2014 British Columbia Building Code Changes



Similar documents
) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

State of Connecticut Department of Public Health RADON PROGRAM

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Development Services City of Lawrence, KS

ECHO System for Basements

2009 IECC Update. Scope. Content. International Energy Conservation Code

INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Foundation. Foundation

Residential Buildings Energy Code Summary

BUILDING SAFETY UNIT

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

Building Energy Codes 101 October 23, Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

Category Measure Minimum Efficiency / Certification Requirements

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

Chapter 2: Foundations

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Zen House. A Case Study on Design, Construction and Cost/benefit Analysis of a High Performance Home. Presentation for Net Zero Networking & Exchange

IECC Compliance Guide for Homes in Virginia

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Home Energy Evaluation Report

HVAC Code Requirements

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

energy-saving checklist a guide for rental property owners

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

RELEASE NOTES EG USA 3.0.0

SIGNIFICANT CHANGES to the 2015 Minnesota Residential Codes (MR 1303, 1309 and 1322)

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Renovating Your Basement

Heating Load Calculation

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Existing Housing Stock

APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1

CLOSED CRAWLSPACES. Have you ever been in your crawlspace? If not, have you ever even

Contract for Weatherization Management Address City & State

1995 Model Energy Code Version 2.0

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

FLORIDA SOLAR ENERGY CENTER

ROOFS, SNOW AND ICE DAMS

First Time Home Buyers Energy Efficiency Workshop Guide

solutions & tips six Wise Energy Guide Building envelope solutions and simple tips AIR SEALING

Arapahoe County Residential Water Heater Installation and Inspection Guide

Heating, Ventilation and Air-Conditioning (HVAC)

Additions and Alterations

Options in the Selection of Materials for Basement Construction

Center for Energy Education Laboratory

CHAPTER 4 VENTILATION

How To Repair A Boat Landing Deck With A Boat Bed

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

BUILDING IN ALASKA HCM-00952

How To Design An Hvac Design For A Stick Built Home

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Excerpts from the Canadian National Building Code (NBC)

Chapter 8. Duct Design and Sealing

Comment Form on Proposed Gut Rehabilitation Alternatives

Analysis of 2009 International Energy Conservation Code Requirements for Residential Buildings in Kansas City, Missouri

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates

Before You Start an Energy Efficiency Retrofit The Building Envelope

bout your apartment SOLVING ODOUR TRANSFER PROBLEMS IN YOUR APARTMENT Understanding Air Movement in Your Building

Structure Survey Findings:

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money

The Optimum Basement Wall

Inspection Item COMMENTS

Indiana Energy and Cost Savings

Mississippi. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Energy Code Compliance With SIPs. Frank Baker, PFB Corporation Don Ferrier, Ferrier Custom Homes

Home Performance with ENERGY STAR. Evaluation Report

Attic condensation during winter can

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM

GUIDELINES for BUILDING ENERGY EFFICIENT NEW HOMES with the URA. November 3, Version 2.0

Colorado Energy and Cost Savings

ENERGY EFFICIENCY PLAN REVIEW CHECKLIST

Condensing Boiler Efficiency

Tennessee. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC

Performance of 8 Passive House Envelopes in Cold Climates

Section Energy Efficiency

Q&A on Tax Credits for Sections 25C and 25D. Notice SECTION 1. PURPOSE

Residential Provisions of the 2012 International Energy Conservation Code July 2011

Ontario s 2012 Building Code Division B, Part 9 (Ontario Regulation 332/12)

October 5, 2015 Dear Client,

Signs of insulation problems In the winter. In the summer. conditioning system

Applications for building permits will not be reviewed until all of the required information has been submitted.

