1 Consulting Associates, Inc. Page 1 EXCERPT - THE DATA CENTER BATTERY DILEMMA Developed by Marco W. Migliaro, PE, Life Fellow IEEE Visit: stationarybatterytraining.com esaconsulting.com Copyright 2014 by Marco W. Migliaro All rights reserved 1 Foreword 2 2 The information and photographs included in this presentation are targeted for those involved with data center high performance lead-acid stationary battery installations (typically UPS batteries). Make certain that a copy of the battery manufacturer's data sheet and installation, operation and maintenance instructions for the specific cell or battery to be installed, inspected, maintained or tested are available. Always read and understand the battery manufacturer's recommendations, including safety requirements, provided in its installation, operation and maintenance instructions or other document and in the battery manufacturer s warranty. Industry standards that provide recommendations for safety, installation, inspection, maintenance and testing are also available and should be readily available for reference and use. Safe work practices should always be followed including wearing proper PPE and using insulated tools. Stationary batteries are very reliable; however, problems can and do occur. The problems experienced may be a result of improper application, selection, installation or maintenance, or not understanding the actual design life of the battery. They may also be due to a product design or manufacturing issue. The photographs in this presentation may show a number of batteries in service, sometimes including the markings of the battery manufacturer. Test equipment may also appear in some of the photographs. These photos are provided for informational or educational purposes only and are not meant to endorse any one battery or equipment manufacturer, nor are they meant to imply that any battery manufacturer produces a superior or inferior product. The developer makes no warranties expressed or implied about the materials contained in this or other presentations. The contents of this and other presentations are owned by the developer and are protected by United States and international copyright laws and international trade provisions.
2 Consulting Associates, Inc. Page 2 DATA CENTER BATTERY SPECIFICATIONS Engineers and owners prepare specifications that: Require vented lead-acid batteries to have a 20 year design (expected, or service) life Deliver the largest kw/lb in the smallest physical footprint with the lowest cost Battery manufacturers respond by offering high performance vented lead batteries that: Have a 20 year warranted life (typically 1 yr full, 19 yrs pro-rata or 3 yrs full, 17 yrs pro-rata) The reality is that these batteries have expected lives of, at best, 10 to 12 years 3 3 DATA CENTER BATTERY SPECIFICATIONS (cont d.) 4 4
3 Consulting Associates, Inc. Page 3 20 YEAR STATIONARY BATTERIES? Battery manufacturers do make vented lead-acid products that have a 20 year design life In these cells, the positive plate thickness is generally 0.30 inch vs to 0.20 inch in high performance cells and plate thickness is the key to determining design life (thick plates = longer life) Some of the products may use a different type of positive plate, e.g., a Planté Some industries require battery manufacturers to demonstrate 20 year design life by test, using naturally or artificially aged cells. The test generally requires the 20 year aged cells to be capacity tested and deliver at least 80% of their nameplate capacity, after having gone through a series of seismic tests on a shake table 5 5 CAN TRUE 20 YEAR LIFE BATTERIES BE APPLIED IN DATA CENTERS? The answer to this is yes, however: Almost all of these cells types are in single cell jars, although there are a few types in two-cell jars The jars are physically larger and will require much larger battery rooms Their cost (on a per cell basis) is much greater than the high performance cells used in data centers primarily because there is more lead in each cell The typical duty cycle of 10 to 15 minutes in a data center will utilize very little of the lead in the cell during a discharge (i.e., discharging the surface but not the depth of the plate) The owner therefore pays for a lot of lead that is never used 6 6
4 Consulting Associates, Inc. Page 4 SO WHAT IS THE REAL ISSUE? Users and engineers: Do not understand that any battery manufacturer s high performance lead-acid battery does not have a 20 year life and battery salespersons continue to tell them the batteries have a 20 year life Continue to write specifications requiring a 20 year life Battery manufacturers: Understand that in most bidding situations, they will likely lose the order if they take exception to the 20 year life requirement Know that if they offer a true 20 year life battery, it s not the right type for application at a data center and they will lose the order based on price 7 7 WHAT IS THE IMPACT ON THE DATA CENTER? The high performance vented lead-acid batteries installed will function normally for the first 8 to 10 years This assumes the batteries have been properly sized, installed, maintained and tested, and the cells do not have any manufacturing defects Once the batteries pass the 8 to 10 year mark, failures begin to occur, often developing shorts The users believing the battery life is 20 years, think the battery manufacturer provided a defective product Maintenance costs will increase, sometimes dramatically, as more and more cells need to be replaced 8 8
5 Consulting Associates, Inc. Page 5 WHAT IS THE IMPACT ON THE DATA CENTER? (cont d.) The real reason why the number of cell failures is increasing, is that the installed batteries are not defective, but are approaching end-of-life The user should be planning entire battery replacements at this time instead of cell replacements for cells that are nearing end-of-life Battery maintenance organizations may not understand: the cells are at end-of-life and may recommend these replacements; may not recognize cells are developing plate shorts; and may recommend additional maintenance that will ultimately do nothing to improve the battery, all of which add to the data center s operating costs 9 9 WHAT IS THE IMPACT ON THE DATA CENTER? (cont d.) Data Center Managers and Supervisors: Will often ask maintenance personnel what they did wrong to cause these 20 year life batteries to start failing at 10 or 12 years Assuming an effective maintenance program, the conclusion is typically that they must have a defective product The reality is that no matter how good the maintenance program is, the high performance vented lead-acid battery will not have a 20 year design life 10 10
