WHITE PAPER. SCADA Systems



Similar documents
PLCs and SCADA Systems

ACE3600 HIGH PERFORMANCE MONITORING & CONTROL REMOTE TERMINAL UNIT

SECURE AND FUTURE-READY SCADA CONTROL SYSTEMS PREPARE YOUR CRITICAL INFRASTRUCTURE FOR WHAT HAPPENS NEXT

SOLUTION BRIEF. Motorola FSA4000. How to Achieve Near 100% Fire Station Alerting Reliability

FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW

R-Win. Smart Wireless Communication Management System

Complete SCADA solution for Remote Monitoring and Control

Understanding Programmable Automation Controllers (PACs) in Industrial Automation

AutoLog ControlMan. Remote Monitoring & Controlling Service

GE Intelligent Platforms. PACSystems High Availability Solutions

Intelligent Device Management with DCS, PLC, and RTU

SCADAPack 530E 535E. remote Programmable Automation Controller

Wireless Communications for SCADA Systems Utilizing Mobile Nodes

SuperIOr Controller. Digital Dynamics, Inc., 2014 All Rights Reserved. Patent Pending. Rev:

S-series SQ Controller

Process Control and Automation using Modbus Protocol

SCADA Systems. Make the most of your energy. March 2012 / White paper. by Schneider Electric Telemetry & Remote SCADA Solutions

JNIOR. Overview. Get Connected. Get Results. JNIOR Model 310. JNIOR Model 312. JNIOR Model 314. JNIOR Model 410

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

WIRELESS REMOTE MONITORING OF CATHODIC PROTECTION SYSTEMS. John Hawkyard MICorr Deputy General Manager Rawabi Corrosion Technology Co Ltd Al-Khobar

Temperature Alert. LAN-based Temperature and Humidity Data Logger

Using Cellular RTU Technology for Remote Monitoring and Control in Pipeline and Well Applications

SCADA System Security. ECE 478 Network Security Oregon State University March 7, 2005

Rack mounted telephone- and leased line modem for industrial applications

FOUNDATION Fieldbus High Speed Ethernet Control System

WP WinPAC-8x49 Series (WP-8149/8449/8849) is the new generation WinCE based InduSoft PAC (Programmable Automation Controller).

HMS Industrial Networks. Putting industrial applications on the cloud

Modular I/O system Rugged Modular I/O System Solutions EN certified for railway applications

REMOTE MONITORING AND CONTROL SYSTEM

NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER

Integrated Communications Platform

Semaphore T BOX Applications in Data Center Facilities

WISE-4000 Series. WISE IoT Wireless I/O Modules

Zlinx Wireless I/O. Peer-to-Peer and Modbus I/O B&B ELECTRONICS PRODUCT INFORMATION

Foxboro Evo Process Automation System

Remote Automation and Monitoring: PLC or RTU?

Real Time Remote Monitoring over Cellular Networks. Wayne Chen Marketing Specialist

Straton and Zenon for Advantech ADAM Copalp integrates the straton runtime into the ADAM-5550 device from Advantech

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

Data Logger & Net Client Software (Windows, ipad, Android) Instant On. Touch. Drop & Drag Opera on. No more proprietary display equipment!

HMS Industrial Networks

NETWORK TECHNOLOGY. Long Range Radio Networks

INTEGRATING SUBSTATION IT AND OT DEVICE ACCESS AND MANAGEMENT

MVME162P2. VME Embedded Controller with Two IP Slots

Ponto Series. A new concept for automation

THE INDUSTRIAL INTERNET OF THINGS NEXT GENERATION TECHNOLOGY ENHANCING PRODUCTIVITY AND SAFETY

High Availability and Safety solutions for Critical Processes

Smart Solutions for Network IP Migration

High rate and Switched WiFi. WiFi QoS, Security 2G. WiFi a/b/g. PAN LAN Cellular MAN

RuggedCom Solutions for

The data can be transmitted through a variety of different communications platforms such as:

SNMP-1000 Intelligent SNMP/HTTP System Manager Features Introduction Web-enabled, No Driver Needed Powerful yet Easy to Use

Using MODBUS for Process Control and Automation

Combined Cycle Control Overview

IMPORTANT PRODUCT INFORMATION

Remote monitoring & control solutions for cathodic protection rectifier

WANic 800 & or 2 HSSI ports Up to 52 Mbps/port. WANic 850 & or 2 T3 or E3 ports Full-speed CSU/DSU. WANic 880.

