ITIL and Data Center Migration



Similar documents
Problem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies

ITIL Essentials Study Guide

Hong Kong Information Security Group TRAINING AGENDA

Predictive Intelligence: Identify Future Problems and Prevent Them from Happening BEST PRACTICES WHITE PAPER

CA Service Desk Manager

Storage Management Within the NEW ITIL Version 3 Context. Dr. D. Akira Robinson, IT Governance Management, Ltd. Dept of Navy

Keys to a Successful Data Center Relocation

ITIL A guide to service asset and configuration management

Project Management Change Management Procedure

FLORIDA COURTS E-FILING AUTHORITY HELP DESK POLICIES & PROCEDURES

About this guide. 4 The syllabus requires knowledge of this topic This is material that may be of interest to the reader but is

NASCIO EA Development Tool-Kit Solution Architecture. Version 3.0

Empowering the Enterprise Through Unified Communications & Managed Services Solutions

WHITEPAPER. 10 Simple Steps to ITIL Network Compliance

Incident Management: A CA IT Service Management Process Map

ITIL. Lifecycle. ITIL Intermediate: Continual Service Improvement. Service Strategy. Service Design. Service Transition

What are metrics? Why use metrics?

Complimentary Relationship Between ITIL and PMBOK

Integrating Project Management and Service Management

Roles within ITIL V3. Contents

Free ITIL v.3. Foundation. Exam Sample Paper 4. You have 1 hour to complete all 40 Questions. You must get 26 or more correct to pass

EDUCORE ITIL FOUNDATION TRAINING

Module 1 Study Guide

Program Lifecycle Methodology Version 1.7

LANDesk Service Desk Certified in All 15 ITIL. v3 Suitability Requirements. LANDesk demonstrates capabilities for all PinkVERIFY 3.

Bringing wisdom to ITSM with the Service Knowledge Management System

Ohio University Office of Information Technology

Best practices in project and portfolio management

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Processes and Best Practices Guide

Case Study. SNW Asset Management. (866)

BSM Transformation through CMDB Deployment. Streamlining the Integration of Change and Release Management

ELIMINATE RECURRING INCIDENTS

HP Service Manager software

Modeling The Enterprise IT Infrastructure

Commonwealth of Massachusetts IT Consolidation Phase 2. ITIL Process Flows

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY

Requirements and Recommendations for the Realization of a Configuration Management Database

ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists

VOLUME 4, NUMBER 1, JANUARY Alloy Navigator 5: Robust New Service Management Solution Slated for Release

Deploying the CMDB for Change & Configuration Management

HP Service Manager. Service Desk help topics for printing. For the supported Windows and UNIX operating systems. Software Version: 9.

Best Practices in ICS Security for Device Manufacturers. A Wurldtech White Paper

Magento Enterprise Edition Customer Support Guide

Configuration control ensures that any changes to CIs are authorized and implemented in a controlled manner.

Panorama Software Software Maintenance and Technical Support Services Policy

The Challenges of Administering Active Directory

Which statement about Emergency Change Advisory Board (ECAB) is CORRECT?

Introduction to OpenUP (Open Unified Process)

Basic Unified Process: A Process for Small and Agile Projects

CACI Cloud Consulting Services

WHITE PAPER. iet ITSM Enables Enhanced Service Management

Solution brief. HP solutions for IT service management. Integration, automation, and the power of self-service IT

CA Service Desk Manager

Service Catalog. it s Managed Plan Service Catalog

Service Level Agreement Between: Computing and Informational Technology And The Finance and Business Operations Division

END TO END DATA CENTRE SOLUTIONS COMPANY PROFILE

Managed Print Programs

ITIL Service Lifecycles and the Project Manager

Application Incident Management

DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN. Version : 1.0 Date : April 2009 : Pink Elephant

Optimizing the Data Center for Today s Federal Government

Practice makes perfect Simulation games to increase the return-on-investment of ITIL training

Gleaning Wisdom from Data

IT Asset Management in Today's Complex Data Center

The ITIL v.3. Foundation Examination

Optimizing the Data Center for Today s State & Local Government

ITIL Managing Digital Information Assets

USFWC Project Management Workshop May 31 st, 2014

PLM System Integration

Business Continuity and Disaster Recovery Service & Solutions. Kevin Kelly: President - Agile360 Kevin Burton: President - Burton Asset Management

Creating a Service-Oriented IT Organization through ITIL

White Paper. Change Management: A CA IT Service Management Process Map

Introduction. What is ITIL? Automation Centre. Tracker Suite and ITIL

Firewall Change Management

Business Process Discovery

QUICK FACTS. Replicating Canada-based Database Support at a New Facility in the U.S. TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Service Desk help topics for printing

11 Tips to make the requirements definition process more effective and results more usable

N(i) 2 WHITE PAPER on CHANGE MANAGEMENT

KIFINTI. Kifinti White Paper. IT Asset Management Four Steps To Implementing an Effective IT Asset Management Strategy. Paul Kelsey 4/1/2012

How to Deliver Measurable Business Value with the Enterprise CMDB

1 Why should monitoring and measuring be used when trying to improve services?

Service Catalog Management: A CA Service Management Process Map

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Incident Management help topics for printing

Transcription:

A White Paper by A L T U S T E C H N O L O G I E S C O R P O R A T I O N 6100 Oak Tree Blvd, Suite 200 Independence, Ohio 44131 440-746-9000 www.altustech.com ITIL and Data Center Migration By Linda Owen, ITIL Executive Consultant Business Development Analyst Date 04/13/11

