UHV Guidelines for X-Ray Beam Transport Systems
|
|
|
- Scot Short
- 10 years ago
- Views:
Transcription
1 XFEL.EU TN TECHNICAL NOTE UHV Guidelines for X-Ray Beam Transport Systems M. Dommach for X-Ray Optics and Beam Transport (WP73) at the European XFEL European X-Ray Free-Electron Laser Facility GmbH Albert-Einstein-Ring Hamburg Germany
2 Contents 1 General information Introduction UHV-compatible design Flanges Designs UHV-compatible materials Electrical connections inside vacuum Feedthroughs Electrical feedthroughs Mechanical feedthroughs Guidelines for UHV systems Manufacturing and assembly Cleaning Cleaning of large items Cleaning of small parts Parts handling Packing Particle-free UHV systems Cleaning and assembly Cleaning of large items Cleaning of small parts Parts handling Packing Vacuum tests Leak test Residual gas analysis Acceptance criteria for unbaked vacuum systems Acceptance criteria for baked vacuum systems Pressure test of cooling water circuits A Appendix A.1 Instruction for marking vacuum parts XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
3 1 General information This document presents guidelines for ultrahigh vacuum (UHV) components for X-ray beam transport systems at the European XFEL facility. 1.1 Introduction The effective and reliable operation of the European XFEL X-ray beam transport systems and their connected instruments is strongly related to obtaining and keeping UHV conditions. These guidelines for UHV components at the European XFEL contain rules and important information on the design, manufacturing, cleaning, handling, and acceptance testing of UHV components to be installed in the European XFEL vacuum systems. This document describes two levels of vacuum requirements: UHV systems and particle-free UHV systems. The requirements for particle-free UHV systems apply to vacuum components that are located in an area 30 m in front of or behind a mirror or grating. If you are unsure which requirements you were asked to comply with, ask your contact person at European XFEL. Deviations from these guidelines must be clarified and accepted in advance by European XFEL. XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 3 of 19
4 1.2 UHV-compatible design Make sure that your UHV components meet the following requirements: Flanges For X-ray beam transport systems, use flanges of the knife-edge type (according to ISO :2007) that are sealed by means of a flat circular gasket made of oxygen-free high conductivity (OFHC) copper. The gasket cannot be reused. Flanges must be made of the electro slag remelted (ESR) version of the preferred stainless steel types. For flange connections use unplated stainless steel (grade A2-70 or better) screws and CuNiSi (Copper-Nickel-Silicon alloy) nuts Designs Choose designs that: Avoid virtual leaks. For example, use vented screws or vent tapped holes. Allow easy cleaning. For example, avoid inaccessible volumes. This is of particular importance if a component has to be particle-free. Rotatable flanges Unless otherwise stated all vacuum components will have one fixed and one rotatable flange for the x-ray beam ports. The rotatable flange points downstream the x-ray beam. Surface roughness The inner roughness of vacuum components should be Ra 0.8 µm, except for welding seams. Water connections Do not use brazed, welded, or other joints to separate UHV from water. XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
5 2 UHV-compatible materials Only materials that are compatible with ultrahigh vacuum (UHV) may be used for the manufacturing of vacuum components. Table 1 lists materials that are compatible or incompatible with UHV, respectively. Use of materials other than those listed as UHV-compatible is permitted only after approval by European XFEL and before the beginning of production. Generally, materials with high vapour pressure are not UHV compatible, in particular cadmium, lead, potassium, selenium, sodium, sulphur, and zinc, or an alloy containing one or more of the materials listed in Table 1. Table 1: Material that are compatible or incompatible with UHV Type Compatible Incompatible Pure metals Stainless steel Alloys Other Aluminium Beryllium Copper Indium Molybdenum Tantalum Titanium Tungsten Preferred types: 304L and 316L for pipes, 316LN ESR for flanges Aluminum (preferred types: EN AW-5086, EN AW-6061 T6, EN AW-6063 T6) Beryllium-copper DENSIMET, GLIDKOP INCONEL 600, 718 Tin-bronze Aluminium ceramics Boron carbide (B 4 C) Diamond, Sapphire Macor, PEEK, PI (Kapton, Vespel ) (e.g. Cadmium, Lead, Zinc) Steel containing incompatible materials (e.g. 303, 303S, 303Se) Inappropriate Aluminium alloys (e.g series) alloys containing Lead or Zinc (e.g. Brass) Organic materials Glue XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 5 of 19
