SUPPLIER REQUIREMENTS MANUAL



Similar documents
GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11

Supplier Quality Requirements

Supplier quality guideline. VOSS Automotive Group Issue Rev00

Ege Fren Ege Fren San. ve Tic. A.Ş.

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

Management System Procedure N 4/01/ of 14

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS)

Comparison ISO/TS (1999) to VDA 6.1 (1998)

Johnson Controls Automotive Experience Global Supplier Standards Manual Chapter 4 Quality October, 2015

ITT Motion Technologies Supplier Quality Manual

KEBA 2014 We reserve the right to make technical modifications. No liability accepted for information provided. All rights reserved.

Production Part Approval Process AIAG PPAP 4 th Edition

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

Valued Supplier: This Manual represents STRATTEC s commitment to quality and supplier partnerships.

GE Power Electronics Business Total Quality Management for Suppliers

INTRODUCTION. The Quality Challenge

APQP information to suppliers. Volvo Construction Equipment 2012

Supplier Quality Assurance Manual

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2

Integrated Supplier Quality Requirements

CORPORATE QUALITY MANUAL

Production Part Approval Process 4 th Edition

CUSTOMER SPECIFIC REQUIREMENTS

Supplier Quality Agreement EK 25

Supplier Quality System Requirements

PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE Supplier Performance Manual REVISION L December 7, 2015

JST Specification QUALITY GUIDELINES RECEIPT CONFIRMATION

Supplier Quality Assurance

AS9100 Quality Manual

FMC Technologies Measurement Solutions Inc.

New Guidelines on Good Distribution Practice of Medicinal Products for Human Use (2013/C 68/01)

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

General Motors Global Purchasing and Supply Chain Global Supplier Quality

HELLA Quality. Guidelines for Suppliers (HP-C-509)

PSA Peugeot Citroën Customer-Specific Requirements for use with ISO/TS 16949:2009

Supplier Quality Manual

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

General Motors Global Purchasing and Supply Chain Global Supplier Quality

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Supplier Quality Manual

Supplier Quality Requirements Manual August 1, 2014

VELUX General Quality Requirements

Quality System Manual

Quality Assurance Agreement

Supplier Quality Requirements Manual

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers.

Supplier Quality Requirements Manual

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

How to Become an A-Class Supplier Using the Best Business Practices Described in the Global Logistics Standard MMOG/LE

VDA Structure Component Requirement Specification. Module I CRS Universal Requirements. <Title> <Number> Version 1.0

Guideline for. General Automotive Quality Agreement for Electronic Components

Supplier Quality Manual Program Requirements. Table of Contents

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

Quality Assurance Agreement (QAA)

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

FMP SUPPLIER QUALITY MANAGEMENT PROGRAM

General Motors Global Purchasing and Supply Chain Global Supplier Quality

Supplier Quality Requirements and Clauses

Quality Manual. ISO/TS 16949:2009 Quality Management System. Sensing and Control

QP-740. Supplier Management Handbook

Quality Systems Manual

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

UNCONTROLLED COPY FOR REFERENCE ONLY

ISO/IEC QUALITY MANUAL

Supplier Quality Assurance Requirements Manual

Data Submission Manual

PERFORMANCE EXCELLENCE Procurement Standards

ENERGY BUSINESS QUALITY REQUIREMENTS (EBQR)

Supplier Guide. Suppliers for production material or services may be qualified for the list in one or more of the following ways:

This Business Management System Manual is based on ISO 9001:2008 requirements

SABRe. Supplier Management System Requirements. Revision 1 1 July 2012 Edition 2. Rolls-Royce plc 2012 Page 1 of 40

Contractor Connect Scheme Electrical Contractor and Worker Handbook

Global Supplier Quality Manual February 2014

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)

Quality Manual MAR 03 Rev P EC

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

Supplier Quality Management Production Part Approval Process (PPAP) Manual

Supplier Requirements Manual M M 0 3

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

Quality Assurance Manual ISO 9001:2000. Uncontrolled copy

SQAS Guidelines March 2011

Ford Motor Company Customer-Specific Requirements

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM a Rev /10/02

Quality Management System Manual Revision L

This procedure applies to all aspects of Specialized Turning, Inc. s Aerospace Quality Management System.

Tailoring your Quality Management System in a Competitive Marketplace Heather Driscoll Infor Presales Business Solutions Consultant

Supplier Quality Requirements Document (SQRD)

VDA6.3 Process Audit Webinar 1 st April Paul Hardiman Qualified VDA6.3 trainer

Table of Contents MODULE 1: QUALITY MANAGEMENT SYSTEM Introduction:... 3 What is a QMS (Quality Management System)?... 3

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

ISO 9000 Quality Standard Background Information Quality Systems Implementation

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Alstom Thermal Power Supplier Quality Manual POWER-Q-MSM Revision B - December 2014

Transcription:

FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 1 sur 39 6

Introduction Our mission is to create and deliver high-quality and innovative products, technical solutions and services that contribute to our customers competitiveness and create value for our employees and shareholders. To achieve this mission, we have to set ourselves ambitious quality objectives. These objectives are to reach 15 PPM 1 and 0 red Safety and Regulation alerts. Zero defects and zero tolerance of non-quality is the FES Faurecia Excellence System objective. An adaptation of FES is done for Suppliers as SES Supplier Excellence System. The Breakthrough Quality Plan is implemented to bridge the gap between our current quality performance and these demanding objectives. At Faurecia, purchased parts account for over 60% of our overall costs. As such, Faurecia s performance is highly dependant on that of our suppliers. To achieve our customer s quality, cost and delivery objectives, we are determined to establish and develop close and long-term relationships with our suppliers. The involvement of our suppliers within this partnership will be managed through this manual, which offers a standardized global approach and focus on product development. This approach will achieve improved involvement and communication between Faurecia and our suppliers, setting out the minimum requirements expected to achieve our customer s total satisfaction. The Supplier Requirements Manual sets out Faurecia policy and procedures for the selection of suppliers and the management of the panel. We must apply this policy strictly if we are to achieve our quality goals and satisfy our customers. Kiichiro (Ken) Sato Senior Vice President Group Quality OVERVIEW OF REQUIREMENTS PANEL NEW PROGRAM ACTIONS ACTIONS for PRODUCTION Quality and Delivery Performance Measure Action Escalation Close RFQ / requirements QUALITY GCP Supplier Key Characteristics Containment General Conditions ppm Performance Review Feasability <24 hours of Purchase (SPR) Incorrect Parts Vendor Profile Nomination Qty Assessment (self, on-site) QAA Quality Assurance Agreement Social & Environmental compliance Confidentiality agreement Control plan (> Prototypes) Run at Rate & MPT Mass Production Trial nb of Qp's Complaints ( pf1,pf2,pf3) 8D (<10days) Special AUDIT: 8D + 20 questions on control plan lessons learned => full 8D < 60 days Process Audit Charge Back ==> ==> Early Containment pf4 Non Quality Costs (end Customer Expertise level Launch Readiness complaint) (Expert, Designer, Manuf, sub-cont,..) DELIVERY & Panel status P ; I ; H ; E A P Q P PPAP MPM Misdeliveries Panel status update 1 In average, commodity dependant FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 2 sur 39

Contents Introduction Scope Supplier Quality system requirements Panel Management Development phase; Quality Requirements in Programs; APQP Serial Production Phase (Performance Measurement, Escalation in case of poor performance, 8D problem solving, Cost recovery, Changes/PCR) Warranty Social and Environmental guidance Appendices Glossary THE FAURECIA ECELLENCE SYSTEM Within FES, the basis of our operating culture, the Supplier Partnership is key in ensuring that we work with you to achieve our common goals Scope Faurecia s Supplier requirements contained in this manual are applicable to all Supplier Manufacturing sites and include production parts, service parts as well as assemblies which are supplied to Faurecia plants. This manual reinforces the Faurecia Purchase Order Terms and Conditions and the General Purchasing Conditions. The QAA (Quality Assurance Agreement) formalizes your agreement to the present manual. To that end, this manual is an appendix to the signed QAA. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 3 sur 39

Supplier Quality System requirements Standards Faurecia recognizes the Global ISO/TS 16949 (Quality management systems, or ISO 9001 where applicable), ISO 14001 (Environmental Management Standard) and OHSAS 18001 (international Occupational Health and Safety management system) Standards and other Customer requirements as they apply to automotive production and relevant service part organizations. Accordingly, all Faurecia suppliers are required to establish documents and implement effective production, quality and management systems compliant with these requirements 2, including those specified by the Customer requirements. The related certifications must be uploaded into the GPS Supplier portal and communicated to the Supplier Account Manager, with information on validity date, update and cancellation. 2 At their latest version Audits/ Assessments By audits and assessments, Faurecia reserves the right to verify supplier compliance to the above listed requirements on-site for those suppliers identified as having a high impact to Safety, Fit, Form, Function, Quality and or Customer down-time, and requires all production suppliers to verify their sub-suppliers and subcontractors certification compliance to the above mentioned standards. Special Quality System Requirements The SUPPLIER undertakes to: Comply with the environmental regulations and requests (material and substances reporting, recycled content, recycling solutions, European Directive on End of life vehicles and its annexes, customers special requests). Guarantee that no critical / hazardous material and substances such as heavy metals are contained in its Parts and Materials according to ELV directive (2000/53/EC and its updated Annex II. see the consolidated text of the ELV Directive on the following website www.europa.eu.int). Fulfil its obligations set out under REACH, the European Regulation (EC) 1907/2006 about the Registration, Evaluation, Authorisation and Restriction of Chemicals (REACH).In particular, all suppliers, including their supply chain, are responsible for ensuring that Faurecia is informed of presence in the product of substances on the candidate list (SVHC) ; that the safe use and risk management measures (RMMs) for Faurecia are included in the safety data sheets ; that for products purchased outside EU, the supplier is responsible for taking the importer role (e.g. nominating an only representative) and that if a product needs to be modified due to REACH, Faurecia will be immediately notified. Provide material documentation data for entry in one of the below systems: - IMDS (International Materials Data System) (German, Asian, American OEM s & Renault) FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 4 sur 39

- MACSI (PSA Client) = specification N PSA B-20 0250 - Toyota COV method: TSZ0001G Toyota Engineering Standard: control method for substances of environmental concern Comply with all Faurecia quality management procedures in Development, including: - Use of Faurecia APQP (Advanced Product Quality Planning) tool to ensure that preventive quality actions are used - Comply with PPAP (Production Part Approval Process) - Use of other automotive industry standard tools & procedures such as: FMEA (Failure Mode and Effects Analysis), MSA (Measurement System Analysis) and SPC (Statistical Process Control) as defined in AIAG (Automotive Industry Action Group) procedures or other tutorial documents) Include any production, inspection measuring and test equipment provided by Faurecia in its own quality management system, if nothing else has been agreed upon. Set up and maintain a Sub-Supplier management system in accordance with the here described requirements and including: - Documented evidence from the Supplier on the follow up of second tier quality management system - Follow up the quality of the bought out parts using other suitable measures (including PPM quality target setting, special key characteristics follow up, Validation plan, Control plan, Run@Rate and Process audit, PPAP and Initial Samples submission,...). Faurecia reserves the right to carry out process approval at the sub-supplier on its own initiative in case of major problem or risk. Build a Control Plan in line with Quality Basics and Put in place an early containment plan for all Program start up (minimum 3 months before PreSerie deliveries and up to 3 months after SOP without defects, extended for the same period when defects are found) and product changes. This will include either a reinforced Control Plan for all parts or a Quality Wall per the "7 Quality Basics" for risky parts (i.e "Traded parts", or parts for which the Supplier process audit and/or Run @ Rate are not satisfactory), or at explicit demand of Faurecia, For each Quality Wall, a specific agreed identification (proof that the parts went through the quality wall) must be added on the packaging. Property of Faurecia - Duplication prohibited OK 1st piece The BASICS : Pass only Good parts to the next stage Poka Yoke 5S Quality Variability Reduction Auto Quality Variability Reduction Stop at defect 6 Basics QRCI Standardized Work Employee Empowerment/ Safety Self -Inspection Includes Stop at Defect 7 Quality Basics Quality Final Inspection Wall Includes Temporary QW Red Bins Rework under Control QRCI Quick Response Quality Control 90 Put in place a Containment in case of PF4 or proven repetitive failures exceeding the PPM target FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 5 sur 39

