Gas Explosion at a Subway Construction Site



Similar documents
Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.

AIR-CONDITIONER SPLIT TYPE

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

How To Safely Dig For Natural Gas

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

National Transportation Safety Board Washington, DC 20594

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy

APPENDIX. The Nagasaki Atomic Bombing

EMERGENCY PREPAREDNESS

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

December Newsletter by Vincent Dunn Backdraft and flashover, what is the difference?

COMBUSTIBLE DUST EXPLOSIONS

The Current Situation and Circumstances Regarding the Great Earthquake Damage

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

Masahiko Kunishima, Takehumi Sato (note of 1)

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

Installation Manual. BYD Wall-mounted AC Charging Box

Eric Six Heath Consultants Incorporated

Leakage Detection Using PLUMBOAT

Preventing Overheated Boiler Incidents

Meeting the Challenge of Pipeline Emergency Repair

Final Report on the Study on Safety Management for Construction Work in Japanese ODA Project. Workers Training Materials for Hazard Prediction

ALMATEC Series CX CX 10 CX 130

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

METHOD OF STATEMENT FOR STATIC LOADING TEST

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

THE ENVIRONMENTAL CRIMINAL JUSTICE IN CHINA

Your Boiler Room: A Time Bomb?

Maintenance and Management of JR East Civil Engineering Structures

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

FUJI DIGITAL SOUND DETECTOR FSB-8D INSTRUCTION MANUAL

BARRIER LIFT SYSTEM 2 BARRIER LIFT SYSTEM

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION

EMERGENCY MESSAGE TEMPLATES

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station

The right cover for your individual circumstances

THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY

Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español

Compressed Gas Cylinder Storage and Handling Guide

Oil and Gas Pipeline Design, Maintenance and Repair

HAZARD RISK ASSESSMENT

Reporting dangerous goods incidents. Guideline (6th edition)

ISO IEC ( ) INFORMATION SECURITY AUDIT TOOL

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Holiday Home Insurance PROPOSAL FORM

A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS

Development of Seismic-induced Fire Risk Assessment Method for a Building

Traffic accidents in Hanoi: data collection and analysis

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Optimum proportions for the design of suspension bridge

Motor Vehicle Fatalities Accepted by the Workers Compensation Board

Accidents - how to deal with them

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Safety issues of hydrogen in vehicles Frano Barbir Energy Partners 1501 Northpoint Pkwy, #102 West Palm Beach, FL 33407, U.S.A.

HOUSE BUILDING DIGEST

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

hs2 Ground A non-technical guide

Fire Safety In High Rise Building

Chapter 4 Crimes (Review)

NEW YORK STATE BAR ASSOCIATION. LEGALEase. If You Have An Auto Accident SAMPLE

FLAMMABLE LIQUIDS COMPLIANCE NOTE

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

SECTION 8 Industrial Facilities Field Investigation

This instruction is valid for all ACD pump models shown on page 2

GUIDELINES - Gas Inspection Regulations 1. Recommendations for camping site owners

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

FLA S FIRE SAFETY INITIATIVE

APPENDIX J GAS DISTRIBUTION

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

WHAT TO DO Immediately After Being Involved in an Auto Accident

ABOVE-GROUND STORAGE TANKS

Lessons from Offshore Accidents

Emergency Preparedness Guidelines

Part of Your Community Important Safety Information. TransCanada - Bison Pipeline

10 Victims and the law 57

Free piston Stirling engine for rural development

Wafer Check Valve ASAHI AV VALVES. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Workplace Incident Fatalities Accepted by the Workers Compensation Board in 2014

PET-10 INSTRUCTION MANUAL PRESSURE TANK

FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER

orlando OWNER S MANUAL

PROPOSAL FOR CONTRACTORS ALL RISKS

Gas Meter Clearances and Service Installation Requirements

ITS specification Jointing chambers and pull pits (ITS-02-02)

