FACTORS AFFECTING CONSTRUCTION ORGANIZATION QUALITY MANAGEMENT SYSTEM IN THE MALAYSIAN CONSTRUCTION INDUSTRY



Similar documents
The Adoption of Management Systems Standards & Best Practices in Malaysia (Current and Future Trend)

Soft Skills Implementation in Construction Management Program: A Comparative Study of Lecturers and Students Perspective

A Survey Of Quality Management Practices In The Kenyan Small And Medium Manufacturing Industries

MODELING OF RISK ASSESSMENT FOR INTEGRATED PROJECT MANAGEMENT SYSTEM IN CONSTRUCTION

ISO QUALITY MANAGEMENT SYSTEM: A LESSON FROM KLIA

An Assessment of Risk Identification in Large Construction Projects in Iran

Total Quality Management in the Malaysian Automobile Industry

THE PRACTICES OF TQM AMONG MS : ISO 9000 CERTIFIED COMPANY

Hansani Chathurika Dassanayake a a University of Peradeniya, Sri Lanka. hansanidassanayake@gmail.com. Abstract

Project Management Practices: The Criteria for Success or Failure

Contractor s Awareness on Occupational Safety and Health (OSH) Management Systems in Construction Industry

Technology Complexity, Personal Innovativeness And Intention To Use Wireless Internet Using Mobile Devices In Malaysia

The KPI Development Framework for ICTSQ Measurement

A Risk Management Standard

How has outsourcing affected public service delivery in Hong Kong? Illustrate with relevant cases.

Exemplars. Research Report

IMPROVING THE CRM SYSTEM IN HEALTHCARE ORGANIZATION

Software Engineering Practices in Jordan

BENEFITS DERIVED BY SMEs THROUGH IMPLEMENTATION OF TQM

Influence of Tactical Factors on ERP Projects Success

Leeds Metropolitan University. BA (Hons) Accounting and Finance 2012/13.

THE CASE FOR VALUE MANAGEMENT TO BE INCLUDED IN EVERY CONSTRUCTION PROJECT DESIGN PROCESS

The Impact of ISO 9000 Certification on Quality Management Practices in Thailand By Dr. Jai W. Hong and Mr. Satit Phitayawejwiwat

Implementation of TQM in Manufacturing Industries in the Kingdom of Saudi Arabia

Universiti Teknologi MARA. User Perception on Electronic Customer Relationship Management (E-CRM) Features in Online Hotel Reservation

The Future of Project Management: Preparing The Next Generation Project Manager

The Use of Accounting Information by Small and Medium Enterprises in South District of Jordan,( An empirical study)

Evaluation of Factors Affecting on Construction Equipment Acquisition Methods in Malaysia

Do They Think Alike? Perception Analysis on Quality Environment (QE) Audit Effectiveness: A Malaysian Case

UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP) VACANCY ANNOUNCEMENT PROCUREMENT ASSOCIATE

The effects of students background on academic performance in an architecture school in Ghana

Performance = Ratio of Knowledge

Feasibility Study of Contractor Registration System and Contractor Grading System in Macau. Pun I Chung. Master of Science in Civil Engineering

EFFECT OF MARKETING MIX ON CUSTOMER SATISFACTION

Application of Time Management Tools and Techniques by Construction Industry Players: A Comparative Study between Kedah and Kelantan

IRCA QUALITY MANAGEMENT SYSTEMS AUDITOR/LEAD AUDITOR TRAINING IRCA Reg. No. A18021 (5 DAYS)

Service Management Policy

THE PROGRAMME PROGRAMME STRUCTURE INTRODUCTION OBJECTIVES LEARNING OUTCOMES DESIGNED FOR

DESIGN OF CORPORATE PERFORMANCE MANAGEMENT SYSTEM: CASE STUDY AT X COMPANY IN INDONESIA

Model of Learning Organizational Development of Primary School Network under the Office of Basic Education Commission