Packaging and Logistics Parts delivery conditions are in the supplier logistic specifications. The packaging and transport mode must ensure the delivered products integrity, to the reception at FAURECIA or at the customer for the "Traded parts". For the BOP packaging, the SUPPLIER is responsible for the development, the investments, the cleanliness and the maintenance. The requirements are: - Recycling packaging - Recycling protection - «bar code» Identification Other requirements may be specified by Faurecia according to the needs of the Faurecia delivery plant. For the "Traded Parts" (i.e. Parts Delivered directly to the End Customer ( PLS ), the SUPPLIER is responsible for the Packaging design recommendations which will have to be submitted and accepted by the End Customer. For more details, refer to the Supplier Logistic Manual Marking Each component must be marked to permit the material identification regarding their recycling. This marking must be visible after the final assembly. The material type mark must be in accordance with the FAURECIA requirement: After assembly, no marking has to be visible on the visible side. In all cases, the marking area must be specified on the supplier drawing following agreement by all concerned parties. In the case of large parts, the marking will have to be repeated. The marking has to be in accordance with the relevant requirement with individual traceability. The product part(s) must contain the flow chart number and the trademark, OEM & FAURECIA Marking Inspection report: At any project stage, all parts deliveries must be accompanied by a control report of the delivered parts containing either: Fully measure: according drawing and CAD model => Qty by cavities to be agreed with the Faurecia (normally 5parts by cavity) Partly measure: according the SC/CC points and other points defined for end of each gate => 30 parts by cavity for capability The control report will be in accordance with the relevant norm or requirement (for example: chemical analysis, mapping ) Exchanges CAD models / Numerical supports The CATIA version to use will be confirmed during the Request for Quotation. During the supplier choice, the supplier designers will have to be trained on this version and the proceeding modules (SOLIDE, GSM) and surface modeling. The CAD models will have to respect the Faurecia conception methods. In case the supplier is present on the Faurecia site; its staff will work in the conditions defined by Faurecia, with a secure access. The accesses will be defined by Faurecia. The supplier will have to use the numerical structure defined by Faurecia. EDISON Supplier Portal is a tool for internet based data exchange with external partners (suppliers, sub contractors...), for sending (upload) and receiving (download) Engineering Data FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 6 sur 39

MATERIAL CONTENT & SPECIFICATIONS, REACH (Registration, Evaluation, Authorisation and Restriction of Chemicals) All suppliers must provide evidence of Materials, Substances, and Recyclability data submission and acceptance by Faurecia with every PPAP submission. Either a copy of the acceptance note or a print out of the Recipient Data from IMDS is considered as the only valid evidence of submission. PPAP approvals will not be granted for the parts not accompanying this documentation. Faurecia suppliers are responsible for cascading this requirement and collecting data from their respective sub-suppliers An action plan for substitution of forbidden substances must be provided in case of parts containing such substances. Special case for the Chromium VI present for rust free prevention covering : In case of impossibility of the specifications respect or the objective price, a case by case request will be made. This one will indicate the quantity of chromium, the quantification measure used and the replacement solutions. Hazardous substances reporting The European instruction 67/548/EEC demands the localization of all the hazardous substances listed in the Appendix 1 of the instruction. A global list for automotive industry has been made and is annually updated on the http://www.gadsl.org website. Renault uses a special list in the 00-010-050 standard. A declaration for chlorinated parts must be done for this OEM (00-010-060 standard). REACH (the European Regulation (EC) 1907/2006 about the Registration, Evaluation, Authorisation and Restriction of Chemicals) is the new chemicals regulation that aims to ensure a high level of protection of human health and the environment from chemical substances, while enhancing competitiveness and innovation. For automotive industry, guidelines have been published to support implementation of REACH: Automotive Industry Guideline on REACH (AIG V2.1) which can be found at www.acea.be/reach. One of the main elements of REACH is registration of substances, which obliges manufacturers and importers of substances to provide a defined set of information, in the form of a registration dossier, to the European Chemical Agency (ECHA). This information concerns the hazards of the substances and whether they could pose risks when being used. Manufacturers and importers of certain hazardous substances need to assess the exact nature and extent of these risks in a chemical safety assessment. Certain very hazardous substances (SVHC : Substances of Very High Concern on the ECHA Candidate List) will require authorisation before they can be used and restrictions may be placed on the use of certain substances. Substances on the Candidate list (SVHC) shall be avoided as far as possible, otherwise Faurecia should be notified of their presence in the product. Under REACH, downstream users must not place on the market or use any substances which are not registered in accordance with REACH. Downstream users will receive information on hazardous substances and preparations, including risks from their use and measures to control these risks, in safety data sheets. Some safety data sheets will have an annex, called an exposure scenario. This exposure scenario will give more specific information on how to use the substance or preparation safely and how to protect yourself, your customers and the environment from risks. Metal raw material All materials used must be to the specifications and grade declared on the drawing. These must be the same as those used during the homologation, testing and production of the validated initial samples. In order to ensure that there is no confusion, it would be advisable to provide a material certificate with all deliveries and/or to state clearly the material grade/specification used on the delivery note. Plastic parts basic rules For the plastic material choice, the supplier will provide all technical justifications in case of a proposal based on a material not part of the Approved Material Reference (AMR or RMA Référence Matière Approuvée) list. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 7 sur 39

Panel Management A supplier will be integrated with a Panel status into the vendor list when it complies with the Faurecia business criteria (financial strength, expertise, foot print, quality and environmental assessment ), have submitted a vendor profile and have signed the following documents: - General Conditions of Purchase - Quality Assurance Agreement (QAA) - Confidentiality Agreement (when requested by Faurecia) - Compliance to Social and Environmental requirements Supplier s expertise - EPERT An expert supplier co-operates with Faurecia to define the functional specifications, propose solutions and participates in design. It is autonomous and responsible for its processes and designs; it will manage and design complete sub-assemblies. - DESIGNER A designer supplier designs parts based on Faurecia functional specifications, designs complex parts with full design & process responsibility. - MANUFACTURER A manufacturer is responsible for its own production processes. Faurecia is responsible for the design (detailed specifications). - SUBCONTRACTOR A subcontractor is considered as an extension of Faurecia manufacturing. It is responsible for the compliance of its process to Faurecia specifications and it manufactures parts in accordance with the definition file. Panel status P = Panel I = Intermediate / Investigation H = on Hold E = Eliminate Pr = Prospect Fully approved supplier for development and production. Only class A suppliers may be considered within this status. All criteria are in accordance with our policy. In the Vendor List but not yet assessed or pending because of other criteria not being fulfilled (Finance, Development ) & Mandated Suppliers No consultation for new development. Production orders maintained. Not acceptable supplier. To be eliminated from the vendor list Supplier which passed a first screening (under market screening process) and can receive an RFI/RFQ No award possible under this Status FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 8 sur 39

DEVELOPMENT PHASE; Quality Requirements in Programs & ADVANCED PRODUCT QUALITY PLANNING (APQP): As 80% of the final product performance is determined during the development phase, effective program management is the key to our success. Faurecia s objective is to work closely with its Suppliers through partnerships. It is Faurecia s intention to provide the framework (a common language) within the development phase, which will enable a structured, managed program that delivers reduced development costs, with the achievement of all set targets (quality, cost and delivery). Program Management System (PMS) is the Faurecia management tool used during this phase. PMS reviews must be set and gates or other milestones respected. To succeed, the supplier must: > Provide feasibility commitment with its offer > Set and agree on quality requirements including timing plan at the beginning of the development phase > Implement corrective action plans on product and processes prior to SOP (start of production) > Deliver Initial Samples out of Run at Rate production, right first time and on time REQUIREMENTS are in the RFQ sent under GPS The principal phases of the product development at Faurecia and the end Customer are: 1. Acquisition The supplier project launch is carried out at the end of a preparation period during which the supplier takes note of Faurecia needs, defines and plans work to realize and dimension its resources and abilities. 2. Product and Process Design and Development: at the agreement on the development data, the supplier conceives the components of the BOP (Bought out Parts or POE Pièces Ouvrées Extèrieures ) allowing fulfilling the requirements specified by Faurecia. 3. Production set-up and Pre-Series After the definition agreements and their justifications made by the supplier during the product and process development and design step, the supplier realizes products which fulfill the Faurecia requirements. For each part delivered to Faurecia, the supplier realizes trials allowing checking if the product answers to the specified requirements and validation plan. 4. Launch From the product definition choice, the supplier conceives its manufacturing process, implements and qualifies it referring to the objectives specified by Faurecia. 5. Production During each PMS phase, the supplier's performance will be tracked and monitored to ensure that suppliers achieve their targets set at each review. All suppliers are required to produce Advanced Quality plans to support the development of new products and/or services, in accordance with the guidelines in the Advanced Product Quality Planning and Control Plan (APQP) as detailed below All suppliers are required to report the status of plan activities on a regular basis. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 9 sur 39

Project Organization & General planning steps Advanced Product Quality Planning (APQP) : Introduction Advance Supplier Quality (ASQ) manages the APQP for external suppliers with the support of the Program Buyer and the D&D Product/Process Design. The APQP process is designed to ensure that external suppliers integrate preventive quality actions into their work methods. The APQP process consists of 31 elements deployed within the phases of the program. Responsibility for each element is either Faurecia, Supplier or shared as defined in kick off meeting : The underlined Elements must be followed with deeper attention because they are potential Program RED LIST criteria. This assessment is done per Program. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 10 sur 39

APQP ELEMENTS DEFINITION FAU SUP 1 Program Steering Within Faurecia, the program team reviews key program information and timing Committee 2 Confidentiality Agreement QAA Enable both Faurecia and Supplier to ensure confidentiality when required Existence of Quality Assurance Agreement is checked; need for update 4 Technical Input Requirements identified Technical data reviewed by Faurecia to include engineering changes and to make expected performance understood between all the Parties Part of the RFQ 3 Special Characteristics Key Characteristics A Key Characteristic is a product characteristic (material, dimension, performance) or a process parameter whose variation can affect: - compliance with the regulations (environment safety and REACH); - compliance with safety requirements for the user of a vehicle or a product; - the satisfaction of the final customer through quality reliability or durability of a Fit, Form and Function ; - The possibility of using the product by downstream customer (mountability, workability). They are identified based on the Drawings, the Process flow diagrams, the Control plans and other engineering documents 5 Technical Reviews Steps 1 ) Designate the KPC Key Product Characteristics based on S/R & F/F; Drawings and Eng. Specs; using D/FMEA, Functional Analysis, TCM Tolerance control management,. They are established by the Expert or Designer Suppliers or by Faurecia for the Manufacturer Suppliers 2 ) Plan & Verify (prototype Control plan, DVP, capability study, PVP) 3 ) Improve KCC Key Control Characteristics resulting in Work instructions and finalize in production Control plan 4 ) Monitor in Series production, update Control plan when needed Meeting attended by potential suppliers to assess the supplier proposition based on below Risk assessment items and resulting in Feasibility Commitment. 6 Risk Assessment Done by Faurecia in 2 phases of the Program o Product & Process Product carry-over; ; full new development Process technology Tooling Design responsibility Program timing Volume and ramp up Safety and legal impact Customer expectations Part Design Mandated supplier 1. Supplier Supplier facility; technology and workforce (Existing; new, ) Performance Production capacity Assessment Logistics; Distance Communication. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 11 sur 39

