DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H



Similar documents
INSTALLATION GUIDE. americanwick.com WICK (9425)

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

ITEM THERMOPLASTIC MEMBRANE ROOFING

How To Test A Wrap N Drain X Dampproofing System

The minimum reinforcement for the stem wall is the placement of:

= gallons of water produced by a 1-inch rainfall. Basic Principles of Artificial Drainage. length (feet) X width (feet) X.

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

How To Repair A Boat Landing Deck With A Boat Bed

Section 2100-Trenching and Tunneling

Residential Foundations and Basements

Chapter 3 Pre-Installation, Foundations and Piers

Product Guide Specification

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

GENERAL RUBBER LINING PRINCIPLES

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Storm Drain Inlet Protection - IP

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, Sauer-Danfoss Building

How To Retaining Wall Guide

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

Table 4.9 Storm Drain Inlet Protetion Applicable for

Stormproof Your Roof. I ve done enough roof repairs to know that storm water that gets past the shingles

City of Shelbyville Site Inspection Checklist

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

Comment Form on Proposed Gut Rehabilitation Alternatives

Guidelines for Earthquake Bracing of Residential Water Heaters

Sun Windows General Information Sun New Construction Window Installation Instructions

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

How To Use A Hydraway System

GreenGuard Housewrap Installation Guide

Guidelines for Earthquake Bracing Residential Water Heaters

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

R E S I D E N T I A L H O U S I N G

Chapter 9: INSTALLING ROOFING

8.7 Schluter -KERDI-LINE

SECTION THERMOPLASTIC MEMBRANE ROOFING

Stormwater/Wetland Pond Construction Inspection Checklist

DIVISION 4300 STORM DRAINAGE

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

Tunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

Residential Roofing Guide

Renovating Your Basement

Installation Guide. Bath and Wall Surrounds SERIES B

SikaProof A Technology

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

Asphalt Shingle Application Requirements

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Lighthouse Engineering, L.L.C.

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

Installation Instructions For Slider Casement Air Conditioners

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Storm Drain Inlet Protection

DELTA Premium Moisture Management Systems for Foundations.

Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal

Installation Instructions

WATERPROOFING SikaProof -A TECHNOLOGY

Protect Your Home From Flooding. A guide for Lethbridge Residents

protect your greatest asset... your home

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

RIW STRUCTURESEAL. Structureseal is a highly effective waterproofing composite, of high strength green coloured geotextile, and sodium bentonite.

Best Basement Water Management Practices

Superform Products Ltd.

Window Installation Instructions

CHAPTER 6 ASPHALT ROLL ROOFING

INSTALLATION OF A BAY WINDOW

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

Installation Guidelines for Segmental Block Wall. Contents 1. INTRODUCTION MATERIALS... 2

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

How to build raised beds page

SECTION STORM DRAINAGE SYSTEM

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

OLDROYD. Interior Walls. Interior Walls. below and above ground. below and above ground

BMP #: Dry Wells / French Drains

SECTION 1 GENERAL REQUIREMENTS

SC-07 STORM DRAIN INLET PROTECTION

Peel & Seal Self-Stick Roofing Solutions

WATERPROOFING DESIGNED FOR PROTECTION & DURABILITY

WATERPROOFING BASEMENTS

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

Schluter -Shower System Installation Handbook Bonded Waterproofing System for Tiled Showers, Steam Showers, Steam Rooms, and Bathtub Surrounds

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Transcription:

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a formed polystyrene core covered on one side with polypropylene filter fabric. The fabric allows water to pass into the drain core while restricting the movement of soil particles which might clog the core. The core allows the water to flow to designated drainage exits. POLYGUARD FLOW 15-P is designed primarily for vertical applications and POLYGUARD FLOW 18-H is designed for horizontal applications. POLYGUARD DRAINAGE MATS also have a built-in film protection layer. Use of a protection board is not necessary on most applications as the polymeric film layer protects softer waterproofing materials such as POLYGUARD 650 waterproofing membrane. The many uses include foundation walls, retaining walls, inclined drains, french drains, trench drains, interceptor drains, embankment drainage, athletic fields, earthen dams, planters, under slabs, and under pavers. TYPICAL PROPERTIES TEST METHOD 15-P 18-H FABRIC PROPERTIES: Material Polypropylene Polypropylene Weight, oz/yd 2 ASTM D3776 4.0 4.0 Grab Tensile Strength, lbs ASTM D4632 110 365x200 Puncture Strength ASTM D4833 65psi 105lbs EOS (AOS) ASTM D4751 100 40 Flow Rate, gpm/ft ASTM D4491 150 100 CORE PROPERTIES: Material Polystyrene Polystyrene Thickness, inch.375.375 Compressive Strength, lbs/ft 2 ASTM D1621 (Mod.) 15,000 21,000 DRAIN PROPERTIES: Flow Capacity, gpm/ft of width ASTM D4716 16 18 Roll Length, feet 50 50 Roll Width, feet 4 4 Roll Weight, lbs 40 46 This Information is based on our best knowledge, but POLYGUARD cannot guarantee the results to be obtained. POLYGUARD PRODUCTS, INC ENNIS, TEXAS 75120-0755 PH: 214-515-5000 800-541-4994 FAX: 972-875-9425 Web Site: www.polyguardproducts.com Polyguard has been ISO 9000 certified since 1996. Current certifications are: - American Natl. Standards Institute - Dutch Council for Certification - Deutscher Akkreditierungs Rat

