Contract awarding procedures and building costs



Similar documents
Provisional Measures for Construction Project Management

Copyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see

Information event for consulting companies on 27 September 2010 at GTZ (now GIZ) Open questions Notes Suggestions

PUBLIC WORKS CONCESSIONS AND SERVICE CONCESSIONS ANNUAL REPORT ITALY. (June 2011) Prof. Francesco GOISIS

Introduction Building project management

BANKA SOCIETE GENERALE ALBANIA

CO2-PERFORMANCELADDER

Request for Proposals for consulting services: Independent review of the ICANN Address Supporting Organization (ASO)

Financial Deal Management as Key to Success in the IT Outsourcing Business

BANKA SOCIETE GENERALE ALBANIA

AN ANTITRUST PRIMER FOR PROCUREMENT PROFESSIONALS

How To Write An Integrated Construction Project

INCENTIVE STRUCTURE IN PUBLIC DESIGN- BID-BUILD TENDERING AND ITS EFFECTS ON PROJECTS

BANKA SOCIETE GENERALE ALBANIA

School Construction Projects

BANKA SOCIETE GENERALE ALBANIA

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no.

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents

BANKA SOCIETE GENERALE ALBANIA

Third EU Health Programme

REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT

PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)

(1) risks should be allocated to the party that is in the position to control them and

Comparative Study on Quality Assurance of Construction Project in Taiwan and Japan

Higher Education Information Systems and the Agency of Science and Higher Education

Risk of coverage gaps in commercial insurance contracts

Assignment of Consultants

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:

CREATIVE EUROPE ( )

CHAPTER 2 CONTRACT STRATEGY

APPLYING BEST-PRACTICE PRINCIPLES IN PROCUREMENT A REFRESHER

2. Theme Information Technology Procurement

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES

THE ASSESSMENT OF GRADUATE PROGRAMS IN ART AND DESIGN. National Association of Schools of Art and Design

INTERNATIONAL INSOLVENCY INSTITUTE

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

Inter university use of tutored online courses: an alternative to MOOCs

Selection Criteria for External Auditors

Project Implementation: Procurement & Contract Management. April 2012

ICAO Procurement Process Briefing

BANKA SOCIETE GENERALE ALBANIA

Interior Design Excellence. Team-Oriented Client Solutions.

Structuring of Investment Managed Accounts for Alternative Investment Funds

Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program

TKS. TKS Unternehmensberatung und Industrieplanung GmbH. Unternehmensberatung und Industrieplanung GmbH. Company Profile


Improving self-regulation through (law-based) Corporate Data Protection Officials *

Knowledge management in construction companies oriented on project success factors

Preventing Corruption in Development Cooperation Checklist for Self- Evaluation

BANKA SOCIETE GENERALE ALBANIA

Competition policy and Law in Nepal.

Community Program Directors, All Community Facilities Staff, State Architects and Engineers

Building Capital Projects in Tough Times John Lynch, State of Washington

PROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) 2018: CALL FOR TENDER PROCESS. An Overview

The Oil & Gas Fiscal Regime in Mexico. Energy and Natural Resources Group Tax and Legal

ANNOUNCEMENT CALL FOR PROPOSALS OPTOELECTRONIC COMPONENTS and SYSTEMS for SMART PRODUCTION, COMMUNICATION and MEDICINE POLAND - BERLIN

Appendix 23. Sample of Invitation Letter for Submission of Fee Proposal for Acting as a Project Consultant for Maintenance and Improvement Works

NHSWHITE PAPER. GPC guide to the. NHS White Paper. Legal overview and guidance on the commissioning proposals STANDING UP FOR DOCTORS.