A Success Measurement Model for Construction Projects

Hosted Exchange for Business

Leeds Metropolitan University. BA (Hons) Business and Management. 2012/13

The Future of ISO 9000 Quality Management System in a Global Economy Dr. Owino A. Okwiri 1 Prof. Isaac M. Mbeche 2

An evaluation of the curriculum of a graduate programme in Clinical Psychology

A Quality Requirements Safety Model for Embedded and Real Time Software Product Quality

Digital Forensics (2012)

SEMESTER- SYLLABUS 4TH SEMESTER INTERNSHIP AND FINAL PROJECT. AP Graduate of Construction Technology. VIA University College Aarhus

MANCHESTER MENTAL HEALTH AND SOCIAL CARE TRUST and DIVISION OF CLINICAL PSYCHOLOGY UNIVERSITY OF MANCHESTER

ISO 9001:2015 QUALITY MANAGEMENT SYSTEMS AUDITOR/LEAD AUDITOR

9 TH INTERNATIONAL ASECU CONFERENCE ON SYSTEMIC ECONOMIC CRISIS: CURRENT ISSUES AND PERSPECTIVES

Comments from past participants

Introduction. Project Management in New Zealand

ISO 9001:2008 Clause 5.6 PR004 Management Review Procedure

The Effectiveness of Ethics Program among Malaysian Companies

Importance of Promotional and Marketing Strategies in Micro, Small and Medium Enterprises (MSME)

CASE STUDY OF ISO/TS16949 APPLICATION IN AUTOMOTIVE INDUSTRY

EXTERNAL CRITICAL SUCCESS FACTORS FOR THE GROWTH OF STARTUP SOFTWARE DEVELOPMENT COMPANIES IN SRI LANKA

Visualizing Patterns of Preference and Trusted Media for Managing Strategic Communication

Professional Services Development Assistance Scheme (PSDAS) Covering Period to

Health Insurance Policy Holders Perception towards Public Sector Health Insurers in Erode District Of Tamil Nadu

Knowledge-Based Sustainable Decision-making Framework for the Implementation of Innovative Technologies in the Malaysian Construction Industry

How To Find Out What Countries Do With Management System Certification

Literature survey: historical and theoretical background. The chapter requires you to have done some library and company research to:

Role Profile. Job No. (Office Use) A238. Competency Job Type

An Overview of ISO/IEC family of Information Security Management System Standards

EXPOSURE WORK COMMUTING: CASE STUDY AMONG COMMUTING ACCIDENT IN KLANG VALLEY, MALAYSIA

BARRIERS AND BENEFITS OF TOTAL QUALITY MANAGEMENT IN THE CONSTRUCTION INDUSTRY: EVIDENCE FROM TURKISH CONTRACTORS

Project Risk Management. Presented by Stephen Smith

Raising Business Continuity Management Awareness in Malaysia

Master of Business (Enterprise Resource Planning Systems)

Quality Management as a Part of CRM

Requirements Engineering: Elicitation Techniques

Important Factors for Success of Public Construction Projects

ENTREPRENEURIAL INTENTION AMONG MALAYSIAN ENGINEERING GRADUATES: MALE VERSUS FEMALE

A Packaging Support System for Open Source Software

The Development of Basic Education School Accounting Administration System under the Office of Basic Education Commission

Total Quality Management in Engineering Education

Fatemeh Akbari* Master of Industrial Engineering Islamic Azad University, Zahedan Brench, Iran

[Arunmozhi, 5(1): January- March, 2015] ISSN: Impact Factor: (SIJF)

Baseline Assessment on Malaysia Mobile App Economy

THE IMPACT OF TOTAL QUALITY MANAGEMENT COMPONENTS ON SMALL AND MEDIUM ENTERPRISES FINANCIAL PERFORMANCE IN JORDAN

Applied Analytics in a World of Big Data. Business Intelligence and Analytics (BI&A) Course #: BIA 686. Catalog Description:

International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research)

Professional Diploma in Marketing Syllabus

Job Description Psychology Services

IMPLEMENTATION OF HYBRID SOFTWARE ARCHITECTURE FRAMEWORK IN CLINICAL INFORMATION SYSTEM: A CASE STUDY OF A MALAYSIAN CLINIC

Design and Development of a Mobile Game - Based Learning Application in Synonyms, Antonyms, and Homonyms

An Investigation on Learning of College Students and the Current Application Situation of the Web-based Courses

Transcription:

FACTORS AFFECTING CONSTRUCTION ORGANIZATION QUALITY MANAGEMENT SYSTEM IN THE MALAYSIAN CONSTRUCTION INDUSTRY Ilias Said 1, Abd Rahman Ayub 2, Arman Abd Razaki 3 & Tee Kuan Kooi 4 1, 3&4 Universiti Sains Malaysia, 2 UiTM Pulau Pinang Email: 1 ilias@usm.my ABSTRACT: The main focus of the construction industry is to ensure that projects are successfully completed within the constraints of best quality, stated period and at minimum cost possible. The implementation of QMS in Construction Industry is meant to assist the industry to improve the efficiency and effectiveness of the organization management system in ensuring successful objectives of company. In the era of globalization where economic competition is intensifying, the implementation of QMS will improve the overall construction process and subsequently lead to the formulization of successful business strategies to meet international requirements. This study is carried out to analyze the scenario of QMS application, to identify factors affecting the construction organization and to issue recommendations on how to improve the implementation of ISO 9001:2000 QMS in Construction Industry. The data will be gathered via questionnaires distributed to the construction organizations at every level of management. Statistical analysis software SPSS 13.0 will be used to analyze the data. Factors affecting the successful implementation of QMS in Malaysia Construction Industry will be identified and recommendations will be suggested on ways to mitigate the problems. Keywords: Quality Management System, Malaysian Construction Industry, Construction Industry Players INTRODUCTION Quality Management System (QMS) is synonym for a concept and application in an organization within the Malaysian Construction Industry. A misunderstanding among organization players on QMS concepts has become a stumbling block for its successful implementation. Theoretically As a matter of fact, QMS could be implemented either at the organization level or at the project level itself. Looking at the construction industry scenario in Malaysia, there are approximately 4000 ISO 9001:2000 QMS certified organizations in the Malaysian construction related industry. However, the number is still relatively small when compared to the total number of 63,204 organizations in this industry. Looking at the current scenario in the Malaysian construction industry, QMS compliance is a required factor to improve the quality of the Malaysian Construction Industry (SIRIM, 2005). RESEARCH QUESTIONS The main objective of this paper is to study the factors affecting the application of construction organizations Quality Management System (QMS) in Malaysia construction industry. In addition to that, recommendations to improve the QMS implementation in Malaysia construction industry will be issued to serve as a guide to other researchers. The objectives of this research are: (i) to study the scenario of QMS applications in Malaysia construction industry, (ii) to identify the factors affecting construction organization and (iii) to

