Management of asbestos in recycled construction and demolition waste

Similar documents
The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

How to Safely Remove Asbestos

HOW TO SAFELY REMOVE ASBESTOS

INTRODUCTION. Alastair Hunter Deputy Director-General, Finance and Infrastructure

How To Manage Asbestos At A University

WORKING WITH ASBESTOS GUIDE WorkCover. Watching out for you. New South Wales Government

ASBESTOS in state and local government

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

WORKING WITH ASBESTOS GUIDE WorkCover. Watching out for you. New South Wales Government

C162 Asbestos Convention, 1986

ASBESTOS MANAGEMENT PLAN WHITE BAY PASSENGER TERMINAL ROAD WORKS PROJECT NUMBER 14 REVISION C

Title: Hazardous Building Materials Procedure

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Asbestos Management Plan

ASBESTOS AWARENESS. Environmental Health And Safety. MAINTENANCE CONTRACTORS

Guide for applicants for asbestos removal and asbestos assessor licences and notifications

REHABILITATION PROVIDERS AND WORKCOVER. WorkCover. Watching out for you. WHAT TO EXPECT FROM YOUR REHABILITATION PROVIDER. New South Wales Government

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

Prepared by Property & Facilities Division. Asbestos Management Plan 2008

How To Manage Asbestos At A Recycling Facility

Policy. Asbestos Management Version 1.0. Adopted by Council at its meeting on 15 June 2010 Minute No: 390

Asbestos in Grounds Management Plan, Matraville Soldiers Settlement Public School, Matraville, NSW

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE

Asbestos Management Plan

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Policy for the Management of Asbestos

WHS Contractor Management Procedure

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS

WHS CONTRACTOR MANAGEMENT PROCEDURE

Approved by: UBC ACT Committee

CONTRACTORS SUBCONTRACTOR PREMIUMS

Pollution Incident Response Management Plan

Asbestos Management & Abatement

Asbestos removal and licensing

Pollution Incident Response Management Plan (PIRMP)

Asbestos Inspection Project Procedure

WORKING GUIDE 1996 FROM HOME. WorkCover. Watching out for you. New South Wales Government

LIVING WITH FIBRO JUNE 1998 WORKCOVER NSW HEALTH AND SAFETY NOTES. WorkCover. Watching out for you.

Administrative Procedure. Asbestos

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

ASBESTOS MANAGEMENT PROGRAM

Asbestos Management and Control Policy for Government Buildings

Asbestos Control Programs

WHS Contractor Management Procedure

Asbestos Containing Materials Survey And Register Moil Shopping Centre

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos

How to Manage and Control Asbestos in the Workplace

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure

Characteristics/Applications

SOUTH AUSTRALIA OCCUPATIONAL HEALTH, SAFETY AND WELFARE (ASBESTOS) REGULATIONS 1991

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship

The Management of Asbestos containing Materials

GUIDANCE NOTE WORKING WITH ASBESTOS IN THE MOTOR VEHICLE REPAIR INDUSTRY

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part , Subpart Z Asbestos

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE

ASBESTOS WHAT LIES BENEATH. Your logo here

Asbestos licensing and notification guide for applicants

Six steps to Occupational Health and Safety

Asbestos frequently asked questions

H2 Opening Statement Asbestos

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

Guide Document for Development of WHS Management Plans

ASBESTOS AND THE HOME RENOVATOR

Removing asbestos in workplaces

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material

HAVEBURY HOUSING PARTNERSHIP

ASBESTOS MANAGEMENT PLAN. Department of Education. July Version 1 19 December 2012 Revision 1 1 July 2014

CODE OF PRACTICE FOR THE MANAGEMENT AND CONTROL OF ASBESTOS IN WORKPLACES [NOHSC: 2018 (2005)]

