Integration of Supervisory Control and Data Acquisition Systems Connected to Wide Area Networks



Similar documents
Open Distributed EMS/SCADA System

WIDESTAR II Base Station Maintenance and Monitoring System

Wide-area Integrated SCADA System Designed to Improve Availability and Flexibility

FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW

Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System)

IPv6 Broadband Access Network Systems

Recent Technologies in Nuclear Power Plant Supervisory and Control Systems

Smart Tips. Enabling WAN Load Balancing. Key Features. Network Diagram. Overview. Featured Products. WAN Failover. Enabling WAN Load Balancing Page 1

Achieving High Availability & Rapid Disaster Recovery in a Microsoft Exchange IP SAN April 2006

Wide-Area Optical Fiber Network Monitoring and Management System

GR2000: a Gigabit Router for a Guaranteed Network

SAN Conceptual and Design Basics

Introduction to Network Management

Recent Trends of Storage System Technologies

Andrew McRae Megadata Pty Ltd.

VoIP / SIP Planning and Disclosure

Operating System Concepts. Operating System 資 訊 工 程 學 系 袁 賢 銘 老 師

Traffic Management Solutions for Social Innovation Business

Requirements of Voice in an IP Internetwork

APPENDIX 8 TO SCHEDULE 3.3

Improved Passenger Services for Local Existing Railways Uchibo Line Transportation Management System (Operation Control and Passenger Services)

Convergence of Advanced Information and Control Technology in Advanced Metering Infrastructure (AMI) Solution

TECHNICAL WHITE PAPER. Monitoring Cisco Hardware with Sentry Software Monitoring for BMC ProactiveNet Performance Management

APPENDIX 8 TO SCHEDULE 3.3

Chapter 16: Distributed Operating Systems

IT Security and OT Security. Understanding the Challenges

Integration of PRIMECLUSTER and Mission- Critical IA Server PRIMEQUEST

Deploying VSaaS and Hosted Solutions Using CompleteView

White Paper. Solutions to VoIP (Voice over IP) Recording Deployment

Redundant Serial-to-Ethernet Data Connections for Mission-critical Devices

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

Chapter 14: Distributed Operating Systems

HMS Industrial Networks

Implementation Guide. Simplify, Save, Scale VoIP: The Next Generation Phone Service. A single source for quality voice and data services.

SystemWatch SM. Remote Network Monitoring

ADVANCED NETWORK CONFIGURATION GUIDE

How To Manage A Network Management System (Hitachi)

LEASED-LINE REPLACEMENT

THE IMPORTANCE OF TESTING TCP PERFORMANCE IN CARRIER ETHERNET NETWORKS

HMS Industrial Networks. Putting industrial applications on the cloud

Hitachi Essential NAS Platform, NAS Gateway with High Cost Performance

Redundant Gigabit Backbone Adds Speed and Reliability to Industrial Networks

Contents. Connection Guide. What is Dante? Connections Network Set Up System Examples Copyright 2015 ROLAND CORPORATION

White Paper ClearSCADA Architecture

PIPELINE ENGINEERING - Pipeline System Automation and Control - C. Bruce Warren and Mike S. Yoon PIPELINE SYSTEM AUTOMATION AND CONTROL

Chapter 12 Network Administration and Support

HyperIP : VERITAS Replication Application Note

The Advantages of Multi-Port Network Adapters in an SWsoft Virtual Environment

Frequently Asked Questions

Cisco Application Networking Manager Version 2.0

Cloud Services Supporting Plant Factory Production for the Next Generation of Agricultural Businesses

secure Agent Secure Enterprise Solutions

ehealth and VoIP Overview

The ABCs of Spanning Tree Protocol

Core Syllabus. Version 2.6 C OPERATE KNOWLEDGE AREA: OPERATION AND SUPPORT OF INFORMATION SYSTEMS. June 2006

Module 15: Network Structures

Cisco IOS Flexible NetFlow Technology

Troubleshooting and Maintaining Cisco IP Networks Volume 1

WANic 800 & or 2 HSSI ports Up to 52 Mbps/port. WANic 850 & or 2 T3 or E3 ports Full-speed CSU/DSU. WANic 880.

How Do I Upgrade Firmware and Save Configurations on PowerConnect Switches?

