STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.



Similar documents
DIRECTIONAL DRILLING

GLOSSARY OF TERMINOLOGY

Lighthouse Engineering, L.L.C.

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

SECTION SHEETING, SHORING AND BRACING

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

PILE FOUNDATIONS FM 5-134

SECTION 1 GENERAL REQUIREMENTS

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION STORM DRAIN SYSTEM

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Safe & Sound Bridge Terminology

Emergency repair of Bridge B421

Designed and Engineered to Perform

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Chapter 3 Pre-Installation, Foundations and Piers

Managing Our Water Retention Systems

SECTION EARTH MOVING

Pro-Lift Steel Pile Foundation Repair

EN Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Chapter 9 Remedial Measures

Section 2100-Trenching and Tunneling

Work Type Definition and Submittal Requirements

BUTE Department of Construction Management and Technology

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Section Installation of pipe and casing for sanitary sewer by methods of augering.

UNIFIED FACILITIES CRITERIA (UFC) DEWATERING AND GROUNDWATER CONTROL

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

ATLAS RESISTANCE Pier Foundation Systems

High Strain Dynamic Load Testing of Drilled Shafts

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Stormwater/Wetland Pond Construction Inspection Checklist

SECTION STORM DRAINAGE SYSTEM

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

COMMONLY USED RESIDENTIAL BUILDING CODES

Design and Construction of Auger Cast Piles

SECTION GRAVITY SANITARY SEWERS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Section 402. STORM SEWERS

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SECTION ABANDONMENT OF SEWER MAINS

Wastewater Capital Projects Management Standard Construction Specification

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

Table of Contents 16.1 GENERAL Overview Responsibilities

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

Evaluating the Condition of Seawalls/Bulkheads

symptoms of a faulty foundation

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

C. Section TESTING LABORATORY SERVICE.

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

RESUME Lee A. Knuppel, P.E.

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 3 SANITARY SEWER DESIGN

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

COSMOS 2012: Earthquakes in Action COSMOS 2012

SECTION STORM DRAINAGE TABLE OF CONTENTS

FY08 SEWER POINT REPAIRS BID TABULATION

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Residential Deck Safety, Construction, and Repair

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Emergency Spillways (Sediment basins)

SANITARY SEWER SPECIFICATIONS

550 PIPE CULVERTS, SEWERS AND DRAINS

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

Chapter 2 Basis of design and materials

CITY UTILITIES DESIGN STANDARDS MANUAL

SECTION SUPPORT OF EXCAVATION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

System. Stability. Security. Integrity. 150 Helical Anchor

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Transcription:

STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill materials, and compaction. A critical structure is defined as a structure that functions as part of the flood control works; or a structure which, if it should fail, the failure would lessen the flood control project' level of flood protection. The Corps of Engineers, Local Protection Section and Structural/Civil Section will determine whether or not a structure is classified as critical. Consideration will be given to the flood control structure's height, structure s proximity to the flood control works, structure size and purpose, foundation blanket type and thickness, and foundation aquifer type. Structures that function as part of the flood control works shall be designed in accordance with the applicable Corps of Engineers guidance for the type of structure listed in the references paragraph at the end of this topic. Where the recommended references are not appropriate, or do not cover the type of work, other standards may be used subject to approval of the Geotechnical Design Section or Structural Section. General requirements for critical and non-critical structures are as follows. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. 1.2. Dewatering of excavations should conform to the topic DEWATERING. 1.3. If the integrity of flood protection will be reduced by excavation in a levee embankment, interim flood protection should be provided as required in the topic INTERIM FLOOD PROTECTION AND CONTINGENCY PLAN. 1.4. If the proposed project location is within the critical area, a contingency plan should be prepared. The contingency plan should conform to the requirements in the topic INTERIM FLOOD PROTECTION AND CONTINGENCY PLAN. The contingency plan should include all information required in the checklist: CONSTRUCTION IN THE CRITICAL AREA OF FLOOD CONTROL PROJECTS CONSTRUCTED BY THE CORPS OF ENGINEERS. 2. Uplift (Flotation) Considerations. 2.1. Uplift analysis should use the hydraulic grade lines for river stages obtained from an underseepage analysis. The underseepage analysis should conform to the topic UNDERSEEPAGE. 2.2. The uplift factors of safety and methods of analysis should conform to the topic UPLIFT. 3. Temporary or Permanent Use of Deep Foundations in and Around Levees. Considerations should include uplift on pile caps, pile negative skin friction, lateral loads on piling, seepage around piling, use of sheet piling for flood walls and retaining walls, and use of temporary or permanent sheet piling. STRUCTURES - 1