issue recommendations on how to improve the implementation of QMS in Malaysia Construction Industry. Quality Management System (QMS) Quality management system (QMS) is defined as all activities of the overall management function that determine the quality policy, objectives and responsibilities, and implement them by means such as quality planning, quality Control, quality assurance and quality improvement within the quality system (MS ISO 8402, 1994). Most organizations today view quality more as a process rather than a product. To be more specific, it is a continuously improving process where lessons learned are used to enhance future products and services in order to retain existing customers, win back lost customers and welcome new customers. Therefore, companies today are developing and integrating quality improvement processes in the companies management system. Factors Affecting Construction Organization According to Chew and Chai (1996), there are three main factors affecting the construction quality management system. The factors are as follows: Lack of Management Commitment Result of the survey indicated that 37.3% of the organizations surveyed encountered problems with this requirement of the standard. Reasons that can account for the lack of commitment are (i) Lack of awareness of the benefits of quality management system, (ii) Implementation of a quality system because of market pressures. Inconclusive Interpretation of Standard Requirements The ISO standards are a generic standard that has its origin from the engineering field. As generic standards, some of the terms used in the standard could be misconstrued as being vague, ambiguous and imprecise. Confusion also arises as there is a lack of the definition of these terms in the standards (Chew and Chai, 1996). Training Policies Looking into the general training policy, the ISO 9001 registered companies have more concern on the training of their employees than the non-registered ones. They not only pay for the course fees, but also allow them to receive training during working hours. For nonregistered companies, the company may reimburse the course fees but employees have to attend training sessions outside of working hours. Moreover, regular training programmes on technical and computer knowledge were commonly provided in many companies. The most

popular training programme organized by ISO 9001 registered companies was Quality Knowledge (Lee et.al, 1992). The Successful Organization Implementation the QMS According to Goh and Chong (2000), the following recommendations are made to increase the usefulness and effectiveness of the QMS in construction industry. They are (i) Increase in Effort by Management, (ii) Internal Quality Audit training for staff of all levels and (iii) Increase the frequency of conducting Internal Quality Audit (IQA). RESEARCH METHODOLOGY Research Design The first stage involved studying and understanding of the topic area and to identify scope and objective of research proposal. This study also employed the survey method by using questionnaires. The questionnaires were distributed by the researcher to the top, medium and lower level management in Klang Valley, N. Sembilan, Melaka and Johore area. Data Collection The task in this stage is to identify project data and to conduct study for further details of the research. The data sources were classified into prime sources and secondary sources. Prime sources provide original data and latest information for the research. A total number of 150 questionnaires were distributed to the respondents. The respondents consist of top, medium and lower level management. The secondary sources are journals, books and thesis from library, articles and journals published in the internet. Data Analysis The results of the questionnaires will be analyzed using SPSS Version 13 (Statistical Package for the Social Sciences) software. SPSS provides a broad range of capabilities for the entire analytical process. All data and information from the questionnaires were entered into SPSS Version 13 program for statistical analysis in order to obtain mean and mode of variables. Descriptive Analysis Descriptive analysis was conducted to describe and to interpret data. The descriptive analysis used in this study was frequency analysis to examine the respondents demographic factor, mode and rank data. Based on frequency test; the scenario of QMS application, the rank of factors affecting of construction organization of QMS and the recommendation for the problems solution were obtained whereby the conclusion for the study could then be made.

DATA ANALYSIS AND RESULTS Background of Respondents In this study, questionnaires were distributed to 150 respondents in top, medium and lower level management. The Sectors of Respondents in the Company TYPES OF SECTOR private 120 (80%) government 30 (20%) Figure 1: Respondents Based on Types of Sector of Organization in the Malaysian Construction Industry Types of Service of Respondents in the Construction Industry TYPES OF SERVICE Contractor (72%) 108 Others (18%) 27 Consultant (6%) 9 Supplier (4%) 6 Figure 2: Respondents Based on Types of Service of Organization in the Malaysian Construction Industry

Executive Officer Project Manager Project Engineer Site Supervisor Other Position of Level Respondents in the Construction Industry Percentage 35% 30% 25% 20% 15% 10% 5% 0% POSITION LEVEL OF RESPONDENTS (14%) 21 (19%) 29 (23%) 34 (11%) 16 (33%) 50 Top Medium Low er Level Figure 3: Percentage Frequency of Respondents Based on Position Level of Organization in the Malaysian Construction Industry Period of Services Respondents in the Construction Industry PERCENTAGE (%) VS PERIOD OF SERVICE Percentage 100 90 80 70 60 50 40 30 20 10 0 Less than 1 year (6%) 9 Between 1 to 3 years (16%) 25 Between 1 to 5 years Period of Service (24%) 35 More than 5 years (54%) 81 Figure 4: Percentage Frequency of Respondents Based on Period of Service Organization in the Malaysian Construction Industry

