TOWN PLANNING BOARD GUIDELINES FOR APPLICATION FOR DEVELOPMENTS WITHIN DEEP BAY AREA UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE



Similar documents
Mai Po Inner Deep Bay Ramsar Site Waterbird Monitoring Programme

Supported Employment Service (As at August 2014)

Property Development

APPLICATION FOR PERMISSION UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (CAP. 131) GUIDANCE NOTES

Planning for Office Land in Hong Kong

Water Supplies Department Active WSD Capital Works Contracts

Examples of major projects with environmental permits :

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million

List of Aided Special Schools (2015/2016)

Allied Environmental Consultants Limited Green Building Certification and Consultancy Project Job Reference

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Advisory Council on the Environment Nature Conservation Subcommittee. Conservation of Black-faced Spoonbill (Platalea minor) in Hong Kong

Additional and Planned Places of Rehabilitation Services (From January to June 2015)

Heritage Place Code. Heritage Place Code

Legislative Council Panel on Security

Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno

Company Name Address Telephone No.

Green Infrastructure Case Study Template

1. Purpose and scope. 2. SEPA's role in hydropower and planning

PLANNING APPLICATION: 12/00056/APP

List of Proposed ArchSD Projects for the Refurbishment of Government Buildings

PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary

March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014

Convention on Wetlands of International Importance especially as Waterfowl Habitat

Central and Western District

HONG KONG HOUSING AUTHORITY

Legislative Council Panel on Security. Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui

Camp. plan template. elements. This section that need to. identify the. vegetation. of flying-fox. also

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL PLAZA, 1-2 KORNBILL ROAD

Different Types of Marine Protected Area

11.4 Voluntary Purchase House Raising and Flood Proofing

ROSTHERNE TO MANCHESTER PICCADILLY

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

Minutes of 960th Meeting of the Town Planning Board held on Permanent Secretary for Development (Planning and Lands) Mr.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

The River Ribble is one of the longest rivers in the North West of England

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

Dorset Green SANGs Report

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Proposed Terms of Reference for EIA studies

House Code. House Code

Outdoor Advertising. Policy and Guidelines. CITY OF DAREBIN 350 High Street, Preston 3072 Telephone January 2001

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

Carmarthenshire LDP Site Assessment Proforma

Sec. 22a-1a page 1 (4-97)

Delivering multiple benefits through effective river restoration UK & EU

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Basics of Sustainability. Environmental Impact Assessments (EIA)

Appendix A: Land Protection Plan

Summary: Introduction

2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at )

4 PLACE OF WORSHIP & INSTITUTIONAL DEVELOPMENTS

District Address Tele No. (+852) G/F YU SUNG BOON BLDG CENTRAL DES VOEUX ROAD MELBOURNE PLAZA

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

Planning for Bushfire Risk Mitigation General Code

Flora and Fauna. Section 4.9: Flora and Fauna

Development Control of Buildings in Hong Kong

Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations

Ecological Restoration of a Brackish Marsh at Parcel 11, Estate Carolina, St. John

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

Rezoning case no. RZ15-08: Adam Development Properties, LP

Data Analysis for Healthcare: A Case Study in Blood Donation Center Analysis

Using Aerial Photography to Measure Habitat Changes. Method

Appendix A. The Marine Life Protection Act (MLPA)

Aiding the Hydro-scheme development process. Web-links to useful information sources

How To Write A New Bill On Flood Management In Scotland

Clearing Code and Branch Code

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

2012 Resource Allocation Exercise - Block Vote Project Proposals

Proposed General Plan Update Goals, Policies, and Implementation Actions

Development Management Report

A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November with

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

Block Vote Projects Approved by the OGCIO in (from to )

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

Facilities Provided by Holders of Private Recreational Leases

CHAPTER 4 RADIATION MONITORING AND ASSESSMENT

PLANNING SERVICES UNIT

Transit Oriented Development and Value Capture Hong Kong

Rural dwellings including bed and breakfast accommodation

Buildings Departmen t Lands Department Planning Department

AN INITIATIVE TO IMPROVE

Transcription:

TPB PG-NO. 12C (Revised May 2014) TOWN PLNNING BORD GUIDELINES FOR PPLICTION FOR DEVELOPMENTS WITHIN DEEP BY RE UNDER SECTION 16 OF THE TOWN PLNNING ORDINNCE (Important Note :- The Guidelines are intended for general reference only. The decision to approve or reject an application rests entirely with the Town Planning Board (the Board) and will be based on individual merits and other specific considerations of each case. ny enquiry on this pamphlet should be directed to the Secretariat of the Town Planning Board (15th Floor, North Point Government Offices (NPGO), 333 Java Road, North Point, Hong Kong Tel. No. 2231 4810 or 2231 4835) or the Planning Enquiry Counters of the Planning Department (Hotline : 2231 5000) (17th Floor, NPGO and 14th Floor, Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin). The Guidelines are liable to revision without prior notice. the Guidelines current at the date on which it considers an application.) The Board will only make reference to INTRODUCTION 1. The Deep Bay, Mai Po Marshes and its adjacent area, including Hoo Hok Wai (collectively known as the Deep Bay rea) is recognised as a wetland of international importance. It is a habitat for a variety of species of waterbirds such as herons and egrets, and a stopover point for thousands of migratory birds. The Deep Bay rea comprises natural and man-made wetlands (rivers, freshwater marshes, fish ponds, gei wais, mangroves and inter-tidal mudflats) which provide a wide range of habitats to support a high diversity of biota (insects, reptiles, amphibian, birds and mammals). Five sites in the Deep Bay rea are designated as Sites of Special Scientific Interest (SSSI), respectively at Mai Po Village, Mai Po Marshes (including Lut Chau), Tsim Bei Tsui, Tsim Bei Tsui Egretry and Inner Deep Bay. The Mai Po Marshes, the Inner Deep Bay and the surrounding fish ponds have been listed as a Wetland of International Importance (the Ramsar Site ) under the Convention on Wetlands of International Importance especially as Waterfowl Habitat (the Ramsar Convention) since 1995. Such designation recognises the ecological importance of the Deep Bay rea as a wetland habitat and refueling station for thousands of migratory birds. Under the Ramsar Convention, if a party subsequently deletes or restricts a Wetland of International Importance, it should as far as possible compensate for the loss of

- 2 - wetland resources and recreate additional nature reserves for the purpose. 2. In recent years, there has been an increasing number of development proposals in the Deep Bay rea involving filling of fish ponds or works which may adversely affect the Deep Bay rea wetland ecosystem. To avoid the irreversible adverse impacts on the fish ponds and other wetland habitats in the Deep Bay rea, the Board provides development guidance for the Deep Bay rea through statutory plans. To facilitate applications for different uses and developments, a set of planning guidelines was also published. PRECUTIONRY PPROCH TO CONSERVE THE ECOLOGICL VLUE OF FISH PONDS 3. The ecological value of a habitat is defined as its contribution in sustaining the wildlife communities and essential ecological processes of a wider ecosystem. The Study on the Ecological Value of Fish Ponds in the Deep Bay rea (the Study) completed in 1997 has confirmed the unique international and regional importance of the fish pond system in the Deep Bay rea particularly for ardeids (i.e. herons and egrets). It has established that fish ponds in the area have intrinsic value as they function ecologically as a substantial source of food supply for the birds and as an important habitat for roosting and foraging of waterbirds. The fish pond system is fundamentally linked with the Mai Po Marshes and is part of the Deep Bay rea wetland ecosystem. The Ecological Field Survey of Hoo Hok Wai completed in June 2013 has further confirmed that the fish ponds and freshwater marshes occupying majority of the Hoo Hok Wai area have high ecological value due to their importance to waterbirds, including ardeids and spoonbills and other wetland-dependent species, including Eurasian Otter, and their strong ecological linkages with other wetlands within the Deep Bay rea, including the Mai Po Inner Deep Bay Ramsar Site. Different ponds are used preferentially by birds in different seasons, and it would be difficult to justify removal of certain individual fish ponds. Higher bird usage was observed to correlate with ponds which are contiguous to each other and with a greater and continuous area as against fragmented and isolated ponds. Developments resulting in the loss of fish ponds would reduce the food source to birds and certain developments adjoining or in the vicinity of fish ponds with disturbance impact, in particular open storage uses, industrial uses, dispersed village type development and roads, would lead to a reduction in bird usage.