GE Consumer & Industrial Power Protection. Digital Energy LP Series UPS. Uninterruptible Power Supply 3-30 kva. GE imagination at work

Control of Boiler Operation using PLC SCADA

How To Use Safety System Software (S3)


Advanced Transportation Management Systems

Product Information D23m Digital I/O System

Natural Gas Well Automation using Kingfisher RTU Products

Series Six Plus Programmable Controller

How To Build A Network For Mining

Optimizing and Securing an Industrial DCS with VMware

Wireless Field Data Backhaul

WIRELESS SOLUTIONS. The Right Connection for. Make the Right Connection for Industrial Wireless Solutions

NEW. EVEN MORE data acquisition and test stand automation

Features: RMU REMOTE MONITORING UNIT AND WEB-BASED SOFTWARE

Testing Automated Manufacturing Processes

MPLS: Key Factors to Consider When Selecting Your MPLS Provider Whitepaper

Electronic Transaction Market Industry Whitepaper. Systech Corporation Internet Payment Gateways

Secure access to a water treatment plant s SCADA network

Programmable Logic Controller PLC

Remote Monitoring and REC 501 Control Unit Product Guide

The BANDIT Device in the Network

Overview. 1. GPS data tracking via GSM SMS / GPRS. 2. GPS data logging in internal memory. 3. Alarm alert via GSM SMS / Dialing / GPRS

Communication Interface Units. CIU Prime & CIU Plus

Cisco 2600 Series Modular Access Routers

Sus tain.ability Honeywell Users Group Asia Pacific. Annemarie Diepenbroek, Greg Belcher Experion Overview and New Solutions

Advantages of the DNP3 Communications Protocol in Water and Wastewater Telemetry Systems. By Vishal Prakash

SECTION PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL Summary. A. Section Includes:

SCADA System Fundamentals

Remote Management White Paper 27th June, 2012

THE TOWN OF GROTON IS REQUESTING PROPOSALS FOR A WIRELESS ALARM MONITORING AND CONTROL SYSTEM WITH INTERNET BASED DATA ACCESS

Redundant Serial-to-Ethernet Data Connections for Mission-critical Devices

Telephone- and leased line modem for industrial applications TD-36

IBM TotalStorage Network Attached Storage 300G

Intelligent RS-485 I/O expansion unit: RU-87Pn Series

imc BUSDAQ autonomous intelligent synchronized Field bus data acquisition - from stationary to mobile imc productive testing

Energy Depot GmbH PRODUCT AND APPLICATION GUIDE. Total Monitoring Solution for PV. Delivering Solutions for Energy Management

How can I Utilize telemetry and remote SCADA architecture for distributed infrastructure?

Portable Wireless Mesh Networks: Competitive Differentiation

Bristol ControlWave Redundant Control

Motorola Wireless Broadband. Point-to-Multipoint (PMP) Access Network Solutions

Environmental data Temperature: -20 C to +55 C (Operating) -55 C to +85 C (Storage) Humidity: 0 95%

Opengear Technical Note

SCADAPack E ISaGRAF 3 User Manual

Transcription:

WHITE PAPER SCADA Systems

CONTENTS 2 Executive Summary 2 Complex Processes Demand System-Level Intelligence 3 PLC Systems are Sub-Optimal for Complex SCADA Systems 4 RTUS Provide Superior Intelligence, Communications and Flexibility 4 Rugged and Reliable Hardware Construction 5 Extensive Programming and Performance Capabilities 5 Broad Communication and Protocol Support 6 Local Control and High Capacity 6 Ease of Maintenance and Upgradability 7 Scalability of Security 7 High Performance RTUS Meet the Process Control and Monitoring Challenge 1 WHITE PAPER: SCADA Systems

Executive Summary With the wide range of RTU (Remote Terminal Units) and PLC (Programmable Logic Controllers) currently on the market, SCADA system engineers and decision makers face several challenges. Which classes of units provide the optimal functionality, expandability, and cost effectiveness for a given SCADA application? What type of unit will serve the mission not just today, but years into the future? As implemented, RTUs and PLCs serve overlapping application niches and share some design details. To combat industry confusion, the discussion that follows provides a background of RTU and PLC units, and compares the various technical aspects for specifying the units including environmental ruggedness, modularity and scalability, and CPU performance. With remote applications for PLCs and RTUs continuing to expand, the discussion also helps the reader understand crucial remote system communication requirements including store and forward, report by exception, support for multiple protocols, and two-way communication with acknowledgements. Complex Processes Demand System-Level Intelligence Many industrial and infrastructure-scale enterprises depend on equipment located at multiple sites dispersed over a large geographical area. A vast majority of large infrastructure and industrial-scale ventures use Supervisory Control and Data Acquisition (SCADA) systems. According to Newton-Evans, the power utility industry alone uses SCADA at more than 50% of their installations. SCADA systems provide monitoring, control, and automation functions that allow the enterprise to improve operational reliability, reduce costs through eased work force requirements, enhance overall Quality of Service (QoS), or meet expected QoS or other key performance factors as well as boost employee and customer safety. Some key examples of SCADA applications include: Public or Private Infrastructure: Water treatment and distribution Waste water collection and treatment Electrical power transmission and distribution Oil and gas pipeline monitoring and control Industrial Processes (continuous, batch, or repetitive): Remote monitoring and control of oil and gas production, pumping, and storage at refineries from both offshore platforms and onshore wells Electrical power distribution from nuclear, gas-fired, coal, or renewable resources In SCADA systems, RTUs and PLCs perform the majority of on-site control. The RTU or PLC acquires the site data, which includes meter readings, pressure, voltage, or other equipment status, then performs local control and transfers the data to the central SCADA system. However, when comparing and specifying a solution for challenging SCADA environments, RTU and PLC-based systems are not equal. 2 WHITE PAPER: SCADA Systems

SCADA Primary Programmer RTU Corporate LAN RTU SCADA Secondary Gateway IP IP S&F Repeater Programmer RTU PLC Systems are Sub-Optimal for Complex SCADA Systems Originally designed to replace relay logic, PLCs acquire analog and/or digital data through input modules, and execute a program loop while scanning the inputs and taking actions based on these inputs. PLCs perform well in sequential logic control applications with high discrete I/O data counts, but suffer from overly specialized design, which results in limited CPU performance, inadequate communication flexibility, and lack of easy scalability when it comes to adding future requirements other than I/O. With the rapid expansion of remote site monitoring and control, three critical industry business trends have recently come into focus: System performance and intelligence Process automation improves efficiency, plant safety, and reduces labor costs. However, complex processes like AGA gas flow calculations and high-resolution event capture in electric utility applications require very high performance and system-level intelligence. The reality is that even high-performance PLCs cannot meet all these expectations. Communication flexibility Redundant communication links between remote systems and the central SCADA application form the basis of a reliable, secure, and safe enterprise. Power routing automation in electric applications, water distribution, warning systems, and oil and gas processes all require unique communication mediums including slow dial-up phone lines, medium speed RF, and broadband wired/wireless IP. Configurability and reduced costs Although process monitoring and control are well defined and understood within many industries, the quest for flexibility and reduced Total Cost of Ownership (TCO) remains challenging. In the past, proprietary PLC units customized with third party components filled the niche, but suffered from lack of configurability and higher maintenance costs than fully integrated units. Today, businesses look for complete modular off-the shelf systems that yield high configurability with a significant improvement in TCO. At the technical level, several requirements currently influence the SCADA specification process: Local intelligence and processing High processing throughput, 32 bit CPUs with expanded memory for user applications and logging with support for highly complex control routines. High-speed communication ports Monitoring large numbers of events requires systems that support multiple RS232/485 connections running at 230/460 kb/s and multiple Ethernet ports with 10/100 Mb/s capability. High-density, fast, and highly accurate I/O modules Hardware that implements 12.5 khz input counters with 16-bit analog inputs and 14-bit analog outputs for improved accuracy. Broadband wireless and wired IP communications Recent innovations in IP devices demands reliable connectivity to local IEDs (Intelligent Electronic Devices) as well as emerging communication network standards. Strict adherence to open standard industry protocols including Modbus, DNP3, and DF-1 on serial and TCP/IP ports Robust protocols for support of mixed communication environments. Protection of critical infrastructure Enhanced security such as password-protected programming, over the air encryption, authentication, and IP firewall capability. 3 WHITE PAPER: SCADA Systems

