A Cost Optimization Model for Hazardous Medical Waste Management in Portugal

Size: px
Start display at page:

Download "A Cost Optimization Model for Hazardous Medical Waste Management in Portugal"

Transcription

1 A Cost Optimization Model for Hazardous Medical Waste Management in Portugal João M. S. C. Nunes de Almeida Department of Civil Engineering, Instituto Superior Técnico ABSTRACT The hazardous medical waste management (HMW) is a very particular field of solid waste management as it requires following specific rules in order to correctly eliminate and treat the hazardous waste. According to Portuguese and European legislation the waste management operations should occur preferably in national territory, thus reducing inter-borders waste-flows. This poses a problem as the Portuguese incineration capacity for HMW is lower than the actual production; as a result there is an urgent need to expand such capacity. HMW in Portugal can be divided into two groups, roughly those that have to be incinerated and those that need to be decontaminated before being transported to landfills. The HMW companies work with both groups at the same time; therefore the HMW management system should be treated as one whole system instead of two separate ones. In this work a tool is proposed (Mixed Integer Linear Programming - MILP - Model) which will optimize in terms of cost, both the location of the facilities related to HMW management as well as the allocation of waste between the different nodes. The aim of this tool is to present the decision maker, in a reasonable amount of time, the optimal solution to the problem. This model will be applied to two different scenarios. The first one will consider none of the existing infrastructures; the locations of all the facilities will be treated as model variables. The second one will only locate the incinerator(s); all the other facilities location will be considered as model parameters. Keywords: Mixed Integer Linear Programming (MILP), Hazardous medical waste management, Facility location model and Cost optimization. 1. Introduction Medical waste is a specific type of solid waste produced in the activities related to healthcare, both of humans and animals. The nature of such waste makes it most of the time hazardous to human health and the environment. Therefore, in developed countries there is a strict legislation regarding the management operations (handling, storage, transportation and disposal) of such waste in order to prevent possible contamination of the surrounding environment. In Portugal the first legislation regarding medical waste management appeared only in 1990 and split medical waste into two groups: non-hazardous and hazardous medical waste (HMW). That legislation specified that HMW had to be incinerated, and so hospitals (the mains producers of HMW) began to install small incineration units in their facilities. In 1996 the legislation changed the classification of medical waste into four groups: I, II, III and IV. The first two are considered non-hazardous medical waste and consequently can be treated like urban solid waste (USW). The last two are considered HMW and as result need special requirements in terms of the management operations. Waste from groups III and IV must be stored in different containers and put in a storage area where they have to be collected within three days or seven days if the storage area is equipped with a refrigeration system. They must be transported from the collection point to the disposal point in 1

2 trucks equipped with isothermal containers. Group III waste can be eliminated the same way as Group IV or it can be decontaminated and then disposed as USW. Group IV waste has to be eliminated and the ashes produced have to be disposed at a non-hazardous industrial landfill; the only elimination method available in Portugal is incineration. As can be seen in figure 1 the path options for HMW are quite limited. Figure 1 Possible waste paths for HMW in Portugal With this new set of rules the HMW management market shifted, and several Group III waste treatment facilities, held by private companies, were opened. In 1999 due to poor environmental conditions, the hospital incineration units started to close leading to the current situation of only one working HMW incinerator located in Lisbon. Again, with this change, a new market was created as Group IV waste had now to be transported from the producing nodes to the only HMW incinerator in Portugal. Due to the characteristics of this transportation (small amounts, high collection frequency) the best competitors offering their services in transporting Group IV waste were the already established Group III waste treatment companies. Their solution was to collect both groups of waste at the same time, transport them to the Group III waste treatment unit where they built transfer stations (TS) storage units for waste, and finally by concentrating big amounts of Group IV waste in the TS, it was possible for them to transport the Group IV waste at lower cost to the Lisboa incinerator. This evolution in the legislation conditioned the growth of the HMW management market. When comparing all the possible paths for HMW (figure 1) and what happens in reality, one can observe that the waste management companies slowly adapted to the legal requirements imposed. Nowadays the HMW management system is not a system based in TS used by both groups of waste, in order to lower transportation costs, but an adaption of the existing Group III waste treatment layout to include Group IV waste collection and transportation. This last affirmation is justified by the disperse layout of infrastructure for Group III waste treatment (13 treatment facilities in 8 districts) high number of treatment facilities suggest lower use of TS by Group III waste and the concentrated layout of infrastructure for Group IV waste elimination (1 facility only) low number of incinerators suggests high use of TS. Another important issue that has to be taken into account is the cost inefficiency in the Group III waste treatment, which is quite a recent market that has grown quickly but not efficiently. Nowadays, as it can be seen in table 1, the installed treatment capacity of Group III waste is almost twice the predicted production for 2016, and since the analysis of the data available in CESUR (2009c) points to a stabilization in HMW production in a near future, such excess in capacity will not be necessary in the coming years. Table 1 Production vs. Treatment capacity Group III (ton/year) Group IV (ton/year) Lower bound Higher bound Lower bound Higher bound Treatment Capacity Estimated production for Differential Source: (CESUR, 2009c) Finally, also from table 1, it is possible to say that there is an urgent need to expand Group IV waste elimination capacity. According to Portuguese legislation all waste produced should be treated 2

3 within the Portuguese territory. In a best case scenario in 2016 there will be a deficit in elimination capacity of 360 ton/year. One can therefore conclude that the HMW management in Portugal is far from being optimal. In this work a mathematical optimization model (MILP) is proposed to address this problem. In section two a literature review is presented and in section three the model formulation detailed. In section four the input data considered for the case study is summed up followed, in section five, by results presentation and discussion. Finally in section six conclusions of this study are drawn and future research suggested. 2. Literature review The problem that is proposed to be solved has been extensively characterized in the available literature as the facility location problem. In these types of problems the objective is to optimally locate a certain type of facilities in order to best fulfill the model purpose. One can distinguish between two big categories of objectives: equity objectives, where the purpose is to minimize the maximal distance between the users and the facility and efficient objectives, where the purpose is to minimize the total distance (time/cost) of the whole system (Current, Daskin, & Schilling, 2002). The model proposed will have an efficient objective. Moreover this is a location-allocation problem which according to Owen and Daskin (1998) is normally solved using median or fixedcharge approaches. The median approach can be defined as minimizing the total demand-weighted travel cost (distance or time). Only variable costs, such as the transportation costs are taken into account in this approach. General formulations can be found in Owen and Daskin (1998), Current et al. (2002), ReVelle and Eiselt (2005) and ReVelle, Eiselt and Daskin (2008). The fixed-charge approach is similar to the median approach but it also includes the construction, capital or expansion costs. Therefore demand may not be assigned to the closest facility but to a farther facility whose fixed costs are lower. The nature of the solid waste management system makes it very suitable to be called a hierarchical facility system. It is composed by first level nodes which are the waste producers, followed by intermediate nodes that can be TS or treatment facilities and finally there are sinking nodes which are the waste disposal sites. Due to the predicted evolution of HMW production in Portugal, and due to the purpose of this model, which is to present the optimized layout of the HMW system in a near future (production data used refers to 2016), the approach considered will be a static deterministic mixed integer linear programming model. The literature on HMW optimization models is quite inexistent. Still there are a lot of articles on solid waste optimization models that are valuable to the HMW case. The first location-allocation models seen in the literature (1971 to 1988) had the objective of locating a few number of facilities, mainly intermediate nodes such as TS, and sinking nodes such as landfills. The big difficulty at that time was to solve the model since the computational capacities were not as evolved as nowadays. Therefore several of the articles found are focused on presenting heuristics that would help find a solution to the solid waste model presented (Walker W., 1976; Jenkins, 1982). In that same period, the articles focused on the model formulation and its application, propose mostly static fixed-charge approaches to locate the facilities stated above (Helms and Clark, 1971; Marks and Liebman, 1971; Harvey and O'Flaherty, 1973). As most of the problems were computer intractable some original procedures were found to make it possible to reach a solution. For instance (Greenberg, Caruana, & Krugman, 1976) propose a linear programming model for managing a three level hierarchical layout only considering hauling costs. The objective of this model is not to yield the optimal solution by itself (which facilities to open and where) but to test different solid waste management strategies, e.g. centralized landfills vs. disperse landfills. In order to reach a good solution the authors state that due to the added complexity of solving a MILP model (fixed-charge approach) it is preferable to include economies of scale by manually executing repetitive test runs of different scale plants (p.4) which is inexpensive to run, flexible and works (p.4). Walker, Aquilina and Schur (1974), also present a fixed-charge approach applied to a three level hierarchical system which purpose is to locate both the intermediate facilities and the sinking nodes facilities. These authors apart from considering both transportation costs and fixed costs of opening a facility at a certain node also consider the scale economies on variable treatment costs. Increasing a facility s capacity factor leads to the decrease of treatment costs per unit. Such costs are considered in 3

