SOLAR ENERGY DEVELOPMENT IN THAILAND



Similar documents
SOLAR ENERGY DEVELOPMENT IN THAILAND

C5 :106. The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

BROKERAGE AGREEMENT. THIS AGREEMENT is made on BETWEEN:

ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S

MODEL CONTRACT FOR PROVISION OF HEALTH CARE SERVICES. This Contract is entered into on / /, corresponding to / /1430H by and between:

CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

WAGES PAYMENT SERVICES AGREEMENT

Foreign Currency Forward Master Contract

FOR INFORMATION PURPOSES ONLY

To complete the process for a net metering interconnection, please follow the steps below:

Standard Conditions of Direct Contract On Purchase of Balance Electricity. (About the Commercial Operator Buying the Balance Electivity)

Escrow Agreement INSTRUCTIONS STOCKHOLM CHAMBER OF COMMERCE ESCROW MODEL AGREEMENT 2014

Terms & Conditions Verder B.V. ( ) Filed at the Chamber of Commerce on

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Terms and Conditions of International Money Transfer Transactions by Card Members

Frequently Asked Questions About. Japan s Feed-in- Tariff System

Electricity in Egypt

E n e r g y, N a t u r a l R e s o u r c e s & E n v i r o n m e n t - J u n e

TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING

FEED-IN TARIFF CONTRACT (FIT CONTRACT)

Consultants Services, Lump-Sum Remuneration

Ministry of National Infrastructures. Charging of Electric Vehicles. Policy Principles

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

Full Scale Program for Renewable Energy in Egypt

TRADING FACILITY AGREEMENT INTERNET TRADING FACILITY

BROKER/SHIPPER AGREEMENT

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

Lek Securities Corporation. Agreement for Prime Broker Clearing Services

GOODS AND SERVICES AGREEMENT BETWEEN SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY AND COMPANY/CONTRACTOR NAME

AGREEMENT OF ADHERENCE TO THE OPERATION RULES OF THE ELECTRIC POWER PRODUCTION MARKET

INVESTMENT ADVISORY AGREEMENT

THE CONTRACT FOR SINO-FOREIGN EQUITY JOINT VENTURE

Most household services provide you with a fixed monthly bill: Broadband Internet service

ELMBROOK TECHNOLOGIES LIMITED Domain Names Standard Terms & Conditions (for.nz Domain Names)

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI

HOMEOWNERS LIMITED REPRESENTATIVE SERVICE AGREEMENT With SERVICE FIRST INSURANCE GROUP LLC. Of CYPRESS PROPERTY & CASUALTY INSURANCE COMPANY

KERALA STATE ELECTRICITY REGULATORY COMMISSION

SMALL GENERATION SYSTEM INTERCONNECTION AGREEMENT (10 kw OR LESS)

e-voting Agreement This Agreement made and entered into at this day of, between

POWER PURCHASE AGREEMENT

SCHEDULE 14. Part 1 Performance Bond PERFORMANCE BOND NO.

Loan regulations (Adopted by the Administrative Council by Resolution 1562, on 14 November 2013)

Renewable Energy Feed-in Tariff Projects Regulations

SCHEDULE FIT TIER 1 AND TIER 2

GENERAL TERMS AND CONDITIONS OF PURCHASE

Websites Made Easy a division of Securecom Limited (WSME) -.nz Domain Names Terms and Conditions

20 April To Manager All Commercial Banks*

M AINTENANCE S ERVICE A GREEMENT L ABOR O NLY

INVESTMENT ADVISER REPRESENTATIVE AGREEMENT

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

Master Agreement Applicable to System Integration Services Furnished By KDDI America, Inc.

CLEARING MEMBERSHIP AGREEMENT

Terms of Use Dedicated Servers

Amendment and Consent No. 2 (Morris County Renewable Energy Program, Series 2011)

INDUSTRIAL INSPECTORATE ACT CAP. 180 L.F.N ACT CAP I8 L.F.N Establishment and composition of Industrial Inspectorate Division.

