1 Project Management Extension Certificate Program Final Assessment Learner Information Guide (Online Final Assessment Paper Course) XPRM PMBOK GUIDE - FOURTH EDITION Based on the Project Management Institute, A Guide to the Project Management Body of Knowledge - FOURTH EDITION PMBOK is a registered mark of the Project Management Institute, Inc. I

2 This publication is a derivative work of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition, which is copyrighted material of and owned by, Project Management Institute, Inc. (PMI), Copyright This publication has been developed and reproduced with the permission of PMI. Unauthorized reproduction of this material is strictly prohibited. The derivative work is the copyrighted material of and owned by, Mount Royal University, Copyright II

3 PROJECT MANAGEMENT FINAL ASSESSMENT PAPER IMPORTANT: This Final Assessment Learner Information Guide is based on the A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Fourth Edition. If you are writing your paper based on the Fifth Edition, please use the Fifth Edition version of this Final Assessment Learner Information Guide. Final Assessment papers submitted in the Fall term of 2013 or any term of 2014 may be written based on either the Fourth or the Fifth Editions of the PMBOK Guide. Any Final Assessment paper submitted after January 1, 2015 must be written based on the PMBOK Guide - Fifth Edition only. NOTE: Please ensure you clearly identify on the FRONT COVER PAGE of your paper, along with your name, whether you have based your paper on the Fourth Edition or the Fifth Edition of the PMBOK Guide course materials. The Project Management Final Assessment paper is the final component in the Mount Royal University (MRU) Project Management Extension Certificate Program. Participants are expected to complete a final paper incorporating project management fundamentals, practices and principles learned throughout the six core courses or three online modules, as they apply in the PMBOK Guide - Fourth Edition. Outlined below are the main criteria for completing the Final Assessment paper. 1. Project Paper: Students will develop a project paper applying the project management processes found in a typical project life cycle. The paper is to be no longer than 25 pages of content (including all support materials and/or Appendices, but excluding any Table of Contents pages, title pages, Appendix title pages or white space due to section breaks). NOTE: For papers longer than 25 pages of content, marks will be deducted or the paper submission may even be refused, in which case, the learner will be asked to follow the rewrite procedure (see the Paper Rewrite item below). Once the paper meets the length requirement, it can then be re-submitted, (subject to the rewrite fee). All papers must use Arial 12 point font-type, single line spacing for the main text. A larger size font for headings is encouraged and the use of Arial 10 point font is acceptable in appropriate charts and tables. 2. Project Selection: Students, in consultation with their assigned course advisor / paper grader, will be required to choose a project. The project must have sufficient scope and complexity that will allow you to demonstrate application of the required project management processes. You are cautioned though, not to choose a project that is too large or complex for you to document within the 25 page content limitation. Some suggestions for projects include a: Future, current or past work project Conference or Seminar Fundraising campaign for a charity Community or special event Note: Although the tense used throughout this document to describe the various requirements of the Final Assessment paper will refer primarily to a project that has not yet started, it is also acceptable to document a project that is completely finished or one that is currently underway. When documenting anything that has been completed, you are encouraged to also describe what you might have done differently, now that you have taken Mount Royal University s Project Management Extension Certificate Program courses. PMBOK is a registered mark of the Project Management Institute, Inc. MRU PM EXTENSION CERTIFICATE PROGRAM 1 UPDATED: AUGUST 2014

4 3. Application of Project Management Processes: In this Program, you learned that all the project management processes can be aggregated into five Process Groups. Exactly when and how the project management processes are applied in a given project can vary significantly, depending on industry and company specific requirements. Thus, it is not possible to prescribe any specific template that must be used when writing this paper. However, it is expected that appropriate tools and templates used throughout the Mount Royal University Project Management Extension Certificate Program courses (or from other suitable sources) will be incorporated in your paper, demonstrating your understanding of how to apply the project management processes. It is further expected that through the application of these various Project Management processes, your paper will demonstrate the integration and interaction between the processes and the purpose each serves in managing a project. 4. Confirmation of Registration and Contact Information: Upon registering over the phone, in person, or by mail, you will receive a Confirmation of Registration in the mail. This receipt will include IMPORTANT INFORMATION for contacting the MRU Student and Program Liaison and who will assist as applicable, with logging into the online Blackboard platform and into the Final Assessment Paper course. Note that a current address is required to access the online course information. No other details about the paper itself will be sent to you in the mail. All other required information regarding paper criteria, grading system, and Frequently Asked Questions can be found in this Final Assessment Learner Information Guide document. NOTE: If you register online you will NOT receive a mailed Confirmation of Registration. At the time you register online, you MUST print your own confirmation as directed. This will contain the required information to contact the MRU Student and Program Liaison. 5. Final Assessment Learner Information Guide: The latest version of this document can always be found at Mount Royal University s Continuing Education website at: Once you are on MRU s website, click on the Certificates / Diplomas link to view the Certificate and Diploma Programs page. Then click on either the Project Management Extension Certificate or Project Management Online Extension Certificate link. At the left, click on the PM Final Assessment link. Then click on the link for the version of the latest Final Assessment Learner Information Guide you require for your paper. OR: Simply access the home page and type Project Management Final Assessment Paper in the Search box and click GO. The link for the Final Assessment Paper course webpage will appear towards the top of the list. OR: Once you have registered in the Final Assessment Paper course, you will be provided with information and a Mount Royal University login to access the online Blackboard course environment. Once you have logged into the Blackboard course, click on the Content link found at the left on the main menu. Then click on the link for the version of the latest Final Assessment Learner Information Guide you require for your paper. MRU PM EXTENSION CERTIFICATE PROGRAM 2

5 6. Course Advisor / Paper Grader: Communication with your assigned course advisor / paper grader via , discussion board or phone is strongly advised as early as possible in the term. It is recommended you contact your advisor to discuss your choice of a project. Your advisor can counsel you on choosing a suitably sized project to document in your paper. Refer to the Frequently Asked Questions section for more details on what information about your project to communicate to your advisor. You are also encouraged to contact your advisor if you have any questions about the paper itself. Please optimize the time with your advisor by preparing specific questions beforehand and keeping conversations or s brief and on-topic. The advisor s time for discussions and replies is limited, as their primary role is to assess and grade the paper. 7. Paper Grading: Students must receive a minimum of 70% (70 points out of a possible 100 points or at least a letter grade of B-) in the Final Assessment paper to successfully fulfill course requirements. Please refer to the Grading System information given later in this document for details on how the marks are awarded. 8. Paper Rewrite: A rewrite can only be requested if you receive a grade less than 70% (or a letter grade below B-). A maximum of two rewrites can be requested. Individuals who are unsuccessful on the second rewrite will be required to wait a year and re-take, or take additional, Project Management courses before applying to write again. The deadline to apply for the rewrite is 60 days after notification of the original paper grade. The fee for a rewrite is $189 plus GST. Only one rewrite can be requested per term. 9. MRU Contacts: Information regarding the paper requirements and the grading system are given later in this document. As indicated above, the latest version of this document can always be found on the MRU Continuing Education website at: Follow the links as described earlier. For further information or questions, please feel free to contact the MRU Project Management Program Coordinator at (403) or the Student and Program Liaison at (403) and fax of (403) Paper Due Date and Submission: The DUE DATE for completing the Final Assessment paper for each term is stated in the Mount Royal University Continuing Education calendar and on the website. All papers must be submitted by: 4:30 P.M. ON THE DUE DATE IMPORTANT: A PDF version of the paper must be submitted through the Assignment Dropbox in the Assignment area within the online Final Assessment Paper course you are registered in. A hard copy of your paper will NOT be accepted. It is essential you submit your Final Assessment paper by the due date! Late submissions will NOT be accepted. If there are extenuating circumstances that arise, preventing a student from submitting the paper by the due date, she/he must contact the Program Coordinator at (403) immediately. All students are asked to ensure they have made a backup hard/paper copy as well as an electronic copy of their complete Final Assessment paper prior to submission. Early submission of your paper is encouraged. MRU PM EXTENSION CERTIFICATE PROGRAM 3

