Lean principles and their supporting tools are widely acknowledged to provide an effective framework for

Similar documents
Rehabilitation Network Strategy Final Version 30 th June 2014

A vision for the ambulance service: 2020 and beyond and the steps to its realisation

Patient Choice Strategy

The Health Foundation

Australian Safety and Quality Framework for Health Care

MID STAFFORDSHIRE NHS FOUNDATION TRUST

consultant link Too many unnecessary referrals and hospital admissions?

About public outpatient services

Defining the boundaries between NHS and Private Healthcare

Improving Emergency Care in England

Leeds Care Record Project. Leeds Care Record Project 1

THE POTENTIAL OF LEAN THINKING IN HEALTHCARE

BOARD PAPER - NHS ENGLAND. Purpose of Paper: To inform the Board about progress on implementation of the Cancer Taskforce report.

Board of Directors Meeting

Report to Trust Board 31 st January Executive summary

Literature Review of Business Process Improvement Methodologies: Executive Summary

Haslemere Health Centre & Grayshott Surgery Commissioning Data Quality Audit Report

Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS

Progress on the System Sustainability Programme. Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014

Fife NHS Board Activity NHS FIFE. Report to the Board 24 February 2015 ACTIVITY REPORT

PRESENT: Mr M Hill Modernisation Director (Chair) Mr J Anning Chair, North Lanarkshire CHP Mr P K Corsar Chair, NHS Board

Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary)

Department of Health/ Royal College of General Practitioners. Implementing a scheme for General Practitioners with Special Interests

Our five-year strategy

SUBMISSION TO THE MEDICARE BENEFITS SCHEDULE REVIEW TASKFORCE

Keeping patients safe when they transfer between care providers getting the medicines right

Tackling insulin safety using a multifaceted multidisciplinary regional approach

National Clinical Programmes

Patients First. Better, safer care for local people. Public consultation on surgery reconfiguration Help us develop our services to meet local need

PATIENT ACCESS POLICY

Defining the boundaries between NHS and Private Healthcare

Big Chat 4. Strategy into action. NHS Southport and Formby CCG

Celebrating 10 years as an NHS Foundation Trust

Benefits Management: Realising Benefits from your projects. Professor Liz Daniel Associate Dean & Professor in Information Management

Report to Trust Board Executive summary

HEALTHCARE SIMULATION

REMOVING THE POLICY BARRIERS TO INTEGRATED CARE

Changing health and care in West Cheshire The West Cheshire Way

Mark Thomas, Director of Health Informatics Mr Graham Putnam CCIO Steve Shanahan, Executive Director of Finance. IM&T Committee

Code of Conduct. Property of UKAPA 20/11/2009 1

Eliminating inefficiencies with PerfectServe. SUCCESS STORY Elimination of delays in consultant care. perfectserve.com

Measuring quality along care pathways

Future hospital: Caring for medical patients. Extract: Recommendations

South East Coast Ambulance Service NHS Foundation Trust

Liberating the NHS: No decision about me, without me. Further consultation on proposals to secure shared decision-making

Community Rehabilitation Beds. Questions and Answers

Australian Safety and Quality Framework for Health Care

Organization of Primary Care Clinics

WHAT DOES THE PSYCHOLOGICAL THERAPIES HEAT TARGET MEAN TO YOU?

31% of people experience pain at work at least once a week 1

CSH Surrey. Why they developed?