7 Master Schedule 8 Feasibility Commitment Capacity 1 Cost Productivity R&D capacity Planning describing tasks and milestones to be able to create a product responding to the program objectives. The supplier must build a master schedule based on Faurecia and End Customer milestones for : Production preparation Process planning ; layout Preparation of facilities and equipment procurement Sub-supplier ; selection; procurement Quality standards and gauges (Control plan, work standards & instructions, Boundary samples, early Containment ) Packaging and transportation Training Trials Manufacturing support systems (handling, control, Poka-yoke, Tool progress Design, Maching Assembly Try out Tuning Tool ready OK for graining As part of its Offer, the Supplier must confirm and provide evidences that the product can be produced according to the quality, planning and cost requirements, with demonstration of its ability to follow the targets (estimations, return on experience, feedback on similar products, related action plans). Remarks and comments are accepted Update may be done at drawing freeze Capacity information must also be given CAPACITY Planning and Check Part Number 4 Run@Rate Date 2 Part Description 5 Supplier Name 3 Faurecia Annual Capacity Planning AVERAGE Volume pcs/year 6 Supplier Location this for take rate or TAKE RATE coefficient when 7 applicable Process Step STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 8 Process Description Units I - Supplier Working Standards 9 Working hours/shift hours 10 Shifts/ day shifts 11 Days/ week days Shifts/ week shifts 0 0 0 0 0 12 Weeks/ year weeks 13 Total hours/year (9*10*11*12) hours 9 Sourcing Committee 10 Sourcing Decision / Contract / SOW II - Supplier Capacity Data COMMENTS 14 % of line for Faurecia parts (Allocation %) % 15 Quoted Production Rate (part # item 1) pcs/hour 16 Quoted % scrap % 17 Quoted % line efficiency % 18 Adjusted production rate (15*(1-16)*17) pcs/hour 19 Available capacity (15*14*(1-16)*17)*13 pcs/year 19 Available capacity (15*14*(1-16)*17)*13/ TAKE RATE pcs/year 20 Utilization % (3/19)/TAKE RATE vs AVERAGE Volume % 21 Bottleneck operation vs AVERAGE Volume When off tool process trials completed, this sheet must be replaced by the PTAR form (Process Trial Acceptance report) unless otherwise noted, produce the corresponding quantity in maximum 15 shifts/week in order to have room for emergencies in case of break downs, peaks ACTIONS Internal Faurecia decision making based on Costs, Risks, Feasibility and past performance Supplier Development actions need to be identified at this step Purchasing/development contract Decision and communication to Supplier (LON Letter of Nomination, TLC Tool Lending Contract In case of a Mandated Supplier or sub-supplier, a SOW (3 or 4 Parties Statement of Work ; OEM, Faurecia, Supplier, Sub-Supplier) must be part of FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 12 sur 39

11 Program Review / Kickoff this element. Faurecia-Supplier meeting(s) and program review scheduled according to PMS milestones. Defines the Project tracking The Supplier plan will be tracked during further project reviews when the following topics will be covered: - Quality - Costs - Master Schedule, Planning Milestones and Deadlines - Product Process - Team (including Supplier Resources) The detailed agenda and the report have to be proposed by the Supplier before the review. The Supplier review report will be sent to FAURECIA within one week. 12 Design FMEA Failure modes and effects analysis. To establish an action plan for product improvements. 13 Design Review Review design product details including functional requirements, assembly and manufacturing. Defines characteristics (KPC,KCC) needing particular controls and capability 14 Pre-Production & Prototype Builds measurements Requirements for delivery to Pilot Plant: - Prototypes Control plan to be defined - Product identification (with engineering revision level) - Packaging - Inspection report 15 Design Verification Plan (DVP) 16 Drawing / Specification - - Definition of the Tests required to verify that the product meets requirements and targets These tests are conducted either by Faurecia (if Manufacturer or subcontractor) or by the Supplier (Expert or Designer), with some OEM contribution. 1. Drawings released by Expert/designer with Faurecia engineering approval or by Faurecia with Supplier Manufacturer approval 2. Drawing approved with Feasibility Commitment update leading to Tool If E or D FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 13 sur 39

Freeze launch 3. OPEN ECR S critical to PPAP timing ECR process should be as described below Any ECR affecting PPAP timing is supposed to turn this element back to RED ECR Management FAURECIA Development Engineer (Copy to Buyer + ASQ) Send ECR to Supplier (Any Clarification) SUPPLIER Project Manager 17.1 17.2 Process Flow Chart; Sub-Supplier management Propertyof Faurecia - Duplication prohibited Buyer ( Copy to ASQ + Development Engineer) Buyer ( Copy to ASQ + Development Engineer) Buyer + ASQ Feasibility + Cost Impact + Time Plan (Negotiation) Official Release of ECN with PO Updated Time Plan to implement ECR Don't forget to include all the impacts, e.g. Packaging, requirement of Gauges during the feasibility of ECR. ECR = Engineering Change Request ECN = Engineering Change Notice Project Manager Project Manager Project Manager 1 ) Representation of Supplier entire manufacturing process flow 2 ) Sub-Suppliers Management ; Supply chain representation with description of sub-suppliers risks and actions Part Name Tier 2 Tier 3 Tier 4 Tier 5 Supplier's name FAU Nominated Manufacturing site Name Country City Risks 109 Opportunities Specific Issues/Concerns YYYYYY A Y A1 Portugal Paint B Y B France Film InMold C Mandated C1 Japon K Clips D Y D France Risk of lack of capacity Found a technical back up solution For critical Sub-Suppliers: Production Preparation Plans; Tool Progress Reports Control plan and Working instruction Planning of readiness (PTAR, Run at Rate, Process audits) Parts Submission Warrant (PSW) with relevant PPAP items Change Requests (PCR) when appropriate 18 Process FMEA Potential Failure modes and effects analysis of the process. Permit to establish an action plan for the process improvements. 19.1 19.2 Facilities, Tools Following key items are tracked: 1. Facilities preparation and Equipment procurement (with special focus on Supplier new location; Milestones and Special Check list to be deployed) 2. Tooling Launch 3. First Off tool (results/dimensional report, convergence process) 19.3 Gauging 4. Gauge launch 5. Gauge available FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 14 sur 39

Gauge validation review to ensure accurate R/R measure of characteristics according to MSA. 20 Control Plan List of planned tasks (Operator, Maintenance, Lab, ) to ensure Product conformity => process parameters and product KEY Characteristics 3 Levels : 1. Prototype (see element 14) 2. Pre-Production Control Plan: 3. Production The control plan must be made using the Faurecia standards in Job Instruction Work instructions Control Plan: Property of Faurecia - Duplication prohibited Final inspection 101 Inspection Instructions Document Acrobat Property of Faurecia - Duplication prohibited 102 FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 15 sur 39

Control Plan: Set up / OK 1 st part SET UP / OK 1st part Daily Check-sheet OK! 1st part OK! Safety, 5S OK/NOK Polyvalence OK/NOK 21 Packaging and Logistic Property of Faurecia - Duplication prohibited Process Parameters Preventive Maintenance Product Characteristics OK/NOK OK/NOK OK/NOK. GO! At every start of shift, process change-over, breakdown Back-up mode clearly identified, available at workstation Keep and display 1st part OK until next change/shift If next start-up NOK or customer concern => identify scope of suspect parts for containment 104 Packaging is defined at 1 st Off tool and validated before MPT Availability of logistic loop is checked at Mass Production Trial Packaging Property of Faurecia - Duplication prohibited 22 Training Plan Supplier workforce trained on: Working instructions; Machine and Tool operation Quality care points ; Master samples, photo book and quality surface; Control path Reaction to NOK WIP handling and Packaging 127 4 levels Polyvalence followed per person and per workstation: I : Beginner : Respect Standard L : Confirmed : Does not pass a defect U : Expert : Reach the cycle time of the Standard O : Trainer : Able to train other operator up to level 4 FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 16 sur 39

Training plan Operator Polyvalence Supplier Launch Support team 23 Appearance Approval Propertyof Faurecia-Duplicationprohibited ITEM 22 e-ppap Multidisciplinary launch support team at Supplier location must be formalized. Selected suppliers may be required to provide Faurecia on-site representation 3 steps : 1. OK for graining 2. 1 st grained parts 3. Design approval ; Graining/ Color / Aspect /, (gloss, and brightness,..) by End Customer Existence of Boundaries samples & Defects library (photo book) signed-off 77 A : VERY VISIBLE Area Propertyof Faurecia -Duplication prohibited B : Hardly VISIBLE Area 24 Pre-PPAP check Early check availability (before Run at Rate) of some key documents required Supplier / Launch Readiness in the PPAP file Supplier readiness includes Production Trials at full capacity, to check that manufacturing process is capable of producing components that meet quality performance and quantity requirements before SOP, 139 Key elements are : - Supplier MPT (Mass Production Trial) element 25 - Process Audit element 26 and - Capability study element 27 25 Trial Run @ Rate MPT (Mass Production Trial ) SUPPLIER will check Launch Readiness and report monthly in phases 3 and 4 to the ASQ & Program buyer (based on checklist refer to appendix) Specific QVR Quality Validation Review may be held at Supplier location Quality and Capacity Supplier Readiness is evaluated in 3 steps: 1 ) PTAR : Upon completion of 1 st Off-Tool parts, the supplier measures 5 parts / cavity or tool and records the trial results under the PTAR (Production Trial Analysis report) ; this report sent to ASQ and program buyer for evaluation FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 17 sur 39

Supplier : PRODUCTION TRIAL ANALYSIS REPORT (P.T.A.R.) Part Number : To be used for First Production Trial Trial Leader Supplier Manager Supplier Quality Manager Part Name (family) : Date : PROCESS TRIAL QUALITY CAPACITY CYCLE TIME EQUIPMENT DOWNTIME OP. PROCESS TARGET OK ACTUAL OK TARGET ACTUAL TARGET ACTUAL(Secs TARGET ACTUAL(Mins No. NAME TIME (HRS) NO. PARTS PRODUCED NOK PARTS PPH PPH SCRAP (%) SCRAP (%) (Secs) ) (Mins) ) JUDGEMENT Note : SCRAP= UNACCEPTABLE KEY : JUDGEMENT= TARGET VERSUS ACTUAL OK PPH (Parts per Hour) ACTUAL OK PPH IS BETWEEN 90% -100% OF TARGET If your trial results indicate you have not reached your target level, please supply pareto analysis of problem and ACTUAL OK PPH IS < 90% OF TARGET. COUNTERMEASURES IDENTIFIES NO CONCERN TO 2 nd countermeasure action plan PRODUCTION TRIAL (MPT) r ACTUAL OK PPH IS <90% COUNTERMEASURES NOT IDENTIFIED 2 ) MPT: Mass Production trial, run with presence of ASQ, with goal to check the full capacity and with a check list per workstation, (specific tools and equipments 100% in place) EMPT Extended Mass production trial Repeated item 2 if needed. The Mass Production Trial : is mandatory produces parts for final Production Part Approval These parts have to be validated through the Production Validation Plan (PVP) Therefore MPT timing is before production validation at the latest SOP (3 months + PVP lead time) or before Faurecia internal MPT date must be defined at Gate Review 1 and confirmed (detailed date) at Gate Review 2 must be carried out at the supplier production location PART NUMBER: DATE: 27/11/2012 PART NAME: SITE: PROCESS: Opening Time: MASS PRODUCTION TRIAL STATUS SHEET Trial Run@Rate Calculation of Target Parts Per Hour Operating Time: to be used for Mass Production Trial and Extended Mass Production Trial Peak demand: Break Time: Parts per Hour: Trial Leader Site Manager Site Quality Manager 50 45 40 Target PPH Target p/h Parts Per Hour (p/h) 35 30 25 20 15 10 5 TOTAL TRIAL TIME - - - - - - - - - - 1 2 3 4 5 6 7 8 9 10 TRIAL NO. (planned date) 1 2 3 4 5 6 7 8 9 DATE TRIAL TIME HRS ACTUAL TRIAL OK PARTS RESULTS NOK PARTS TOTAL TARGET NO. PARTS / HR OK PARTS NOK PARTS TOTAL NOK PARTS (ppm) REWORK (ppm) SCRAPS (ppm) JUDGEMENT (O,, ) 0: >=100% of target p/h ok parts Comments: :>=90% of target p/h ok parts>>pdca :<=90% of target p/h ok parts>>pdca Property of Faurecia - Duplication prohibited 143 FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 18 sur 39