Contractor Grade Contractor Grade Based on CIDB 2% Unregistered 24% G1 G2 50% 4% 6% G3 G4 G5 G6 8% 2% 4% G7 Figure 5: CIDB Percentage of Contractor by Grade According to the statistics earlier, 50% of the respondents fall within the category of grade G7 CIDB and 45% are Grade A PKK. The reason of the disproportionate distribution of the questionnaires is due to lack of cooperation of some of the respective company. Table 1: Distribution of the Advantages of QMS Application in Malaysia Construction Based on Mode and Mean Statistic List of Advantages Mean Mode Enhanced image and reputation of organization 4.19 4 Performance improvement and increase customer satisfaction 4.16 4 Clear line of duties 3.97 4 Facilitates access to certain markets 3.87 4 Increase chances to be award the tenders/contracts 3.89 4 Improved relationship and cooperation between clients, contractors, 3.84 4 consultants and suppliers Establishing clear documented procedures and instructions 4.15 4 Consistency in quality of services 4.15 4 Efficiency of operations in construction site 4.15 4 Reduction of Quality Cost 4.05 4 Prevention of errors at the earliest stage of the project 3.98 4 Project completion within the stated period of time 3.66 4

Table 2: The Ranking of the Advantages of QMS Application in Malaysia Based On Mean Statistic Ranking List of Advantages Mean 1 Enhanced image and reputation of organization 4.19 2 Performance improvement and increase customer satisfaction 4.16 3 Establishing clear documented procedures and instruction 4.15 4 Consistency in quality of services 4.15 5 Efficiency of operations in construction site 4.15 6 Reduction of Quality Cost 4.05 7 Prevention of errors at the earliest stage of the project 3.98 8 Clear line of duties 3.97 9 Increase chances to be award the tenders/contracts 3.89 10 Facilitates access to certain markets 3.87 11 Improved relationship and cooperation between clients, contractors, 3.84 consultants and suppliers 12 Project completion within the stated period of time 3.66 For the ranking of QMS application advantages in the Malaysian Construction Industry, Enhanced Image and Reputation of Organization topped the list followed by Performance Improvement and Increase Customer Satisfaction. The respondent s results put Establishing Clear Documented Procedures and Instruction as the third in the line up, followed by Consistency in Quality Services and next Efficiency of Operations in Construction Site. Project Completion within the Stated Period of Time was listed as the least in bringing about advantages in the Malaysian Construction Industry.

The Analysis: The Problems Encountered By Organization in the Implementation of QMS in Malaysia Construction Industry Table 3: Distribution of the Problems Encountered By Organization in the Construction Industry List of Problems (%) Strongly Frequenc Disagre y e Disagre e Neutra l Agre e Strongl y Agree Lack of understanding in the QMS (%) (1.3) (12.0) (17.3) (49.3) (20.0) n 2 18 26 74 30 Lack of understanding in the process (%) (2.7) (13.3) (15.3) (47.3) (21.3) requirement n 4 20 23 71 32 Lack of awareness in benefits of QMS (%) (1.3) (6.0) (22.7) (48.7) (21.3) n 2 9 34 73 32 Lack of support from the top management (%) (4.7) (14.0) (19.3) (50.0) (12.0) n 7 21 29 75 18 Lack of available Quality System (%) (0.7) (18.7) (30.7) (40.7) (9.3) documentation such as procedures records construction n 1 28 46 61 14 construction period, work instruction and records Lack of documentation for suppliers, (%) (1.3) (10.7) (36.0) (37.3) (14.7) materials and services n 2 16 54 56 22 Lack of planning to implement QMS (%) 0 (14.7) (19.3) (50.7) (15.3) n 0 22 29 76 23 Lack of continuous professional (%) (0.7) (10.7) (26.7) (39.3) (22.7) development (CPD) n 1 16 40 59 34 Lack of QMS exposure among workers (%) (0.7) (10.0) (18.7) (51.3) (19.3) n 1 15 28 77 29 High cost to implement QMS (%) (2.7) (12.7) (28.0) (36.0) (20.7) n 4 19 42 54 31 Lack of time to implement QMS/Time (%) (3.3) (8.7) (30.7) (40.0) (17.3) Consuming n 5 13 46 60 26