6 Consulting Associates, Inc. Page 6 LACK OF ATTENTION TO DETAIL MAINTENANCE ORGANIZATIONS The following examples illustrate issues that should be identified and brought to the owner s attention by their maintenance organization but were not These are taken from data for four, 192 cell high performance lead-acid UPS batteries with nominal SG electrolyte Each battery was the same model number Two batteries were 11 years old and the remaining two were 8 years old One of the two 11 year old batteries had gone into thermal runaway and the second had started to go into thermal runaway 2 months after the quarterly inspection for the data shown was performed LACK OF ATTENTION TO DETAIL MAINTENANCE ORGANIZATIONS (cont d.) A review of the battery maintenance reports for the previous 18 months (the start of the current maintenance organization s contract) showed the issues that lead to the thermal runaway and near runaway began to show up in the maintenance data over a year before the event The maintenance organization did not recognize the issues and continued to provide the owner with recommendations that would accelerate the degradation of the batteries Some maintenance recommendations were based on averages rather than baselines At no time was there a recommendation to contact the battery manufacturer or to have the manufacturer s service department inspect the batteries 12 12
7 Consulting Associates, Inc. Page 7 LACK OF ATTENTION TO DETAIL MAINTENANCE ORGANIZATIONS (cont d.) Although from the owner s perspective, the batteries were being regularly maintained, based on the events, it is likely that at least one of the four batteries and possibly two could have failed to perform their design function had they been required to do so The maintenance program did not include discharge testing of the batteries It is incumbent on the owner to review and question if necessary, the maintenance reports, including the recommendations provided and not simply file them away EXAMPLE 1 MAINTENANCE REPORT 240 CELL UPS BATTERY These data are from the quarterly report for one 11 year old battery that was submitted to the owner and approximately 7 weeks later, the battery experienced a thermal runaway and had to be immediately removed from service The maintenance organization had to bring in a temporary battery and an unplanned (unbudgeted) replacement of this battery and the second 11 year old battery which was found to be starting into thermal runaway had to be performed A recommendation made in the quarterly maintenance report is likely to have accelerated the failure of the battery 14 14
8 Consulting Associates, Inc. Page 8 EXAMPLE 1 RECOMMENDATIONS EXAMPLE 1 DATA EXCERPT 16 16
9 Consulting Associates, Inc. Page 9 EXAMPLE 1 OBSERVATIONS These observations should not be considered a detailed evaluation of the data Although these are the maintenance data, the cells were visually in distress, with signs of plate growth, slivering, plate cracking and this should have been obvious to those performing the quarterly inspection There was no recognition that the battery was at end-oflife and there was no recommendation made to replace it (or even selected cells), although there was a recommendation to capacity test it; however, if there was a need to capacity test, the test should not have been performed until the cells needing replacement were replaced EXAMPLE 1 OBSERVATIONS (cont d.) There were 11 cells in the battery with cell voltages 2.09 Vdc (one of these cells was <2.0V) As important as low voltage cells, there were 30 cells with voltages 2.34 Vdc (with 12 of these cells 2.40 Vdc), but these are often overlooked and not thought of as being an issue High voltage cells are as much of a problem as low voltage cells, since the higher voltage will cause excessive gassing (which will increase the need for watering in these cells), degrading the cells The reason for these extremely high voltage (the highest 2.45 Vdc) cells is that with the battery floating at constant voltage, as the voltage of the shorted cells drop, the remaining cell voltages will increase since the overall charge voltage remains constant 18 18
10 Consulting Associates, Inc. Page 10 EXAMPLE 1 OBSERVATIONS (cont d.) There is no recommendation to replace any cells although some replacements were needed, to ensure the battery could perform until replaced E.g., cell no. 81 which is clearly in trouble Since this is a quarterly report, only 10% of the cell SGs and internal resistances are measured There is no recommendation to measure the SGs of the cells that are shorted to assess their state-of-health The recommendation to equalize the battery will accelerate the degradation of both shorted cells and high voltage cells Although it should be obvious to a knowledgeable person that some of these cells will never recover, the recommendation was made none the less EXAMPLE 1 OBSERVATIONS (cont d.) Four cells are identified as having higher SG than other cells with a recommendation to reduce the SG of the cells Reviewing past maintenance data, this issue had been on every maintenance report since this maintenance organization had assumed responsibility for maintenance 18 months ago The reason the SG of these cells was high was that they were nominal SG cells in a string with SG cells (and the cell nameplate had a different model no.) It is presumed that the previous maintenance organization either purchased the wrong model cells or the battery manufacturer delivered the wrong model cells and they were installed in the battery The current maintenance organization never clearly identified the issue to the owner and never took action 20 20
11 Consulting Associates, Inc. Page 11 EXAMPLE 2 - MAINTENANCE REPORTS IDENTIFY HIGH RESISTANCE CELLS These data are from the quarterly report for the four UPS batteries previously discussed The maintenance organization uses deviation from average values to determine cell issues, instead of a baseline value with specific limits As a consequence, the same model cells in two different batteries with the identical internal resistance will be judged acceptable in one case and identified as a problem in the other. There can also be cells with even higher resistance judged to be acceptable in the battery with the higher average resistance Evaluation and analysis of data in this manner is incorrect! EXAMPLE 2 DATA EXCERPT 22 22
12 Consulting Associates, Inc. Page 12 EXAMPLE 2 DATA EXCERPT (cont d.) WHAT NEEDS TO BE DONE? Users and engineers: Need to recognize that any battery manufacturer s high performance vented lead-acid battery is the right choice for data center UPS applications; however, they will never have a 20 year design life Need to prepare specifications that call for a 10 year design life Battery manufacturers: Can effectively respond to proposals, understanding the 10 year expected life requirement is part of the UPS battery specification and this levels the playing field for all manufacturers that will respond to the bid 24 24
