STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure



Similar documents
ASBESTOS in state and local government

Procedures for Cutting and Handling of Asbestos Cement Pipe. City of Richmond Public Works Operations

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS

STANDARD OPERATING INSTRUCTION. Worksite Safety Traffic Management Procedure

HOW TO SAFELY REMOVE ASBESTOS

How to Safely Remove Asbestos

LEGAL REVIEW & UPDATE

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

ASBESTOS IN THE HOME

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

Asbestos in the home. Health and safety in the home. Asbestos in the home A

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

Asbestos Removal and Assessor Licensing Information

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards

ASBESTOS AND THE HOME RENOVATOR

Environmental Protection Information Sheet: 2. Advice on Asbestos

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS

asbestos management SECTION 21 SECTION CONTENTS ADDITIONAL READING Asbestos Management / Page1 / SECTION 21 TULANE UNIVERSITY

Asbestos

ASBESTOS CONTROL PLAN

Asbestos Work Permit Procedures

Asbestos Removal Procedures for Homeowners

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Policy on the Management of Asbestos

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

How to Properly Remove Cement Asbestos Board Siding

Asbestos removal and licensing

UBC Plant Operations Asbestos Work Procedures April 2004

Asbestos Management. 2. Introduction. Contents

ASBESTOS MANAGEMENT PROGRAM

WHS Contractor Management Procedure

How To Deal With Asbestos In Minster Of Minsteria

Asbestos frequently asked questions

have been provided with information on whether they do or do not contain asbestos before starting work;

WOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT

Asbestos Management Procedures

Asbestos licensing and notification guide for applicants

UI Procedures for Asbestos Management

Guide for applicants for asbestos removal and asbestos assessor licences and notifications

Asbestos Management Policy (Version 3)

ASBESTOS REGULATIONS Government Notice No 155 Gazette No dated 10 February 2002

Lead Management. Presented by: Gary Chinn (815) President, Best Technology Systems

Excavation & Trenching Procedure

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship

Management of asbestos in recycled construction and demolition waste

Policy for the Management of Asbestos in the Workplace

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

Removing asbestos in workplaces

LIVING WITH FIBRO JUNE 1998 WORKCOVER NSW HEALTH AND SAFETY NOTES. WorkCover. Watching out for you.

Asbestos Policy & Procedure

OCCUPATIONAL HEALTH AND SAFETY AUTHORITY ACT (CAP. 424) Protection of Workers from the Risks related to Exposure to Asbestos at Work Regulations, 2006

Asbestos in your home

Lead Exposure Management Plan

Asbestos in Grounds Management Plan, Matraville Soldiers Settlement Public School, Matraville, NSW

WHS CONTRACTOR MANAGEMENT PROCEDURE

CHEMICAL SPILL MANAGEMENT GUIDELINES

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK

Dealing with. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS

EVERYONE'S RESPONSIBILITY

Decontamination Units

Asbestos in the home. WHERE it may be found WHAT to do if you find it. Date: 15/08/14

POLICY Contents. 1.0 Introduction Statement

ASBESTOS MANAGEMENT PROGRAM

Asbestos. from the Home. Removing. Read this booklet for:

Asbestos Disposal in the Northern Territory

CWM Technical Guideline

ASBESTOS MANAGEMENT POLICY

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Facilities management Contractor Safety Guideline

REVISED. Cutting, Handling and Disposal of. Asbestos Cement (AC) Pipe Guidelines JUNE 2014 PMS > CMYK > REVERSED >

Regulatory Services. Asbestos in the Home. What is asbestos?

Containment and disposal of asbestos contaminated dust and debris arising from fire damaged buildings. Guidance note

Guide Document for Development of WHS Management Plans

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

Confined Space Management Procedure

Asbestos Storage Facility Plan Examples

Asbestos Policy and Management Plan

Pollution Incident Response Management Plan

Asbestos: Guidelines for Managing Asbestos in Buildings

OHSMS Implementation Guide

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

H2 Opening Statement Asbestos

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

The Management of Asbestos containing Materials

ASBESTOS CONTROL PROGRAM

Course Guidelines. Occupational Health and Safety for the Asbestos Worker

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

Guidance sheet 4: Chemical Spill Management

Asbestos Management & Abatement

WHS CONTRACTOR MANAGEMENT PROCEDURE

Decontamination of the victim. Protection of medical personnel. Disposing of contaminated protective equipment and wash solutions.

