Nordex SE. Nordex goes Offshore



Similar documents
Nordex SE. Capital Markets Day Products & Sales - Lars Bondo Krogsgaard

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

Nordex SE. Capital Markets Day Introduction - Thomas Richterich

Siemens D7 platform 6.0-MW and 7.0-MW direct drive wind turbines. The new standard for offshore. siemens.com/wind

Siemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines. Reduced complexity, increased profitability. siemens.

Nordex SE Conference Call 9M Hamburg, November 11, 2010

Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore

Wind Turbine Manufacturing a case for consolidation

Haliade 150-6MW Experiencia funcional con la nueva generación offshore

Simplified Design as Secret to higher Performance: Siemens Direct Drive Technology

OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS

The Reliance on Wind Energy Depends on Advancements in Blade Pitch Control

A macro-economic viewpoint. What is the real cost of offshore wind? siemens.com / wind

Wind Turbine Power Calculations

V MW. Your best option for low cost energy production at low and medium wind sites. Federico Gonzalez Vives. Director Technology.

The installation and servicing

Nordex SE Conference Call Q Frankfurt/M. November 14, 2013

Nordex SE Annual Results 2013

PMDD WIND TURBINE 1.5MW

offshore wind The future of

Nordex SE. Analyst Presentation Preliminary Figures FY Hamburg 28/02/2012

Newsletter September 2013

Nordex SE Conference Call Q Frankfurt/Main May 15, 2013

Case Study 5 Use of Wind Turbine Technology

Press Presse Press Presse

V kw The turbine that goes anywhere

Nordex SE Conference Call H Hamburg August 15, 2013

Document number #12 DNS Authors #20 Telephone: Date #40 AUGUST 2013

Nordex SE Conference Call 9M Hamburg, 13/11/2012

MENA Wind Power Outlook

V MW Making wind even more profitable

Onshore Wind Services

Assessment of the Economic Benefits of Offshore Wind in the Mid-Atlantic

GE Energy 1.5MW. Wind Turbine

GE Renewable Energy. GE s 3 MW Platform POWERFUL AND EFFICIENT.

Christopher Monk Engineering Manager STRUCTeam Ltd

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions

2.1MW PLATFORM Generations ahead

QUALITY OF WIND POWER. How does quality affect the cost of electricity generation from wind power?

Nordex SE Fiscal 2011 and Outlook. Frankfurt, April 2nd, 2012

Nordex SE Conference Call FY Frankfurt/Main, 25/03/2013

GE Power & Water Renewable Energy. Digital Wind Farm THE NEXT EVOLUTION OF WIND ENERGY.

Offshore Wind: some of the Engineering Challenges Ahead

Turbines R&D and Global Solutions & Services Less investment more value. by Anders Vedel, Executive Vice President, CTO

Nordex SE Conference Call FY 2014

MAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES

Nordex SE Conference Call Q Hamburg 13 November 2014

Session: Turbine Manufacturers and New Technologies. Istanbul November 2014 A.Beyer

Offshore Wind. IEEE Boston PES - November 16, 2010

NORDEX SE CAPITAL MARKETS DAY 2014

EXPERT REMANUFACTURED WIND TURBINE

NORDEX USA, INC. GREAT LAKES SYMPOSIUM

Attractive wind turbines and solar cell facilities

Sweden s leading manufacturer of small-scale wind power stations!

Nautischer Verein zu Bremerhaven Bremerhaven, Nautischer Verein

Nordex SE. Capital Markets Day Production & efficiency - Dr. Marc Sielemann

Wind Power Overview - with offshore focus. Jörgen Svensson Industrial Electrical Engineering and Automation

Dutch wind energy strength

Outline. Introduction to Wind Energy. US Wind Energy Installations. ME 483 Alternative Energy Engineering II 1

The Role of a Pension Fund in Renewable Energy Investments. Transformational NAMA in the Renewable Energy Sector May 2013

The Renewable Energy Sector in Cyprus

Depth-independent solution for Offshore Wind the WindFloat

Nordex SE Conference Call H Hamburg 30 July 2015

Nordex SE Conference Call 9M Frankfurt 11 November 2015

OPERATION AND MAINTENANCE. Levent İshak Service Manager, Vestas Turkey

PresentationDocument. Nordex Capital Markets Day. October Speaker: Morten B. Keller, MAKE Consulting

Ernst Rauch Munich Re 29 June 2010

Siemens Wind Turbine SWT The new productivity benchmark.