6 11. Application to Graduate Form: Once your Final Assessment paper has been marked, your final mark and comments from the course advisor / paper grader will be posted online in your Assignment Dropbox area, in the Final Assessment Paper - Results sheet attachment. If you achieved 70% (or a letter grade of B-) or more on your paper, an Application to Graduate form is available in the online Blackboard environment in the Information area. In order to obtain your official Mount Royal University Project Management Extension Certificate, you are asked to complete this form and submit it (by mail, in person, by fax, or by with an attached completed form in PDF file format) to the Student and Program Liaison (address/fax/ information as given below). By Mail: Student and Program Liaison, Project Management Program, Mount Royal University Faculty of Continuing Education and Extension, 4825 Mount Royal Gate SW, Calgary, AB T3E 6K6 In Person: Please address the envelope: Attention: Student and Program Liaison, Project Management Program and deliver to: Mount Royal University Faculty of Continuing Education and Extension, Room EC Mount Royal Gate SW, Calgary, AB (Located on the 3 rd Floor of the Roderick Mah Centre for Continuous Learning - East C Building) (map link: By Fax: Attention: Student and Program Liaison: Fax (403) By Send an with the completed Application to Graduate PDF attachment to the Student and Program Liaison contact who is identified in your Confirmation of Registration. 12. Course and Program Evaluation: Once you have completed the Final Assessment paper, you are asked to log into the online Final Assessment course environment and complete the Evaluation Survey, found in the Content area. This survey asks for your comments about the Final Assessment paper itself as well as the overall MRU Project Management Extension Certificate Program. We appreciate your input. MRU PM EXTENSION CERTIFICATE PROGRAM 4

7 NERVOUS ABOUT WRITING A PAPER? The Student Learning Services centre at Mount Royal University is available to assist you with writing assignments. Contact a Learning Consultant by using the following FREE services: One-on-one appointments Telephone appointments Drop-in sessions instruction Web handouts Small group appointments Workshops You may book a 30 minute appointment with a Consultant by calling (403) For more information re: the Student Learning Services centre, visit their website at and follow the links for Academic Support then Student Learning Services. Be aware that the Student Learning Services centre is not familiar with the criteria for the content of the MRU Project Management Extension Certificate Program Final Assessment paper but will be able to assist you in the organization and the writing of the paper itself, once you have decided on the appropriate content. SESSION: Preparing for the Final Assessment Mount Royal University offers a three hour classroom session in Calgary (and elsewhere, as arranged) entitled Preparing for the Final Assessment, which is designed to provide additional support beyond what is offered in the Certificate courses. This session gives you the opportunity to work with an instructor who marks Final Assessment papers so you can obtain further insight into what is required to be successful. Note: This session has a separate fee and is offered as an optional session to help learners prepare for writing the Final Assessment paper and is not a required session for the MRU Project Management Extension Certificate. To find out the session dates and fees for the current term, refer to the information given in the MRU Continuing Education Calendar or on their website at: Follow the links as described earlier. MRU PM EXTENSION CERTIFICATE PROGRAM 5

8 PROJECT MANAGEMENT FINAL ASSESSMENT GRADING SYSTEM PLEASE INCLUDE THE FOLLOWING COMPONENTS IN YOUR FINAL PAPER While the information presented here is intended as a guide only and is not totally prescriptive, a few recommendations may help you organize and plan your paper better. For the overall organization of your paper, you are asked to use the section headings as given below (except of course for the Presentation and Organization heading) and organize the sections in the same order. It will also be helpful to include informative dialog that helps tie sections and items within sections together. Simply collecting together a number of pages containing copies of the various tools and techniques or outputs shows little evidence of how you are actually applying these to your project. Also, by keeping the point value of each section in mind, the number of pages for each section should be roughly proportional to the possible marks in a given section. For example, using this method of estimation, the Planning Processes section would be somewhere in the region of 10 to 12 pages. EXECUTIVE SUMMARY 10 POINTS In the context of this Final Assessment paper, the Executive Summary should serve as a stand-alone section, targeted to a busy executive or manager who is not necessarily directly involved in the project. This summary will provide a general overview of the key aspects of the project and will typically include the following areas: the purpose, the business need / justification of doing the project, a brief description of the project, general approach to the project, the most important stakeholders, estimated duration and budget, key constraints and assumptions, major risks, types of resources needed (human, equipment, etc.), and the overall approach to measuring and evaluating success and quality of the project. You are advised to write the Executive Summary AFTER you have completed all other sections of your paper and it should be placed at the beginning of your submitted document. This section should contain no new information but should summarize, at a high level, the key elements of the Final Assessment paper for an executive level audience. INITIATING PROCESSES 15 POINTS Information included in this section should state the project purpose, justification and high-level description, define the objectives and related success criteria, determine the project requirements, describe the organization and authority, summarize resources, budgets, schedule milestones and risks, and assign the project manager. Students will be expected to utilize and show application of the appropriate tools and techniques and outputs from the processes in this Process Group that were covered in the Project Management Extension Certificate Program courses. These may include (but are not limited to) the following: Project selection criteria Force Field Analysis Project Charter SWOT technique Stakeholder Analysis/Register MRU PM EXTENSION CERTIFICATE PROGRAM 6

9 PLANNING PROCESSES 40 POINTS Develop a comprehensive project plan. Be sure to define the project scope, subdivide the project into major deliverables, identify relevant activities, estimate activity durations, determine resource requirements, construct and analyze the project network. Describe how you will estimate resources, recruit and organize the project team, their schedule and document their work. Determine a project schedule and show evidence of cost estimation and budgeting. Students will be expected to utilize and show application of the appropriate tools and techniques and outputs from the Planning Processes that were covered in the Project Management Extension Certificate Program courses. These may include (but are not limited to) the following: Collecting requirements Project Scope Statement Work Breakdown Structure (WBS) Network diagram Project schedule Cost estimating Organizational and resource planning Quality planning Human resource requirements / assignments Communications planning Risk planning, identification, analysis and response planning Procurement planning Other subsidiary Management Plans as required Other supporting details as required EXECUTING AND MONITORING & CONTROLLING PROCESSES 15 POINTS Describe and demonstrate, by possibly using sample processes and forms, what needs to be measured and/or verified / validated and how, how changes will be managed and controlled, how project performance and budget will be tracked and reported, how contracts will be obtained, signed and administered, how you will execute risk management and quality assurance and control measures, how the project team will be acquired, developed and managed, how other key stakeholder s expectations / engagements will be managed, and how issues will be tracked. CLOSING PROCESSES 10 POINTS Describe and demonstrate, by possibly using sample processes and forms, how you will turn the project over to the customer, obtain acceptance and close contracts, what project documentation will be archived, where and how, and what information the final Close-out Report will contain, including lessons learned. PRESENTATION AND ORGANIZATION 10 POINTS The ability to communicate your knowledge and understanding of the key processes in the project management Process Groups in this final assessment is critical. You will be assessed on the overall presentation of the paper as well as: clarity, organization and flow of the content, readability (including font type and size), terminology, writing mechanics and language used to convey meaning. TOTAL POINTS: 100 POINTS MRU PM EXTENSION CERTIFICATE PROGRAM 7

10 FREQUENTLY ASKED QUESTIONS 1. Question (Q): Where do I find out about the details of the requirements for the Final Assessment paper? Answer (A): This document is the definitive source for all the Final Assessment paper requirements. The most current version of this document can be found on the Mount Royal University Continuing Education website at: Follow the links that were given earlier in this document for the Final Assessment Learner Information Guide information. OR: You can simply access the homepage and type Project Management Final Assessment in the Search box and click on GO. You will see the required link listed. Just click on this link to access the details on the Final Assessment paper course. OR: As described earlier, log into the Blackboard online Final Assessment Paper course, click on the Content link found at the left on the main menu. Then click on the link for the version of the latest Final Assessment Learner Information Guide you require for your paper. You will also be given more details in various courses, for example: An Overview and the Integration and Scope classroom courses and/or Modules 1 through 3 in the online Program. If you are in the Calgary region (or other Centre as arranged), you might consider attending the session entitled Preparing for the Final Assessment. Refer to the details that were given earlier about this session. If you have any other questions regarding the Final Assessment paper, do not hesitate to ask (or ) any of your Project Management Extension Certificate Program instructors or call the Mount Royal University Project Management Program Coordinator's office at (403) or the Student and Program Liaison at (403) Q: When should I apply for registration in the Final Assessment course? A: You should apply after you have successfully completed your six courses (or the three online modules for those registered in the online Program). It is advised you time your application for the Final Assessment paper so that you can start to finalize your paper once you have finished all six classroom or the three online courses (see also the next Question and Answer below). You must complete the paper by the stated due date for the term in which you are registered. 3. Q: How long after finishing my sixth classroom course or third online course, do I have to apply for my Final Assessment? A: It is strongly recommended you apply to write your paper in the term following your last course. You will be permitted to register for the Final Assessment paper course up to two years from the date you took your last course (that is, after the sixth classroom course or the third online module) in the Program. Please contact the Program Coordinator if you are not able to meet this requirement. MRU PM EXTENSION CERTIFICATE PROGRAM 8