How To Deal With Asbestos In Minster Of Minsteria

Contractor Safety Management

UI Procedures for Asbestos Management

Managing Asbestos Policy

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos in your home

How To Get Back To Work After You Have Been Injured At Work

ASBESTOS POLICY AND MANAGEMENT PLAN

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

ASBESTOS CONTROL PLAN

Asbestos Disposal in the Northern Territory

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association

ASBESTOS MANAGEMENT PROGRAM

FARM SAFETY STARTER GUIDE

Undercover storage requirements for waste/recycling depots

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Guideline for the Management of Waste Asbestos. 1 Introduction. 2 Roles and Responsibilities. 3 Waste Management. 4 Conclusion

ASBESTOS IN THE HOME

Policy on the Management of Asbestos

Traffic Management Issue 1.0 Revision: v2 October 2014

ASBESTOS MANAGEMENT INTRODUCTION

FACT SHEET RECOGNITION OF CONSTRUCTION INDUCTION CARDS

Hazard Identification, Risk Assessment And Control Procedure

Workplace rehabilitation providers and WorkCover

Asbestos Awareness at the University of Toronto

Control of Asbestos Policy

AIOH POSITION PAPER ASBESTOS

WHS CONTRACTOR MANAGEMENT PROCEDURE

Asbestos Management Policy (Version 3)

RSPH Level 3 Certificate in Asbestos Project Management. February Guided Learning Hours 2 Prior Learning Hours

OCCUPATIONAL HEALTH AND SAFETY AUTHORITY ACT (CAP. 424) Protection of Workers from the Risks related to Exposure to Asbestos at Work Regulations, 2006

Transcription:

Management of asbestos in recycled construction and demolition waste Guide November 2010

Disclaimer This publication may contain occupational health and safety and workers compensation information. It may include some of your obligations under the various legislations that WorkCover NSW administers. To ensure you comply with your legal obligations you must refer to the appropriate legislation. Information on the latest laws can be checked by visiting the NSW legislation website (www.legislation.nsw.gov.au). This publication does not represent a comprehensive statement of the law as it applies to particular problems or to individuals or as a substitute for legal advice. You should seek independent legal advice if you need assistance on the application of the law to your situation.

CONTENTS PAGE 1. INTRODUCTION 2 2. SCOPE 3 3. DEFINITIONS 4 4. RECYCLING PROCESS 5 4.1 SITE SET-UP 5 4.2 RECEIVING CONSTRUCTION AND DEMOLITION WASTE 5 4.2.1 Classification of materials 5 4.2.2 Inspection process 6 4.2.3 Rejected load register 7 4.2.4 Processing waste materials 8 5. TESTING AND SYSTEM REVIEW 11 6. TRAINING AND COMPETENCY 12 7. FLOW CHART: ACM INSPECTION PROCESS 14 APPENDIX 15

1. INTRODUCTION Products containing asbestos containing materials (ACM) are prohibited from being sold or used as recycling materials. This guide provides practical assistance to the construction and demolition waste recycling industry to minimise the potential risk of contamination in recycled construction and demolition (C&D) materials eg concrete and brick. It outlines the procedures to verify that asbestos-containing material (ACM) does not contaminate material intended for resource recovery. An evaluation of the guide will be conducted in 12 months, to determine the effectiveness and practicality of the solutions. The regulatory obligations for the management, control and removal of asbestos are defined in the Occupational Health and Safety Act 2000, Occupational Health and Safety Regulation 2001, the Code of practice for the management and control of asbestos in the workplace [NOHSC: 2018 (2005)] and the Code of practice for the safe removal of asbestos [NOHSC: 2002 (2005)]. This guide is a useful tool to help you achieve compliance. Contributors to this guide include: Building Trades Group CFMEU Civil Contractors Federation (NSW) Demolition Contractors Association Council Safe NSW Department of Environment, Climate Change and Water Hunter Regional Councils Master Builders Association Southern Councils Group Unions NSW Waste Management Association of Australia NSW C&D Working Group Waste Contractors Recycling Association (NSW) 2