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

CONTRACTOR INDUCTION HANDBOOK

BLR s Safety Training Presentations

Transcription:

STANDARD OPERATING INSTRUCTION Safe Handling and Removal of Asbestos Cement Pipes Procedure 1 July 2012

Title System Reference Number Approved By Safe Handling and Removal of Asbestos Cement Pipes People and Wellbeing SOI-GVW-310 Manager Operations Date Approved 1 July 2012 Next review date 1 July 2015 Note: With each edit to this document, the following must be completed. Also if a document is being reviewed and there are no changes, it should be noted that the review was undertaken and the next review date updated. Details of Review/Changes Date Description Modified By Approved By 01/07/12 Document reviewed S H & W Coordinator Manager Operations 26/10/12 Updated to new template Christina H Peter K 30/07/13 Minor amendment adding WorkSafe online Asbestos Removal notification (ref Section 6.4) SH&W Co-ord. SH&W Co-ord. Last modified: 1 July 2012 Page 2 of 11 Reference Number: SOI-GVW-310

1.0 Purpose and Scope To detail the health, safety and documentary requirements for GVW employees carrying out the repair and removal of non friable asbestos cement water and waste water pipes and to ensure compliance with legislative requirements of the Occupational Health and Safety Regulations 2007. This applies to the repair, connection, removal, handling or transportation of asbestos cement pipes. This document also includes repairing, tapping or altering polyethylene pipes that have been installed by pipe bursting asbestos cement pipes. This is on the basis that broken asbestos cement pipe material could remain in the ground close to the new polyethylene pipe. 2.0 References and Relevant Legislation and Publications Occupational Health & Safety Regulations 2007; Occupational Health & Safety Act 2004; Environment Protection Act 1970; 3.0 Definitions Environment Protection (Prescribed Waste ) Regulations 2009; and EPA Information Bulletin: Instructions for completion of waste transport certificates (Published Dec. 2007). PPCE AC GIS SOI PE Personal Protective Clothing and equipment Asbestos Cement Geographic Information System Standard Operating Instruction Polyethylene 4.0 Responsibilities and Authorities 4.1 PAW Administration Officer Ensure prospective applicants, who may be required to remove asbestos cement pipe as part of their work, are provided with information about medical examinations and the risks of asbestos exposure; Coordinate asbestos training and refresher training for all relevant employees; and Maintain records of training for individuals and update the training data base. Last modified: 1 July 2012 Page 3 of 11 Reference Number: SOI-GVW-310

4.2 SH&W Coordinator Coordinate initial and follow up asbestos medical examinations for all relevant employees every 2 years; Maintain Goulburn Valley Water s Register and Risk Assessment of Asbestos Containing Materials (not including asbestos cement water pipes) and review every five years; and Liaise with WorkSafe regarding Goulburn Valley Water s asbestos removal licence. 4.3 District Manager / Manager Identify AC mains including existing, abandoned and/or replaced by pipe bursting, are shown correctly on the GIS, with appropriate notes to assist; Ensure new employees attend an asbestos medical examination before any asbestos removal work is undertaken for the first time; Ensure employees attend an update asbestos medical examination every 2 years; Ensure employees who cease asbestos removal (including employees who have resigned) are offered an asbestos medical examination within 30 days of ceasing asbestos removal activities unless the employee has had a medical examination in the last 12 months; Provide a visible commitment to the program by undertaking regular on-site visits and participating in checking on-site conditions; Ensure employees have completed authorised asbestos removal training including training in this procedure before any asbestos removal work is undertaken for the first time; Once trained authorise employees to carry out asbestos removal works; Ensure all records of asbestos removal are accessible and retained for a minimum of 2 years after the completion of the asbestos removal works. Ensure records are made available on request to a WorkSafe Inspector; Discipline employees who do not follow the correct procedures; and Ensure asbestos waste removed from GVW s storage sites (Depots) to any EPA licensed waste treatment facility leave the site in accordance with EPA s Environment Protection (Prescribed Waste) Regulations. 4.4 Works Coordinator / Supervisor Monitor to ensure employees follow the procedure for safe removal of asbestos cement water pipes and refer any failure by a staff member to the District Manager/Manager; Ensure new staff members do not carry out asbestos removal without completing the appropriate training and medical examination; Last modified: 1 July 2012 Page 4 of 11 Reference Number: SOI-GVW-310

