HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing



Similar documents
HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing

DCM 18.1 How to Prepare a Data Center Strategy

ITM 6.1: To Colocate or Not Colocate

Data Centre Outsourcing a Buyer s Guide

SERVICE OFFERING: DATA CENTER REAL ESTATE & SITE SELECTION SERVICES. Data Center Expertise Delivered with Integrity

Data Center Build vs. Buy

Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today s presentation)

W H I T E P A P E R. Reducing Server Total Cost of Ownership with VMware Virtualization Software

PMINJ Chapter May 5 th Symposium Best Practices to Manage Disruptive Technologies

Optimizing for Success in Implementing Mission Critical Real Estate Strategies

Physical infrastructure: Effective consolidation of space, power, and cooling

Migration Planning and Execution:

The facility in a converged infrastructure Michalis Kefalakis HP Data Centre Facilities Strategy Lead EMEA

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor

Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions

Information Technology Strategic Plan Final Presentation

IT Disaster Recovery Services Program

2011 EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

Insourcing vs. Outsourcing. Bart Leung Senior Associate, Ehvert Mission Critical

Pursuing Operational Excellence. Better Data Center Management Through the Use of Metrics

OUTSOURCE or INSOURCE A Datacentre Buy or Build Guide

Dealing with Thermal Issues in Data Center Universal Aisle Containment

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity

EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

Federal Data Center Consolidation Initiative (FDCCI)

Data Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert

Business Resiliency Business Continuity Management - January 14, 2014

Data Center: In House Outsource Optimize Options

Data Center Refresh: Build or Buy?

The business value of improved backup and recovery

TCO (TOTAL COST OF OWNERSHIP) CLIENT ALTERNATIVES TO PURCHASING

Proposal: Long Term Data Center Briefing Presentation. Information System Advisory Committee May 24, 2012

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

Data Center Operations

CONSIDERING CLOUD and ON-PREMISE ACCOUNTING SOLUTIONS. A Guide to Put Things in Focus

C24 - Inside the Data Center Andrew J. Luca

CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY.

Hybrid Cloud Mini Roundtable. April 17, Expect Excellence.

Building a Next Generation Data Centre in Hong Kong

Federal Data Center Consolidation Initiative

Building the Business Case for. Data Center Modernization

Market Pulse Research: Big Data Storage & Analytics

Cloud Computing. Introductions 10/20/2010

DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE

Below you ll find out how we helped clients with our Design, Consulting & Management services.

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

How green is your data center?

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

How To Design A Data Center

IT Club : Lloyd s and London Insurance Market

Factors to Consider When Developing a Cloud ROI. Michelle Olson

Data Center of the Future. Is it possible to be Efficient, Reliable and Cost Effective?

Server Consolidation for SAP ERP on IBM ex5 enterprise systems with Intel Xeon Processors:

Bridging the Gap Between IT and Facilities: Morgan Stanley Case Study

SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY

Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops

Introduction to AWS Economics

Disaster Recovery Planning and Implementa6on. Chris Russel Director, IT Infrastructure and ISO Compu6ng and Network Services York University

Enabling an agile Data Centre in a (Fr)agile market

Patrick Osterhaus President & CTO Protera Technologies Patrick@protera.biz

Re Engineering to a "Green" Data Center, with Measurable ROI

U.S. Nuclear Regulatory Commission

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

Introduction. Rising demand

EXECUTIVE REPORT. Build vs Buy: Key Steps to Overcome Capital Constraints in the Data Center

Data Center / Collocation Real Estate Dynamics

Global Headquarters: 5 Speen Street Framingham, MA USA P F

Getting Started with Business Intelligence

Data Center UPS Systems Why 1% Efficiency Matters

Total Cost of Ownership Analysis for Data Center Projects

Data Center Business Overview:

IT Economics: A Structured Approach to Identify, Measure and Reduce IT Costs. David Merrill Chief Economist Hitachi Data Systems

Agility Logistics Datacenter Trends in Enterprises. Ben N. Hasnai VP IT Infrastructure and Operations

Data Center Facility Basics

Engineers Ireland Cost of Data Centre Operation/Ownership. 14 th March, 2013 Robert Bath Digital Realty

Subject: County of Los Angeles Data Center Space Requirement

A New World Of Colocation

Leveraging the Cloud. September 22, Digital Government Institute Cloud-Enabled Government Conference Washington, DC

Scalability & Capacity Planning: Build vs. Buy

EXECUTIVE REPORT. Scalability & Capacity Planning: Build vs. Buy

CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE

Juniper Networks QFabric: Scaling for the Modern Data Center

mini data center facilities as a service: choosing the right infrastructure team Walter Miros / May 19, 2016

Common mistakes in datacentre planning

Convergence of Complexity

Technology & Innovation Conference. July 2015

Making Leaders Successful Every Day

Below you ll find out how we helped clients with our Design, Consulting and Management services.