13 Consulting Associates, Inc. Page 13 WHAT NEEDS TO BE DONE WITH MAINTENANCE REPORTS AND DATA? Users: Should select a maintenance organization that is knowledgeable in stationary battery maintenance, including visual inspection and analysis of the data taken, to specific baseline values for the particular cell type installed Should require the battery maintenance organization to not only analyze these data but trend these data and virtually no battery maintenance contracts require this today Alternately, the owner could perform this trending analysis itself Consider having an independent 3 rd party review of the battery maintenance program periodically, possibly triennially, or as frequently as annually HOW WILL A UPS BATTERY SPECIFICATION REQUIRING 10 YEAR LIFE CHANGE DATA CENTER OPERATION? Users: Should experience no major issues with the UPS batteries, unless there is a design or manufacturing defect Will understand they need to plan for replacement batteries in 10 to 12 years Should see a reduction in operating and maintenance costs and unnecessary maintenance should be eliminated Battery manufacturers: Will not have to deal with unrealistic user and engineer battery design requirements for a cell type that will never have a 20 year design life 26 26
14 Consulting Associates, Inc. Page 14 STATIONARY BATTERY One type within the classification of industrial batteries Manufacturers in North America generally classify vented lead-acid cells as* Long duration: telecommunications ( 0.30 to 0.35 inch thick positive plate) General purpose: switchgear tripping, generating station, substation, industrial control, industrial UPS ( 0.25 to 0.30 inch thick positive plate) High performance: commercial UPS ( 0.17 to 0.20 inch thick positive plate) *NiCd cells are classified as long, medium, high and ultra high THE HIGH PERFORMANCE LEAD-ACID STATIONARY BATTERY Battery manufacturers have done everything to optimize this battery type for high current, short duration discharges, such as: Using thin plates to allow more plates to be installed in the jar to maximize the plate surface area available for discharge Used flat pasted plates with an optimal design to produce the greatest amount of discharge current/power Used plastic vs rubber separators to minimize separator thickness and some eliminated retainers Minimized plate spacing and strap/post height Use pure copper or copper inserted posts Increased electrolyte specific gravity 40 40
15 Consulting Associates, Inc. Page 15 END OF USEFUL LIFE Assuming that a stationary battery has been properly sized, installed, maintained and tested, and that the battery itself has no design or manufacturing defects: The end of useful life for a lead-acid stationary battery is corrosion of its positive plates. Signs of end of life include positive plate growth, plate cracks and sulfate The end of useful life of a nickel-cadmium battery is carbonization of its electrolyte EXAMPLE OF A BATTERY MAINTENANCE COMPANY MISSING THE OBVIOUS The second slide after this one shows a portion of a commissioning report for a 240 cell UPS battery that has been installed and open circuit cell voltages have been measured before the freshening (i.e., initial) charge is applied It clearly shows some cells are not charged and were likely not recharged after their factory discharge test They were shipped to the site in an uncharged condition (there were 40 cells affected) The organization making the measurements did not recognize the obvious, did not bring the condition to the attention of any party and performed the initial charge 59 59
16 Consulting Associates, Inc. Page 16 EXAMPLE OF A BATTERY MAINTENANCE COMPANY MISSING THE OBVIOUS (cont d.) By not recognizing the issue, the initial charge will not be effective and not charge the cells properly, but more importantly, the uncharged cells may fail prematurely or may have already been irreparably damaged, depending how long they have been in their present condition (including time in storage) The correct action here would have been to notify the appropriate parties, and contact the battery manufacturer s service department and have the cells examined If the manufacturer determined the uncharged cells could be recovered, they would be placed on a charge by themselves before the entire string was placed on initial charge 60 60
17 Consulting Associates, Inc. Page 17 PLATE SHORTS Plate shorts can occur in a cell if a positive plate and negative plate contact each other as a result of: Positive plate growth, including growth of grid elements like forming bars A defect in a separator or a mispositioned separator Paste lumps or other material buildup (e.g., blisters) on the plates Lead runs or flash not removed from a cell Sediment buildup Plate shorts are difficult to detect visually but if they can be seen, the positive plate will turn grey in the area of the short The easiest way to detect a plate short is by measurement of cell voltage If a short develops, the cell voltage will drop to near open circuit PLATE SHORTS (cont d.) Although plate shorts are not a desired condition, the presence of a plate short does not mean that the cell (or battery) does not have enough capacity to meet its design function Any shorted cell must be replaced, but if detected early it may be possible to allow the cell to remain in the battery until the replacement cell is received If the cell is allowed to remain in the battery, then periodic measurement of its electrolyte specific gravity must be made to determine if it may remain in the battery or needs to be removed from the battery 63 63
18 Consulting Associates, Inc. Page 18
19 Consulting Associates, Inc. Page 19
LEAD ACID BATTERY working LIFETIME STUDY
LEAD ACID BATTERY working LIFETIME STUDY Valve Regulated Lead Acid (VRLA) Batteries Overview The most common type of battery used on UPS systems and for backup of telecommunications systems. VRLA batteries
More informationSubstation Battery & Charger Maintenance
Document title AUTHORIZED COPY Substation Battery & Charger Maintenance Document number MNT-TRMX-00015 Applies to: Keywords: Transmission Operations & Planning Department Carolinas and Florida maintenance;
More informationCanadian Regulatory Compliance for Stationary Battery Systems North American Update
Canadian Regulatory Compliance for Stationary Battery Systems North American Update ComplianceKnowledgeCenter.com What is Compliance? In general: compliance means conforming to a rule, such as: a specification,
More informationBattery Technology for Data Centers and Network Rooms: Lead-Acid Battery Options
Battery Technology for Data Centers and Network Rooms: Lead-Acid Battery Options By Stephen McCluer White Paper #30 Revision 11 Executive Summary The lead-acid battery is the predominant choice for Uninterruptible
More informationCharger Output AC Ripple Voltage and the affect on VRLA batteries
TECHNICAL BULLETIN 41-2131 Charger Output AC Ripple Voltage and the affect on VRLA batteries Please Note: The information in this technical bulletin was developed for C&D Dynasty 12 Volt VRLA products.
