NVLAP Assessor Training



Similar documents
THERMAL INSULATION MATERIALS

Competency Unit: Exemplar Global AU Management Systems Auditing

BIOMETRICS TESTING. National Voluntary Laboratory Accreditation Program. NIST HANDBOOK Edition

Client information note Assessment process Management systems service outline

NVLAP Assessor Training. Assessor Qualification & Training Requirements

COMBINE. Part B. Manual for Marine Monitoring in the. Programme of HELCOM. General guidelines on quality assurance for monitoring in the Baltic Sea

NIST HANDBOOK CHECKLIST CONSTRUCTION MATERIALS TESTING

Procedures and General Requirements

American Association for Laboratory Accreditation

Application of ISO/IEC for the Accreditation of Food Safety Management Systems (FSMS) Certification Bodies

NIST HANDBOOK 150 CHECKLIST

RABQSA Certified AS9110 Aerospace Quality Management System Lead Auditor

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

REQUIREMENTS FOR CERTIFICATION BODIES TO DETERMINE COMPLIANCE OF APPLICANT ORGANIZATIONS TO THE MAGEN TZEDEK SERVICE MARK STANDARD

Advanced Systems, Inc. Course. Registration Form. (Please complete all information)

Network Certification Body

IAS ACCREDITED INSPECTION AGENCIES: GUIDELINES FOR CONDUCTING INTERNAL AUDITS AND MANAGEMENT REVIEWS. Revised January, 2016

Steps to ISO/IEC Accreditation

ISO 9001:2015 vs. ISO 9001:2008

EA-7/01. EA Guidelines. on the application. Of EN Publication Reference PURPOSE

Calibration Service Selection Guide

A Guide for Documenting the Management System for a Testing/Calibration Lab. May 2015

IAF Mandatory Document

Evaluation Reminders. For Team Chairs Evaluators, Financial Reviewers, And Generalists Institutions being Reviewed

ENERGY EFFICIENT LIGHTING PRODUCTS

R101 - General. Requirements: Accreditation of. ISO/IEC Laboratories

Certification Process Requirements

ISO/IEC QUALITY MANUAL

Quality Product Certification Scheme for Mechanical Couplers (QS/MC)

TITLE: Quality System Manual DOCUMENT NUMBER: QMS

Info 15:2 TRAINING 2015/2016. Info 13:19

NABL NATIONAL ACCREDITATION

Assessment Strategy for. Audit Practice, Tax Practice, Management Consulting Practice and Business Accounting Practice.

1 For more information T: / E: DAP@ul.com / W: ul.com/dap

EMS Example Example EMS Audit Procedure

ASCLD/LAB-International

Translation Service Provider according to ISO 17100

MANAGEMENT REVIEW FOR LABORATORIES AND INSPECTION BODIES

Recognition of my Product (Testing Laboratory) Why I need recognition, what is the effect?

Dutch Accreditation Council (RvA) Policy rule Nonconformities. Corrective action

ISO 9001:2008 Audit Checklist

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

LAB 37 Edition 3 June 2013

High Level Importance: ISO Microbiology compliance

EPA NATIONAL LEAD LABORATORY ACCREDITATION PROGRAM. LABORATORY QUALITY SYSTEM REQUIREMENTS (LQSR) REVISION 3.0 (November 05, 2007)

Luminus Devices, Inc Luminus Testing Laboratory Quality Management Systems Manual

IAF Informative Document. IAF Informative Document for the Transition of Management System Accreditation to ISO/IEC 17021:2011 from ISO/IEC 17021:2006

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification

IAS CALIBRATION and TESTING LABORATORY ACCREDITATION PROGRAMS DEFINITIONS

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ PHONE: (520) FAX: (520)

IAF Mandatory Document. Witnessing Activities for the Accreditation of Management Systems Certification Bodies. Issue 1, Version 2 (IAF MD 17:2015)

NABET Criteria for INFORMATION SECURITY MANAGEMENT SYSTEMS (ISMS) Lead Auditor Training Courses

Gap Analysis of ISO 15189:2012 and ISO 15189:2007 in the field of Medical Testing

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

RULES FOR THE PARTICIPATION IN INTER- LABORATORY COMPARISONS AND PROFICIENCY TESTING SCHEMES

Non-Controlled Copy. Quality Manual Revision Log. Rev # Date Description

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

R103 - GENERAL REQUIREMENTS: PROFICIENCY TESTING FOR ISO/IEC LABORATORIES

IAF Informative Document for the Transition of Food Safety Management System Accreditation to ISO/TS 22003:2013 from ISO/TS 22003:2007

