Project Delivery Methods & Contract Types CSTM 102 Spring 2013



Similar documents
REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

Program Management for School Construction

Evaluating Project Delivery Options

AN OWNER'S GUIDE TO PROJECT DELIVERY METHODS

Construction Delivery Methods for Texas school districts

1.040 Project Management

The programming, design

BRG Look Back Study. November 30, 2015

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel

School Construction Projects

Construction Contract Fundamentals. Baker Tilly refers to Baker Tilly Virchow Krause, LLP,

Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD

Project Procurement Management

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

CM/GC Guidelines FOR PUBLIC OWNERS. A Joint Publication Building Your Quality of Life. AGC Publication Number 2912 NASFA Publication Number F-3007

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida

Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

Contracting Practices in Mega Projects

PROJECT MANAGEMENT BASICS

The Construction Management Delivery System An Architect s Point of View

A Guide to Building Delivery. Ready, Set, Build.

Project Organization. System and Project Management 1.040/1.401J Nathaniel Osgood

COMMUNITY LIBRARY (SUNBURY) RFP for Construction Manager at Risk

Construction Management At-Risk

AN OWNER'S GUIDE TO CONSTRUCTION AND PROGRAM MANAGEMENT. Enabling Project Success Under Any Delivery Method

An Owner s Guide To Construction Management Assuring Project Success Under Any Delivery Method

Fundamentals of a Construction Audit. August 7, 2014

Project Procurement Management

Policy Number: Policy Name: Professional Services and Construction Services Procurement

Oregon Public Contracting Coalition Guide to CM/GC Contracting

Design-Build Options for Public Projects

Eanes Independent School District

iowa school construction best practices

Construction Activity: Audit Strategies

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

Major Changes to Public Contracting and the CM/GC Delivery Method

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

Lessons Learned/Best Practices: Case Study- Design-Build at SFO

Contract Administration

ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS

Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering

CM at Risk. process of design-bid-build as an established method of project delivery. a 3D/International essay

Pricing of Construction Contract Change Order Documentation

CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid

Advanced Water Treatment Facility Alternative Project Delivery A Better Way

Commissioning Large Public Projects Using Construction Manager at Risk

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO

Professional Practice Commission: March Alternative Project Delivery Systems

Lease-Leaseback 201:Lessons Learned in Dancing School. Our Agenda

CONSIDERING GC/CM There are some benefits and risks to using GC/CM. Departments should consider these carefully.

Schedule Acceleration Techniques Using a CM

Estimating Activity Durations CSTM 462

Owner s project control review Baker Tilly Virchow Krause, LLP

Appendix 18 NEC3 Options

Construction Management/ General Contractor Alternative Contracting Process

DESIGN IS GOOD BUSINESS

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS

REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS (SOIQ) FOR ARCHITECTURAL SERVICES Provo City School District

REPORT TO THE UTAH LEGISLATURE. A Performance Audit of School Building Construction. November Number Audit Performed By:

Project Management Manual for Design and Construction Projects. (Revised August 2010)

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR

Quick Guide to Cost and Price Analysis for HUD Grantees and Funding Recipients

CONSTRUCTION MANAGER AT RISK

OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES

PROJECT PROCUREMENT MANAGEMENT

Procurement Routes. Curtin University of Technology

C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director

Construction Management & Engineering CIEG

Construction Practice Group

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

CHAPTER 2 CONTRACT STRATEGY

Christopher Noble, Negotiating Owner-Architect Agreements: Theory and Practice (revised February 2011)

NUCLEAR SUPPLY CHAIN SYMPOSIUM

Cash flow is the life line of a business. Many start-up

CONSTRUCTION & DESIGN AGREEMENTS FOR OWNERS. Presented by ALEXANDER F. FERRINI, III

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Construction Management

Community Program Directors, All Community Facilities Staff, State Architects and Engineers

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Construction Management Standards of Practice

Doniphan-Trumbull Public School BP Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

How To Get Construction Procurement Services

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

5. Whether the timely completion of the project is critical to the university s ability to repay debt service or to meet grant obligations.