6 2.1 Electrical connections inside vacuum Cables used inside vacuum have to be Kapton - or ceramic-insulated. Other insulation materials (for example, PTFE or silicone) are prohibited. Voltages and currents carried by the cables may not exceed the manufacturer s ratings. Cable connections must be made by crimping or screwing. Soldered connections are prohibited. 2.2 Feedthroughs This section describes the requirements for feedthroughs Electrical feedthroughs Feedthroughs used for electrical connections into the vacuum system must be of the ceramic-to-metal type. No glass-to-metal feedthroughs are permitted. The preferred installation method is feedthroughs that are mounted in a flange. Feedthroughs may also be welded directly to a chamber when a flange connection is not feasible. Care must be exercised to prevent the weld from putting undue stress on the ceramic. Voltages and currents carried by the feedthroughs must not exceed the manufacturer s ratings. Quality control of feedthroughs consists of visual and mechanical inspection of dimensions, as shown by the appropriate drawing and leak checking. External covers should be provided to protect the ceramics from damage after installation Mechanical feedthroughs Bellow-type mechanical feedthroughs or magnetically coupled feedthroughs have to be used to impart a rotational or linear movement to the vacuum. O-ring-sealed feedthroughs are not permitted. Feedthroughs must adhere to all applicable sections of this specification with regard to materials, fabrication, cleaning, welding, leak tightness, bakeout capability, and so on. Installation of these feedthroughs must be by means of a knife edge -type flange. Feedthroughs that have bearings exposed to vacuum must be XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
7 evaluated regarding their UHV suitability. Feedthroughs containing parts that cannot be cleaned may not be used. XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 7 of 19
8 3 Guidelines for UHV systems The chapter includes guidelines for manufacturing, assembling, cleaning, testing, and packing ultrahigh vacuum (UHV) systems. 3.1 Manufacturing and assembly When manufacturing and assembling UHV systems, follow these guidelines: Cleaning and degreasing Clean and degrease all machined parts before welding. For example, do the following: Prewashing Use a high-pressure cleaner to remove coarse contaminations and then wash the parts with a suitable detergent. Pickling Choose a pickling bath that is suited to the material and the pickling of UHV components. Immediately afterwards, rinse with deionized water. Do not pickle flanges. Possible etching methods: Aluminium Diluted NaOH, water rinse, neutralization (Dekapierung) with diluted nitric acid, water rinse, and drying. Stainless steel Water-based mixtures of HF + HNO 3 or HF + H 2 SO 4, water rinse, and drying. XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
9 Welding Complete welds on the vacuum side of the vessel only. If the welds have to be done from the outside, fill the interior of the vessel with inert gas. Avoid spillage inside the vacuum vessel and sink holes in the welding seam as well as sagging. If necessary, cover the welds from inside and flush them with shielding gas. Perform the welds with full penetration. Acceptable welding procedures: Electron beam Laser Metal inert-gas (MIG) Plasma Tungsten inert-gas (TIG) Brush welds only with suitable brushes that are not contaminated by other materials. Brazing joints Braze joints only under a vacuum or shielding gas atmosphere without a fluxing agent. Before brazing, get approval from European XFEL of the brazing solders to be used. Cleaning parts Clean vacuum parts that will be assembled into larger units in advance. Clean the parts after mechanical manufacturing, taking into account the UHV cleaning requirements. Leak testing Before final assembly, leak-test smaller units and welds, which are not accessible separately after mounting. Marking If you are asked to mark the vacuum components (indicated on the technical drawing) follow the guidelines given in European XFEL drawing B-000, which can be found on page 19 of this document. Avoiding contamination Avoid contamination of the components during assembly and welding processes. XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 9 of 19
10 Therefore, do the following: Mount and weld in a clean room separated from the mechanical manufacturing. Wear clean, lint-free gloves during assembly. Surface treatments Such as glass-bead blasting or electro polishing, must be approved in advance by European XFEL. Machining Before performing necessary subsequent machining, get approval from European XFEL. For a cooling fluid, use isopropanol only. Use new cutting tools. Standard cooling lubricants and cutting oils are not allowed. 3.2 Cleaning Pre-cleaning must be applied to welding seams and holes. Wipe all invacuum welds with isopropanol. Holes and threaded holes shall be precleaned with isopropanol using brushes or special sticks. After the general cleaning, check all holes and welds for residual contamination Cleaning of large items When cleaning large UHV systems, like pipes, chambers or vessels, follow these guidelines (list of suitable cleaning companies is available on request): 1 Chemical mechanical precleaning (based on HNO 3 ) 2 Rinsing with water (resistivity 1 MΩcm -1 at 25 C) 3 Depending on the dimensions of the item to be cleaned, do one of the following: Long pipe sections: Anodical cleaning (based on H 2 SO 4 and H 3 PO 4 ) Vacuum chambers, vessels or buffers: Pickling (based on HF and HNO 3 ) 4 Rinsing with water (resistivity 1 MΩcm -1 at 25 C) XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