Virtualization Technologies in SCADA/EMS/DMS/OMS. Vendor perspective Norman Sabelli Ventyx, an ABB company

Colocation Buyer s Guide. Learn the benefits of colocation and decide if a third party data center makes sense for your business.

Hosting Infrastructure. Data Centre Economics

Defining a blueprint for a smarter data center for flexibility and cost-effectiveness

Hospital IT and Facilities Special Report Top concerns in the hospital include budget, power requirements

By CDG 450 Connectivity Special Interest Group (450 SIG)

Top 5 Trends in Data Center Energy Efficiency

Data Center Colocation Build vs. Buy

Types of Prefabricated Modular Data Centers

June 27, 2011 Updated: July 29, 2011 Build Or Buy? The Economics Of Data Center Facilities

Who moved my cloud? Part I: Introduction to Private, Public and Hybrid clouds and smooth migration

Transcription:

HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing

Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820 www.plannet.net

Agenda ü What is a Data Center strategy? ü Ge;ng started ü Assessing the current state ü Developing a future state model ü Building a business case ü What your decision- makers want to know ü Case studies

Data Center Strategy A Data Center Strategy is usually inibated for any or all of the following reasons: ü Data Center failures are impacbng the business ü Growth is expected to exceed power, cooling and/or space capacibes ü Risk real or perceived ü Lowering Cost of OperaBon ü Improve systems availability and disaster recovery ü Inform a decision to build, co- locate or a combinabon of approaches

Ge;ng Started Define your objecbves ü Business drivers ü Technology imperabves ü Desired outcome Assemble a Core Team ü IdenBfy/appoint a project sponsor Sponsorship typically comes from Real Estate, FaciliBes or IT ü Typical make- up of a Core Team FaciliBes representabve (VP, Director) IT representabves CIO, IT Infrastructure VP, Network, user representabve(s) Procurement, sourcing and finance

IdenBfy Stakeholders ü A Data Center strategy has many stakeholders ü It s cribcal to engage to appropriate stakeholder resources to gain consensus and eliminate surprises ü Missing a key stakeholder is analogous to missing a Bre on your car

Gather InformaBon Formalize the project with a Stakeholder kick- off ü Introduce the inibabve and objecbves ü Layout Bmelines ü Set expectabons

Assessing the Current State Develop and issue a Comprehensive Request for InformaBon and meet with Stakeholders to gather informabon ü Some of the informabon is available electronically (e.g., CMDB, As- Built drawings, energy bills, etc.) ü Some of the informabon will be drawn out in Stakeholder meebngs (e.g., applicabon por\olio, financial models, etc.) RFI Categories ü Equipment/applicaBon inventory ü Data Center FaciliBes ü Real Estate ü OperaBons ü Network ü Business Systems & Services ü Business ConBnuity ü Finance ü Growth & Capacity Planning ü IT Strategic Plan

Assessing the Current State Key Points ü Establish current demand load KW is the currency ü Determine historical demand growth (3-5 years) ü Assess exisbng facility s aaribute and constraints (e.g., Tier rabng, power, cooling, space, SPOCs) ü IdenBfy applicabons and their Ber levels ü IdenBfy network constraints (e.g., latency sensibve applicabons) ü IdenBfy adjacency requirements/constraints ü IdenBfy key business & IT inibabves (e.g., new business ventures, merger/acquisibon, virtualizabon, etc.) ü Document outage history (many execubves are unaware of outages)

Outages.what outages? 11/18/2007 PRISM outage 3/12/2007 UPS Failure 16 hour outage 4,000 hours recovery effort 6/30/2008 Spokane ATS Failure 25 hour outage 6,300 hours recovery effort 12/31/2008 Failed UPS Transfer 4/1/2007 7/1/2007 10/1/2007 1/1/2008 4/1/2008 7/1/2008 10/1/2008 1/1/2009 4/1/2009 7/1/2009 10/1/2009 1/1/2007 10/26/2009 7/11/2007 Over Temp from Power Failure 5/16/2008 Power Upgrade Outage 12/8/2008 Sprinkler Work Power Outage 6/25/2009 Fire Panel AC Outage 23 hour outage 5,800 hours recovery effort