Resource Piling Large Load Tests using a Reaction System

Adjustments for the Active Pneumatic Vibration Isolation Table during Final Installation (File version 6)

Maintenance and Service Instruction

Factors to Consider When Developing an Evacuation Plan

R&D on Oil-Burning, Environment-Friendly, High-Efficiency Boiler

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

Transcription:

Gas Explosion at a Subway Construction Site Apr. 8th, 1970, Osaka city KOBAYASHI, Hideo (Tokyo Institute of Technology) (Summary) On April 8th, 1970, a huge gas explosion occurred at the site of construction for elongation of Osaka city subway line No.2 (Tanimachi line). The gas was leaked out of a detached joint for a drainer on the medium pressure piping, which was under construction for suspension. The gas was filled in the tunnel, ignited, and exploded violently creating a fire pillar of over 10m in height, and causing cover plates over to scatter over an area 200m in length (Figures 1, 2, and 3). The explosion resulted in a terrible accident (so-called Tenroku gas explosion accident), with 79 persons dead, 420 persons injured and 495 houses and buildings burned and destroyed. Almost all of the victims were bystanders having no direct relation to the construction work. The causes of the accident were believed to be a decrease of the joint strength by the weight of passing traffic vehicles together with the influences of the construction work itself. Furthermore, no measures were taken against drawing off the joints. Because most of victims were bystanders, this accident had a large social influence, and it left various precepts as a municipal disaster that was produced by the tremendous boom of municipal development in an age of high economic growth. 1. Event At the site of construction for elongation of Osaka city subway line No.2 (Tanimachi line), the suspending work had been conducted in the underground for the exposed pipes of medium and low pressure gas (Figures 4 and 5). A joint of the drainer for the medium pressure pipe became detached, and that caused gas to blow out, ignite, and then explode violently (Figure 6). Results of fault tree analysis are described below. Figure 7 - Fault tree diagram based on morphology, mechanism, and process of the destruction. The possible causes of the gas leak are considered to be rupture, draw out, crack, or opening of the pipe. Results of investigation after the accident showed that a joint of the drainer for the medium pressure pipe was drawn down, and that was assumed to cause the leak of gas. The same type of the drawn joint had an initial strength that was rated against an inner pressure of about 8 tons, however, the detached joint could not resist an inner pressure of even 1 ton. The cause of this change in the strength of the joint could be one or more of the following; (1) the strength of the joint had decreased, (2) no measure was taken to prevent the drawing off the joints, and (3) the construction work on the day of the accident formed a suspending condition of the pipe. These complex conditions caused the drawing down of the joint of the pipe. Cause (1) of the decrease in strength of the joint was considered to be the result of the following three factors, initial defects, gradual degradation over time by the traffic load, and influences from the construction work of the subway. The possibility of initial defects that were formed when the joint buried 1