RTUs Provide Superior Intelligence, Communications, and Flexibility Over the past decade, RTUs and PLCs have slowly progressed toward a common design and usage point. Still, primary markets determine the amount of change that systems can accommodate. In practice, the typical PLC usage model revolves around localized fast control of discrete variables. RTU usage focuses on remote monitoring with control, but with a higher demand for application communications and protocol flexibility. As a result, RTU designs tend to have greater CPU horsepower, programming flexibility and broader communication support than PLC systems. Like a PLC, the RTU functions at the remote location wherever a SCADA system needs equipment monitoring or control. The optimal RTU system is modular integrating the two-way data acquisition interface for process equipment control, and the interface to the communication subsystem. Modular RTUs and PLCs contain separate CPU, I/O, and communication modules, and support the addition of new modules through a common backplane. When specifying SCADA system hardware, there are several critical areas to consider when comparing RTUs to PLCs. The following sections detail each area. Rugged and Reliable Hardware Construction Unlike PLCs, modular high performance RTUs include additional hardware features, power supplies with multiple AC/DC voltage rails, diagnostic displays, and provide support for integrated battery backup. Furthermore, RTUs must withstand the harsh environmental conditions encountered at offshore drilling platforms, arctic power stations, and other installations that require NEMA4/IP65 enclosure options. Key hardware specifications include: Modularity RTU systems that use a modular approach enable flexible CPU, I/O, and radio/modem configurations. As a result, RTU modules provide mission-driven configurations and enable quick expansion as needs change. Intelligent power management, battery backup and optimized temperature compensated battery charging for overcharging and discharging protection. Some provide accurate remaining battery life to permit alarm or shut down procedures. Temperature and hazardous environment hardening: Operating temperature: - 40 ºC to +70 ºC (-40 ºF to 158 ºF) Operating humidity: 5% to 95% RH @ 50 ºC without condensation Mechanical vibrations: Per EIA/TIA 603 Base-station, Sine 0.07 mm @ 10 to 30 Hz, 0.035 mm @ 30-60 Hz Operating altitude: - 400 meter to + 4000 meter (-1312 ft to + 13120 ft) Input isolation: 2.5 kv DC/AC between input and module logic Overload and short circuit protection: Constant current limit with automatic recovery Over-voltage protection 4 WHITE PAPER: SCADA Systems