- 3-4. precautionary approach has been adopted by the Board in view of the known intrinsic value of fish ponds in ecological terms and the complex response of birds to future landuse changes and carrying capacity which has not been fully understood. The intention is to protect and conserve the existing ecological functions of fish ponds in order to maintain the ecological integrity of the Deep Bay wetland ecosystem as a whole. This precautionary approach is formulated with the support of scientific surveys and analysis as provided in the Study. THE PRINCIPLE OF NO-NET-LOSS IN WETLND 5. In considering development proposals in the Deep Bay rea, the Board adopts the Study s recommended principle of no-net-loss in wetland which provides for the conservation of continuous and adjoining fish ponds. The no-net-loss can refer to both loss in area and function. No decline in wetland or ecological functions served by the existing fish ponds, especially as a source to provide abundant and accessible food and roosting grounds to ardeids and other species, should occur. s the fish ponds form an integral part of the Deep Bay rea wetland ecosystem, alternative uses could be considered suitable only if it could be demonstrated that they would not result in the loss of ecological function of the original ponds and if they complement the ecological functions of the wetlands and fish ponds in and/or around the Deep Bay rea. It is important that the alternative wetland habitat to replace the fish ponds can provide food supplies in a sustainable manner so that birds, particularly, the egret and heron population, are not put at risk. LND USE CONCEPT ND DEVELOPMENT GUIDELINES 6. The fundamental landuse planning concept for the Deep Bay rea should be the avoidance of loss of fish ponds and habitat fragmentation as well as mitigation of negative impact from undesirable landuses and human disturbance. two-pronged approach to landuse planning control is adopted through the designation of Wetland Conservation rea (WC) for all existing continuous and adjoining active/abandoned fish ponds and the designation of Wetland Buffer rea (WB) to protect the ecological integrity of the WC. This buffer generally comprises the strip of land of about 500m wide along the landward side of the WC (Figure ).

- 4 - Wetland Conservation rea (WC) 6.1 The planning intention of the WC is to conserve the ecological value of the fish ponds which form an integral part of the wetland ecosystem in the Deep Bay rea. It comprises the existing and contiguous, active or abandoned fish ponds in the Deep Bay rea, which should all be conserved. New development within the WC would not be allowed unless it is required to support the conservation of the ecological value of the area or the development is an essential infrastructural project with overriding public interest. ny such development should be supported by an ecological impact assessment to demonstrate that the development would not result in a net loss in wetland function and negative disturbance impact. For any redevelopment which requires planning permission from the Board, an ecological impact assessment would also be required. Wetland compensation is required for any development involving pond filling and mitigation measures against disturbance would be necessary. They would be imposed as part of the planning approval conditions. 6.2 Subject to submission of ecological impact assessments, the types of activities which may be considered within the WC must be related to one of the following uses: Conservation 6.2.1 Land uses in WC should be devoted to conservation management of the wetland areas such that the integrity of the habitat should be maintained to avoid disturbance and/or fragmentation. lternative ecologically beneficial uses to existing fish ponds which would perform ecological functions similar to or better than the existing fish ponds to be replaced and be compatible with the conservation objectives of the wetland in Deep Bay rea, such as recreated nature reserve, wetland wildlife reserve for bird watching or sports fishery and aquaculture, would be considered. The proposed use should be appropriate to the rural and wetland setting and be able to enhance the visual and landscape quality of the area. It should not add to the pollution loading of the Deep Bay rea.

- 5 - Environmental Education 6.2.2 Research and educational uses which will facilitate the public understanding of the ecology and nature conservation of the area would be encouraged. Educationally based facilities, such as nature trails, ecology study centre and field study centre, with controlled access would be considered. The proposed use should be appropriate to the rural and wetland setting and be able to enhance the visual and landscape quality of the area. It should not add to the pollution loading of the Deep Bay rea. Essential Infrastructure Projects 6.2.3 Essential infrastructure projects needed for public purpose, such as rail, emergency vehicular access and footpath, road, drainage and flood protection project and public utility project, for which no suitable alternative locations outside the WC could be identified, would also be considered by the Board. However, any such proposed project should include a practical wetland compensation scheme for the consideration of the Board. It should not add to the pollution loading of the Deep Bay rea. Private-Public Partnership pproach 6.3 While the primary planning intention of the WC is to conserve the ecological value of fish ponds, if there are strong planning justifications and positive measures to enhance the ecological functions of the existing fish ponds, the Board may consider development with conservation objectives within the WC under a private-public partnership approach. Having regard to the precautionary principle and the no-net-loss in wetland concept, the approach would allow consideration of limited low-density private residential/recreational development at the landward fringe of the WC in exchange for committed long-term conservation and management of the remaining ponds within the development site. Development of this nature should require minimum pond filling and be located as far away from the Deep Bay and/or adjoining to existing development site. dherence to the no-net-loss principle would be important to ensure no decline in the wetland functions of the fish ponds within the development site and surrounding ponds. ny such development proposal