Monitoring the Operation of Wind Turbines Alex Robertson, Vestas Northern Europe

Korea s Wind Energy Industry Eyeing Overseas Markets

GE Energy Wind Technology and Windfarm Overview

ALSTOM IN THE WIND. Industry Trends. CIII class wind turbines will represent over half of total installs in 2016

Trends in offshore wind economics the past and the future

Scottish Enterprise. Offshore Wind Power: Priorities for Research and Development (R&D) and Innovation. Supporting a globally competitive Scotland

CABLES FOR WIND FARMS

Determining Probabilistic Estimates of Net Present Value for US Offshore Wind Projects. Introduction

PNE WIND AG. Presentation January Buchholz wind farm

Hub North Netværksarrangement d. 14. Juni 2011

Keyword wind turbine wind turbine wind turbine design small wind turbine honeywell wind turbine wind turbines what is a wind turbine wind turbine

DONG Energy offshore wind experience

WV Energie AG Offshore Wind Power. July 13

E.ON Climate & Renewables Our Wind Energy Business

MAKING SOLAR ENERGY COST-EFFECTIVE TODAY IS A SNAP

Wind Energy Math Calculations Calculating the Tip Speed Ratio of Your Wind Turbine

Energy over view and wind power. Ola Carlson. Chalmers University of Technology

PMG vs. DFIG the big generator technology debate

Parallel Session III-B: Nuclear and Renewable Energy. Wind Farm Simulations Dennis Nagy and Mike Dombroski

6 Oktober KIVI Niria congres Offshore Wind De uitdaging. Eneco wind. Ernst van Zuijlen

V MW & V MW (OFFSHORE)

Wind Power in Germany in 2014

Wind Service Offshore. We can t conquer the elements But we can outthink them

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL...

STATE OF THE ART and NEW TECHNOLOGIES OF DIRECT DRIVE WIND TURBINES

Modern insurance solutions protect innovative technologies RENEWABLE ENERGY

Wind Turbine Technology Offshore

in-service inspections

Brochure. Generators for wind power Proven generators reliable power

GE Renewable Energy. Digital Wind Farm THE NEXT EVOLUTION OF WIND ENERGY.

Power to Gas - an economic approach?

Jen Banks Wind Energy Project Coordinator North Carolina Solar Center

Transcription:

Nordex SE Nordex goes Offshore Hannover, April 2011

Content 1. Offshore Wind Market 2. Nordex Offshore History & Future 3. Competition & Technical Development 4. The N150/6000 2

Strong growth prospects for offshore wind energy (1/2) Expected annual global offshore wind turbine installation 2010 vs. 2020 in MW Growth drivers of future offshore wind energy development Total installation volume 2010 2020: ~ 47 GW ~ 7,800 Increasing security of energy supply due to higher offshore wind energy capacity load as compared to onshore wind energy Growing expertise will lead to decreasing electricity production costs CAGR: 19.6% Political renewable energy targets can be reached only with extensive use of offshore wind energy only ~ 1,300 2010 2020 Source: Nordex estimates 3

Strong growth prospects for offshore wind energy (2/2) Expected annual global offshore wind turbine installation 2010 vs. 2020 in MW Challenges of future offshore wind energy development Bottlenecks financing Total installation volume 2010 2020: ~ 47 GW CAGR: 19.6% ~ 7,800 Bottlenecks supply chain Bottlenecks grid infrastructure Volume not yet high enough for further cost reductions Technology to-date offers only limited energy production cost reduction ~ 1,300 2010 2020 Source: Nordex estimates 4

Europe will be the main growth driver for offshore in the years ahead Offshore installations in Europe by country 2011-2016 CAGR: 34.1% Current political debate regarding accelerated nuclear phaseout could boost further offshore wind energy growth Source: MAKE 5

Content 1. Offshore Wind Market 2. Nordex Offshore History & Future 3. Competition & Technical Development 4. The N150/6000 6

Our offshore test turbines have been running since 2003 without major repairs Nordex offshore experience Frederikshaven Breitling N90 2,3 MW Prototype Installation in 2003 N90 2,5 MW Prototype Installation in 2006 Test site with 1 x Nordex, 1 x Vestas, 1 x Siemens turbine Best yield at test site No major component changes First offshore WTG in Germany 97% availability in operating business year 2009 Uninterrupted operation Nordex has installed more than 4,400 WTG turbines to date (proven track record) High capacity for technological innovation and know how in long term quality assurance as well as turbine development for the most extreme weather conditions 7