Future State IdenBfy the future state scenario ü Establish operabonal objecbves and service levels ü Establish availability targets Tier RaBng Geography ü Determine efficiency objecbves (PUE) ü Define sustainability goals ü Consider adaptability needs Plan for the Unplanned

Establish the Future State Determine relevant sourcing models ü Co- LocaBon ü Greenfield ü Tenant Improvement ü Retrofit ExisBng FaciliBes ü Cloud/Services Select markets to be evaluated ü Ideally, markets with co- locabon opbons, cheap power and free- cooling potenbal ü Determine business affinity to parbcular markets ExisBng operabons Business drivers ExisBng or future real estate or facility programs

Establish Demand Forecast Align business growth with IT growth ü OpBmize IT deployment as part of the deployment of a new data center 30,000 28,000 26,000 24,000 22,000 Capacity Demand Forecast Capacity Demand - k Watts 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 Un- optimized Managed Optimized

Establish Demand Forecast ü Establish capacity threshold vs. demand forecast ü Depict historical growth with future planning ü IdenBfy strategies to mibgate capacity constraints

Define Day 1/Day 2 Plan for incremental deployment based on demand forecast 16,000 Site 1 - Production Buildout Phases 14,000 12,000 k Watts 10,000 8,000 6,000 4,000 * DAY 1: 3,900 kw, 22.5K SF *DAY 2: 7,900 kw, 22.5K SF 2,000 0 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 Managed Forecast Deployed Capacity

Market Analysis Qualitative Metrics use to disqualify markets Energy ü Rates vs. Nat l average ü Sustainability ü Free cooling ü Reliability TelecommunicaBons Labor ü Diversity ü RelaBve costs ü Latency ü Availability ü RelaBve costs FaciliBes ü Control/Lease Terms TransportaBon/Accessibility ü Flight Availability ü Door to Door Time Vendor & Services Support ü Proximity to cribcal vendors Environmental Risk ü Seismic/Volcanic ü Hurricane/Tidal ü Severe Weather IncenBves (very dependent on properbes) ü Enterprise Zones ü Sales Tax ü Energy rebate programs

QualitaBve Market Rankings What s important to you? Keep it simple

Building a Business Case Determine Capital Expenditures Determine OperaBonal Expenditures Develop a MulB- Year Total Cost of Ownership for each model (5/10 yr) Compare TCO for each model

Determine CapEx & OpEx CAPEX OPEX ü ConstrucBon & Sok Costs (Greenfield, TI) ü Cable Plant ü Network Electronics ü DepreciaBon ü MigraBon ü Lease costs ü Power ü Maintenance ü Facility Management ü Security ü IT OperaBons Staff ü TelecommunicaBons ü Services ü Sales Tax ü MigraBon

Prepare TCO for each Scenario Co-Location Example E. Washington Co- Lo (Phase- In) 2011 Start Year 1 Year 2 Year 3 Year 4 Year 5 5 year Total Year 6 Year 7 Year 8 Year 9 Year 10 10- Year Total Operating Costs Power $ 46 $ 96 $ 154 $ 166 $ 178 $ 641 $ 192 $ 205 $ 220 $ 237 $ 254 $ 1,749 Predictive Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Rent $ 478 $ 915 $ 1,244 $ 1,269 $ 1,294 $ 5,201 $ 1,411 $ 1,439 $ 1,468 $ 1,497 $ 1,527 $ 12,542 IT Staff $ 90 $ 93 $ 96 $ 99 $ 102 $ 480 $ 105 $ 108 $ 111 $ 115 $ 118 $ 1,037 Facilities Staff $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Telecommunications $ 828 $ 845 $ 861 $ 879 $ 896 $ 4,309 $ 914 $ 932 $ 951 $ 970 $ 990 $ 9,066 Co- lo Setup Costs $ 120 $ - $ - $ - $ - $ 120 $ 17 $ - $ - $ - $ - $ 137 DC Equipment Sales Tax $ 128 $ 130 $ 133 $ 135 $ 138 $ 664 $ 141 $ 144 $ 144 $ 146 $ 146 $ 1,384 Operating Costs Subtotal $ 1,690 $ 2,079 $ 2,489 $ 2,548 $ 2,609 $ 11,414 $ 2,779 $ 2,828 $ 2,894 $ 2,965 $ 3,035 $ 25,916 Capital Costs DC TI $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Racks / Cabling $ 1,112 $ - $ - $ - $ - $ 1,112 $ 127 $ - $ - $ - $ - $ 1,240 Network Electronics $ 879 $ 188 $ 188 $ - $ - $ 1,256 $ 378 $ - $ - $ - $ - $ 1,633 Migration Costs $ 1,624 $ 915 $ 634 $ - $ - $ 3,174 $ - $ - $ - $ - $ - $ 3,174 Capital Costs Subtotal $ 3,615 $ 1,104 $ 823 $ - $ - $ 5,541 $ 505 $ - $ - $ - $ - $ 6,047 Depreciation $ 1,958 $ 1,288 $ 1,296 $ 410 $ 410 $ 5,363 $ 328 $ 290 $ 94 $ 94 $ 94 $ 6,262 Cash Flow $ 5,305 $ 3,183 $ 3,311 $ 2,548 $ 2,609 $ 16,956 $ 3,284 $ 2,828 $ 2,894 $ 2,965 $ 3,035 $ 31,963 Total $ 3,649 $ 3,367 $ 3,785 $ 2,958 $ 3,019 $ 16,777 $ 3,107 $ 3,119 $ 2,988 $ 3,059 $ 3,129 $ 32,178