26 Process Audit Audit performed per the MPT check list as a minimum (and if needed, per the automotive standards (VDA 6-3, FIEV, AIAG), Process Quality Audit Faurecia) MPT check list ITEMS ok WS 1 tick nok ok WS 2 tick nok 27 Process Capability Study Product definition ( last version drawing, Bill of Materials...) Equipment (machine & tool) in final location validated vs specifications Mass production fixtures used Production operation sequence followed Machine cycle time at mass production rate Standard operation for machine(s) defined Machine process parameters defined First production trial reporting available List of Special Characteristics available (product & process) Control plan completed (including Special Characteristics) and consistent with process flow diagram, Product FMEA & Process FMEA Checking fixtures with appropriate instructions available. Repeatability & Reproductibility (R&R) acceptable. Machine capability completed Cmk> 1,67 Following Quality Basic items in place :work station documentation, identification of non conforms, management of rework, reserved workstation, auto-inspection instructions, Poka- Yoke, process start-up Boundaries samples, master samples in place and signed-off Team leader & operator / qualified at the workstation Parts manufactured by Team members / Operators only. Multi skills and multi posts matrix available and validated Plant Material and Information Flow Analysis (MIFA) up to date. Representative packaging for BOP& BIP validated in terms of product quality and workstation ergonomics Representative packaging for finished parts validated in terms of product quality and workstation ergonomics (including individual protection) Equipment conform to HSE regulations (Health, Safety & Environment) 100% MPT planned successfully performed for BOP & BIP. Relevant BOP, BIP and raw material conformance according to Incoming Inspection requirements. (*)STATUS Calculation: If result OK: value is 10 If result NOK: value is 0 Therefore, obtained points = the sum = S 0 Total potential is sum of the lines 10= P 220 (except if NA not applicable) N A STATUS= (S/P)100 0,0% Machine, Short Term & Long Term Capability studies performed on KPC & KCC 28 Production Validation (4) This column shows the minimal value to reach as a result of the capability study, depending on sample size, to meet the 1.33 / 1.67 target for the true capability. Testing based on off-tool, off final process parts which may include: - Raw material Evaluation/certification - Performance tests FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 19 sur 39

29 Early Containment plan 30 PPAP Production Parts Approval Process - Reliability, Durability tests - Functional tests - Other Enhanced Control Plan, including a Temporary Quality wall (as defined in Faurecia 7 Quality Basics) on critical parts; or reinforced inspection in other cases. All suppliers are required to obtain full approval from the Faurecia receiving facility per the below requirements based on of the AIAG Production Part Approval Process (PPAP) Manual,4 th Edition Approval based on the Initial Samples and associated documents integrating the below items (retention at supplier versus submission to Faurecia can be discussed, however Control Plan and FMEA abstract are mandatory parts of the Submission package) All sample submissions are to be Level 3 (per AIAG) unless otherwise specified. PPAP SUBMISSIONS OVER 1 YEAR OLD Whenever Faurecia is required to submit PPAP to their customer, all suppliers PPAP documentation must be no more than one year old. At that time, all PPAPs over one year old are to be updated upon request by Faurecia, regardless of the supplier s business relationship with Faurecia s customer x FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 20 sur 39

PPAP Items 1 SUPPLIER REQUIREMENTS MANUAL Design Records: (drawings, GD&T ) index & appropriate part number and name correct 2 Engineering Change Documents Customer Engineering Approval Waivers if applicable CRT (Component Review Team) 3 Key Characteristics: List including all Safety & Regulations characteristics, functional characteristics (and aspect if important for customers) 4 Design FMEA Process flow diagram 5 BOM; (critical) Sub-Supplier PSW; Supply chain description (Tier 3 & +) 6 Process FMEA: Control plan 7 and final inspection Work Instructions Measurement System Analysis 8 (gauge R&R Repeatability) Dimensional Results & Fitting 9,1 1 ) dimensional results 9,2 Dimensional Results & Fitting 2 ) Assembly (Fit) and Processability test Recommended code of Practice, manipulation, storage Material Compliance to Regulations & Restrictive substance report (IMDS, REACH, ), Safety and Regulation data sheet Materials, Substances, and 10 Recyclability data submission Copy of the acceptance note or print out of the Recipient Data from IMDS as 11 Process capability 12 Laboratory scope and accreditation Appearance approval report ( Style, Visual)& Border samples 13 existence Sample Parts (IS, Initial Samples) production part status sheet part photo 14 Marking (with shipping label and sample part label) Packaging (description and acceptance; photo) Tool(s) Identification (photo of the plates and of the tools) Master / Border Sample 15 (+ photo book when required ) Checking aids/ Gauges description List of Testing/Measurement equipments 16 Approval form ; calibration record gauge work instruction Compliance to Customer & Faurecia Specific requirements: Run @ Rate / PTAR & MPT 17 Commitments (Capacity, Quality, Feasibility, S/R; ) Early containment plan Training plan of operators Cover sheet = PSW Part Submission Warrant reason for submission index & appropriate part number and name correct 18 correct weight provided supplier signature of an authorized official responsible for the submission FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 21 sur 39

31 Transition to Series & Lessons Learned Review the SLI and End of APQP Transfer to series production x x APQP tracking: the status report APQP is applicable to BOP s but also to COP (carry over parts) and specific raw materials, using a restricted list of the above elements. The ASQ organization within Faurecia Purchasing monitors and manages selected suppliers from new product release through the Start Of Production. A status is assigned to each APQP element according to the risk for the project represented by a color: For each APQP element ; The advancement and the delivery time are shown in an APQP synthesis chart named status report. This synthesis will be used as support in the progress meeting and in the project APQP review. The supplier must contribute to its monthly update all along the program phase by providing the agreed deliverables. 5 status possible G Element OK Y Submitted with Deviation ; Recovery plan acceptable ; counted as 50% of Green R Late and/or unacceptable quality of the delivery NA Non Applicable A Applicable ; PND (Program Need Date) not yet reached In order to allow a Convergence plan, an SLI (Single List of Issues) will be maintained for open issues with this content: Entry date date of entry of the item in the SLI (noted YY/MM/DD for sorting possibility) Last date modif date of last update of the item n Supplier name of supplier; possibility also to add its location Module name of module (ex IP, TC; DP) if a program integrates more than 1 module Part Part designation APQP related n element of the APQP which is under deviation; may be more than just one; count up to 4 possible APQP elements for a single item Issue / Problem describe the deviation & the root cause (text) Action (text) Responsible name of the leading person Dept department of the responsible Support/Contributor name of the other involved persons Deadline date Status opens (with progress shown 25%, 50%, 75%) /closed Issue level escalation requested depending on management involvement required (1 = ASQ or Program buyer; 2= program management 3 = Director Level & functional org. such as commodity or SQC) A 3 rd party web portal may be used to track APQP and PPAP status FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 22 sur 39

SERIAL PRODUCTION PHASE The objective during the serial production phase is to maintain world-class suppliers as selected from the panel and developed during the Program. During the series production phase, supplier s performances are consolidated and monitored against Faurecia Business and Performance criteria. EVALUATION OF SUPPLIER QUALITY PERFORMANCE Faurecia measure the supplier s quality performance by recording each claim (named Qp) in a Faurecia group level system named QSS (Quality Steering System) Evaluation of supplier performance is done according to following indicators: Quantity of incorrect parts & PPM Number of Complaints (Qp) ; with emphasis on number of PF4 & S/R related complaints Supplier reactivity measurement with nb of Qp not closed / closed PFx level = The disturbance generated by the failure as defined below 4 levels of perturbation of flow are stated according to the disturbance generated by the failure: PF1 Disturbance of the supply flow PF2 Disturbance of the production flow PF3 Stoppage of FAURECIA production line PF4 Claim from FAURECIA customer PF4/SR Claim from FAURECIA customer related to a S/R characteristic A part is the unit ordered by the customer/invoiced by the supplier. It can be: 1. A separate part or assembly 2. A collection of parts (e.g. seat or door panel collection) 3. Liquid products: liter, 4. Sheet and coil material: sheet or unit weight (kilogram, pound, ton, ) 5. Roll deliveries: linear meter, m², 6. Powder products: kilogram, pound, ton, 7. Fasteners (Pins, Bolts, Nuts, ): packaging unit FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 23 sur 39

An incorrect part is a component, assembly, part, collection of parts or materials identified in the Series Phase as not meeting the quality level approved at the PPAP and/or at any other subsequent agreement with the customer. They include parts with packaging and labelling issues but not missed or late deliveries. Problems caused by Faurecia personnel or Faurecia designated carriers are not to be taken into account. The same rule applies for problems caused by Faurecia designed packaging under the condition that a formal document has been sent by the supplier to the Faurecia denying any responsibility in case of problem due to this packaging. If not, the Faurecia designed packaging is supposed to be accepted by the supplier. How to count parts in a packaging unit? ( For big containers, the packaging unit is usually the same as the handling unit; for small boxes, the packaging unit is the small box and not the handling unit) If an incorrect part is found by the customer in a packaging unit, we count all parts in the Packaging unit. If other packaging units are then doubtful: We count all parts in the packaging unit when the packaging unit is sorted by Faurecia We count only the incorrect* parts when this activity is organized by the supplier in Faurecia premises. We do not count any part if the supplier replaces the packaging unit by a new one. Those rules apply to mislabelled packaging units In case the parts didn t necessitate rework as such but a temporary production set up, we count only the parts used to allow for this set up. Cases of yard blockages, deviation and warranty returns: We count parts involved in a yard blockage according to customer records. We do not count parts for which a formal deviation has been granted and which have not entered the customer facility before the date/time of the formal deviation agreement. We do not count warranty returns. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 24 sur 39