11 4. Q: What is the pass mark for the Final Assessment paper? A: The pass mark is 70 % (equivalent to a letter grade of B-). 5. Q: Do I get my Mount Royal University Project Management Extension Certificate automatically after I pass the Final Assessment paper? A: No, there is an Application to Graduate form available specifically for applying for your official Mount Royal University Project Management Extension Certificate. Only after you have successfully met all the requirements for the Certificate, including completion of all six courses OR three online modules AND passing the Final Assessment paper requirements, can you apply for the Certificate. If your mark on the Final Assessment paper is 70% (or letter grade of B-) or more, then complete the Application to Graduate form that is available in the Information area of the online Blackboard Final Assessment Paper course. 6. Q: Have students failed the Final Assessment? A: Yes, there are clearly defined requirements and if these are not met, the student will not be successful in passing the Final Assessment paper. 7. Q: What is the most common reason for failure of a paper or loss of marks? A: The most common reason for failure or loss of marks is because key required items such as a budget or a schedule have not been included. You are advised to use the number of points identified for each section as a guideline in determining the relative importance of that section. For example, writing only a paragraph for the Closing Processes will not be awarded 10 points or similarly, only a paragraph for the Executing / Monitoring & Controlling Processes will not be worth 15 points. Another area where candidates lose marks is that they just regurgitate the project management theory and do not show how they have applied this theory to their chosen project. Also, you are discouraged from including too much technical information about the project itself. Remember, the purpose of the paper is for you to show evidence of how you might apply the project management theory you learned in the courses to a specific project and not to just communicate pages of technical project information that is relevant primarily to the technical resources who are assigned to specific work on the project. 8. Q: What are my options if I fail (get less than 70% or a letter grade below B-)? A: You may apply for a rewrite of your paper (at a cost of $189 plus GST) and attempt to obtain a pass grade. You are allowed one rewrite per term to a maximum of 2 rewrites. If you wish to rewrite the Final Assessment paper, you are required to apply within 60 days of receiving your original grade. Individuals who are unsuccessful on the second rewrite will be required to wait a full year and re-take, or take additional, Project Management courses. 9. Q: Can I ask to be assigned to a specific course advisor/ paper grader? A: No. Each Final Assessment course advisor / paper grader is assigned papers on a rotational basis (depending on how many students have already been assigned to a given advisor / MRU PM EXTENSION CERTIFICATE PROGRAM 9

12 grader). So, when your Final Assessment registration comes in, you are simply assigned to the next available course advisor / paper grader. 10. Q: How do I find out who has been assigned as my course advisor / paper grader? A: Upon registering over the phone, in person, or by mail for the Final Assessment Paper course, a Confirmation of Registration receipt will be mailed to the address you provided to the Mount Royal University Registration department. This receipt will indicate your payment information as well as the contact information for the MRU Student and Program Liaison who can provide you with contact information for your assigned course advisor / paper grader. NOTE: If you register online you will NOT receive a mailed Confirmation of Registration. At the time you register online, you MUST print your own confirmation as directed. This will contain the required information to contact the MRU Student and Program Liaison who can provide you with the contact information for your assigned course advisor / paper grader. Regardless of how you register, you will only be able to obtain the contact information of your course advisor / paper grader on or after the start date of the Final Assessment Paper course for the term in which you have registered. 11. Q: Will the assigned course advisor / paper grader contact me or do I contact her/him first? A: The onus is on the student to make the first contact with the assigned course advisor / paper grader, and it is recommended you do this as early as possible in the term. 12. Q: What is the role of my assigned course advisor/ paper grader? A: As early in the term as possible, it is strongly recommended you your assigned course advisor / paper grader for confirmation that the project you intend to choose will be a suitable project to document for your Final Assessment paper (see the Answers to other Questions given later for more details on what constitutes a suitable project). It is recommended that when you your advisor to confirm if your project is suitable, you include the following information about your candidate project: a couple sentences briefly describing your project number of people (human resources) to be assigned to the project and their estimated cost overall estimated cost of the project estimated duration of the project any other important considerations or comments regarding your selection of the project Also, as the work on your paper progresses, your advisor can be contacted via , discussion board posts, or phone to answer your questions as required. Once your paper has been submitted to Mount Royal University using the assignment dropbox in the online Blackboard Final Assessment Paper course environment, your paper will be available to the course advisor / paper grader to mark. Note: The advisor does not approve your project per se; she/he will be able to counsel you though, about whether or not the project you are considering for your paper will be suitable for the requirements of the paper. MRU PM EXTENSION CERTIFICATE PROGRAM 10

13 13. Q: What type of project is suitable for my Final Assessment? A: As indicated in the information found elsewhere in this document or discussed in the classroom courses or online modules, you can document a project from any number of possible areas. The key criteria is that it be complex enough for you to be able to illustrate your level of knowledge through the application of the principles learned from each of the six classroom courses or three online modules that you took in preparation for this Final Assessment paper. Your project also needs to be small enough so that you can easily summarize it within the 25 page limit. It can also be at any stage, that is, it can be completely finished, currently underway, or not even started yet. Before starting on your Final Assessment paper, you are strongly advised to obtain confirmation from your assigned course advisor / paper grader that the project you have chosen is suitable for documenting in your paper. 14. Q: Must the project I choose for my paper be a work-related project? A: No, not necessarily. It would be prudent, though, to choose a work related project if your organization has paid for your courses. 15. Q: Am I able to meet in person with my assigned course advisor / paper grader? A: No, since all necessary communication can easily be handled using either , discussion board posts, or phone calls, there is no need for a face to face meeting to be held. Also, MRU does not contract the course advisors / paper graders to do this, nor would it even be feasible for them to meet with all the Final Assessment students in a given term, especially those who live outside the Calgary area. 16. Q: How much consultation time do I get with my assigned course advisor / paper grader? A: MRU is not able to mandate any particular length of time any specific course advisor / paper grader is available, but our goal is to ensure each student is able to obtain the help she/he requires to complete the Final Assessment paper. It is important though, that you optimize the time with your advisor by ensuring you are well prepared before any contact and that you remain focused on the questions you need answered. Your assigned advisor will be able to guide you through difficulties you have in understanding the assignment. In preparation for the Final Assessment Paper course, you are also encouraged to ask questions in EACH of the six core classes / three online modules as you take them. 17. Q: When I a question or leave a phone message for my course advisor / paper grader, what should my expectation be for a reply? A: Course advisors / paper graders are asked to try and reply within three business days of receiving an inquiry (excluding weekends). Students must appreciate that a course advisor / paper grader may, on occasion, be unavailable for periods of time due to either personal or business reasons. So, if you do not hear back within the expected three business days, you are asked to contact the MRU Student and Program Liaison (contact information was given earlier) as this person will have information MRU PM EXTENSION CERTIFICATE PROGRAM 11

14 regarding your course advisor s status. In cases where there will be an extended absence of an advisor, coverage will usually be arranged to reply to any inquiries. You will find, though, that there is no single question / inquiry that will prevent you from still continuing to work on other sections of your paper until your inquiry has been answered. 18. Q: Can I submit a draft of my paper or major components of my paper to my course advisor / paper grader to see if I am on the right track? A: Absolutely NOT! That would be like pre-marking your paper before you submit it. You are expected to submit only a PDF formatted file of your completed final paper to the Assignment Dropbox within the online Blackboard course environment. No separate components of your paper submitted earlier will be accepted or even viewed by your course advisor / paper grader. If you submit any separate components of your paper and ask for the course advisor / paper grader to give feedback on questions such as Am I on the right track? or How am I doing so far?, these items will not be reviewed. If you need confirmation that you are on the right track, you should formulate specific questions to ask of your assigned advisor. 19. Q: May I submit my paper directly to my course advisor or MRU via or hard copy? A: No, a PDF version of your paper needs to be submitted through the online Blackboard Final Assessment Paper course environment you are registered in. ed or hard copies will not be accepted either by the course advisor / paper grader or Mount Royal University. (Refer to the paper submission details given earlier in this document and in the online course environment.) By submitting your paper online as indicated, Mount Royal University will be able to record the fact that a specific student has submitted her/his Final Assessment paper on a specific day and time. It is essential a PDF formatted file of your paper be submitted because there are often several software applications used in the preparation of a paper and the contracted course advisors / paper graders may not have these same applications that are required in order to view the contents of the various sections. As well, there are far too many security / virus issues surrounding the ing of files over the internet for Mount Royal University or your paper grader to be responsible for the safe receipt of all components that might make up a student s final paper expect for a paper submitted in PDF format within the secured online Blackboard course environment. So, please ensure your Final Assessment paper is submitted using the secured Blackboard online course site only. This will ensure the submission date and time will formally be logged by the system, a grader is available and the paper is in a predictable and reliable format that can be marked by all graders. IMPORTANT: As emphasized earlier, all students are asked to ensure they have made their own backup hard/paper and electronic copies of their completed Final Assessment paper prior to submission. 20. Q: May I submit my Final Assessment Paper earlier than the due date? A: Absolutely! YES, you certainly may. In fact you are encouraged to submit it early. It is always appreciated when a learner submits her/his paper BEFORE the final due date which avoids the MRU PM EXTENSION CERTIFICATE PROGRAM 12

