Bombardier Aerospace Belfast. Central Manufacturing Engineering Project Manager Manufacturing Systems

Similar documents
QUEST The Systems Integration, Process Flow Design and Visualization Solution

Week 4 - Lecture Assemblies. ME Introduction to CAD/CAE Tools

Product Lifecycle Management. Diane Ryan Siemens PLM Software

Training Course Catalog

PPR Information Managements for Automotive Die Shop

NUARB TRAINING ACADEMY

Airbus PLM A350 Manufacturing Engineering strategy


CLIQUEZ POUR MODIFIER PRESENTATION LE STYLE DU TITRE 2015

Dassault Aviation. Revolutionizing aircraft development with the Virtual Platform and V5 PLM

Summary of Technical specification Implementation and Support of PDM/PLM Solutions

Different Product Structures with Windchill MPMLink

Improve Project Team Collaboration Using Microsoft Project Online

ENGINEERING AND TECHNOLOGY EDUCATION DEPARTMENT

Cost-effective supply chains: Optimizing product development through integrated design and sourcing

Integration Services

Introduction to the Siemens PLM End to End Solution for Composites

Ontology for PLM Implementation to Facilitate Inorganic Growth for an Organization

Easy to find, reuse and control 3D Standard Parts

Case Study BOEING 787: GLOBAL SUPPLY CHAIN MANAGEMENT TAKES FLIGHT. Leveraging Global Partners to Maximize Customer Value

A CIMdata Program Review

5. Product Lifecycle Management. Database Technologies for Integrating Engineering Data

Aerospace Manufacturing Technology Challenges

SIEMENS. Teamcenter manufacturing process management Getting Started with Manufacturing PLM

Meeting Room Booking System Allan MacDougall. Room Booking System at Airbus, Filton.

CAE DATA & PROCESS MANAGEMENT WITH ANSA

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

Programme Discussions Wissenschaftstag Braunschweig 2015 Laminarität für zukünftige Verkehrsflugzeuge

Powering up your ENERGY business processes

MTM delivers complete manufacturing solutions from top to bottom enterprise to the factory floor.

A Roadmap to Concurrent Engineering 2.0

Engineering BOM vs. Assemblage BOM

Federated, Generic Configuration Management for Engineering Data

What s new in Teamcenter Service Pack

Bridging the gap between compliance and innovation. ENOVIA PLM solutions for life sciences

Simulation Data Management with Interoperability across domains

Status report on Virtual Manufacturing at Volvo Cars

ENOVIA SmarTeam Engineering Express

Critical Success Factors for Product Information Management (PIM) System Implementation

Standardizing Best Industry Practices

Product Structure Preface What's New? User Tasks

CAD/CAE systems and cost engineering

CATIA for Aerospace Supply Chain. Dedicated zone for your graphic band images.

Critical Success Factors for an MDM Initiative

How To Learn From The Most Successful Manufacturers

Plexus Planning. Plexus - Mastering Complex Aerospace and Defense Supply Chains

Project Time Management

Models for MES In an Enterprise Architecture

Ford Motor Company CAE PLM Solution and integration with CAE Pre-Processor Software

This case study walks you through the challenges involved in each step of the MDM initiative as shown in Fig.1 below: Oracle PLM.

Project Management Planning

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

Consolidating Multiple Product Development Systems at TreeHouse Foods into SAP Product Lifecycle Management

BEDIFFERENT A C E I N T E R N A T I O N A L

ProSTEP ivip e. V. / VDA Integration of Simulation and Computation in a PDM- Environment (SimPDM)

operating services group a Bombardier Preferred Provider

Integrating CAD, PLM and LCA: a new architecture & integration proposal

Computer Aided Design and Drafting (CAD)

Knowledge Management from a

Composite Program in Taiwan Aviation Industry and Areas of Interest(s)

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

Aerospace Supply Chain Engineering Enablement

Majenta Engineering Centre (MEC)

Product Synthesis. CATIA - Product Engineering Optimizer 2 (PEO) CATIA V5R18

A Manufacturing Solution or

A TOOL FOR SUPPORTING THE PROCESS OF PROPERTY MANAGEMENT AND THE CREATION OF TECHNICAL DRAWINGS

Technology and Innovation for the Future of Composites Manufacturing

MPM. Manufacturing Process Management (MPM) Introduction. Current Status

Validating the Possible

Future Multi-Mission Satellite Operations Centers Based on an Open System Architecture and Compatible Framework

Comprehensive digital manufacturing solutions

Implement RAMIS MDAT application software through which Master Data can be cleaned up and verified, and then managed on a continuous basis.