ZZZ Plant ISPG / Supplier JKL Facility accountable for defect (Faurecia site or supplier) What is the problem? Sketch/picture can be attached separately On 5W+2H CCC Vehicle VVV / Airbag module Traceability, batch number of defective part / component Quality: 100% inspection Safety: first aid... Name, title Why is it a problem? Risks on other products or processes? Other vehicles potentially impacted? Same severity of defect? Other plants warned? How can the defect be detected? Potential volume impacted? NO YES At customer, in transit, in stock, in safety stock... AMS or QSS or Customer reference When ground wire cable is unclipped, static electricity is no more evacuated and so, intempestive deployment may appear. Where was it detected? If known, where was it created? Safety Regulation When was it detected? PF1 to PF4 04-Sep-07 If known, when was it Logistic created? O km Who detected it? Warranty Incoming inspector If known, who created it? Programme... How was it detected? Visually, whilst unpacking the If known, how was it How many defective parts? airbag module from cardboard created? How many suspect parts? (if boxes known) 2 parts the 14/09 in incoming inspection + 2 parts at PSA If yes, QSS number of 1st YES NO complaint Yes if only if no reoccurence Need to inform Customer? And if yes, Customer informed? Inventory can be in: - Customer Plant, - Transit, - Logistic platform - Plant - Safety stock, - Sub-supplier... YES NO By production day and shift Name, title List up each validated root causes with Occ1, Occ2, etc. Validated roota causes should comes from factor investigation + 5 Why's Show each validated root cause of non-detection, starting by 'Non D1', 'Non D2', etc. Should come from factor investigation + 5 Why's Paste here the tracking chart of defects (customer, internal), by manufacturing date, showing the implementation date of each containment and corrective action with its individual impact. Can be attached separately if too heavy. Select the D8 actions applicable from the list on the left Show the link with the root causes identified in D4 & D5 300 250 200 150 100 50 0 47 Autoliv modification: 24.09.2007 264 233 7 7 Permanent ones, not investigation NOK Module found for September end November 27 9 6 1 0 14 Quality member 0 2 8 1 0 7 Date 0 Definitionof action plan By Management (Plant Manager or equivalent) 2 0 3 2 0 0 Status can be: - Done; - Done and checked (how?): - in progress - NOK... 1 1 1 2 2 7 1 SUPPLIER REQUIREMENTS MANUAL The supplier PPM is based on this incorrect quantity after sort. Therefore, to minimize the PPM level, quick reaction from the supplier when facing a batch issue is requested. EVALUATION OF SUPPLIER DELIVERY PERFORMANCE Faurecia measures the supplier s delivery performance by recording at receiving that Delivery Time and Quantity are compliant with the instruction given named MANIFEST. The indicator which measures supplier delivery performance is the MPM: Misdeliveries per Million. This indicator is defined as: 8D PROBLEM SOLVING MANAGEMENT When purchased material does not meet standards (e.g. quality, engineering change level, adherence to test specifications, etc.), or last qualified PPAP, a quality claim (Qp) is emitted by Faurecia based on the QSS system. SUPPLIER is requested to: submit to Faurecia an 8D document using the procedure and chapters below to document the problem and prevent its reoccurrence Upload the 8D document via the Faurecia supplier portal named GPS (Global Purchasing System) D1: Problem description What is the problem? D2: Risks on similar products and processes Do I have same problem elsewhere? D3: Containment actions (<24h) How to contain? D4: Root cause for non-detection Why sent? D5: Root cause for occurrence Why made? D6: Corrective action plan (<10days) D7: Effectiveness D8: Lessons learned (<60 days) What did we learn. how to capitalize and transversalize? Property of Faurecia - Duplication prohibited 2. Containmnent Actions D1 - Problem Description: 5W+2H detection/occurrence Customer Part number 8D tutorial Facility Product / What? Problem Description / Sketch / picture of defect (NOK/OK parts) Alert/ Occ1: protection from unclipping not working Category Root Cause Corrective Action Pilot Deadline Status QP Number Clip is bent Deformation of the ground wire cable clip in the boxes AB Added 100% check of clip at incoming inspection, picture 27-Sep-07 Done AMS-0000 Safety Non-D1 Occ2: Ground wire cable clips touch cardboard during transport of the NOK airbag module (ground wire cable unclipped) Use of cardboard instead of plastic boxes Common decision supplier JKL / Faurecia / PSA Increase thickness of the ground wire cable clip JKL Why? Occ3: Development perimeter for this module was not correctly defined Occ1 thickness of 0,05 mm Supplier 24-Sep-07 Done between module supplier and customer Change position of airbag module in the cardboard JKL Where? Incoming inspection area at ZZZ Occ2 boxes in order to avoid contact of the ground wire cable 24-Sep-07 Done Supplier clip with walls of the cardboard boxes When? Who? How? How many? Part manufacturing Reoccurence? date Did not appear in and YYY plants, which assemble the same airbag module. Is / Is not analysis Difference: they use plastic boxes D2 - Risks on Similar Products and Processes Because of plastic packagin, no risk seen on deliveries to & YYY 1. Sorting by Location Airbag ground cable disconnected D3 - Containment # NOK / Location # checked Customer 02 / 3382 House 583 / 4729 Safety stock 0 / 960 Actions 100% inspection: unclip and clip again connector Inform Effective? Customer? Comments / Conclusions Checking method: unclip and clip again connector JKL production 24/08 to 02/09, no correlation on defects versus shift or production day. High qty of rejects is due to severe containment action (unpulling) Date / Hour implemented 14-Sep-07 Clean Point Action Pilot Deadline Status 4/9, 12:00 Yellow sticker on part barcode label D5 - Root Causes of Occurrence D4 - Root Causes of Non-Detection Non D1: checking clip was not a check item of incoming inspection D6 - Permanent Countermeasures D7 - Effectiveness Rejects at incoming inspection ZZZ. Due the severity of the checking method (unclip / clip), still some parts are found suspect D8 - Lessons Learned Non D2, D3 => Update Control plan & P-FMEA CD 15-Oct-07 Done Lesson learned sheet for Occ1 EF 15-Oct-07 Done (thickness) Lesson learned sheet for Occ2 GH 13-Oct-07 Done (packaging) Lesson learned sheet for Occ3 IJ 13-Oct-07 Done (Management in Programme) / Created updated by AAA Customer Contact BBB Opening date 04-Sep-07 Last update 03-Dec-07 D3 validation: CCC Date D6 validation: DDD Date D8 validation: EEE Date N.O.K. FMEA, control pla n, maintena nce plan, workstatio n do cume nts, audit frequ ency, bo undary sam ples, knowledg e man ageme nt database / pro duct or process standard, Lesson Learned Sheet 18.09.200 21.0 9.200 2 5.09.2007 01.10.2007 04.10.200 09.1 0.2007 1 2.10.2007 17.10.2007 22. 10.200 04-Sep-07 173 04-Sep-07 15-Oct-07 FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 25 sur 39

D1 Problem Description 5W+2H and Is / is not / Differences (compare Good part/ Bad part) The essence of the Is / Is not / Differences tool is to ask oneself not only why under some circumstances the problem occurs, but also why, under other circumstances, the problem does not occur. And from there, identify differences. IS (Is the problem,is contributing...) IS & IS NOT analysis IS NOT (Is not the problem, not contributing ) Retained Factors N Typical questions include: What? Why this part / this reference and not that one?... Who? Why Mr. and not Mrs. Y?... Where? Why here and not there? Why this process and not that one?... When? Why today and not yesterday?... Why? How? Why this way and not that way (ex: detection)?... How many? Why more with A than with B?... Hints Assign the appropriate cross-functional team including experts whenever needed - to address all critical aspects of the problem. Go to the real place to really understand the problem. Look at the real defective part when available; compare bad parts with good parts. Look at reality. Use real data, be precise. Prohibit vague, generic problem statements that are the sum of several problems (i.e. 'high scrap rate' ) Is it a recurring problem? If yes, fill in tracking chart prior to problem opening. IN PRODUCTION: Shift / daily ppm figures are not statistically relevant. Rather monitor number of defects. Typically: sent to customer; found at final inspection; created and detected at workstation. Is it a reworked part? For customer complaints, include an operator in the team. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 26 sur 39

D2- Risks on Similar Products and Processes Objective Identify risks on similar products and processes. To be carried out before step D3 (containment), because such similar products / processes might be impacted by the problem as well and would also need containment actions. Hints Identify all potential scope of problem. Are all other products / processes identified with potential volume at risk? D3 - CONTAINMENT Measures = Actions required within 1 day (24 hours) Objective Define the immediate actions to be carried out to protect the customer. They typically include an immediate sorting out of all parts identified as potentially at risk, then a temporary containment (for major claim, a Quality Wall ) until definitive, robust countermeasures are in place. Report results of all containment actions with Qty Rej/ Qty inspected at each step Tools Quality Wall check-list. (Location : separated from the line but not too far; part flow clear, red bin available, tally sheet available and defects individually traced; trace part inspected; inspection instruction identical to final inspection; inspectors duly trained) All 8Ds shall be answered with a short-term solution based on containment. Containment is a list of actions detailing where and how the SUPPLIER will protect Faurecia from receiving this defect again and shall include, at a minimum: - Inspection of all finished stock/ ALL parts: Parts in SUPPLIER facilities, parts at Faurecia, parts on truck, parts at the End Customer Control of material at Faurecia facilities may be performed by SUPPLIER personnel (whenever possible) or by an external firm at Supplier expense. If necessary, Faurecia will assist the SUPPLIER in arranging services from an external firm. - Update of Supplier s end-of-line inspection procedures and instructions including an evaluation of checklists, methods, gauges, etc. - Labeling of parts, racks, boxes, etc. of checked parts, clearly marked with the purpose of the extra check and the number of Qp report. to prevent the release of additional incorrect material into Faurecia process. Should a pf4 occurs or a new occurrence of the same failure escape SUPPLIER internal containment efforts and arrive at Faurecia, an additional inspection named Temporary Quality wall will be required in the form of a formal Containment. Choice between Containment 1 and 2 depends on the frequency and severity of the failure. Containment Controlled Shipment Level 1 (CCS-1) is an additional 100% control station (not the standard end of line check) set up by SUPPLIER at its plant, using own manning. Results shall be sent at a specified interval to the Faurecia plant SQA. Containment Controlled Shipment Level 2 (CCS-2) is a second additional 100% control station (additional to the already existing CCS-1) by using of an external 3 rd Party company to inspect for nonconforming parts. 100% of parts shall pass through this inspection prior to delivery to Faurecia plant. Supplier Plant Manager and Quality Manager shall sign CCS-2 documentation. Containment action shall continue until SUPPLIER has shown its process capable of providing products according to specification and the pipeline is clean from any nonconformance. Once imposed, neither CCS-1 nor CCS-2 will be lifted until zero defects have been found for the length of time specified by relevant Faurecia representative at start. To stop this CCS-1 and/or CCS-2, a process audit could be performed. The importance of these containment actions cannot be stressed enough, and the SUPPLIER is expected to implement them IMMEDIATELY upon receipt of the 8D FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 27 sur 39

D4 - Root causes of non-detection SUPPLIER REQUIREMENTS MANUAL Root Cause of non detection must be specially documented. Human Error is not and never has been an acceptable reply! Where human error is unavoidable, controls must be in place to prevent the defect from leaving SUPPLIER plant. This item is rarely documented; please don t forget (same rules as D5; suggest use of FICS; refer below) D5 Root Cause Occurrence Preliminary check-list Control Plan and FMEA's checked? OK 1st part done properly? Poka Yoke/process parameters checked? Operators trained and standardized work followed? [Development] Product-process standards used? Objective Identify likely causes why the problem was not detected where or when it was created, then validate them. R&R forms, Tools FICS Factor Investigation and Compliance to Standards (mandatory) Validation of likely causes (mandatory) See QRQC Problem Solving Tool training package. 5 why's (mandatory) Gage R&R (if necessary) See the continuous and discrete gage FICS (Factor Investigation and Compliance to Standard) analysis:. Difference between bad parts and good parts, what is the standard?. Examples of non-detection factors in production: inspection means, visual Inspection within standardized work, information availability, training, rework, inspection flow, workstation lighting, ergonomics, NOK parts identification, traceability, Poka yoke, people availability, cycle time.does reality (good parts, bad parts) comply with the identified Yes O, standard for the considered factor? no, Possible answers: doubt..is the standard relevant (existing, updated, clear )? If relevant, attempt to reproduce non-detection. Validate root causes of non-detection before root causes of occurrence Make sure your measurement / inspection process is validated. Possibly carry out a gage R&R test. Once technical root cause of non-detection is found, do 5 why's to drill deep into real management / organizational root causes Factor OK Real? OK Std? Factor validated? Control Point Standard REAL situation NOK parts OK parts Real vs. Std? Std OK? E O ok NOK Separate investigation doubt actions from Corrective actions Investigation Plan to validate / eliminate factor Investigation Action Responsible / Deadline Do all real data (NOK parts and OK parts) meet standard? Yes => O; No => ; doubt (ex: can not be sure) => Is standard updated? Clear? No contradictory with other standard? No defective part produced when standard is met? To record whether factor is a real cause. Problem can not be reproduced => O ; Problem reproduced => ; Doubt => Completion check-list Can you prove logically what is (are) the root cause(s) for occurrence? What is the management / organizational root cause? Result - Defect reproduced? Factor validated? FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 28 sur 39