4 the model by including concave piece-wise linear cost functions. In this paper a heuristic method (SWAM) to solve the model is presented as well. In the later literature models one can distinguish Kulcar (1996), who proposes a fixed-charge model to locate, in a first part the transfer stations, and in a second part the collection trucks depots in the region of Brussels, as well as Badran and El-Haggar (2006), whose model determines the optimal location of collection stations and the optimal waste flows allocation considering only cost as a factor. Finally Komilis (2008) presents two different approaches for optimizing the haul and transfer of municipal solid waste. The first one is based on time, rather practical when information on cost is not available, and the second one based on cost, which is more appropriate when different types of vehicles with different costs are involved. In this article the chosen path for waste between nodes is given by a binary variable which is equal to one when a certain path is used. 3. Model formulation 3.1 Model objective and considerations The model purpose is to optimize the entire layout of the HMW management system in a cost point of view. For that purpose this model will optimize both the location of the facilities, i.e. TS, Group III waste treatment facilities (from now on referred simply as DS) and incinerators (INC), but also the allocation of waste to the different nodes. As it was seen, in reality the HMW cycle does not end in the DS, for Group III waste, or in the INC, for Group IV waste. However it was concluded that the exclusion of landfill locations would be a simplification to the model whose effects could be disregarded. Truth is, USW landfills are present all over the Portuguese territory and so the location of the DS will not have any relevant influence in the costs of transporting the refuse to the landfill. In what concerns the Group IV ashes, its transportation cost to non-hazardous industrial waste landfills is not significant enough to alter the incinerator location choice. Consequently the possible waste paths considered are as shown in figure 2. The Group III waste can go from the generating node to an intermediate node (TS) and then to the DS (GIII-1) or directly to the DS (GIII-2). The Group IV waste can go directly from the generating node to the INC (GIV-1) or, it can go through a TS between the initial node and the final node. The difference is that, as Group IV waste represents on average 10% of the HMW produced at each node there will be a difference in cost when this type of waste is transported together with Group III to the same TS (GIV-3) or otherwise (GIV-2). Figure 2 Possible waste flows considered by the model In terms of the costs considered, the model will include the different transportation costs between the several facilities, the fixed costs of opening a facility (included as an annuity in the model) and the variable costs of treatment for DS and elimination for INC. These last costs will be included in the model recurring to a similar formulation as the one presented by Walker et al. (1974). The choice of the path taken for each type of waste in each node will be done with binary variables as the ones used by Komilis (2008). 4

5 3.2 Indices The indices are: i {1,,m} for Generating nodes; j {1,,n} for Transfer Station nodes (TS); k {1,,p} for Disposal Site nodes (DS); l {1,,q} for Incinerator nodes (INC) and x {1,,r} for the Cost function. 3.3 Parameters Cs Ct Cts PG4 i PG3 i FixTS j FixDS kx FixINC lx VarDS kx VarINC lx δ β d ij, d ij, d ij, d ij, d ij, Cost per ton*km of transporting Group IV waste from a generating node to a TS or INC individually in a small capacity vehicle Cost per ton*km of transporting Group IV waste together with Group III waste from a generating to a TS in a small capacity vehicle, or Group III form a generating node to a TS or directly to the DS Cost per ton*km of transporting all types of waste from the TS to a DS or INC in big capacity vehicles Group IV waste production at node i (ton per year) Group III waste production at node i (ton per year) Fixed cost of opening a TS at location j Fixed cost of opening a DS at location k, associated to cost curve x Fixed cost of opening an INC at location l, associated to cost curve x Variable cost (per ton) of treating waste at a DS in location k, for cost curve x Variable cost (per ton) of eliminating waste at an INC in location l, for cost curve x Control parameter equal to the highest ratio Group IV waste produced at node i divided by Group III waste produced at the same node plus 1 Control parameter which has to be greater or equal than the total amount of HMW in the system Euclidean distance between the different set of nodes (km) 3.4 Variables QtDS kx Quantity of waste being treated at DS (k) with cost curve (x) QtINC lx Quantity of waste being treated at DS (k) with cost curve (x) Z1 il (1) if path GIV-1 is chosen, (0) otherwise Z2s ijl (1) if path GIV-2 is chosen, (0) otherwise Z2t ijl (1) if path GIV-3 is chosen, (0) otherwise Z3 ik (1) if path GIII-2 is chosen, (0) otherwise Z4 ijk (1) if path GIII-1 is chosen, (0) otherwise Y1 j (1) If TS at node j is open, (0) otherwise Y2 kx (1) If DS at node k is open, (0) otherwise Y3 lx (1) If INC at node l is open, (0) otherwise Δ1 jk (1) path chosen between TS (j) and DS (k), (0) otherwise Δ2 jl (1) path chosen between TS (j) and INC (l), (0) otherwise 5

6 3.5 Objective function The objective function represents the sum of all costs considered: Min Cost = [Z1 PG4 d Cs] + Z2s PG4 d Cs + d Cts + Z2t PG4 d Ct + d Cts + [Z3 PG3 d Ct] + Z4 PG3 d Ct + d Cts + FixTS Y1 + [QtDS VarDS + FixDS Y2 ] + [QtINC VarINC + FixINC Y3 ] (1) In this sum, the first five terms are related to transportation costs and the last three to facility costs (variable and fixed). 3.6 Constraints Z4 PG3 + Z2t PG4 δ Z4 PG3, i = 1,, m; j = 1,, n (2) [Z1 ] + Z2s + Z2t = 1, i = 1,, m (3) [Z3 ] + Z4 = 1, i = 1,, m (4) PG4 Z2s + Z2t + PG3 Z4 β Y1, j = 1,, n (5) PG3 Z4 + [PG3 Z3 ] β Y2, k = 1,, p (6) PG4 Z2s + Z2t + [PG4 Z1 ] β Y3, l = 1,, q (7) QtDS β Y2, k = 1,, p; x = 1,, r (8) QtINC β Y3, l = 1,, q; x = 1,, r (9) Y2 1, k = 1,, p (10) Y3 1, l = 1,, q (11) [PG3 Z3 ] + PG3 Z4 QtDS = 0, k = 1,, p (12) [PG4 Z1 ] + P43 Z2s + Z2t QtINC = 0, l = 1,, q (13) Z4 1 0, i = 1,, m; j = 1,, n; k = 1,, p (14) Z2s + Z2t 2 0, i = 1,, m; j = 1,, n; l = 1,, q (15) 1 = 1, j = 1,, n (16) 2 = 1, j = 1,, n (17) 6