11 5 Chemical passivation of the surface (based on HNO 3 ) 6 Rinsing with water (resistivity 1 MΩcm -1 at 25 C) 7 Final treatment (for particle-free cleaning, continue with Section 4.1, Cleaning and assembly ) Rinsing with 80 C DI water (resistivity 15 MΩcm -1 at 25 C) Drying with Nitrogen (quality 5.0 or better) Quality control (visual inspection, surface roughness) Closing with clean plastic flange caps Cleaning of small parts Smaller UHV parts can be cleaned in a laboratory washing machine using Neodisher detergent and DI water for rinsing. Alternatively, you can use an ultrasonic bath with DI water and a suitable detergent (for example, Tickopur R33). Perform ultrasound operations (for example, 3 to 6 times for 5 min.), interrupted by short rinsing periods (at least 1 min.). 3.3 Parts handling Handle clean parts on all vacuum surfaces with clean, lint-free gloves only. XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 11 of 19
12 3.4 Packing When packing UHV systems, follow these guidelines: Vacuum vessels Fill vacuum vessels with dry nitrogen and seal them off with blank flanges or seal flanges with polyethylene plastic foil. Protect knife edges and sealing surfaces with clean plastic flange caps. Alternatively, wrap the evacuated vacuum vessel in a double layer of PE-foil. Vacuum pipes Close vacuum pipes with clean plastic flange caps. Mark rotatable flanges of pipes longer than 2000 mm with an orange sticker (cleanroom-compatible tape) on the tube next to the flange Sleeved and sealed in a double layer of PE foil, inner foil filled with Nitrogen Other components Wrap and seal other components in a double layer of PE foil. Transport For transport, fix movable components (for example, bellows and rotating flanges). XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
13 4 Particle-free UHV systems To obtain ultrahigh vacuum (UHV) components that are particle free, follow the guidelines in this chapter in addition to the guidelines in Chapter 3, Guidelines for UHV systems. 4.1 Cleaning and assembly Cleaning of large items Final treatment in cleanroom ISO class 5 or better After a UHV-compatible cleaning, described in Section 3.2, Cleaning, perform the following steps inside a cleanroom: Rinsing with 80 C DI-water (resistivity 15 MΩcm -1 at 25 C) Drying with Nitrogen (Quality 5.0 or better) Quality control (visual inspection, surface roughness) Closing with clean plastic flange caps Testing the absence of particles The absence of particles must be verified using a suitable particle counter inside a cleanroom ISO class 5 or better. For the measurement, create a turbulent flow of particle-free (ionized) nitrogen inside the component and place the particle counter where most of the flow will come out. Run the measurement procedure for at least 5 minutes (longer for very large items or complex geometries). Determining factor is always the particle count for the smallest measurable particle size according to Table 2. Table 2: Maximum number of particles for ISO class5 Particle size [μm] 0,3 0,5 1,0 0,5 Particles/m XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 13 of 19
14 Getting approval Due to the multitude of components to be analysed and their different geometries, there is no standardized test setup or specification of the procedure. Thus, a suitable positioning of the particle counter and the chosen blow process for the components must be approved by European XFEL Cleaning of small parts Use a laboratory washing machine operating with DI water and suitable detergents like Neodisher. Unload in a room with ISO class 5 or better. When using ultrasonic bath for particle cleaning, it is mandatory to clean in several steps, changing the position of the parts (for example, 3 to 6 times for 5 min.). As an alternative to a lab washer or an ultrasonic bath, you can place components that cannot be cleaned easily (for example, mirrors, detectors, and so on) in a cleanroom in a particle-free airflow (ISO class 5 or better) for several hours before assembly. 4.2 Parts handling Assemble components and join vacuum parts in an environment according to the specified cleanroom class. For assembly in cleanrooms, use only unlubricated and uncoated screws that do not cold-weld (for example, titanium screws in components made of stainless steel). XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
15 4.3 Packing When packing components for particle-free UHV systems, follow these guidelines: Vacuum vessels Fill vacuum vessels with dry particle-free nitrogen and seal them off with blank flanges or seal flanges with particle free PE foil. Protect knife edges and sealing surfaces with clean plastic flange caps. Alternatively, wrap the evacuated vacuum vessel in particle free PE foil. Mask gaps in flange connections on the outside with cleanroom-compatible adhesive tape. Vacuum pipes Close vacuum pipes with clean plastic flange caps. Mark rotatable flanges of pipes longer than 2000 mm with a sticker (cleanroom compatible tape) on the tube next to the flange Sleeved and sealed in a double layer of particle free PE foil, inner foil filled with dry particle-free Nitrogen Other components Wrap and seal other components in a double layer of particle free PE foil. Transport For transport, fix movable components (for example, bellows and rotating flanges). Aluminum foil Aluminium foil is strictly forbidden for packing particle-free UHV components. XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 15 of 19