IAF Informative Document for the Transition of Food Safety Management System Accreditation to ISO/TS 22003:201X from ISO/TS 22003:2007

Certification Process Requirements

Testing Facility Laboratory Manual

Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training

SAAS Notification. September 1, 2015

NABL accreditation is a formal recognition of the technical competence of a medical testing laboratory

SADCAS Experiences- Medical Laboratories Accreditation Programme. Presented by. Maureen P Mutasa (Mrs) SADCAS CEO

UL s Medical Quality Management System Registration

ISO/IEC ACCREDITATION REQUIREMENTS FOR CALIBRATION LABORATORIES

Software Verification and Validation

Nonconformities (NCs) and Observations (OBs)

QUALITY MANUAL GREAT LAKES INSTITUTE FOR ENVIRONMENTAL RESEARCH ANALYTICAL LABORATORIES. October 2008 Revision 08

EXAM PREPARATION GUIDE

ISO 13485:201x What is in the new standard?

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC , Explosive Atmospheres - Edition 1.

Analytical Laboratories, Inc.

Cisco Global Commerce Audit Preparation Document, v4.0

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART II

Auditing Process-based Quality Management Systems. Charlie Cianfrani and Jack West

State Meat and Poultry Inspection (MPI) Program Laboratory Quality Management System Checklist

Food Safety. Management Systems. Scope of Accreditation

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM a Rev /10/02

Aerospace Guidance Document

ISO 9001:2008 Clause PR018 Internal Audit Procedure

ISO 9001:2000 Gap Analysis Checklist

Information Technology Security Testing - Common Criteria

Evaluation of the Quality System Appraisal of Conformity

DHI DANETV Test Centre Quality Manual

REQUIREMENTS FOR GAINING AND MAINTAINING ACCREDITATION SAAS CERTIFICATION REQUIREMENTS TABLE OF CONTENTS 1.0 CERTIFICATION BODY...

HKCAS Supplementary Criteria No. 8

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

NABET Accreditation Criteria for QMS Lead Auditor Training Course

Auditing HACCP Programs

CORPORATE QUALITY MANUAL

ISO and SANAS guidelines for use of reference materials and PT scheme participation Shadrack Phophi

Transcription:

NVLAP Assessor Training Assessment Techniques

Outline Purpose of the Types of Assessments Instructions to the Assessor Conducting the Opening Meeting Collecting and Verifying Information Horizontal vs. Vertical Assessment Completing the Report(s) Time Management Conducting the Closing Meeting Case Study Assessment Techniques September 24, 2013 2

Assessment - Definition Process undertaken by an accreditation body to assess the competence of a CAB, based on a particular standard(s) and/or normative documents and for a defined scope of accreditation (ISO/IEC 17011:2004) Assessment Techniques September 24, 2013 3

Initial Types of NVLAP Assessments NIST Handbook 150:2006 Program-specific handbooks/requirements Renewal NIST Handbook 150:2006 Program-specific handbooks/requirements Monitoring/Scope Expansion Few designated items Full review Assessment Techniques September 24, 2013 4

Laboratory Assessment Instructions for Assessor Do not commit monies prior to receipt of the purchase order Goal - conduct assessment within the first 6 months of the renewal cycle. Assessment Techniques September 24, 2013 5

Laboratory Assessment Instructions for Assessor Lead Assessor Pre-assessment Document Review and Agenda to lab at least 2 weeks prior to assessment Lead Assessor - contact lab rep, and the other assessor(s), 2-5 days prior to on-site to confirm dates and final logistics Assessment Techniques September 24, 2013 6

Importance of the document review Requirement of APLAC/ILAC Request currency of management documents Request the Cross-Reference, if LAP requires Understand the lab s processes Evaluate the documented systems against accreditation requirements. Allows time for lab to correct potential NCs Assessment Techniques September 24, 2013 7

Importance of the document review (continued) Identifies the in-house calibration needs Provides a foundation for record review Affords for the opportunity for the on-site to be completed in timely manner Identify clearances, safety, hazards, etc. If potential NCs are serious enough to consider not proceeding with the on-site assessment, contact your NVLAP PM immediately Assessment Techniques September 24, 2013 8

Typical On-Site Assessment Agenda Day 1 8:30 Team arrival at lab 8:30-9:30 Opening meeting 9:30-10:00 Laboratory tour 10:00 Assessment begins Management requirements: John James Technical Thermodynamic Susan Jones Force/Torque Frank Brown Assessment Techniques September 24, 2013 9

