Norfolk Flooding Strategy Update. Presentation to Norfolk City Council March 27, 2012



Similar documents
Swannanoa River Flood Risk Management Study

COASTAL RESILIENCE STRATEGY

Flood Risk Management

Flood Risk Management

Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Standard Operating Procedures for Flood Preparation and Response

2012 Flood Hazard Prevention By Building and Planning Operations Manager Lou Ann Patellaro

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

COMMUNITY CERTIFICATIONS

Section 6: Mitigation Strategy

Section 6: Mitigation Strategy

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1.

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Flood Damage Mitigation And Insurance Costs

Tools from the US EPA s Climate Ready Water Utilities Initiative (CRWU) EPA Region 3 Conference Extreme Weather Events: Adapt, Mitigate, and Survive

Section 19. Basin-wide Mitigation Action Plans

Community RiskMAP Questionnaire

What if Hurricane Sandy made landfall on the SC Coastline???

The City of Ottawa Flood Hazards

NAFSMA Position on Floodplain Management Issues

United States Army Corps of Engineers, Civil Works

Hoboken Resiliency & Readiness Plan

Whole Community Concept Integration into National Disaster Preparedness Training Center University of Hawaii

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

HAZUS th Annual Conference

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Oregon. Climate Change Adaptation Framework

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Portion of Smith Tract and Weber Tract Flood Contingency Map

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

Risk MAP Project Coordination Meeting: Burlington County, NJ. FEMA REGION II May 8, 2013 Westampton, New Jersey

Adaptation for City Infrastructure; A Case Study of East Boston, MA

Page Intentionally Left Blank

New York Sea Grant Strategic Plan

Focus Areas: Program/Project Management, Repetitive Loss Properties, Flood Map Modernization, Standard Business Processes.

CDM. City of Jacksonville Master Stormwater Management Plan (MSMP) Update. December 2008 Update. Agenda. 1. Data Collection. 2.

c f'f:..-- Risk Identification Branch

City of Cambridge Climate Protection Action Committee. Recommendations for Adaptation to Climate Change. Purpose

Disaster Recovery Assistance Program Guidance. Important

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management. New Jersey Department of Environmental Protection

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

MEETING DATE: February 08, 2008

United States Postal Service Climate Change Adaptation Plan

New Coastal Study for Puerto Rico FIRMs. Paul Weberg, FEMA RII Mat Mampara, Dewberry Jeff Gangai, Dewberry Krista Collier, Baker

Climate Change Long Term Trends and their Implications for Emergency Management August 2011

Successfully Surviving the Flood. Date: October 31, 2001 Federal Triangle Stormwater Study Working Group Paul Tertell, PE

Overview. Homeowner Flood Insurance Affordability Act

ARkStorm: California s Other Big One!

Surviving the Storm Economic impacts of an acute flooding event in the Bay Area. Downtown San Anselmo New Years Flood

Emergency Support Function #14 Long Term Community Recovery and Mitigation

Time Allotted 1:50pm-2:23pm Agenda Topic Overview New Business

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

Federal Emergency Management Agency (FEMA) Preliminary Flood Insurance Rate Maps (FIRMs) and Preliminary Flood Insurance Study (FIS) for New York City

FEMA s Risk Mapping, Assessment, and Planning (Risk MAP) Fiscal Year 2011 Report to Congress March 15, Federal Emergency Management Agency

North San Jose Neighborhoods Planning Taskforce

City of Indian Rocks Beach, Florida NFIP Number

June 16, 2015 PURPOSE

U.S. Army Corps of Engineers

Town of Chatham Department of Community Development

US Army Corps of Engineers Authorities and Programs

How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015

Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY

April 3, Write Your Own (WYO) Principal Coordinators and the National Flood Insurance Program (NFIP) Servicing Agent