Ensure an approved Asbestos Supervisor has been nominated for each asbestos removal activity; Liaise with Asset Performance, and where required complete the GIS As Constructed Advice, for GIS updates and amendments to asbestos cement pipe locations; Ensure a copy of Goulburn Valley Water s Asbestos Removal Licence is readily accessible at each asbestos removal site; and Carry out periodic audits of asbestos removal activities to ensure employees are following Goulburn Valley Water s asbestos removal procedures. 4.5 Asbestos Supervisors Participate in initial and refresher asbestos training; Ensure compliance with the GVW procedures at individual work sites; and When requested visit the asbestos removal site to provide assistance on asbestos removal matters. 4.6 Employees Participate in asbestos training and medical examinations when required; Follow all requirements within this procedure; Report any defective equipment to the Work Coordinator and not use this equipment until it is repaired or replaced; and Ensure that records of asbestos training (employees training record card) is readily accessible at the asbestos removal site. 5.0 OHS HAZARDS AND CONTROLS 5.1 Hazards Plant and Equipment Hazards: Backhoe, FEL, excavator; Hazardous Materials Hazards: Exposure to Asbestos Fibres; Dangerous Goods Hazards: Nil; Environmental Hazards: Power, Gas, thermal; and Atmospheric Hazards: Exposure to Asbestos Fibres. 5.2 Controls Engineering controls: Use of Non Powered Tools to cut asbestos pipe, wetting down of pipe; Administrative controls: Safe Removal of Asbestos Cement Water Pipes; Personal Protective Equipment: P2 Disposable Mask, Disposable Coveralls, Disposable Gloves, Gum Boots; and Last modified: 1 July 2012 Page 5 of 11 Reference Number: SOI-GVW-310

Other Safety Equipment: Nil 6.0 PRELIMINARY MATTERS 6.1 Training 6.1.1 No employee is permitted to remove or repair AC Pipes without completing an approved training course on Asbestos Removal. Employees must also be authorised by the District Manager to carry out asbestos removal works; 6.1.2 Records of Training shall be included on an employee s personnel file. A summary listing of the training is maintained on the Training Records located in HRSS; 6.1.3 A training record card will be issued by the training provider to all employees who complete asbestos removal training. This card must be readily accessible at the asbestos removal site; and 6.1.4 Employees will undertake refresher training every two years. 6.2 Asbestos Medical Surveillance and Information to Job Applicants 6.2.1 All employees who have been or are likely to be involved in work with asbestos or asbestos based products shall undergo an Asbestos Medical Examination in accordance with the recommendations of the National Health and Medical Research Council s (NHMRC) guidelines for asbestos/silica medical examinations; 6.2.2 Asbestos medical examinations shall be provided before an employee commences asbestos removal work for the first time; 6.2.3 Ongoing medical assessments shall be provided every 2 years; 6.2.4 An exit asbestos medical examination is required to be provided to employees within 30 days after they cease asbestos removal works unless a medical examination was completed in the last 12 months; 6.2.5 Examinations shall be carried out at the Corporation s expense and during normal working hours (further information is available in SOI- GVW-311 Occupational Health Monitoring); 6.2.6 A copy of the results of the medical examination shall be provided by the medical practitioner to each employee. A summary of the results is required to be kept by GVW on the employee s personnel file; and 6.2.7 Information about the risks associated with exposure to asbestos and the need for and details of asbestos medical examinations will be provided to new job applicants who may be required to remove asbestos as part of their work with Goulburn Valley Water. For further details refer to Quality Form: QF-GVW-310 Asbestos Removal Information Sheet for new employees. Last modified: 1 July 2012 Page 6 of 11 Reference Number: SOI-GVW-310

6.3 Asbestos Supervisors 6.3.1 As per Regulation 4.3.62 an Asbestos Supervisor must be appointed for each asbestos removal job. This person must be trained to oversee AC removal work and provide additional guidance to work crews as required; 6.3.2 As per Regulation 4.3.63 an Asbestos Supervisor must be accessible by telephone during removal works and where assistance is required attend the removal site; 6.3.3 Asbestos Supervisors will receive additional training on their roles and responsibilities under the OH&S Regulations 2007; and 6.3.4 District Managers are required to nominate Asbestos Supervisors to WorkSafe via the SH&W Coordinator. All Asbestos Supervisors are listed on Goulburn Valley Water s Asbestos Removal Licence and the Site Safety Risk Assessment form. 6.4 Notification of Asbestos Removals to WorkSafe 6.4.1 Unplanned Works (includes, breakages and burst mains) - Goulburn Valley Water s asbestos removal licence allows exemption from the usual notification to WorkSafe for unplanned removal works. 6.4.2 Planned works >10 square metres Notification to WorkSafe must be made at least 5 days before removal works are undertaken. 6.4.3 Planned works < 10 square metres Notification to WorkSafe must be made at least 2 days before removal works are undertaken. Important notes: 10 square metres is equivalent to the following linear metres for various pipe diameters: Note: Online notification to WorkSafe now available: www.worksafe.vic.gov.au/notifyasbestosremoval Nominal Diameter of Pipe Equivalent length (m) to 10m2 based on O.D. 100mm 25 150mm 18 200mm 13 225mm 12 250mm 11 300mm 9 375mm 7.5 450mm 6 6.4.4 Tapings Do not need to be notified to WorkSafe Notification for planned works must be made by fax to the Shepparton WorkSafe office using an Asbestos Notification form (available on SharePoint). 6.5 Asbestos Control Plans and Records or Removal Last modified: 1 July 2012 Page 7 of 11 Reference Number: SOI-GVW-310