DUCT SYSTEM DESIGN CONSIDERATIONS Part 1

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

4 Installation Requirements

PERFORMANCE OF SIDE-BY-SIDE SOUTH TEXAS HOMES Isolating the Contribution of Spray Polyurethane Foam Insulation

Transcription:

District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most notable revisions and staff interpretations. This package is for information purposes only and does not constitute a formal or legal document. The actual British Columbia Building Code (BCBC) 2012 should be reviewed in its entirety for any design / construction applications. Prepared by District of Houston Engineering and Development Services 1 P a g e

The following information has been obtained from the HPO Illustrated Guide, Energy Efficiency Requirements for Houses in British Columbia, BCBC 9.36 & 9.32, Building Officials Association of British Columbia and The Canadian Wood Council. 2 P a g e

Before December 19, 2014 The above cross section indicates the typical framing with insulation being constructed prior to December 19, 2014 where the nominal insulation thickness determined the required R-value. 3 P a g e

After December 19, 2014 9.36.2.4 now takes into account all of the assembly components including, cladding, sheathing framing, insulation and interior finish materials. This is known as Effective Insulation / Effective Thermal Resistance taking the whole wall assembly into consideration. 4 P a g e

A wall effective thermal resistance design calculator is available at http://cwc.ca/wtd, a list of assembly s and their effective insulation values is available from the Canadian Wood Council site at the address listed. Energy & Thermal Performance This wall is subject to some thermal bridging due to exposure of framing elements to outside temperature conditions. The framing factor for this wall at 16 o.c. is 23% (i.e. 23% of the wall is wood only and 77% is insulated) As an example for calculation purposes, the wall assembly above was taken from the Canadian Wood Council s Thermal Design Calculator and to meet the minimum RSI value for the wall assembly of 2.97 or R-value of 16.86 an HRV must be incorporated into this design. 5 P a g e

Houston is located in Zone 7a Prescriptive reductions for insulation values will apply for the walls, ceilings below attics and skylight shafts when an HRV is introduced into the home. 6 P a g e

Energy & Thermal Performance This wall is subject to some thermal bridging due to exposure of framing elements to outside temperature conditions. The framing factor for this wall at 24 o.c. is 20% (i.e. 20% of the wall is wood only and 80% is insulated) As an example for calculation purposes, the wall assembly above was taken from the Canadian Wood Council s Thermal Design Calculator and meets the minimum RSI value of 3.08 or R-value of 17.48 for a wall assembly not incorporating an HRV The RSI (R-value System International) can be multiplied by 5.678 to obtain the R-Value. Houston is located in Zone 7a, 5000-5999 Heating Degree Days, the above table indicates the required RSI values of the solid building assembly. 7 P a g e

Example The illustration incorporates R-40 Blown Cellulose insulation in Zone 5, with an installed HRV is compliant, without an HRV will require R-50 Conditioned Interior Space Attached garages are treated as unconditioned space, even if the garage is insulated and intended to be heated. 1) Wall between house and garage built to RSI of the above ground wall assembly Attached garages are treated as unconditioned space with no allowances for heat. The assembly (walls & ceilings) separating the garage from the conditioned space must be insulated and air tight. 8 P a g e

Mechanical, electrical and plumbing components placed within an exterior wall must be insulated behind to the effective thermal resistance required for the above or below grade wall assembly. Exposed foam plastics to be protected as per BCBC 9.25.2 Thermal bridging of repetitive structural members (ie; joist box ends, header spaces) must be included when calculating the thermal resistance of the exterior above grade wall assembly. 9 P a g e

In the attic at the perimeter wall, the insulation value must maintain a minimum RSI value as the wall assembly for a maximum of 4. ( In some designs the introduction of a high heeled truss may be warranted ) Round Styrofoam backer rod and caulking, air space without insulation meets the minimum U value of adjacent door / window The space between the framing member and window / door frame may have the same effective U-value as the adjoining window / door. 10 P a g e

Assembly Nominal Insulation (HRV or NOT) Attic Ceiling (Typical Truss at 24 o.c.) Zone 7A: R-60 (RSI 10.6) Cathedral Ceiling Wall (2x6 at 16 o.c.) Zone 7A: 5 & R-31 6: R-28 (RSI 5.5) (RSI 2x12 4.9) 16" 2x10, o.c. 16 o.c. Cavity Continuous R-22 exterior (RSI 3.9) wall ins. not required Floor over Unheated Space Zone 57A: & 6: R-31 R-28 (RSI (RSI 5.5) 4.9) 2x12, 2x10, 16 o.c. 16 o.c. 11 P a g e