KEY CONSIDERATIONS IN POWER PURCHASE AGREEMENT (PPA) RISK ALLOCATION AND COMMON CLAUSES WHICH FORM PART OF A PPA

CHAPTER NINE DISPUTES SETTLEMENT ARTICLE 187 Scope of the Chapter The provisions of this Chapter shall apply to the settlement of disputes concerning

Conditions of Supply of Internet Services

(LABOR HOUSING LOAN AND GRANT TO A NONPROFIT CORPORATION)

(-Translation-) Rule of Department of Employment. The Criteria for the Consideration for Work Permit Issuance B.E (A.D.2009)

Gas Customer Choice Contract Residential and Small Commercial Terms and Conditions of Service

Terms and Conditions v

Municipal Aggregation Program FAQs


CHAPTER 11 APPEALS AND DISPUTES

INTERNAL REGULATIONS

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

AGREEMENT FOR THE PURCHASE OF SERVICES

Terms and Conditions of International Money Transfer Transactions

CLS Investments, LLC Instructions for the Solicitor Application and Agreement

CITY OF ROCKFORD Electricity Aggregation Program. Plan of Operation and Governance

GENERAL PURCHASING TERMS AND CONDITIONS

CLAIMS ADMINISTRATION SERVICES AGREEMENT

Master Service Agreement

SolarEdge Technologies Ltd.

d.b.a. North State Communications First Revised Page 1 Canceling Original Page 1 INFORMATIONAL TARIFF INTERSTATE OPERATOR SERVICES

Transcription:

18 December 2014 SOLAR ENERGY DEVELOPMENT IN THAILAND 1. Energy Regulatory Commission The Energy Industry Act B.E. 2550 (A.D. 2007) was published and became effective in December 2007. It established a new regulatory regime for electricity and natural gas businesses. One of the purposes of the Act was to restructure the energy industry management by separating policy making, regulation, and operating functions. It provided for the establishment of the Energy Regulatory Commission, whose members have been appointed, and the Office of Energy Regulatory Commission. Operators of energy businesses must obtain several licenses from the Commission. The types of licenses required depend on nature of operation and size of production capacity or distribution capacity. Royal decree, regulations, and notifications to implement the Act have been published. The Commission is responsible for the prevention of abusive use of monopoly power and protection of energy consumers and those adversely affected by the energy industry operation. 2. Policies re Renewable Energy On 26 December 2006, the National Energy Policy Committee ( NEPC ) approved EGAT purchasing power from generators using renewable energy, and instructed EGAT to revise its regulations for purchase of power from SPPs using renewable energy. On 28 January 2009, the Cabinet approved a 15-year Renewable Energy Development Plan ( REDP ), and on 9 March 2009, the NEPC approved additional tariff adders for certain categories of alternative energy. The announced goal was for renewable energy to constitute up to 20% of total energy consumption by 2022. On 30 November 2011, the NEPC approved a 20-year energy conservation plan (2011-2030) under which energy consumption by the industrial sector, large-scale business buildings, small business buildings, and residential hours and transportation sector will be reduced. NEPC also approved a 10-year 25% Alternative Energy Development Plan 2012-2021 ( AEDP ) to replace the 15-year REDP. During the 14 th ASEAN Summit in Thailand 28 February 1 March 2009, the meeting recognized the challenge of climate change, and agreed to cooperate on energy security, ASEAN energy cooperation, and development of renewable and alternative energy. The Department of Alternative Energy Development and Efficiency ( DEDE ) is responsible for implementation of the alternative energy plan. See its website at www.dede.co.th. On 23 August 2011, the Prime Minister presented the Policy Statement of the Council of Ministers, which included: 3.5.4 Support the production, use, research and development of renewable and alternative energy sources, with the objective of replacing 25% of the energy generated by fossil fuels within the next decade. Comprehensive development of the energy industry will also be promoted. memo re solar energy development in thailand_(328363_12).doc 1

