Performance management Identification of metrics

Similar documents
Block 0: Capabilities within our Grasp

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

Translating the Region s Vision of a Seamless Sky into Reality Session. Soe Paing. Deputy Director Department of Civil Aviation Myanmar

Performance-based Navigation and Data Quality

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

CAPACITY AND EFFICIENCY Global Air Navigation Plan

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

Key Points from CMAC/FUA Related Seminar/Workshop

Air Traffic Management Services Plan

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

Direct Approach Consulting Inc.

Air Traffic Management

CNS/ATM SYSTEMS IN INDIA

Traffic Flow Management. December 2010

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

Evolution in Regional Aircraft Avionics

Safety Oversight Audit Section

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

PBN Aeronautical Charts and Procedure Design

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

A Strategic Vision of Air Traffic Management in New Zealand to 2025

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

International Civil Aviation Organization

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region

Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel

DRAFT WHITE PAPER ON CIVIL AVIATION CRAFTING NEW POLICY FOR SA AVIATION

Minneapolis-St. Paul International Airport: Performance-Based Navigation (PBN) Process Recap and Insights

FAA International Strategies 2010 to 2014 Western Hemisphere Region

How To Improve The Performance Of Anatm

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

ICAO Safety Management Systems (SMS) Course Information and outline

RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards. Baseline 2 Tutorial. Melbourne (FL), March 2013

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

Doc 9965 AN/483. Manual on Flight and Flow Information for a Collaborative Environment

MODEL REGULATION SAFETY MANAGEMENT SYSTEM REGULATION. International Civil Aviation Organisation

Manual on Air Navigation Services Economics

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

From patchwork to network:

Título ponencia: RNP APCH Implementation

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

CIVIL AVIATION ADVISORY PUBLICATION CAAP 42

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015

Trends in Aeronautical Information Management

Pricing Framework July 2012

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Doc 9750 DRAFT Triennium Edition

TRANSITION TO THE NEW ORGANISATION OF GREPECAS. (Presented by the Secretariat)

Assessment of changes to functional systems in ATM/ANS and the oversight thereof

ICAO s Policies on Charges for Airports and Air Navigation Services

How To Design An Airspace Structure

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Annex to Decision 2013/008/R

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Central Route Charges Office

Space Applications and Technologies Expo Rome, Italy February 4 6, 2010

General Aviation Exemption from Annex 14, Vol I Rescue and Fire Fighting Provisions

ALAMEDA DO AEROPORTO Caixa Postal, Maputo REGULATIONS NEW FORMAT FLIGHT PLAN


Global Air Traffic Management Operational Concept

Space Based ADS-B. Transforming the Way you See the Sky March, COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

Action Plan of the Bolivarian Republic of Venezuela for the activities to reduce CO2 emissions

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Choosing the right revenue management service

ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation

Tuesday, March 18, :00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.

Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research

How To Operate A Helicopter

Transport Spectrum Tune-Up Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009

Air Navigation Charges Services EUROCONTROL can provide

18/01/2012. This working MIDAD. The. Action by the - AIS/MAP. TF/6 Report Report. 1.1 The. Recovery, paper is based SUMMARY REFERENCES

Communications/Navigation/ Surveillance and Air Traffic Management in Africa

International Civil Aviation Organization ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE

51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

EASA New Regulation on Air Operations. Dated : 05/01/2012. Version : Version 2. Antoine BLIN & Arnaud SCHAEFFER Consultants. Technical Director

Operational Use of the English Language. ATM Safety around Europe


SBAS 2015 SPACE BASED AUGMENTATION SYSTEM WORKSHOP

International Strategic Plan

SITA AIRCOM Service (VHF & Satellite)

EUROCONTROL Training Activities 2013

REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION CIVIL AVIATION SAFETY REGULATION (C.A.S.R)

Global Air Navigation System Performance Based Air Navigation eanp Framework

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

Safety Management 1st edition

SES Safety and ATM/ANS Regulations - EASA activities related to MET services

Policy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).

