Lincoln County Floodplain Development Permit Application



Similar documents
Teller County, Colorado Floodplain Development Permit Application

OWNERS NAME PHONE OWNERS ADDRESS APPLICANTS NAME PHONE APPLICANTS ADDRESS

DEPARTMENT OF PLANNING AND DEVELOPMENT

OKANOGAN COUNTY OFFICE OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION

How To Build A Floodproofed Basement

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

SECTION 15 FLOODPLAIN MANAGEMENT

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and

FLOOD DAMAGE PREVENTION ORDINANCE

Floodplain Development Land Use Review

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff)

CITY OF PITTSBURGH Department of City Planning 200 Ross Street, Pittsburgh, PA (fax)

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

Administrative Procedures Regarding the Application of Flood Damage Prevention

Kentucky Model Flood Damage Prevention Ordinance KAMM Annual Conference Carey Johnson Kentucky Division of Water


156. FLOOD DAMAGE PREVENTION

SPECIAL PURPOSE FLOOD DAMAGE REDUCTION RESOLUTION BELMONT COUNTY, OHIO

ARTICLE 12 FLOOD DAMAGE PREVENTION

Sample Flood Damage Prevention Ordinance

Chapter FLOOD DAMAGE PREVENTION

SPECIAL PURPOSE FLOOD DAMAGE REDUCTION RESOLUTION MUSKINGUM COUNTY, OHIO

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

CITY OF MIDDLETOWN, OHIO FLOOD DAMAGE PREVENTION REGULATIONS

B. Minimize expenditure of public money for costly flood control projects.

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

Chapter FLOOD DAMAGE PREVENTION

DIVISION 11. [FLOOD DAMAGE PREVENTION]*

ORDINANCE NO. 618 BE IT ORDAINED AS FOLLOWS:

Kanawha County Floodplain Regulations Quick Guide & Overview

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

240, FLOOD DAMAGE PREVENTION [HISTORY:

Custer County Flood Damage Prevention Ordinance

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

FLOOD DAMAGE PREVENTION ORDINANCE ARTICLE 1. STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES

PENNINGTON COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

UNIT 5: THE NFIP FLOODPLAIN MANAGEMENT REQUIREMENTS

CHAPTER 151: FLOOD DAMAGE PREVENTION

WILLIAMS COUNTY, OHIO SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS

TOWN OF OTEGO FLOOD DAMAGE PREVENTION

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

TITLE 8 FLOOD DAMAGE PREVENTION

Special Flood Hazard Development and Local Governments

Floodproof Construction Requirements

Chapter 141, FLOOD DAMAGE PREVENTION [HISTORY: Adopted by the Mayor and Council of the Borough of Laurel Springs by Ord. No

ARTICLE 5. FLOOD DAMAGE PREVENTION 1. Statutory Authorization, findings of fact, purpose and objectives.

C. Development Permit Requirement in Flood Hazard Areas

Permits for Development within Floodplains

ORDINANCE NO Chapter 74 FLOOD DAMAGE PREVENTION. ARTICLE I Statutory Authorization; Findings of Fact, Purpose and Objectives

Elevation Certificate Completion Guide

FLOOD DAMAGE PREVENTION ORDINANCE

CHAPTER 152: FLOOD DAMAGE PREVENTION

City of Douglas Commercial Building Permit Site Application

ORDINANCE NO

APPENDIX G FLOOD-RESISTANT CONSTRUCTION CHAPTER G1 GENERAL PROVISIONS

Substantial Improvement/Substantial Damage for Floodplain Administrators Mitigation Fact Sheet

SUBCHAPTER 51 FLOOD DAMAGE PREVENTION ORDINANCE Statement of Purpose and Methods of Reducing Flood Losses

FLOOD DAMAGE PREVENTION TOWN OF GORHAM Chapter 45

4. Minimize expenditure of public money for costly flood control projects;

ARTICLE 23. FLOOD DAMAGE PREVENTION ORDINANCE

Elmore County Flood Damage Prevention Ordinance. (Non-Coastal Communities)

FLOOD DAMAGE PREVENTION ORDINANCE ARTICLE 1. STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES

POLK COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

Floodplain Management and Ordinance of the National Flood Insurance Program

ARTICLE 22. FLOOD DAMAGE PREVENTION

Selecting a Building Lot Or Manufactured Home Park - Special Flood Hazards

How To Manage A Flood

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

FLOOD DAMAGE PREVENTION ORDINANCE STANLY COUNTY, NORTH CAROLINA

Flood Plain Management Permit Options For New Construction Homes

Flood Damage Prevention

FLOOD DAMAGE PREVENTION ORDINANCE

ORDINANCE NO. 627 BE IT ORDAINED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF REXBURG, IDAHO:

GREENBRIER COUNTY FLOODPLAIN ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE

CHAPTER XXII FLOOD DAMAGE PREVENTION

Chapter FLOOD DAMAGE PREVENTION

CHAPTER 3.26 FLOOD DAMAGE PREVENTION

ALAMANCE COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

Things N~eded to Obtain a Building Permit

Chapter 1350 FLOOD DAMAGE REDUCTION ORDINANCE

Chapter 8.5 FLOOD DAMAGE PREVENTION

Relationship between Floodplain Management and Flood Insurance

CITY OF NORTHWEST FLOOD DAMAGE PREVENTION ORDINANCE. Non-Coastal Regular Phase

ORDINANCE # AN ORDINANCE SUPPLEMENTING CHAPTER 14, FLOOD DAMAGE PREVENTION, OF THE BOROUGH CODE

Floodplain Information

Time/Date Stamp when received:

FLOOD DAMAGE PREVENTION ORDINANCE NORTH CAROLINA MODEL

Title 12. Teton County, Idaho Flood Damage Prevention Ordinance

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS OF FACT PURPOSE AND OBJECTIVES

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

FEMA Updates Flood Plain Information For 2006

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

Home Construction and Flood Plain Management Regulations

51 FLOOD DAMAGE PREVENTION 51 CHAPTER 51 FLOOD DAMAGE PREVENTION. ARTICLE I Findings, Purpose and Objectives. ARTICLE II Word Usage and Definitions

Transcription:

Lincoln County Floodplain Development Permit Application Application # FP Use Permit Variance Appeal Date SECTION I: GENERAL PROVISIONS (APPLICANT to read and sign) 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re issued. 4. Development shall not be used or occupied until a Certificate of Compliance is issued. 5. The permit will expire if no work is commenced within six months of issuance. 6. Applicant is hereby informed that additional permits may be required to fulfill local, state, and federal regulatory requirements. 7. Applicant hereby gives consent to the Local Administrator or his/her representative to make reasonable inspections required to verify compliance. 8. All work must be completed within 180 days of permit approval. CERTIFICATION TO THE ADMINISTRATOR: As the applicant I certify that I am either the owner or authorized agent of the owner and that all statements herein and in attachments to this application are, to the best of my knowledge, true and accurate. The work to be performed, including flood protection works, is as described below and in attachments hereto. The undersigned agrees that all such work shall be done in accordance with the requirements of the Lincoln County Flood Damage Prevention Ordinance, and with all other applicable City/Federal ordinances and the laws and regulations of the State of New Mexico. WARNING: PLEASE READ AND ACKNOWLEDGE. The Flood Insurance Rate Maps (FIRM) and other flood data used by the Lincoln County Floodplain Manager in evaluating flood hazards to proposed developments are considered reasonable and accurate for regulatory purposes and are based on the best available scientific and engineering data. On rare occasions greater floods can and will occur, and flood heights may be increased by man made or natural causes. Issuance of an exemption certificate does not imply that developments outside the identified areas of special flood hazard will be free from flooding or flood damage. Issuance of an exemption certificate shall not create liability on the part of Lincoln County, the Lincoln County Floodplain Manager or any officer or employee of Lincoln County in the event flooding or flood damage does occur. The undersigned hereby makes application for a Floodplain Use Permit. (Print name of Agent/Owner) (Signature of Agent/Owner) Date 1

SECTION 2: OWNER/PROJECT INFORMATION (To be completed by APPLICANT) Owner or Agent Owner Name (if agent) Mailing Address City Property Address (from County Addressor) State Zip Code Phone Engineer Property Legal Description Description of Work (Check all applicable boxes) A. Structural Development Activity New Structure* Addition* Renovations*/Repairs*/ Maintenance* Structure Type Residential (1 4 Family) Residential (4+ Family) Non Residential (Floodproofing? Yes) Manufactured Home B. Other Development Activities Paving Grading Filling Mining Excavation (Except for Structural Development Checked Above) Watercourse Alteration (Including Dredging and Channel Modifications) Drainage Improvements (Including Culvert Work) Road, Street, Bridge Construction* Individual Water or Sewer System Other (Please describe) *Notice: FEMA elevation Certificate MUST be attached to this application Elevation of the 100 year (Base) flood (Identify source if other than the FIRM): ft.(navd1988) Highest adjacent grade at the development site (natural ground): ft.(navd1988) Lowest adjacent grade at the development site (natural ground): ft.(navd1988) Required elevation/depth for lowest floor (including basement: ft.(navd1988) Proposed elevation/height above grade for lowest floor (incl. basement): ft.(navd1988) 2