Request of Qualification Proposal for Construction Management Services

How to get value for money from service providers on major projects

Building Capital Projects in Tough Times John Lynch, State of Washington

RFQ NORTHSTAR AUDITING SERVICES ADDENDUM NO. 1 REF. LOCATION DESCRIPTION OF CHANGE. Revised Scope of Work. Work tasks have been revised.

Transcription:

Project Delivery Methods & Contract Types CSTM 102 Spring 2013

Schedule February 16- Building Information Modeling February 21- Midterm Review February 23- Midterm

In the industry the term Pre-Construction Services is utilized when defining the first five stages of the project life cycle. Pre-Construction Services 1. Project Conception 2. Project Delivery 3. Design 4. Construction Documents 5. Bidding/Negotiating/Procurement This is where the industry and owners are beginning to see an opportunity to increase the success of the project by the integration of design and construction throughout these stages of the project life cycle.

Al look at the preconstruction design phase Project Concept Project Delivery Design Schematic Design (SD) Design Development (DD) Contract or Construction Documents (CD)

2. Project Delivery Project Delivery is the process by which all of the procedures and components of designing and building a project are organized and put together in an agreement that results in a completed project. The Owner s approach to organizing the project team that will manage the entire design and construction process. Project Delivery is the contractual relationships between the owner, architect/engineer (A/E), contractor(s), and the management services utilized to design and construct a project.

Contract Types In addition to choosing a delivery system for a project, the owner must decide what type of contract to use. A contract is simply an agreement between two or more entities in which they agree to provide a specific task in exchange for something in return. The contract type basically is the format on how the owner pays for the services of the contractor.

What You Need to Know The Traditional Delivery Method- Design-Bid-Build Design-Negotiate-Build The Construction Management Delivery Methods The Design/Build Delivery Method Contract types Lump Sum or Fixed Price Unit Price Cost Plus Fee Cost Plus with a GMP

Project Delivery Methods Many factors will effect the method selection such as: Owner s experience, qualifications and capability The magnitude, form, function and complexity of the project. Time is of the essence. Sequencing of the project. Establishing the project timeline. Fast-tracking utilizing multiple contractors or contracts to condense the project timeline. Cost /Budget/ Other Financial Challenges

Project Delivery Methods and Services Traditional Design-Bid-Build Design-Negotiate-Build Construction Management As Owner s Agent CM at risk (CM>GC) Design-Build

The Traditional Method- Design-Bid-Build The Design-Bid-Build method is most common. The Owner first contracts with a Design Professional who provides the design. The basis of this delivery method is that design is completed prior to bidding/pricing and construction. Competitive bidding is a a method of determining the least cost for accomplishing the scope of work defined by the bid documents. Once the design is complete, the Owner contracts with the Builder who provides the most responsive competitive bid for construction.

Traditional Method- Design-Bid- Build Owner Architect/Engineer General Contractor Design Consultants Subcontractors Craft Workers Suppliers/Vendors

Traditional Method Well defined relationships, procedures and rules of conduct have been worked out and understood. A known quantity. Lots of experience in this method by all parties. The risk of cost increases depends to a large extent on the accuracy and completeness of the work scope and contract documents. The actual construction price of the project is not known until all bids are received. No collaboration from the contractor. Normally design-bid-build with a specific timeframe. This does not allow for fast tracking the project. This process is inherently adversarial. Price is based on a specific scope of work. If the documents are poor or scope of work is undefined then the potential for change orders is extreme. This can lead to contract problems and litigation.