Predicting Coastal Hazards: A Southern California Demonstration

Eastern Connecticut Risk & Vulnerability Assessment Workshop

NAPA COUNTY WATERSHED SYMPOSIUM

(Adopted July 26, 2005 Resolution No ) Prepared by: Kevin Marstall, PE, Senior Civil Engineer, CRS Coordinator

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Mariana Leckner, Ph.D., Professor, American Military University Thomas O. Herrington, Ph.D. Associate Professor, Stevens Institute of Technology

Melbourne Water Flood Risk Assessment: How flood impacts are assessed in the Port Phillip and Westernport region

In Coastal Virginia, flooding

Overview of Singapore s Drainage Management Approach July 2011

SPRING Anna Killius, J.D. Law School Graduate Virginia Coastal Policy Clinic at William & Mary Law School. VCPC White Paper Number 1

This paper provides a concise description of

City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events

Flood Insurance Repetitive Loss Property

Illinois Farmers Insurance Company v The Metropolitan Water Reclamation District of Greater Chicago.

Presented by: Michael DePue, PE, CFM Annual Georgia Association of Floodplain Management Conference Lake Lanier Islands, Georgia March 23, 2010

Association of State Flood Managers Annual Conference Wednesday, June 4, 2014

Public Law th Congress An Act

Leveraging Resources for Financing, Implementing, and Sustaining Climate Change Adaptation and Resiliency

Disaster Recovery Managing and Leveraging Multiple Funding Sources

Table of Contents ESF

SECTION 3.2 CLIMATE AND PRECIPITATION

Extreme Climate/Weather Events: Lessons Learned from Water and Wastewater Utilities

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps

University of Missouri Extension Emergency Management Guidance (Updated 3/2011)

GAO s High-Risk Program

CHAPTER 7. EMERGENCY SERVICES

Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine

An Assessment Of Maryland s Vulnerability To Flood Damage

H 5478 S T A T E O F R H O D E I S L A N D

Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts

Malcolm L. Spaulding Professor Emeritus, Ocean Engineering University of Rhode Island Narragansett, RI 02881

FLOOD HAZARD IN THE URBAN ENVIRONMENT: IMPLICATIONS FOR DEVELOPERS, DESIGNERS, AND ATTORNEYS

Designing and Developing WebGIS SLR tools: NJ Floodmapper

Chapter 6: Mitigation Strategies

Transcription:

Norfolk Flooding Strategy Update Presentation to Norfolk City Council March 27, 2012

Presentation Overview The purpose of this presentation is to provide City Council an update on activities carried out under the City s Flooding Strategy Items include: Flooding Strategy Overview Update on Mitigation Studies Update on Legislative Initiatives

Norfolk Flooding Strategy Over the course of the past year, the City has undertaken a comprehensive approach to address precipitation and tidal flooding across the entire City. Realizing the magnitude by which we must address this issue, our work plan has evolved into a four-pronged strategy.

Norfolk Flooding Strategy (Cont d) Plan City planning Study and analysis Modeling & simulation Prepare Emergency Preparedness & Response Education & Training Communicate Citizen outreach Partnerships Online resources Mitigate Infrastructure development Flood remediation and mitigation

Plan City Flood Prevention Committee Meets weekly Cross collaboration amongst City departments Long term tidal & precipitation flooding analysis Fugro & Moffat-Nichol Studies Shoreline Protection analysis U.S. Army Corps Willoughby & Ocean View study Federal & State legislative initiatives Partnerships for information & Analysis Analysis and Revision of City Codes

Prepare National Incident Management System Certification of staff by FEMA National Flood Insurance Program City participation to benefit residents StormReady Community National Weather Service approved Community Emergency Response Team All Risk All Hazard Training Transportation Alternatives Evacuation strategies

Mitigate Storm Water Infrastructure Shoreline Protection & Stabilization Property Acquisition Tidal Flooding Mitigation Projects FEMA Hazard Mitigation Grant Program Home elevations National Flood Insurance Program Increased Cost of Compliance Participation