15 end of term "crush". In most cases, when a paper is submitted before the due date, the turnaround time is very often much less because the course advisor / paper grader is simply not as busy marking papers during the term as she/he is at the end of the term. You must appreciate the fact that all PM Program instructors do have other employment (sometimes full time) so often have other commitments throughout the term. So, if you are able to submit your paper before the due date, it is advised you give a "heads-up" to the course advisor / paper grader so she/he can confirm availability and can look out for it. 21. Q: Will the paper grader mark up my paper submission with comments? A: This is up to the discretion of each individual paper grader. If comments have been written within your paper, a copy of your paper with the corresponding comments will be scanned in and made available to you electronically in your dropbox. Regardless of whether or not comments have been written on your paper submission, comments (when appropriate) and your corresponding grade will still always be recorded on the Final Assessment Paper - Results sheet that will be made available for your viewing in the online Assignment Dropbox area. 22. Q: May I ask for an extension if I am having difficulty completing the paper by the due date? A: In the information given earlier, it was stated that Late submissions will NOT be accepted. How individuals navigate the demands of the Final Assessment paper is a reflection of their overall skills as a Project Manager and how well they have integrated the information from the course material. Project Management is all about planning for and delivering on commitments and the completion of the Final Assessment paper is no different. It is expected people will plan for and submit their Final Assessment paper on or before the due date. It is understood, though, there may be extenuating circumstances that arise which were totally unforeseeable. If this is the situation, it is important to contact the Program Coordinator immediately and advise her/him of the specific circumstances that have arisen. Options on how to proceed can then be discussed. The Program Coordinator will communicate with the assigned course advisor / paper grader regarding any such requests. 23. Q: What is the turnaround time of my Final Assessment paper once I submit it for marking? A: This will always depend on a number of circumstances, including the immediate availability of your assigned paper grader, (who may, for example, be called out of town with her/his job). In general, we are finding that the turnaround time for you to receive your mark is within approximately four weeks of submission. If your Final Assessment paper results are not available to you for viewing within this time period, please contact the Student and Program Liaison to inquire about the status of your paper. 24. Q: Does the paper grader give comments on areas that were missed or need improvement? A: Yes, a Final Assessment Paper - Results sheet is completed by the grader which includes comments as appropriate. 25. Q: Can I obtain my mark from the course advisor / paper grader via ? MRU PM EXTENSION CERTIFICATE PROGRAM 13

16 A: No, it is not appropriate to give a mark via . You can view your mark within the Tools area using the My Grades link as well as in the Final Assessment Paper - Results sheet found in the Assignment Dropbox area, both of which, are in the online Blackboard course environment. 26. Q: What resources should I be using to assist me with the Final Assessment? A: You are advised to review the Learner Manuals (classroom format) or Module PDF files (online format) from all the courses in the MRU Project Management Extension Certificate Program as well as the PMBOK Guide version you are using for your paper (see the next question / answer below). You are also welcome to use any other references or resources you may have access to within your organization. 27. Q: Where do I look in the PMBOK Guide for assistance in writing the Final Assessment paper? A: Although most of the PMBOK Guide has relevance, the most important information can be found in Chapter 3 of the PMBOK Guide Fourth Edition. At the beginning of this chapter (Page 43) you will find the cross referencing of all the Knowledge Area Processes mapped against the five Process Groups of Initiating, Planning, Executing, Monitoring & Controlling, and Closing. Since the marking scheme for the paper is based on these five Process Groups, the information in Chapter 3 is essential in understanding how you should organize your Final Assessment paper. 28. Q: Do I have to show evidence of application of ALL the process inputs, tools and techniques or outputs found in the PMBOK Guide? A: No. There is certainly not the space within the 25 page content limitation to include all such information. You are encouraged to use the Tools & Techniques and Outputs of the processes in the PMBOK Guide as a guide, but you need only include those that apply specifically to your project and in some cases only to a summary level. The content material provided and the workshop exercises within the courses in the MRU Project Management Extension Certificate Program will be an invaluable source for what information or documents you should include in your paper. 29. Q: Are there certain components that are mandatory to include in my paper? A: Yes, there are certain components such as a Project Charter, Stakeholder Analysis/Register, information on collecting requirements, Project Scope Statement, WBS, schedule, cost estimating, quality and communications planning, risk planning, identification, analysis, and response planning, change control process and supporting form, resource assignments, performance reporting, and Close-out Report that are essential for any project. But, the exact content and level of detail within each component will depend entirely on the project you are documenting. As you learned in the PM Extension Certificate Program courses, there are also other components that may need to be included, depending on the specific requirements of the project. MRU PM EXTENSION CERTIFICATE PROGRAM 14

17 30. Q: What is expected in the Final Assessment paper for the Collect Requirements process? Isn t it really someone like a Business Analyst who collects the requirements? I thought this paper is supposed to be from the perspective of the Project Manager. A: Yes the information you include in the paper for the Collect Requirements process is to be from the perspective of the Project Manager, NOT from the perspective of the resource (for example a Business Analyst) who will be assigned to actually collect the requirements. Your information can include such elements as who (what project resource) will actually be responsible for collecting the requirements, how the requirements be collected, and what key elements or components will make up the Requirements Documentation. Note: This is NOT the actual detail of WHAT the requirements are themselves, but rather a high level outline of the key components or items that you the PM, will look for, to represent the requirements. You will need to indicate how the requirements, once collected, will be validated as far as being correct and are of the quality expected for the type of project being undertaken. Also, who will approve or make the decision that the requirements are indeed final and correct? It is always helpful when planning this process to indicate how changes / updates to the requirements will be tracked or monitored, (for example, using a Requirements Traceability Matrix; which would not necessarily need to be included, though). 31. Q: Should I include some of the separate documents that I learned about, for example, the Project Charter, Project Scope Statement, Work Breakdown Structure and other items that may be contained within an overall Project Management Plan? A: Yes, it is appropriate to include some of these specific project documents within your paper, but exactly what you include and how or where will depend on the format of your paper and the size, context and complexity of your project. (See also the next Question/Answer below.) 32. Q: My paper is documenting a project that has not yet started. Since nothing has happened in this project yet, can I just include sample templates that are blank (for example Change Request form, Status Report, or the Close-Out Report)? A: It is appreciated that if the project hasn't happened yet, then you won't have any sample content to include in some of the forms you intend to use in your paper. Some learners choose to fictionalize content to illustrate what a sample template might contain. If you do not wish to spend time fictionalizing content for these sample templates we suggest that you make the effort to "annotate" or input comments in certain key fields that will help when it comes time to actually use the template. Some of the standard project information can be completed in the templates, as that won't change, but any field that requires information for a specific situation or result, you might make a comment explaining what information needs to go in the field and where or who it might be obtained from, or how... Anything that shows you have an understanding of how to apply the template is better than just copying a blank template from the course material into your paper. Doing this communicates to the paper grader that you know what to put in the template. If you include only a blank template all this says is that you can find a template in the course material and include it in a section that may contain the same name or type of information... It does not communicate that you actually know how to apply the template in a real project situation. MRU PM EXTENSION CERTIFICATE PROGRAM 15

18 33. Q: I am confused about some of the names of the documents that should be included in my paper. What is expected? A: Do not be confused by the variety of names documents may have across the various organizations. You are advised to follow the PMBOK Guide and the supporting course material to help you find a consistency in the names. You must still apply judgment in designing the documentation for your project. For example, remember that the Project Charter is primarily to establish the Project Manager s mandate and authorize the project to begin. That must be done early in the project, perhaps before any detailed planning data is available, so it is often a good idea to focus on business objectives and roles/responsibility and release this document early. On the other hand, a consultant dealing with an outsourced project might simply offer one document (a proposal), that will contain the result of pre-sales work, including a Project Charter, Statement of Work (SOW), and other project initiating and planning items. The important point is to look at the CONTENT and PURPOSE of these documents and to ensure the appropriate content is covered for the required purpose. How it is arranged into documents and approved, is a question of approach. 34. Q: The Develop Project Management Plan process of Chapter 4, Project Integration Management of the PMBOK Guide, emphasizes the output of Project Management Plan. Where or how do I include this in my Final Assessment Paper? A: As indicated in the MRU Project Management Extension Certificate Program course material, other names used for the Project Management Plan can be the Project Execution Plan, the Project Implementation Plan or simply the Project Plan. Since you are documenting in your Final Assessment paper what you would do, or are doing or have done in the project you have chosen, you might consider all the Planning section components of your paper (along with procedural-based content in the Executing, Monitoring & Controlling and Closing sections), collectively, make up your Project Management Plan. You therefore do not need to include the Project Management Plan as a separate component in your Final Assessment paper. 35. Q: I am having difficulty deciding whether a particular topic / item or use of a tool goes in the Initiating Processes section or in the Planning Processes section. Do I have to repeat everything in each section? A: No, if you have included the essential tool or template (to an appropriate level of detail) in a given section and cross-referenced it from another section, this is adequate. In Project Management, because so much of what you do is progressive elaboration, there are no clearly defined lines or boundaries between process groups, for example. If it makes sense to include specific information in one section versus another, then this is acceptable, as long as you keep the reader informed as to the layout of where specific items can be found. Also, as you write your paper, it may seem like you are repeating certain information. For example, your Project Scope Statement may contain some level of the same information you have in the Project Charter, but the Project Scope Statement, by definition, should be more detailed than the Project Charter. This is because the Project Charter is done very early and at a higher level with less specific information available. MRU PM EXTENSION CERTIFICATE PROGRAM 16