More information2. Add the following definitions to 3.3 General Definitions and renumber 3.3 as required:
NFPA 72-2013 National Fire Alarm and Signaling Code TIA Log No. 1188 Reference: Various Sections on Battery Comment Closing Date: June 19, 2015 Submitter: Herbert Hurst, Savannah River Nuclear Solutions,
More informationTel.X Ni-Cd battery. The compact maintenance-free solution for telecom networks
Tel.X Ni-Cd battery The compact maintenance-free solution for telecom networks Tel.X, delivering high-energy performance in a compact maintenance-free package Tel.X: guaranteed power continuity for remote
More informationConstant Voltage Charger Selection for VRLA Batteries
TECHNICAL BULLETIN 41-2129 Constant Voltage Charger Selection for VRLA Batteries Please Note: The information in this technical bulletin was developed for C&D Dynasty 12 Volt VRLA products. While much
More informationREPORT ON THE LONG TERM RESULTS OF BATTERY CAPACITY RECOVERY PROCESSES FOR VRLA CELLS
REPORT ON THE LONG TERM RESULTS OF BATTERY CAPACITY RECOVERY PROCESSES FOR VRLA CELLS Peter J. DeMar Founder Battery Research and Testing, Inc. ABSTRACT It is well understood that premature capacity loss
More informationWHEN THERMAL RUNAWAY STRIKES, WHAT SHOULD YOU DO?
WHEN THERMAL RUNAWAY STRIKES, WHAT SHOULD YOU DO? Mark Dixon Chief Engineer ABM Engineering Services Sacramento, CA 95816 ABSTRACT This paper is the documentary of a series of events from a data center,
More informationTHE PROPER CHARGING OF STATIONARY LEAD-ACID BATTERIES. (YOUR BATTERY IS ONLY AS GOOD AS HOW YOU CHARGE IT.)
THE PROPER CHARGING OF STATIONARY LEAD-ACID BATTERIES. (YOUR BATTERY IS ONLY AS GOOD AS HOW YOU CHARGE IT.) J. Allen Byrne Engineering, Training and Tech Support Manager Interstate PowerCare, a Division
More informationDRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)
U.S. NUCLEAR REGULATORY COMMISSION October 2006 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE Contact: W.S. Raughley (301) 415-7577 DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision
More informationUsing battery test equipment with asset management software. Megger is a registered trademark
WWW.MEGGER.COM Using battery test equipment with asset management software Megger is a registered trademark Subject Author Andrew Sagl Product Marketing Engineer Date April 2010 Keywords Abstract BITE,
More informationTELEDYNE BATTERY PRODUCTS. INSTRUCTIONS FOR CONTINUED AIRWORTHINESS and COMPONENT MAINTENANCE MANUAL. For
TELEDYNE BATTERY PRODUCTS INSTRUCTIONS FOR CONTINUED AIRWORTHINESS and COMPONENT MAINTENANCE MANUAL For TSO-C173/C173a Authorized (GILL ) 7000 Series LT Valve-Regulated Lead-Acid Aircraft Batteries REFER
More information10 Year VRLA Battery Periodic Maintenance Instructions
TECHNICAL BULLETIN 41-7546 Valve Regulated Lead Acid Battery 20 to 200 ampere-hours capacity 10 Year VRLA Battery Periodic Maintenance Instructions 41-7546/0213/CD www.cdtechno.com General Information
More informationTel.X Ni-Cd battery. The compact solution for stationary applications
Tel.X NiCd battery The compact solution for stationary applications Tel.X, delivering highenergy performance in a compact maintenancefree package Tel.X: guaranteed power continuity for remote or hard to
More information1. Scope This specification is applied to ICR18650. 2. Product Specification Table 1 No. Item Rated Performance Remark
1. Scope This specification is applied to ICR18650. 2. Product Specification Table 1 No. Item Rated Performance Remark 1 Rated Capacity Typical Minimum 2 Nominal Voltage 3.7V 3 Voltage at end of Discharge
More informationDigital echo-charge. Owner s Manual. Xantrex Digital echo-charge Battery Charger
Digital echo-charge Owner s Manual Xantrex Digital echo-charge Battery Charger Thank you for purchasing a Xantrex Digital echo-charge. Xantrex Technology Inc. takes pride in manufacturing quality products
More informationLEAD CRYSTAL. User Manual. Valve-regulated lead-crystal batteries Energy storage Cells
Engineering Production Sales LEAD CRYSTAL Valve-regulated lead-crystal batteries Energy storage Cells User Manual www.axcom-battery-technology.de info@.axcom-battery-technology.de Chapter 1: 1. Introduction
More informationUptimax New Generation Ni-Cd battery. Maintenance-free solution for backup power applications
NiCd battery Maintenancefree solution for backup power applications The ideal choice for total security and availability Saft your trusted battery partner for stationary applications Saft has over 100
More informationBATTERY SERVICE. This Automotive Series BATTERY SERVICE has been developed by. Kevin R. Sullivan. Professor of Automotive Technology Skyline College
BATTERY SERVICE This Automotive Series BATTERY SERVICE has been developed by Kevin R. Sullivan Professor of Automotive Technology Skyline College All Rights Reserved v1.1 Visit us on the web at: www.autoshop101.com
More informationHeight w/o Terminals (in)
EaglePicher Technologies, LLC Commercial Power P.O. Box 47 Joplin, MO 6482 (417) 623-8 inquiry.carefree@eaglepicher.com Carefree Sealed Lead Acid (SLA) MSDS EaglePicher s Carefree lead acid batteries are
More informationConductance Testing as an Integral Element in Battery Management
Conductance Testing as an Integral Element in Battery Management Today s CATV communication networks are being overrun by an increasing demand for bandwidth and reliability. Lapses in commercial utility