Offshore strategy is built on three main pillars Competitive product: N150 Experienced Management Team Market entry with reference project Direct drive, 6 MW, 150m Rotor Prototype phase in 2012/2013 Establishment of separate business unit Nordex Offshore Management with track record of more than 15 years in that area on board Additional staff with extensive experience in offshore wind industry hired Fast track to achieve offshore market entry 39% share in the Arcadis Ost 1 project Deliver up to 70 turbines, planned installation in 2014/15 Arcadis Ost 1 8

Nordex offshore plan time schedule 2010 Arcadis Ost 1 Signed 2012/2013 Prototype phase (intensive testing) 2014 Start series production 2015 First large scale project 9

Extensive testing of prototype turbines and components ensures the high quality of Nordex products 10

Content 1. Offshore Wind Market 2. Nordex Offshore History & Future 3. Competition & Technical Development 4. The N150/6000 11

Swept rotor area to generator capacity drives efficiency Swept rotor area per MW 1st generation (2002 2009): Energy production per turbine is too low with 2-3 MW WTG (high infrastructure costs/mw) 2nd generation (2009 2014): Existing 5-6 MW offshore turbines are relatively heavy and rotor is too small Efficiency generation (2014 -): Direct drive, large rotor, low top head mass, extended lifetime The N150/6000 will be one of the first of the new more powerful and lighter generation of offshore turbines 12

Direct drive reduces operations and maintenance costs and increases energy yield Advantages of direct drive permanent magnet + Conventional gearbox drive trains have energy losses of 3-4% Higher yield + With direct drive the number of moving parts is reduced significantly which increases reliability Lower OPEX Higher yield + Maintenance is minimized with direct drive so operating costs are reduced Lower OPEX Proven technology: Direct drive generator already in the market for several years 13

Low top head mass is a must to achieve low cost per kwh Low top head mass 14

Content 1. Offshore Wind Market 2. Nordex Offshore History & Future 3. Competition & Technical Development 4. The N150/6000 15

6MW is the optimal generator size for the future offshore turbine generation Efficiency 3 m²/kw 55 t/mw 6 MW Output High infrastructure costs require maximum energy production Durability Longer blade = higher technical risk Nordex offshore turbine with capability for further yield increase 16

The N150/6000 is Nordex turbine for the offshore market Technical data 6.0 MW rated power Direct drive permanent magnet Rotor diameter 150m 17,671 m² swept area Designed for extreme offshore conditions 17

EUR 322m additional revenues per wind farm Discounted revenues of a 70 x 6 MW turbine offshore wind farm +17% 1,9 Mrd. + 322 Mio. 2,2 Mrd. 6 MW Turbine* N150/6000 Annual revenue per WTG (year 1-12) Gross output per turbine** 6 MW/125m* Delta N150 / 6000 3,38 Mio. + 574 k /a 3,95 Mio. 26,5 GWh/a + 4,5 GWh/a 31,0 GWh/a 70 WTG Lifetime 25 years Discount factor: 10 % Total loss: gross net: -15 %; FIT year 1-12: 15 Cent / KWh; FIT year 13-25: 8 Cent / KWh *Rated power 6000 kw, Rotor diameter 125 m; **9.5 m/s @ 100 m 18

The N150/6000 is the most economical solution for offshore wind projects Key features of the N150/6000 Leading edge swept area to generator ratio Maximum efficiency Direct drive permanent magnet Reduced operations and maintenance costs Higher reliability Higher energy yield Very low top head mass Lower costs (structure + logistics) Service friendly design Lower logistics and operations costs 25 years design lifetime Minimum cost per kwh 19

Dimensions of the new N150/6000 Rotor Diameter: 100 m Rotor Diameter: 150 m N100/2500 N150/6000 20

Dimensions of the new N150/6000 Swept area: 7,854 m² Swept area: 17,671 m² N100/2500 N150/6000 21

The rotor diameter of the N150/6000 exceeds the London Eye by 15 meters Diameter: 135 m 22

The rotor diameter of the N150/6000 exceeds the London Eye by 15 meters Diameter: 150 m 23

The N150/6000 A perfect match to customers expectations Nordex offshore wind turbine delivers a superior energy yield Nordex is the company with a 25 year track record and more than 4,400 onshore turbine installations that delivers reliable, high quality products The Nordex Offshore team will have extensive experience in the offshore wind energy industry 24