3.1. Piles such as auger cast piles that leave no void between the concrete and the soil when complete may be used for deep foundations. A minimum diameter of 18 inches should be used for auger cast piles to provide sufficient depth from the outside of the pile to the reinforcing steel to develop the required moment capacity. 3.2. EM 1110-2-2906 - DESIGN OF PILE FOUNDATIONS discusses pile capacity, pile negative skin friction and lateral loads and lists computer programs which can be used in determining lateral loads on piles. 3.3. Seepage around sheet piling cutoffs should be considered as shown in EM 1110-2-2502, RETAINING AND FLOOD WALLS. Due to interlock leakage, sheet piling is only 50% effective in reducing uplift in coarse grained soils. 3.4. Sheet piling for flood and retaining walls should be designed and constructed as shown in EM 1110-2-2502, RETAINING AND FLOOD WALLS, and EM 1110-2-2504, DESIGN OF SHEET PILE WALLS. Cantilevered I-type sheet piles walls should not be used when the differential fill height is greater than 10 feet. 3.5. Permanent sheet piling may be used as cutoff to control underseepage and provide scour protection for foundations. Temporary sheet piling may be used to support excavations. Design of permanent or temporary sheet piling retaining structures must consider the effect of sheet pile lateral deflection. 4. Watertightness of Walls for Reinforced Concrete Structures. 4.1. To insure watertightness, minimum 10-inch thick walls should be used. Two layers of reinforcing steel must be placed with the horizontal steel continuous around the wall corners. Continuity of reinforcement around the corners will prevent wall corners from opening under load and enhance water tightness. 4.2. Horizontal construction joints in walls shall be straight with the surface roughened and vertical steel continuous through the joints. If a waterstop is necessary, a 1/8-inch thick galvanized flat steel waterstop can be used. 4.3. If transverse contraction joints are required in the walls of a structure like a reinforced concrete box culvert, waterstops of a flexible type should be used, as specified in EM 1110-2- 2102, WATERSTOPS AND OTHER PREFORMED JOINT MATERIALS FOR CIVIL WORK STRUCTURES. 5. Repair/modification of Existing Flood walls and Retaining Walls. 5.1. Suggestions for repair measures of existing floodwalls or retaining walls within the critical area are contained in EM 1110-2-2502, RETAINING AND FLOOD WALLS and EM 1110-2-2002, EVALUATION AND REPAIR OF EXISTING CONCRETE STRUCTURES. STRUCTURES - 2

5.1.1. If an opening needs to be provided in an existing wall, remove an entire monolith section of the wall, if practicable, to avoid modification to the existing adjacent walls. 5.1.2. If only a portion of the wall monolith will be removed, then the modified monolith must meet all applicable criteria. 5.1.3. Existing wall sections should be carefully removed by saw cutting. Use of "headache" balls and blasting are not permitted. 5.1.4. Existing reinforcing steel should be left in place and incorporated into the new work. 5.1.5. Shrinkage compensating concrete next to the existing concrete surfaces having a minimum compressive design strength of 3,000 PSI at 28 days should be used. 5.1.6. The modified structure must be watertight. 6. Methods of Abandonment of Structures. 6.1. Proposed method of abandonment and/or removal of structures within the critical area of flood control projects should be described. 6.2. Excavation and backfill for removal and abandonment of structures should comply with the requirements shown in the topic EXCAVATION AND BACKFILL. 7. Minimum Depth of Foundations to Prevent Frost Heave. 7.1. Minimum design depths for building foundations below finished grade is detailed in UFC 3-310-01 (previously TI 809-01 & EI 015901), LOAD ASSUMPTIONS FOR BUILDINGS. The following procedures are recommended: 7.1.1. Frost penetration value for project locations are shown in Table 1 of the above referenced UFC 3-310-01. 7.1.2. Using frost penetration values from Table 1 and taking into account whether the structure is heated or not, the bottom of the foundation depth should be determined from Fig. 1 of the above referenced UFC 3-310-01 7.1.3. If erosion potential or moisture desiccation is a concern, the design depth should be adjusted accordingly. 7.1.4. In no instance should the bottom of isolated or strip footings be less than 3 feet below finished grade. 8. Structures Located in Corrosive Environments. 8.1. Corrosion effects on vitrified-clay, reinforced concrete, cast iron, steel, flexible metal, STRUCTURES - 3