6.5.1 As per the Asbestos Regulations an Asbestos Removal Control Plan must be completed prior to each asbestos removal job. The asbestos control plan forms part of Goulburn Valley Water s High Risk Works Site Risk Assessment. 6.5.2 This plan summarises the safety controls listed in this SOI. Control Plan records must be kept for a minimum of 30 days by the local District, and be able to be provided to WorkSafe on request. 6.6 Asbestos Risk Assessments 6.6.1 In accordance with the Asbestos Regulations, Goulburn Valley Water will examine all of its assets to locate and identify any asbestos containing materials. The location of AC water pipes, (including existing, abandoned and/or replaced with PE pipe by pipe bursting) are identified on the GIS. Other in-situ asbestos (e.g. contained in buildings) will be listed on a register maintained by the SH&W Coordinator and recorded in SharePoint under IMS/OHSMS/Hazards-High Risk Works - Asbestos Risk Assessment Survey. 6.6.2 These documented lists will be the basis of Goulburn Valley Waters Register and Risk Assessment of Asbestos Containing Materials. 6.6.3 The Asbestos Register will be updated as asbestos materials are removed or identified and the risk associated with any identified material assessed. Appropriate control measures shall be implemented to ensure the workplace is safe. As per Regulation4.3.27 (6) (b) Asbestos containing building products must be, where practicable, identified by labelling. 6.7 Use of Contractors Contractors may not be used by GVW to remove asbestos cement pipes unless the contractor has an asbestos removal licence or engages a licensed asbestos removalist to carry out the works. For installation of tappings on PE pipelines, which have been installed by pipe bursting, the Corporation will be responsible for excavating the main, removing any AC pipe material, and providing a clear section of pipe for tapping. 6.8 Personal Protective Clothing and Equipment Employees involved in the cutting, removal, bagging and wrapping of asbestos cement pipe must wear the following PPCE: 6.8.1 A correctly fitted disposable Half Face Mask with P2 rating or Disposable P2 Respirator as per Australian Standard AS 1715.No employee shall commence any asbestos removal works unless they have achieved a satisfactory fit test with the respirator correctly positioned on the face. It is not possible to obtain a satisfactory fit test if there is excessive facial hair present. Personnel who wear glasses should ensure that the glasses do not interfere with the respirator fit. Last modified: 1 July 2012 Page 8 of 11 Reference Number: SOI-GVW-310

7.0 PROCEDURE 6.8.2 A pre-filter shall be used, which assists to prolong the life of a filter cartridge and also offers additional protection shall be used wherever possible. This must be disposed of as asbestos waste for each asbestos removal job. 6.8.3 Persons with beards, excessive facial hair or those that cannot achieve a satisfactory fit using a half face mask must wear a positive pressure full face piece hood/mask. 7.1 Pre Work Disposable coveralls (Type 5); Safety gumboots; and Gloves. 7.1.1 Identify the pipe material by referencing the GIS to determine if the pipe material is AC or PE pipe material that has been installed by pipe bursting an AC pipeline. 7.1.2 Notify WorkSafe (as per Clause 6.4) for planned removal works. For unplanned work proceed to 7.1.3. 7.1.3 At the worksite complete Asbestos Risk Control Plan and Record. 7.1.4 Ensure immediately adjacent employers are informed of the asbestos removal works. This can be either verbally or using GVW interruption cards. For work outside normal business hours employees should assess the need to inform immediately adjacent employers. 7.1.5 Erect adequate barricades and signage to protect the public from excavation and asbestos hazards. Where practicable this will be at a minimum distance of approximately ten metres from the process. Ensure persons not involved in the asbestos removal process do not enter the area. 7.1.6 Ensure all equipment including the following is on hand for the removal works: Adequate water for decontamination; All PPCE required; and Plastic for disposal of asbestos waste and discarded PPCE. 7.1.7 Carry out safe excavation as per SOI-GVW-308 Working in Excavations - Trenches and Shafts. 7.1.8 Carefully uncover pipe to remove or repair section. Once exposed manual excavation should be used to minimise further damage to the pipe. Last modified: 1 July 2012 Page 9 of 11 Reference Number: SOI-GVW-310