AORC Technical meeting 2014

SNMP Monitoring: One Critical Component to Network Management

VOICE OVER IP AND NETWORK CONVERGENCE

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, Electric Grid Operations

2. IP Networks, IP Hosts and IP Ports

Technical Brief. DualNet with Teaming Advanced Networking. October 2006 TB _v02

Going Critical. How to Design Advanced Security Networks for the Nation s Infrastructure. w w w. G a r r e t t C o m. C o m

VERITAS Backup Exec 9.0 for Windows Servers

Edgewater Routers User Guide

New Technologies for Electric Power Distribution Systems

an introduction to networked storage

An Oracle White Paper June Oracle Database Firewall 5.0 Sizing Best Practices

Fault Tolerant Servers: The Choice for Continuous Availability on Microsoft Windows Server Platform

EE4367 Telecom. Switching & Transmission. Prof. Murat Torlak

Failsafe Protection for Utility Critical Infrastructure

WinClon CC. Network-based System Deployment and Management Tool. A Windows Embedded Partner

Understanding IP Faxing (Fax over IP)

Multifunctional Broadband Router User Guide. Copyright Statement

Huawei One Net Campus Network Solution

Corporate PC Backup - Best Practices

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

Clearing the Way for VoIP

CROSS PLATFORM AUTOMATIC FILE REPLICATION AND SERVER TO SERVER FILE SYNCHRONIZATION

Networking Systems (10102)

Meiden Customer Center

Transcription:

Hitachi Review Vol. 53 (2004), No. 3 169 Integration of Supervisory Control and Data Acquisition Systems Connected to Wide Area Networks Mitsuya Kato Katsufumi Watahiki Tatsuyuki Suzuki OVERVIEW: Continued evolution of networking and PC technologies has enabled better integration of control center systems and driven down operating costs. By employing low-cost-high performance PC servers, we can anticipate new load dispatching control systems implemented at substantially lower development cost. Especially in the current fluid and rapidly changing environment faced by the power industry, these new load dispatching control systems can be readily tailored to flexibly accommodate whatever operating structural changes emerge in the years ahead. These were the circumstances motivating the Hitachi Group to develop integrated SCADA (supervisory control and data acquisition) systems interconnected over WANs (wide area networks). This is the first time such a system has been developed in Japan featuring WANs-interconnected substation controller and PC servers running the Linux* 1 operating system. The new integrated WANs-interconnected SCADA systems have now been deployed at The Kansai Electric Power Co., Inc. s Tokai Load Dispatching Center. INTRODUCTION UNTIL now SCADA systems have been largely based on UNIX* 2 servers, which exchanged information with substation controller via telephone lines with *1 Linux is a registered trademark or a trademark of Linus Torvalds in the U.S. and other countries. *2 UNIX is a registerd trademark in the United States and other countries, licensed exclusively through X/Open Company Limited. proprietary protocols. But due to changes now facing the power industry, power companies have been seeking ways to push down the costs of developing and operating power networks. To address these issues it is necessary to (1) employ low cost PC servers that run Linux, (2) minimize system operating costs by adopting an Load dispatching center Local control center Local control center (backup) Fig. 1 Configuration of Load Dispatching Control System, The Kansai Electric Power Co., Inc. s Plant in Tokai Region. All operating sites are interconnected and integrated over WANs and backup systems are dispersed over a wide area. Also interconnected over WANs, the substation controller provides supervisory control information over a wide area. The main servers configuring SCADA system are PCs running Linux. Generation/substation IP: Internet Protocol Substation controller RTU: remote terminal unit Supervisory data terminal WANs IP converter Legacy RTU Backup system Supervisory data terminal Dam

Integration of Supervisory Control and Data Acquisition Systems Connected to Wide Area Networks 170 integrated type of SCADA systems, and (3) reexamine the traditional system configuration both in terms of constituent elements as the system as a whole. The Hitachi Group has developed comprehensive WANs-interconnected SCADA systems that fully integrate all the independent power control systems. While preserving the excellent reliability and processing capabilities of Hitachi s existing supervisory control technologies, the new comprehensive system combines an integrated control center system based on PC servers running Linux and substation controller connected to WANs using IP technology. Now deployed at The Kansai Electric Power Co., Inc. s plants in Tokai Region, a schematic of the new system is shown in Fig. 1. This paper details some of the issues faced and the technologies developed in implementing the new system. SPECIFIC REQUIREMENTS OF WANS- INTERCONNECTED SCADA SYSTEMS Fig. 2 depicts the configuration of the WANsinterconnected SCADA systems. Deployed over WANs, the systems consist of control center systems and substation systems. (1) systems The control center systems consist of an integrated load dispatching computer system with servers and support for client terminals in the ACC (area control center) and LCCs (local control centers) for operators. The integrated load dispatching computer system effectively integrates the various computer systems deployed at the ACC and LCCs. Processing performance and reliability are significantly improved by the integration and consolidation of system operations. The terminals in LCCs are connected to the integrated load dispatching computer system via WANs, and operators in LCCs can access real-time information using the terminals. Backup equipment is installed in one of the LCCs in the event the main load dispatching equipment fails. (2) Substation systems Substation controllers are installed in substations and generating stations. The substation controllers support RTU and communication functions. They interconnect the integrated load dispatching computer system and backup equipment over the Large-sized screen Load dispatching center Local control center backup Projector Server SCADA servers Display Display Display Operator s console Terminal Operator s console Online information server A Online information server B Backup server WANs Group A Group B Fig. 2 Configuration of WANsinterconnected SCADA systems. Substation controllers are linked to higher stations by a broadband network. Substation controller Substation/generation station HDLC: high-level data link control CDT: cyclic digital telemeter IP converter Legacy RTU Substation/ generation station HDLC CDT IP converter Communication base CDT Substation/generation station