under the ground, was estimated by considering the working situation and procedure of the burying process as well as the burying conditions at that time. The gradual degradation of the joint strength was considered to be important because of the shallow depth at which he medium pressure gas pipe was buried that caused it to suffer from vibration and subsidence by the passing traffic vehicles prior to the start of the construction work on the subway. After beginning the subway construction work, repeated excavation and burying in the area for the experimental drilling and covering was estimated to exert a larger influence than the traffic loads even though the period was much shorter. The source of the ignition was regarded at first to be an emergency vehicle, which caught fire at the site of the gas leakage. However, because the fire of the emergency vehicle continued for about ten minutes, the concentration of the gas mixture in the upper part of the pit just below the fire was believed to have already exceeded the limit of combustion, so that there was no fear of catching fire. Otherwise, the fire in the emergency vehicle should have occurred at the same time as the ignition of the explosion. The explosion occurred at near the center where the emergency vehicle that had caught fire located. However, the ignition point does not always coincide with the center of explosion because of a phenomenon by which the flame caused by the ignition propagates in the mixed gas before the explosion. From the reasons mentioned above, it is difficult to consider that the emergency vehicle fire was the source of ignition. There were many other potential sources of ignition around the site. The ignition source was considered to be one of those other potential sources except the emergency vehicle. Results of event tree analysis are described below. Figure 8 - Event tree diagram for the explosion and the leak of gas by drawing off the joint. The fastening strength of the gas pipe was decreased by an initial defect that had occurred immediately after the burying work. Furthermore, the joint strength degraded gradually over time from vibration and subsidence caused by the traffic loads, and finally the joint strength decreased rapidly as a result of the influences of the subway construction work. The pipe was exposed in hanging condition during the construction work. The decreased joint strength could not resist the inner pressure because there was no prevention against drawing off. Then the joint was drawn off, and caused the gas leak. The explosion occurred as a result of some unidentified ignition source. 2. Course The medium pressure gas pipe, the joint of which was drawn off in the accident was installed in May 1957. The construction work of the subway was conducted by the open-cut method, one of the methods for digging tunnels. The procedure of the open-cut method is as follows. First, steel piles are hammered along both sides to form walls. Then, the steel piles are bridged with H-shaped steel bars, upon which covering plates are placed to minimize the traffic disturbance on the roads. Finally, the area between the walls of steel piles is excavated from the ground surface. In this construction work, a tunnel of 11m in width, 5m in depth, and 225m in length was excavated along the north side of a road of 26m in width, and covered with covering plates (2m in length, 75cm in width, 20cm in thickness, and 380kg by weight) which were made 2

of concreted steel frames. The gas pipe, a total of 200 m in length, had two traversing points at both ends forming right angles bends. On the morning of April 8, the soil under the north corner of the traversing point was removed causing the entire length of the medium pressure gas pipe including the traversing points to be suspended, making it easy for pipe to move near the traversing point in a horizontal direction. At about 5:15 pm, 27 workers under suspending work for the exposed pipes escaped from the tunnel to the surface because they noticed the gas that blew out suddenly. At 5:20 pm, a patrol car of the gas company, on the way back to the base by chance, also found the gas leak by chance, and took communications by wireless with an emergency car and a repair car to call out. Fire trucks also arrived by dispatch from stations around the site. At that time, the gas blew out from cracks, 20m in length, between the cover plates. Fire men requested all residents and bystanders in the area to evacuate and avoid using fire. At 5:39 pm, when the emergency car of the gas company started its engine over the cover plates, the car caught fire, and then the gas blowing from the cracks also ignited. The fire gained force gradually, and at 5:47 pm, a huge explosion with a fire pillar of over 10m in height occurred, causing the cover plates to scatter over an area 200m in length. The injured persons and the cover plates fell down to the ground, and the fire pillar expanded to the surrounding houses on both sides. 3. Cause The strength of the joint had decreased by multiple causes including initial defects, gradual degradation with traffic loads, and influences from the construction work for subway. Construction work related personnel should have estimated the decrease of the joint strength, even though the failure may not been anticipated. Therefore, the basic cause of the accident was attributed to the lack of measures taken to prevent the drawing off of the joints. 4. Immediate Action When a large gas leak happens, construction work related personnel must inform not only the gas company, but also the fire station and the police station. Depending on the place and situation of the gas leak, the personnel must announce to persons in a wide area that persons and cars are not to enter the site and they must inform people around the site that the use of fire is prohibited as soon as possible. Furthermore, they must order the neighboring residents to take refuge in a safety area. The victims of this accident included a crowd of curious spectators for the first gas leakage, who did not realize that they were standing on the cover plates. In order to avoid such a tragedy, persons around the site must be ordered to take refuge in a safety area. 5. Countermeasure Taking opportunity of the accident, the Gas Service Act, 77th and 78th articles, "Protection of gas pipe exposed by excavating" was legislated. The act contained the following stipulations. Confirm that sand and soil at both ends of an exposed pipe have no possibility of collapse. 3