AERONAUTICAL INFORMATION CIRCULAR 26/15

Transcription:

WKSP/ASBU/NAIROBI/2013-PPT/10 Performance management Identification of metrics Air Navigation Bureau WORKSHOP ON ASBU FRAMEWORK: ALIGNMENT OF REGIONAL AND NATIONAL PERFORMANCE PLANS, PLANNING, 14 October 2013 IMPLEMENTATION, MONITORING AND REPORTING Page 1 (NAIROBI, KENYA, 21-25 OCTOBER 2013)

Outline Background Performance Framework Requirements, terminology Measurement approach Metrics Next Steps 14 October 2013 Page 2

Vision Statement To achieve an interoperable global ATM System for all users during all phases of flight that: meets agreed levels of safety provides for optimum economic operations is environmentally sustainable meets national security requirements 14 October 2013 Page 3

What is a Global ATM System? It is a system of systems which: facilitates interoperability of different technologies; accommodates different procedures; covers all elements of AN systems (ATM, CNS, AGA, AIM and MET); and provides harmonization thus leading to seamlessness across regions. This is achieved through progressive, cost effective and cooperative implementation of air navigation systems worldwide. 14 October 2013 Page 4

Performance Framework Background Eleventh Air Navigation Conference, held in September 2003, urged ICAO to develop a performance framework for Air Navigation Systems 35 th Session of the ICAO Assembly, held in September 2004, adopted Resolution A35-15, App B and urged ICAO to ensure that the future global ATM system is performance based and that the performance objectives and targets for the future system are developed in a timely manner September 2004 14 October 2013 Page 5

Performance Framework Principles Focuses on results through adoption of performance objectives and targets Encourages collaborative decision making Relies on facts and data for decisions Emphasizes on performance monitoring 14 October 2013 Page 6

Performance Framework Requirements Once an organization, State or a region has adopted performance based planning, it must acknowledge the following : Commitment (at the top) Agreement on goals (desired results) Responsibility (who is accountable) Human resources and know-how (Culture & Skills) Data collection, processing, storage and reporting Collaboration and coordination (with other partners) Cost implication (what does it cost) 14 October 2013 Page 7

Performance Framework Advantages Result oriented, transparent and promotes accountability Shift from prescribing solutions to specifying performance Employs quantitative and qualitative methods Avoids a technology driven approach Allows optimum resource allocation 14 October 2013 Page 8 8

Performance Framework Terminology (1/3) Expectation or Key Performance Area 11 expectations are defined in the OCD Access/Equity, Capacity, Cost-effectiveness, Efficiency, Environment, Flexibility, Global interoperability, Participation by the ATM community, Predictability, Safety and Security Focus Area Focus areas may be defined as areas where performance must be addressed in any given KPA. For example, in the safety KPA, focus may be in such areas as CFIT accidents, runway incursions. For capacity, focus area could be enroute airspace or terminal airspace. 14 October 2013 Page 9

Performance Framework Terminology (2/3) Performance Objective Each expectation should be reached through a set of specific, measurable, achievable, relevant and timely (SMART) performance objectives Performance Objectives is defined in a qualitative way - a desired trend from today s performance (e.g. improvement), within a well specified ATM planning environment. In other words it is a high level statement of outcome that satisfies ATM community expectations. Example : In ASBU approach the module itself becomes performance objective ASBU B0-RSEQ: Improve traffic flow through runway sequencing Performance Target A set of agreed numerical values of related performance indicators, representing the minimum performance levels at which an objective is considered to be achieved. Example: Ten percent increase in the capacity of terminal airspace. 14 October 2013 Page 10

Performance Framework Terminology (3/3) Performance Indicator Indicators are defined when there is a need to document current performance levels and progress in achieving an objective. It is a measure of progressive achievement of performance objective. Example: Three percent increase in the capacity of terminal airspace Performance Metric Metrics are quantitative measures of system performance through data. Example: Number of movements per day per aerodrome; Kilograms of fuel saved per operation; Kilograms of CO 2 emissions reduced per operation. 14 October 2013 Page 11

ICAO Performance Framework evolution Performance based Global Air Navigation Systems (2008) Aviation System Block Upgrade (ASBU) Methodology (2012) Global ATM system (2006) CNS/ATM systems ( 1994) Future Air Navigation Systems ( 1992) EVOLUTION TO A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEMS WITH ASBU METHODOLOGY Ground based Air Navigation systems 14 October 2013 (Before 1992) Page 12

Performance Framework Tools GAP analysis operational enhancements/technology Safety analysis Safety case and safety assessment Economic analysis Develop aircraft movement forecasts, assess costs and benefits of technology, calculate NPV, determine funding sources, agree on cost recovery methodology, identify risk factors and implement risk mitigation techniques the process is known as Business case 14 October 2013 Page 13