THIS PERMIT IS ISSUED WITH THE CONDITION THAT THE LOWEST FLOOD (INCLUDING BASEMENT) OF ANY NEW OR SUBSTANTIALLY IMPROVED BUILDING WILL BE ELEVATED TO AT LEAST ONE FOOT ABOVE THE 100 YEAR (BASE) FLOOD ELEVATION (IF AVAILABLE) OR AT LEAST THREE FEET ABOVE THE HIGHEST ADJACENT GRADE (IN AO ZONES), AND THAT IF THE DEVELOPMENT IS PROPOSED IN A DELINEATED FLOODWAY, THE DEVELOPMENT WILL CAUSE NO INCREASE IN THE 100 YEAR (BASE) FLOOD ELEVATION. ALL UTILITIES, APPLIANCES AND DUCT WORK SHALL BE ELEVATED TO AT LEAST ONE FOOT ABOVE THE 100 YEAR (BASE) FLOOD ELEVATION OR DEPTH NUMBER, OR BUILT OF WATER RESISTANT MATERIALS AND DESIGNED TO BE FLOOD PROOF. OR THIS PERMIT IS ISSUED WITH THE CONDITION THAT ANY NEW OR SUBSTANTIALLY IMPROVED BUILDING (INCLUDING ANY MANUFACTURED HOUSE) COVERED BY THIS PERMIT WILL BE BUILT ON COMPACTED FILL THAT IS AT LEAST AS HIGH AS THE 100 YEAR (BASE) FLOOD ELEVATION, AND THAT SUCH FILL WILL EXTEND AT LEAST TEN FEET FROM ALL WALLS OF THE BUILDING BEFORE IT DROPS BELOW THE 100 YEAR (BASE) FLOOD ELEVATION. THIS PERMIT IS ISSUED WITH THE CONDITION THAT THE DEVELOPER/OWNER OF ANY NEW OR SUBSTANTIALLY IMPROVED BUILDING (INCLUDING ANY MANUFACTURED HOUSE) WILL PROVIDE A COMPLETED FEMA ELEVATION CERTIFICATE BY A REGISTERED ENGINEER, ARCHITECT OR LAND SURVEYOR BASED ON ACTUAL CONSTRUCTION PRIOR TO ISSUANCE OF AN OCCUPANCY PERMIT. Application, Plans and Specifications Received this Day of, 20 (Signature of Agent/Owner) (Signature of Floodplain Administrator) 3

SECTION 3: ADDITIONAL INFORMATION (To be completed by APPLICANT) If the proposed development is located in a Special Flood Hazard Area the applicant must submit the documents as noted below, before the application can be processed: Development plans, drawn to scale, and specifications, including where applicable: details for anchoring structures, proposed elevation of lowest floor (including basement), types of water resistant materials used below the first floor, details of floodproofing of utilities located below the first floor, and details of enclosures below the first floor. (Required for structural development activities.) Completed Floodplain Building application (Required for building permit requests involving structures.) A copy of all data and hydraulic/hydrologic calculations used to determine the base flood elevation and floodway limits. A copy of all data and hydraulic/hydrologic calculations used to determine the floodway limits. (Required for proposed development in the floodplain where base flood elevations are established but no floodway or non encroachment areas are determined.) Plans showing the extent of watercourse relocation and/or landform alterations. (As applicable) Change in water elevation (in feet) Meets ordinance limits on elevation increases: YES NO (Required for proposed encroachments to a floodway or non encroachment area.) Top of new compacted fill elevation ft.(navd1988). (Required for development involving fill in the floodplain.) Floodproofing protection level (non residential only) ft.(navd1988). Applicant must attach certification from registered engineer or architect. (Required for floodproofed structures.) Certification from a registered engineer that the proposed activity in a regulatory floodway will not Result in any increase in the height of the regulatory flood event, or conditional approval issued by FEMA via a Conditional Letter of Map Revision (CLOMR) for the proposed activity. A copy of all data and hydraulic/hydrologic calculations supporting this finding must also be submitted. (Required for proposed encroachments to a floodway or non encroachment area.) A certified and completed Elevation Certificate that includes the proposed elevation of lowest floor (including basement). Applicant must submit the Elevation Certificate before construction (based on construction drawings), when building is under construction (before lowest floor is completed), and when construction is finished (as built elevations). A certified and completed Floodproofing Certificate for floodproofed non residential structures. Location of all fill that will be stored in the floodplain, and statement of the amount of fill In addition, for a house show: The existing ground elevation and calculated height of the base flood elevation For a bridge submittal drawings and specifications for the bridge, certified by a registered professional Engineer. Calculations showing amount of fill (if any). A cross section at bridge location showing existing conditions, proposed conditions and BFE level. A site plan showing the location of all existing structures, water bodies, adjacent roads, lot dimensions, and proposed development. A copy of all data and hydraulic/hydrologic calculations supporting bridge submittal must also be submitted. Other: 4

SECTION 4: COMPLIANCE ACTION (To be completed by LOCAL ADMINISTRATOR) The LOCAL ADMINISTRATOR will complete this section as applicable based on inspection of the project to ensure compliance with the community s local law for flood damage prevention. 1 st INSPECTION DATE BY DEFICIENCIES? Yes No 2 nd INSPECTION DATE BY DEFICIENCIES? Yes No 1 st Elevation Certificate Date Final Elevation Certificate Date Certificate of Compliance issued: DATE BY FLOODPLAIN MANAGER Application Action Taken: Approved Denied Floodplain Administrator Other Date LINCOLN COUNTY COMMISSIONERS APPLICATION Action Taken: Variance Appeal Approved Denied Other Commission Action Confirmed By: Floodplain Administrator Date of BCC meeting Updated 03/09/2012 5