16 5 Vacuum tests This chapter includes guidelines for acceptance testing of UHV systems and particle-free UHV systems. 5.1 Leak test When performing leak tests, follow these guidelines: Recommended procedures Follow the recommended leak-test procedures described in ASTM E498, Standard Test Methods for Leaks Using the Mass Spectrometer Leak Detector or Residual Gas Analyser in the Tracer Probe Mode. Integral leak rate acceptance criterion Make sure that the integral leak rate (sum of all leaks) is mbar l sec -1. Inaccessible units and welds Before assembly, perform leak test on units and welds that are no longer accessible after assembly. Equipment Perform the leak test using a standard leak detector or an RGA. Before performing the test, verify the required sensitivity and the correct function of the leak detector with a test leak. Baked components Before and after the thermal treatment, leak test components at room temperature. Vessel leak test For the final leak test of vessels, use metal gaskets. XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
17 5.2 Residual gas analysis The outgassing of all UHV components must be free of hydrocarbons. Perform the appropriate proofs using a sufficiently sensitive residual gas analyser (RGA), usually equipped with a secondary electron multiplier (SEM). The test procedure has to be performed and documented twice with the same parameters: the pumping system itself and with the component to be tested attached. Components are considered to be clean when the respective conditions are fulfilled Acceptance criteria for unbaked vacuum systems The mass 18 peak of the leak-free system reaches a pressure below mbar. After 15 hours of pumping the RGA spectra are recorded: all mass peaks between mass 18 and 44 have to be 100 times lower than the mass 18 peak, except masses 28, 32 and 44 All mass peaks from mass 45 to at least mass 100 have to be 1000 times lower than the mass 18 peak Acceptance criteria for baked vacuum systems Leak-free system reaches a total pressure below 10-7 mbar. Sum of the partial pressures of masses from mass 45 on to at least mass 100 is less than 10-3 of the total pressure. For documentation, a mass spectrum (at least Masses amu, resolution mbar)) of each component is needed, as well as a reference spectrum of the applied pumping system itself. The integral specific desorption rate for baked components should be mbar l sec -1 cm -2. The method of verification must be approved by European XFEL. XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 17 of 19
18 5.3 Pressure test of cooling water circuits Every water-cooled UHV device has to undergo a pressure test prior to installation. There should be no noticeable drop in pressure within eight hours after applying the 1.6 fold of the later used working pressure. XFEL.EU TN of 19 UHV Guidelines for X-Ray Beam Transport Systems
19 A Appendix A.1 Instruction for marking vacuum parts XFEL.EU TN UHV Guidelines for X-Ray Beam Transport Systems 19 of 19
Cleaning Methods of SRF Power Couplers. Mircea Stirbet
Cleaning Methods of SRF Power Couplers Mircea Stirbet Principles - The FPC cleaning should start at the design stage - Continue during component manufacture, storage and transportation to the final destination.
Projects and R&D activities
Projects and R&D activities J.M. Jimenez On behalf of the Vacuum, Surface and Coatings Group (VSC) Vacuum, Surface and Coatings group* Mandate Design, construction, operation, maintenance and upgrade of
Lecture 30: Cleanroom design and contamination control
Lecture 30: Cleanroom design and contamination control Contents 1 Introduction 1 2 Contaminant types 2 2.1 Particles.............................. 2 2.2 Metal ions............................. 4 2.3 Chemicals.............................
Large Systems Commissioning
Large Systems Commissioning, DESY CAS Vacuum in Accelerators Platja D`Aro, May 21, 2006 Special thanks to O. Gröbner 1 Outline Introduction Pump Down and Leak Check Components Check Bake Out Interlocks/Safety
Crevice Corrosion on Stainless Steel Propeller Shafts
Crevice Corrosion on Stainless Steel Propeller Shafts A Quick Summary: What is it? How to Prevent it. How to Repair it. Stainless steel propeller shafts and running gear are subject to pitting & crevice
www.axon-cable.com Power distribution systems
www.axon-cable.com Power distribution systems Power distribution systems As vital components for electrical power distribution in telecommunication satellites and landbased weapon systems, the bus and
Chapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503
1 User s Guide to: Phoenix Vessel Technology Limited 1000 psi End port pressure vessels 2.5. Model number: 1503 Lenntech [email protected] Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 Phoenix
VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01)
VdS Guidelines for water extinguishing systems VdS 2100-09en Requirements and test methods VdS 2100-09en : 2011-05 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,
NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
Installer s Guide 18-AH39D1-13
18-AH39D1-13 Cased Aluminum "Convertible" Coils 4TXCA018BC3HC** 4TXCA024BC3HC** 4TXCB025BC3HC** 4TXCB026BC3HC** 4TXCB031BC3HC** 4TXCB032BC3HC** ALL phases of this installation must comply with NATIONAL,
Specifications for Programs: 737, 747, 757, 767, 777, 787
= Performed by GKN BAC 5000 AN General Sealing 6-262, 6-265, 6-267, 6-270 PSD for 787 Only: 6-242, 6-269, 6-271 PSD for 777 Only: 6-261,6-264, 6-266, 6-269, 6-271 BAC 5004 L Installation of Permanent Fasteners
STM, LEED and Mass spectrometry
STM, LEED and Mass spectrometry R. Schloderer, S. Griessl, J. Freund, M. Edelwirth, W.M. Heckl Introduction TDS UHV technique Preparation STM LEED QMS Concept of new UHV chamber Conclusion P. Cole, M.