7 Constraint (2) allows the flow of Group IV waste to be transported at reduced cost only when it goes from the same generating node, i, to the same transfer station, j, along with Group III waste. The coefficient δ serves as a control parameter, i.e. whenever the flow of Group III waste in a certain arch is equal to 0 then δ*0=0, which means that the Group IV waste flow in the same arch has to be 0 (since the right hand side of (2) cannot be negative). If the Group III waste flow is 0 then δ, which is a big number, allows Group IV waste flow to travel along this path. Constraints (3) and (4) confirm that for each node i only one path is taken, regarding respectively Group IV and III waste collection. This means that the waste produced at a certain node can only be transported through one path (method of transportation), avoiding having more waste transported than the one produced. Constraints (5), (6), (7), (8) and (9) can be considered as capacity constraints, though in this case they prevent waste flow to go through facilities that do not exist (when Y=0). The first three constraints of this group ensure that the path chosen for a certain node i, (Z=1) is going through existing facilities (Y=1). The last two constraints ensure that if a certain amount of waste is billed with a certain cost curve at a facility then the fixed cost associated with that curve must also be taken into account. The coefficient β serves has a control parameter. This coefficient can quickly transform these constraints into capacity constraints being β the capacity limit. The role of β in these constraints is analog to the role of δ previously mentioned. Constraints (10) and (11) ensure that only one cost curve is used per location, meaning that all the treatment costs of one location (k or l) are taken from the same cost curve. Finally constraints (12) and (13) guarantee that all the waste coming to a certain facility is charged with the according variable treatment cost. Constraints (2) to (17) are control constraints, to ensure that all waste of the same group flowing through a TS has the same final destination. 4. Input data for the model To run the previously formulated model to the Portuguese case study, one must have defined: (1) the geographical distribution of the HMW producers, (2) the production of each node, (3) the location where it will be possible to build the infrastructure (TS, DS and INC) and (4) the different types of costs. The first requisite was fulfilled by assuming a simplification. The producers, which are healthcare facilities, such as hospitals, public healthcare clinics (PHC), etc., are numerous and their precise location is difficult to obtain. Therefore it was considered that there would be one point per municipality to represent that area s producers. By observing the data available, it was possible to distinguish two types of healthcare facilities. Those that are use in a day-to-day basis (PHC, pharmacies, etc.) which account for 29% of total HMW production, and the necessity facilities, where the user goes if he needs special healthcare (hospitals) and which account for 71% of total HMW production. So in each node the production was dependent on the resident population (day-to-day share) and on the number of hospital beds in that municipality (necessity share). As the facilities in the HMW management sector are expensive to build, but also as the purpose of this application is to present a rough idea of the optimal locations for HMW management facilities it was decided that only one node per district would be considered for each of the three facilities type. Therefore based on the production of each municipality of a certain district, the gravitational centers were calculated and used as the possible location for opening the facilities. The different costs were estimated based on the available literature and are presented in table 2. Ct ( /ton/km) Cs ( /ton/km) Table 2 Considered costs for the case study Group III FixDS k1 ( /year) VarDS k1 ( /ton) FixDS k2 ( /year) VarDS k2 ( /ton) 15, , ,30 Cts ( /ton/km) FixTS j ( /year) Group IV FixINC l1 ( /year) VarINC l1 ( /ton) FixINC l2 ( /year) VarINC l2 ( /ton) 5, , ,98 5. Case study results The model was programmed using the GAMS software. The solver chosen was the CPLEX. As it is a MILP model, there is the need to define an optimization margin. The default value of 10% was 7

8 chosen for that margin, since it was considered that the improvements gained after attaining this value, in most of the cases were not worth the extra time spent. The objective of this case study is to observe, with the available data, what could be the optimized scenario for the HMW management system. Although the purpose of this model would be to create an interaction between the user and the results, allowing the user to adapt the technology choices and consequently converge into the optimal solution, due to the limited data available the case study presented will be pointing to the possible savings made by rearranging the number and location of such infrastructure while using the same technology available (cost estimated before). The first solution found had an optimization margin of 4,59% and an objective function value of 14,72 millions of Euros per year (total HMW management cost). After some analysis to the results it was understood that the solution found could be improved. By altering the model constraints to limit the location of the facilities a new solution was found with a total cost of 14,71 million of Euros, which is equivalent to an improvement of about 0,044%, compared to the first solution found. To try and reach the same solution with the original formulation the model was set to run with CPLEX option Objllim set to 14,713. After running for over 20 hours the model did not reach the solution. Still the analyzed results will focus on the best available results. The estimation for the total cost of HMW management, under the current real scenario and for the time period of the case study, is 19 millions of Euros per year. This means the optimized solution would reduce the total costs by 22,5%. In table 3, it is presented the location of the several facilities opened by the model, as well as the capacities used by the different DS and INC. First of all, one can see that most of the DS are working at a low capacity, with the exception of Porto and Lisboa the other DS are working at an average capacity of 18%. This is the result of very high transportation costs, which account for around 70% of the total costs. Therefore, under these conditions it is preferable to work at lower capacities than to transport the waste to farther facilities. In terms if the incinerators, although they are not working at a high capacity (50% of max. cap.), their usage is not as worrying as the ones seen for the DS. LOCATION Table 3 Location of infrastructure by model and existing facilities T. STATION DISP. SITES INCINERATOR LOCAT. EXISTING LOCAT. EXISTING % USED LOCAT. EXISTING % USED AVEIRO X X X - 18, BEJA X X - X BRAGA X X X X 31, BRAGANÇA X - X - 4, CASTELO BRANCO X X X X 10, COIMBRA X - X - 38, ÉVORA X - X - 12, FARO X X X X 12, GUARDA LEIRIA - X - X LISBOA X X X X 125,81 X X 48,22 PORTALEGRE X PORTO X X X X 63,64 X - 51,60 SANTARÉM X - X - 16, SETÚBAL X X - X VIANA DO CASTELO X VILA REAL X - X - 10, VISEU Total A sensitivity analysis to the relation between transportation and treatment costs led to a validation of the model. The higher the impact of treatment costs the more concentrated the layout became. However it must be stated that the number of incinerators opened by the model was constant, only varying for transportation costs much higher than the ones used (200%). This led to the conclusion that the location of incinerators was not only dependent on the direct costs associated with Group IV waste, but also with the layout of the Group III infrastructure (common transportation). 8

9 The results presented point out to the current inefficiency of the set up infrastructure, in terms of the DS units capacity. As it was said before Portugal has already almost twice the capacity needed to treat Group III waste. This leads to the understanding that the best solution for the HMW infrastructure location would be a high number of low capacity facilities well distributed over Portugal. In order to extract the reason behind the cost savings seen it is also possible to observe in table 3 the existing facilities in Portugal. One must be aware that in reality, each district might include more than one facility. At this moment, there are 13 DS equipped with TS and only two TS, in Portugal. When comparing to the results given by the model to reality it is possible to see that both situations are quite similar; in the model results there are 11 DS equipped with TS and 4 TS. So, one can conclude that the big share of savings observed in the optimization results, is due to a better distribution of the resources. Instead of positioning 13 DS in 8 districts the model equips 11 districts with a DS. Although the technology choice can be improved, the results of the model can be considered as more than satisfactory, since that any improvements in the technology choice will only affect a small portion of the total costs (treatment costs, around 30%). Therefore the total cost value given by this model is a very good approximation to what would be the lowest possible total cost of HMW management in Portugal, so considering other technologies or capacity for the used infrastructure would not lead to much lower values than the annual 14 millions of Euros. In terms of the INC case, as it was said at the beginning there is an urgent need of expanding its total capacity. The model presented a North-South division which is not only accurate since it is the less costly solution, but also because it is advisable that the HMW incineration market does not constitute a monopolist market. In the current situation only one operating company controls the whole share of HMW incineration. If fees are not regulated then the incentive of that company is to charge a little less than the second cheapest solution, which is to export HMW. This leads to the practice of higher and non-competitive fees by the solo service provider. Just to give an illustration of the solution presented by the model, it is included in appendix the influence areas of the different facilities. 6. Conclusion and further research Finally one can conclude from the results presented that the future of HMW management in Portugal will pass through the downsizing of treatment facilities in the Group III waste case, in order to present more competitive prices, but it will also include a better distribution of resources among the territory. In the incinerators case it is very important that a two operator solution is found quickly. Firstly due to the unacceptable location of the current incinerator, in central Lisbon, and also due to its capacity, already under the waste production, secondly due to the monopolist market which results in inflated fees for the user, and finally because of the high transportation costs which point to savings if there is a better distribution of incineration resources along the Portuguese territory. In terms of the transfer stations location and number, one can say that although they might generally seem the pillar of the HMW system, and so one would expect to see a high number of transfer stations serving both Group III and IV waste, due to the high transportation costs the benefits created by such facilities are easily overcome. So the real role of this type of infrastructure in the Portuguese case is to serve mostly as transfer stations for Group IV waste. Regarding future research two main aspects would be important to discuss. The first one concerns the application of the model to the same case study, considering the different cost curves associated with facilities of several types and capacities; as it was said before the savings described in section 5 are the biggest share of cost improvements possible to obtain by optimizing the HMW management system, still one could study this problem in a bigger detail by including such data into the model to quantify the gains of a more capacity efficient infrastructure. The second aspect is also related to studying this problem with more detail, but in a different approach. It consists in considering each of the several zones where the model located facilities as new case studies. Taking into account other factors, such as social, environmental, political, etc., it would be interesting to define inside of each of these new areas the best precise location of the facilities. 9