Hitachi Review Vol. 53 (2004), No. 3 171 WANs. The substation controllers must provide the control center systems with real-time data at all times to ensure rapid switching to backup equipment and continuity of data delivery. Substation controllers will be installed in generating stations and substations in a phased deployment, so IP conversion equipment will be installed in the generating stations and substations until they are upgraded to translate conventional data transmission protocols to IP network protocols. (3) WANs WANs must ensure adequate bandwidth to transmit real-time data within a certain length of time even under heavy network traffic conditions. The WANs must also provide redundant network paths and path switching so no data is lost when a network path fails. LINUX SERVER RELIABILITY ENHANCEMENT TECHNOLOGIES It is essential that the server supporting the core functions of the supervisory control system must provide extremely high reliability and long-term stable operational support. It was to provide such a platform that low-cost Linux servers were commercialized that employ a PC server and open source Linux that has attracted so much attention as the operating system. In the rest of this section we will consider the main advantages of this approach. Enhanced Hardware Reliability Adopting a PC server with Pentium4* processor for the hardware provides a highly reliable and long operating life solution. (1) Parts for the power supply designed for long life were rated as highly reliable according to the same criteria used to evaluate computers for conventional control purposes. (2) We developed a high-performance heat pipe and upgraded the cooling system to efficiently cool the Pentium4 processor known to give off substantial heat. (3) We also developed a proprietary fault detection monitoring LSI endowed with functions to monitor the cooling fan, temperature, and power supply problems. In addition, we also added a server operation monitoring capability that greatly enhanced the RAS (reliability, availability, and serviceability) of the system. * Pentium is a registered trademark of Intel Corporation in the USA and other countries. Program Fault occurs Hardware Redundant support function Fault monitoring function Device recognition function Software operation, log function User built-in error processing Console Message output Disc Message log Fig. 3 Fault Monitoring System. The fault monitoring system detects software and hardware faults, collects detailed information about faults, and initiates user built-in error processing and recovery based on classification of faults. Fault Monitoring System The commercial Linux package that is available does not always provide notification when there is a problem. This led us to develop several accurate fault diagnosis and advance notification tools including a hardware device recognition function that accurately pinpoints the hardware part that fails and a software operating log that logs program operating states just before the software fails, making it easy to troubleshoot the problem. Fig. 3 shows an overview of the fault detection and monitoring system. Hardware and software failures are detected by the fault monitoring system, which identifies the specific part that fails and logs all data pertaining to software failures. In the event of a serious breakdown, the redundant support function automatically switches over to a backup server. A number of user built-in error processing procedures can also be run when faults are detected including restoration processing depending on the type of failure and function degeneration processing. Information detailing the specific part or location of hardware faults and program operation status is recorded to hard disk and displayed as a failure message on the console. Redundant Server Support Capabilities To further bolster the reliability of the supervisory control system, we developed a redundant support system interconnecting two Linux servers with a dedicated redundant supervisory control network (see Fig. 4). The safety monitoring system is implemented so that the suspension or interruption of communication