The detailed illustration above indicates the Nominal Insulation values required in a home constructed in Zone 5, 6 and 7a incorporating an HRV. Description Nominal Effective Description Nominal Effective 3 XPS insulation over 8 poured-in-place concrete wall RSI 2.64 (R-15) RSI 2.65 (R- 15.3) R-22 batt insulation in 2x6 wood framing at 16 o.c. RSI 3.87 (R-22) RSI 2.55 (R- 14.5) Other building enclosure layers that contribute to effective insulation: 1. dampproofing 2. interior air film Total effective insulation value: Minimum effective thermal resistance for below grade walls: Below Grade Wall Assemblies (Common) RSI 0.33 (R-1.9) RSI 2.98 (R- 16.9) RSI 2.98 (R- 16.9) Other building enclosure layers that contribute to effective insulation: 1. exterior air film 2. cladding & air cavity 3. sheathing membrane 4. sheathing 5. polyethylene 6. gypsum board 7. interior air film Total effective insulation value: Minimum effective thermal resistance for above grade walls: RSI 0.63 (R- 3.57) RSI 3.18 (R- 18.1) RSI 3.08 (R- 17.5) Above Grade Wall Assemblies (Common) 12 P a g e

Illustrations below indicate insulation placement for unheated and heated slabs on grade above the frost line Thermal Break 50% of the required insulation thickness quired insulation Insulation placement of unheated slabs Radiant Infloor Thermal Break 50% of the required insulation thickness Insulation placement of heated slabs Insulation separated by the foundation wall at the floor slab is not required to be continuous, provided the exterior insulation extends down to the footing. 13 P a g e

Exposed foam plastics to be protected as per BCBC 9.25.2 When insulation is separated by the building envelope as indicated above, the interior insulation side must extend down the wall 4 times the thickness of the wall. Junctions between the floor and rim joist and rim joist to foundation must be sealed Illustrations above indicate where potential leakage conditions occur and where sealing is required between all joints and junctions between the structural components, and/or covering the structural components with an air barrier material and sealing it to the adjacent air barrier material. 14 P a g e

15 P a g e

Poly hats are required on exterior walls and ceilings for electrical boxes and pot lights and must be sealed to the air / vapor barrier The attic hatches and all electrical penetrations into the attic space along any gaps, spaces, penetrations, irregularities that could inhibit leakage must be sealed Section 9.36 of the BCBC details all areas requiring attention to air leakage, the illustrations are a few of the most common areas of concern. 16 P a g e

Section 9.36.2.7 of the BCBC requires garage vehicular doors to have an R Value of 6.245 or RSI 1.1 when conditioned. Example Window Label showing U-value The U-factor is a rating given to a window based on how much heat loss it allows. U-factors generally range from 0.2 (very little heat loss) to 1.2 (high heat loss). The U-factor is the inverse of the R-value of a window, which measures a window s insulating value. Thus, a high R-value is the same as a low U- factor, and means that a window does not allow much heat to escape. 17 P a g e

Heating Efficiencies Ducts must be insulated to the same level as required for walls if they are outside of the heated space and carrying conditioned air. Bathroom, dryer and kitchen exhaust are exempt from this requirement though are required to be directed directly outdoors, insulated to RSI 0.75 and have a vapor barrier Transverse and longitudinal joints in duct work must be sealed using an approved tape and sealant when outside the heated space. 18 P a g e

Heating Efficiencies Fabric tape is not approved in the BCBC for this application In general, ducts are required to be equipped with a damper. The damper may be gravity operated, motorized or spring loaded. Where motorized dampers are used, they must remain in an open position if damper operation fails, such as during power outages. 19 P a g e

Heating Efficiencies Exterior Roof Top Heat / Cool Unit Interior Residential Gas Furnace HVAC equipment must be located inside the heated space. Only HVAC equipment designed strictly for outdoor installation can be located outside the Heated space. Attached garages, even if heated, are considered unconditioned space. 20 P a g e