Communicate Citizen Focus Group Civic League participation Experts Advisory Committee US Army Corps, US Navy, VPA, HRSD, HRPDC, VIMS, ODU, NOAA, NASA HRUBS Bill Inserts Council Updates Flooding Website

Norfolk Flooding Website April 2012

Update on Mitigation Studies Fugro Study Final Recommendations Hague Floodwall Preliminary Design Received Estimated Cost $60M Pretty Lake Floodwall Preliminary Design Received Estimated Cost $50M Masons Creek Pump Station Preliminary Design to be completed in 2-3 Weeks Estimated Cost $30M Complimentary Water Quality Analysis. Ohio Creek Implementing Recommendations City Wide Review Analysis of other areas of the City in Progress Tidal flooding Rainfall Flooding

The Hague Project Recommendations

Pretty Lake Project Recommendations

Mason Creek Project Recommendations CAPITAL PROJECT intended to protect against rainfall runoff (Area protected from Tidal Surge by Existing Tide Gate (operated by Navy) will require: Pump station to remove rainfall runoff when gate closed New Storm Culvert beneath Navy OPTIONAL APPROACH Peripheral walls (or berms) where land surface is low around Creek Structure elevation Future building requirements

Ohio Creek: Project Recommendations CAPITAL PROJECT Phased as Follows: Phase 1 Acquisition of most vulnerable properties in planning state Phase 2 - Installation of new tidal gate planned for 2012 including capacity for small pump Phase 3 Expansion of existing box culvert or new culvert is proposed for future improvement Booker T. Washington H.S Spartan Village Norfolk State University

Citywide Risk Analysis & Flood Mitigation

Next Steps for Mitigation Studies Make project reports available to public Coordinate with Army Corps of Engineers and Congressional Delegation for inclusion of Fugro analysis in Federal studies Review environmental requirements Continue Citywide study and analysis of all watersheds

Update on Legislative Initiatives The City has undertaken a complete intergovernmental approach to seek assistance and collaboration with all levels of government including: Federal Government Congress Federal Agencies Commonwealth of Virginia General Assembly State Agencies Institutions Universities Local Governments

Federal Legislative Initiatives The City initiated efforts to seek Federal assistance through our Congressional Delegation and the U.S. Army Corps of Engineers (USACE). The City coordinated a Citywide tour of flood prone area for Federal representatives. The City hosted community meetings with Representatives Rigell and Scott. In March 2012 the USACE proposed to reprogram $100,000 of Section 205 funding to begin a Reconnaissance Study.

Federal Legislative Initiatives (cont d) Next Steps Seek Congressional Authorization & Funding to complete: Reconnaissance study FY13 Feasibility study FY14 Environmental Impact Statement TBD NEPA Coordination - TBD Construction - TBD

State Legislative Initiatives At the request of the City of Norfolk the General Assembly approved a joint resolution requesting the Virginia Institute of Marine Science to study strategies for adaptation to prevent recurrent flooding in Tidewater and the Eastern Shore Virginia localities. The study will (i) review and develop a comprehensive list of ideas and examples of strategies used in similar settings around the United States and the world; (ii) convene a stakeholder advisory panel for the purpose of discussing and assessing the feasibility of employing these strategies in Tidewater and Eastern Shore; and (iii) offer specific recommendations for the detailed investigation of preferred options for adapting to relative sea-level rise.

State Legislative Initiatives (cont d) Next Steps Governor signs study resolution March/April 2012 W&M VIMS, in partnership with ODU, commence study in earnest in April 2012. W&M VIMS complete Study by January 2013. Request that the 2013 General Assembly create and appropriate funding for: A state flood mitigation fund that Virginia Coastal and Shoreline Communities can subscribe to for assistance with federal match share.

Summary The City has a comprehensive strategy to address precipitation and tidal flooding. The City has established enhanced communication and collaboration efforts to increase awareness about our flood prone areas. The City has identified specific mitigation projects that will require significant public investment and intergovernmental coordination.