On 16 July 2013, the NEPC approved two feed-in tariff policies for solar PV rooftop and solar PV community ground-mounted systems. See part 6 below. On 15 August 2014, the NEPC approved the preparation of the Power Development Plan ( PDP ) 2015 2036, the Energy Efficiency Development Plan ( EEDP ) 2015 2036, and the Alternative Energy Development Plan ( AEDP ) 2015 2036, and appointed the Ministry of Energy to prepare the plan and send to the NEPC for further consideration. The NEPC also approved three feed-in tariff policies for solar as follows: (i) (ii) (iii) Approved feed-in tariff at the rate of 5.66 Baht/kWh for a period of 25 years for the pending PPA applications that had already been submitted to EGAT/PEA/MEA prior the NEPC s resolution on 28 June 2010 and have not yet received letter of acceptance from EGAT/PEA/MEA with total quota of 576 MW. Approved an extension of SCOD for solar PV rooftop projects which have signed PPA with PEA/MEA for total capacity of 130.64 MW from the end of December 2013 to the end of December 2014 and approved accepting applications for solar PV rooftop for residential rooftop that have installation capacity of less than 10 kw for total capacity of 69.36 MW, with a feed-in tariff of 6.85 Baht/kWk. These new projects shall achieve COD by the end of December 2015. Approved the change on the solar PV community ground-mounted systems programme which was approved by NEPC s resolution on 16 July 2013 with the new solar farms in the form of Public Private Partnerships with the governmental sector or agricultural cooperatives programme. This new programme will be for solar farm (ground-mounted solar installations) having installation capacity of not more than 5 MW. The feed-in tariff for this programme will be at the rate of 5.66 Baht/kWh for a period of 25 years with total quota of 800 MW by the end of December 2015. The NEPC appointed the ERC to consider and issue the Regulation for the Purchase of Power from Solar Power Project under FiT regime. On 22 October 2014, the NEPC approved the amendment of the NEPC s resolution on 15 August 2014 as follows: (i) (ii) Approved the increase of quota for another 800 MW for those pending PPA applications that already submitted to EGAT/PEA/MEA prior the NEPC s resolution on 28 June 2010 and have not yet received letter of acceptance from EGAT/PEA/MEA and allowed the projects that have the transmission line issues to change their location. Approved an extension of SCOD for solar PV rooftop projects which have signed PPA with PEA/MEA for total capacity of 130.64 MW from the end of December 2014 to June 2015. On 8 December 2014, the Administrative Committee on Promotion Measures for Power Generation from Renewable Energy ( RE Committee ) approved the acceptance of power purchase from solar farm (ground-mounted solar installations) projects (178 projects) that already submitted the PPA applications with EGAT/PEA/MEA prior the NEPC s resolution on 28 June 2010 and have not yet received letter of acceptance from EGAT/PEA/MEA by dividing into two groups as follows: memo re solar energy development in thailand_(328363_12).doc 2

(i) (ii) 25 projects (138.350 MW) which have no issue on transmission line or land. These projects can execute the power purchase agreement within the framework of period under the Regulation for Acceptance of Power Purchase of related Power Utility; whereby the project shall achieve the COD by the end of December 2015. 153 projects (875.025 MW) which have transmission line or land issues. These projects are entitled to change their locations provided that all proceedings will be completed by 31 March 2015 and inform DEDE so that DEDE will coordinate with EGAT/PEA/MEA for inspection of the propagation of electric transmission lines, proceed for the acceptance of power purchase, and execution of power purchase agreement. All 153 projects shall achieve the COD by the end of December 2015. 3. EGAT Regulations On 18 April 2007, EGAT announced Regulations for the Purchase of Power from Small Power Producers exclusively for the generation from renewable energy. SPPs can obtain information from the Power Purchase Agreement Division, EGAT. The Regulations (as amended in 2009) can be found at www.egat.co.th. The Regulations cover the following subjects: A. Objective of Power Purchase from Small Power Producers B. Enforcement C. Characteristics of the Power Generating Processes of SPPs D. Electrical System Standards of SPPs E. Procedures and Consideration Principles of Power Purchase from SPPs F. Conditions of the Power Purchase from SPPs G. Power Purchasing Point and Connection Point H. Costs Incurred for SPPs I. Conditions of the Power Generating Operation and the Maintenance Shutdown of SPPs J. Principles of the Tariff Determination for the Purchase of Power from SPPs K. Failure to Comply with the Power Purchase Agreement (PPA) L. Performance Security for Compliance to the Power Purchase Agreement after the Commercial Operation Date M. Bill Settlement Conditions N. Damages to the Power System O. Problems Arising from Compliance with the Regulations and Power Purchase Agreements P. Amendments to the Regulations Q. Solution to the Problems Arising from Compliance with the Regulations for Synchronization of Generators to the Power Utility System, the Power System Interconnection Criteria and the SPP Grid Code EGAT has published standard forms of PPAs including Model Non-Firm Agreement (Renewable, without Supporting Fuel (Khor. 1), with Adder). 4. PEA Regulations In 2006, PEA announced Regulations for the Purchase of Power from Very Small Power Producers for the Generation Using Renewable Energy ( Regulations ). On 20 May 2008, PEA has issued the Notification re: Prescription of Increment of Power Purchase Price for Renewable Energy Very Small Power Producers. The Cabinet at its meeting on 24 March memo re solar energy development in thailand_(328363_12).doc 3