Buiding Blocks of an Intelligent RTU Power Supply Housing and Chasis CPU Frames I/O Modules Communications Interface Software Extensive Programming and Performance Capabilities PLCs commonly contain limited intelligence, while older units reflect obsolete CPU technology, lack performance, and cannot scale when task size or functional requirements increase. When specifying a SCADA system, analyze the following key architectural building blocks while considering their affect on overall performance: CPU RTUs require high processing capability to manage complex control tasks efficiently. For example, RTUs that contain a 200 MHz, 500 Million Instructions per Second (MIPS) CPU with multiple communication port support are optimal for performing simultaneous communications, networking, and control tasks. Ladder and C source code Support for legacy, current, and future software applications and upgrades. Scan times High processing power, I/O counts, and data rates translate directly into high scan rates. RTUs with high scan rates in the order of 1-ms SOE (Sequence of Events) resolution helps enable rapid respond to changing conditions at the remote site. Real Time Operating System (RTOS) PLCs generally employ a proprietary OS architecture, while some RTUs use inefficient non-rtos architectures. Because RTOS kernels use a highly optimized, efficient data model requiring minimal source code, RTUs built with RTOS benefit from faster task processing, reduced memory requirements, and lower risk of failure due to overly complex code. Broad Communication and Protocol Support While adequate in situations where system communication requirements are minimal, PLCs suffer from a lack of communication flexibility only the larger and more expensive units can function both in a peer-to-peer and as the master controller. PLCs perform local processing tasks well, but lack the capability for handling newer system communication requirements or multiple protocols to connect with IEDs. Support for wireless IP stands out as another key issue when specifying a SCADA system. To enable high SCADA communication reliability, redundancy, and flexibility make sure the system supports the following: Time synchronization Ensure that the unit can time sync to the required accuracy. The electrical power industry requires sub-millisecond accuracy, which is not achievable without fast processors and an accurate time signal from a GPS receiver. Store and forward Allows easy extension of radio networks without additional, expensive RF equipment; this adds redundancy, fault tolerance, and improves overall system reliability. Dual link communications Improves system redundancy through full two-way messaging with acknowledgements on both links; also allows the data to travel through the RTU and communication medium simultaneously. For example, from IP to trunking radio, thus enabling easy system extension. 5 WHITE PAPER: SCADA Systems

Alternate links Equipping the unit with multiple links increases the likelihood that communications reach their destination. For example, if path 1 fails, use path 2, or path 3. Dual mode operation Make sure the unit can operate and easily switch between master/slave and peer-to-peer operation. In a master/slave system, every message must go through the SCADA master, thus creating a single point of failure. RTUs with dual mode operation significantly improve overall system reliability. Data rates The higher the data rate, the faster the unit can acquire and act upon information from high I/O count modules and scale with SCADA system complexity. Two-way radio operation Supporting multiple radio types and spectrums provides flexibility, especially in areas with high RF (Radio Frequency) interference: Mobile/portable two-way radio Analog/digital trunking MAS 900 MHz Broadband (WLAN, Canopy, inet900, etc) Cellular modem (GPRS) Report by exception Enables fast reporting of alarm conditions, yet minimizes channel use because the system only reports when necessary. Wide range of CPU protocols and programming interfaces: MDLC and MDLC over IP Modbus RTU on serial and TCP/IP DNP 3.0 on serial and IP IEC 60870 DF1 (Allen Bradley) Any protocol implemented in the application program for serial ports (RS-232/485) and Ethernet ports (TCP/IP). Local Control and High Capacity For large monitoring and control tasks, SCADA systems require sufficient hardware and software capacity to perform their mission efficiently. While control loops and multiple protocol support can consume large amounts of system resources, intelligent hardware must also have enough resources to perform historical analysis and take predictive action if a system failure occurs. PLC systems with extensive control and capacity resources for logging historical data tend to be highly specialized and expensive. PID (Proportional Integral Derivative) Designers size various classes of PLC systems based upon the number of PID loops they can support within a specified time. The more loops a system supports, the faster and more expensive the processor/plc. SOE (Sequence of Events recording) Because most PLC designers optimize the unit to execute control routines not monitor them, PLCs generally lack SOE capabilities. RTUs, however, contain detailed support for SOE monitoring. High performance RTUs can log thousands of events time tagged to 1-ms. Data logging To perform event data logging, systems require large amounts of available program and or user memory. Large PLCs tend to support data logging, but at a great expense in memory and price. When specifying a system, ensure that sufficient program memory exists for the target application. I/O types and sizing When compared to an RTU, PLCs generally contain smaller I/O counts per module with overall lower density, which may require larger I/O racks to support needed capacity. For serial and/or IP links to another IED, make sure that the system contains sufficient hardware connections and programming flexibility to retrieve status and alarm information from other devices. Ease of Maintenance and Upgradability Because PLC-centric solutions contain limited configurability and program expandability, combining multiple functions into a single unit presents a major challenge. This limitation makes long-term SCADA system maintenance and scalability costly when compared to RTUs. Be sure to consider the needs of the overall system in two-five years, not just expanded I/O or a few new module slots. Furthermore, verify that the system can support future additions or changes in design and communication requirements. To achieve optimal system scalability and lowered TCO, make sure the remote unit supports: Remote programming through wired/wireless IP networks and other communication mediums Remote downloads of applications, enabling rapid, secure configuration and upgrades of software code: Site configuration IP configuration tables Network configuration data Phone book and modem setup files (STM files) User programs (ladder and C) and user data Remote safe download of unit firmware allowing for upgrades without having to establish a local connection. High storage capacity (FLASH, DRAM, SRAM) for adding new programs, functions and increased user data storage Module hot swapping, which eliminates the need to power down the system to replace modules 6 WHITE PAPER: SCADA Systems