Cables. Accessories. For Force, Torque and Strain Sensors
Accessories Cables For Force, Torque and Strain Sensors Charge mode, high impedance piezoelectric measurement demands highly insulated coaxial cables and connectors to ensure an insulation resistance greater
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
S GATE KNIFE GATE VALVE WITH PNEUMATIC ACTUATOR
MAIN FEATURES The pneumatic S GATE knife gate valve is intended for the automatic shut off of pipes of the heavy fluids like slurries and powders. The main fields of application are the water treatment,
"In-situ" calibration of QMS for gas flow measurements
Institute of Metals and Technology, Ljubljana, Slovenia "In-situ" calibration of QMS for gas flow measurements Janez Šetina, Bojan Erjavec Institute of Metals and Technology Lepi pot 11, 1000 Ljubljana
Manual piston sampler...m 11
SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr
Good Boards = Results
Section 2: Printed Circuit Board Fabrication & Solderability Good Boards = Results Board fabrication is one aspect of the electronics production industry that SMT assembly engineers often know little about.
the runnerless types of molds are explained post molding operations are described the basic methods of applied decoration methods are examined
Training Objectives After watching the video and reviewing this printed material, the viewer will gain knowledge and understanding of the various plastic finishing processes used in industry and their
Operator Quick Guide EC SENSOR
Operator Quick Guide EC SENSOR Revision G - 24/04/2008 General Information About This Guide The information in this guide has been carefully checked and is believed to be accurate. However, Hach Ultra
Mechanical shaft seal types and sealing systems
Chapter 2 Mechanical shaft seal types and sealing systems 1. Mechanical shaft seal types 2. Sealing systems 3. Selecting a mechanical shaft seal Mechanical shaft seal types and sealing systems 1. Mechanical
NDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
STRAIN GAGE INSTALLATION HOLE DRILLING
Via Delle Calandre 63 50041 Calenzano (Florence) Italy Tel: +39.055.8826-302 Fax: -303 www.sintechnology.com [email protected] STRAIN GAGE INSTALLATION HOLE DRILLING How to install strain gages for
Important Information
Single Door Quadrant Instruction Manual ESQ Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to
RBS detergents for laboratories
RBS detergents for laboratories High performance solutions For reliable and reproducible results Competence & experience RBS products are mainly intended for water-based cleaning processes of glassware
Mini USB and USB 2.0-IP67 Connector System
Mini USB and USB 2.0-IP67 Connector System Section 12 Mini USB and USB 2.0-IP67 Connector System CONEC has added the Mini-USB connector. This Mini-USB IP67 receptacle and plug family, feature a bayonet
RUBBER SLEEVE KNIFE GATE VALVE
RUBBER SLEEVE KNIFE GATE VALVE The model knife gate is a wafer valve designed for a wide range of industrial applications. The double-seated design provides bi-directional shut off. The design of the valve
Explosion proof enclosures
1 of 7 Explosion proof enclosures DE8 C 2 of 7 The Ex d enclosures are rugged and designed for harsh environment like: Oil and gas industry Chemical industry Pharmaceutical industry Agribusiness Without
Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version
instrumentation for fluids Electromagnetic sensor Series FLOMID FX Instructions Manual! Conforms with the Pressure Equipment Directive 97/23/EC. 0830 This equipment is considered as being a pressure accessory
RAIL ADAPTER SYSTEM DRAFT TC-23-AIMSS CHAPTER 1 1-1 DESCRIPTION
DRAFT TC-23-AIMSS CHAPTER 1 RAIL ADAPTER SYSTEM 1-1 DESCRIPTION The Rail Adapter System (RAS) consists of a set of lightweight specially modified sections that replace the standard front handguards on
USER MANUAL. 10 GPM Small Single Line Cryogenic Coupling
JC Carter LLC LNG Couplings USER MANUAL 10 GPM Small Single Line Cryogenic Coupling Models 50E722 Nozzle and 50E721 Receptacle User s Manual and Installation Guide! Warning: Read the User s Manual and
Vacuum Tube Solar Water heater Non-pressure. User manual
Vacuum Tube Solar Water heater Non-pressure User manual Please read this manual carefully before beginning installation Specification Tubes 12 --- 30 58X1800 Nominal volume tank capacity 100L --- 300L
GK Packing System Welding Instructions
GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL [email protected], www.roxtec.de Welding instructions
Warranty. www.tissot.ch 1/5. Warranty