More information875 Dearborn Drive Columbus, Ohio 43085 Tel: (614) 846-7500 Fax: (614) 885-3990
Selection and Sizing of Batteries for UPS Backup 875 Dearborn Drive Columbus, Ohio 43085 Tel: (614) 846-7500 Fax: (614) 885-3990 Selection and Sizing of Batteries for UPS Backup Abstract Introduction Battery
More informationBattery Model: 25 Part Number: 8025-160 Nominal Voltage: 12 volts NSN: Number applied for, product currently available
Battery Model: 25 Part Number: 8025-160 Nominal Voltage: 12 volts NSN: Number applied for, product currently available Battery Model: 35 Part Number: 8020-164 Nominal Voltage: 12 volts NSN: Number applied
More informationApproval Sheet for. Li-ion Battery (Lithium Iron Phosphate) Model: LiR14505F-600mAh
Approval Sheet for Li-ion Battery (Lithium Iron Phosphate) Model: LiR14505F-600mAh AA Portable Power Corp (http://www.batteryspace.com) Address: 860 S, 19th St, Unit A, Richmond, CA, 94804 Tel: 510-525-2328
More informationLi-ion Rechargeable Battery. Specification
Customer: Specification Model: GMB043450S Prepared By/Date Checked By/Date Approved By/Date Note:1.Kindly please sign on the above and send it back to us if the sample is approved. 2.Kindly please contact
More informationBattery testing guide
Battery testing guide Why backup batteries are needed Battery types Failure modes Maintenance philosophies Practical battery testing Frequently asked questions Megger products overview WWW.MEGGER.COM Contents
More informationTechnical Information Battery Management of the Sunny Island Gentle charging control for lead-acid batteries based on current state of the battery
Technical Information Battery Management of the Sunny Island Gentle charging control for lead-acid batteries based on current state of the battery Content Exact determination of the state of charge is
More informationDataSafe HX Top Terminated Batteries 6 and 12 Volt HX
DATASAFE HX TOP TERMINATED BATTERIES DataSafe HX Top Terminated Batteries 6 and 12 Volt HX Available exclusively from EnerSys, the world leader in stored power solutions. DataSafe HX Top Terminated Batteries.
More informationLS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL
EPSOLAR LS1024B / LS2024B/ LS3024B Solar Charge Controller USER MANUAL Thank you very much for selecting our product! This manual offers important information and suggestions with respect to installation,
More informationD. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.
SECTION 263354 STATIC UPS TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. System start-up services. 2. Battery charging. 3. Load bank testing. 4. Battery load testing. 5.
More informationAbattery voltmeter is the most
Lead-cid Battery State of Charge vs. Voltage ichard Perez 1993 ichard Perez battery voltmeter is the most basic system instrument. Battery voltmeters are inexpensive, easy to install, and can provide a
More informationAUTOMATIC BEST BATTERY SELECTOR INSTALLATION & OPERATION BBS-1600 BBS-1600E
AUTOMATIC BEST BATTERY SELECTOR INSTALLATION & OPERATION BBS-1600 BBS-1600E SENS part no: 101314 Document revision: F DCN No. 106811 Date 8/3/15 1840 Industrial Circle Longmont, CO 80501 Fax: (303) 678-7504
More informationATTACHMENT I TO IPN-92-041 RELATED TO LOAD TESTING AND,24 MONTH OPERATING CYCLES
ATTACHMENT I TO IPN-92-041 PROPOSED TECHNICAL SPECIFICATION CHANGE RELATED TO -BATTERY LOAD TESTING AND,24 MONTH OPERATING CYCLES NEW YORK POWER AUTHORITY INDIAN POINT 3 NUCLEAR POWER PLANT DOCKET NO.
More informationINSPECTION AND TESTING OF FIRE ALARM SYSTEMS
Page 1 January 2, 2009 INSPECTION AND TESTING OF FIRE ALARM SYSTEMS Introduction Early warning plays a key role in a healthcare facility s ability to safely evacuate its residents during a fire emergency.
More information6 & 12 Volt Battery and Systems Tester with 100 Amp Load
6 & 12 Volt Battery and Systems Tester with 100 Amp Load Form No. 841-731 -000 DESCRIPTION This Load Tester tests 6 or 12 volt automotive-size lead-acid batteries under load. It will also test 6 or 12
More informationLife Cycle Testing of Series Battery Strings with Individual Battery Equalizers
Life Cycle Testing of Series Battery Strings with Individual Battery Equalizers Nasser H. Kutkut PowerDesigners, LLC 931 East Main Street Suite 4 Madison, WI 53703, USA Tel: (608) 231-0450, Fax: (608)
More informationSODIUM-METAL HALIDE BATTERIES FOR STATIONARY APPLICATIONS
SODIUM-METAL HALIDE BATTERIES FOR STATIONARY APPLICATIONS Richard Bourgeois, P.E. Lead Systems Engineer Energy Storage Technology GE Transportation Schenectady, NY 12345 INTRODUCTION Advanced batteries
More informationUser s Manual AURORA 1.2K/2.2K
User s Manual AURORA 1.2K/2.2K Uninterruptible Power System Safety CAUTION This UPS utilizes voltages that may be hazardous. Do not attempt to disassemble the unit. The unit contains no user serviceable
More informationBattery Discharge Testing: Implementing NERC Standards and Field Experiences
Battery Discharge Testing: Implementing NERC Standards and Field Experiences Dinesh Chhajer Applications Engineer Megger Dallas, TX 75237 Robert Foster Applications Engineer Abstract Periodic testing and
More informationHow To Use A Power Supply Unit (Upu)
BRAVER UPS (Uninterruptible Power System) User s Manual Safety CAUTION! This UPS utilizes voltages that may be hazardous. Do not attempt to disassemble the unit. The unit contains no user replaceable parts.