2009 approved and acknowledged the resolution of the NEPC at its meeting No. 2/2009 (No. 124) held on 9 March 2009 re: Proposal to Improve the Guideline for Promotion of Power Generating from Renewable Energy by prescribing the period and purchased power capacity eligible for increment of power purchase price, adjustment of rate of increment of power purchase price for renewable energy power producers classified according to the type of technology and fuel, and revision of Regulations For Purchase of Power. PEA also published standard forms of PPAs including Power Purchase Agreement for the Purchase of Power from a Very Small Power Producer (for the Generation using Renewable Energy). See Attachment No. 1. Features of PEA s PPAs signed after 19 August 2009. 5-year term, renewable without limit Requirement for a bank guarantee of Baht 200,000 per MW Delay LDs for delays exceeding 60 days in achieving SCOD: 0.33% of guaranteed amount per day 5. Carbon Market Financing There is a growing market for carbon market finance. Thailand established a Designated National Authority ( DNA ) to manage CDM projects, currently the Thailand Greenhouse Gas Management Organization ( TGO ). 221 letters of approval for CDM projects have been issued, there are 132 registered Thai CDM projects, and 27 projects have been certified, as of June 2013. The TGO is drafting the rules for a carbon fund. It would provide low interest rate loans for CDM, and purchase carbon credits from project developers for sale to the international carbon trading markets (latest data posted in DNA website). 6. Adder Policy On 19 August 2009, PEA issued the Notification of the Provincial Electricity Authority re: Prescription of Increment of Power Purchase Price for Renewable Energy Very Small Power Producers (up to 10 MW) under the Resolution of the NEPC dated 9 March 2009. For solar energy, an adder of Baht 8 per unit was prescribed for ten years from COD. The special adder for 3 southern most provinces (Yala, Pattani, and Narathiwat) of Baht 1.50 was also prescribed. On 15 January 2010, EGAT issued the Notification re Prescription of Increment of Power Purchase Price for Renewable Energy Small Power Producers (10 MW 90 MW). For solar energy, an adder of Baht 8.00 per unit was prescribed, for ten years from COD. The special adder for 3 southern most provinces (Yala, Pattani, and Narathiwat) of Baht 1.50 was also prescribed. On 9 April 2010, PEA issued a notification suspending receipt of applications for sale of power for solar projects and wind projects. On 22 September 2010, PEA issued a notification continuing suspending receipt of application for solar projects. On 5 April 2010, EGAT issued a notification suspending receipt of applications for sale of power from solar project. On 29 October 2010, EGAT issued a notification continuing suspending receipt of application for solar projects. On 20 July 2010, the Thai Cabinet approved resolutions of NEPC adopted on 28 June, 2010, including confirming adder of Baht 8.00 per unit under PPAs which have been signed, and for memo re solar energy development in thailand_(328363_12).doc 4