Warranty Warranty Your TISSOT watch is warranted by TISSOT S.A. for a period of twenty-four (24) months from the date of purchase under the terms and conditions of this warranty. The international TISSOT
Mechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE
B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY
Introduction to vacuum gauges. Vacuum Gauges where the Pressure Readings are Independent of the Type of Gas (Mechanical Vacuum Gauges)
Introduction to vacuum gauges Vacuum Gauges where the Pressure Readings are Independent of the Type of Gas (Mechanical Vacuum Gauges) BOURDON Vacuum Gauge The inside of a tube which is bent into a circular
IMPORTANT SAFETY NOTICE
IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will minimize your risk of injury. ITT Goulds
italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines
PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines On customer request it is possible to supply: Benches for PCB Oven for PCB Chemicals
SOFT START VACUUM VALVES. Vacuum Valves. Two-Stage Valves
SOFT START AUU AES W W W. K S I S T. O acuum alves Two-Stage alves Features and Benefits Provides soft pumpdown and isolation of your vacuum system Reduces particulate contamination during early turbulent
Profiles for floors of same height Cerfix Projoint
PROFILPAS S.P.A. VIA EINSTEIN, 38 35010 CADONEGHE (PADOVA) ITALY TEL. +39 (0)49 8878411 +39 (0)49 8878412 FAX. +39 (0)49-706692 EMAIL: [email protected] s for floors of same height Cerfix Projoint Application
BRAZED PLATE INSTALLATION MANUAL
www.brazedplate.com BRAZED PLATE INSTALLATION MANUAL S.E.C. Heat Exchangers P.E.I. CANADA C0A 1A0 tel; 902-659-2424 fax; 902-659-2800 Table of Contents Description...2 Mounting position...3 Piping connections......3
Quick Connect Boxes Inside Gloveboxes
ULC Series Junction Boxes Quick Connect Boxes Inside Gloveboxes The ULC quick connect junction boxes are the essential elements to optimize the cabling inside gloveboxes. Large range Designed for nuclear
FLEXIBLE CIRCUITS MANUFACTURING
IPC-DVD-37 FLEXIBLE CIRCUITS MANUFACTURING Below is a copy of the narration for DVD-37. The contents of this script were developed by a review group of industry experts and were based on the best available
Vacuum Pumping of Large Vessels and Modelling of Extended UHV Systems
Vacuum Pumping of Large Vessels and Modelling of Extended UHV Systems Georgy L. Saksaganski D.V. Efremov Institute, St Petersburg, Russia [email protected] An overview of the methods for reducing of
Screw Plug Immersion Heaters
Immersion Heaters Overview Immersion Heaters consist of hairpin bent tubular elements brazed or welded into a screw plug and provided with terminal enclosures for electrical connections. Immersion Heaters
DIAMOND Retractable Rodding Robot Model SPRAYROD-R
2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic
Robot Welding Torch System
T e C H N O L O G y f O R T H e W e L d e R s W O R L d. Robot Welding Torch System W W Robot welding torch system... The universal MIG/MAG-torch system for robot welding: A new interface and cable assembly
60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
Engineering Specifications
PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press
AMPSEAL* Automotive Plug Connector and Header Assembly
AMPSEAL* Automotive Plug Connector and Header Assembly Application Specification 24 SEP 97 Rev E All dimensions are given in millimeters unless otherwise specified. All dimensional tolerances are +0.2
Make sure oven is OFF. Never remove parts or touch the fan unless the oven is OFF.
Morning Cleaning The following start-up procedures MUST be completed before using the oven. The procedures may be completed at night after the oven has completed the clean cycle, or in the morning BEFORE
Stainless Steel Single and Dual Circulation Kits
Instruction Sheet P/N 160780 01 Stainless Steel Single and Dual Circulation Kits Introduction The single and dual high-pressure circulation kits allow you to vary and control the circulation rate of coating
NetShape - MIM. Metal Injection Molding Design Guide. NetShape Technologies - MIM Phone: 440-248-5456 31005 Solon Road FAX: 440-248-5807
Metal Injection Molding Design Guide NetShape Technologies - MIM Phone: 440-248-5456 31005 Solon Road FAX: 440-248-5807 Solon, OH 44139 [email protected] 1 Frequently Asked Questions Page What
Shaft Repair Rebuild and Maintenance Guide
Shaft Repair Rebuild and Maintenance Guide Introduction This guide has been designed to provide quick and easy assistance to the professionals responsible for the maintenance and repair of shaft assemblies.
Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls
Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems
Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment
Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment Whatever You Rebuild, Repair and Protect...... Find the Right Solution! Henkel's Solutions for all Surface Engineering Needs
Anodizing Reference Guide
Anodizing Reference Guide Type Thickness Type II Conventional coatings produced 1.8µ-25.4µ from sulfuric acid bath Type I A Conventional coatings produced 0.5µ-7.6µ (microns) from chromic acid bath Type
CHEMICAL CLEANING UNIT Product number: 737189
CHEMICAL CLEANING UNIT Product number: 737189-1 - v.05/16 Content Page Intro 3 Specifications 4 Installation 5 Safety precautions 7 Maintenance 8 Spares and Accessories 8 Unitor Chemicals 9 Notes 10-2
BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12
BACKPACK SPRAYERS MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12 INTRODUCTION Thank you for purchasing this CLARKE Sprayer, designed for use only with
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
orlando OWNER S MANUAL
orlando OWNER S MANUAL 2 Assembling & operating manual Orlando 30 mbar - PORTABLE GAS BARBECUE 1. 2. 3. Improper installation, adjustment, alteration, service or maintenance can injury or property damage.
Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE
Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will
Product Specification
Product Specification Model No.: DC-240-L01-00-TR Description: H=3.00mm Horizontal SMD DC Power Jacks Pin Shaft Diameter: 0.65mm Packing Method: Tape & Reel (600pcs./R) 1. General 1a. Scope The jacks should
2. AIRCONDITIONING AND REFRIGERATION
2. AIRCONDITIONING AND REFRIGERATION 1. INTRODUCTION Air Conditioning and Refrigeration is an important area where in lot of self-employment opportunities are available. Now a day there is hardly a house
Plasma Source. Atom Source, Ion Source and Atom/Ion Hybrid Source
Plasma Source Atom Source, Ion Source and Atom/Ion Hybrid Source The tectra Plasma Source* is a multi-purpose source which can easily be user configured to produce either atoms or ions and finds uses in
G8 GALILEO. Innovation with Integrity. High-End Melt-extraction Analyzer. Inert Gas Method
G8 GALILEO High-End Melt-extraction Analyzer Innovation with Integrity Inert Gas Method Determination of O, N and H The market demands Metals, minerals, and inorganic compound markets demand high-quality
Handling Corrosive or Abrasive Liquids
Handling Corrosive or Abrasive Liquids Defining abrasion and corrosion An abrasive liquid is one that has particles in it. Some, like inks, have very fine particles, while others, like some paints, contain
THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494
THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 1. BEFORE YOU BEGIN IMPORTANT INSTRUCTIONS READ AND SAVE FOR THE CONSUMER WARNING: Risk of scalding or other severe injury. Before completing installation,
INSTALLATION, OPERATION & MAINTENANCE MANUAL
INSTALLATION, OPERATION & MAINTENANCE MANUAL Flanged Disk Check Valve with Strainer Ref. GENEBRE: 2450 2451 2452 1 INSTRUCTIONS FOR INSTALLATION, OPERATION & MAINTENANCE MANUAL 1. Spare parts... 3 1.1
A Remote Plasma Sputter Process for High Rate Web Coating of Low Temperature Plastic Film with High Quality Thin Film Metals and Insulators
A Remote Plasma Sputter Process for High Rate Web Coating of Low Temperature Plastic Film with High Quality Thin Film Metals and Insulators Dr Peter Hockley and Professor Mike Thwaites, Plasma Quest Limited
T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A
T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test
Self Assessment Exercise
Self Assessment Exercise Read the following extract of supporting documentation for Permit Application for Galvos plc galvanising facility and the accompanying tables. Decide if the proposed control techniques
Ultrasonic Reference Blocks
Ultrasonic Reference Blocks Custom and Standard Test Blocks for Nondestructive Testing Introduction 3 IIW Type 1 Calibration Block 4 Miniature Angle Beam (ROMPAS) Calibration Block 4 Distance Calibration
OLI. Oil level indicator
OLI Oil level indicator Oil level indicator Unexpected or accidental oil leakages may occur randomly along transformer s lifetime. Clear indication of oil level inside transformer tank and on load tap
Cerobear Spindle Bearings for Machine Tool Applications
Cerobear Spindle Bearings for Machine Tool Applications Cerobear Spindle Bearings About CEROBEAR Committed to the abbreviation CEramic in ROlling BEARings, CEROBEAR GmbH is the renowned world leader in
An SPX Process Equipment Operation. Universal II Industrial Series Rotary Positive Displacement ECP Pumps
An SPX Process Equipment Operation Universal II Industrial Series Rotary Positive Displacement ECP Pumps New levels of performance. Reduced operational and maintenance costs. For more than half a century,
Typical water pump claims and causes
Typical water pump claims and causes www.meyle.com MEYLE water pumps pioneering advancements instead of technological dead end! The water pump quality depends upon the use of high grade components. These
Copper Alloys COPPER ALLOYS. Weld Tech News VOL 1. NO. 8
Copper Alloys Weld Tech News VOL 1. NO. 8 WELD TECH NEWS is a newsletter for welders working primarily in maintenance and repair. Each issue contains useful information on materials (cast irons, steels,
Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the A325 structural bolt. Rev.