2. SCOPE This guide covers the receipt, processing and management of construction and demolition (C&D) materials at construction and demolition (C&D) facilities. These facilities process and/ or recover construction and demolition waste (but not kerb side recyclables from residents). The guide assists employers and controllers of construction and demolition (C&D) facilities to meet their work health and safety (WHS) obligations by: checking and inspecting incoming materials before stockpiling or processing, to minimise the risk of asbestos contamination in recovered materials rejecting loads, to avoid accepting and recycling ACM recording non-complying waste generators that illegally dispose of asbestos or ACM investigating non-compliant incidents independent reviews of the systems, so that customers and regulatory authorities have confidence in the quality of the product and the operations of those businesses that adopt these guidelines increasing the level of construction and demolition (C&D) recycling material in a safe, sustainable, environmentally sound manner. These guidelines allow construction and demolition (C&D) facilities flexibility in assessing their own supply chain and developing strategies to deal with levels of risk that apply to their customers. 3

3. DEFINITIONS ACM Asbestos Bonded asbestos C&D facility C&D materials Competent person Contamination DECCW EPA Friable asbestos Inspector of loads Licensed demolisher Occupational hygienist Personal protective equipment (PPE) Processing Regulator Rejected load register Skip bins Supplier Trained personnel Transporter Waste generator Waste materials asbestos-containing materials. the fibrous form of mineral silicates belonging to the serpentine and amphibole groups of rock-forming minerals, including actinolite, amosite (brown asbestos), anthophyllite, chrysotile (white asbestos), crocidolite (blue asbestos), tremolite, or any mixture containing one or more of the mineral silicates belonging to these groups. contains a bonding compound reinforced with asbestos fibres. recycling facilities that process and/or recover construction and demolition waste (but not kerbside recyclables from residents). waste materials from construction and demolition activities. a person who has acquired through training, qualification or experience (or a combination of these), the knowledge and skills to carry out a particular task. any unwanted substance found in waste materials. NSW Department of Environment, Climate Change and Water. Environment Protection Authority (NSW), part of the DECCW but holding certain statutory functions and powers exercised in the name of the EPA. ACM that, when dry, is (or may become) crumbled, pulverised or reduced to powder by hand pressure. the person responsible for the inspection of the loads. any person who is licensed by the WHS regulator to demolish a building or structure where all ACM is removed before or during demolition. a person who specialises in the assessment and control of chemical, physical and biological hazards. the equipment worn by workers to reduce their exposure to hazards. PPE includes respirators, hard hats, safety shoes, glasses, ear plugs, overalls and the like. the complete recycling process, including the inspection of incoming loads, the removal of ACM and other unwanted material from the feedstock, and the crushing and blending of different materials to create recycled product. the WHS authority and environmental authority in each State. an onsite document that records details of a rejected load. bins left on a site for loading; the contents may or may not be source separated. see waste generator. those who have the knowledge and skills expected of someone who has successfully completed the bonded asbestos removal course. the employer or self-employed person who is engaged to demolish and/or remove material from a construction or demolition site. a person who generates recyclable waste via demolition and/or construction. waste that a C&D facility receives and processes, usually from construction and demolition sites. 4

4. RECYCLING PROCESS 4.1 SITE SET-UP A key to the successful elimination of ACM from the waste stream is to have a site that: advises suppliers that asbestos and ACM will not be accepted incorporates a no asbestos clause in contracts installs highly visible signs indicating that NO ASBESTOS in C&D waste will be accepted ensures that workers who receive and inspect C&D materials are trained and provided with suitable equipment to complete their tasks has a site safety plan that documents a safe system of work see appendix. 4.2 RECEIVING CONSTRUCTION AND DEMOLITION WASTE The procedures for receiving waste will play an important part in minimising the risk of ACM entering the recycling process. 4.2.1 Classification of materials The primary control point for the removal of asbestos is prior to demolition. The responsibility lies with the waste generator and the owner of the building or structure that is being demolished. The probability that waste contains ACM depends on the type and source of the material. Buildings and structures normally undergo regulated and comprehensive asbestos removal programs and stringent clearance inspections before they are demolished. If licensed demolishers conduct the demolition, and the waste has ACM removed and separated at the source, the probability of ACM being present should be low. However, it is not unusual for mixed waste from unknown sources, or from small-scale demolition or refurbishment activities that place their waste into skip bins, to contain amounts of ACM waste. These sources should be considered high risk. All waste materials from skip bins should undergo a rigorous inspection ie the material should be spread out and inspected. Nowadays, the probability that waste materials contain ACM is minimal, due to: the requirement by the State regulatory authority for asbestos registers the removal of ACM before the demolition of buildings and structures licensed demolishers. 5