projects for which acceptances to purchase electricity have been issued. In the case of applications for sale of electricity submitted and pending consideration, the adder of Baht 6.50 per unit would apply. For other renewable energy projects, the Cabinet approved NEPC s guidelines for coordination and follow-up of promotion of renewable power production in compliance with the policy, and establishment of a committee comprising representatives from such related agencies of MoE and NESDB, and to approve a Feed-in Tariff system. On 30 March 2011, EGAT issued the Notification re Prescription of Increment of Power Purchase Price for Renewable Energy Small Power Producers in order to amend the EGAT Notification dated 15 January 2010 and to approve the special increment of power purchase price (Adder) for renewable energy projects from Small Power Producers that located in the areas of four Districts in Songkla Province, namely, Jana District, Thepa District, Nathawi District and Saba Yoi District, that sell the electric to the system under the Regulations for the Purchase of Power from SPP. For solar energy, an adder of Baht 6.50 per unit was prescribed, for ten years from COD. The special adder for four Districts in Songkla Province of Baht 1.50 was also prescribed. On 12 April 2011, PEA issued the Notification of the Provincial Electricity Authority re: Prescription of Increment of Power Purchase Price for Renewable Energy Very Small Power Procedure Under the Resolution of the NEPC dated 25 November 2010 in order to amend the PEA Notification dated 19 August 2009 and to approve the special increment of power purchase price (Adder) for renewable energy projects from Very Small Power Producers that located in the areas of four Districts in Songkla Province, namely, Jana District, Thepa District, Nathawi District and Saba Yoi District, that sell the electric to the system under the Regulations for the Purchase of Power from VSPP. For solar energy, an adder of Baht 6.50 per unit was prescribed, for ten years from COD. The special adder for four Districts in Songkla Province of Baht 1.50 was also prescribed. On 16 July 2013, the NEPC approved two feed-in tariff policies, which will lead to reopening support of solar power for two packages: 1. Solar PV Rooftop The solar PV rooftop policy applies to solar PV rooftop projects having the installation capacity lower than 1 MW, with a combined capacity of 200 MW. Projects must be installed by December 2013. The Feed-in Tariffs for solar rooftops are as follows: Type of Buildings Installation Capacity Feed-in Tariff (Baht) Residential House 10 kw 6.96 per kilowatt-hour Small Business 10 kw 250 kw 6.55 per kilowatt-hour Medium-Large Business/Factory 250 kw 1000 kw 6.16 per kilowatt-hour The Feed-in Tariff will apply for 25 years from the Scheduled Commercial Operation Date ( SCOD ). The NEPC appointed the ERC to consider and issue the guidelines, rules, procedures and conditions for purchase of electricity from solar PV rooftop. The Thai Cabinet at its meeting on 13 August 2013 approved and acknowledged the resolution of the NEPC at its meeting No. 2/2556 (No.145) held on 16 July 2013 as proposed by the Ministry of Energy. On 30 August 2013, ERC announced the Regulations prescribe the regulations governing purchase of electricity from solar PV rooftop which come into force on 3 September 2013. memo re solar energy development in thailand_(328363_12).doc 5

The ERC Regulations will apply to the purchase of electricity from Very Small Power Producers ( VSPP ) who wish to produce electricity from solar PV rooftop only, and it will not apply to other VSPPs who produce electricity from other sources of renewable energy including the VSPPs who produce electricity from solar PV panels but have not installed the PV panels on the rooftop. On 6 September 2013, ERC announced the Notification re purchase of electricity from solar PV rooftop. According to the ERC Notification dated 6 September 2013, the VSPPs who wish to produce electricity from solar PV rooftop and sell to the Metropolitan Electricity Authority ( MEA ) or Provincial Electricity Authority ( PEA ), may file the VSPP application for solar PV rooftop with the MEA or PEA as the case may be from 23 September 2013 to 11 October 2013. MEA and PEA will consider the VSPP application on first come first serve basis and will announce the result of its consideration on the VSPP applications from 14 October 2013 onwards. On 24 March 2014, ERC announced the Notification re Solar PV Rooftop shall not be considered as power plant. Under this Notification, a power plant generated from solar PV rooftop shall be exempted from a factory operation license but required to notify ERC in accordance with ERC Notification re Determination of Energy Industry Exempt from License Application to be an Industry to Notify B.E. 2551. On 15 August 2014 and 22 October 2014, the NEPC approved the resolutions extend an extension of SCOD for solar PV rooftop projects which have signed PPA with PEA/MEA for total capacity of 130.64 MW from the end of December 2013 to the end of June 2015 and approved the open up of applications for solar PV rooftop for residential rooftop that have installation capacity of less than 10 kw for total capacity of 69.36 MW, with a feed-in tariff of 6.85 Baht/kWk. These new projects must achieve COD by the end of December 2015. On 12 November 2014, ERC published ERC Draft Regulations on Purchase of Electricity from Solar PV Rooftop and Draft Notification re Purchase of Electricity from Solar PV Rooftop for public hearing. As of 18 December 2014, the public hearing is closed. ERC has not yet announced the Regulation and the Notification. 2. Community ground-mounted solar The Ministry of Energy together with the National Village and Urban Community Fund Office will develop Solar PV project on the basis of one MW per village, with a combined capacity of 800 MW. All projects shall be installed by December 2014. The Feed-in Tariffs for community ground-mounted solar are as follows: Period Year 1 Year 3 Year 4 Year 10 Year 11 Year 25 Feed-in Tariff (Baht) 9.75 per kilowatt-hour 6.50 per kilowatt-hour 4.50 per kilowatt-hour Each village will be able to apply for one solar power project with capacity of 1 MW and the source of fund for financing project (100%) will derive from loan from a government bank, either (i) Government Savings Bank or (ii) Bank for Agriculture and Agricultural Cooperatives. memo re solar energy development in thailand_(328363_12).doc 6

