PLEASE REFER TO YOUR INDIVIDUAL QUOTE

Similar documents
(02) Peel Street TAMWORTH STANDARD INCLUSIONS (Residential)

CASINO VILLAGE R.V RESORT (HOMES) 01/01/2012

Defining who is responsible for items and areas in a Strata Scheme

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

A home owner s guide to rebuilding after a flood

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Building Condition Assessment Report

Building Condition Assessment Report

Estimating Database Checklist

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Getaway. On display at Hutchinson Boulevard, Byford

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

October 5, 2015 Dear Client,

Cost of Building a Typical Home The impact of using PVC and alternative construction materials in house construction

Estimated Cost of Repair

Does Wall Township require an inspection by the building department on resale of a home?

RRIO Checklist. Use of checklist: Definitions: Limitations

Chelton. Lower Level. Crescendo Builders. Chelton. Bethesda, Maryland. Elevation A. Elevation A. an award winning homebuilder

Notice to Property Owners

House Insurance Calculator Guide

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Sports Buildings: budget costs for the Flood Relief Fund

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Riva 14s Change the way you view contemporary family living. With modern style and innovative design for 14 metre wide lots, the Riva range

THE hudson 8 OLIVE YORK WAY

Inspection Item COMMENTS

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

THE VOID LETTABLE STANDARD

How to report a repair

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Internal Dry Area Finishes for Major Defects & Significant Items

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

RUSS L. ROBINSON ATLANTA COMMUNITIES (770)

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

S t e p h e n A l e x a n d e r

CHARLOTTE COUNTY Community Development Department

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Residential Inspection Guidelines

The Carriage Homes at Woodland Pond Phase III & IV

PRE-PURCHASE INSPECTION REPORT

Building Report. John Citizen. 1 Example Street Melbourne. Report Commissioned By: Property Address:

Building Permits: When are they required?

N.S.W. MASTER BUILDING INSPECTORS

Home Inspection Report

The UPLANDS at ORO VALLEY Sterling Features

Proudly Presenting Twinflower Crescent

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Open House and Home Tour Checklist

Self-Home Inspection Checklist

Repairs and looking after your home

Total Home Inspection Checklist

PLAN SUBMITTAL INFORMATION

HA5 4JX T: NEW Instruction. One Bedroom Retirement Flat for the over 60's. Greater London HA5 4JX. 523 Uxbridge Road Road

Holz Choices & Specifications

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

A Homeowner s Guide to Building Permits

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Owner Cleaning and Maintenance Checklist

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Renovation instructions

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

Water Leak 1: Intrusion Policy

NAHB PRODUCT DEFINITION

healthy homes assessment

Every Home Offers Special Features

Cost of Repair Worksheet

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri $428,500

SAMPLE QUOTE FROM: JOE THE BUILDER

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Welcome To Mallard Park

BUILDING PERMIT SPECIFICATIONS

Everything You Need To Know. Since the beginning...

5000 Series House Plans & Pricing

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood.

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

A guide to plumbing, drainlaying, and gasfitting that does not require a building consent. Superseded. Building Act 2004.

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 19 th Jan 2011)

A contractor s guide to rebuilding after a flood

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

STERLING SPRINGS. Irrigation System Front & 2 Sides Yard 9 Ceiling First Floor

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

A.C.E. Home Inspection Service St. Peters, MO (636)

Ferrier Fields, Kirriemuir DD8 5EH

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

Inspecton Report. Property Address:

BUILDING OR RENOVATING

Transcription:

STANDARD INCLUSIONS AND EXCLUSIONS SECONDARY DWELLING 16/04/2014 PLEASE REFER TO YOUR INDIVIDUAL QUOTE Inclusions Super Structure: Timber Frames including Roof Trussing and Framing, Internal and External Wall Frames, Ceiling Joists and Floor Bearers. External Inclusions: External wall options: - Weathertex 100% Australian Natural Hardwood Architectural Panels - Duratuff Vinyl Cladding Standard colour: Wicker ($1950 variation for other colours) Painting: Standard colour Dulux Hog Bristle colour exterior Weathershield paint on cladding, ($1950 variation for other colours). Roof Options: Skillion or Gable Colorbond Custom Orb corrugated sheeting over timber roof frame Rainwater control: Colorbond guttering and PVC downpipes for connection to stormwater drain or rainwater collection tank. Windows: To our selected standard sizes (Wideline) refer to standard plan. Aluminium sliding windows with fly-screens and locks rated to N2 to sta Doors: - Aluminium sliding glass doors with security screen and lock - Solid core entry door with single glass light strip - Hollow core internal doors Foundations: - Concrete footings to Engineers Specifications with 90x90mm posts. Subfloor frame is treated timber bearers & Joists fixed to steel posts. Insulation: Insulation to be done in accordance with the BASIX report. Internal Inclusions: Lining: Fully lined with 10mm CSR Gyprock plasterboard as per clients specifications or similar material to all interior walls and ceiling in living areas with Villaboard lining to wet areas.

