PETRA GARDEN & POOL-COMPLEX 2003 End of Season Report submitted to Michel Conan Dumbarton Oaks



Similar documents
Labraunda Preliminary report

Field Report: Caere Project 2015

Hopewell Archeology: The Newsletter of Hopewell Archeology in the Ohio River Valley Volume 6, Number 1, September 2004

Phnom Bakheng Conservation Project Update

Chapter 3. Exploration Results at the Krang Kor Site

VILLAS OF TRADITIONS AT GREY OAKS

Geophysical Survey at MIMA, The Bull Tavern Site Lexington, MA Draft

Ground Penetrating Radar Survey of a Portion of the Riverside Cemetery, Hopkinsville, Kentucky

Emergency Safeguarding. of the World Heritage. Site of Byblos

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON

Property Care White Papers. Site Drainage: Monitor and Maintain

Block and Gravel Inlet Protection (BIP)

Storm Drain Inlet Protection

Figure 10.1 Totally collapsed mosque at Kavakl district of Gölcük

POTENTIAL AND LIMITATIONS OF THE ARCHAEO-GEOPHYSICAL TECHNIQUES

GROUND-PENETRATING RADAR SURVEY

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Storm Drain Inlet Protection

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

CABIN A Restored & Preserved 1850 Slave Cabin

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

Architectural Processing and Inspections for Home Mortgage Insurance

Archaeological Data Visualization in VR: Analysis of Lamp Finds at the Great Temple of Petra, a Case Study

Texas Building Pros Foundation Repair Services

Hidden Collections become Digital Treasures

Harris Hydraulics Laboratory Pumphouse Fall Guard Addendum to the Historic Resources Addendum

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

OSU Extension FACT SHEET

Ground Penetrating Radar (GPR) Investigations at Fort Pulaski National Monument, Chatham County, Georgia. Prepared for:

The Effects of Trees On Buildings And Their Characteristics - Part 2

Residential Foundations and Basements

CITY UTILITIES DESIGN STANDARDS MANUAL

CHRYSALIS ARCHAEOLOGICAL CONSULTANTS Cultural Resource Specialists

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CIVL451. Soil Exploration and Characterization

Spotting Structural Problems in a Home

Re: Damages to Alaska Building from Legislative Information Office Construction

Building Foundation and Structure

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

An Archaeological Settlement Analysis of Goshono Site

Slavic Village Building Condition Review

Stormwater/Wetland Pond Construction Inspection Checklist

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

Consolidation of bank slippage Mount Sandel Fort (LDY 007:020) Coleraine County Derry

Simpson Engineering A state licensed engineering firm F-1607

4 EFFECTS OF SURFACE FAULT RUPTURE ON INFRASTRUCTURE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA

Table 4.9 Storm Drain Inlet Protetion Applicable for

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Page & Turnbull imagining change in historic environments through design, research, and technology

Letter Report Geophysical Subsurface Investigation Activities and Results Suspected Burial Site, Corpus Christi, Texas W.O. No

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

SECTION STORM DRAIN SYSTEM

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

EXCAVATOR SAFETY TRAINING

Department of Homeland Security Consolidated Headquarters at St. Elizabeths. St. Elizabeths. Archaeological Investigations.

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Outlet stabilization structure

Local Road Assessment and Improvement Drainage Manual

Igneous rocks formed when hot molten material (magma) cools and hardens (crystallizes).

Moving Small Mountains Vesuvius Dam Rehab

Appendix To Operational Review and Recommendations For Juniper Golf Course

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

(

CHAPTER 2 HYDRAULICS OF SEWERS

ROCK RINGS AND GRANARY BASES IN SAN DIEGO COUNTY

St Aiden's Church, Rutland BC

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Lighthouse Engineering, L.L.C.

What is the exact size and orientation of the Great

Ancient Greek Arts and Architecture

Basement Waterproofing in Existing Buildings

PERC-RITE DRIP DISPERSAL DESIGN GUIDE FOR SEPTIC TANK OR ADVANCED TREATMENT EFFLUENT MAINE

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Section 402. STORM SEWERS

CHAPTER 5. Storm Sewer

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

The 1984 Fire. Factsheet 12

Replacing lead and common supply pipes

Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire

WOODROW WILSON HOUSE RESTORED

National Archives and Record Administration

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Sports Buildings: budget costs for the Flood Relief Fund

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

Preventing water damage in the basement

How to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete

Truck Company Operations

Open Channel Flow in Aquaculture

A n. P w Figure 1: Schematic of the hydraulic radius

SECTION SITE PREPARATION

Transcription:

PETRA GARDEN & POOL-COMPLEX 2003 End of Season Report submitted to Michel Conan Dumbarton Oaks Team: Project Director: Leigh-Ann Bedal (Pennsylvania State Unviersity Erie) Hydraulics consultant: James Wescoat (University ofillinois, Urbana Champaign) Geophysicist (Ground-Penetrating Radar): Michael Grealy (Denver University) ArchaeologistlExcavator: James Schryver (Cornell University) Excavator: Edward Thiry III (pennsylvania State Unviersity Erie) The Petra Garden & Pool-Complex 2003 field season was carried out over a three week period, July 5 th - July 24th 2003. The season was made possible with the cooperation of the Department of Antiquities of Jordan. Funding was provided by a project grant from Dumbarton Oaks (Trustees of Harvard University) and a senior archaeology grant from the National Science Foundation (NSF). The goals of the PGPC 2003 season had six major objectives: 1) to excavate the large deposit of earth and debris that washed down from the Ez-Zantur ridge and covered the southwest corner of the pool area; 2) to move the limestone blocks scattered along the base of the east escarpment to the top of the escarpment near the cistern from which they originated so that reconstruction of the cistern may be carried out in future seasons; 3) to excavated the baulk between Trenches 3 and 5 in order to understand the connection between the pool's castellum and water channels uncovered in Trench 3 (1998) and the stone structure (platform) in Trench 5 (2001); 4) to initiate the study of the site's hydraulic system; 5) to investigate the nature of the vaulted opening at the center of the Retaining Wall along the northern boundary of the garden terrace; and 6) to complete the subsurface survey of the garden terrace using ground-penetrating radar (GPR). The results of the Petra Garden & Pool-Complex 2003 field season, including the hydraulics study and GPR survey will be submitted for publication in the 2004 volume of ADAJ. Pool SouthWest Beginning on the first day of fieldwork, July 5 th, we began to excavate the large mound of earth and debris that washed down from the Ez-Zantur ridge and covered the southwest corner of the pool area. We began at the top of the mound (elevation = 911 m), immediately below the South Portal which is situated west of center on the South Escarpment, approximately 10 meters above the level ofpool. Over a period of 14 work days, we worked down along the natural rock face, to an elevation of 903.5 m (= 7.5 m depth) and exposing an area measuring 20 m from the SW corner of the Pool Area. The artifacts found in the earth fill (architectural fragments, pottery sherds, lamps, and coins) were a mix of Nabataean, Roman, and some Early Byzantine. Underneath the fill, the top 9 courses ofa screen wall (South Wall) built to mask the natural rock of the southern escarpment, was uncovered. Only a 10 m length of the South Wall, which appears to be of Nabataean construction, was clearly exposed, although its uppermost courses 1

can be traced eastward along the full length of the southern escarpment. A second wall (West Wall) runs N-S for 7.8 m, forming the western boundary of the Pool Area. Running parallel to the West Wall, is the Great Temple's East Perimeter Wall. Between the West Wall and the GT East Perimeter wall is a small reservoir (8.23 x 2.63 m) that is situated on a bedrock shelf at the level of the GT Upper Temenos. To the south of the reservoir, is a small room (Room C) with a small channel cut into the bedrock floor. The channel runs E-W and appears to be used to drain water from the Room and through an unexcavated opening in the West Wall at the NE comer of the room. View ofthe southwest corner ofpool area looking south, before excavations (left) and at the end ofthe 2003 field season (right). A third wall was exposed in the clearance of the debris mound in the SW comer of the Pool Area. This wall is built on top of an earlier fill that covers the original floor in this area up to about 1.5 m and has a different construction from the Nabataean walls. The wall stands roughly 1 m tall and is 5 m in length (E-W), with its west end built up against the E face of the West Wall. Based on its stratigraphic relationship to the other walls and its construction of roughly hewn stones without clear courses, it probably dates to the Byzantine period or later. In September, Chrysanthos Kanellopoulos completed a scale drawing of the Byzantine Wall's north face and top plan for documentation. This wall will be removed as excavation continues in this area in 2004. In October 2003, Dakhilallah Qoblan oversaw the consolidation of the exposed section of the South Wall in order to assure its stability and preservation during subsequent excavation seasons. 2

Byzantine? Wall View ofthe southwest corner ofthe Pool area looking west, showing the architectural features exposed in the 2003 field season. 3

East Cistern The eastern edge of the Pool area is covered by a dense scatter of fallen stones, many of which originated from the elevated cistern built on top of the eastern escarpment, 16 m above the pool level. The cistern stones are easily identified by their material (limestone) and the thick coat of hydraulic concrete that is still adhering to the interior face for containment of water. In order to be able to excavate the Pool's eastern boundary in future field seasons and to carry out the partial reconstruction of the cistern, the rock fall had to be moved to the SW comer of the "Middle Market" at the same level as the cistern. Over a period of two work days, five workmen worked to load all of the identifiable cistern stones into the bucket of the bulldozer which transported the stones up to the cistern where they were unloaded and neatly laid out. (left) View of the east edge of the Pool area looking east, showing the dense rock fall at the base of the eastern escarpment and the remnants ofthe East Cistern above. (right) While walking the area around the cistern to determine the best location for depositing the stones, Dakhilallah Qoblan noted a small column drum (ht: 0.46; D: 0.37) resting on its side just 3 meters to the SE of the cistern. When rolled over, it was discovered that one face of the drum was carved with the bust of a man wearing a robe draped over his left shoulder inside a window framed by two columns. The man's face is badly damaged. Because of its association with the cistern and the desire to move the sculpture before it suffered further damage, it was photographed and numbered (pgpc2003 S 1 000) and promptly moved to the museum. In September, Chrysanthos Kanellopoulos completed a scale drawing of the sculpted bust column drum for documentation. ~~::!!!;:;;;;;C.')lu.mn drum with carved bust (pgpc2003 S 1000) 4