More informationAutomatic taper of charge rate for superior battery life through good equalization of cells and low water use rate.
*00151* FEATURES Automatic taper of charge rate for superior battery life through good equalization of cells and low water use rate. Silicon diodes with inherent surge protection operated at a conservative
More informationEmergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your
More informationHeight w/o Terminals (in)
EaglePicher Technologies, LLC Commercial Power P.O. Box 47 Joplin, MO 6482 (417) 623-8 inquiry.carefree@eaglepicher.com Carefree Sealed Lead Acid (SLA) MSDS EaglePicher s Carefree lead acid batteries are
More informationSpecifying higher-quality durable power tools
Case study Specifying higher-quality durable power tools June 2011 A case study of three cordless drills to illustrate and encourage specifications for durability and repair, with design principles that
More informationNew York City Fire Code & Energy Storage Systems
New York City Fire Code & Energy Storage Systems Winnie Lei on behalf of Tamara Saakian, P.E. Director of Engineering & Technology Management Technology Management Unit Bureau of Fire Prevention Fire Department
More informationIf you accidentally get battery acid on your skin, flush it with lots of water
RV Battery Savvy To properly maintain and extend the life of your RV batteries you need to have a basic understanding of what a battery is and how it works. Batteries used in RVs are lead acid batteries.
More informationEPSOLAR LS0512R / LS0524R. Solar Light Controller INSTRUCTION MANUAL. Please read this manual carefully before using the product!
EPSOLAR LS0512R / LS0524R Solar Light Controller INSTRUCTION MANUAL Please read this manual carefully before using the product! LandStar LS0512R / LS0524R Solar Light Controller Nominal system voltage
More informationLi-ion Polymer Battery Specification
Customer: ME1421A Li-ion Polymer Battery Specification Model:HPL302030-130mAh Checked & Approved by Prepared by Date Andy Liu Wang Wei 2014-7-18 History of revisions Edition Prepared by Approved by Date
More informationBC-5000 OPERATIONS MANUAL BATTERY CAPACITY TESTER COFKO LLC.
BC-5000 BATTERY CAPACITY TESTER OPERATIONS MANUAL COFKO LLC. COPYRIGHT 2010 1 UNPACKING As you unpack your new BC-5000 battery capacity tester, inspect the tester for signs of shipping damage. If shipping
More informationDOE HANDBOOK PRIMER ON LEAD-ACID STORAGE BATTERIES. U.S. Department of Energy Washington, D.C. 20585 METRIC. DOE-HDBK-1084-95 September 1995
TS METRIC DOE-HDBK-1084-95 September 1995 DOE HANDBOOK PRIMER ON LEAD-ACID STORAGE BATTERIES U.S. Department of Energy Washington, D.C. 20585 FSC-6910 DISTRIBUTION STATEMENT A. Approved for public release;
More informationManual for Fire Suppression & Methane Detection System
Manual for Fire Suppression & Methane Detection System Fogmaker North America Post address: 150 Gordon Dr Exton, PA 19341 Delivery address: 150 Gordon Dr Exton, PA 19341 Tel: 610-265-3610 Fax: 610-265-8327
More informationOPzS Vented Lead-Acid STANDBY POWER BATTERIES
www.midacbatteries.com OPzS Vented Lead-Acid STANDBY POWER BATTERIES CATALOGUE OPzS CELLS OPzS BLOCKS OPzS CELLS Advantages 15+ years Design Life More than 1500 deep discharge cycles Extended topping-up
More informationSunica.plus Ni-Cd batteries. The robust daily cycling solution for off-grid solar PV systems
Sunica.plus Ni-Cd batteries The robust daily cycling solution for off-grid solar PV systems Sunica.plus is the ideal energy storage choice for off-grid solar PV systems (1) The most reliable battery under
More informationSpec. No. ICR18650-26C Version No. 0.0
1. Scope This product specification has been prepared to specify the rechargeable lithium-ion cell 2. Description and Model 2.1 Description Cell (lithium-ion rechargeable cell) 2.2 Model ICR18650-26C 3.
More informationULM Ultra Low Maintenance batteries for aircraft. Because you have a choice.
ULM Ultra Low Maintenance batteries for aircraft Because you have a choice. Designed by Saft engineers and tested in the air, not on paper. How ULM technology works ULM performance hinges on Saft s plastic
More informationXC120 XC180. Owner's Guide Conforms to / Conforme à UL std. 458, Toll Free 1 866 295 6775. www.powerbright.com
WARNING: This Unit employs Components that tend to produce arcs or sparks To prevent fire or explosion, do not install in compartments containing batteries or flammable materials - SHOCK HAZARD. DO NOT
More informationRoofing 101 - Signs that Your Roof Needs Repair/Replacement
By: Cherie Martel Roofing 101 - Signs that Your Roof Needs Repair/Replacement 1. Tell us a little bit about your company and its foundation. In 1963, Samuel T. Martel began a small family run roofing company,
More informationIEEE STD. 450 2010 IEEE RECOMMENDED PRACTICE FOR MAINTENANCE, TESTING AND REPLACEMENT OF VENTED LEAD-ACID BATTERIES FOR STATIONARY APPLICATIONS
IEEE STD. 450 2010 IEEE RECOMMENDED PRACTICE FOR MAINTENANCE, TESTING AND REPLACEMENT OF VENTED LEAD-ACID BATTERIES FOR STATIONARY APPLICATIONS M. S. (Steve) Clark Senior Engineer Bechtel Power Corp. Knoxville,
More informationli-ion Polymer Battery Specification
Customer: li-ion Polymer Battery Specification MODEL: GMB042035 Prepared By/Date Checked By/Date Approved By/Date Note:1.Kindly please sign on the above and send it back to us if the sample is approved.