Speaker: CHRISTOPHER WADE, Chief Engineer, SWECO International, Stockholm, Sweden l, and Chairman of FIDIC Contracts Committee

HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical Devices 2012/S

Property Management Service Level Agreement

Client Skills: Skills required by Government as the Construction Industry Client

A BIM Case Study: SELCEN Mimarlik

Inventarisatie toepassing EU btw-regelgeving op hoveniersdiensten

SAFETY REVIEW NOT SPECIFIED IN CONTRACT

Handbook No REV 2 CHAPTER 6. SEALED BIDS

Procurement Routes. Curtin University of Technology

Data Centre Construction. Paul Jayson - Partner 20 March 2012

Department of Construction Management

UK-London: IT services: consulting, software development, Internet and support 2011/S CONTRACT NOTICE. Services

Trading policies and compliance programs as the instruments of antimonopoly risks management in Russia

Nachhaltig gute Wohnqualität

Study of the Importance and Applicability of the Factor "Mark-up in the Budgeting of Construction

Compensation for personal injury in road traffic accidents in Sweden. (Compensation based on the Swedish Law of Damages)

CONTRACT MANAGEMENT ACTIVITIES

CABINET 17 JANUARY 2012 MERGER/ACQUISITION OF RIDGEWAY PARTNERSHIP NHS TRUST

WEBRU STAAL. Partner for delivering all types of buildings / industrial buildings.

We create advertising content for real estate sales and marketing, helping to promote objects that are not built yet. We provide real estate

II. Contract conclusion, contracting parties, limitation of contractual liability and limitation period

SERVICE CONTRACT NOTICE. Development of a sustainable information system for MAFWM Location - Serbia

Samsung Engineering Co., Ltd.

External aid programmes - Service contract - Contract notice - Restricted procedure

EFFECT OF PROCUREMENT SYSTEMS ON THE PERFORMANCE OF CONSTRUCTION PROJECTS

The programming, design

Consultancy Services Proposal

IBM Data Center Services. Building or upgrading your data center, while helping to minimize cost, risk and delay

Software License Agreement

So You Want to Do Business with the Saudi Government

Government of India Ministry of Earth Sciences. Tender Notice for Republic Day Tableau- 2014

Special Terms of Contract to the VOB/B as Amended in 2012

M E M O R A N D U M. Re.: Overview on Brazilian Merger Control, pursuant to Law No /2011

IMIA Short Paper (Provided by Michael Spencer, Zurich London - June 2008) The Tunnel Code of Practice for Risk Management 5 Years On

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Research and Design of Management Information System Based on Infrastructure Projects

FOR INFORMATION PURPOSES ONLY

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM

PERFORMANCE BONDS AND LABOUR AND MATERIAL PAYMENT BONDS: WHAT THE CONSTRUCTION INDUSTRY SHOULD KNOW

Energy: Price Comparison Tools BEUC response to the CEER public consultation on the draft advice on Price Comparison Tools

CODE OF CONDUCT. for Suppliers and Business Partners

MALAYSIA S GOVERNMENT PROCUREMENT REGIME

Transcription:

VERGABEVERFAHREN UND BAUKOSTEN WEEBER+PARTNER Kurzbericht (englisch) 1 Kurzbericht (englisch) Contract awarding procedures and building costs The study deals with contract awarding procedures in Germany and is based on facts which may not be the same in other countries. No-one will seriously argue that the bidding and contract awarding procedures for building services may have a considerable influence at the costs at which the project can eventually be realized and accounted for. However, opinions differ widely which procedure may have which impact. We assume that most of the conditions can at least be identified that will recommend or exclude a certain bidding procedure for a project. However, low building costs are usually only one of many criteria. The building costs as one crucial factor compete with others, such as cost guarantees, reliable deadlines, high quality, the easiness of the project implementation, the manageability of the project etc. Another prerequisite for the intended contract awarding procedure as well as for the project and contract documents, which must have been adapted to the relevant situation, is the existence of a strong market. Unfortunately, the market is often impaired by the dominating market position of one competitor or by attempts to regulate the market. A brief introduction: Inviting tenders and awarding contracts The relevant planning stage at which the client will part with the project will largely determine the contract awarding procedure. The client will try to retain his influence and his say in the matter until he has found a contracting party that promotes his interests to the extent as originally intended. The client may award the contract for the project at any stage: during the preliminary planning, during the design and permit phase or during the execution planning. Depending on the concrete planning stage in which the project is, the client will have to choose contractors that are able to offer and render the necessary planning and construction services required from this point in time onwards. The client will also have to make sure that his interests as regards quality and warranties are taken care of. The contract awarding procedures are a constituent part of the project organization as a whole. Therefore, the contract awarding procedure is also a reflection of how the project including its targets and the costs is to be managed and controlled. This study will largely focus on the contract awarding procedures relevant for housing construction.