19 As emphasized above, it is important to appreciate that the development of the Project Charter and then the Project Scope Statement, for example, are all representative of the progressive elaboration characteristic of projects. This means that the project management team develops a better and more complete understanding of the project objectives and deliverables as the project progresses. Learners are encouraged to demonstrate this progressive elaboration where possible in their papers. 36. Q: Are there sample Final Assessment papers that can be viewed? A: No. Sample Final Assessment papers are not available for learners to review. First of all, there is the problem that the information in most papers received and marked is confidential and can therefore NOT be released. Also, it is felt that by releasing a "sample template" of a paper a number of learners would simply use this as a "recipe" or "cookie cutter" template for the paper and NOT think about what is or is not appropriate for their particular project. All projects are unique and therefore require different treatment when responding to the requirements of the Final Assessment paper. Of the papers that have been submitted for the Final Assessment in this Program, there has been a wide range of content in the successful papers. Due to the variety of projects that exist, we do not want anyone to be disillusioned into thinking that "one template fits all". If you have severe English language / cultural barriers or physical barriers that you feel may compromise your ability to write a successful paper, please contact the Program Coordinator to discuss this concern before registering in the Final Assessment Paper course. 37. Q: What is Mount Royal University s policy on plagiarism with regards to the Final Assessment paper? A: While it is often the practice, and in fact, it is encouraged for Project Managers to cut and paste from previously used templates for similar projects so you do not have to re-invent the wheel for each new project, there is a line that can be crossed where it would be considered plagiarism for the purpose of the Final Assessment paper. If you cut and paste exact contents for sections from a previous candidate s paper, this would be considered plagiarism. You are advised to visit the links below for information related to this topic. Detecting Plagiarism: and then type Detecting Plagiarism in the Find Articles field and click on the Go button. Code of Student Conduct: MRU PM EXTENSION CERTIFICATE PROGRAM 17

20 38. Q: Am I required to use project management software, such as MS Project in order to submit my Final Assessment for marking? A: No. We cannot require a student to have this software to complete the Final Assessment paper. There is a requirement to submit at least some form of project schedule, but it is possible to create this in other applications (for example MS Word or Excel or even neatly on graph paper), so it is not essential to use project management software. For those students who have access to project management software, they are welcome to use it. 39. Q: Do I need to include a network diagram if I already have a Gantt chart showing my schedule? If I do include a network diagram, do I need to show all the Critical Path Method (CPM) calculations? A: If the Gantt chart you have included in your paper for the schedule shows activity sequence arrows (as is often the case when a Project Management software package is used), NO, you do not have to include a network diagram. If your Gantt chart does not show activity sequence arrows, then yes, you do need to include a simple network diagram using the Precedence Diagramming Method (which uses activity sequence arrows). If you choose to include a network diagram, no, you do not need to show all the Critical Path Method calculations from a forward pass and backward pass. Somewhere, though, most likely on your schedule, you need to show at least the early start / early finish schedule for each activity. 40. Q: Is it permissible to include my Gantt chart (schedule) on 8 ½ x 14 inch paper? A: Yes, this chart is acceptable on a legal size page, that is 8 ½ x 14 inch. The remaining pages of your Final Assessment paper must be on 8 ½ x 11 inch pages. Remember, your entire paper needs to be submitted as a single PDF formatted file. 41. Q: I have printed my Gantt chart on an 8 ½ X 14 inch page as permitted but am having difficulty scanning this page into my PDF file along with the rest of my paper. Can I just submit my Gantt chart in the assignment dropbox as a separate PDF file? A: It is very much preferred that you insert the separate PDF file containing your Gantt chart into the appropriate location within the rest of your Final Assessment paper. Do not hesitate to ask someone else to help you do this. If you are absolutely unable to incorporate your Gantt chart page within the file that contains the rest of your paper, then you may submit this second file in the Assignment Dropbox separately from your main paper PDF file. Note that this page still counts within the permitted maximum of 25 pages. Be sure to indicate with a note to your paper grader in the Submission box that you have submitted a separate PDF file that contains your Gantt chart. 42. Q: What if I do submit a paper that is over 25 pages of content? A: Marks will be deducted for papers that exceed 25 pages of content. In fact, if a paper exceeds the 25 page content limit by a considerable amount, the paper may not be accepted by the paper grader / Mount Royal University and the student may then be asked to revise the paper so that it meets the stated requirement of 25 pages of content. MRU PM EXTENSION CERTIFICATE PROGRAM 18

Mount Royal University Faculty of Continuing Education & Extension

Mount Royal University Faculty of Continuing Education & Extension Mount Royal University Faculty of Continuing Education & Extension Project Management Certificate Program FINAL ASSESSMENT LEARNER INFORMATION GUIDE PMBOK GUIDE - FOURTH EDITION Mount Royal University

More information

Supply Chain Management Extension Certificate Program

Supply Chain Management Extension Certificate Program Faculty of Continuing Education & Extension Supply Chain Management Extension Certificate Program Final Assessment Paper The Supply Chain Management Final Assessment is the final component in the Mount

More information

Project Management Extension Certificate Program

Project Management Extension Certificate Program Mount Royal Faculty of Continuing Education & Extension Project Management Extension Certificate Program Program Information Guide Policies ~ Guidelines ~ Descriptions Project Management Extension Certificate

More information

Project Management in Construction Extension Certificate Program

Project Management in Construction Extension Certificate Program Mount Royal Faculty of Continuing Education & Extension Project Management in Construction Extension Certificate Program Program Information Guide Policies ~ Guidelines ~ Descriptions Project Management

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

Project Management Standards: A Review of Certifications/Certificates

Project Management Standards: A Review of Certifications/Certificates Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in

More information

APPENDIX X1 - FIFTH EDITION CHANGES

APPENDIX X1 - FIFTH EDITION CHANGES APPENDIX X1 FIFTH EDITION CHANGES The purpose of this appendix is to give a detailed explanation of the changes made to A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

More information

A COMPARISON OF PRINCE2 AGAINST PMBOK

A COMPARISON OF PRINCE2 AGAINST PMBOK Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the

More information

MCC Monroe Community College

MCC Monroe Community College The New 3Rs Respect, Responsibility, Reality MCC Monroe Community College HED 130 Online - Foundations in Personal Health & Wellness Instructor: Cristin Finch, MSEd, MCHES Office: 10-122 Office Phone:

More information

Information Technology Project Oversight Framework

Information Technology Project Oversight Framework i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11

More information

Stanford University Department of Communication Degree Requirements & Department Procedures for Ph.D. Students and Ph.D. Advisors (October 10, 2015)

Stanford University Department of Communication Degree Requirements & Department Procedures for Ph.D. Students and Ph.D. Advisors (October 10, 2015) Stanford University Department of Communication Degree Requirements & Department Procedures for Ph.D. Students and Ph.D. Advisors (October 10, 2015) Table of Contents 1. Introduction 2. Departmental Graduate

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition 1 Topics for Discussion

More information

The PMP Exam Application Reference Guide

The PMP Exam Application Reference Guide The PMP Exam Application Reference Guide Version 3.0 (4 th Ed. PMBOK Guide) September 2011 112 Townpark Dr. NW Suite 150 Kennesaw, GA 30144-3743 Toll-Free 888.568.2527 Local 770.424.3535 Fax 770.424-3565

More information

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) 11/17/07 Introduction Editor's Note: We liked so much of this book that we asked for the author's permission to quote

More information

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012 Minnesota Health Insurance Exchange Project (MNHI) Deliverable Definition Document (DDD) For Project Plan Date: 07-31-2012 11/9/2012 1:18 PM Page 1 of 8 1. High Level Deliverable Description The Project