More informationUPS Applications and VRLA Battery Sizing
TECHNICAL BULLETIN 41-7334 UPS Applications and VRLA Battery Sizing 41-7334/0213/CD www.cdtechno.com The uninterruptable power system (UPS) is used to protect critical equipment and processes from the
More informationHow Batteries Work by Marshall Brain
How Batteries Work by Marshall Brain Batteries are all over the place -- in our cars, our PCs, laptops, portable MP3 players and cell phones. A battery is essentially a can full of chemicals that produce
More informationLITHIUM BATTERY CR123A SPECIFICATION
LITHIUM BATTERY CR123A SPECIFICATION Date: April 24, 2012 Approved by: Scotty Scott PANASONIC ENERGY CORPORATION OF AMERICA LITHIUM BATTERY DIVISION 1. Designation : CR123A 2. Nominal Voltage : 3 V 3.
More informationDear Neuton Owner, This is a helpful hint to guide you in getting the most out of your NEUTON Battery and Charger.
Battery-Powered Mower NEUTON 24-Volt Charger Instructions Booklet Dear Neuton Owner, In order for you to get the most out of your Neuton Mower, we recently reviewed and revised our battery-charging instructions.
More informationBattery Handbook. By: RON SMITH
Battery Handbook By: RON SMITH Information compiled from the Battery Charger Handbook and the Battery Handbook written by Alvin G. Graham, Chief Engineer, Ratelco Electronics Inc. Introduction The purpose
More informationRecycling Material Identification Guide
Recycling Material Identification Guide 1 Recycling of Lead-Acid Batteries at Exide Technologies Lead-acid batteries received at Exide s recycling facilities are shredded or otherwise disassembled, and
More informationSolar Wind Microhydro Water Pumping Inverters Batteries Professional system design and installation
Solar Wind Microhydro Water Pumping Inverters Batteries Professional system design and installation BATTERY CHARGING GUIDELINES FOR GLOBAL/DAVIDSON TUBULAR PLATE BATTERIES Introduction Your Global/Davidson
More informationUltracapacitors Help P21 To Provide Fuel Cell Based Backup Power For Telecoms
Ultracapacitors Help P21 To Provide Fuel Cell Based Backup Power For Telecoms Introduction P21 develops, produces, and sells fuel cell based backup systems. They are used in base station networks where
More informationVCE VET ENGINEERING STUDIES
Victorian Certificate of Education 2013 SUPERVISOR TO ATTACH PROCESSING LABEL HERE STUDENT NUMBER Letter Figures Words VCE VET ENGINEERING STUDIES Written examination Section Wednesday 20 November 2013
More informationPRODUCT SPECIFICATION
Lithium Ion LG 18650HE4 2500mAh BCY-PS-HE4-Rev0 2013-05-30 0 PRODUCT SPECIFICATION Rechargeable Lithium Ion Battery Model : 18650HE4 2500mAh LG Twin Towers 128, Yeoui-daero, Yeongdeungpo-gu, Seoul, Republic
More informationMOBILE DC POWER SYSTEMS FOR SUBSTATION APPLICATIONS
MOBILE DC POWER SYSTEMS FOR SUBSTATION APPLICATIONS Gary P. Guagliardi Director Sales & Marketing HindlePower, Inc. Easton, PA Introduction This paper explores the use of mobile DC power systems for three
More informationRenewable Energy Test Station (RETS) TEST PROCEDURES FOR SOLAR TUKI
Renewable Energy Test Station (RETS) TEST PROCEDURES FOR SOLAR TUKI March 2007 A. Test Procedures for Solar Tuki Lamp S. No. Test Parameters Technical Requirements Instruments Required Test Methods A.
More informationBLUE RIBBON CORP. BC001 Birdcage Installation Manual
Product Overview: This manual is applicable for the BC001 Birdcage Submersible Level Transmitters. If the product you have has a different prefix part number than listed above please contact the factory
More informationExecutive Summary. Technical Description
Executive Summary The Cellwatch system is built using modules. The majority of the system is constructed with Data Collection Modules (DCMs). The DCMs are optically linked to Control Units (CUs) that in
More informationCapacity Testing of VRLA Batteries (20 to 200 Ampere-Hours Capacity)
TECHNICAL BULLETIN 41-7135 Capacity Testing of VRLA Batteries (20 to 200 Ampere-Hours Capacity) 41-7135/0412/CD www.cdtechno.com The VRLA battery is rated in ampere-hours or watts per cell (w/c) at specific
More informationInstallation and Operation Guide for PD5100 Automatic Transfer Switch
Installation and Operation Guide for PD5100 Automatic Transfer Switch Member P r o gr e ssive Dynamics, Inc. 507 Industrial Rd Marshall, MI 49068 www.progressivedyn.com 2012 Progressive Dynamics, Inc.