D6 - Corrective Actions > required within 10 working days: definition of permanent actions The 8D shall be updated with long-term solution. This means: 1) a statement of root cause for both NON DETECTION (how it escaped Supplier process) and NON CONFORMANCE (how the failure occurred) 2) A description of containment actions taken 3) The definition of permanent actions For all cases, the SUPPLIER answer MUST include a documentation of every 8D element (either by mail,.doc,.xls,.pdf or.ppt) Upload 8D via GPS Supplier Side 2. Fill in your 8D report 3. Attach the completed report for each 8D relevant step in GPS D3 step D6 step D8 step GPS Where immediate implementation of the long-term solution is not possible, an Action Plan shall be provided including due dates for each item. An updated copy of this plan showing progress made shall be sent to Faurecia on a weekly basis (or as otherwise agreed), until all items are complete with proven capability of the long-term solution. Property of Faurecia - Duplication prohibited Faurecia Side Notification 1. QP document sent from Faurecia Notification 4. SQA validates the 8D report QSS 171 D7 - Verify Corrective Actions Objective Check effectiveness / robustness of D6 actions on selected indicators. Tools > Tracking chart. Hints When using QRQC board, highlight on tracking chart the implementation date of corrective action and to see its effect on selected indicators Check effectiveness of detection Completion check-list Are corrective actions effective (tracking chart)? Do corrective actions prevent defect creation? Actions Verification mode Pilot Deadline Results Effectiveness of corrective actions confirmed by indicators? Is detection effective? (simulate defect to test detection) No recurrence for one month? (after action plan is completed and containment removed. (mandatory for S/R issues and customer complains) Operators trained in all shifts? Can they correctly describe the changes? Do corrective actions prevent defect creation? D8 Lessons Learned Objective Identify definitive changes to make sure the problem will never occur again, anytime, anywhere (where problem happened, in the whole site, in other sites and for future developments). Tools Control plan, Workstation instructions & documents and any other standard to be updated. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 29 sur 39

ESCALATION IN CASE OF POOR SUPPLIER PERFORMANCE In case of repetitive defects, the escalation process leads to entry in a Red List followed by either Supplier Performance Review or by Special audit Escalation process Escalation Process Purchasing Level 4 BG SQD Mgr Level 3 SQD Region Management Feedback for big quality concerns Level 2 Plant SQA Kaizen for quality concerns Level 1 Goods Incoming Inspection Daily PDCA for quality concerns Plant Quality Technical perfection, automotive passion. Monitoring global quality performance (actions prioritized according to the Red List) Alert quality (crisis management) Supplier process audit Level 2 Special Audit Weekly Communication Monitoring plant quality performance Reinforce Daily PDCA by 8D Challenge 8D Supplier process audit Level 1 Audit based on 20 questions of Control plan Detection of non-conformity Feedback of non-detection (8D) Organization of Containment CSL1 8 1 ) Special Audit at supplier Confirm Capitalization & Transversalization of 8D in 1-hour meeting (by using 8D checklists ) Perform special audit 20 Questions on Control Plan in 2 hours at shop floor If result is not acceptable, repeat process next month 2 ) Supplier Performance Review at Faurecia Attendees : Supplier General Manager; Quality Mgr, Key Account Mgr Process : Current Performance indicators 8D presentation on each key Problem Progress Plan including estimated Quality level after implementation of all the actions Open points Next steps & conclusion <LEVEL> 5:Very good(more than expectation) 4:Good(Expectation) 3:Average(Less than Expectation) 2:Bad 1:Very bad(nothing) Items Question Point this audit Expectations for level 4 0 8D REVIEW list of 8D reviewed : na Customer defects tracked daily Sorting with data (number of NOK parts / number of parts sorted, by shift and place). Systematic investigations on root cause of occurrence and non detection On time closure of 8D: 24 hours for D3, 10 working days for D6, and 60 working days for D8. 0 Logistic what are the next truck to Faurecia? What is the preparation status na Instructions for logistic operators exist. Products prepared mini 4h before truck Departure Final control 1 (or Control at important process) How many checking points do you have? 4 Do you have Working instruction (Inspection instruction) for this? 4 Manufacturing operator clearly knows exact number of checking points, which corresponds to the standard, and also less 10 checking poin ts. Clear working instruction (inspection instruction) with photo (or picture) put in front of operator Is this working instruction (inspection instruction) coherent with control 4 plan? Are frequency, responsibe person and action in case of Not OK clear? 4 All checking points in working instruction (inspection instruction) are cohernt with control plan, and matching with process flow diagram Clearly defined boundary sample, frequency, responsibe person, and the action (scrap or repaire) in case of Not Ok in working instruction (inspection instruction) Daily check sheets(dcs) 2 How do you decide your checking 4 points? Do you have DCS for checking points records including tally sheet? 3 Do you have graph for dimension check result? 3 Do you have OK first part? Do you have check sheet for OK Start of Poka-yoke or test equipment? 3 4 Checking points should be up-dated from feedback of final customer (warranty), and customer (PPM), and past internal problems. Have DCS for daily doccument of all defects coherent with working instruction (inspection instruction) SPC graph with OK tolerance, process capability with action rule is clearly displayed somewhere in plant. OK first part is performed every begin ing of shift or every change overs with the evidence by part and its check sheet OK Start of all Poka-yoke and test equipment done with check sheet Not OK parts control 3 In case of not OK, do you scrap or repair parts? 3 Operator respect their instruction sheet with boundary sample which is clearly showing "Scrap or repaire" Customer feed back 4 How do you distinguish scrap and 3 repaire? In this case, do you feed back to occurence process? 3 Scrap parts go to red box; repair parts to repair place with identification. Immediate feedback to occurrence process, and feedback to GAP leader in case of escalation In this case, do you stop inventory? 3 In case of sample check, can clearly identify suspected inventory parts with its traceability How do you repair your parts? Working instruction sheet for repair is clearly displayed, including which parts can be 3 reuse, where they return repaired parts. Do you have pareto for PPM (even Weekly tracking chart with parato by causes for PPM displayed somewhere in plant 4 from the next process as customer)? Do you have action plan for Top 5? PDCA exist for Top5 items. Problems completely killed after action. 3 Incoming parts control 5 Do you have incoming parts They identify incoming parts are OK or NOK. NA inspection area in the plant? They can retain parts to be used before inspection is finished. Did you decide checking points with Checking points clearly shown in inspection report from supplier NA your suppliers? Do you have file with periodical Existing file with periodical inspection report from supplier. inspection report from supplier for NA OK/NOK should be clarified. this check result? Do you periodically audit your Audit plan existing; audit suppliers to improve quality results. NA suppliers to prevent quality concerns? Total 69% C+ FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 30 sur 39

COST RECOVERY POLICY: Suppliers are liable for all costs incurred by Faurecia when the cause is the supplier s responsibility. Applicable charge backs to external suppliers are outlined below by some examples and indicative values (these values are finalized with the Supplier in the QAA (Quality Assurance Agreement)): Administrative charge Each Quality or Logistic Problem (Qp) has an administrative charge covering the collection of data and documentation of the quality incident/spill. Operating costs of protective measures; o extra Incoming Inspection & o Sorting of parts (, Suspect Material In-House, at Customer Location or Third Party Warehouse and Contractor Costs), Repackaging o Destruction/Disposition of Scrap Rejects of completed and/or semi-finished PRODUCTS 150 Euro per complaint in West Europe, or equivalent local rate in local currency. (this administrative charge may be multiplied by a certain factor in following cases: x 2 if reoccurrence of the same problem x 2 if no appropriate answer to the 8D process according to the D3, D6, D8 delays outlined in the 8D Problem Solving Management ) 33 Euro / hour in West Europe, or equivalent local rate in local currency Or contractor 3rd Party costs directly charged to the Supplier Real costs (product) Costs incurred in the downstream operation stage or Third Party claims BASED ON REAL COSTS + handling charge (10%) o Retrofit of sub-assemblies or vehicles o Production & Machine Downtime @ standard machine rate o Staff costs associated 55 Euro / hour in West Europe, or equivalent local rate in local currency o Lost production time & Based on direct+ indirect labour of the stopped line o Overtime to Avoid Production Interruption o Transportation costs ; Premium Freight Costs including Air Charter if Required o Travels and extra- trip to customer o Claims charged by the CUSTOMER o Costs of an expert and Outside Lab Testing PRODUCT / PROCESS & PRODUCTION CHANGE REQUESTS (PCR): Supplier must propose any change information using the PCR form and must request approval in writing from Purchasing and all Faurecia receiving facilities Faurecia Purchasing and all receiving facilities must approve all changes in advance, Samples may be required for review and to evaluate potential impact on Faurecia s manufacturing processes. Submission for PPAP approval is mandatory prior to the shipment of the new parts (or from new location) unless specifically waived. After Faurecia written approval, the first delivery with new parts must be identified The tool move plan must include the requirements of a production bank if necessary to ensure Faurecia s Production and Service requirements are not affected. The change has also to be communicated to PC&L Plant for assessing Feasibility (new product in Information System, taking care of all existing stock, update Supplier Logistics Agreement, schedule last delivery old product, first delivery - receipt of new product) FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 31 sur 39

ETENDED SHUTDOWN / START- UP AUDIT: WORK STATION(s) Audit Name Date : Auditor (Quality Manager) : Sector : Audited : Work Station : Supervisor : Visa Faurecia Purchasing and ALL receiving Faurecia facilities must be notified in writing prior to an extended production shutdown and must submit a completed audit at restart. Examples of extended shutdown/start-up periods include Customer change-over, scheduled preventative maintenance for Tooling, Machinery or Processes or the anticipation of a work stoppage due to Union Contract Negotiations. TARGET : Check if Workers apply correctly Standardized Work and Produce Parts without defect (after stop of production) A - WORKSTATION CONDITIONS OK NOK NA Comments Actions Resp. Time Done Validated Right Parts at last engineering level : Are the possible expiry dates taken into account, and are the expired goods (parts, raw materials, etc.) eliminated in case of quite important stock? Work in Process protected 'At the opening of the plant, did you unprotect the pending work (semi-finished parts, or finished parts waiting for expedition) according to the validated methods? 5S Workstation Clean OK 1st Part / Start up Done (at assembly line or injection Press) + Is there any procedure to release a possible degraded process D:\SQ_KIT\QSE 7 (deviation/waiver system, etc.)? Basics Serie QRQC_BQP\OK_1st_Part\OK+1st part FAU-S-PSG-063 Standardized Work Available (Work Instruction / ) D:\SQ_KIT\QSE 7 Trained operator : Work Instruction Read by Worker before re-start Basics Serie QRQC_BQP\Standard_Operation_Form\Standard+Operation (Are they updated almost in case of modifications during the stop production period?) Worker trained at the good level (skills matrix updated) IF S/R Workstation, Worker Trained on S/R Risks Parts labelling and Packaging Boxes labelling conforms Red Bins Identified and at a real Place Press/ Machine Parameters in adequation with Standard Settings Sheet Did you validate any possible process modifications and/or the major maintenance interventions that may have been realised during the stop of the production? 1st Maintenance Level Respected Total no conformities (A) : B - AUDIT WORK STATION Defects Knowledge OK NOK NA Comments Actions Resp. Time DoneValidated Feedback on problems Did you plan a meeting in order to have people to be aware of the risks related to the restart, with all different categories of staff? Worker knows, showing OK/NOK parts, which are mains internal defects and which one has already impacted the customer Poka Yoké / Gages Worker knows Poka Yoké and their utility Worker use Checking Fixture and Gages if necessary Inspection : observation (supervisor + fonction support Quality) - Mini 10 cycles Inspection instructions followed (control weight / visual check / ) Self-Inspection (defects are detected at the workstation) Self Inspection applied Are the acceptance criteria (OK/NOK) accurately defined: tolerance range, boundary samples, gauges, etc.? Defects Registration and Instruction to evacuate defective parts Defects Identification Available and Respected (ex : red sticks) Defective parts go in a red bin if they are defectives Defects Registration Sheet Available and Respected Total no conformities (B) Diffusion Supervisor Quality Technician Person in Actions Nom NA : Not Applicable Responsible.U.A.P. (Prod Unit) FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 32 sur 39