Effective Approaches in Urgent and Emergency Care. Priorities within Acute Hospitals

Prime Minister s Challenge Fund (PMCF): Improving Access to General Practice. Innovation Showcase Series Using Technology to Improve Access

Dashboard Views. Alerts

INDIGENOUS CHRONIC DISEASE PACKAGE CARE COORDINATION AND SUPPLEMENTARY SERVICES PROGRAM GUIDELINES

Lung Cancer Multidisciplinary Meeting Toolkit. National Lung Cancer Working Group

Gaining agreement to implement TOC in healthcare. Practical approaches to stakeholder engagement in a healthcare environment

Appointment Non-Attendance (Did Not Attend) Procedure

Unbundling recovery: Recovery, rehabilitation and reablement national audit report

One Health Group Limited

Managing and Minimising Appointment Slot Issues

The Planned Care Improvement Programme

Research in the NHS HR Good Practice Resource Pack

Commissioning Policy (EMSCGP005V2) Defining the boundaries between NHS and Private Healthcare

PATIENT ACCESS POLICY V3

The importance of nurse leadership in securing quality, safety and patient experience in CCGs

How To Improve Safety In The Nhs

The CQC have identified the following Must do s and Should do s in relation to outpatient services:

Capacity Manager. Seamless Pathways of Care Test duration Mar 2013 Mar 2015 Author/Lead. Paula Tate Contact details

ehealth and the personally controlled electronic health record (PCEHR) system

Delivering Quality in Primary Care National Action Plan. implementing the Healthcare Quality Strategy for NHSScotland

Hip replacements: Getting it right first time

A fresh start for the regulation of independent healthcare. Working together to change how we regulate independent healthcare

A&E Recovery & Improvement Plan

UKCPA - A Review of the Current Pharmaceutical Facility

Discharge to Assess: South Warwickshire NHS Foundation Trust

Everyone needs a little help sometimes

Developing the workforce to support children and adults with learning disabilities described as challenging

Consultation on amendments to the Compliance Framework. Dated 31 January 2008

Submission to the Senate inquiry into out-of-pocket costs in Australian healthcare

Welcome. Our aim is to provide firstclass independent healthcare for

A step by step introduction to setting up and running a successful nurse-led clinic in practice

Improving patient flow

BOARD PAPER NHS ENGLAND

Six Month Pilot Analysis: Improving Rehabilitation for Men with Prostate Cancer in North East London

Care Closer to Home. The Gateway, Middlesbrough: A New Integrated Health, Social Care & Housing Pathway

Together for Health Delivering End of Life Care A Delivery Plan up to 2016 for NHS Wales and its Partners

Option Five: Maintain the Status Quo

BOARD OF DIRECTORS PAPER COVER SHEET. Meeting date: 29 November 2006 Agenda item: 7.4

Report to the Trust Board 4 May Independent Inquiry into the Treatment and Care of DC

CQC: The journey to excellence and The new approach to inspection of ambulance services

Effective patient booking for NHSScotland. Best practice in the booking and management of patient appointments

Time to Act Urgent Care and A&E: the patient perspective

Bespoke talent management programmes

A guide to accessing private healthcare

Lean thinking and Six sigma at the level of Clinical Service Delivery

The new Stroke Nurse Practitioner candidate position at Austin Health

Centricity Physician Office

Associates Private Medical Trust Guide

Transcription:

Performance improvement through the application of Lean principles and change management methodology Introduction Lean principles and their supporting tools are widely acknowledged to provide an effective framework for performance improvement in manufacturing. Over the last decade, there has been a drive to adopt such principles within the public sector, for example to improve equipment servicing in the Ministry of Defence, to increase productivity in the asylum system, and to help hospitals manage the twin challenges of financial pressures and the requirement for care quality improvement. In this document we share 2020 Delivery s perspectives on using Lean effectively in the public sector and the potential impact of Lean tools, using as a case study a project we have recently completed on a haematuria 1 service as part of our support to the Royal Surrey NHS Foundation Trust s Patients First programme. This project led to a 75% reduction in the length of the referral-to-diagnosis pathway What is lean? Lean thinking is based on waste reduction techniques started by the Japanese car manufacturer Toyota in the 1930s. Core to the concept of lean is that every part of a process that does not contribute to the creation of value for the customer is a form of waste. Since the turn of the 21st century, lean principles have increasingly been applied in the NHS. Consequently, in a health care context, an example of a process could be a patient pathway, value for the customer optimum clinical outcomes and patient experience, and waste any activity within a pathway which does not improve the status of the patient. (from 63 days to 16 days), and to improvements in clinical quality and patient experience. Based on the success of this initial project, the approach is being rolled out across other service lines, including emergency medical admissions, fractured neck of femur, and total knee replacements. 2020 Delivery s perspective on implementing Lean effectively within the public sector By applying the six principles below, we believe managers can deliver successful and sustained change using the Lean approach: 1. Implement Lean as part of a structured programme of change that has a clearly communicated vision. This vision should link customer -level needs to the needs of the teams within the organisation, and also the organisation s strategy as a whole. The vision should also emphasise simultaneous improvements in quality, efficiency and user experience. 2. Use pilot projects to prove the concept, and focus on achieving significant and measurable changes in 1