7.2 Cutting and Disposal 7.2.1 Wear PPCE before commencing any works that may release asbestos fibres or create AC dust or AC pipe fragments. 7.2.2 Prepare plastic for the disposal of contaminated PPCE and asbestos waste. 7.2.3 Thoroughly wet area to be cut to further reduce the release of dust containing fibres when cutting (ie before cutting starts and during cutting ensuring it is wet at all times).where there is an interruption to normal water supplies, sufficient water may need to be transported to the site. 7.2.4 Only use non-powered hand tools, such as Reed cutters, chain cutters or hand saws as these generate a smaller quantity of predominately coarser dust or waste chips. Power tools and abrasive cutting or sanding discs must not be used on asbestos cement products. Alternatively, break AC pipe collar with a hammer or similar implement. 7.2.5 Remove section of pipe from trench including all off-cuts, residue, soil and any collected dust before disposal as asbestos waste. 7.2.6 Double wrap asbestos cement pipe in plastic sheeting and collect small quantities. Ensure plastic sheeting is fully sealed with duct tape and labelled Asbestos Waste before transport back to the depot. 7.2.7 Dispose of disposable clothing, disposable type respirators, all pre-filters and filter cartridges (where the operator has identified the filter has reached capacity and needs replacement) and disposable gloves by wetting down before placing with asbestos debris. All disposable PPCE shall be used once only and disposed of after use. 7.2.8 Non-disposable PPCE eg gumboots and silicone rubber half face masks shall be rinsed clean. 7.2.9 All tools and equipment shall be washed down prior to removing them from the excavation. 7.2.10 Wash hands immediately after handling AC pipe. Following work with AC pipe, employees should shower at the end of the working day. 7.2.11 Thoroughly clean half face respirator, dispose of pre-filter as asbestos waste. Care should be taken not to wet cartridge filter, replace and dispose of as asbestos waste when breathing becomes difficult. Store mask in designated airtight container with either new pre-filter in place over filter or testing disc. 7.2.12 All double wrapped asbestos waste shall be securely loaded onto a Goulburn Valley Water vehicle and transported from the work site to the depot. The material must be transported directly from the work site to the depot and not to another location except in accordance with EPA requirements for transport and disposal of Asbestos. 7.2.13 At the depot the waste shall be stored in a secure skip bin for disposal. Last modified: 1 July 2012 Page 10 of 11 Reference Number: SOI-GVW-310

APPENDICES Nil Each depot shall contain a dedicated and secure skip bin that shall hold the appropriately wrapped bundles of waste. The skip shall be labelled Asbestos Waste. No other material may be disposed inside the skip. Disposal of stored material shall occur by transferring to an EPA approved Waste Disposal Site by an approved and permitted waste disposal contractor. The waste will be removed from the storage containers at each depot on as needs basis. 7.2.14 Pass on information to Work Coordinator so that update to GIS and Hansen Systems can be made regarding changes to location of asbestos cement pipes. 7.2.15 Place Asbestos Control Plan and Record of Removal, on job file. 7.3 Documentation (Transport of Asbestos Waste) Asbestos Waste storages at GVW sites are required to be transported to an EPA licenced waste treatment facility. Waste transport certificates are required under the Environment Protection (Prescribed Waste) Regulations 2009 to tack the movement of prescribed industrial waste (PIW) from cradle to grave. It is the responsibility of the waste producer (GVW in the case of asbestos), transporter and receiver to ensure that accurately completed waste transport certificates accompany each load. GVW s responsibility requires Part A of the waste transport certificate to be completed. Part B is completed by the transport operator and Part C completed by the waste treatment facility. Completed documentation is required to be mailed to EPA by the waste treatment facility (receiver) within 7 days. GVW has no obligation other than ensuring the completion of Part A of the Transport Certificate. The green carbon copy of the certificate is to be retained by the waste producer with Parts A & B complete for 24 months. See Part A Environmental Protection Authority Waste Transport Certificate for details on how to complete the form (available on SharePoint). Last modified: 1 July 2012 Page 11 of 11 Reference Number: SOI-GVW-310