- 6 - should be accompanied by an ecological impact assessment with an acceptable and feasible wetland enhancement and management scheme to demonstrate that the development would not result in, or be able to fully compensate for, any loss of the total ecological function of the original ponds on the site and that the development impact can be mitigated. The proposal should also include a mechanism to ensure that the long-term management of the wetland could be practically implemented and monitored. development proposal of this kind would be carefully scrutinized either through the objection consideration process or by way of a request to rezone the site to Other Specified Uses (Comprehensive Development and Wetland Enhancement rea). Wetland Buffer rea (WB) 6.4 The intention of the WB is to protect the ecological integrity of the fish ponds and wetland within the WC and prevent development that would have a negative off-site disturbance impact on the ecological value of fish ponds. buffer area of about 500m along the landward boundary of the WC is thus designated as a WB. s a substantial amount of the fish ponds within the WB have already been lost over time through filling and certain areas have been degraded by the presence of open storage use, these degraded areas may be considered as target areas to allow an appropriate level of residential/recreational development so as to provide an incentive to remove the open storage use and/or to restore some of the fish ponds lost. 6.5 Within the WB, for development or redevelopment which requires planning permission from the Board, an ecological impact assessment would also need to be submitted. Development/redevelopment which may have negative impacts on the ecological value of the WC would not be supported by the Board, unless the ecological impact assessment can demonstrate that the negative impacts could be mitigated through positive measures. The assessment study should also demonstrate that the development will not cause net increase in pollution load to Deep Bay. Some local and minor uses are however exempted from the requirement of ecological impact assessment. They are listed in ppendix and include temporary uses. 6.6 pplications for new open storage or container back-up uses including workshops within the WB, whether temporary or permanent, would normally not be allowed in view of the adverse disturbances of such activities on birds, in

- 7 - particular for such uses involving filling of contiguous ponds. However, open storage or container back-up uses located close to the Lok Ma Chau crossing and without involving pond filling might be sympathetically considered by the Board in view of the genuine need to facilitate cross-boundary movements of goods in the area. 6.7 Proposals for residential/recreational developments on degraded sites to remove/replace existing open storage or container back-up uses and/or to restore lost wetlands may be given sympathetic consideration by the Board subject to satisfactory ecological and other impact assessments. For those disturbed areas directly abutting the WC, the development should provide a wetland and visual buffer to separate the development from the WC to minimise its impact on the wetland and to restore some of the lost fish ponds to an appropriate form of wetland adjoining the WC. Within these degraded areas targetted for upgrading, the following types of activities may be considered: Wetland Restoration 6.7.1 Development proposals to restore lost fish ponds or to replace existing undesirable uses by wetland habitats are encouraged. Recreation 6.7.2 ppropriate recreational use may be considered. Consideration should be given to the compatibility of such use with any adjoining fish pond area and to other planning and environmental implications of the development. Residential 6.7.3 Residential development projects which include replacement of existing open storage and port back-up uses and/or proposals of detailed wetland restoration may be given special consideration subject to satisfactory ecological and other impact assessments. These developments should be compatible with the surrounding land uses and the rural setting of the area.

- 8 - Ecological Field Investigation 6.8 For planning applications requiring ecological impact assessment within either the WC or the WB, field investigation normally covering a period of not less than 12 months should be included to provide baseline information of, and to study effects on, existing wildlife habitats, flora and fauna, and their seasonal changes. The exact requirements for the field investigation may depend on the proposed scale and nature of development, and whether any direct loss of fish ponds would be involved. Potential applicants should seek advice from the griculture, Fisheries and Conservation Department on the technical requirements for the ecological impact assessment. Other Planning Considerations 6.9 In addition to ecological consideration, other planning considerations including development intensity, compatibility with the surrounding land uses, environmental impact (e.g. noise, air and water qualities), traffic and drainage impacts, provision of infrastructure and visual impact are also important in the assessment of an application within the Deep Bay rea. TOWN PLNNING BORD MY 2014