4.2.2 Inspection process An inspection process should be implemented when waste materials are received at the C&D facility. It should be a two-stage process undertaken by trained personnel. The first stage takes place on receipt of the load, the second when the load is tipped out (and before it is included in a mass stockpile). Upon receipt of the load: ascertain its source inspect the top surface record details ie date, name and address of supplier, vehicle registration, estimated weight of the load, and classification of material. First inspection If friable asbestos is detected, the load should be immediately rejected. If ACM is not sighted, or bonded ACM needs to be removed from the load, direct the driver to the second inspection area and advise the inspector of loads. The material is then tipped out and inspected more thoroughly by trained people wearing appropriate PPE. Second inspection No asbestos sighted 6

Second inspection Asbestos sighted and wearing appropriate personal protective equipment Recommended PPE for the removal of ACM includes: half-face P1 or P2 respirator disposable or cartridge respirator (see AS 1715, AS 1716) gloves disposable overalls with hood boot covers wet wipes. If bonded ACM is detected, it should be removed in accordance with the Code of practice for the safe removal of asbestos and stored appropriately for later disposal. If friable ACM is detected, the load must be isolated and kept wet during the course of further inspection. If ACM is detected, the load should be either: assessed by an occupational hygienist rejected and reloaded onto the delivery truck isolated until removal is arranged. 4.2.3 Rejected load register Details of the waste generator and transporter should be recorded in a rejected load register. The waste generator should be notified and, if necessary, issued with a rejected load certificate. Maintaining a register of rejected loads will ensure a more stringent inspection regime on those waste generators and transporters who repeatedly deliver waste that is rejected. The register must be kept on site for the regulator to review at any time. 7

4.2.4 Processing waste materials Only process waste material that has been inspected and cleared. An environmental protection licence prohibits most C&D facilities from receiving or storing asbestos waste. However, if waste materials are received that appear asbestos-free and subsequently found to contain ACM, it must be managed in accordance with regulatory requirements and removed from the site for lawful disposal. 8

REJECTED LOAD REGISTER Company name: ABN: DATE COMPANY REGISTRATION A: Asbestos (suspected) B: Batteries H: Hazardous (fumes, petrol, chemicals, etc) L: Light fittings (PCBs) R: Rubbish (timber, plasterboard, etc) S: Soil COMMENT RELOAD TURNED AWAY COMPANY CONTACTED REASON CERTIFICATE ISSUED (Y/N) 9

REJECTED LOAD CERTIFICATE Certificate number: Date: Time: Source of waste: Vehicle registration details: Driver s name: Driver s licence number: Driver s signature: Company s signature: This certificate is to advise that your load has been found to contain suspected asbestos containing material and therefore is rejected from entry to this site. Details of your vehicle, company and the reason for rejection will be entered in the rejected load register, which is audited by the regulator. This load should be conveyed to a facility that is licensed to accept asbestos for disposal. 10

5. TESTING AND SYSTEM REVIEW If waste-derived products are found to contain asbestos, the C&D facility should undertake an internal review of its receival processes. Random testing for ACM should be undertaken when other quality control tests are conducted, and the recycling process should be reviewed internally every six months. A suitably qualified, competent and independant person should review the entire C&D facility every two years. The written review should include: the date of the review who carried out the review remedial action non-compliant issues date of next review. The six-monthly review should involve: checking signage inspecting PPE training for those involved with ACM inspecting the rejected loads register observing the inspection process. The two-yearly review should involve: analysing the six-monthly reviews reviewing the safety guidelines reviewing the site safety management plan observing and reviewing the process for receiving waste reviewing testing results reviewing non-compliant incident reports reviewing training. 11