The NEPC appointed the ERC to consider and issue the regulations for purchase of electricity from the community ground-mounted solar. At the moment, ERC has not yet announced any regulations or notification concerning this matter. On 15 August 2014, the NEPC approved to replace the solar PV community ground-mounted systems programme with solar farms in the form of Public Private Partnerships with the governmental sector or agricultural cooperatives programme. This new programme will be for solar farm (ground-mounted solar installations) having installation capacity of not more than 5 MW. The feed-in tariff for this programme will be at the rate of 5.66 Baht/kWh for a period of 25 years with total quota of 800 MW by the end of December 2015.On 12 November 2014, ERC published ERC Draft Regulations on Purchase of Power from Ground Mounted Photovoltaic Power Project for Government Agencies and Agricultural Cooperatives for public hearing. As of 18 December 2014, the public hearing is closed. ERC has not yet announced the Regulation and the Notification. 7. Department of Alternative Energy Development and Efficiency (DEDE) Attached is a set of slides presented by Khun Thidarat Sawai from the Bureau of Solar Energy Department, Department of Alternative Energy Development & Efficiency, Ministry of Energy Thailand on 25 November 2014 titled Thailand s Solar Energy Policy and New Alternative Energy Development Plan (2015-2036) 8. Restrictions on amendments to PPAs The Committee on Management of Measures for Promotion of Renewable Power Production, appointed under the National Energy Policy Board, No. 1/2554 on January 26, 2011, (No. 6), instructed the three power authorities to issue a notification prohibiting a change in or amendment to PPAs with renewable energy projects applying for (i) a change in the quantity of the power energy offered for sale, (ii) relocation of the power plant, or (iii) a change in the production technology. EGAT issued such notification dated 14 March 2011. It is PEA s internal policy to allow transfers of rights of generators under PPAs only to affiliates of the transferors; affiliates as defined in Section 39 of the Revenue Code. PEA s current practice on postponement of SCODs is to grant up to two 6-month extensions, to allow project owners who has actually started construction to avoid delay LDs. Attachments: 1. PEA standard form of VSPP PPA (renewable energy). 2. Slides of Khun Thidarat Sawai from the Bureau of Solar Energy Department, Department of Alternative Energy Development & Efficiency, Ministry of Energy Thailand on 25 November 2014. memo re solar energy development in thailand_(328363_12).doc 7

Attachment No. 1* PEA standard form of VSPP PPA (renewable energy) Power Purchase Agreement No. for the Purchase of Power from a Very Small Power Producer (for the Generation Using Renewable Energy) between and the Provincial Electricity Authority This Power Purchase Agreement is executed and delivered at the Distribution Utility on between, represented by, with the office located at, hereinafter called the Power Producer, of the one part, and the Provincial Electricity Authority, represented by, title:, office:, hereinafter called the Utility, of the other part. WHEREAS both parties agree to purchase and sell electricity under the following terms and conditions: 1. Purchase and Sale of Electricity 1.1 The Power Producer and the Utility shall abide by the terms and conditions pertaining to the purchase of power and system interconnection as stipulated in the Regulations for the Purchase for Power from Very Small Power Producers (for the Generation Using Renewable Energy) and the Regulations for Synchronization of Generators with Net Output under 10 MW to the Distribution Utility System, B.E. 2549 (2006), as detailed in Appendices 1 and 2 attached to this Agreement respectively. 1.2 Appendices 1 and 2 annexed hereto shall form an integral part of this Agreement. In case of inconsistency between the provisions in this Agreement and those in Appendices 1 and 2, the former shall prevail. 1.3 The Utility agrees to purchase and the Power Producer agrees to sell electricity at a maximum capacity of MW at the voltage level of Volt, with the Purchasing Point located at, with details of the generation system as specified in the Application for Sale of Electricity and System Interconnection and the Power Producer agrees to sell electricity to the Utility within. 1.4 The Utility agrees to sell standby power to the Power Producer at the request of the latter, pursuant to the announcement on the standby power tariff and in line with the standby power purchase agreement between the Utility and the Power Producer. 2. Agreement in Force and Termination This Agreement shall come into force as from the date of its signing by both parties for a period of five (5) years. The Agreement shall be automatically extended on a continual basis, each time for another period of five (5) years, and shall remain effective unless it is terminated in the event of the following: * N.B.: The rate of Adder does not appear in the PPA. It is mentioned in the letter of acceptance. memo re solar energy development in thailand_(328363_12).doc 8