_ N ƒg Sandy Ridge Cemetery F ˆ SHENZHEN SPECIL ECONOMIC ZONE o º Lo Wu Tak Yuet Lau j flb Ma Tso Lung San y r da Lok Ma Chau U W Lo Wu Correctional Institution B Ha Wan ˆ g n ou j TI LW HU a re d se lo C ˆ T r ie nt ro ififlb F Community Sports T _ SM PO SHUE 9»fl FNLING s HIGHWY 9 SN TIN t y Ser Res nd ar ƒ m O B ou MI PO Lin Barn re a Beas River Lodge D T se C lo LE r ie nt P ø e m ST Beas River Country Club Y Mai Po San s HW ƒhfi (RESTRICTED RE) North Distr Hospital KWU TUNG RESERVOIR C Mai Po Lo Wai Tam Kon Chau ƒhfiƒm@ z ro ƒhfi Pœæ MI PO NTURE RESERVE F RO K E d ˆ IN NT HIG S b F Sha Kiu Pak Hok Chau j } n«f TI LONG KEI Nam Sha Po M' x Barracks Wo Shang Wai yƒ Tsim Bei Tsui Royal Palms Palm Springs Golf x [ {ƒ [ {ƒ 9 X Cemetery ˇ æ Yau Mei San œ Mong Tseng Wai LEGEND x Fairview Park ««Mong Tseng Course Barracks Barracks ˇ LUT CHU ªaƒO«ß NGU TM MEI BOUNDRY OF WETLND CONSERVTION RE ªaƒw Lau Fau Shan D R I N E R R R SE E E V R Tin Fook Wai 9 ZƒfiW ªaƒO«DEEP BY L ł Yuen Long Kingswood Villas Industrial Estate WETLND CONSERVTION ND LM TSUEN COUNTRY PRK æ»^ Tin Shui Estate a Wing Kei VE E G ER S E IN Nam Sang Wai fiu Ser Res Fung Kong t Ser Res G n«d t BOUNDRY OF WETLND BUFFER RE Tai Sang Wai M ay Fung Lok Wai SPECIL RE Tin Highw HONG KONG WETLND PRK j San y B LU FU SHN y B» ªaƒ BUFFER RES BOUNDRIES Tin Shui Wai Park a Sw P s ' F Shan Pui Chung Hau ' Tin Yiu Estate s s WNG CHU Shan Pui LE PE F Yu Sheung Cheung Wai YUEN LONG Yuen Long Estate fi 9 YUEN LONG C «s C W H ST Tung Tau Industrial rea H TSUEN W p ««W KR OD Kingswood Villas KU HUI t Ser Res TOWN PLNNING BORD SECTION PLNNING DEPRTMENT K ß PT KONG LENG REFERENCE No. YOHO u Tau L ł M/TPB/2014/12 LM TSUEN COUNTRY PRK SCLE W CSTLE PEK ROD C«s ƒ HEUNG METRES 250 0 250 500 750 Ø ` æ 1 000 1 250 1 500 1 750 2 000 METRES Date: 29/1/2014 ˇ Figure

ppendix List of Uses Exempted from Ecological Impact ssessment Within the Wetland Buffer rea For planning applications involving uses/development within the Wetland Buffer rea, the following uses/development are exempted from the requirement of ecological impact assessment as part of the submission to the Board : - Temporary Uses - gricultural Use (except in SSSI Zone) - ncestral Hall - Bank# - Barbecue Spot - Barber Shop# - Beauty Parlour# - Burial Ground - Clinic/Polyclinic* - Electricity Substation of single storey - Government Refuse Collection Point^ - House (lteration, modification and/or redevelopment to the existing building bulk only) - New Territories Exempted Houses - Off-Course Betting centre# - On-farm Domestic Structure - Photographic Studio# - Playground/Playing Field in V and R(D) zones - Police Post/Police Reporting Centre - Post Office* - Private Club# - Public Convenience - Public Library* - Public Utility Installation (electricity mast, lamp pole, pipeline and telephone booth only)^ - Pumping Station of single storey - Refreshment Kiosk - Retail Shop# - School*

- Showroom excluding Motor-vehicle Showroom# - Shrine - Social Welfare Facility* - Tent Camping Site Note: # other than free-standing building * other than free-standing building exceeding 3 storeys ^ not applicable to the Other Specified Uses annotated Eco-lodge zone on the Ma Tso Lung and Hoo Hok Wai Outline Zoning Plan