WARRANTY MANAGEMENT This addendum sets forth the method for the handling and settlement of costs incurred from the delivery of defective goods by Suppliers to Faurecia. The basic method of recourse is the application of the principle that the party supplying the defective goods shall be responsible for costs associated with all (supplier fault) warranty related complaints, costs and expenses. The purpose of the warranty process is to provide for the pass-through of all warranty costs from OEM to the supplier that has provided the defective goods. 1. Supplier Organization: All suppliers shall establish and maintain resources to support Faurecia warranty requirements. Suppliers shall also appoint a warranty engineer as a single point of contact to Faurecia for warranty support, issue tracking and product improvement. 2. Management Requirements / Quality Procedures All suppliers shall provide a Warranty Procedure and Flow Chart documenting the system for control, analysis and corrective action integration into the production process. The procedure shall include regularly scheduled warranty part reviews for emerging warranty issues. Faurecia will notify supplier warranty designates in advance, when their participation is needed in such reviews. 3. Warranty Parts Return Faurecia receives only a small sampling of the parts replaced by dealers. Within two weeks after receiving warranty parts from an OEM customer, Faurecia shall make available to the Supplier the warranty parts received, if any, with copies of all available documentation (as provided by the OEM customer) for traceability, investigation and corrective action purposes. The required Response time frame is as follows: o An initial response to a critical problem (essentially the containment action/ 8D report: Steps 1 to 3) is required within 24 hours of receipt from Faurecia. o A 5-Why analysis for ascertaining root causes and verification is required to be completed as part of the 8D process. o 8D final response (with verified complete root cause analysis / 8D report: Steps 4 to 6) is required within 15 calendar days of receipt from Faurecia. If suppliers fails to respond within Faurecia required time frame (24 hours for critical issues for section 1 of the 8D report and/or 10 working days for full root cause and final corrective action for section 2 and 3 of the 8D), supplier will be deemed to have accepted the warranty claim and all warranty costs received from OEM and all other costs and expenses of Faurecia will be the sole responsibility of the supplier. Faurecia together with our OEM customer performs part preanalysis and defines possible factors, recognition of responsibility and causes for customer complaints during warranty review meetings. This is done by examining the parts, reviewing dealer service comments, records and part tags attached to each returned part. 4. Warranty Parts Review, Containments and Problem Solving Upon receipt of a warranty claim, suppliers shall respond within the specified me limits, utilizing only the array of available responses as set forth below: Category 1: Responsibility of Supplier (Sample provided by FAU Supplier) Category 2: Trouble Not Found TNF (Sample provided by FAU Supplier) Category 3: Responsibility of Dealer and/or Customer Reporting Tool 8D and Required Response Time Frame Supplier will undertake to receive and respond to an 8-D Problem Action report which is the official communication tool for reporting and resolving problems. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 33 sur 39

4.1. Category 1: Responsibility of Supplier Warranty part analysis results and actions shall be documented using the Faurecia standard 8-D format. This format is also utilized to monitor the effectiveness of corrective actions over time by each component. Implementation of a testing process to verify actual root cause and determine corrective action for dealer claims is required of Faurecia by our OEM customers and must therefore be pass-thru to our suppliers as well. The Supplier shall keep all provided parts received as warranty for a period of 6 weeks from issue notification date. 4.2. Category 2: TNF: Trouble Not Found If TNF status is declared in the 8-D process, suppliers must clearly describe and document with data, how they arrived at this conclusion. In other words, TNF status in the warranty analysis process must follow systematic elimination of potential root cause factors. TNF typically describes a scenario whereby testing indicates the returned part meets Faurecia and/or our customer part and performance requirements as defined in purchase orders, PPAP and warranty terms and agreements. Examples include: additional levels of testing, development of new test procedures, simulation of customer usage, verification to all applicable specifications, etc. In some cases when the defect is proven at the customer, a compromise may have to be reached between Supplier, Faurecia, and Customer (shared % responsibility ) 4.3. Category 3: Responsibility of Dealer and/or Customer When the supplier investigation has determined the defect to be Dealer or Customer miss-use, suppliers need to provide all supporting documentation for approval of this category. In the event that Faurecia disagrees with a supplier response, Faurecia will give timely notice of its objection. Should Faurecia decline a submitted response the supplier will be asked to amend it. A rejected supplier response where the parties do not agree as to content effectiveness, shall not be binding upon Faurecia. The supplier shall retain the affected components until the issue is resolved in a positive manner; such that Faurecia customers will concur with our suppliers root cause and corrective action analysis, including supporting documentation. 5. Warranty Analysis Resources Suppliers shall have proper equipment (commensurate with products, services and processes provided to Faurecia) or outside resources available when needed for warranty part conformance testing. This applies to all components, systems and vehicle requirements relative to the warranty issue under investigation. At Supplier s cost, supplier shall conduct all components level testing (inside/outside laboratories) and analysis of warranty returned parts within the Faurecia required time frame. For system level testing, Faurecia and Suppliers shall work together in good faith to determine the best testing method. Each party will absorb their own testing cost. 6. Implementation of Lessons Learned Suppliers shall incorporate Lessons Learned from warranty analysis into their processes. Suppliers shall produce a process/procedure outlining the use of Lessons Learned in the development of new products. The procedure shall include problem resolution, reporting of current issues, and how they are captured for future product development. All Lessons Learned shall be part of the 8-D report (Customer and /or Faurecia 8D & LL format) A Lessons Learned database is recommended for suppliers. 7. Technical Support Suppliers at their cost shall provide technical expertise for the review of Service Manuals, Service Bulletins, Service Repair Tips / Repair Catalogues, etc. Suppliers shall assist in the development of service fixes as needed for warranty issue resolution/closure as it pertains to products and services provided. 8. Warranty Terms and Conditions & Recovery Cost - Chargeback to Suppliers All of the associated warranty claim costs for Category #1 failures as noted above will be DEBITED to the responsible Supplier. The terms of the supplier warranty granted to Faurecia will be not less than the coverage provided by OEM manufactures to their end customers. Note: Warranty coverage for purposes of determining OEM coverage, starts from the date of delivery to the endcustomer. In the event of an extension of the contractual warranty given by Faurecia to its Customer, Suppliers shall grant the same corresponding extension to Faurecia. 8.1. Warranty Terms and Conditions Indicative only, refer to your counterpart for most recent updates on warranty T&C FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 34 sur 39

Customer BMW USA, Canada and Puerto Rico BMW Europe and (Non US, Canada and Puerto Rico) SUPPLIER REQUIREMENTS MANUAL Period of Time Coverage in Miles 5 years 70,000 miles 3 Years 100,000 Km Warranty Cost Monthly and Yearend deductions by the Customer Monthly and Yearend deductions by Charge-back Agreement by Customer 14x Factor for the US markets 28x Factor for the US markets Warranty Requirements by Customer BMW GS-95004 BMW GS-95004 the Customer Chrysler / Fiat 3 years 36,000 miles Monthly Deductions Technical Factor Chrysler ADP Ford 3 Years 36,000 miles Monthly Deductions Technical Factor Ford SIMS General Motors 3 years 36,000 miles Monthly Deductions Technical Factor GM Warranty Mercedes Benz 4 years 50,000 Miles Monthly Deductions Technical Factor Mercedes Benz Warranty Nissan 3 Years 36,000 miles Monthly Deductions Technical Factor R-M Warranty Renault 3 Years 36,000 miles Monthly Deductions Technical Factor R-M Warranty Volkswagen (USA & Canada) 4 years 70,000 miles Monthly Deductions Technical Factor VW Warranty Volkswagen (Non US & Canada) 3 years 100,000 Km. Monthly Deductions Technical Factor VW Warranty 9. WARRANTY COST In the event that the Supplier delivers defective components, the supplier shall indemnify Faurecia against all expenses and costs incurred by Faurecia. Faurecia reserves the right to set off its payment obligations against any amount which might be owed by the Supplier, on any grounds and of any nature whatsoever, including amounts corresponding to penalties and quality claims. In the event the products do not conform to the warranties granted to Faurecia, Faurecia may, without prejudice to Faurecia s right to claim for damages, charge the Supplier with, and the Suppliers undertakes to bear, all and any repair or replacement costs reported by the OEMs. Faurecia shall make available to the Supplier the Charge-back warranty data (as provided by each customer) The warranty provisions set forth herein supplement the Faurecia Terms and Conditions of purchasing. The full warranties granted by suppliers are set forth in Terms and Conditions of Purchasing of Faurecia. The Faurecia warranty claim has the following five (5) basic elements, which represent the expense to the vehicle incurred by our OEM customer: (a) Labor: The standard repair time to replace or repair a failed part, based on the OEM vehicle time guide, multiplied by the average labor rate. (b) Parts: Replacement parts purchased by Dealerships (c) Parts Handling: Charge for administration, shipping and handling of defective parts. (d) Sublet: Repairs or services provided by a third company (i.e.: machine shop, paint shop, etc.) (e) Indirect Cost: Consequential Damages caused to other components as results of the defective part. Consequential damages included also the cost for mobility (i.e.: loaner cars) The foregoing elements illustrate the typical costs related to the repair and replacement of a defective component and are not an exhaustive list of the costs incurred with a warranty claim for which the supplier will be liable. Faurecia s rights are more fully set forth in the Faurecia Terms and Conditions of Purchasing and this document is intended to supplement such Terms and Conditions. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 35 sur 39