10 Appendix Influence areas of (1) TS, (2) DS and (3) INC (1) (2) (3) References Badran, M., & El-Haggar, S. (2006). Optimization of municipal solid waste management in Port Said - Egypt. Waste Management, 26, CESUR. (2009c). Plano Estratégico dos Resíduos Hospitalares Agência Portuguesa do Ambiente - DGS. Current, J., Daskin, M., & Schilling, D. (2002). Discrete Network Location Models. In Z. Drezner, & H. Hamacher, Facility Location: Applications and Theory (pp ). Berlin: Springer-Verlag. Greenberg, M., Caruana, J., & Krugman, B. (1976). Solid-waste management: A test of alternative strategies using optimization techniques. Environment and Planning A, 8, Harvey, D., & O'Flaherty, T. (1973). An analysis of solid waste transportation and disposal alternatives. INFOR, 3, Helms, B., & Clark, R. (1971). Selecting solid waste disposal facilities. Journal of the Sanitary Engineering Division, 97-4, Jenkins, L. (1982). Parametric mixed integer programming: An application to solid waste management. Management Science, 28-11, Komilis, D. (2008). Conceptual modeling to optimize the haul and transfer of municipal solid waste. Waste Management, 28, Kulcar, T. (1996). Optimizing solid waste collection in Brussels. European Journal of Operational Research, 90, Marks, D., & Liebman, J. (1971). Location models: Solid waste collection examples. Journal of the Urban Planning and Development Division, 97-1, Owen, S. H., & Daskin, M. S. (1998). Strategic facility location: A review. European Journal of Operational Research, 111, ReVelle, C., & Eiselt, H. (2005). Location analysis: A synthesis and survey. European Journal of Operational Reshearch, 165, ReVelle, C., Eiselt, H., & Daskin, M. (2008). A bibliography for some fundamental problem categories in discrete location science. European Journal of Operational Research, 184, Walker, W. (1976). A heuristic adjacent extreme point algorithm for the fixed charge problem. Management Science, 22-5, Walker, W., Aquilina, M., & Schur, D. (1974). Development and use of a fixed charge programming model for regional solid waste planning. Santa Monica, CA: Rand Corp. Paper. 10

Optimal Planning of Closed Loop Supply Chains: A Discrete versus a Continuous-time formulation

Optimal Planning of Closed Loop Supply Chains: A Discrete versus a Continuous-time formulation 17 th European Symposium on Computer Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 Optimal Planning of Closed Loop Supply Chains: A Discrete

More information

The retrofit of a closed-loop distribution network: the case of lead batteries

The retrofit of a closed-loop distribution network: the case of lead batteries 20 th European Symposium on Computer Aided Process Engineering ESCAPE20 S. Pierucci and G. Buzzi Ferraris (Editors) 2010 Elsevier B.V. All rights reserved. The retrofit of a closed-loop distribution network:

More information

A green tax proposal to address fiscal and environmental issues

A green tax proposal to address fiscal and environmental issues 1 A green tax proposal to address fiscal and environmental issues Claudia Dias Soares Green Tax Reform Commission Portuguese Catholic University soarescl1@gmail.com GETC 2014, Copenhagen, 25 September

More information

A Maximal Covering Model for Helicopter Emergency Medical Systems

A Maximal Covering Model for Helicopter Emergency Medical Systems The Ninth International Symposium on Operations Research and Its Applications (ISORA 10) Chengdu-Jiuzhaigou, China, August 19 23, 2010 Copyright 2010 ORSC & APORC, pp. 324 331 A Maximal Covering Model

More information

A hierarchical multicriteria routing model with traffic splitting for MPLS networks

A hierarchical multicriteria routing model with traffic splitting for MPLS networks A hierarchical multicriteria routing model with traffic splitting for MPLS networks João Clímaco, José Craveirinha, Marta Pascoal jclimaco@inesccpt, jcrav@deecucpt, marta@matucpt University of Coimbra

More information

Branch-and-Price Approach to the Vehicle Routing Problem with Time Windows

Branch-and-Price Approach to the Vehicle Routing Problem with Time Windows TECHNISCHE UNIVERSITEIT EINDHOVEN Branch-and-Price Approach to the Vehicle Routing Problem with Time Windows Lloyd A. Fasting May 2014 Supervisors: dr. M. Firat dr.ir. M.A.A. Boon J. van Twist MSc. Contents

More information

Revenue Management for Transportation Problems

Revenue Management for Transportation Problems Revenue Management for Transportation Problems Francesca Guerriero Giovanna Miglionico Filomena Olivito Department of Electronic Informatics and Systems, University of Calabria Via P. Bucci, 87036 Rende

More information

Cost Models for Vehicle Routing Problems. 8850 Stanford Boulevard, Suite 260 R. H. Smith School of Business

Cost Models for Vehicle Routing Problems. 8850 Stanford Boulevard, Suite 260 R. H. Smith School of Business 0-7695-1435-9/02 $17.00 (c) 2002 IEEE 1 Cost Models for Vehicle Routing Problems John Sniezek Lawerence Bodin RouteSmart Technologies Decision and Information Technologies 8850 Stanford Boulevard, Suite

More information

VEHICLE ROUTING PROBLEM

VEHICLE ROUTING PROBLEM VEHICLE ROUTING PROBLEM Readings: E&M 0 Topics: versus TSP Solution methods Decision support systems for Relationship between TSP and Vehicle routing problem () is similar to the Traveling salesman problem

More information

Scheduling Algorithm with Optimization of Employee Satisfaction

Scheduling Algorithm with Optimization of Employee Satisfaction Washington University in St. Louis Scheduling Algorithm with Optimization of Employee Satisfaction by Philip I. Thomas Senior Design Project http : //students.cec.wustl.edu/ pit1/ Advised By Associate

More information

Supply Chain Planning Considering the Production of Defective Products

Supply Chain Planning Considering the Production of Defective Products Supply Chain Planning Considering the Production of Defective Products Ferrara Miguel, Corsano Gabriela, Montagna Marcelo INGAR Instituto de Desarrollo y Diseño CONICET-UTN Avellaneda 3657, Santa Fe, Argentina

More information

A METHODOLOGY FOR MODELING A LARGE LOCATION PROBLEM

A METHODOLOGY FOR MODELING A LARGE LOCATION PROBLEM A METHODOLOGY FOR MODELING A LARGE LOCATION PROBLEM Samuel Vieira Conceição* Luís Henrique Capanema Pedrosa** Marcellus Vinagre da Silva** Álvaro Simões da Conceição Neto** * Department of Industrial Engineering

More information

Milan Seminar. 2 nd. nd 5 th April 2009. Maria Helena Patrício Paes AGAINST SOCIAL EXCLUSION. mhpaes@prosalis.pt www.prosalis.pt

Milan Seminar. 2 nd. nd 5 th April 2009. Maria Helena Patrício Paes AGAINST SOCIAL EXCLUSION. mhpaes@prosalis.pt www.prosalis.pt Criminal Justice 2007 2 nd Milan Seminar nd 5 th April 2009 AGAINST SOCIAL EXCLUSION Maria Helena Patrício Paes mhpaes@prosalis.pt www.prosalis.pt Rua José Estêvão, n.º 137, 2.º 1169-058 Lisbon PORTUGAL

More information

Multiple Spanning Tree Protocol (MSTP), Multi Spreading And Network Optimization Model

Multiple Spanning Tree Protocol (MSTP), Multi Spreading And Network Optimization Model Load Balancing of Telecommunication Networks based on Multiple Spanning Trees Dorabella Santos Amaro de Sousa Filipe Alvelos Instituto de Telecomunicações 3810-193 Aveiro, Portugal dorabella@av.it.pt Instituto