Painting: Dulux paint to internal walls, ceiling, doors, skirting and Standard colours: Hog Bristle & Artic white for internal walls and skirting/architraves. ($1950 variation for other colours) Flooring: Bamboo flooring (tongue & grooved). Standard colour: Coffee, Red mahogany or Natural ($1950 variation for other colours). Bathroom Shower: Framed shower screen with tiled floor and walls. Shower head and taps: minimum 3 star water rating Toilet: Full ceramic close-coupled toilet suite with 4 star water rating Shaving Cabinet: Mirror faced shaving cabinet with soft close doors Vanity: Full ceramic top basin with Melamine Cabinet and Polyurethane doors Laundry tub: Stainless steel laundry tub with steel cabinet. Ventilation: - Aluminium sliding window with obscure glass; - IXL 3-in-1 heater, light, and exhaust fan Laundry: minimum 3 star rated washing machine taps Waterproofing: 2 coats of polyurethane membrane applied to all wet areas Tiling: To skirtings, splashback and full shower only Bedroom Wardrobes: Sliding mirrored wardrobe to bedrooms (max 2) Kitchen Design/size: Our standard design will be provided; any modifications or additions will be a variation. See Standard Plan Benchtop: Laminate benchtop. Colour to be selected from samples. Appliances: 4 burner cook top electric 600mm range-hood, under bench electric oven Electrical: All internal wiring to internal distribution board with safety feature. 12 Double power points, Oyster lighting to standard plan. hard wired smoke detector. Air-Conditioning: TBA Plumbing: All internal plumbing, mixer taps, floor wastes & stainless steel kitchen sink Water Heater: 80 Litre electric hot water system Splashback: 600x600 vitrified tiles

Any other item not mentioned in these inclusions, are considered a non-standard inclusion. Exclusions Section 94 contributions are not included in the price. Some Council s may require payment of contributions for Complying Development Applications. Council bonds: Bonds required by Council for construction development works Storm-water system upgrading: If required Sewer Encasement or Protection Works: If required, including any deep piering within the sewer or easement zone of influence Travel: Costs for House Logic's contractors to remote locations for installation is specifically excluded from the price. Delivery: Delivery outside Sydney Metropolitan Area will incur delivery costs. Additional works: Such as decking, pergolas, privacy fencing, paving, landscaping or incidental construction is not included but may be arranged by House Logic at the client's request and expense. External: Brick Veneer, Render and Mac render. Internal: 13mm CSR Gyprock Plasterboard Foundation: - Concrete slab to engineer specifications (all types) Roof: - Boral Concrete/terracotta tiles per clients specifications ($4000 upgrade to tiles) Demolition Works: Demolition works and removal of any rubbish and debris not from HLS that is not specified in the quotes, is not included Grading and removal of dirt: Land levelling and grading and removal of dirt is excluded unless specified in our quote. Removal of trees: Removal of any trees and roots required. Unforeseen excavation: Through rock or other underground services including the breaking of any hard surfaces, unless specifically noted on plans. Electrical Connection: Separate meter and upgrade to electrical boards and supply lines. Sewer and Water Connection: Provision included in quote is for $1,000.00 only, excess is considered a variation. Gas: Gas connection not included, cost is variable depending on existing site conditions. Timber slats: Timber slats to cover piers around dwelling (all specifications subject to change without prior notice) Any other item not mentioned in the exclusions or inclusions, is considered an exclusion and will be an additional item.

Approval Stage Prior to the Approval Stage, the client must provide a current Section 149 Certificate and Sewer diagram. We can collect these documents on the client s behalf for an additional cost. CDC Standard approval Inclusions ($8,500.00 set fee) - Detail and Contour Survey - Architectural plans & Electrical plan - Structural Plans - Storm Water plans - Long service levy payment - BASIX Report - Home Warranty Insurance - Sydney water stamping - CDC approval & OC - Coordination of all documentation for approval. CDC approval Inclusions (with encasement or sewer protection works) ($9,500.00 set fee) - Includes all of the above plus: - Sewer location report - Sydney water approval and inspection

DA approval Inclusions ($9,500.00 set fee) - Detail and Contour Survey - Architectural plans - Structural Plans - Storm Water plans - BASIX report - Home warranty insurance - DA requirements checklist - DA lodgement fee - Construction Certificate fee - Coordination of all documentation for approval. Exclusions (applies to both CDC & DA approvals) - Sewer location report - Tree/arborist report and tree removal applications - Heritage report - Easement research & documentation - Section 94 Contributions - Council fees for Road/ footpath bonds. - Sydney water approval and inspection (for encasement or sewer protection works) - Bush fire report - Flood zone report / documentation - Section 149 Certificate - Sewer Diagram - Pre Da-Lodgement Meeting fees Please note: Once the Architectural plans have been accepted and signed by the client to progress to the Structural and Hydraulic engineers, any changes after this point will incur additional fees for changes/additions at the customer s request. Any extras & Additions to the scope of works stated on the signed quote will be considered a variation.