Total Cost of OperaBon Tenant Improvement Example Seattle TI/Lease Year 1 Year 2 Year 3 Year 4 Year 5 5 year Total Year 6 Year 7 Year 8 Year 9 Year 10 10- Year Total Operating Costs Power $ 297 $ 320 $ 345 $ 371 $ 400 $ 1,734 $ 429 $ 460 $ 494 $ 530 $ 568 $ 4,216 Predictive Maintenance $ 131 $ 221 $ 279 $ 233 $ 240 $ 1,104 $ 247 $ 254 $ 262 $ 270 $ 278 $ 2,415 Rent $ 462 $ 476 $ 490 $ 505 $ 520 $ 2,453 $ 536 $ 552 $ 568 $ 585 $ 603 $ 5,296 IT Staff $ 250 $ 258 $ 265 $ 273 $ 282 $ 1,328 $ 290 $ 299 $ 308 $ 317 $ 326 $ 2,868 Facilities Staff $ 147 $ 151 $ 155 $ 160 $ 165 $ 778 $ 170 $ 175 $ 180 $ 186 $ 191 $ 1,680 Telecommunications $ 828 $ 845 $ 861 $ 879 $ 896 $ 4,309 $ 914 $ 932 $ 951 $ 970 $ 990 $ 9,066 Other Costs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - DC Equipment Sales Tax $ 131 $ 134 $ 137 $ 139 $ 142 $ 683 $ 145 $ 148 $ 148 $ 151 $ 151 $ 1,425 Operating Costs Subtotal $ 2,246 $ 2,405 $ 2,533 $ 2,561 $ 2,644 $ 12,388 $ 2,730 $ 2,820 $ 2,911 $ 3,009 $ 3,107 $ 26,966 Capital Costs DC TI $ 6,078 $ - $ - $ - $ - $ 6,078 $ 876 $ - $ - $ - $ - $ 6,954 Racks / Cabling $ 1,112 $ - $ - $ - $ - $ 1,112 $ 127 $ - $ - $ - $ - $ 1,240 Network Electronics $ 1,157 $ - $ - $ - $ - $ 1,157 $ 378 $ - $ - $ - $ - $ 1,535 Migration Costs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Capital Costs Subtotal $ 8,347 $ - $ - $ - $ - $ 8,347 $ 1,381 $ - $ - $ - $ - $ 9,728 Depreciation $ 796 $ 796 $ 859 $ 796 $ 796 $ 4,041 $ 716 $ 716 $ 557 $ 557 $ 557 $ 7,145 Total $ 3,041 $ 3,200 $ 3,392 $ 3,357 $ 3,440 $ 16,429 $ 3,447 $ 3,537 $ 3,468 $ 3,566 $ 3,664 $ 34,111 In thousands