6. TRAINING AND COMPETENCY The minimum training for those at a C&D recycling workplace where ACM may be present is the asbestos awareness course, which runs for about two hours. The content of the course includes: Introduction to asbestos what is asbestos? the three types of asbestos found in ACM the properties of asbestos Asbestos products when asbestos was used in Australia the types of material that can contain asbestos bonded and friable ACM samples of ACM Health effects the adverse health effects the routes of exposure the effect of fibre size hazards and risks Legislation Occupational Health and Safety Regulation 2001 Code of practice for the safe removal of asbestos Code of practice for the management and control of asbestos in workplaces Safe handling techniques and PPE how to handle ACM techniques to reduce asbestos exposure the use of PPE how to store ACM. The minimum training for those involved in the inspection and removal of bonded ACM is the bonded asbestos removal course, which runs for about four hours. The minimum training for those involved in the inspection and removal of friable ACM is the friable asbestos removal course which runs for a minimum of two days. TAFE offers the following courses: Asbestos removal (friable asbestos) Asbestos training for supervisors (friable) Bonded asbestos removal course Asbestos training for supervisors (bonded). 12

The Master Builders Association (MBA) and the Asbestos Removal Contractors Association of NSW (ARCA) offer: the friable asbestos removal workers course the friable asbestos removal supervisors course the bonded asbestos removal workers course the bonded asbestos removal supervisors course. The Housing Industry Association (HIA) offers: the bonded asbestos removal course the bonded asbestos supervisors course. The Local Government Training Institute offers: the bonded asbestos removal course the bonded asbestos supervisors course. 13

7. FLOW CHART: ACM INSPECTION PROCESS First inspection at weighbridge or gate Incoming load assessment What is the source of the load? What type of site is the load from? What does the C&D material consist of? Second inspection on the ground No ACM found Bonded ACM found and skip bins Process Load must be spread out REJECT LOAD Less than 10m 2 of ACM Greater than 10m 2 of ACM Isolate Area Wet down Asbestos removal team Asbestos handling PPE Double bag in approved asbestos bag, wrap in 200 micron vinyl plastic Dispose at appropriate licensed facility Friable ACM found Isolate Area Wet down Engage licensed removalist Friable ACM found REJECT LOAD 14

APPENDIX The site safety plan should address the health and safety hazards associated with the recycling process, such as: the inspection process the work environment, including site layout, traffic management, weather and noise equipment and materials, including trucks, potential contaminants in loads, mobile plant, crushers and conveyors. The plan should take into account all those involved in the recycling process, including subcontractors, visitors and truck drivers. Any ACM removed during this process must be disposed of at a facility that is licensed to accept asbestos. The site safety plan should include: Occupational health and safety policy Demonstrates the organisation s commitment to the health, safety and welfare of its workers and anyone else that may be affected through its activities, and to controlling the hazards and risks that have the potential to harm the environment. Roles and responsibilities Ensures that the appropriate time and resources are provided to effectively implement and maintain the plan. Consultation An agreed and documented mechanism where workers consult on a regular basis to express their views on OHS matters. Risk management Identifies hazards, assesses the risks, and implements control measures Allocates responsibilities and resources to implement control measures and assesses the effectiveness of the risk management process Develops procedures, including safe work method statements, which demonstrate how hazards are identified and risks are assessed eg safe removal of asbestos, manual handling, traffic management. Training and competency Everyone is trained to fulfill their roles and responsibilities, and are competent to perform tasks safely, so as not to adversely impact upon themselves, others or the environment. Document control All records of OHS matters ie documents, forms and procedures are maintained, relevant and up-to-date. Evaluation and review Regular inspections of the workplace are understood to monitor control measures and reduce the likelihood of an incident. 15

Catalogue No. WC02772 WorkCover Publications Hotline 1300 799 003 WorkCover NSW 92 100 Donnison Street Gosford NSW 2250 Locked Bag 2906 Lisarow NSW 2252 WorkCover Assistance Service 13 10 50 Website www.workcover.nsw.gov.au ISBN 978 1 74218 737 2 Copyright WorkCover NSW 1110