performance from each of the pilot projects. These reference pathways then become the role models for other parts of the organisation. For example, the Ministry of Defence ran pilots on equipment service lines in the RAF, Navy, and Army and were able to review the lessons from these before rolling out more widely. 3. Identify and involve the full set of stakeholders actively in every project. For example, in health this means involving clinicians, patients, specialty managers and support service providers (e.g., radiology). Ensure that the solutions in each project are consciously patient-centric, and that all clinical service projects are clinically led. 4. Use a structured methodology and stick to it to avoid jumping to sometimes inappropriate conclusions. To quote a recent client, without a methodology, we would have implemented the wrong solution. In some organisations, it will be important to tailor the methodology to the department, and to develop a bespoke XYZ Organisation Way for implementing Lean. By doing so, the methodology and its underpinning principles and tools are much better understood and, therefore, owned by the organisation. 5. Include skills development and training as a part of the programme: the organisation will need to develop a cadre of Lean practitioners, as well as a wider group of people who have sufficient awareness of the tools and principles of Lean to be able to contribute and support projects. The reliance on external help may be a short-term need but it is not a long-term solution. 6. Plan for a multi-year programme of change. A Lean revolution requires continuous improvement, and many of the most successful programmes will include a succession of projects in the same service area, but potentially separated at six month intervals. In these situations, each project builds on the successes of previous projects, and takes improvement a step further. In practice, we realise that it is difficult to have all of these recommendations in place from the start. An element of phasing is likely to be necessary, for example, small pilots may be needed to prove the approach before the organisation commits to a full change programme. Case example: Lean pathway improvement for the haematuria service at Royal Surrey 2020 Delivery has been supporting the Royal Surrey s programme of patient pathway improvement based on Lean principles and on change management methodology. The goals of the programme are to improve patient experience, patient safety and clinical outcomes, at the same or improved level of efficiency, in each pathway within the scope of the project. The haematuria pathway was chosen as the first pathway for the programme as a proof of concept. Context At the beginning of the project, there were three main problems within the hospital s haematuria service: 1. Referrals to the haematuria clinic were growing but there was no further capacity 2. The time to get a decision/ diagnosis for most patients was too long (approximately two months) 3. Patients made too many trips to the hospital (up to five times to the point of decision/ diagnosis) The initial haematuria pathway, prior to the project, took an average of 63 days, involved the patient in five to seven steps, and there were other diagnostic and administrational steps which supported this patient interaction, as shown in figure 1. 2

Average time between steps 19 days 7 days 9 days 28 days TOTAL 63 days Haematuria discovered 1 2 3 4 5 6 7 Referral by GP 1 st out-patient clinic Phone follow up Different types of diagnostic test Flexible IVU Ultrasound Rigid Figure 1: The Initial patient pathway Project approach The haematuria project was part of the hospital s overall change programme, which was developed and led by hospital clinicians and managers. For the haematuria project, three urology consultants, one radiology consultant, two nurse specialist, and the project management collectively designed the best quality pathway without the involvement of these key stakeholders the chosen solution would have been suboptimal and the implementation period significantly extended. In addition, the patient was at the centre of the project from the start: the project was initiated by asking current patients what they wanted from the service, and subsequently a patient was a key member of the project at all stages. Key Lean tools applied in each phase 1 2 3 4 5 6 DEFINE ESTABLISH CREATE ORGANISE DO EVALUATE & REFINE Voice of customer Value mapping stream Ideas generation Implementation plan Benefits tracking Value definition TIMWOOD waste analysis Criteria development RACI allocation Continuous improvement Team forming and battle rhythm Process constraints & capability Benefit vs effort assessment Risk assessment Project benefits (+) and concerns (-) Figure 2: Improvement Methodology, DECODER Framework used to improve pathway 3