Compare Models Annual Operating Costs Years 1-10 (in 1000's) Year 1 Year 2 Year 3 Year 4 Year 5 5 year Total Dif $ Dif % 10 Year Total Dif $ Dif % As- Is Owned $ 2,929 $ 3,125 $ 3,461 $ 3,661 $ 3,878 $ 17,054 $ - 0% $ 39,639 $ - 0% Optimized Owned $ 2,669 $ 2,869 $ 3,047 $ 3,232 $ 3,433 $ 15,251 $ (1,804) - 11% $ 35,527 $ (4,112) - 10% Market 1 Co- Lo $ 3,145 $ 3,117 $ 3,281 $ 3,298 $ 3,383 $ 16,224 $ (830) - 5% $ 33,773 $ (5,866) - 15% Market 2 Co- Lo $ 3,205 $ 3,188 $ 3,362 $ 3,391 $ 3,489 $ 16,635 $ (419) - 2% $ 34,896 $ (4,743) - 12% Market 3 TI / Lease $ 4,388 $ 3,653 $ 3,900 $ 3,882 $ 3,993 $ 19,816 $ 3,620 21% $ 44,423 $ 4,784 12% Market 4 Co- Lo $ 3,327 $ 3,400 $ 3,610 $ 3,677 $ 3,814 $ 17,828 $ 3,449 20% $ 38,203 $ (1,436) - 4% Market 5 TI / Lease $ 3,302 $ 3,497 $ 3,730 $ 3,717 $ 3,823 $ 18,068 $ 3,447 20% $ 38,071 $ (1,569) - 4% Market 6 Co- Lo $ 3,306 $ 3,368 $ 3,557 $ 3,622 $ 3,746 $ 17,599 $ 3,425 20% $ 37,778 $ (1,861) - 5%

Scenario Analysis Annual Operating Expense Comparison $10,000 Annual Operting Expenses (1,000's) $9,000 $8,000 $7,000 $6,000 $5,000 $4,000 $3,000 $2,000 $1,000 2009 2009 w/stabalization Scenario 2 $65.5M 10 Yr TOC 0 1 2 3 4 5 6 7 8 9 10 Year Scenario 2 Scenario 1 Scenario 3 Senario 1 $68.1M 10 Yr TOC Scenario 3 (Current- state with expansion) $58.7M 10Yr TOC

Case Studies Issues ü Aging primary data center in a high risk region ü Sub Tier 2 design ü History of outages ü Running out of capacity ü Facing major capital expenditures to retrofit the primary data center ü Lease expiring on Disaster Recovery site Major Regional Bank Results Analysis ü Assess deficiencies of exisbng facilibes ü Determine amount of Bme before the DC reaches capacity ü Evaluate low- risk markets ü Evaluate own vs. co- lo Outcome ü Move primary DC to co- lo ü Retrofit exisbng DC to Tier 2 ü Repurpose exisbng DC to sub- producbon and DR ü Improved availability with nominal increases in TOC

Case Studies Global Technology Company Issues ü 40+ data centers worldwide ü Growing through acquisibon ü Unsustainable operabng costs ü Unmanageable data center footprint ü Business driver to consolidate operabons ü Latency sensibvity from global engineering applicabons Results Analysis ü Assess operabon efficiencies and costs ü Evaluate mulbple markets and corporate owned real estate ü Evaluate geo- regional consolidabon alternabves ü Analyze enterprise architecture ü Evaluate own vs. co- lo Outcome ü Geo- regional consolidabon (N.A, ENAME, PAC- RIM) ü Deploy owned Tier 2+ ü MulB- site recovery ü $100M+ 10- year future cost avoidance

Case Study Issues ü Significantly high energy costs ü High- risk locabon ü Planning for significant business technology inibabves ü Facing future capital expenditures to uplik primary data center Global Entertainment Company Results } Analysis Assess deficiencies of exisbng facilibes Determine impact of new compubng demand Evaluate low- cost markets Evaluate own vs. co- lo } Outcome Expand primary DC to co- lo Leverage exisbng facility for business partner and DR Recommended phased deployment to opbmize ROI

Case Study Issues ü Aging primary data center in a high risk region ü Sub Tier 2 design ü History of outages ü Running out of capacity ü Facing major capital expenditures to retrofit the primary data center ü Affinity for in- State deployment Regional Healthcare Company Results } Analysis Assess deficiencies of exisbng facilibes Assess mibgabon strategies to buy Bme Evaluate regional markets Evaluate own vs. co- lo } Outcome Move primary DC to co- lo in a lower risk geography Repurpose exisbng DC to sub- producbon and DR Stabilize current environment Recommended best value alternabve

Thank you for your Bme!