PIONNIER Consulting Services Research. Consulting. Outsourcing

Teamcenter s manufacturing process management 8.3. Report Generator Guide. Publication Number PLM00064 E

Installation Guide for Artic Air 24 Volt R134A Air Conditioner

Gian Luca Sacco Marketing Director South & Central Europe. Smarter decisions, better products.

Work Process Management

IBM Product Lifecycle Management. DELMIA Digital Manufacturing Portfolio

Automated Strength Analysis Processes for Aircraft Structures

Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y

ERP Integration Strategies Approaches for Integrating ERP and PLM

ZUKEN Soluzioni dinamiche per progettare sistemi Automotive. Claudio Meola Account Manager

Managing Information throughout the Asset Lifecycle. Executive Overview ARC Perspective of ALM... 3

A discussion of information integration solutions November Deploying a Center of Excellence for data integration.

OPTIMIZING PRODUCTION

How To Reduce The Risk Of Innovation In Bombardier Aerospace

Wonderware MES/Operations Managing the transformation of materials into finished products in real time

44-76 mix 2. Exam Code:MB Exam Name: Managing Microsoft Dynamics Implementations Exam

PLM Center of Excellence PLM for Embedded Product Development - Challenges, Experiences and Solution. M a y

SAP Configuration Management at Harley-Davidson Motor Company SAP Product Configurator Info Day

Tuesday, November 11: Agenda Overview*

Utilizing KolibriMFG Software System to Schedule and Control Shop Floor

RESILIENT PRODUCT LIFECYCLE MANAGEMENT STRATEGIES & SOLUTIONS FOR FUTURE-PROOFING PLM

Transcription:

Bombardier Aerospace Belfast Brian Welch Iain Crosbie Central Manufacturing Engineering Project Manager Manufacturing Systems

Contact Details Ian.crosbie@aero.bombardier.com 02890 368436 b.welch@aero.bombardier.com 02890 362329

Agenda Who are Bombardier Belfast Bombardier and Delmia Bombardier Belfast 2007 Project Progress so far Future work Findings, risks and issues 3

Bombardier who we are Bombardier Aerospace World leader in regional, business and amphibious aircraft Bombardier Transportation World leader in the manufacturing and servicing of rail equipment and railrelated products F07 revenues: $8.2 billion 56% of total revenues Backlog: $13.2 billion* Employees: 27,130* F07 revenues: $6.6 billion 44% of total revenues Backlog: $27.5 billion* Employees: 29,100* *As at January 31, 2007 4

Bombardier regional aircraft Q100/200 Q300 Q400 CRJ200 CRJ700 CRJ900/705 CRJ1000 5

Bombardier s Business Aircraft portfolio is centred on three families LEARJET FAMILY Learjet 40 XR Learjet 45 XR Learjet 60 XR CHALLENGER FAMILY Challenger 300 Challenger 605 Challenger 850 GLOBAL FAMILY Bombardier Global 5000 Global Express XRS 6

The Short brothers a heritage of innovation Wright Flyer Centenary in 2008 7

Bombardier Aerospace, Belfast - Manufacturing Sites 1 Queen s Island Main Assembly Facility 2 Dunmurry Composites Fabrication and Assembly 3 Newtownabbey Composites Fabrication and Assembly 4 Hawlmark Metal Component Fabrication Facility 3 1 4 2 8

Bombardier Aerospace, Belfast Fuselages: Belfast designs, manufactures and assembles fuselages for Bombardier business and regional aircraft programs Nacelles Belfast designs and manufactures engine nacelles for major engine manufacturers Advanced Composites (two plants) Centre of excellence for Composites within the Bombardier Aerospace Group. New RTM facility - 9