More information

INFORMATION FOR GRADUATE STUDENTS IN BIOCHEMISTRY. Department of Chemistry and Biochemistry Utah State University, Logan, Utah

INFORMATION FOR GRADUATE STUDENTS IN BIOCHEMISTRY. Department of Chemistry and Biochemistry Utah State University, Logan, Utah Biochemistry Graduate Program Approved July 2014 INFORMATION FOR GRADUATE STUDENTS IN BIOCHEMISTRY Department of Chemistry and Biochemistry Utah State University, Logan, Utah The Department of Chemistry

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

Project Scope Management in PMBOK made easy

Project Scope Management in PMBOK made easy By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating

More information

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1

More information

ABC COMPANY Extended Accounting System (EAS) Project Charter Sample

ABC COMPANY Extended Accounting System (EAS) Project Charter Sample ABC COMPANY Extended Accounting System (EAS) Project Charter Sample Prepared by: Document Details ABC Company IT Canada Inc. Business Services Department Information Technology Project: Extended Accounting

More information

Impact of PMBOK 5 th Edition

Impact of PMBOK 5 th Edition PMP Exam Changes Impact of PMBOK 5 th Edition When the PMI exam will change Major Updates X1.1 Scope of Update Comments and feedbacks for prior version Overall review for accuracy Appropriate alignment

More information

Management Consultancy Project Student Guidelines

Management Consultancy Project Student Guidelines Management Consultancy Project Student Guidelines Welcome to the management programmes Consultancy Project process. Roles in the Consultancy Project process Several Laureate Online Education/UoL roles

More information

FAP Modules Frequently Asked Questions (FAQ) Updated: April 27, 2015

FAP Modules Frequently Asked Questions (FAQ) Updated: April 27, 2015 FAP Modules Frequently Asked Questions (FAQ) Updated: April 27, 2015 Q: How much does it cost to complete the entire Fundamentals of Actuarial Practice (FAP) course? A: The overall cost of the course is

More information

NGO Self-assessment through a SWOT exercise

NGO Self-assessment through a SWOT exercise NGO Self-assessment through a SWOT exercise Step 1: Analyse your NGO s Capacity > page 2 Step 2: Do the SWOT Exercise > page 5 Step 3: Make a Strategic Plan > page 8 Step 4: Implement, Monitor, Evaluate

More information

AMBERTON UNIVERSITY e-course SYLLABUS

AMBERTON UNIVERSITY e-course SYLLABUS AMBERTON UNIVERSITY e-course SYLLABUS MGT6154.E1 PROJECT MANAGEMENT APPLICATIONS SPRING 2016 PROFESSOR INFORMATION: Name: Dr. Ron C. Darnell Phone Number: 972-279-6511 ext. 152 (Use Amberton ext. #) Email

More information

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading

More information

How To Write A Job Application

How To Write A Job Application AEC 3033C Research & Business Writing for Agricultural and Life Science Erin Nessmith enessmith@ufl.edu 813-757-2280 Welcome to the wonderful world of business and research writing! Please Read Carefully.

More information

HCC ONLINE COURSE REVIEW RUBRIC

HCC ONLINE COURSE REVIEW RUBRIC HCC ONLINE COURSE REVIEW RUBRIC Adapted from Maryland Online FIPSE Project and Lake Superior College I. COURSE OVERVIEW AND INTRODUCTION General Review Standard: The overall design of the course, navigational

More information

Professional Business Communications

Professional Business Communications BASIC PUBLIC RELATIONS EXTENSION CERTIFICATE Professional Business Communications Extension Certificate Program Information Guide Policies ~ Guidelines ~ Descriptions 1 Professional Business Communications

More information

Looking to. pass the exam. training is. America. (unauthorized. courseware) 5 Days. of Training. happy. first day. training) have a highh

Looking to. pass the exam. training is. America. (unauthorized. courseware) 5 Days. of Training. happy. first day. training) have a highh PMP /CAPM Certification Looking to pass the PMP or CAPM exam on your first try? We have helped thousands to pass the exam on their first try. We are one of the top training provider of PMP /CAPM training.

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

IDEAL PROGRAM PRST 224 Critical Thinking & Writing SYLLABUS ONLINE

IDEAL PROGRAM PRST 224 Critical Thinking & Writing SYLLABUS ONLINE Dear Student, IDEAL PROGRAM PRST 224 Critical Thinking & Writing SYLLABUS ONLINE Please read the following course syllabus carefully, especially the course dates, times and location. If you have any questions,

More information

Learning to Teach Online!

Learning to Teach Online! elearning: enhancing learning, teaching and assessment in the creative arts Learning to Teach Online! Introduction to Blackboard Part One: the Student Experience elearning: contacts Julian Fletcher Leigh

More information

Office of Adult Education Follow-Up Manual

Office of Adult Education Follow-Up Manual Office of Adult Education Follow-Up Manual State of Michigan Workforce Development Agency Office of Adult Education revised September 2014 CONTENTS OVERVIEW OF NRS REQUIREMENTS...2 OVERVIEW OF THIS DOCUMENT...

More information

A Comparison of PMI s PMBOK Guide Versions 4 & 3

A Comparison of PMI s PMBOK Guide Versions 4 & 3 PM WORLD TODAY FEATURED PAPER MAY 2009 A Comparison of PMI s PMBOK Guide Versions 4 & 3 By Germán Bernate The Project Management Institute PMI announced on December 31, 2008 the availability of PMBOK Version

More information

output: communications management plan

output: communications management plan Q1. (50 MARKS) A. List the nine PMBOK knowledge areas and give a one sentence description of the purpose of each knowledge area along with at least one output (document etc.) and its purpose. 1.Project

More information

Master s Project Manual

Master s Project Manual Master s Project Manual Revised August 2009 An Overview: The Process of Writing the Master s Project...3 The Purpose of Research in the Master's of Nursing Curriculum...4 Types of Master's Projects...4

More information

YIIP1100 PROJECT MANAGEMENT

YIIP1100 PROJECT MANAGEMENT YIIP1100 PROJECT MANAGEMENT PLANNING THE PROJECT - DEVELOPING PROJECT MANAGEMENT PLAN EXECUTING, CONTROLLING & MONITORING THE PROJECT JOUNI HUOTARI, JUHA HAUTANEN & JOHN MUSSER BASED ON PMBOK, SECTIONS

More information

Student Portfolios Department of Geological Sciences Brigham Young University

Student Portfolios Department of Geological Sciences Brigham Young University Student Portfolios Department of Geological Sciences Brigham Young University This document contains information on student portfolio requirements, formatting portfolios, and how to create a portfolio

More information

Appendix E. A Guide to Writing an Effective. Executive Summary. Navy and Marine Corps Public Health Center Environmental Programs

Appendix E. A Guide to Writing an Effective. Executive Summary. Navy and Marine Corps Public Health Center Environmental Programs Appendix E A Guide to Writing an Effective Executive Summary Navy and Marine Corps Public Health Center Environmental Programs MISSION Ensure Navy and Marine Corps readiness through leadership in prevention

More information

MIS 424 COURSE OUTLINE

MIS 424 COURSE OUTLINE UNIVERSITY OF ALBERTA School of Business DEPARTMENT OF ACCOUNTING & MIS MIS 424 COURSE OUTLINE Course website: http://courses.bus.ualberta.ca/mis424-mullaly/ Instructor: Mark Mullaly Term II, 2004/2005

More information

IT Optimization Consulting Services for Organizational Change Management (OCM)

IT Optimization Consulting Services for Organizational Change Management (OCM) IT Optimization Consulting Services for Organizational Change Management (OCM) April 5, 2013 REQUEST FOR QUOTATION MINORITY BUSINESS ENTERPRISE (MBE) PREFERRED State Term Schedule Table of Contents 1.

More information

Commerce 4KF3 Project Management Fall 2014 Course Outline- Tentative. Information Systems Area DeGroote School of Business McMaster University

Commerce 4KF3 Project Management Fall 2014 Course Outline- Tentative. Information Systems Area DeGroote School of Business McMaster University 4KF3 - Fall 2014-1 of 9 COURSE OBJECTIVE Commerce 4KF3 Project Management Fall 2014 Course Outline- Tentative Information Systems Area DeGroote School of Business McMaster University The need for project

More information

Project Management for Everyone

Project Management for Everyone Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group System, Analytics & Insights Group Phone: (202) 994-6867 Email: adonald@gwu.edu Objectives Basic

More information

Software Project Management Plan (SPMP)

Software Project Management Plan (SPMP) Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.

