ALM-PLM Integration for Systems Development Rob McAveney Chief Architect Aras Corp Copyright 2014 Boeing. All rights reserved. GPDIS_2015.ppt 1
Increasing product complexity Product Complexity Connected Systems Product as a Service Software SE/MBSE Electronic Mechatronics Electrical Mechanical 3D Mechanical 2D GPDIS_2015.ppt 2
PLM Cross-Domain Co-Design System/Product View Functional Block diagram Linked to Requirements Engineering Domains Software (Embedded) Electronics (ECAD) Mechanical (MCAD) Product structure Parts & BOM oriented Drives Engineering BOM to Manufacturing BOM System View Mechanical GPDIS_2015.ppt 3
PLM Product Structure Assembly MCAD File Part Part Electronics Assembly MCAD File MCAD File ECAD Package Component Component Software Build Files MCAD explicit MCAD file PLM Part/Assembly (BOM) MCAD files mapped to PLM Parts ECAD extractable ECAD file PLM Part/Assembly (BOM) Components mapped to PLM Parts Embedded Software indirect IDE files PLM Part/Assembly (BOM) Released binaries (builds) mapped to PLM Parts to drive manufacturing processes Mapping via System/Product View GPDIS_2015.ppt 4 2015 Aras 4
PLM Through-Life Support 2015 Aras 5 GPDIS_2015.ppt 5
The Challenge Integrate software development processes into the enterprise Enable enterprise change and configuration management Encourage collaboration between traditionally isolated groups Link software structure to the physical item hierarchy Promote truly interdisciplinary impact analysis Allow for proper enterprise traceability and audit Achieve thru lifecycle configuration control across disciplines PLM and ALM must synchronize across the entire product lifecycle Integrate to avoid major impact on existing tools / processes GPDIS_2015.ppt 6 2015 Aras 6
Strategic Partnership 2015 Aras 7 GPDIS_2015.ppt 7
Open Services for Lifecycle Collaboration Open standard for integration between lifecycle systems Aras & IBM participating in public use case development based on OSLC Further enhancements expected to enhance configuration management GPDIS_2015.ppt 8 2015 Aras 8
Implementer's Forum ALM-PLM Integration for Systems Engineering Reference architecture implementation Airbus partners IBM for ALM Aras for PLM 2015 Aras GPDIS_2015.ppt 9
OSLC Capabilities Data and Processes Continuous Verification Change Management Requirements Management Architecture Management Configuration Management Quality Management Physical Product - PLM - Aras Process: Enterprise Wide Structure, Parts, BOM, File Vault IBM Continuous Engineering & SSE Rational Team Concert Rational DOORS Next Generation Rational Quality Manager Rational Rhapsody Design Manager Rational Engineering Lifecycle Manager Unlocking Engineering Knowledge Strategic Reuse Change Management Configuration Management Tracked Resource Set Product Structure GPDIS_2015.ppt 10 2015 Aras 10
PLM Process Goal Physical Product - PLM - Aras Process: Enterprise Wide Structure, Parts, BOM, File Vault OSLC APIs IBM Continuous Engineering Processes/Practices for System/Requirements IBM SSE Aras Connectors Solutions: Tool/Domain Specific System & Software Domains Mech. Domain Elect. Domain Tech Pubs GPDIS_2015.ppt 11 2015 Aras 11
PoC Highlights: ECO/ Integration Aras PLM Mechanical Electronic Product ECO Rational Team Concert IBM Continuous Engineering & SSE Software Binary File OSLC Enterprise ECO links to s in other domains Integration between change items, lifecycles and product artifacts OSLC maintains live links between relevant items GPDIS_2015.ppt 12 2013 Aras 12
PoC Highlights: Impact Analysis Aras PLM Mechanical Electronic Product ECO Rational Team Concert IBM Continuous Engineering & SSE Software Binary File OSLC Cross-disciplinary impact analysis performed as part of the enterprise ECO process Discipline-specific workflows identify and share affected items Cost and risk are analyzed based on the full enterprise impact GPDIS_2015.ppt 13 2013 Aras 13
PoC Highlights: Engineering WIP Aras PLM Mechanical Electronic Product ECO Rational Team Concert IBM Continuous Engineering & SSE Software Binary File OSLC Each discipline handles its own work-in-progress data Results are promoted to the enterprise level at relevant checkpoints Release of engineering data is driven by the enterprise and synchronized between disciplines GPDIS_2015.ppt 14 2013 Aras 14
PoC Highlights: Work Product Upload Aras PLM Mechanical Electronic Product ECO Rational Team Concert IBM Continuous Engineering & SSE Software Binary File OSLC Discipline-specific data is uploaded to enterprise PLM Cross-discipline collaboration is enabled Released data are controlled at the enterprise level GPDIS_2015.ppt 15 2013 Aras 15
PoC Highlights: Enterprise ECO Release Aras PLM Mechanical Electronic Product ECO Rational Team Concert IBM Continuous Engineering & SSE Software Binary File OSLC Signoffs occur based on the system-level view Proper traceability and audit trail are preserved Single, authoritative data source for downstream systems/processes GPDIS_2015.ppt 16 2013 Aras 16
Summary Aras is innovating on PLM-ALM integration and processes New approach to software/hardware processes and product structure Leverage existing systems in place for software development Aras/IBM have partnered to create PLM-ALM reference architecture Enterprise-wide, cross-discipline through the lifecycle Configuration Management, including traceability and audit trails Using Open Services for Lifecycle Collaboration OSLC is a standards-based integration technology Used to integrate Aras with IBM s Continuous Engineering suite GPDIS_2015.ppt 17 2015 Aras 17
2015 Aras 18 GPDIS_2015.ppt 18