Flood Damage Prevention in Delaware County, NY



Similar documents
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

How To Amend A Stormwater Ordinance

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners

5.14 Floodplains and Drainage/Hydrology

1.7.0 Floodplain Modification Criteria

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Proposed General Plan Update Goals, Policies, and Implementation Actions

COMMUNITY CERTIFICATIONS

Challenges. Estimated Damages from 100-Year Flood

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Prattsville Berm Removal Project. 1.0 Project Location

Flood Risk Management

Flood Risk Management

Summary: Introduction

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Barre City City-wide Policy and Program Options

Iowa Smart Planning. Legislative Guide March 2011

H 6042 S T A T E O F R H O D E I S L A N D

Reservoir Simulations for the Delaware River Basin Flood of June, 2006

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Floodplain Development Land Use Review

Shooks Run Drainage Study Basic Terminology

Building Olive s Flood Resiliency

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS)

Appendix J Online Questionnaire

Watershed Rehabilitation Program in Texas

4. Environmental Impacts Assessment and Remediation Targets

Chapter 6: Mitigation Strategies

7.0 INTRODUCTION 7.1 BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Natural Resource-Based Planning*

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

Preventing Basement Flooding

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

NAPA COUNTY WATERSHED SYMPOSIUM

6.01 FEMA National Flood Insurance Program (NFIP)

Town of Chatham Department of Community Development

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Innovative Approaches in Flood Damage Reduction

Green Spaces to Improve Waterways and Communities

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Community RiskMAP Questionnaire

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Bolton s Flood Risk Management Strategy

(Adopted July 26, 2005 Resolution No ) Prepared by: Kevin Marstall, PE, Senior Civil Engineer, CRS Coordinator

URBAN DRAINAGE CRITERIA

BRIEF HISTORY OF GEOGRAPHICAL INFORMATION SYSTEMS

Remaining Wetland Acreage 1,500, , ,040-39%

Stormwater Management Functional Servicing Report

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

Sims Bayou Federal Flood Damage Reduction Project

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Homeowner s Guide to Drainage

Why does Kittitas County want to form a Flood Control Zone District?

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

Is a Storm Drain a Trashcan?

Stormwater Master Plan August 2014

Preventing Basement Flooding Through Early Site Evaluation

Using Land Use Planning Tools to Support Strategic Conservation

Ecosystem Services, Wetlands and Houston s Growth. Jim Lester

Drainage Analysis for the McKownville Area

Rockdale County Storm Drain Stenciling Program Volunteer Information and Safety Briefing

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language

STORMWATER MANAGEMENT CHECKLIST

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

Creating the environment for business

Flood Protection Tips

Section 6: Mitigation Strategy

Warren County MS4 Stormwater Management Program Plan

Transcription:

Flood Damage Prevention in Delaware County, NY Susquehanna Basin 2 Villages, 8 Hamlets Schoharie Basin 1 Hamlet Cannonsville Basin 4 Villages, 6 Hamlets Pepacton Basin 2 Villages, 6 Hamlets Upper Delaware Basin 2 Villages, 5 Hamlets Nicole Franzese Delaware County Planning Department

Layers of project oversight in Delaware County Federal: FEMA, USACOE State: NYDEC SEQRA Review PROJEC T Regional: DRBC, NYCDEP Local: County and municipal

SEQRA New York's State Environmental Quality Review Act (SEQR) requires all state and local government agencies to consider environmental impacts equally with social and economic factors during discretionary decision-making. This means these agencies must assess the environmental significance of all actions they have discretion to approve, fund or directly undertake. SEQR requires the agencies to balance the environmental impacts with social and economic factors when deciding to approve or undertake an "Action".

NYCDEP oversight More than 50% of Delaware County land area is in NYC watershed Extra set of restrictions in watershed: Restrictions on impervious surface within 100 feet of watercourse or 300 feet of reservoir Restrictions on building within 100 feet of watercourse or 300 feet of reservoir Most projects require a separate Stormwater Pollution Prevention Plan and NYCDEP stormwater

County-Wide initiatives Regional Planning Documents Multi-Jurisdictional All-Hazard Mitigation Plan Stream Corridor Management Plans Delaware County Action Plan

SCMP A voluntary program locally developed that defines stream stewardship and management for the entire community Identification of problems and opportunities to address: stream stability and property protection issues flood issues aesthetic, recreational and ecological concerns Opportunity to work with government agencies and local groups to address stream maintenance issues Identification of funding sources for locally sponsored projects

DCAP Comprehensive locally driven watershed management program Components Agriculture Stormwater & Floodplain Management - (Urban and Highway) Stream Corridor Management On-Site Septic Systems Monitoring, Modeling and Research Home Rule & Economic Prosperity

Stormwater & Floodplain Management Scientific Research SEQRA (State Environmental Quality Review Act) Reviews Stormwater Plans and Retro-fit Programs Highway Management Program Source Water Protection

Local oversight Review by Municipal Planning Boards SEQRA compliance Site Plan Review Process Local Flood Damage Prevention Law Subdivision regulations Zoning Restrictions ie. Development Limitation Overlays Local planning documents Stormwater Management Plans Source Water Protection Plans Comprehensive Plans

Case Study: Town of Andes Section 2.12B Zoning Law: Special use permit required for construction within 100 ft of a protected stream or NYSDEC designated wetland. Subdivisions, site plans and special use permits shall be held to the standard that buildings and parking areas must avoid the area within 100 ft of streams or wetlands to the maximum extent practical Section 4.4 (2) (c) pg. 32 Subdivision Regulations: Drainage facilities must be large enough to accommodate potential runoff from entire upstream watershed, based on 50-yr storm and assuming maximum development within watershed. Section 4.4 (2) (d) pg. 33 Subdivision Regulations: Planning Board may require study to determine subdivision's effect on downstream drainage. Where it is anticipated that additional runoff created would exceed capacity of downstream drainage facilities, Board may withhold approval until this condition is corrected. Pg. 39 Subdivision Regulations, Table 1: On-site septic must be located at least 100 ft from a water body or wetland

Case Study: Town of Delhi Subdivision regulations pg 35 Section 4.4-4 Flood Plain Areas: Flood plain areas as defined by official HUD Flood Hazard Maps shall be preserved from any and all destruction or damage resulting from clearing, grading or dumping of earth, waste material or stumps, except at discretion of planning board. Zoning Law pg 20 Section 407 (Development Limitations Overlay) A) Description: Development limitations include, but are not limited to, Flood Hazard Areas as identified by FEMA on the 1985 FIRM, slopes over 15%, elevations over 2000. Zoning Law pg 21 Section 407 (Development Limitations Overlay) G) Other Provisions and Requirements: No further building construction for any purpose shall be permitted within the area designated as a Flood Hazard Area. Parking, open space and other uses not posing any obstructions to water flow may be permitted. Zoning Law pg 50 Section 706 Site Plan Review Submission

Summary Delaware County has several layers of regulatory structure in place to control development in and around flood hazard areas It makes more sense to work within existing regulatory constraints than to create new ones New floodplain maps are critical for proper planning and enforcement

Contact Us Delaware County Planning Department PO Box 367, Page Avenue Delhi, NY 13753 Phone: (607) 746-2944 Fax: (607) 746-8479 Email: pln@co.delaware.ny.us Visit us on the web at: http://www.delawarecountyplanningdepartment.com