plastic pipes, ductile iron pipes and asbestos cement pipes should be considered as addressed in EM 1110-2-2902, CONDUITS, CULVERTS AND PIPES and in MRD Policy on Installation of Pressurized Water Lines in Existing Dam Embankments (NWDR 1110-1-1). 8.1.2. Required soil resistivity measurements for buried ferrous metal facilities for use in determining the need for cathodic protection should conform to Kansas City District Policy - Cathodic Protection of Buried Facilities, Measurements of Soil Resistivity. 8.2. Concrete protection requirements for reinforcing steel cover are contained in ACI 318-95, ACI 318R-95, Building Code Requirements for Structural Concrete and Commentary. For structures that are classified as hydraulic structures design must follow the guidance provided in EM 1110-2-2104, Strength Design Of Reinforced Concrete Hydraulic Structures. Special requirements for the concrete mix are also covered in the ACI publications. 9. Mechanical Consideration for design and construction of sluice gates are shown in the topic SLUICE GATES. 10. Recommended references. The following references are recommended to be used for design and construction of structures within the levee embankment or in the critical area of flood control projects. 10.1. EM 1110-2-3104, STRUCTURAL AND ARCHITECTURAL DESIGN OF PUMPING STATIONS, describes the following requirements: a. Structural loads on pumping plants. b. Design stresses, design criteria, and loading conditions for pumping plants. c. Design criteria for pressurized lines. 10.2. EM 1110-2-3102, GENERAL PRINCIPLES OF PUMPING STATION DESIGN AND LAYOUT, includes the layout criteria of Pumping Station discharge lines. 10.3. EM 1110-2-2902, CONDUITS, CULVERTS AND PIPES, includes the following: a. Methods of Analysis, loadings, materials, installation, joints, and camber for pipes and concrete culverts, through levees or in the critical area of flood control projects. b. Loadings on installed pipes, materials and installation for pipe jacking. c. Corrosion effects on pipes. 10.4. EM 1110-2-2502, RETAINING AND FLOOD WALLS, contains the following information for walls within the critical areas of flood control projects: walls. a. Design and construction considerations and methods for floodwalls and for retaining b. Geotechnical investigation requirements. c. Repair measures suggestions for existing floodwalls. STRUCTURES - 4

10.5. EM 1110-2-2705, STRUCTURAL DESIGN OF CLOSURE STRUCTURES FOR LOCAL FLOOD PROTECTION PROJECTS, includes the following requirements and information: a. Selection criteria of closure types. b. Structural analysis and design of closure structures. c. Gate operating equipment, seal assemblies, embedded materials. d. Corrosion protection criteria and requirements. 10.6. TM 5-818-1, AFM 88-3, Chap. 7, SOILS AND GEOLOGY PROCEDURES FOR FOUNDATION DESIGN OF BUILDINGS AND OTHER STRUCTURES (EXCEPT HYDRAULIC STRUCTURES), includes the following information: a. Necessary subsurface investigation and laboratory testing to determine the engineering properties of soil and rock for foundation design. b. Settlement analysis. c. Bearing capacity analysis. d. Selection of foundation type. e. Stabilization of subgrade soils. f. Design analysis for spread footings, mat foundations, deep foundation including drilled piers, and pile foundations. g. Foundations in areas of significant frost penetration. 10.7. EM 1110-1-1905, BEARING CAPACITY OF SOILS, contains the following information: a. Determination of the engineering properties of foundation soils for bearing capacity analysis. b. Bearing capacity analysis for shallow foundation. c. Analysis of deep foundations including drilled shafts and driven piles. 10.8. EM 1110-2-2102, WATERSTOPS AND OTHER PREFORMED JOINT MATERIALS FOR CIVIL WORK STRUCTURES, includes requirements necessary to insure watertightness of construction. 10.9. EM 1110-2-2906, DESIGN OF PILE FOUNDATIONS, includes the following: a. Geotechnical investigations for design of pile foundations. b. Design analysis construction requirements for pile foundations. 10.10. EM 1110-2-2504, DESIGN OF SHEET PILE WALLS. 10.11. NAVFAC DM-7.2, NAVAL FACILITIES ENGINEERING COMMAND - FOUNDATIONS AND EARTH STRUCTURES. 10.12. EM 1110-1-1904, SETTLEMENT ANALYSIS, includes design analysis for settlement STRUCTURES - 5

of construction. 10.13. UFGS 03373, CONCRETE FOR CONCRETE CUTOFF WALLS, includes material requirements, construction and testing of cutoff walls. 10.14 NWD POLICY ON INSTALLATION OF PRESSURIZED WATER LINES IN EXISTING DAM EMBANKMENTS, NWDR 1110-1-1, 15 May 1999, contains guidance on corrosion protection for buried metallic lines and casing pipes. 10.15. KANSAS CITY DISTRICT POLICY - CATHODIC PROTECTION OF BURIED FACILITIES, MEASUREMENTS OF SOIL RESISTIVITY, addresses requires soil resistivity measurements for buried ferrous metal facilities for use in determining need for cathodic protection. 10.16. ACI 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, addresses concrete reinforcing steel cover requirements and denseness and non-porosity of concrete in corrosive environments. 10.17 UFC 3-310-01, LOAD ASSUMPTION FOR BUILDINGS, addresses frost depth requirements for foundations. 10.18 EM 1110-2-2504 DESIGN OF SHEET PILE WALLS. 10.19 EM 1110-2-2104, STRENGTH DESIGN OF REINFORCED CONCRETE HYDRAULIC STRUCTURES, provides supplemental design guidance, to ACI 318, required of hydraulic structures. 10.20. EM 1110-2-2105, DESIGN OF HYDRAULIC STEEL STRUCTURES, provides guidance for designing hydraulic steel structures and guidance for fracture control. STRUCTURES - 6