Belfast participates in all Bombardier aircraft families BOMBARDIER CRJ700 BOMBARDIER CRJ900 BOMBARDIER LEARJET 40XR BOMBARDIER Q400 BOMBARDIER LEARJET 45XR 10

Belfast participates in all Bombardier aircraft families BOMBARDIER CHALLENGER 300 BOMBARDIER CHALLENGER 605 BOMBARDIER GLOBAL 5000 BOMBARDIER GLOBAL EXPRESS XRS 11

Bombardier and Delmia

History of Delmia and Bombardier Aerospace Belfast Manufacturing Engineering initial investigation/pilot of Delmia 2004 Virtual factory analysis Belfast/Montreal 2005 Belfast M.E. DTI funded 2006 Consortium of 12 partners Belfast Production Pilot 2007 Today 13

Drivers for Digital manufacturing Engineering change at NPI Reduce operations learning time at NPI. Influencing early Design Manufacturing Engineering Vision is process design, not I.T. Move M.E. to higher value added activity. Investment in Catia V5 not exploited Investment in systems lagging competitors Design are moving to solely 3D definition Burning platform systems Current CAPP system 23 years deployed 14

The Current ME Environment ID Task Name EPR Title Work Duration Predecessors Resource Names 1 A83300 92.32 hrs 32.22 hrs 2 100534STG1OP09X11 -A LOCATING STUB FRAMES/FWD FLOOR & 26.25 BEAMS 4.29 hrs 4.29 hrs Fitter 3 100534STG1OP10X13 -A STAGE 1 ASSY(LOCATE PRESSURE FLOOR & H.STICKS 7.5 hrs 2.5 hrs 2 Fitter[300%] 4 100534STG1OP20X17 -A STG 1(LOCATE FRONT SPAR STUD,FRMS & LONGERONS) 5.19 hrs 5.19 hrs 3 Fitter 5 100534STG1OP25X23 -A LOCATE HOCKEY STICKS,B`HEADS & S`MATIC BEAMS 6.06 hrs 3.03 hrs 4 Fitter[200%] 6 100534STG1OP30X09 -A STG 1(INSTALL FASTENERS IWO PRESS FLOOR) 9.79 hrs 4.89 hrs 5 Fitter[200%] 7 100534STG1OP31X03 -A STG 1 RIVET IWO PRESS FLOOR 3.4 hrs 1.7 hrs 6 Rivetter[200%] 8 100534STG1OP35X05 -B STAGE 1 (LOCATE REAR SPAR & INSTALL FASTENERS) 9.81 hrs 9.81 hrs 6 Fitter 9 100534STG1OP40X14 -A INSTLN. OF AFT MC BULKHEAD 7.38 hrs 7.38 hrs 5 Fitter 10 100534STG1OP41X03 -A INSTLN. OF CLEATS IWO REAR SPAR & FWD BULKHEAD 1.53 hrs 1.53 hrs 11 Fitter 11 100534STG1OP50X14 -A STG1(LOCATE FWD BTM PANEL/FWD B/HEAD & FLOOR) 7.52 hrs 7.52 hrs 5 Fitter 12 100534STG1OP60X05 -B STG1(INSTL FASTENERS POSTS,BTM PNL FRMS&B/HEAD 6.81 hrs 3.4 hrs 11,9 Fitter[200%] 13 100534STG1OP61X06 -A STG1(RIVET REAR SPAR,POSTS,BTM PNL FRMS&B/HEAD 5.02 hrs 2.51 hrs 8,12 Rivetter[200%] 14 100534STG1OP65X07 -A RIVET M/C AFT BULKHEAD/PRESSURE BOXES 2.87 hrs 1.43 hrs 12 Rivetter[201%] 15 100534STG1OP70X07 -A STG 1.LOCATE BUMP STOP BEAM,SHEAR DECK & 6.4 DRILL hrs 6.4 hrs 5 Fitter 16 100534STG1OP75X06 -E STG 1.INSTL B/STOP BEAM & SHEAR DECK FASTENERS 4.74 hrs 2.37 hrs 15 Fitter[200%] 17 100534STG1OP80X14 -D STAGE 1.INSTALL AFT LOWER BULKHEAD WEB. 4.01 hrs 4.01 hrs 14 Fitter 18 FINISH 0 hrs 0 hrs 7,10,13,16,17 04 Jun '07 11 Jun F S S M T W T F S S M T Fitter Fitter[300%] Fitter Fitter[200%] Fitter[200%] Rivetter[200%] Fitter Fitter Fitter Fitter Fitter[200%] Rive Rivetter[201% Fitter Fitter[200%] Fitter 11/ 15