More information

Instituto de Engenharia de Sistemas e Computadores de Coimbra Institute of Systems Engineering and Computers INESC Coimbra

Instituto de Engenharia de Sistemas e Computadores de Coimbra Institute of Systems Engineering and Computers INESC Coimbra Instituto de Engenharia de Sistemas e Computadores de Coimbra Institute of Systems Engineering and Computers INESC Coimbra João Clímaco and Marta Pascoal A new method to detere unsupported non-doated solutions

More information

Locating and sizing bank-branches by opening, closing or maintaining facilities

Locating and sizing bank-branches by opening, closing or maintaining facilities Locating and sizing bank-branches by opening, closing or maintaining facilities Marta S. Rodrigues Monteiro 1,2 and Dalila B. M. M. Fontes 2 1 DMCT - Universidade do Minho Campus de Azurém, 4800 Guimarães,

More information

Two objective functions for a real life Split Delivery Vehicle Routing Problem

Two objective functions for a real life Split Delivery Vehicle Routing Problem International Conference on Industrial Engineering and Systems Management IESM 2011 May 25 - May 27 METZ - FRANCE Two objective functions for a real life Split Delivery Vehicle Routing Problem Marc Uldry

More information

TRANSPORT PLANNING IN CONDITIONS OF DIFFERENT TRANSPORT TARIFFS APPLICATION OF INTEGER PROGRAMMING

TRANSPORT PLANNING IN CONDITIONS OF DIFFERENT TRANSPORT TARIFFS APPLICATION OF INTEGER PROGRAMMING TOTAL LOGISTIC MANAGEMENT No. 1 2008 PP. 25 31 Paweł HANCZAR TRANSPORT PLANNING IN CONDITIONS OF DIFFERENT TRANSPORT TARIFFS APPLICATION OF INTEGER PROGRAMMING Abstract: This paper presents the application

More information

The Problem of Scheduling Technicians and Interventions in a Telecommunications Company

The Problem of Scheduling Technicians and Interventions in a Telecommunications Company The Problem of Scheduling Technicians and Interventions in a Telecommunications Company Sérgio Garcia Panzo Dongala November 2008 Abstract In 2007 the challenge organized by the French Society of Operational

More information

Coordinating Supply Chains: a Bilevel Programming. Approach

Coordinating Supply Chains: a Bilevel Programming. Approach Coordinating Supply Chains: a Bilevel Programming Approach Ton G. de Kok, Gabriella Muratore IEIS, Technische Universiteit, 5600 MB Eindhoven, The Netherlands April 2009 Abstract In this paper we formulate

More information

IE 1079/2079. Summer 2009. Dr. Louis Luangkesorn. Introduction. What is logistics? Course Content. Course structure. Course policies.

IE 1079/2079. Summer 2009. Dr. Louis Luangkesorn. Introduction. What is logistics? Course Content. Course structure. Course policies. Outline 1 2 3 4 University of Pittsburgh June 22, 2009 5 6 Course What is logistics? focuses on the supply chain of services and products Comparisons IE 1080 - Supply Chain Analysis - Focuses on production

More information

MEDIGRAF - TELEMEDICINE SUSTAINABILITY 2013

MEDIGRAF - TELEMEDICINE SUSTAINABILITY 2013 MEDIGRAF - TELEMEDICINE 2013 Framework Medigraf IT platform is a solution totally developed by PT to suppress an identified need of health care professionals; Populations living in isolated or disadvantaged

More information

Strategic planning in LTL logistics increasing the capacity utilization of trucks

Strategic planning in LTL logistics increasing the capacity utilization of trucks Strategic planning in LTL logistics increasing the capacity utilization of trucks J. Fabian Meier 1,2 Institute of Transport Logistics TU Dortmund, Germany Uwe Clausen 3 Fraunhofer Institute for Material

More information

Airport logistics - A case study of the turnaround

Airport logistics - A case study of the turnaround Airport logistics - A case study of the turnaround process Anna Norin, Tobias Andersson Granberg, Di Yuan and Peter Värbrand Linköping University Post Print N.B.: When citing this work, cite the original

More information

Patient Classification System based on Dependency of Nursing Care

Patient Classification System based on Dependency of Nursing Care based on Dependency of Nursing Care Cristina Duarte Paulino Lisbon October 2008 Challenge Provide high quality care Contain the costs More flexibility from de organisations More rational use of the existing

More information

A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem

A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem John Karlof and Peter Hocking Mathematics and Statistics Department University of North Carolina Wilmington Wilmington,

More information

Constrained Clustering of Territories in the Context of Car Insurance

Constrained Clustering of Territories in the Context of Car Insurance Constrained Clustering of Territories in the Context of Car Insurance Samuel Perreault Jean-Philippe Le Cavalier Laval University July 2014 Perreault & Le Cavalier (ULaval) Constrained Clustering July

More information

During the analysis of cash flows we assume that if time is discrete when:

During the analysis of cash flows we assume that if time is discrete when: Chapter 5. EVALUATION OF THE RETURN ON INVESTMENT Objectives: To evaluate the yield of cash flows using various methods. To simulate mathematical and real content situations related to the cash flow management

More information

EMC meeting No./date 120/July 09. Decision. INSTITUTO POLITÉCNICO DE BEJA ESCOLA SUPERIOR DE TECNOLOGIA E GESTÃO DE BEJA School Address/Contact

EMC meeting No./date 120/July 09. Decision. INSTITUTO POLITÉCNICO DE BEJA ESCOLA SUPERIOR DE TECNOLOGIA E GESTÃO DE BEJA School Address/Contact s submitted to Expert: Name: INSTITUTO POLITÉCNICO DE BEJA ESCOLA SUPERIOR DE TECNOLOGIA E GESTÃO DE BEJA Rua D. Afonso III, n.º 1 7800-050 BEJA PORTUGAL Tel. (+351) 284 311 540 Fax (+351) 284 311 542

More information

Simulation-based Optimization Approach to Clinical Trial Supply Chain Management

Simulation-based Optimization Approach to Clinical Trial Supply Chain Management 20 th European Symposium on Computer Aided Process Engineering ESCAPE20 S. Pierucci and G. Buzzi Ferraris (Editors) 2010 Elsevier B.V. All rights reserved. Simulation-based Optimization Approach to Clinical

More information

Dynamic Management of an Emergency Vehicle Fleet : Deployment and Redeployment of Ambulances

Dynamic Management of an Emergency Vehicle Fleet : Deployment and Redeployment of Ambulances Dynamic Management of an Emergency Vehicle Fleet : Deployment and Redeployment of Ambulances Fayez F. Boctor Guillaume Carpentier Angel Ruiz August 2011 CIRRELT-2011-48 Document de travail également publié

More information

Waste Collection Vehicle Routing Problem Considering Similarity Pattern of Trashcan

Waste Collection Vehicle Routing Problem Considering Similarity Pattern of Trashcan International Journal of Applied Operational Research Vol. 3, o. 3, pp. 105-111, Summer 2013 Journal homepage: www.ijorlu.ir Waste Collection Vehicle Routing Problem Considering Similarity Pattern of Trashcan

More information

Minimizing costs for transport buyers using integer programming and column generation. Eser Esirgen

Minimizing costs for transport buyers using integer programming and column generation. Eser Esirgen MASTER STHESIS Minimizing costs for transport buyers using integer programming and column generation Eser Esirgen DepartmentofMathematicalSciences CHALMERS UNIVERSITY OF TECHNOLOGY UNIVERSITY OF GOTHENBURG

More information

Differentiated Pricing of Urban Transportation Networks. Networks with Vehicle-Tracking Technologies

Differentiated Pricing of Urban Transportation Networks. Networks with Vehicle-Tracking Technologies of Urban Transportation Networks with Vehicle-Tracking Technologies Mahmood Zangui Yafeng Yin* Siriphong Lawphongpanich Shigang Chen Department of Civil and Coastal Engineering University of Florida July

More information

A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO)

A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO) A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO) Zhanyou Huang a, Wenlong Cai a, A. Frederick Banfield a a Mintec, Inc., Tucson, Arizona, USA The MineSight Schedule

More information

Optimization Modeling for Mining Engineers

Optimization Modeling for Mining Engineers Optimization Modeling for Mining Engineers Alexandra M. Newman Division of Economics and Business Slide 1 Colorado School of Mines Seminar Outline Linear Programming Integer Linear Programming Slide 2

More information

A Reference Point Method to Triple-Objective Assignment of Supporting Services in a Healthcare Institution. Bartosz Sawik

A Reference Point Method to Triple-Objective Assignment of Supporting Services in a Healthcare Institution. Bartosz Sawik Decision Making in Manufacturing and Services Vol. 4 2010 No. 1 2 pp. 37 46 A Reference Point Method to Triple-Objective Assignment of Supporting Services in a Healthcare Institution Bartosz Sawik Abstract.