Scalability of Security Many PLC solutions perform well in a specialized functionality set, but lack the flexibility to add new capabilities for protecting infrastructure such as remote security monitoring and access. Adding security enhancements to a PLC frequently requires the use of expensive ancillary hardware. In contrast, modular RTUs enable rapid scalability of a wide range of current and emerging security applications. Monitoring and control are only two aspects of optimizing and protecting infrastructure. With today s expanding homeland security requirements, consider the following when specifying a SCADA system: Support for multiple passwords at multiple abstraction levels Allows for compartmentalization of application software and SCADA hardware access control Hardware IP firewalls Hides the unit s wireless/wired IP address Support for currently available encryption Most PLC and RTU systems do not meet Data Encryption Standard (DES) and Advanced Encryption Standard (AES) requirements. New RTU systems under development use both a DES and AES compliant encryption routine. Over the air and over the wire authentication All incoming packets verified and authenticated as valid, preventing unauthorized access by rogue programs. Adding authorization to security routines Grants/restricts permissions to users and devices based upon user/device name and system access level. Maintaining a sign-in and activity log Even though a system provides encryption or firewall protection, the unit must keep track of all access related activities autonomously. High Performance RTUs Meet the Process Control and Monitoring Challenge SCADA systems built with the latest RTU technologies can deliver the optimal reliability, efficiency, and cost-effectiveness that today s complex infrastructure and industrial processes require. When specifying a SCADA system, be sure to investigate not only the current business and technical needs of the application, but the long-term scalability and TCO of the overall solution. Just as important, consider all aspects of the system, including performance, capacity, communications, ruggedness, and security. Feature High Performance RTU PLC Temperature -40 to +70 C -20 to +60 C CPU word size clock rate 32 bit 200 MHz 16/32 bit - 50-100 MHz RAM/Total memory 4 MB/32 MB 32 KB/256 KB On-board serial/ethernet ports 2/2/other options Typically 1 of each Remote application upload yes no Remote software diagnostics yes no Remote firmware download yes no Encryption support yes no Integrated radio support yes no Store and forward standard feature Yes no Report by exception mode yes no Integrated power supply options with battery charging yes no Motorola, Inc. 1301 East Algonquin Road Schaumburg, IL 60196 U.S.A. www.motorola.com/governmentandenterprise MOTOROLA and the Stylized M Logo are registered in the U.S. Patent and Trademark Office. All other product or service names are the property of their respective owners. Motorola, Inc. 2007. RO-99-2140