Baulk 3/5 In order to understand the connection between the pool's castel/urn and water channels uncovered in Trench 3 (1998) and the South Platform in Trench 5 (2001), the baulk between the two trenches was excavated and Trench 3 was extended 1.5 m westward. The south face of the South Platform was exposed revealing a plastered face and two small openings through which water from the castellum flowed into or underneath the platform. The channels were originally laid underneath a paved floor which was later robbed out for reuse of the channels. The disturbance of floor pavers to the west of the channels, the laying of a pipeline (running NW) into the floor complex, and a complex stratigraphy of soils above the floor, indicate subsequent periods of reuse and abandonment of the water system for a long period. Numerous coins and pottery discovered in the space between the castel/urn and the platform were badly worn and corroded from water erosion. ;;- (left) View oftrenches 3 and 5 looking north, at the end ofthe 2001 field season, and (right) end ofthe 2003 field season. 5

North Arch A limited probe was carried out in the vaulted opening at the center of the Retaining Wall along the northern boundary of the garden terrace in an attempt to determine the function of the vaultis it a doorway providing access to the garden terrace, or a part of the terrace's drainage system, or perhaps a decorative niche facing the street? Unfortunately, it was impossible to determine the function without excavating a larger area that exposes both faces of the Retaining Wall which will have to wait until a future field season. The southern face of the Retaining Wall is badly collapsed and the vault is densely packed with field stones. Two courses of wall stones built up against the north face of the Retaining Wall appear to be a later construction that blocked the opening. View of the Petra Garden & Pool-Complex looking south, showing the North Arch in the Retaining Wall at the central axis ofthe garden terrace. ofthe North Arch after cleaning, 2003. 6

Hydraulics Reconnaissance Hydraulics specialist, James Wescoat, arrived mid-season and spent five days in the field, studying the water catchment system to the south of the Petra basin in order to trace the sources and route of the water that would have fed the Petra Garden & Pool-Complex. Wescoat visited several of the major springs in the area (Ain Musa, Ain Sadr, Ain Lemun, and Ain Braq), and walked the wadis between Ain Braq and the Snake Monument, observing the cisterns, aqueducts, channels, and settling pools in the area. He was also given permission to investigate the water channels and large cistern of the Great Temple complex. His preliminary findings are that the garden's main water supply originates from Ain Braq, and is transported in the Braq aqueduct to Jebel Attuf and into several large cisterns located along the eastern slope of Ez-Zantur before being carried to the pool. The bedrock shelves located immediately south of (above) the pool on Ez-Zantur created an effective water catchment that directed the flow of rain water to the East Cistern and the pool. View ofez-zantur southwest from the "Middle Market", showing the bedrock shelves above the Pool that likelyfunctioned to channel water flow into the East Cistern and the Pool. 7

,, Ground-Penetrating Radar Michael Grealy arrived mid-season and spent four days in the field carrying out a subsurface survey of the garden terrace using ground-penetrating radar (GPR). His work was a continuation ofthe GPR survey carried out by Lawrence Conyers 2001. In addition to collecting data from previously unstudied areas of the site, including the raised field in the SE quadrant of the garden terrace and along the Roman Road north ofthe garden terrace, using a 400 mgz antenna, Grealy carried out a detailed investigation ofpreviously studied areas using a 900 mgz antenna in an effort to answer questions raised by the original data and to provide a more detailed subsurface map that will aid in future excavations and interpretations ofthe overall site. During his last afternoon in Petra, Grealy carried out a GPR study of the area in front ofthe Khazneh upon the invitation by Mr. Suleiman Farajat of the Petra Archaeological Park. Unfortunately, his Zip Drive was damaged during travel to Jordan and so he was unable to process his data in the field. Note: At the time of this report (11/7/03) I have not received any data or report from Grealy regarding the GPR. He had a computer problem in mid-october and says that the data is safe, but the hard drive must be replaced and he is still waiting for this to be completed. I will submit a copy ofhis report to Dumbarton Oaks as soon as I receive my own. Leigh-Ann Bedal Director, Petra Garden & Pool-Complex Excavation Lecturer, Pennsylvania State University Erie 8