2 Kurzbericht (englisch) WEEBER+PARTNER VERGABEVERFAHREN UND BAUKOSTEN Description of the contract awarding procedures < Inviting individual trades to tender: The performance description and the specification will be prepared for each trade individually on the basis of the execution planning, which becomes part of the invitation to tender. < Functional invitation to tender: When a performance program is included in the invitation to bid, the mode of execution and the techniques used become part of the competitive bidding procedure. < Inviting groups of trades to bid (Building according to Smart; SIA/SBV, Switzerland) "Building according to Smart" means that the building project will be realized by a number of trades that are joined in a group for making a bid (a kind of "ad hoc consortium"). < Building team (The Netherlands) By co-operating from an early stage onwards, all parties involved in the construction work intend to optimize the project under technological and economic aspects. < GMP: Guaranteed maximum price: The building contractor guarantees a price and sets a limit. Any savings can be distributed between the client and the contractor. < Construction system competition: A competition involving the architect and the contractor, so that not only creative services but also building services are covered. Based on the preliminary design, a performance and price competition of the partial systems evolves (such as for the foundations, for the supporting framework, for the mechanical service, for the interior work, for the cladding etc.) < Turnkey projects: In the case of a turnkey project, a complete object is delivered on the basis of a lump-sum offer. How to select a contract awarding procedure? A contract awarding procedure has three crucial features: < The type of performance description, in which the client has laid down his objectives and ideas (performance description with specification(s), performance description with performance schedule) < The type and the layout of the agreements with which the client contracts the contractors for the project. < The type of companies that may become the contracting parties of the client (such as general contractors, multi-trade contractors, individual trades).

VERGABEVERFAHREN UND BAUKOSTEN WEEBER+PARTNER Kurzbericht (englisch) 3 Once the preferred type of the contract awarding procedure has been selected after having given careful consideration to the circumstances, a fourth feature must be considered as well: < The type of cost control, especially the use of the competition between several bidders, but also other ways and means of ensuring that the client will get the best value for his money. Experience gained by housing constructors The contract awarding procedures in Germany are still heavily dominated by the traditions of inviting tenders for individual building lots and awarding contracts on the basis of public and restricted invitations to tender. However, there is an increasing number of projects, for which the usual contract awarding procedures are not used any longer. Here are the main features in brief: < Type of performance description: Clear and uncomplicated, adapted to the cost calculation procedure. It may include a performance schedule, although a specification is preferred. < Layout and type of contract: Depends on whether control mechanisms are required before and after the contract has been awarded. Closely connected with the organization of the planning and supervision processes. < The type of contractors used: Depends on the market situation; in the case of multi-trade contractors also depending on their previous experience, their references and the extent to which the capacity of the own personnel is used. < The way a certain bidder is selected: Frequently selected on the basis of the VOB [Verdingungsordnung für Bauleistungen / Contractual scale of building performance], although this form of selection has come in for criticism, as the VOB/B sometimes proves to be restrictive. A friendly form of cooperation as a factor contributing to economic efficiency is also required. < Involving contractors in the contract awarding procedure: Not very often used, but successful. Important is a detailed economic experience of the procedure. Concurrent invitations to bid If different invitations to bid for an object are issued at the same time, the economic efficiency of the different types of invitation can be directly compared, at least with regard to the current... [fehlt im Original]. Some companies use this method quite frequently, other do not even know it. However, in some cases legal concerns have also been raised. Summary As long as companies get the value for their money they look for with the approved contract awarding procedures, they are not interested in trying out new ones and put