Take suitable measures to prevent leakage. Take measures to absorb and to disperse the expansion and contraction of the pipe by the change of temperature. Take measures to shut off the gas in an emergency. 6. Knowledge Consider the possibility of defects: This accident occurred because of no one had considered the possibility of a defect causing the decrease of joint strength. Construction work related personnel should take actions based on consideration that old facilities used for a long time might have some number of defects. It should be remarked that routine actions considered to be safe in ordinary circumstances might in fact be quite dangerous unknown to anyone. Recognize the dreadfulness of urban civil engineering works. 7. Sequel In regard to the criminal responsibility of the accident, the accused side, that is, the constructor, Osaka-city, and Osaka Gas Company, was tried with the procurator side in criminal court. The judicial decision, given fourteen years later, judged a responsibility of negligence on the part of the accused side. At that time, a series of judgments of "not guilty" had continued in the criminal trials on urban disasters. This judgment changed the trend of criminal trial and became an epoch-making decision to recognize anew the importance of safety. The judgment concluded that the accident was the joint responsibility of the accused three juridical persons for not applying an appropriate preventive draw off measure that would have been an effective method for preventing the accident. 8. Information Source (1) On the Liaison Office for Accident of Gas Explosion at Osaka, May, 1970, Gas Section, Department of Public Utility service, MITI. (2) Information about Cases of Serious Accidents, The Japan Gas Association. 9. Primary Scenario 01. Poor Value Perception 02. Poor Safety Awareness 03. Lack of Safety Measure 04. Organizational Problems 05. Poor Management 06. Poor Management for Work 07. Production 4

08. Hardware Production 09. Construction Work for Subway 10. Open-cut method 11. Suspension of Gas Pipe 12. Regular Operation 13. Nonobservance of Procedure 14. No prevention against Drawing Off 15. Malfunction 16. Poor Hardware 17. Decrease of Joint Strength 18. Failure 19. Fracture/Damage 20. Drawn Off Joint for Drainer 21. Secondary Damage 22. External Damage 23. Leak of Gas 24. Explosion 25. Bodily Harm 26. Death 27. Bodily Harm 28. Injury 29. Damage to Society 30. Social System Failure 31. Burned Down of Houses 5

Fig. 1 Spot of gas explosion accident. 6

Fig. 2 Appearance of fire by gas explosion. 7

Sakaisuji-line Kokubunji-2chome Tenroku-cross Tanimachi-line Tenjinbashi-suji-6chome St. Kokubunji Starting spot of accident Accident spot Miyakojima-dori Kanei-cho Fig. 3 Rough sketch of accident spot. 8

Drawing off part Drainer for medium pressure gas Drainer for high pressure gas Hanging bolt Piping for medium pressure gas (300mm in inner diameter) Piping for low pressure gas (500mm in inner diameter) Sleeve Sleeve Cable duct Fig. 4 Appearance of piping for city gas. 9

Fig. 5 Imaging sketch of hanging situation. 10

Pressing ring Rubber O-ring Lead O-ring Jute Fig. 6 Connecting method for piping. 11

Gas explosion or Gate Ignition souse Gas leakage or Gate Others Fired car or Gate Burst Drawing off and Gate Crack, Opening mouth No prevention against drawing off Hanging in space Decrease of joint strength and Gate Initial defect Degradation on time by traffic load Influence by construction work for subway Fig. 7 Fault tree diagram based on morphology, mechanism, and process of the destruction. 12

Gas piping Initial defect Degradation on time by traffic load Influence by construction work for subway Hanging in space No prevention against drawing off Yes Ignition souse Yes Result Explosion Yes No Leakage Yes No Decrease of joint strength Yes No Decrease of joint strength Yes No Decrease of joint strength No Decrease of joint strength No Soundness Fig. 8 Event tree diagram for the explosion and the leak of gas by drawing off the joint. 13