More information

TEPM 6301 Project Management for Technical Professionals Course Overview

TEPM 6301 Project Management for Technical Professionals Course Overview TEPM 6301 Project Management for Technical Professionals Course Overview Instructor Classroom Email Class URL Office Hours Alexandra Loukina, PMP Technology Building T2 aloukina@sark.com http://www.tech.uh.edu/programs/project_management/

More information

Diploma in Insurance. About your continuous assessment (CA) course. 2014 Student guidelines. www.cii.co.uk A CENTURY OF PROFESSIONALISM

Diploma in Insurance. About your continuous assessment (CA) course. 2014 Student guidelines. www.cii.co.uk A CENTURY OF PROFESSIONALISM Diploma in Insurance 2014 Student guidelines About your continuous assessment (CA) course A CENTURY OF PROFESSIONALISM www.cii.co.uk Welcome to your continuous assessment course Overview of the course

More information

AMBERTON UNIVERSITY e-course SYLLABUS

AMBERTON UNIVERSITY e-course SYLLABUS MGT4495.E1 Project Management Foundations WINTER 2016 AMBERTON UNIVERSITY e-course SYLLABUS PROFESSOR INFORMATION: Name: Jim Stafford Phone Number: 972-279-6511 ext. 211 Email Address: JStafford@eCmail.Amberton.edu

More information

St. Thomas University. BUS 323 Human Resource Management. Spring 2015. Room 210 FFC

St. Thomas University. BUS 323 Human Resource Management. Spring 2015. Room 210 FFC St. Thomas University BUS 323 Human Resource Management Room 210 FFC Course Description: A survey course covering modern human resource management practices, including: human resource management in dynamic,

More information

Australian School of Business School of Accounting ACCT 5917 VALUE CREATION FROM THE OFFICE OF THE CFO

Australian School of Business School of Accounting ACCT 5917 VALUE CREATION FROM THE OFFICE OF THE CFO Australian School of Business School of Accounting ACCT 5917 VALUE CREATION FROM THE OFFICE OF THE CFO COURSE OUTLINE SEMESTER 1, 2010 TABLE OF CONTENTS 1. STAFF CONTACT DETAILS 1 2. COURSE DETAILS 1 2.1

More information

A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition

A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Brochure More information from http://www.researchandmarkets.com/reports/2326795/ A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Description: A compendium of ready made

More information

Quick Guide to the OJS Process

Quick Guide to the OJS Process Quick Guide to the OJS Process More details below. Words in quotation marks or underlined are hyperlinks. AUTHOR SUBMISSION Go to: http://www.aall.org.au/journal/ojs/index.php/jall REGISTER if haven t

More information

User Guide. A guide to online services available through Sircon for Education Providers. DOC CX 08/13/10 02/02 v5

User Guide. A guide to online services available through Sircon for Education Providers. DOC CX 08/13/10 02/02 v5 User Guide A guide to online services available through Sircon for Education Providers DOC CX 08/13/10 02/02 v5 Contents Contents Contents... 2 Introduction... 4 About this Guide... 4 Getting Started...

More information

PRINCE2, the PMBOK Guide and ISO 21500:2012. Klas Skogmar. AXELOS.com

PRINCE2, the PMBOK Guide and ISO 21500:2012. Klas Skogmar. AXELOS.com PRINCE2, the PMBOK Guide and ISO 21500:2012 Klas Skogmar AXELOS.com White Paper September 2015 Contents Introduction 3 Relationships between PRINCE2, the PMBOK Guide and ISO 21500 4 Major differences between

More information

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise

More information

Project Management Professional Exam Prep Plus

Project Management Professional Exam Prep Plus In this course, you ll gain the essentials preparation needed to pass the PMP exam. Concentrating on exam content form the Guide to the Project Management Body of Knowledge-Fifth Edition (PMBOK Guide)

More information

1 of 18 2/14/2014 11:33 AM

1 of 18 2/14/2014 11:33 AM 1 of 18 2/14/2014 11:33 AM ATHABASCA UNIVERSITY. CANADA'S OPEN UNIVERSITY. Welcome, You have 1 incomplete application. Please click on the one that you want to edit. Then open the "Welcome" message for

More information

Content Strategy (TCC6710)

Content Strategy (TCC6710) Content Strategy (TCC6710) Northeastern University College of Professional Studies (CPS) Spring 2016 (Full Term) Instructors: Danielle Gobert Cooley Class Dates: 4/11/16 7/2/16 Email Address: d.cooley@neu.edu

More information

The ODU Guide to Teaching Online. Education Division MEd Online

The ODU Guide to Teaching Online. Education Division MEd Online The ODU Guide to Teaching Online Education Division MEd Online Created by: The Center for Instructional Technology and e-learning May 2010 2 Table of Contents Welcome!... 3 Learning Your Way Around the

More information

Expert Reference Series of White Papers. Intersecting Project Management and Business Analysis

Expert Reference Series of White Papers. Intersecting Project Management and Business Analysis Expert Reference Series of White Papers Intersecting Project Management and Business Analysis 1-800-COURSES www.globalknowledge.com Intersecting Project Management and Business Analysis Daniel Stober,

More information

Thesis/Dissertation Guide. Instructions for Preparation and Submission

Thesis/Dissertation Guide. Instructions for Preparation and Submission Thesis/Dissertation Guide Instructions for Preparation and Submission Graduate Services College of Arts and Sciences 8th Floor Haas Howell Building Atlanta, Georgia 30303 404 413 5040 TABLE OF CONTENTS

More information

The Project Planning Process Group

The Project Planning Process Group 3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

IT Project Management Practices Guide

IT Project Management Practices Guide IT Project Management Practices Guide Introduction The IT Project Management Practices Guide (Guide) contains a repeatable, institutionwide approach for the management of application development and/or

More information

SCHOOL BUSINESS MANAGEMENT

SCHOOL BUSINESS MANAGEMENT ILM Level 5 Diploma SCHOOL BUSINESS MANAGEMENT Cohort One Induction Unit 2016 Getting started... This induction module offers an overview of your Level 5 course and outlines the key information you will

More information

Austin Community College BMGT 1023 IT Project Management (IT Project+) Certificate Program <Term> <Year> ONLINE SYLLABUS Version 1.

Austin Community College BMGT 1023 IT Project Management (IT Project+) Certificate Program <Term> <Year> ONLINE SYLLABUS Version 1. INSTRUCTOR: Bob Futrell, PMP, Project+ 512-663-8285 rfutrell@austincc.edu OFFICE HOURS: Most evenings, 8-10pm; Weekends, 8am-12 noon COURSE DESCRIPTION: (modified from the ACC Catalog) This certificate

More information

H. JOHN HEINZ III COLLEGE CARNEGIE MELLON UNIVERSITY PROJECT MANAGEMENT SPRING 2015 94813 A3 / B3 COURSE SYLLABUS

H. JOHN HEINZ III COLLEGE CARNEGIE MELLON UNIVERSITY PROJECT MANAGEMENT SPRING 2015 94813 A3 / B3 COURSE SYLLABUS H. JOHN HEINZ III COLLEGE CARNEGIE MELLON UNIVERSITY PROJECT MANAGEMENT SPRING 2015 94813 A3 / B3 COURSE SYLLABUS INSTRUCTOR TEACHING ASSISTANTS Laura W. Synnott Lara Dorko ldorko@andrew.cmu.edu Associate

More information

Principles of Marketing MK 301 (Online) Summer 2012

Principles of Marketing MK 301 (Online) Summer 2012 Emporia State University Department of Business Administration and Education Principles of Marketing MK 301 (Online) Summer 2012 Instructor: Jun Yu Office: Cremer Hall 302 Phone: (620)341-5784 (office)

More information

The PMP Application Process

The PMP Application Process The PMP Application Process The purpose of this document is to explain the PMP application process and provide helpful links and tools for submitting your application. Reference: The reference for the

More information

Mindjet MindManager : A Vital Solution for Improved Project Management

Mindjet MindManager : A Vital Solution for Improved Project Management Timothy G. Bolwerk, PMP tbolwerk@columbus.rr.com Mindjet MindManager : A Vital Solution for Improved Project Management Project managers wrestle with mountains of information. Throughout the course of

More information

AMBERTON UNIVERSITY e-course SYLLABUS

AMBERTON UNIVERSITY e-course SYLLABUS MGT6152.E1 PROJECT EXECUTION & CLOSING FALL 2015 AMBERTON UNIVERSITY e-course SYLLABUS PROFESSOR INFORMATION: Name: Ron C. Darnell, MBA, PMP, PMI-ACP, CSM Phone Number: 972/279-6511 ext. 152 Email Address:

More information

English 3010IA: Writing for Business

English 3010IA: Writing for Business English 3010IA: Writing for Business CRN 20347 Spring 2015 3 semester hours Web only on BlazeView Dr. Lee Campbell Department of English College of Arts and Sciences Valdosta State University Valdosta,

More information

The University of Illinois at Chicago College of Urban Planning and Public Affairs (CUPPA) Graduate Program in Public Administration COURSE SYLLABUS

The University of Illinois at Chicago College of Urban Planning and Public Affairs (CUPPA) Graduate Program in Public Administration COURSE SYLLABUS The University of Illinois at Chicago College of Urban Planning and Public Affairs (CUPPA) Graduate Program in Public Administration COURSE SYLLABUS PA 462 PROJECT MANAGEMENT FOR PUBLIC MANAGERS Fall Semester

More information

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Partnering for Project Success: Project Manager and Business Analyst Collaboration Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,

More information

MIS 460 Project Management

MIS 460 Project Management Ursuline College Accelerated Program CRITICAL INFORMATION! DO NOT SKIP THIS LINK BELOW... BEFORE PROCEEDING TO READ THE UCAP MODULE, YOU ARE EXPECTED TO READ AND ADHERE TO ALL UCAP POLICY INFORMATION CONTAINED

More information

Family Computer Centre

Family Computer Centre PMP - Project Professional 35 Contact Hours Comprehensive Training Program Designed on the basis of Project Body of Knowledge (PMBOK Guide) Family Computer Centre Ground Floor, Al Rayyan Complex P. O Box:

More information

College of Graduate Studies and Research Master s Thesis Manual

College of Graduate Studies and Research Master s Thesis Manual College of Graduate Studies and Research Master s Thesis Manual Table of Contents GENERAL INFORMATION... 1 Selecting and formulating a thesis topic... 1 Preparing a thesis proposal... 2 Acceptance of a

More information

Frequently Asked Questions (FAQs) Online Applications

Frequently Asked Questions (FAQs) Online Applications Frequently Asked Questions (FAQs) Online Applications The following answers to frequently asked questions (FAQs) are provided to support applicants using the University s online recruitment system. Topics:

More information

Internship Guide. M.Ed. in Special Education

Internship Guide. M.Ed. in Special Education Internship Guide M.Ed. in Special Education Together We Shape the Future College of Education Qatar University Draft - December 2007 The conceptual framework of the College of Education at Qatar University

More information

DIPLOMA OF PROJECT MANAGEMENT BSB51407. (Classroom Delivery)

DIPLOMA OF PROJECT MANAGEMENT BSB51407. (Classroom Delivery) DIPLOMA OF PROJECT MANAGEMENT BSB51407 (Classroom Delivery) This qualification may also be delivered at the workplace Training and Assessment Plan Developed by: NDA Tasmania Diploma of Project BSB51407

More information

MBA K731 (E) Project Management Winter 2014 Course Outline. Information Systems Area DeGroote School of Business McMaster University

MBA K731 (E) Project Management Winter 2014 Course Outline. Information Systems Area DeGroote School of Business McMaster University K731 - Fall 2014-1 of 8 MBA K731 (E) Project Management Winter 2014 Course Outline Information Systems Area DeGroote School of Business McMaster University COURSE OBJECTIVE This course aims to provide

More information

Internal Verification

Internal Verification GUIDE TO INTERNAL VERIFICATION: (for Non-NVQ qualifications): Process Procedures and Review This guide should be used for those programmes where there is a need to provide candidates with a series of assessment

More information

Blackboard 9.1 Basic Instructor Manual

Blackboard 9.1 Basic Instructor Manual Blackboard 9.1 Basic Instructor Manual 1. Introduction to Blackboard 9.1... 2 1.1 Logging in to Blackboard... 3 2. The Edit Mode on... 3 3. Editing the course menu... 4 3.1 The course menu explained...

More information

COMMONWEALTH OF VIRGINIA

COMMONWEALTH OF VIRGINIA COMMONWEALTH OF VIRGINIA Information Technology Resource Management (ITRM) PROJECT MANAGER SELECTION AND TRAINING STANDARD Virginia Information Technologies Agency (VITA) Reviews This publication was reviewed

More information

Introduction to the ITS Project Management Methodology

Introduction to the ITS Project Management Methodology Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer

More information

*Syllabus is always subject to change*

*Syllabus is always subject to change* Personal and Family Finance Human Development and Family Studies 283 XV Summer 2012 College of Human Sciences Department of Human Development and Family Studies Iowa State University of Science and Technology

More information

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,

More information

OXFORD UNIVERSITY DEPARTMENT FOR CONTINUING EDUCATION PANEL OF PART-TIME TUTORS. Generic Job Description for Part-time Face-to-Face Tutors

OXFORD UNIVERSITY DEPARTMENT FOR CONTINUING EDUCATION PANEL OF PART-TIME TUTORS. Generic Job Description for Part-time Face-to-Face Tutors OXFORD UNIVERSITY DEPARTMENT FOR CONTINUING EDUCATION PANEL OF PART-TIME TUTORS Generic Job Description for Part-time Face-to-Face Tutors Main Duties There are four main components to the duties of a part-time

More information

AMBERTON UNIVERSITY e-course SYLLABUS

AMBERTON UNIVERSITY e-course SYLLABUS AMBERTON UNIVERSITY e-course SYLLABUS MGT6154.E1 PROJECT MANAGEMENT APPLICATIONS FALL 2015 PROFESSOR INFORMATION: Name: Ron C. Darnell, MBA, PMP, PMI-ACP, CSM Phone Number: 972/279-6511 ext. 152 Email

More information

Management 3050 Y Human Resource Management

Management 3050 Y Human Resource Management Management 3050 Y Human Resource Management Summer 1 2013 Course Outline Saturdays / 9:00 11: 50 am & 1:00 3:50 PM / Room S4019 INSTRUCTOR OFFICE HOURS COURSE MATERIALS Required Textbook: Mali Mansouri

More information

Program Builder Online Users Guide

Program Builder Online Users Guide Program Builder Online Users Guide Welcome! Programs Builder Online is a web-based program planning tool designed to make it easier for leaders to plan outings and weekly meetings. The tool allows leaders

More information

Leadership Development Catalogue

Leadership Development Catalogue The TrainingFolks Approach The importance of superior management, leadership and interpersonal skills are critical to both individual and organizational success. It is also critical to apply these skills

More information

MKTG 330 FLORENCE: MARKET RESEARCH Syllabus Spring 2011 (Tentative)

MKTG 330 FLORENCE: MARKET RESEARCH Syllabus Spring 2011 (Tentative) INSTRUCTOR: Ta Tao Chuang, Ph.D. OFFICE and OFFICE HOURS: tba and by appointment EMAIL: chuang@jepson.gonzaga.edu BLACKBOARD: http://learn.gonzaga.edu DAYS, TIMES & ROOM: M, W 5:15 6:45 pm (15 weeks) IMPORTANT

More information

Meeting Time: N/A (online course) Office Location: UC 205 Email Address: Corrine.Hinton@TAMUT.edu Office Hours: online via email and

Meeting Time: N/A (online course) Office Location: UC 205 Email Address: Corrine.Hinton@TAMUT.edu Office Hours: online via email and Texas A&M University Texarkana English 306: Young Adult Literature (Web-based) Course Syllabus Summer II (July 13 August 13) Instructor: Dr. Corrine Hinton Meeting Time: N/A (online course) Office Location:

More information

Certified Financial Planner Program

Certified Financial Planner Program Mount Royal Faculty of Continuing Education & Extension Certified Financial Planner Program Program Information Guide Policies ~ Guidelines ~ Descriptions The Certified Financial Planner Program Earn the

More information

INTRODUCTION TO PROJECT MANAGEMENT AND MS PROJECT

INTRODUCTION TO PROJECT MANAGEMENT AND MS PROJECT LECTURE -01 TO PROJECT MANAGEMENT AND MS PROJECT 2 Objective LEARNING OBJECTIVES To learn Project Management Software and their Application to Civil Engineering Books Microsoft Office Project Step by Step

More information

User Guide For Event Registration System (ERS)

User Guide For Event Registration System (ERS) User Guide For Event Registration System (ERS) Contents CONTENTS... 1 GETTING STARTED GUIDE... 2 ACCESSING ERS... 3 SSO LOGIN... 3 PIN LOGIN... 3 LOGIN NOTICE PAGE... 4 CONFIGURATION OPTIONS... 4 CREATING

More information

Online Learning Policies & Procedures. La Roche College

Online Learning Policies & Procedures. La Roche College Online Learning Policies & La Roche College 2012 Table of Contents INTRODUCTION... 1 DEFINITIONS... 1 I. COURSE DEVELOPMENT... 2 A. Course Material Development... 2 B. Online Course Approval... 2 C. Online

More information