VERTICAL INSTALLATION (Primarily FLOW 15-P) 1. Measure wall height or lift, adding sufficient material for overlapping pipe detail. Unroll FLOW 15-P and cut to length. 2. Peel back fabric from drainage core and remove 4" of core. (Drain core should remain 6-12 inches below backfill.) 3. At top termination glue fabric to wall or tuck fabric under core when using a furring strip. (Furring strip can be removed after backfilling.) 4. Glue adjacent panels at the vertical joints, making sure that fabric overlaps to prevent soil intrusion when backfilling. 5. At drain tile, peel back fabric from drainage core and wrap around drain tile. Tuck excess fabric under core, making sure inner core has direct contact with drain tile. 6. Backfill as soon as possible. HORIZONTAL INSTALLATION (FLOW 18-H) 1. Clean horizontal surface of loose debris and unroll FLOW 18-H fabric side up in the direction of maximum slope. 2. Attach FLOW 18-H to the surface with double-sided tape or adhesive that is compatible with waterproofing membranes. 3. For overlaps, place adjacent panels so that the cores abut. 4. Secure the fabric overlap at five foot intervals with glue or tape. 5. Join roll ends by peeling back fabric and removing 4" of core. 6. Place end panels so that cores abut, then glue or tape fabric overlap. NOTE: All core joints must be covered by fabric overlay. Protect waterproofing with approved protection system. RECOMMENDED ADHESIVES Polyguard 650 LT Liquid Adhesive, Maxbond Construction Adhesive, H B Fuller Co Plionail, Goodyear Liquid Nails, Miracle 297, 294, and Gibson-Homans Shur-Stick 94. NOTE ON ISO 9000 Polyguard drainage mats are not covered by Polyguard s ISO 9001 quality system registration. x:/lit/arch/data sheets/37-flow 15P and 18H Drainage Mats.doc R1-22-08

INSTALLATION INSTRUCTIONS TOTAL-FLOW AND FLOW 15-P Prefabricated Soil Sheet Drain REQUIRED MATERIALS 1. 2' X 50' rolls of TOTAL-FLOW sheet drain. 2. 4' x 50' rolls of FLOW 15P sheet drain, if full wall drainage is required. 3. TOTAL-FLOW sheet drain corner guards 4. 3" wide underground tape 5. Attached materials (see below) 6. Knife or scissors, rubber hammer. INSTALLING NEXT ROLL OF FLOW To attach the next roll of TOTAL-FLOW drain, cut one row of low-profile dimples from each end of the two sections to be joined. Do not cut fabric. Interlock one row of the high-profile section and secure connection. Overlap fabric and apply 3" wide underground tape from the top to the bottom of the joint to prevent soil intrusion. DRAIN ATTACHMENT METHODS For attaching drain to waterproofing material, concrete or wood, several methods may be used including metal stick pins, nails driven through washers or wood lathing, construction adhesives or double sided tape. Discuss materials compatibility with waterproofing supplier before adhesives. Typically any method used for attaching waterproofing protection board will work for drain. For attaching drain to bare earth, 4-8" anchor pins with washers work well. CLEAN WALL / WATERPROOF / INSULATE Clean wall and apply waterproofing or insulation if required. INSTALLING FIRST ROW OF DRAIN (The TOTAL-FLOW sheet drain row) The first row of drain to be installed is the TOTAL-FLOW at the bottom of the wall. The drain should sit on top of the footing with the high profile part of the drain at the bottom to provide high lateral water flow. GOING AROUND CORNERS Bend drain to make inside corners. For outside corners, cut the low-profile core flush with corner and tape edges. Slit fabric on high-profile section, bend around corner, and place guard with fabric over slit of high-profile drain. Secure with underground tape. If not using Flow 15-P sheet drain for full wall coverage, close the top end of the drain to prevent soil intrusion by folding the fabric behind the drain. Close the high profile section with 3" underground tape. This Information is based on our best knowledge, but POLYGUARD cannot guarantee the results to be obtained. POLYGUARD PRODUCTS, INC ENNIS, TEXAS 75120-0755 PH: 214-515-5000 800-541-4994 FAX: 972-875-9425 Web Site: www.polyguardproducts.com Polyguard has been ISO 9000 certified since 1996. Current certifications are: - American Natl. Standards Institute - Dutch Council for Certification - Deutscher Akkreditierungs Rat