Code of Conduct Sourcing & Supply Chain Background Faurecia, a global automotive supplier, is committed to growth founded on socially-responsible actions and behaviors in all countries in which it operates and in all fields in which it does business. Faurecia is committed to adhere to the principles based on the Universal Declaration of Human Rights, the international Labour Organization s (ILO) Declaration on Fundamental Principles and Rights at Work, the Rio Declaration on Environment and Development and the United Nations Convention Against Corruption. These commitments have been reiterated in the corporation s Code of Ethics and Rules of Business Conduct. This charter is regularly updated and is available on the Faurecia website. The charter puts forward a common set of key references. Each individual, from top executives to all employees, must comply with it in all circumstances. Furthermore, on a specifically environmental level, Faurecia has a product development strategy to reduce the emissions and environmental impact of cars. Faurecia expects its suppliers to support a sustainable approach throughout a vehicle s lifecycle. Faurecia intends to make these principles key elements of its purchasing policy. Faurecia, in order to verify conformance of the Supplier s practices with the Faurecia requirements. Faurecia Code of Conduct Sourcing & Supply Chain: Application Within the framework of invitations to tenders, Faurecia considers social, environmental and fair economic business principles as key elements in business award decision, both for new and existing suppliers. Supplier compliance with standards that match our own as outlined below is of utmost importance for Faurecia. Faurecia reserves the right to carry out, at any time, audits at Supplier s various sites, by Faurecia or by a third party appointed by Commitments 1. Obey the Law Suppliers must respect and comply in all areas with the laws and regulations in force in all of the countries in which it operates and/or sells. When legislation is lower than the international standards outlined below, suppliers are still required to converge to these latest standards. 2. Responsible Supply Chain Management Suppliers should prevent any contravention of human rights and prevent or mitigate environmental impacts that its enterprise may cause or contribute to through its own activities, or which may be directly linked to its operations, products or services by its business relationships. Suppliers should carry out human rights and environmental assessments, in order to identify, prevent, mitigate and account for how they address their potential adverse impacts. Suppliers shall apply this code throughout its own supply chain. Labour & Social Policies 3. No Child Labour Suppliers are prohibited from employing children in violation of the stipulations of the International Labour Organisation s convention (ILO Convention n 138, 182). The minimum age for employment shall be the country legal minimum age, or the age for completing compulsory education in that country, whichever is higher. In any case, suppliers will not employ children under the age of 16, and will comply with the provisions of the ILO regarding the health, safety and morality of young people aged between 15 and 18. As an example, FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 36 sur 39

but not limited to, suppliers should ensure workers younger than 18 do not exceed the prescribed working hours within the countries it operates. 4. No Forced Labour Suppliers must not, under any circumstances, resort to forced or compulsory labour. Forced or compulsory labour is any work or service which is forced upon any person under the menace of a penalty and which the person has not entered nto of his or her own free will. Forced labour can include practices such as restricting people's movement; withholding wages or identity documents to force them to stay on the job; or entangling them in fraudulent debt or wage deductions from which they cannot escape; or developing their dependency of in-kind payments; or deprivation of food, shelter or other necessities; applying compulsory overtime; or loss of social status; etc. (see ILO Conventions n 29, 105). Suppliers should ensure that workers understand their rights with regard to payment of wages, overtime, retention of identity documents, etc. Migrant workers, workers who are part of a group that has suffered from longstanding discrimination, young people & unskilled or illiterate workers, and women among these groups, constitute populations which may not be aware of their legal rights. Therefore suppliers will ensure that they are treated fairly and their rights are respected. In the case workers are recruited by third parties, suppliers will pay particular attention that these principles are properly applied. 5. Working Hours Working hours (including overtime), as well as break times and periodic days off, shall be compliant with applicable laws & regulations, collective-bargaining agreements and international conventions. Overtime work should be voluntary and paid as such. Work or service outside normal daily working hours shall not be imposed by exploiting a worker s vulnerability under the menace of a penalty. For example, employers shall not set performance targets that result in an obligation to work beyond normal working hours because of the worker s need to be able to earn the minimum wage. 6. Fair Wages Suppliers shall comply with all applicable laws and regulations, including those relating to minimum wages, overtime hours and legally mandated benefits. In places where no legal requirement exists for defining a minimum wage, ILO Convention n 131 can serve as a basis for the definition. Workers must be paid in a fairly and timely manner, and the basis on which workers are being paid must be clearly conveyed. 7. Non-Discrimination and Equal Remuneration Suppliers must not discriminate against any worker based on race, color, age, gender, sexual orientation, ethnicity, disability, religion, political affiliation, union membership, national origin, social origin, or marital status in hiring and employment practices such as applications for employment, promotions, rewards, access to training, job assignments, wages, benefits, discipline, termination and retirement (see ILO Convention n 100, 111). 8. Freedom of association Suppliers must respect the right of workers to associate freely, form and join workers organization of their own choice, seek representation, and to bargain collectively, as permitted by and in accordance with the applicable laws and regulations. Suppliers shall ensure that representatives of such personnel are not the subject of discrimination and that such representatives have access to their members in the workplace as well as adequate working space in order to work effectively and without interference (see ILO Convention n 98, 87). Where the right to freedom of association and collective bargaining is restricted under law, suppliers should provide workers a parallel mechanism to make their views known to the management, and take those into consideration. 9. Health and Safety Suppliers shall ensure that the health and safety (H&S) risks to their policyholders, employees, contractors and members of the public which arise from its operations are reduced as far as is reasonably practicable. We require that our suppliers carry out their operations in a safe manner in line with relevant regulation, approved codes of practice and industry best practice and in a way that does not expose any person to the risk of injury or ill health. Accordingly, its chosen contractors or suppliers are expected to demonstrate a clear commitment to Health and Safety Management and that they maintain effective policies and procedures. The social impact of accidents can be incalculable and may indicate a weakness in H&S controls and training. We therefore consider the incidence of accidents together with reactive monitoring very seriously and require full disclosure of statistics. Suppliers shall then provide Faurecia their H&S indicators, risk assessment and associated H&S improvement plan, if requested. Suppliers shall adopt a continuous improvement approach, based on the collection and analysis of occupational incident and accident data and feedback. Suppliers shall also respect workers rights of participating in such activities and H&S decisions. Faurecia believe that employee involvement is critical to the success of an organization and this principle applies as strongly to H&S Management. We expect that suppliers will have provided training to its employees and anyone else impacted by their activities, where the details may include training in use of work equipment; manual handling; risk assessments; fire safety, emergency response and preparedness; first aid; personal protective equipment and training relevant to the particular health and safety risks relevant to or created by that organization's operations. Suppliers should ensure the provision and maintenance of protection equipment, at no cost to the workers. Under the hierarchy of control measure personal protection equipment is deemed the last line of defense and as such must offer the necessary protection against foreseeable hazards. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 37 sur 39

Environment 10. Environment Environmental Policy: Suppliers shall not only comply with all environmental laws and regulations, but also implement measures contributing to the protection of the environment. Therefore, they should strive to minimize the adverse environmental impact of their products and services during the whole product life cycle: conception, development, production, transport, use and disposal or recycling. To this end, we encourage the supplier to be ISO 14001 certified or equivalent. Innovation & product life cycle: Faurecia is particularly attentive to bringing to market, in all countries, vehicles with better standards of environmental performance and endeavors to research and promote innovative technical solutions contributing toward this. Consequently and if applicable, Suppliers commit to adopt a voluntary policy in the field of research in order to develop its products to achieve an everhigher standard in terms of respect for the environment. Suppliers are expected, not only to consider the environmental impacts of their products during their design phase, but also in their production & procurement processes as well. Natural resources preservation: Suppliers should be focus on reducing the use of raw materials and resources as well as to eliminate the waste produced by all its activities. This goal will be achieved through the improvement of production, maintenance and cleaning processes, modes of conservation and transportation, as well as the substitution, re-use and recycling of materials, design, process changes, innovations, etc. Prohibited substances and materials: Products or parts bought from Suppliers by Faurecia, whether they are standard or specificallydeveloped by the Suppliers for Faurecia, must not contain any product, material or substance prohibited by the legislation or regulations applicable in the Suppliers countries, the European Union and, more generally, in all of the countries in which these supplies, products or parts are used and should be validated beforehand by Faurecia. Therefore Suppliers must address the European REACH procedures or its national / international equivalent, such as the American Toxic Substance Control Act (TSCA). Faurecia may also, in some cases, ask its supplier to provide disclosure on the use and provenance of certain substances and materials for legislation and regulations compliance purpose. As an example, to be compliant with US Conflict minerals legislation, suppliers could have to disclose whether the products they manufacture or contract to manufacture contain conflict minerals, which means minerals that directly or indirectly finance or benefit armed groups in specific countries. CO2 emission reductions: The Suppliers shall promote the development of technologies limiting CO2 emissions as well as energy saving and recycling solutions, and implement logistic strategies that minimize environmental impact. Economic practices 11. No Corruption & Bribery Suppliers shall prevent and fight all forms of corruption, bribery, extortion and improper advantage, and comply with all applicable laws pertaining to these issues. Suppliers should not, directly or indirectly, offer, promise, give, demand or accept any bribe or other undue advantage, to Faurecia employees, public officials or other private or public actors, with the intention to obtain or retain business or any other improper advantage. Suppliers should develop and adopt adequate internal controls, ethics and compliance programmes or measures for preventing and detecting bribery. These may include promoting employee awareness of the company policies against bribery and a system of financial and accounting procedures, reasonably designed to ensure the maintenance of fair, transparent and accurate books, records, and accounts. 12. Fair Business Practices Suppliers shall strive for fair business practices, and in any case suppliers must comply with all applicable laws and regulations related to fair competition. Suppliers shall also commit to communicate its financial health, on business activities, evolution and forecast to business stakeholders. A conflict of interest exists when an employee or a close relative liable to benefit personally from a transaction involving a company in the Faurecia group. Conflicts of interest shall be addressed by avoiding, identifying and revealing situations where there is an actual risk of conflict of interest in association with Faurecia employees or their relatives. Faurecia has strict policy as for the acceptance of gifts and gratuity from suppliers, for details please refer to Code of Ethics and Rules of Business Conduct. FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 38 sur 39

APPENDI 1: GLOSSARY 8D 8 Disciplines methodology In problem solving APQP Advanced Product Quality Planning ASQ Advanced Supplier Quality In Programs BOP Bought Out Part F : Pièce Ouvrée Extérieure CCS1 Containment Controlled Shipment Level 1 additional 100% control by Supplier at its plant CCS2 Containment Controlled Shipment Level 2 additional 100% control by external 3rd Party FES Faurecia Excellence System ECO Engineering Change Order ECR Engineering Change Request EDI Electronic Data Interchange eppap 3rd party Web-Portal for PPAP documentation interface with Supplier f.f Free Format FES Faurecia Excellence System FICS Factor Investigation and Compliance to Standard problem solving technique FIFO First In, First Out FMEA Failure Modes and Effects Analysis Risk analysis to avoid failure in series GPS Global Purchasing System IT supplier portal application used to interface with suppliers (Profile, RFQ, Certification, 8D upload, ) HSE Health, Safety and Environment IMDS International Material Data Sheet IOD Issues de l Outillage Définitif First parts from a series process =Off-tool parts IS Initial Samples F: Echantillons Initiaux ISO International Standard Organization KCC Key Control Characteristics KPC Key Product Characteristics KPI Key Performance Indicator LOP List of Open Points Open issues list MOB Make Or Buy MPM Mis-deliveries per Million MPT Mass Production Trial MSA Measurement Systems Analysis (from ISO/TS 16949) PCR Purchased Part Change Request Form to be used by supplier for communication PDCA Plan Do Check Act PF Perturbation of Flow PF4 Disturbance of flow level 4, i.e. any disturbance to Customer s production leading to a claim from the Customer (whatever the level of disturbance at the Customer s (such as rejection, sort-out, stoppage production line) for which the supplier is held responsible). PMS Program Management System (acronyme anglais retenu) PPAP Production Part Approval Process PPM Parts Per Millions PSW Part Submission Warrant QAA Quality Assurance Agreement QSV in Germany QCD Quality Cost Delivery Qp Quality Problem Quality claim entered in QSS QRCI Quick Response Continuous Improvement (named QRQC previously) team, gemba problem solving QSS Quality Steering System. IT application collecting quality data access from Group Quality Intranet. REACH Registration, Evaluation, Authorisation and Restriction of Chemicals SES Supplier Excellence System S/R Safety/Regulation SRC Safety Regulation Characteristics SC Special Characteristics (also Key Characteristics ) Those retained as part of the control plan SOP Start Of Production F: Démarrage série (DMS) SOW Statement of Work SQ&D Supplier Quality & Development SQA Supplier Quality Assurance (acronyme anglais retenu) In plant Description of work packages responsibilities between Parties (OEM, Faurecia, Supplier, sub-suppliers) FAURECIA_SUPPLIER_REQUIREMENTS_MANUAL_FAU-C-SPG-4030-EN-6b Page 39 sur 39