More informationSPECIALTY CARBON BLACKS. High Performance Materials for Advanced Lead Acid Batteries
SPECIALTY CARBON BLACKS High Performance Materials for Advanced Lead Acid Batteries Better Your Batteries Cabot Corporation is a global performance materials company, and we strive to be our customers
More informationSOLAR PV SYSTEM MAINTENANCE GUIDE
SOLAR PV SYSTEM MAINTENANCE GUIDE GUYANA HINTERLANDS STAND-ALONE SOLAR PV INSTALLATIONS IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) GUYANA CONTRACT NO. EPP-I-00-03-00008-00, TASK ORDER 07 APRIL 2013
More informationThe most complete line of premium quality marine batteries in the industry FLOODED AGM GEL
The most complete line of premium quality marine batteries in the industry FLOODED AGM GEL Marine Master batteries are renown for their proven dependability and solid performance. This flooded battery
More informationCarefree Sealed Lead Acid (SLA) MSDS
EaglePicher Technologies, LLC Commercial Power P.O. Box 47 Joplin, MO 6482 (417) 623-8 inquiry.carefree@eaglepicher.com Carefree Sealed Lead Acid (SLA) MSDS EaglePicher s Carefree lead acid batteries are
More informationBefore H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
More informationSC Series: MIS Chip Capacitors
DATA SHEET SC Series: MIS Chip Capacitors Applications Systems requiring DC blocking or RF bypassing Fixed capacitance tuning element in filters, oscillators, and matching networks Features Readily available
More informationPIPELINE INSPECTION COMPANY LTD. Portable Holiday Detectors. OPERATING INSTRUCTIONS SPY PORTABLE HOLIDAY DETECTORS Models 780, 785, & 790
PIPELINE INSPECTION COMPANY LTD. Portable Holiday Detectors OPERATING INSTRUCTIONS SPY PORTABLE HOLIDAY DETECTORS Models 780, 785, & 790 Safety Disclaimer Only trained and responsible personnel should
More information12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual
12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual This 30Amp charge controller is designed to protect your 12Volt Lead-acid or Gel-cell battery from being overcharge by solar
More informationSpecification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers
Specification Guide for RVAC Direct Replacement AC Medium Voltage Circuit Breakers Table of Contents 1.0 General Work Scope...3 2.0 Standards...3 3.0 Supplier Qualifications...4 4.0 Circuit Breaker Element
More informationHeavy Duty Alternator Charging System Troubleshooting
Heavy Duty Alternator Charging System Troubleshooting Alternator Charging System Troubleshooting Squealing noises under the hood? Headlight bulbs blow out repeatedly or dim? Is the dash voltmeter gauge
More informationStationary Storage Battery Systems
ORANGE COUNTY FIRE AUTHORITY Planning & Development Services Section 1 Fire Authority Road, Building A Irvine, CA 92602 714-573-6100 www.ocfa.org Stationary Storage Battery Systems Guideline G-10 Date:
More informationCrawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809
More informationInstallation and Operation Guide for PD4000 Series Power Control Center
Extended warranties are available for purchase at www.progressivedyn.com Installation and Operation Guide for PD4000 Series Power Control Center Member Thank you for selecting Progressive Dynamics as your
More informationAdvantium 2 Plus Alarm
ADI 9510-B Advantium 2 Plus Alarm INSTALLATION AND OPERATING INSTRUCTIONS Carefully Read These Instructions Before Operating Carefully Read These Controls Corporation of America 1501 Harpers Road Virginia
More informationNorthStar Battery (NSB) Telecom Red Application, Installation, and Operation Manual
NorthStar Battery (NSB) Telecom Red Application, Installation, and Operation Manual To help us better serve you, please visit our web site at /survey and complete our Customer Survey. We value and appreciate
More informationKESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850
INSTALLATION AND OPERATING INSTRUCTIONS KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850 Product advantages Automatic float switch as water
More informationSFxxx-S PID Test Report (Potential Induced Degradation) TUV Rheinland Japan. ARC Product Management 2015.07 Ver. 1
SFxxx-S PID Test Report (Potential Induced Degradation) TUV Rheinland Japan ARC Product Management 2015.07 Ver. 1 Outline SLIDE 1 2 Outline What is PID? TOPICS 3 4 5 6 7 8 Principle of PID & resistance
More informationBATTERY CHARGING GUIDELINES FOR 6-VOLT DEEP CYCLE BATTERIES
BATTERY CHARGING GUIDELINES FOR 6-VOLT DEEP CYCLE BATTERIES Introduction Your 6-volt deep cycle battery set has been specially formulated for long cycle life and has particular voltage and specific gravity
More informationExtend the Life of Existing Switchgear
Extend the Life of Existing Switchgear January 2011/1910DB1002 by Hal Theobald, Product Manager Schneider Electric USA, Inc. Make the most of your energy SM Summary Introduction... p 3 Maintenance Requirements...
More informationLong-term performance of photovoltaic modules Artur Skoczek
1 Long-term performance of photovoltaic modules Artur Skoczek 2 The European Solar Test Installation (ESTI) has the primary objective of providing the scientific and technological basis for a sound and
More informationHAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE
Appendix B-2 - Electrical Safety In Design Final Report TECHNOLOGIES THAT REDUCE LIKELIHOOD OF INJURY FROM ELECTRICAL HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE The following are technologies that reduce
More informationOperating instructions. 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline
Reliance Industrial Products, LLC Operating instructions for 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline Model # 6095 Reliance Industrial Products PO Box 140008 Denver, CO 80214 Ph. (800)
More informationKrav til sikkerhed for sekundære batterier og installationer af batterier Del 2: Stationære batterier
Dansk standard DS/EN 50272-2 1. udgave 2001-08-10 Krav til sikkerhed for sekundære batterier og installationer af batterier Del 2: Stationære batterier Safety requirements for secondary batteries and battery
More information