Table 4: Distribution of the Problems of QMS Application in Malaysia Construction Industry Based on Mean and Mode Statistic List of Problems Mean Mode Lack of understanding in the QMS 3.75 4 Lack of understanding in the process requirement 3.71 4 Lack of awareness in benefits of QMS 3.83 4 Lack of support from the top management 3.51 4 Lack of available Quality System documentation such as procedures, 3.39 4 records construction period, work instruction and record Lack of documentation for suppliers, materials and services 3.53 4 Lack of planning to implement QMS 3.67 4 Lack of continuous professional development (CPD) 3.73 4 Lack of QMS exposure among workers 3.79 4 High cost to implement QMS 3.59 4 Lack of time to implement QMS/Time Consuming 3.59 4 Table 5: The Ranking of the Problems Encountered by Organization in the Implementation of QMS in Malaysia Construction Industry Based on Mean Distribution Ranking List of Problems Mean 1 Lack of awareness in benefits of QMS 3.83 2 Lack of QMS exposure among workers 3.79 3 Lack of understanding in the QMS 3.75 4 Lack of continuous professional development (CPD) 3.73 5 Lack of understanding in the process requirement 3.71 6 Lack of planning to implement QMS 3.67 7 High cost to implement QMS 3.59 8 Lack of time to implement QMS/Time Consuming 3.59 9 Lack of documentation for suppliers, materials and services 3.53 10 Lack of support from the top management 3.51 11 Lack of available Quality System documentation such as procedures, records construction period, work instruction 3.39 and record

DISCUSSIONS Over the years, QMS application systems in the Malaysian Construction Industry have been on an increasing trend. Currently, there are more than 4,000 QMS certified organizations as compared to when it was first introduced in 1987 (SIRIM,2005). So far, QMS has brought about positive changes in the Malaysian Construction Industry. However, the industry is still facing problems in the implementation of QMS. From this research, four main advantages have been identified. They are (i) organization image and reputation enhancement, (ii) performance and customers satisfaction improvement, (iii) documentation procedures & instructions establishment and (iv) constant quality service.qms application can enhance the image and reputation of an organization, as QMS is a versatile and flexible management tool that an organization can use to improve their goals, efficiency and profitability. The application of QMS also can influence the organization to improve their performance and increase customers satisfaction. Moreover, organization are also able to establish clear documented procedures and instruction that includes the documented statements of policy quality and objectives quality, manual quality, documented procedures, effective standard requirement planning, operation, record and control of the processes are also needed. Besides that, the implementation of QMS can serve as a guideline to ensure quality services are able to meet the required standard. Nevertheless, organizations in the industry faced some problems after the implementation of QMS. The problems are lack of awareness in benefits of QMS, lack of QMS exposure among workers, lack of understanding of QMS and lack of continuous professional development (CPD). In general, the organizations are unaware about the benefits of QMS because they lack in fulfilling commitment responsibilities and failure to disseminate organization policy to all level of management. Furthermore, the organization also lack of competence skill to be applied in different levels of management. Another problem is inadequate QMS monitoring, training and unawareness in abiding by the standard requirement. Some of the terms used in the standards could be vague, ambiguous and imprecise which will cause lack of QMS understanding in the organization. The poor guidance in the training programs affects the lack of CPD for every level of management. From the findings, most organizations in the Malaysian Construction Industry face four major problems, which are; lack of awareness in the benefits of QMS, lack of QMS exposure among workers, lack of QMS understanding and lack of Continuous Professionals Development (CPD). In order to ensure the success of implementing ISO 9001:2000 QMS standard in Malaysia Construction Industry, the management should endeavour towards being focused and systematic. The recommendations to solve this problem are extracts of the from respondents opinions and established organization suggestions. The recommendations are to increase management effort, to train all organization management levels [by conducting conducted Internal Quality Audit (IQA)], to ensure proper documentation system is in-place, to increase the level of QMS understanding, promote new Construction Technology usage to enable the government to extend its tax incentives, to promote and monitor levels of management participation in training and motivation programs and lastly, to provide the guidance for ISO 9001: 2000 QMS for organizations in the Malaysian construction Industry. CONCLUSION From the results of the questionnaires and analysis using SPSS 13.0 Software, a majority of the respondents suggested the main advantages of implementation of QMS are Enhanced Image and Reputation of Organization followed by Performance Improvement and Increased Customer Satisfaction. Overall, the result of the analysis also shows that the main problems encountered by organizations with the implementation of QMS in Malaysia Construction Industry is Lack of Awareness in Benefits of QMS, followed by Lack of QMS exposure among workers.