Heating Efficiencies Minimum Efficiency 92% Gas Fired Tankless 21 P a g e

Heating Efficiencies Gas Fired Boiler Minimum Efficiency 90% Air Conditioners now have a 14.5 SEER rating (Seasonal Energy Efficiency Rating) Heat Pumps now must have an 11.5 Energy Efficiency Rating The efficiency ratings for gas furnaces, boilers and hot water tanks both storage and instantaneous have been adjusted in the new requirements. Air conditioners and heat pumps also have increased efficiency ratings. 22 P a g e

Heating Efficiencies Gas Fired Tankless Instantaneous Gas Fired Storage HWT Electric Storage HWT The efficiency ratings for hot water tanks both storage and instantaneous have been adjusted in the new requirements. 23 P a g e

Service Water Heating Piping Pipe insulation is required for the first 2 m (6.5 ft) of the storage tank inlet and outlet. The insulation must be at least 12 mm (0.5 ) thick. In cases where piping is located outside the building enclosure or within unconditioned space, the insulation must be installed to a thermal resistance not less than the effective resistance requirements of the exterior above grade wall. First 2m of piping on the water storage tanks requires at least 12mm (1/2 ) of insulation. Piping located in unconditioned space must be insulated to the same value as the above grade wall. In homes with recirculating hot water systems, all piping must be insulated. Heat recovery ventilation is not a requirement of Section 9.36. Where heat recovery ventilators are used, equipment must conform to the requirements of 9.36.3.9., including having a minimum sensible heat recovery efficiency of 60%. 24 P a g e

9.32 Ventilation Pre December 19, 2014 the exhaust only systems were used where a fan (bathroom) was used to create a negative pressure within the space and ventilation air was achieved through air leakage from loose building construction. Post December 19, 2014 and with the introduction of a principal exhaust fan in 2006, the sizing was based on the number of bedrooms, the table above now indicates the number of bedrooms as well as floor area to determine the principal ventilation fan sizing. 25 P a g e

The primary ventilation system is required to run continuously, this can be achieved by the use of an HRV or a dedicated Lo-Sone fan not exceeding 1.0 sones. ( noise level ) 26 P a g e

With 4 options to deliver ventilation air, utilizing the forced air system interlocked to the primary ventilation fan is cost effective in a majority of applications. The fresh air piping to the forced air return duct has also been reduced in length to the furnace cabinet and must not be located upstream of a return air grill. A 2 nd option is to incorporate a passive HRV as the primary ventilation fan, the furnace blower would be required to run continuously 24/7 27 P a g e

The 3rd option is to incorporate an HRV as the primary ventilation system. This system is installed separately from the forced air system or as a standalone ventilation system when forced air is not being installed. The 4 th option is also installed separately from the forced air or as a system when forced air is not being installed. A primary ventilation fan is installed and interlocked with a distribution fan sized 2-3 times the primary ventilation fans capacity. The air discharge grill should be installed no closer than 2m from the floor ensuring that the cooler air is mixed with tempered air maintaining a suitable comfort level. 28 P a g e

Should the calculations provided on the Mechanical Ventilation Check list provided by the HVAC installer indicate the collective exhaust appliances exceed the ½ air change per hour, make up air sized accordingly to the excess exhaust must be provided to the dwelling. As Kelowna is in Radon Area 1 this clause applies. Exhaust from bath fans, primary ventilation fans and range exhaust ducts must be vented directly out doors, insulated with an RSI of 0.75 (R-4) and have a continuous vapor barrier. 29 P a g e

RADON CHANGES The BC Building Code does not require installation of a fan during initial construction, although designers should consider the future installation of a fan (which will require access and electrical supply) somewhere along the radon vent pipe. The BC Building Code refers to material that creates the space allowing the movement of soil gases between the air barrier system and the ground as a gas permeable layer The gas permeable layer allows for effective depressurization of that space, and functions as the drainage layer required in Article 9.16.2.1. A typical solution is to install coarse clean granular material below the floor on the ground. This allows compliance with 9.16.2.1.(1) The Radon rough in must be piped directly outdoors, an in-line fan is not required by code to complete a mitigation system. Changes have also occurred to the granular materials component and now are referred to as approved materials within the code. Alternate piping configurations may be considered by the Authority Having Jurisdiction. 30 P a g e