2020 Delivery and the Royal Surrey designed a structured approach to ensure that Lean and Six Sigma tools were used effectively and in an appropriate manner for the Trust setting. The approach is called DECODER and it structures the project into six stages: Design, Establish, Create, Organise, Do, Evaluate & Refine. As shown in the following chart, key Lean and change management tools are applied at each stage in the process: The application of this approach made the inefficiencies and constraints in the existing process very apparent. As an example, investigating the supply and demand balance in the pathway (as part of the Establish phase) exposed a significant constraint in the process: additional capacity had been added to outpatient clinic step at the beginning of the pathway to meet the growing level of referrals, however, an equivalent increase in capacity had not been added to the telephone follow-up step at the end of the pathway. This meant that either (i) the waiting list for the follow up appointment would grow every month (and, hence, lead to increased delays); or (ii) those conducting the follow up appointment could afford significantly less time per patient. Neither consequence was acceptable for the patient. Once the existing pathway constraints were fully understood, the new pathway was designed by working with stakeholders to generate potential solutions and objectively assess them. Project outcomes The project led to a reduction in the length of the referral-to-diagnosis patient pathway from 63 days to 16 days, and from five to seven steps to only two to three steps involving the patient, primarily by establishing a onestop-shop. This enabled all diagnostic tests and a face-to-face decision to be carried out on the same day in the majority of cases. Average time between steps 16 days The One-stop shop 16 days for decision Haematuria discovered 1 2 3 Referral by GP 1 st out-patient clinic Decision CT scan Flexible (Further Diagnostic) Figure 3: The reduced haematuria patient pathway The project also led to clinical benefits by moving from ultra-sounds to CT scans which gave a more complete test of the renal tract and meant that patients with malignancy (20% of cases) are now diagnosed and placed on the right pathway earlier. 4

And crucially, patient experience was improved with only one trip to hospital required for patients and decisions made face-to-face. A locally agreed price with the PCT meant that the Trust was appropriately paid for the service that it offered. Even though the pathway delivered significant benefits in terms of outcome and patient experience, it cost the PCT no more than the previous pathway. The Trust itself made savings from the removal of unnecessary duplication in its pathway and reallocation of these resources. Conclusion Utilisation of Lean methodology as part of a larger change transformation programme resulted in a significant efficiency gain, improved clinical outcomes, and improved patient experience in the haematuria pathway healthcare example. The project methodology is designed to ensure the root causes of inefficiency and waste are addressed by the proper solutions. The individual tools are useful in directing focus and guiding discussion during a change project. The haematuria project has been acknowledged as a significant success, winning the South East Coast s Strategic Health Authority s Best of Health Awards and being presented to the Chief Executive of the NHS and the Secretary of State for Health. The success of the haematuria project highlighted throughout the Trust the real, sustainable gains that could be achieved in a short space of time using Lean methodology. 2020 Delivery has continued to support the Royal Surrey on its performance improvement programme, and across a broader range of projects. Recent successes on the programme include large operational improvements in Fractured Neck-of-Femur treatment, and in Emergency Medicine. The Trust has already achieved 20% Length of Stay reduction in the Emergency Medicine Admissions Pathway, translating into actual savings of 700,000 and expected ongoing 1 million annual saving for the Trust, and a saving to Commissioners through reduced excess bed day payments. Footnotes 1 Haematuria is the occurrence of blood in the urine 5