Integration of Supervisory Control and Data Acquisition Systems Connected to Wide Area Networks 172 Linux server Redundant support system Fault monitoring system Ethernet* LAN1 for mutual supervision Linux server Redundant support system Fault monitoring system LAN2 for mutual supervision Redundant path to monitor the servers are live or dead * Ethernet is a registered trademark of Xerox Corp. First arriving information is applied. Later arriving information is discarded. A group Operation processing AP group i-a1 1 4 B group Fig. 4 Server Redundant Support System. Two Linux servers monitor each other using redundant mutual supervision LANs. If a problem occurs on one of the systems, it is forcibly stopped and all activity is immediately switched to the standby system. with other systems is detected by the network for redundant mutual supervision. Notification of server abnormality is sent to the fault monitoring system, the faulty system is forcibly stopped by the backup server redundant support system, and operations are switched to the standby server. DATA TRANSMISSION PROTOCOL Basic Data Transmission Protocol There are two types of IPs: (1) TCPs (transmission control protocols) that deal with setting up interconnections and the reliability of data transmission, and (2) UDPs (user datagram protocols) that focus primarily on connectionless transmission efficiency. For remote supervisory control of power systems that can handle telemeter measurement, binary state data, and control request information, realtime delivery with the highest standard of reliability is critically important. Moreover, in contrast to conventional HDLC (high-level data link control) communication schemes assuming connectivity between one RTU and one control center, in the wide-area distributed topology that we are proposing, supervisory control information is provided to multiple control centers at the same time. This calls for a very sophisticated protocol supporting excellent data transmission efficiency, responsiveness, and the ability to ascertain states very rapidly. Based on a comprehensive assessment of these special requirements, we adopted UDP as the protocol for basic data transmission, and Same information sent to all control centers Both A and B s operated at the same time AP: application program i-a1 i-b1 i-a2 i-b2 Same information I Substation controllers 1 Substation controllers n Fig. 5 Schematic of Transmission Protocol. Employing substation controller using two s (A group and B group) and transmission protocols, transmission reliability is enhanced by sending the same information over two s at the same time. a scheme guaranteeing failsafe delivery of data for the application level protocol. Transmission Protocol In this section we will highlight the key features of the transmission protocol (see Fig. 5). (1) One feature that markedly improves data transmission reliability is to send the same data twice (initial transmission and follow-on transmission) simultaneously to all control centers via two separate s (a two- simultaneous transmission scheme). In addition, we adopted a protocol that coordinates traffic over the two s so that when one develops a problem or data is corrupted by a transient surge and the line is switched, no data is lost and there is no appreciable delay. (2) To make sure the continuity of incoming data is correct and that no data has been lost in transmission, a protocol is adopted that attaches a sequential number to each packet of data that is delivered. The same packet data numbers are attached to the same two streams of data that are simultaneously delivered over

Hitachi Review Vol. 53 (2004), No. 3 173 the two s, and the redundant data is efficiently handled by processing the first data stream to arrive and discarding the second data stream to arrive. (3) In order to immediately detect if data has been lost, the transmission has developed problems, or the far-side station is having trouble, devices have been implemented in all control centers that determine whether the received packets arrive within the prescribed time and in the right sequential order. When no regular data is being sent over the system, network monitoring packets are transmitted at three-second intervals from the substation controller to control centers to ensure the network is working and problemfree. (4) If a control center detects that data is missing, it sends a retransmit request message to the substation controller from which the data was sent, and the missing data is recovered and resent. In cases where missing data cannot be recovered in response to a resend request, all displayed data sent from substation controller is periodically restored so recovery is not endlessly repeated. (5) In order to efficiently transmit telemetry measurement data and the binary state data from a lower station to several control centers at the same time, the following protocols were implemented. (a) For the telemeter measurement information, transmission by exceptional scheme is adopted in which the current value is compared with the previous value at each periodic transmission and only that which has changed to exceed the prescribed bandwidth is sent. This way, the amount of transmitted data representing normal states can be reduced. (b) The timing at which the periodic information is transmitted is slightly shifted for each substation controller to avoid congestion of network. CONCLUSIONS This paper described the implementation of WANsinterconnected SCADA system using Linux servers and substation controllers. Up to now, most SCADA systems have been implemented using proprietary equipment, but here we have described a way of implementing such systems over an IP network and taking full advantage of generic, general-purpose equipment and systems while maintaining the same high standard of reliability. This system has been installed and began operating in July 2004 at The Kansai Electric Power s Tokai Load Dispatching Center. System adjustment tests were performed and it was found that the system exhibits better performance responsiveness than the conventional system while maintaining the same high level of reliability. ACKNOWLEDGMENTS We would like to express deep appreciation to the members of the Control Division at The Kansai Electric Power Co., Inc. s Tokai Branch Office for close cooperation in developing and deploying and testing the new SCADA system. REFERENCE (1) M. Kikuchi, et al., Dependable and Open Network Solutions for Power Systems, Hitachi Hyoron 85, pp. 455-458 (July 2003) in Japanese. ABOUT THE AUTHORS Mitsuya Kato Joined Hitachi Information & Control Systems, Inc. in 1980, and now works at the Control Systems Department. He is currently engaged in developing energy management system and supervisory control/ data acquisition systems. Mr. Kato can be reached by e-mail at katou@hicos.co.jp. Tatsuyuki Suzuki Joined Hitachi Engineering Co., Ltd. in 1986, and now works at the Public Control System Engineering Department, the Electrical & Digital Systems Group. He is currently engaged in developing substation controller of electric power plant. Mr. Suzuki can be reached by e-mail at tatsu@juo.hitachi-hec.co.jp. Katsufumi Watahiki Joined Hitachi, Ltd. in 1991, and now works at the Information & Control Systems Development Department, the Information & Control Systems Division, the Information & Telecommunication Systems. He is currently engaged in the development of control system operated by Linux. Mr. Watahiki can be reached by e-mail at katsufumi_watahiki@pis.hitachi.co.jp.