Typical Agenda - continued 11:45-12:00 Assessor progress meeting (if necessary) 12:00-1:00 Lunch 1:00-4:30 Continue assessment 4:30-5:00 Day 1 - briefing 5:00 End Day 1 Assessment Techniques September 24, 2013 10

Typical Agenda continued Day 2 8:30 Team arrival at lab 8:30-12:00 Continue assessment process Management requirements: John James Technical Thermodynamic Susan Jones Force/Torque Frank Brown 12:00-1:00 Lunch Assessment Techniques September 24, 2013 11

Typical Agenda - continued Day 2 1:00-2:00 Finalize/follow-up Technical Thermodynamic Susan Jones Force/Torque Frank Brown 2:00-4:00 Report completion 4:00-5:00 Closing meeting 5:00 Assessment complete Assessment Techniques September 24, 2013 12

Agenda Determining Sample of Test/Cals Look at previous assessment report Specifically which methods were witnessed TMRS (if used in LAP) OT Observed Test (includes the three options listed below) W/TT Walked/Talked Through (includes listening and examining apparatus) LDP Listened to Description of Procedures EA Examined Apparatus. Observe (OT) different methods from previous assessment(s), if appropriate. Assessment Techniques September 24, 2013 13

Conducting an Opening Meeting Introduction of personnel Audit purpose (initial/renewal assessment) Review/verify agenda Identify assessment requirements HB 150 HB 150-xx (program-specific) Verify the requested scope of accreditation Assessment Techniques September 24, 2013 14

Opening Meeting (continued) Explain the assessment process Confidentiality between parties Methods of collecting information Interviews Observation Documentation/record review Witness of testing/calibration activities Representative sampling process Not a sampling of the actual requirements Process for when nonconformities are identified Identify reporting documents Assessment Techniques September 24, 2013 15

Opening Meeting (continued) Logistics Assessor base Quality manager -> lead assessor (typical) Tech. manager -> tech assessor(s) (typical) Lunch arrangements Verify restrictions Clearances, escorts, clothing, hazards, etc. Assessment Techniques September 24, 2013 16

Facility Tour Identify state of quality Observe the environment Accommodations Observe the overall atmosphere Allows lab to showcase Assessment Techniques September 24, 2013 17

Typical Assessment Activities (ISO 19011:2011, Fig. 2) Before Arrival On-Site Depart 6.2 Initiating the audit 6.2.1 General 6.2.2 Establishing initial contact with auditee 6.2.3 Determining the feasibility of the audit 6.3 Preparing audit activities 6.3.1 Performing document review in preparation for audit 6.3.2 Preparing audit plan 6.3.3 Assigning work to the audit team 6.3.4 Preparing work documents 6.4 Conducting the audit activities 6.4.1 General 6.4.2 Conducting the opening meeting 6.4.3 Performing document review while conducting the audit 6.4.5 Communicating during the audit 6.4.5 Assigning roles and responsibilities of guides and observers 6.4.6 Collecting and verifying information 6.4.7 Generating audit findings 6.4.8 Preparing audit conclusions 6.4.9 Conducting closing meeting 6.5 Preparing and distributing audit report 6.5.1 Preparing the audit report 6.5.2 Distributing the audit report 6.6 Completing the audit 6.7 Conducting audit followup (If specified in the audit plan) Assessment Techniques September 24, 2013 18

Collecting and Verifying Information (ISO 19011, Figure 3) Source of information Collection by sampling (record review, observation, interview) Assessment evidence Evaluating against criteria Findings Reviewing Assessment conclusions Assessment Techniques September 24, 2013 19

Sampling Record Review Customer contracts Purchasing documents of services and supplies Customer feedback Complaints Corrective action & preventive action Internal audits & management review Personnel qualification/training (5.2) Test/calibration reports and certificates Quality control data/pt results Assessment Techniques September 24, 2013 20

Record Sampling How do you select a sample of the records? There s no defined rule No statistical requirement of how many The sample size should be relevant The sample size should be representative Generally the sample size is small Look at the last report Assessment Techniques September 24, 2013 21

Assessment Tools Observations - a sampling Test methods Calibrations Walk through a process Follow a sample/artifact from receiving into the lab Follow a sample/artifact during a test Observe representative tests Follow a sample/artifact through certificate/report (vertical) Follow the feedback process Assessment Techniques September 24, 2013 22

Interviews Assessment Tools Supervisors/management Technical staff (Bench metrologist, technologist, technician) Supporting staff Administrative Purchasing Shipping/receiving Assessment Techniques September 24, 2013 23