2.1 The Power Producer gives a written notice to the Utility of his intention to discontinue the purchase/sale of electricity by terminating the Agreement. 2.2 If one party is in breach of any terms and conditions specified in the Agreement, the nonbreaching party shall send a written notice to the breaching party to make necessary correction. If the breaching party fails to make such correction, the non-breaching party is entitled to terminate this Agreement. 3. Power System Interconnection 3.1 The Power Producer will allow the Utility to enter its premises to install, to undertake the maintenance, to change and/or to relocate the power system interconnection equipment after the owner or the possessor of the location has been notified. 3.2 The Utility reserves the rights to specify the requirement of additional equipment, at a later stage, both for the Utility s distribution system and for the Power Producer s power plant, to be in line with the technical standards and the pattern of power dispatch of the Utility. 3.3 One party has to notify the other party in advance if any change has been made to its power system, which will affect the protective equipment in the power system of both parties. No action related to the interconnection equipment shall be taken without a written notice to the Utility in advance. 4. Control and Operation of the Power Plant 4.1 The Power Producer must strictly abide by the switching order of the Utility s Control Center for the benefits of the operation and maintenance, except for the case where damage may be caused to the life or property of either party. 4.2 The Power Producer has to submit the information about the amount of fuel consumption per year and the Average Lower Heating Value of the primary and secondary fuels used for electricity generation. 4.3 The Power Producer, using commercial fuels, such as oil, natural gas and coal, as a secondary fuel at a ratio greater than 25% of the total heat consumption for power generation in that given year, must generate electricity efficiently by having the ratio of Primary Energy Saving (PES) at no less than 10% in each year. The PES ratio calculation method is provided in Attachment 2 of the Regulations for the Purchase of Power from Very Small Power Producers (for the Generation Using Cogeneration System). In case of the failure to comply with the requirements about the efficiency of the power generating processes, a fine shall be imposed, pursuant to the calculation method described in Item 4.4. 4.4 In the event that the PES ratio achieved by the Power Producer is less than 10%, the Utility will demand a refund from the revenue from the energy charge that the Utility has paid to the Power Producer in that given year, according to the difference of the PES ratio as required by the Regulations, i.e. 10%, and the actual PES ratio derived from the calculation using the calculation formula specified in the Regulations for the Purchase of Power from Very Small Power Producers (for the Generation Using Cogeneration System). 5. Billing Settlement 5.1 The payment for the purchase/sale of electricity shall be in compliance with the provisions specified in the Regulations for the Purchase of Power from Very Small Power Producers (for the Generation Using Renewable Energy). memo re solar energy development in thailand_(328363_12).doc 9