Design-Negotiate-Build Same structure as Design-Bid-Build usually the design is complete before negotiations. The contractor may be selected on other factors than low price including qualifications, expertise, reputation and timeline. This negotiating process allows both parties to work together on issues including design, product selection, project phasing, optimum constructability, scheduling and budgeting. Cost is not usually the primary consideration for selection but the firm s history of successfully completing complex projects on time which will usually mean an ultimate savings of money and time with collaboration and working together.

Design-Negotiate-Build Limitations The lowest cost may not be obtained due to the absence of competition and inflated prices. Negotiated contracts are rarely used for publicly funded projects because laws are requiring competitive bidding to protect the public s interest. In this method the final price may be negotiated on partial information. Modifications to design documents after the price is negotiated may lead to cost increases or the project scope may be reduced. These modifications are sometimes referred to as scope creep. By negotiating agreement, the owner becomes financially committed to the project without knowing the total cost. More known's by selecting a contractor.

Construction Management As Owner Agent As GC Allows construction input during Pre- Construction. The Owner pays the contractors directly, the CM acts as the Owner s agent. Allows construction input during Pre- Construction Can be called CM/GC. Usually proposes a guaranteed maximum price (GMP) on a scope of work. Sometimes called atrisk construction management.

Construction Management As owner s agent Owner Architect/Engineer Construction Manager Contractors Subcontractors/Vendors

Construction Management At-risk, CM/GC Owner Architect/Engineer Construction Manager CM to GC Subcontractors/Vendors

Construction Management Approach Good communications among owner, designer and CM firm is established early in the project. Usually involve multiple contracts or fast-tacking or complex projects that require intense professional management. Knowledge of construction, systems costs and scheduling is utilized during the design phase. Good opportunities for cost savings and value engineering by having construction expertise involved early. The Owner receives the cost benefit of the competition among the subcontractor and supplier bids. Good communication leads to a less difficult change process. This delivery system requires the project team to share responsibilities where trust, proper ethics and a cooperative environment is a must. Its important you have a strong CM/Design Team the advantages of this method can turn to the disadvantages fast.

CM/GC approach becoming popular The CM/GC approach assumes one entity, manages all facets of the construction effort including preconstruction services. During pre-construction the contractor is a CM and converts to GC after the guaranteed maximum price is decided upon. The firm could subcontract, on a lump sum or cost plus basis, work that the Client feels is suitable for local hire such as specialty subcontracts (painting, insulation, HVAC, refractory, grading/paving and site development).

The Design-Build Method A single entity provides both design and construction of the project. The Design-Builder is obligated to meet the design criteria and performance requirements specified in the bidding documents. On a design/build project the contractor and designer work together to serve the Owner on cost, schedule and scope of work. Ability for fast track/phased construction. Three types of design-build entities Contractor Led (subcontract design or joint venture) Designer Led (subcontract construction or joint venture) A single firm with both capabilities internally

Design/Build Owner Design-Build Firm Design Consultants Subcontractors Vendors/Suppliers

Design-Build is not a new concept! A long history of Design-Build! The Master Builder Egyptian Pyramids The Dome of the Cathedral in Florence, Italy The Renaissance The Dark Ages The 1900s Separation/Limit Liability

Why Design/Build? Ability for fast track/phased construction. Higher quality projects. Reduction of claims and litigation against owners. Identification of costs early. Better relations and communication, more Contractor involvement throughout the process. The design-builder provides only the necessary documentation to build the project efficiently.

A Main Difference in Design-Build The contractor is responsible for the risk of design in their contractual relationship with the Owner.

Design-Build in the Public and Private Sectors New issues to deal with. Scope development and the selection process. The need for new documents. The differentiation of design and construction. Legal and professional issues. Owner expertise. Public and federal procurement rules and policies. Insurance/Bonding/Indemnification/Limits of Liability.

The Design-Build Institute of America predicted that by 2005, 55% of private commercial projects will use design-build method. Not so but alternate delivery systems are becoming much more common in the industry.