Performance Framework Definition In essence, a Performance Framework is a set of principles requirements terminology describes the building blocks/tools used by ATM community members to collaborate and cooperate on performance driven activities/tasks 14 October 2013 Page 14

Measuring success Success of global air navigation system implementation Based on outcomes Meet 11 expectations of ATM Community Each PIRG will choose measurable metrics related to KPAs 14 October 2013 Page 15

Measurement Approach What (very general) KPAs 11 standard KPAs What (less general) Focus Areas What performance will focus on Definition of Performance Application of Performance When Where Who Performance Objectives Performance targets What (specific definition of what will be improved) Quantification of current/expected performance Quantitative measure of system performance through data collection Performance Indicators Performance Metrics Data 14 October 2013 Page 16

REGIONAL AIR NAVIGATION PLANNING PERFORMANCE METRICS- EXAMPLES KPAs Related Performance Metrics 1. Access & Equity 1. KPA/Access: Number of international aerodromes with APV 2. KPA/Access: Percentage of time Special Use Airspace (SUA) available to Civil Operations 3. KPA/Access: Percentage of requested flight level versus cleared flight level 4. KPA/Access: Number of access denials due to equipment failure 5. KPA/Equity Percentage of aircraft operators by class that equity is achieved 6. KPA/Equity: Percentage of different types of aircraft operating in a particular airspace or international aerodrome. 2. Capacity 1. Number of operations (arrivals+departures) per international aerodrome per day 2. Average ATFM delay per flight at an international aerodrome 3. Number of landings before and after APV per international aerodrome 4. Average en-route ATFM delay generated by airspace volume 5. Number of aircraft in a defined volume of airspace for a period of time 3. Cost 1. IFR movements per ATCO hour on duty 2. IFR flights (en-route) per ATCO hour duty effectiveness 4. Efficiency 1. Kilograms of fuel saved per flight 2. Average ATFM delay per flight at the international aerodrome 3. Percentage of PBN routes 5. Environment 1. Kilograms of CO 2 emissions reduced per flight (= KGs fuel saved per flight x 3.157) 2. The number of electronic pages dispatched

REGIONAL AIR NAVIGATION PLANNING PERFORMANCE METRICS- EXAMPLES KPAs Related Performance Metrics 6. Flexibility 1. Number of backups available in emergency 2. Number of changes approved to the flight plan 3. Number of alternatives granted 7. Global Interoperability 1. Number of ATC automated systems that are interconnected 8. Participation of 1. Level of participation in meetings the ATM 2. Level of responses to planning activities Community 9. Predictability 1. Arrival/departure delay (in minutes) at international aerodrome 10. Safety 1. Number of runway incursions per international aerodrome per year 2. Number of incidents/accidents with MET conditions as as a contributory factor 3. Number of ACAS RA events 4. Number of CFIT accidents 11. Security Not Applicable 5. Number of missed approaches avoided due to use of CDO

REGIONAL AIR NAVIGATION PLANNING IMPLEMENTATION METRICS- EXAMPLES Infrastructure Monitoring the Implementation of ASBU modules Related Implementation Indicators/Supporting Metrics 1. Percentage of aircraft fitted with ADS-B IN 2. Percentage of aerodromes comply with Visual Aids for Navigation requirements as per Annex 14 3. Percentage of certified aerodromes used for international operations 4. Number of States implemented WGS-84 5. Percentage of aircraft fitted with ACAS / logic Version 7.1 6. Percentage of aerodromes with PBN STAR implemented 7. Percentage of aerodromes with CDOs implemented 8. Number of ADS-Cs available over oceanic/remote area 9. Number of continental CPDLC systems established 10. Percentage of aerodromes with PBN SIDs implemented 11. Percentage of aerodromes with CCOs implemented 12. Percentage of ATS units with ground based safety nets

Performance Framework Next Steps The next step calls for establishment of measurement and reporting strategy. While PIRGs are progressively identifying a set of regional performance indicators and supporting metrics, States have recognized that data compilation, processing, storage and reporting for the identified regional performance metrics are fundamental to success of the performance-based approach. PIRG to assign the performance measurement to an existing subgroup of a PIRG or establish a new subgroup for this purpose; States to support the ICAO Regional Office by providing the requisite information to demonstrate operational improvements; and States, that have not yet done so, to establish a performance measurement strategy for their air navigation system. 14 October 2013 Page 20

Thank You 14 October 2013 Page 21