More information

In the Name of God. Waste Management Law

In the Name of God. Waste Management Law In the Name of God Waste Management Law Article 1- To fulfil the fiftieth Principle of the Islamic Republic of Iran Constitutional Law and in order to protect the environment form harmful effects of waste

More information

Urban Rehabilitation: an instrument for sustainable cities

Urban Rehabilitation: an instrument for sustainable cities Urban Rehabilitation: an instrument for sustainable cities The case of Covilhã, an old industrial area in Portugal Ana L. VIRTUDES 1 ; Filipa ALMEIDA 2 1 Full professor, 2Architect, PhD student Department

More information

Summary of specified general model for CHP system

Summary of specified general model for CHP system Fakulteta za Elektrotehniko Eva Thorin, Heike Brand, Christoph Weber Summary of specified general model for CHP system OSCOGEN Deliverable D1.4 Contract No. ENK5-CT-2000-00094 Project co-funded by the

More information

A Robust Optimization Approach to Supply Chain Management

A Robust Optimization Approach to Supply Chain Management A Robust Optimization Approach to Supply Chain Management Dimitris Bertsimas and Aurélie Thiele Massachusetts Institute of Technology, Cambridge MA 0139, dbertsim@mit.edu, aurelie@mit.edu Abstract. We

More information

A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM:

A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM: A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM: A TEMPORAL AND SPATIAL CASE V. Tosic, O. Babic, M. Cangalovic and Dj. Hohlacov Faculty of Transport and Traffic Engineering, University of

More information

Measurement Information Model

Measurement Information Model mcgarry02.qxd 9/7/01 1:27 PM Page 13 2 Information Model This chapter describes one of the fundamental measurement concepts of Practical Software, the Information Model. The Information Model provides

More information

Transportation. Transportation decisions. The role of transportation in the SC. A key decision area within the logistics mix

Transportation. Transportation decisions. The role of transportation in the SC. A key decision area within the logistics mix Transportation A key decision area within the logistics mix Chapter 14 Transportation in the Supply Chain Inventory Strategy Forecasting Storage decisions Inventory decisions Purchasing & supply planning

More information

VEHICLE ROUTING AND SCHEDULING PROBLEMS: A CASE STUDY OF FOOD DISTRIBUTION IN GREATER BANGKOK. Kuladej Panapinun and Peerayuth Charnsethikul.

VEHICLE ROUTING AND SCHEDULING PROBLEMS: A CASE STUDY OF FOOD DISTRIBUTION IN GREATER BANGKOK. Kuladej Panapinun and Peerayuth Charnsethikul. 1 VEHICLE ROUTING AND SCHEDULING PROBLEMS: A CASE STUDY OF FOOD DISTRIBUTION IN GREATER BANGKOK By Kuladej Panapinun and Peerayuth Charnsethikul Abstract Vehicle routing problem (VRP) and its extension

More information

Unifying the Private Fleet with Purchased Transportation

Unifying the Private Fleet with Purchased Transportation Unifying the Private Fleet with Purchased Transportation Achieving Lower Costs and Higher Service via Dynamic, Omni-Mode Integration of Private Fleet with For Hire Operations Sponsored by: The Descartes

More information

Transvision Waste Planner

Transvision Waste Planner Transvision Waste Planner Improving waste collection and transport efficiency TRANSVISION WASTE PLANNER facilitates major cost savings and impressive CO 2 emission reductions in your waste collection and

More information

A MANAGER S ROADMAP GUIDE FOR LATERAL TRANS-SHIPMENT IN SUPPLY CHAIN INVENTORY MANAGEMENT

A MANAGER S ROADMAP GUIDE FOR LATERAL TRANS-SHIPMENT IN SUPPLY CHAIN INVENTORY MANAGEMENT A MANAGER S ROADMAP GUIDE FOR LATERAL TRANS-SHIPMENT IN SUPPLY CHAIN INVENTORY MANAGEMENT By implementing the proposed five decision rules for lateral trans-shipment decision support, professional inventory

More information

DECEMBER 11 BUSINESS MEETINGS LISBON, PORTUGAL ASSOCIAÇÃO DOS PROFISSIONAIS E EMPRESAS DE MEDIAÇÃO IMOBILIÁRIA DE PORTUGAL

DECEMBER 11 BUSINESS MEETINGS LISBON, PORTUGAL ASSOCIAÇÃO DOS PROFISSIONAIS E EMPRESAS DE MEDIAÇÃO IMOBILIÁRIA DE PORTUGAL DECEMBER 11 BUSINESS MEETINGS ASSOCIAÇÃO DOS PROFISSIONAIS E EMPRESAS DE MEDIAÇÃO IMOBILIÁRIA DE PORTUGAL HISTORY: HIGHLIGHTS 1143 1910 1933 1974 1986 Monarchy Republic Estado Novo Authoritarian Revolution

More information

Optimization of the sales forecast algorithm for a supermarket supply chain

Optimization of the sales forecast algorithm for a supermarket supply chain Optimization of the sales forecast algorithm for a supermarket supply chain Patrícia Oliveira; Fátima Rosa; Miguel Casquilho Instituto Superior Técnico, Av. Rovisco Pais, 1049-001 Lisboa (Portugal) Abstract:

More information

at which branching takes place, a "middleman," if you will. See the transship model panel. ABSTRACT

at which branching takes place, a middleman, if you will. See the transship model panel. ABSTRACT Optimal Solution of Discrete Resource Allocation Problems with SAS/OR Software by LTC Doug McAllaster, US Army Logistics Management College, Fort Lee, VA ABSTRACT This paper is a tutorial on how to use

More information

A Quantitative Decision Support Framework for Optimal Railway Capacity Planning

A Quantitative Decision Support Framework for Optimal Railway Capacity Planning A Quantitative Decision Support Framework for Optimal Railway Capacity Planning Y.C. Lai, C.P.L. Barkan University of Illinois at Urbana-Champaign, Urbana, USA Abstract Railways around the world are facing

More information

Optimization of recyclable waste collection using real-time information.

Optimization of recyclable waste collection using real-time information. 6th International Conference on Industrial Engineering and Industrial Management. XVI Congreso de Ingeniería de Organización. Vigo, July 18-20, 2012 Optimization of recyclable waste collection using real-time

More information

Instituto Superior Técnico. Theme 1: Transport networks design and evaluation Case study presentation and synthesis

Instituto Superior Técnico. Theme 1: Transport networks design and evaluation Case study presentation and synthesis Instituto Superior Técnico REGIÕES E REDES (REGIONS AND NETWORKS) Theme 1: Transport networks design and evaluation Case study presentation and synthesis Luis Martinez 1 OUTLINE Case study: Soybean transportation

More information

What is Intellectual Capital?

What is Intellectual Capital? WWW.ATTAINIX.COM What is Intellectual? Abhijit Talukdar Founder, Attainix Consulting info@attainix.com Introduction, in the business context, refers to any asset that will produce future cash flows. The

More information

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015 Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center

More information

A linear algebraic method for pricing temporary life annuities

A linear algebraic method for pricing temporary life annuities A linear algebraic method for pricing temporary life annuities P. Date (joint work with R. Mamon, L. Jalen and I.C. Wang) Department of Mathematical Sciences, Brunel University, London Outline Introduction

More information

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations Why use simulation? Accurate Depiction of Reality Anyone can perform a simple analysis manually. However, as the complexity of the analysis increases, so does the need to employ computer-based tools. While

More information

VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR

VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR Andrew Goldstein Yale University 68 High Street New Haven, CT 06511 andrew.goldstein@yale.edu Alexander Thornton Shawn Kerrigan Locus Energy 657 Mission St.