The Future ME Environment for Assembly 16

The Belfast Team Project Sponsors Robert Burke John Cahill Internal BAB resources Functional Experts. As required M.E. Processes & Tools Donna McAleenan Brian Welch Caroline Gibson Peter Elliott Gerry McGrattan I.T. Iain Crosbie Aidan Hughes Alan Weir Steven McMorris Delmia UK Colin Clemson Nick Woodruff Iain Ashmore Jason Jones 17

Delmia Project Objectives & Scope for CRJ1000 Flights To partially integrate & configure Delmia (DPE & DPM) To provide a system that enables assembly processes to be designed and validated prior to a first physical build (up to and including data take-on for the first build) To develop Delmia competence within ME & IT ME competence in the use of various Delmia workbenches IT competence in configuring & supporting Delmia 18

Project Scope - High Level Process Map Create a Project in the Hub 1.1 Insert Evolving Product 2.1 1.2 Insert Evolving Resources 2.2 Create Assembly Process Process Nodes PERTs, Assembly Plans, Sub-Assembly Plans, Operations. Operations Modelled, Non-modelled, Fabs, Assy, Inspection 3.1 Analyse Assembly Process Part instance consumption Load ERP 4.1 MBOM to MAXIM 3.2 Dynamic Clash Detection 4.2 EPRs to CAPP 1.3 Load Process Library 2.3 Part links - modelled 4.3 PVAs 2.4 2.5 Part Links - non-modelled (eg. rivets, paint) Requirements links (eg. dimensions, notes & specs) 2.6 Resource Links (Tools) To-Be architecture diagram??? 2.7 Standard Times 2.8 Crew Size 2.9 Predecessors 2.10 Work Instructions Out Out of of Scope Scope 4.4 3D Training Material Detail planning Detail planning Detail Condition of Supply Detail Condition of Supply Network Analysis Network Analysis Factory Layout Factory Layout Ergonomic simulation Ergonomic simulation BOM and Process maintenance after set 1 BOM and Process maintenance after set 1 2.11 3D Simulations 2.12 CSD definition 19

Progress so far(1) Consulting with Delmia UK Training - User training - Business Consulting - Basics of PTS and database objects Scripting - Getting data into PPR hub - Moving data around - Extracting data (eg BOMs) Script Actions - Listening for events and taking actions - Preventing functionality - Helping users make the right choice 20

Progress so far(2) Load Product and Tooling from Legacy PDM (not Enovia) Mechanism to highlight change in evolving product View design changes in DPE :- Use light Browser technology Geometric and non geometric changes. Control over if/when M.E. accept/hold the design changes into the process Aerospace PTS as a starting point for BAB configuration Utilising Delmia deployment methodologies as a framework Developed in conjunction with aerospace PTS in the U.S Apron & uplock avi with red parts?!? 21

Intent From Disparate applications and data duplication Unstructured process planning data To Network, BOM, work instructions, Std Times on one platform ie Delmia Structured Data sets enabling analysis and Automation 22

Next steps COS management Configuration control (DMU) Network analysis Full integration to ERP 3D work instructions Detail part planning Factory Layout Ergonomic simulation 23

Findings, Risks, Issues, Lessons and Constraints. Unique in the world methodology of in-house software development Standard of license sets DPE/DPM/Human/Quest etc. Bombardier Aerospace Group PLM strategy Utilising Consultants effectively The Aerospace PTS and modifying it Implementation methodology Business Change Management Eg Tooling models from Sub Contractors Roles & responsibilities Moving forward in one step change 24