5.2 In case the Power Producer fails to make payment within the period specified in the Regulations for the Purchase of Power from Very Small Power Producers, the Utility is entitled to take measures pursuant to the Utility s announcements or regulations. 5.3 In case the Utility fails to make payment within the period specified in the Regulations for the Purchase of Power from Very Small Power Producers, the Utility agrees that the Power Producer charge for the interest of the amount in arrears at the then MLR rate charged by Krung Thai Bank Public Company Limited, as from the date of default until the payment is made in full. In this connection, the imposed interest rate shall not exceed fifteen percent (15%) per annum. 6. Force Majeure 6.1 Force Majeure denotes any event of which the happening or pernicious results could not be prevented even though a person against whom it happened or threatened to happen were to take such appropriate care as might be expected from him in his position and in such a situation, and shall include any or several of the following events: 6.1.1 acts of the government such as a change to the energy policy of the government; 6.1.2 acts of public enemies in a war situation (whether declared or undeclared), blockades, riots, insurrection, commotion, espionage, sabotage, strikes, work stoppages as stated in the labor law, any eviction, earthquakes, storms, fires, floods or explosions; and 6.1.3 interruptions in the distribution system resulting from detriments to the distribution system or any devices related to the system interconnection. 6.2 In the event that either party is unable to perform his obligations under this Agreement by reason of Force Majeure under Item 6.1 hereof, such party shall not be held in breach of the Agreement, and the other party shall not claim for any compensation whatsoever. 6.3 The party claiming Force Majeure shall: 6.3.1 notify the other party as soon as practicable of the Force Majeure, together with the detailed information of the event and the period of time necessary to cure the damages resulting from such Force Majeure; and 6.3.2 use, at its own cost, all reasonable efforts to remedy the situation as soon as possible and such implementation must be within the ability of the party. 7. Settlement of Disputes and Arbitration 7.1 Any dispute or difference arising out of, or in connection with, the Agreement or the implementation of any of the provisions of the Agreement which cannot be settled amicably shall be referred to arbitration. If no settlement can be reached by arbitration, the dispute or the difference shall be referred to a Thai court for a final decision. 7.2 Unless both parties agree in the appointment of a single arbitrator, any dispute or difference shall be referred to two (2) arbitrators. Either party shall serve upon the other a notice of intention to submit the dispute or difference to arbitration and specify the name of an arbitrator to be appointed by him. Then, the other party shall appoint the other arbitrator within thirty (30) days after receipt of the said notice. If the two arbitrators are unable to compromise such dispute or difference, an umpire shall be appointed by the two arbitrators memo re solar energy development in thailand_(328363_12).doc 10

within thirty (30) days from the date of disagreement. The umpire so appointed shall resolve the dispute or difference. The arbitration proceedings shall follow either the Rules of Arbitration of the Ministry of Justice s Arbitration Office, mutatis mutandis, or the Rules of Arbitration and Conciliation of the International Chamber of Commerce, as agreed by both parties. The arbitration proceedings shall be conducted in the Thai language. 7.3 The appointed arbitrators must have qualifications illustrating expertise in the field of development, debt financing, construction, power plant operation or power plant maintenance and shall not be employees or agents of, or advisors to either party. 7.4 Should either party decline to appoint an arbitrator, or in case the two arbitrators cannot reach an agreement regarding the appointment of an umpire, each party is entitled to refer the matter to a Civil Court for the appointment of arbitrator or umpire as the case may be. 7.5 Any decision or award given by the arbitrators or the umpire, as the case may be, shall be final, conclusive and binding upon the parties hereto. If the arbitrators or the umpire cannot settle the dispute or difference, or the notified party pursuant to Item 7.2 hereof fails to appoint an arbitrator on his side, wishing to exercise the right of institution of court action, then the dispute or difference shall be deferred to the relevant Provincial Court for a decision. 7.6 Each party shall bear the cost of his own arbitrator s service and share equally other cost of all proceedings. In case a single arbitrator or an umpire is appointed, the cost of the single arbitrator s service or the cost of the umpire s service shall be decided by the arbitrator or the umpire, as the case may be. This Agreement is executed in two identical counterparts. Both parties have thoroughly read and understood the contents hereof and have hereto appended their respective signatures and affixed their seals (if any) in the presence of witnesses. Both parties shall keep each copy of the Agreement. Power Producer Provincial Electricity Authority Signature:..... Power Producer ( ) Title Signature:... Utility ( ) Title Signature:. Witness ( ) Title Signature: Witness ( ) Title memo re solar energy development in thailand_(328363_12).doc 11

Attachment No. 2 Slides of Khun Thidarat Sawai from the Bureau of Solar Energy Department, Department of Alternative Energy Development & Efficiency, Ministry of Energy Thailand on 25 November 2014 -insert presentation- memo re solar energy development in thailand_(328363_12).doc 12