The bidding process may change with each project delivery method but each one will select one of the below bid processes. The Competitive Bid Process Open Bid Select Bid List Negotiated Bidding Selection Process Trust

Trends Traditional delivery leads to more problems regarding cost overruns and disputes. A large majority of large military projects are now design-build. Many public companies are going to CM/GC or GC/CM contracting. Design-Assist -new terminology Mechanical Exterior Cladding New Rules Changes due to Building Information Modeling

Advance Topics Crossing Over Boundaries Constructability/Value Engineering Multiple Delivery Methods in a project Example Mechanical Systems- HVAC Sole Source Responsibility Design Assist Design-Build-Maintain Capital Cost vs. Life Cycle Analysis

Contract Types In addition to choosing a delivery system for a project, the owner must decide what type of contract to use. A contract is simply an agreement between two or more entities in which they agree to provide a specific task in exchange for something in return. The contract type basically is the format on how the owner pays for the services of the contractor.

Contract Types Fixed price or lump sum- The contractor agrees to provide a specified amount of work (known as the scope of work) for a specific sum. Cost plus a fee- The contractor is reimbursed for their costs and receives a agreed upon fee. A GMP (guaranteed maximum price) may be added to the contract. The contractor may share in savings if provided in the contract. If the contract amount goes over the contractor is responsible for the overage. Time and Materials- Specific labor rates are agreed to and charged out based on the work accomplished. Materials are reimbursed with an appropriate mark-up. Unit Price or Rate- The owner and contractor agree on the price to be charged per unit for the major elements of the project.

Contract Type Examples Fixed Price/Lump Sum Based on a scope of services a lump sum or fixed amount decides the value of the contract. Cost Plus Fee Cost Plus is the accumulation of actual costs expended on the project plus an appropriate fee to cover overhead and profit for the contractor. Cost Plus Fee GMP The GMP (Guaranteed Maximum Price) sets a not to exceed price. If the accumulation of actual costs goes over the GMP the contractor pays. If it goes under the contractor may share in savings based on the contract.

Contract Type Examples Time and Materials Carpenter $50.00 per hour X 400 hours= $20,000.00 Laborer $30.00 per hour X 100 hours= $ 3,000.00 Backhoe $45.00 per hour X 100 hours= $ 4,500.00 Lumber Invoice $1500 X.15% markup = $ 1,725.00 Total Project $29,225.00 Time labor rates are based on an hourly rate per worker or piece of equipment used which includes all associated costs for providing labor and equipment. Overhead and profit is included in the labor and owned equipment rates. Material is invoiced cost plus a markup or fee.

Contract Type Examples Unit Price or Rate Gravel 5000 tons @ $10.00 per ton= $ 50,000 Asphalt 8000 tons @ $ 8.00 per ton= $ 64,000 Concrete Barriers 1500 CY @ $100.00 per CY= $150,000 Drain Pipe 1000 LF @ $ 10.00 per LF= $10,000 Total Price $274,000 Used primarily in Heavy/Civil/Highway construction. Unit prices include all associated costs for project. Overall scope is based on those target quantities agreed to by the Owner and Contractor. Any major change in quantities may require renegotiating unit prices. The unit rates include all overhead and profit for the project.

Types of Contracts All Companies Industrial & Nonresidential Heavy & Highway Specialty Trades Fixed Price 61% 56% 47% 74% Cost Plus Guaranteed Max 14% 28% 1% 4% Cost Plus Fee 5% 7% 2% 3% Time and Materials 7% 3% 6% 13% Construction Management 2% 55 0% 1% Unit Price 10% 0% 43% 5% Other 1% 1% 0% 0%

What You Need to Know The Traditional Delivery Method- Design-Bid-Build Design-Negotiate-Build The Construction Management Delivery Methods The Design/Build Delivery Method Contract types Lump Sum or Fixed Price Unit Price Cost Plus Fee Cost Plus with a GMP

Project Delivery sets the Rule Book The Construction Documents are the rules to play by. The Contract Plans and Specifications