REFERENCES Abdulaziz A.B. and Tawfiq, H.A. (1999). ISO 9000 Quality Standards in Construction, Journal of Management in Engineering, Nov/Dec, (41-45). Ahmadinejad,M. and Keymanesh,M. (2006). The Survey Of Implementing Quality Management System In Iran Construction Industry, International Civil Engineering Conference Towards Engineering Practice Surabaya, August 25-26, 2006. Al Nakeeb, A.A.R. and Mustapha, F.H. (1994). Quality Assurance in Construction Does it Really Works?. Quality Management in Building and Construction: Proceedings of Eureka Conference, Hamar/Lillehammer, June, 242-247. Brownlee (1960). Electronic Statistic Textbook (STATISTICA), Stat Soft. Inc. Chan, Y.K and Nealey, K. (1998). ISO 9004-2 Quality Management System - The way to World-Class Service, 6, (395-401). Chew. Y. S and Chai.L.N. (1996). ISO 9002 In the Malaysian Construction Industry Guide and Implementation, MacGraw-Hill Book Co. Giles, R. (1997). ISO 9000 Perspective for Construction Industry in the UK. Training for Quality, Vol. 5, No. 4, (178-181). Goh, K.C and Chng,T.S. (2000). Internal Quality Audit as a Measure of Effective Implementation of ISO 9000 Quality Management System, BAS Thesis, RMIT University/Singapore Institute of Management, Singapore. Kerzner, H. (2001). Project Management: A Systems Approach to Planning, Scheduling and Controlling, 7th Edition, John Wiley and Sons, Inc. Lee, S.F et.al (1992). Survey on ISO 9001 Quality Management System Implementation in Hong Kong, 14, (77-88). Liebesman, S (1993). the ISO 9000 Series Standards - A New Way of Doing Business, IEEE. Salgae, F and Dassonville, L. (2000), Handbook for Implementing a Quality Management System in a National Mapping Agency, http://www.eurogeographic.org/eng/documents/handbook_vi.pdf.(27 March/2008). (N.A.). (N.D.). International Standard, ISO 9001 Quality Management System-Requirement, 3rd Edition, ISO 9001: 2000 (E), Switzerland. Serpell, A. (1999). Integrating Quality Systems in Construction Projects: The Chilean Case, International Journal of Project Management, 17, Issue 5, (317-322). SIRIM, (2005). Standard and Quality News: Quality Management Beyond ISO 9000, Vol. 12(3)/2005. Tummala, V.M.R. (1994). "Strategic Quality Management, Malcolm Baldrige and European Quality Awards and ISO 9000 Certification: Core Concepts and Comparative Analysis", Annual Issue of IIE (HK), (40-55).