4 Kurzbericht (englisch) WEEBER+PARTNER VERGABEVERFAHREN UND BAUKOSTEN them to the test. However, the markets in the planning and building industries are changing, and more and more companies, irrespective whether they are "ad hoc consortia" combining various trades or general contractors, offer their services in a package. Cost control Looking at the results of our investigation it remains doubtful, whether a particular contract awarding procedure will also have a certain effect on the bidder's pricing. What has definitely been established is, that the contract awarding procedures have a rather different effect on the other objectives the client had in mind when selecting a particular contract awarding procedure. One of the most important criterion for a successful project implementation is surely the transparency and manageability of the entire process, apart from the building costs themselves. The prices are heavily dependent on the use of the current market capacities (also in partial segments). If the client wishes to select market segments and contractors offering favorable prices, he will eventually have to be flexible with regard to controlling all other project details and necessities as well. He will then have to be prepared to accept various organizational arrangements and contractual agreements and to concede even a certain room for maneuvering as regards the actual construction work. It became clear that an efficient cost control presupposes a close co-operation between all parties involved. As compared with more modern contract awarding procedures, the room for maneuvering as regards the cost controlling process has been much smaller when traditional contract awarding procedures are used, where the planning and the implementation processes remain strictly separated. It seems to be useful to initiate an exchange of proposals between the planning and the construction partners at the earliest possible point in time, so that innovative, object-related solutions can be worked out together, which will also have a favorable impact on the costs. However, it is not just the co-operation between the architect and the contractor which matters. The client himself will also have to decide to which extent he wishes to become involved in the planning and construction processes. Co-operative procedures, which integrate the client as well as the planning and the construction partners, as is the case with building teams, with construction system competition and with GMP contracts, will allow all parties involved to keep track of the costs. If there are signs that the cost targets cannot be met, the parties involved can respond to the situation well in time. Competition and market transparency Normally, the question who is the most reasonably priced bidder will always be asked before any contract is awarded, irrespective of the actual contract awarding procedure selected. The potential client can only find the most suitable bidder as long as he knows the market. A well functioning market is also transparent, which cannot be said about the building market. Too little information about the bidding results are known in the industry, so that the capacity of both contractual parties to act suffers. The assertion more information ruins the market and keeps the prices high is untrue, as

VERGABEVERFAHREN UND BAUKOSTEN WEEBER+PARTNER Kurzbericht (englisch) 5 < genuine competition will beat any price restrictions and price-fixing conspiracies, which unfortunately are still common, < market transparency encourages competition and merely restricts its extremes, which can be done without anyway, such as ruinous and unrealistic prices, < market transparency also directs attention to the quality and innovative aspects. One can only speak about market transparency if it applies both to supply and demand, i.e. the performance descriptions will have to be worded unambiguously so that the prices become comparable in the first place. Unfortunately, performance descriptions are often poorly worded and thus misleading. Competition in the early project stages The basic principle is: In order to use the largest possible savings potential as regards the building costs, competition (or similar mechanisms) should start as early as possible. At the stage of the project design, a traditional form of competition is the one between architects. As regards the placement of construction services, the competition between the individual trades on the basis of a performance description including the specification(s) is still widely used. Another form of competition or a combination of various forms of contesting against each other is the construction system competition, which can be put up during the preliminary planning or the planning stage. Team planning competitions, which optimize the planning (also its technical aspects) and the building costs before the actual construction services are contracted, may be considered as equally good. The competitive situation between potential contractors exists only during the preliminary stage, as only those contractors will be invited to become team members who are expected to make the most interesting contributions. However, it should be contractually agreed that further bidders may be invited at a later point in time in order to keep the prices under control. General contractors and turnkey bidders can act like clients if they were to prepare their offers during an early stage of the planning process. They can act in a similar fashion as a building team or as in a construction system competition. Normally, the deadlines set for handing in the bids do not allow enough time for using procedures like that, although the more permanent forms of co-operation and the relationships evolving between companies make it possible to co-operate in the case of bids with a so-called "creative component". Construction quality The quality of executing the construction work is one of the most important items specified for a project. The quality standards as they have been described and contracted are an important factor in the cost control process. The way the other contracting parties are acquainted with these quality standards is a crucial factor, so that the client will eventually get good value for his money. The required quality standards are not only incorporated in the plans and other performance descriptions, they will also have to be pointed out to the contractors when they are familiarized with the project and especially their part in it. Eventually, the site supervision will also give instructions as to meeting the required quality standards. Saving potentials in this field can only be used to the extent as

6 Kurzbericht (englisch) WEEBER+PARTNER VERGABEVERFAHREN UND BAUKOSTEN standards and tolerances make it possible. The room for maneuvering in this field will have to be clearly defined in order to optimize the planning process under cost aspects.