More information

DEVELOPMENT AND CURRENT STATE OF WASTE SECTOR

DEVELOPMENT AND CURRENT STATE OF WASTE SECTOR WASTE MANAGEMENT DEVELOPMENT AND CURRENT STATE OF WASTE SECTOR Municipal Waste In accordance with Law on Environment, Solid Waste Management Regulation, Metropolitan Municipalities Law and Municipal Law;

More information

5 INTEGER LINEAR PROGRAMMING (ILP) E. Amaldi Fondamenti di R.O. Politecnico di Milano 1

5 INTEGER LINEAR PROGRAMMING (ILP) E. Amaldi Fondamenti di R.O. Politecnico di Milano 1 5 INTEGER LINEAR PROGRAMMING (ILP) E. Amaldi Fondamenti di R.O. Politecnico di Milano 1 General Integer Linear Program: (ILP) min c T x Ax b x 0 integer Assumption: A, b integer The integrality condition

More information

Real-Time Traffic Patrol Allocation for Abu Dhabi Emirate (UAE)

Real-Time Traffic Patrol Allocation for Abu Dhabi Emirate (UAE) Real-Time Traffic Patrol Allocation for Abu Dhabi Emirate (UAE) Hussain Al-Harthei Traffic and Patrols Directorate, Abu Dhabi Police, Email: alharthei@saaed.ae Oualid (Walid) Ben Ali University of Sharjah,

More information

Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness

Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness Débora P. Ronconi Ernesto G. Birgin April 29, 2010 Abstract Scheduling problems involving

More information

METHOD FOR PROJECT APPRAISAL: NET PRESENT VALUE OR NPV The sum of discounted cash flows.

METHOD FOR PROJECT APPRAISAL: NET PRESENT VALUE OR NPV The sum of discounted cash flows. OBJECTIVE: ECONOMIC ANALYSIS OF A PROJECT, consisting of the operation of a new incineration plant by the municipality. In particular we are interested in the computaton of a Solid Waste Tariff, consistent

More information

Optimizing the prediction models of the air quality state in cities

Optimizing the prediction models of the air quality state in cities Air Pollution XV 89 Optimizing the prediction models of the air quality state in cities J. Skrzypski, E. Jach-Szakiel & W. Kamiński Faculty of Process and Environmental Engineering, Technical University

More information

Portugal. Sub-Programme / Key Activity. HOSPITAL GARCIA DE ORTA PAR 2007 ERASMUS Erasmus Network European Pathology Assessment & Learning System

Portugal. Sub-Programme / Key Activity. HOSPITAL GARCIA DE ORTA PAR 2007 ERASMUS Erasmus Network European Pathology Assessment & Learning System HOSPITAL GARCIA DE ORTA PAR 2007 ERASMUS Erasmus Network European Pathology Assessment & Learning System UNIVERSIDADE DE AVEIRO PAR 2007 ERASMUS BeFlex Plus: Progress on Flexibility in the Bologna Reform

More information

SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID

SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID Amparo MOCHOLÍ MUNERA, Carlos BLASCO LLOPIS, Irene AGUADO CORTEZÓN, Vicente FUSTER ROIG Instituto Tecnológico de la Energía

More information

Oligopolistic models, because...

Oligopolistic models, because... Overview Network models of spatial oligopoly with an application to deregulation of electricity generation By Benjamin F.Hobbs Operations Research, vol. 34 (3) 1986, 395-409 Heikki Lehtonen 25th February

More information

The Rolling Stock Recovery Problem. Literature review. Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ

The Rolling Stock Recovery Problem. Literature review. Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ The Rolling Stock Recovery Problem Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ DTU Management Engineering, The Technical University of Denmark, Produktionstorvet, DTU Building 424, 2800

More information

Web-Based Economic Optimization Tools for Reducing Operating Costs

Web-Based Economic Optimization Tools for Reducing Operating Costs Web-Based Economic Tools for Reducing Operating Costs Authors: Keywords: Abstract: Jeffery Williams Power & Water Solutions, Inc. David Egelston Power & Water Solutions, Inc. Browsers, Economics, Linear

More information

Logistics optimization of a biomass supply chain BOUVET Alain (1), CAMBAZARD Hadrien (2), PENZ Bernard (2)

Logistics optimization of a biomass supply chain BOUVET Alain (1), CAMBAZARD Hadrien (2), PENZ Bernard (2) Logistics optimization of a biomass supply chain BOUVET Alain (1), CAMBAZARD Hadrien (2), PENZ Bernard (2) (1) FCBA Direction Innovation Recherche, 10 avenue de Saint Mandé 75012 Paris, France (2) G-SCOP

More information

State of the Nation Report

State of the Nation Report State of the Nation Report Landfilling Practices and Regulation in Denmark Contents 1. Summary of Solid Waste Management Sector... 2 2. Overview of Landfill Practices... 5 3. Key Stakeholders in the solid

More information

Screening Study of Life Cycle Assessment (LCA) of the Electric Kettle with SimaPro Software***

Screening Study of Life Cycle Assessment (LCA) of the Electric Kettle with SimaPro Software*** GEOMATICS AND ENVIRONMENTAL ENGINEERING Volume 5 Number 3 2011 Katarzyna Grzesik*, Kinga Guca** Screening Study of Life Cycle Assessment (LCA) of the Electric Kettle with SimaPro Software*** 1. Introduction

More information

(Refer Slide Time: 02:17)

(Refer Slide Time: 02:17) Internet Technology Prof. Indranil Sengupta Department of Computer Science and Engineering Indian Institute of Technology, Kharagpur Lecture No #06 IP Subnetting and Addressing (Not audible: (00:46)) Now,

More information

CONSTRUCTION AND DEMOLITION WASTE IN THE REGION OF PORTO - PORTUGAL: MANAGEMENT AND SURVEY

CONSTRUCTION AND DEMOLITION WASTE IN THE REGION OF PORTO - PORTUGAL: MANAGEMENT AND SURVEY CONSTRUCTION AND DEMOLITION WASTE IN THE REGION OF PORTO - PORTUGAL: MANAGEMENT AND SURVEY Sousa, H. (1), Sousa Coutinho, J. (1), Faria, J. (1), Figueiredo, F. (1), Sousa, R. (1) (1) FEUP - Faculty of

More information

The facility location problem in a reverse logistic network: Weeenmodels project in the city of Genoa

The facility location problem in a reverse logistic network: Weeenmodels project in the city of Genoa The facility location problem in a reverse logistic network: Weeenmodels project in the city of Genoa Silvia Siri 1, Ishara Thirimadura Mendis 2, Cino Repetto 2 Abstract In this paper a multi-stage multi-commodity

More information

South Carolina College- and Career-Ready (SCCCR) Probability and Statistics

South Carolina College- and Career-Ready (SCCCR) Probability and Statistics South Carolina College- and Career-Ready (SCCCR) Probability and Statistics South Carolina College- and Career-Ready Mathematical Process Standards The South Carolina College- and Career-Ready (SCCCR)

More information

A Florida County Locates Disaster Recovery Centers

A Florida County Locates Disaster Recovery Centers Vol. 35, No. 2, March April 5, pp. 133 139 issn 92-22 eissn 1526-551X 5 352 133 informs doi.1287/inte.5.127 5 INFORMS A Florida County Locates Disaster Recovery Centers Jamie Dekle Union County High School,

More information

Post Consumption Materials Management for Hospital Economic and Environmental Sustainability

Post Consumption Materials Management for Hospital Economic and Environmental Sustainability Post Consumption Materials Management for Hospital Economic and Environmental Sustainability Ron Pierce President WM Healthcare Solutions, Inc. September 22, 2009 Presentation Objectives Identify challenges

More information

MEMORANDUM 1. INTRODUCTION 2. METHODS FOR FINANCING AND WASTE FLOW MANAGEMENT. John Sedley. Russ Smith, Anke Bergner, Capital Regional District