Horizontal Assessment An evaluation of a process, activity, or requirement across two or more units (working your way through the assessment checklists) Assessment Techniques September 24, 2013 24

Horizontal Assessment - example Assessment Techniques September 24, 2013 25

Vertical Assessment An in-depth review of a particular function. This type of assessment technique would monitor the use of all relevant procedures as they are used to support the function. Review of records that are created in the process. Assessment Techniques September 24, 2013 26

Vertical Assessment - Beginning to End Example 1 Witness test and then review test report 5.10 (Reporting) 4.4 (Contract Review) 5.2 (Personnel) 5.5 (Equipment) 5.7 (Sampling) Annex A (NVLAP symbol use) Annex B (Traceability) Assessment Techniques September 24, 2013 27

Vertical Assessment - Assess the Process Example 2 Review a contract (4.4) 4.7 (Service to Customer) 4.13 (Control of Records) 5.4 (Method Selection) 5.5 (Equipment) 5.8 (Test/Calibration Items) 5.9 (Quality Assurance/PT) 5.10 (Reporting) Assessment Techniques September 24, 2013 28

Horizontal Assessing Benefits: Ability to evaluate that a certain function is being effectively implemented across a grouping Challenges: May not provide sufficient insight on how the different parts of the system interoperate Assessment Techniques September 24, 2013 29

Vertical Assessing Benefits: Provides insight on how the different parts of the system interoperate Challenges: May lead into areas outside of the scope of the assessment; the proverbial rabbit hole Assessment Techniques September 24, 2013 30

Horizontal vs. Vertical (which one should I use on-site?) Both A hybrid approach will in almost all cases provide you the overall "best value assessment (in-depth evaluation vs. time allotted). Assessment Techniques September 24, 2013 31

Time Management Putting the necessary time into the preassessment document review Knowing when to move on Refrain from jumping from location to location Assessment Techniques September 24, 2013 32

Completing the Assessment Report Use the checklist during the assessment. The checklists provide a road map to keep the assessment on track. You may work on it at the hotel. Finalize it during the last few hours of the assessment. Assessment Techniques September 24, 2013 33

Conducting a Closing Meeting A meeting shall take place between the assessment team and the CAB prior to leaving the site. At this meeting, the assessment team shall provide a written and/or oral report on its findings obtained from the analysis (see 7.8.1). An opportunity shall be provided for the CAB to ask questions about the findings, including nonconformities, if any, and their basis. (ISO/IEC 17011, 7.8.3a) Assessment Techniques September 24, 2013 34

Conducting a Closing Meeting Begin meeting with appreciation of the lab s conduct and hospitality throughout the assessment Identify the method of reporting and explain how the assessment findings will be presented Explain that the assessor s role is the messenger. The laboratory has the opportunity to challenge findings directly to NVLAP. Assessment Techniques September 24, 2013 35

Conducting a Closing Meeting Deliver the assessment report (typically through review of the cited nonconformities & comments along with the narrative report) ( findings can be either positive or negative) Allow lab opportunity to ask questions about the report Explain the process of how the lab is to handle the comments and nonconformities (i.e., 30 days, recommendation of follow-up assessment) Assessment Techniques September 24, 2013 36

Conducting a Closing Meeting Deliver positive feedback from throughout the assessment Finish up by again thanking the lab staff for their cooperation and flexibility throughout the assessment Assessment Techniques September 24, 2013 37

Case Study #1 - Question During the on-site assessment, you identify that the lab has not validated their new software testing tool The lab responds by saying they identified this issue also during their internal audit and have opened a corrective action Do you still cite this as a NVLAP nonconformity? Assessment Techniques September 24, 2013 38

Answer: Perhaps Case Study #1 - Answer Does the finding cast doubt on the effectiveness of the testing/calibration activity? Assessment Techniques September 24, 2013 39

Case Study # 2 - Question On Day 1 of the assessment, you identify an NC to the lab that their equipment calibration certificates are not being verified upon equipment return (HB 150, 4.6.3) The next morning, the lab comes to you with a record of checked compliance for 1 of their 3 oscilloscopes and asks you to close the NC on-site. Do you comply? Assessment Techniques September 24, 2013 40

Case Study #2 - Answer Answer: No, you do not. The reason is that the NC has been identified and is now part of the assessment report. A laboratory shall address NCs by following their corrective action procedure, which is to begin with identifying the root cause (HB 150, 4.11). Your response: Please provide me with your corrective action information. [END] Assessment Techniques September 24, 2013 41