Contents Introduction Problem Statement Previous Options Altus Solution Implementation Summary 2 2 2 3 5 6 Introduction Data Center Migrations are among the most complex projects for the business environment. The planning activities for migrations are among the most critical of the requirements. The migration teams involved need to have a primary focus for developing the migration project plan as their first priority. Attention to preparedness of the ITIL services management, which will be supporting the migration execution, often times falls to the sidelines with much less priority focus. Problem Statement By not including an ITIL evaluation of the customer s key process controls (problem, change & configuration management) as an integral part of the migration planning activities, the risk to the business becomes an unknown for assurance of sufficient process controls for migration support. For the successful delivery of the migration project, the unknowns around process controls needs to be reviewed, identified and addressed as part of the planning activity expectations for the effective management and execution of the migration move events. Previous Options If the customer does not deem the ITIL process evaluation as a vital part of the migration activities, the data center migration team would typically assume the task of reviewing the key customer process controls by default as a needed requirement of the overall migration planning. If the key process controls strengths are thought to be in question, create a workaround for temporary process control plans by obtaining as much information as possible during the project planning and data gathering activities with the customer.

Altus ITIL Solutions Altus offers ITIL systems management consulting solutions as stand-alone consulting service offerings as well as coupled with data center migration offerings: The stand-alone ITIL systems management offering can support any of the 20 processes in the ITIL services lifecycle for assessment, design and implementation. The ITIL systems management offering coupled with data center migration offering has primary focus on the three key system management process areas of change, problem and configuration management. Additional process areas can be supported per request.

Altus ITIL Solutions Benefits Including an ITIL process evaluation as a dedicated task activity in the data center migration project ensures the key process controls of problem, change & configuration management will be reviewed and validated for sufficient ability to support the migration project by a certified ITIL consultant. The Altus ITIL consultant is a service management professional certified in ITIL process controls with extensive field experience across industries with data center operations systems management and migrations of various types. Also, having the ITIL process consultant manage the migration process controls support tasks is to eliminate several risks that can be introduced to the migration execution if performed by the migration team architects and PM s: Additional time and activity spent supporting process control planning with the customers as opposed to primary focus on core migration project planning activities Process control research activity being performed as a sideline event lacking trained and experienced ITIL knowledge Data gathering primarily done during migration planning sessions causing both tasks to possibly suffer time constraints Risks of having gaps in the temporary process control plans where unknown gaps may be discovered during a move event Another benefit from the Altus ITIL consultant evaluation is the sharing of best practice knowledge and guidance with the customer operations support teams during the evaluation activities to help them understand possible gaps and improve process and procedures within the three core system management processes. In summary, including an ITIL process evaluation as an integral part of the data center migration project is beneficial for these key reasons: A data center migration is driven by business initiative and must meet stringent business objectives Bringing the workload back online fast with minimal disruption to day-to-day activities. Minimize risk to maintaining service levels during the relocation planning and implementation. Avoiding downtime that can cost thousands of dollars a minute. Performing the due diligence for the key process controls to sustain the data center migration activities Knowledge sharing in support of continuous improvement across the service management environment as applicable

Implementation The data center migration ITIL review will include baseline activities for evaluation of these three key system process controls to maintaining service levels: Change Control process - Is the existing customer change control process documented and disciplined to effectively manage changes and end user communications? - Does the existing customer change control process automatically link into the customer configuration information (CI database) for updates to all IT changes? Problem Management process - Is the existing customer problem management process documented and disciplined to effectively manage problems and end user communications? - Can the data center migration team to effectively manage the data center migration problem situations utilize the existing customer problem ticket system? Configuration Management process - Does the existing customer configuration information support changes to both physical and logical IT assets that will be associated with the data center migration? - Can the customer configuration information (CI database) be used as a document of integrity for system data representation for the data center migration? The outcome of systems controls evaluation determines if additional control processes or procedures are needed to warranty the data center migration: Should this evaluation determine insufficient ability within the customer s existing process controls for migration support in any of the three process areas mentioned, the ITIL consultant will work with the customer teams and the migration team to design, document and implement a sufficient workaround process (or temporary process) to ensure the successful delivery of the migration move events. - This may be a temporary augmentation to these customer processes and/or procedures - Or, a temporary replacement process or procedure developed to be used by the data center migration team and the associated customers with possible vendor representatives participating in the migration activities.

- In either case, these will be temporary process controls used for the data center migration activities only. - These temporary process controls developed for the migration project will be owned and removed by the Altus team upon the close of migration project. The ITIL consultant will monitor the workaround process control plan throughout the phases of the migration move events to refine and/or adjust process controls as needed. This monitor activity is needed due to the unknowns that are typically associated with any type migration activity and is seen as part of the overall migration project contingency planning activities. Summary The Altus ITIL solution coupled with data center migration will allow the migration architects and technical project managers to focus specifically on the migration project planning and delivery readiness, which is a much better use of their time and skills. The Altus ITIL consultant works with the data center migration team and the customer migration teams in performing the key process evaluations and creating the process support plans for a custom fit of the migration move event requirements. Also, over the course of the migration activities, the Altus ITIL consultant has the professional training and years of field experience in the ITIL process controls arena, supporting data center migrations and other IT system management projects, to share valuable tips and provide best practice guidance to the customer with respect to their continuing review of the their process controls to identify and address service management deficiencies.