Structural Bolting ASTM A325 and ASTM A490 are the two U.S. standard structural bolts. When looking at the mechanical requirements of bolts it appears that an ASTM A325 and SAE J429 Grade 5 are identical
Colonnade Security Pipe
Description: Round & Square downpipe formed from extruded 6060 T4 aluminium in various sizes (Ø83mm, Ø108mm, 83x83 mm & 108x108mm*) & supplied with a complete range of accessories i.e. Offsets, bends,
GEET Fuel Processor Plans
GEET Fuel Processor Plans This is a greatly simplified Proof of Concept version of the GEET Fuel Processor that just about anyone can build from parts from a local Hardware store in a weekend for very
FLEXWELL Safety Pipe. Pipe systems for installations Technical details
Pipe systems for installations Technical details Notes 08.04.2013 T page 2 Contents 4.0 4.0 Contents 4.1 System description 4.100 System description FLEXWELL Safety Pipe 4.105 System description FLEXWELL
Technical Info Sheet. Ionic contamination testing in a no-clean soldering process. Scope
Scope This document provides information about ionic contamination testing and its relevance in a no-clean. Also so-called C3 testing and ROSE (Resistivity of Solvent Extract) testing are forms of ionic
Introducing an All New Line of Cleaning Chemicals
www.alltemp.ca Introducing an All New Line of Cleaning Chemicals Coil Cleaners & Brighteners Metal Cleaning Detergents Ice Machine Cleaners Scale Removers Electronic Cell Cleaner Degreasing Solvent Leak
BB-18 Black Body High Vacuum System Technical Description
BB-18 Black Body High Vacuum System Technical Description The BB-18 Black Body is versatile and is programmed for use as a fixed cold target at 80 K or variable target, at 80 K- 350 K no extra cost. The
General Guidelines for Repairing Buried PE Potable Water Pressure Pipes
515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance
How to Build a Printed Circuit Board. Advanced Circuits Inc 2004
How to Build a Printed Circuit Board 1 This presentation is a work in progress. As methods and processes change it will be updated accordingly. It is intended only as an introduction to the production
Figure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4
This specification covers the requirements for application of ELCON Drawer Series Connectors: True Hot Plug, Blind Mating Mixed Signal and Power Connectors. These connectors are designed for use in pluggable
CHAPTER 5. OVERVIEW OF THE MANUFACTURING PROCESS
CHAPTER 5. OVERVIEW OF THE MANUFACTURING PROCESS 5.1 INTRODUCTION The manufacturing plant considered for analysis, manufactures Printed Circuit Boards (PCB), also called Printed Wiring Boards (PWB), using
Things you need to assemble the tube actuator. Left to right. are small piece of masking tape, super glue,pen knife and small
Things you need to assemble the tube actuator. Left to right are small piece of masking tape, super glue,pen knife and small crosspoint screwdriver. You will also need a few drops of light oil. Begin by
Industrial circular connectors
Industrial circular connectors M 16 M 58 010 CONINVERS - M16 to M58 circular connectors for industrial applications CONINVERS GmbH, an independent company, is the specialist for M16 to M58 circular connectors
Key Elements of Vacuum Chamber Design: Will they all fit on a napkin or envelope??
Key Elements of Vacuum Chamber Design: Will they all fit on a napkin or envelope?? Neil Peacock MKS Instruments, HPS Products Boulder Colorado [email protected] 23 Sept 2010 Intent This talk is
3/2-way Solenoid Valve, direct-acting, NC or NO
3/2-way Solenoid Valve, direct-acting, NC or NO Electrical connection cable plug, Form A With or without manual override as standard Threaded port and sub-base s Impulse optional Type 6014 can be combined
STANDARDS FOR THE MATERIALS
STANDARDILUETTELO 1(15) Kpl Standardin numero STANDARDS FOR THE MATERIALS 1 EN 10204 2004-10 Metallic products.types of inspection documents 2 EN 10079 1992-10 Definition of steel products 3 EN 10027-1