MEMORANDUM 1. INTRODUCTION 2. METHODS FOR FINANCING AND WASTE FLOW MANAGEMENT. John Sedley. Russ Smith, Anke Bergner, Capital Regional District MEMORANDUM TO: Russ Smith, Anke Bergner, Capital Regional District cc. John Sedley FROM: Konrad Fichtner, P.Eng. FOR INFO OF: PLEASE RESPOND BY: PROJECT No.: 5130323 00 RE: Solid Waste System Financing

More information

COS AND LAND USE PLANNING: OPEN DATA TOWARDS PLANNING

COS AND LAND USE PLANNING: OPEN DATA TOWARDS PLANNING COS AND LAND USE PLANNING: OPEN DATA TOWARDS PLANNING EFFICIENCY R. Saraiva 1, B. M. Meneses 2, M. J. Vale 3, R. Reis 4 1) General Directorate for Territorial Development, Portugal rsaraiva@dgterritorio.pt

More information

Optimization with Big Data: Network Flows

Optimization with Big Data: Network Flows Optimization with Big Data: Network Flows Sertac Karaman Assistant Professor of Aeronautics and Astronautics Laboratory for Information and Decision Systems Institute for Data, Systems, and Society Massachusetts

More information

A Shift Sequence for Nurse Scheduling Using Linear Programming Problem

A Shift Sequence for Nurse Scheduling Using Linear Programming Problem IOSR Journal of Nursing and Health Science (IOSR-JNHS) e-issn: 2320 1959.p- ISSN: 2320 1940 Volume 3, Issue 6 Ver. I (Nov.-Dec. 2014), PP 24-28 A Shift Sequence for Nurse Scheduling Using Linear Programming

More information

Abstract. 1. Introduction. Caparica, Portugal b CEG, IST-UTL, Av. Rovisco Pais, 1049-001 Lisboa, Portugal

Abstract. 1. Introduction. Caparica, Portugal b CEG, IST-UTL, Av. Rovisco Pais, 1049-001 Lisboa, Portugal Ian David Lockhart Bogle and Michael Fairweather (Editors), Proceedings of the 22nd European Symposium on Computer Aided Process Engineering, 17-20 June 2012, London. 2012 Elsevier B.V. All rights reserved.

More information

A Service Design Problem for a Railway Network

A Service Design Problem for a Railway Network A Service Design Problem for a Railway Network Alberto Caprara Enrico Malaguti Paolo Toth Dipartimento di Elettronica, Informatica e Sistemistica, University of Bologna Viale Risorgimento, 2-40136 - Bologna

More information

Operational Indicators for public transport companies

Operational Indicators for public transport companies Operational Indicators for public transport companies João Mendes Moreira, Jorge Freire de Sousa INEGI, Rua dos Bragas, 4099 Porto Code, Portugal Tel: +351-2-2073650 Fa: +351-2-2073659 Email: joao@gist.fe.up.pt

More information

Equilibria and Dynamics of. Supply Chain Network Competition with Information Asymmetry. and Minimum Quality Standards

Equilibria and Dynamics of. Supply Chain Network Competition with Information Asymmetry. and Minimum Quality Standards Equilibria and Dynamics of Supply Chain Network Competition with Information Asymmetry in Quality and Minimum Quality Standards Anna Nagurney John F. Smith Memorial Professor and Dong (Michelle) Li Doctoral

More information

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa OPTIMIZING CONDENSER WATER FLOW RATES W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa T.A. Brown, P.E. Thermal Energy Corporation Houston, Texas ABSTRACT Most chillers are designed for a

More information

Supply Chain Design and Inventory Management Optimization in the Motors Industry

Supply Chain Design and Inventory Management Optimization in the Motors Industry A publication of 1171 CHEMICAL ENGINEERING TRANSACTIONS VOL. 32, 2013 Chief Editors: Sauro Pierucci, Jiří J. Klemeš Copyright 2013, AIDIC Servizi S.r.l., ISBN 978-88-95608-23-5; ISSN 1974-9791 The Italian

More information

A DECISION SUPPORT SYSTEM FOR TIMETABLE ADJUSTMENTS

A DECISION SUPPORT SYSTEM FOR TIMETABLE ADJUSTMENTS A DECISION SUPPORT SYSTEM FOR TIMETABLE ADJUSTMENTS João Mendes-Moreira Dept. of Informatics Engineering, Faculty of Engineering, University of Porto, Portugal LIAAD-INESC Porto L.A., Portugal E-mail:

More information

Market Power and Efficiency in Card Payment Systems: A Comment on Rochet and Tirole

Market Power and Efficiency in Card Payment Systems: A Comment on Rochet and Tirole Market Power and Efficiency in Card Payment Systems: A Comment on Rochet and Tirole Luís M. B. Cabral New York University and CEPR November 2005 1 Introduction Beginning with their seminal 2002 paper,

More information

A wave lab inside a coaxial cable

A wave lab inside a coaxial cable INSTITUTE OF PHYSICS PUBLISHING Eur. J. Phys. 25 (2004) 581 591 EUROPEAN JOURNAL OF PHYSICS PII: S0143-0807(04)76273-X A wave lab inside a coaxial cable JoãoMSerra,MiguelCBrito,JMaiaAlves and A M Vallera

More information

Study of the Importance and Applicability of the Factor "Mark-up in the Budgeting of Construction

Study of the Importance and Applicability of the Factor Mark-up in the Budgeting of Construction Study of the Importance and Applicability of the Factor "Mark-up in the Budgeting of Construction Abstract Forming the price of a service and the subsequent finding of the value of the proposal is based

More information

Information and Responsiveness in Spare Parts Supply Chains

Information and Responsiveness in Spare Parts Supply Chains Information and Responsiveness in Spare Parts Supply Chains Table of Contents 1.0 Motivation... 3 2.0 What is Supply Chain?... 3 2.1 Spare Parts Supply Chain... 4 2.2 Spare Part Supply Chain Characteristics...

More information

A MULTI-PERIOD INVESTMENT SELECTION MODEL FOR STRATEGIC RAILWAY CAPACITY PLANNING

A MULTI-PERIOD INVESTMENT SELECTION MODEL FOR STRATEGIC RAILWAY CAPACITY PLANNING A MULTI-PERIOD INVESTMENT SELECTION MODEL FOR STRATEGIC RAILWAY Yung-Cheng (Rex) Lai, Assistant Professor, Department of Civil Engineering, National Taiwan University, Rm 313, Civil Engineering Building,

More information

Discrete Optimization

Discrete Optimization Discrete Optimization [Chen, Batson, Dang: Applied integer Programming] Chapter 3 and 4.1-4.3 by Johan Högdahl and Victoria Svedberg Seminar 2, 2015-03-31 Todays presentation Chapter 3 Transforms using

More information

Optimal Haul Truck Allocation in the Syncrude Mine

Optimal Haul Truck Allocation in the Syncrude Mine University of Alberta Optimal Haul Truck Allocation in the Syncrude Mine by Chung Huu Ta A thesis submitted to the Faculty of Graduate Studies and Research in partial fulfillment of the requirements for

More information

OPTIMIZED H O M E C A R E S C H E D U L I N G AND ROUTING

OPTIMIZED H O M E C A R E S C H E D U L I N G AND ROUTING OPTIMIZED H O M E C A R E S C H E D U L I N G AND ROUTING A White Paper for Home Care Executives and Operations Managers ALGORITHM-BASED OPTIMIZATION FOR SOLVING THE SCHEDULING AND ROUTING PROBLEMS IN

More information

Integrated support system for planning and scheduling... 2003/4/24 page 75 #101. Chapter 5 Sequencing and assignment Strategies

Integrated support system for planning and scheduling... 2003/4/24 page 75 #101. Chapter 5 Sequencing and assignment Strategies Integrated support system for planning and scheduling... 2003/4/24 page 75 #101 Chapter 5 Sequencing and assignment Strategies 5.1 Overview This chapter is dedicated to the methodologies used in this work

More information

Chapter 13: Binary and Mixed-Integer Programming

Chapter 13: Binary and Mixed-Integer Programming Chapter 3: Binary and Mixed-Integer Programming The general branch and bound approach described in the previous chapter can be customized for special situations. This chapter addresses two special situations:

More information