Ken Saccoccia Deputy Director Page 1 One Agency One Mission DCAA Overview Priorities and Better Buying Power Small Business
OAIG-AUD (ATTN: AFTS Audit Suggestions) Inspector General of the Department of Defense 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704
Additional Copies The Office of Audit Policy and Oversight, Office of the Assistant Inspector General for Auditing of the Department of Defense, prepared this report. To obtain additional copies of this
Enprise Job Costing and DCAA Compliance
April 2014 Author: Document Version: Product: Product Version: SAP Version: Localization: Enprise Solutions 1.5.0 Enprise Job Costing All versions All current versions North America 2014 Enprise Solutions