INSTALLATION INSTRUCTIONS TOTAL-FLOW AND FLOW 15-P Prefabricated Soil Sheet Drain Page 2 CONNECTING FLOW 15-P SHEET DRAIN: If full wall drainage is required, FLOW 15-P soil sheet drain is attached above the TOTAL-FLOW sheet drain. The FLOW 15-P may be installed either horizontally or vertically. ATTACHING NEXT ROLL OF FLOW 15-P: There are two acceptable methods for joining two sections of sheet drain. VERTICAL WALL: When the FLOW 15-P sheet drain is installed vertically, the flange should be facing the direction opposite if the TOTAL-FLOW water flow. When the FLOW 15-P sheet drain is installed horizontally, the edge of the core with the flange should be at the top. This flange position, similar to roof shingle applications, minimizes seepage of water behind the drain. Fold back the fabric at the top of the TOTAL-FLOW sheet drain and place the FLOW 15-P sheet drain on top of the TOTAL-FLOW core flange. Fold fabric from sheet drain section down over the TOTAL-FLOW section and secure with 3" tape. METHOD #1 Fold back edge of fabric on lower (or downstream) drain. Do not detach from dimples. Place cones of upper (upstream) drain over flange of lower drain. Overlap fabric of upper drain over lower drain. Seal seam with 3" tape. METHOD #2 Overlap drain core as shown at right. Peel back fabric exposing two rows of cones. Place connector over two rows of cones on each side of joint. Overlap fabric of upper drain over lower drain. OPTIONAL METHOD For either method, overlap fabric in direction of water flow. Use tape or spray adhesive, if necessary, to keep fabric at joint in place prior to backfilling. All edges of drain should have extra fabric tucked behind core edge to prevent soil from entering core. PIPE COLLECTION SYSTEM: For foundation walls where a drain pipe will be used, position lower end of core horizontally on ground. Peel back fabric to allow drainage pipe to rest on core. Tuck fabric around drainage pipe and under core. Place small amount of select backfill material on fabric to hold in place until backfill is completed. NOTE: The non-woven fabric is bonded to the core on the flange side with permanent glue (will not adhere if pulled from core) and on the flush side away from the flange with pressure sensitive glue (will re-adhere if pressure is applied). The pressure sensitive glue permits the fabric to be peeled back easily to be placed around pipes. Woven fabric is attached with all pressure sensitive glue. Permanent glue can be softened, if necessary, with a blow drier. Do not use near open flame to avoid damaging the fabric.

Page 3 INSTALLATION INSTRUCTIONS TOTAL-FLOW UNIVERSAL FITTINGS Use razor knife and cut a V-notch in the bottom portion of the TOTAL-FLOW approximately 3" wide at the bottom and 4" high and discard Insert fitting over notch and tape bottom of the TOTAL-FLOW Make sure all edges of fitting are covered with tape Insert pipe into fitting and secure with tape Place end outlet over bottom corner of TOTAL-FLOW with fabric up Fold fabric around exposed edge of core and tape with 3" underground tape Secure all edges with 3" tape to prevent soil intrusion Insert 4" pipe into end of outlet and secure connection with 3" tape

INSTALLATION INSTRUCTIONS TOTAL-FLOW UNIVERSAL FITTINGS Page 4 GOING AROUND CORNERS Bend drain to make inside corners. For outside corners, cut and bend drain core to reach corner and provide 3" of extra fabric to wrap around corner. Attach drain to wall and overlap fabric at joint. BACKFILLING: Soil should be placed and compacted directly against the drain. Direct compactor exhaust away from the drain to prevent damage. Backfill to a minimum of 6" above drain to allow for coverage after settlement. FOR HORIZONTAL PLAZAS- (see Figure 3) Place drain with fabric side up. Cut core and fabric to fit tightly around floor drain. RETAINING WALLS- (see Figure 1) Cut bottom of drain to match bottom of wall. (Cut 1/2" diameter holes in flat back of core, opposite fabric) at weep locations. DO NOT CUT FABRIC. Place drain on wall fabric toward soil. Tuck extra fabric at downstream edge of core. Attach drain with appropriate attachment method. SHORING WALLS - (see Figure 2) Place drain with fabric side toward soil to be drained. Cut 1/2" diameter holes on flat back of core at discharge pipe location. DO NOT CUT FABRIC. Concrete or gunnite/shotcrete may be placed directly against the core side of the drain. FIGURE 3 INSTALLATION UNDER SLABS For under floor slab installation, position TOTAL-FLOW sheet drain as shown with geotextile to soil side. Waterproofing and/or floor slab can be applied directly to the back of the core. FIGURE 1 FIGURE 2 SEALING EDGES: All edges of drain should have extra fabric tucked behind core edge seal to prevent soil from entering core. QUANTITY TO ORDER: It is suggested that in the absence of exact information on the amount of material required, add 5% to the estimated quantity. X:/lit/arch/totalflowandflow15-PInstallation.doc R. 4-10-08